Golden State Warriors
Event Center & Mixed-use Development
at Mission Bay
SFMTA Board Policy Advisory Group
October 16, 2015
2
Setting
3
Site Plan
4
Street View
5
Baseline Improvements
6
Arena Specific Improvements
7
Preliminary Event Plan (DSEIR)
DSEIR Analyzed Arena Path of Travel
PCO (DSEIR location)
On-site Mgmt Center
Event Enforcement Services (DSEIR)
8
Final Supplemental EIR
DSEIR Analyzed Arena Path of Travel
PCO (DSEIR location)
On-site Mgmt Center
PCO (FSEIR added location)
Expanded Event Enforcement Services (FSEIR)
9
L/HAP
DSEIR Analyzed Arena Path of Travel
Local/UCSF Circulation
Owens Street Local Access (Arena Traffic
w/o Pre-Paid Local Parking Assignments
Discouraged)
PCO (DSEIR location)
On-site Mgmt Center
PCO (FSEIR added location)
PCO (L/HAP added location)
Local / Hospital Access Plan (L/HAP)
Proposed Southern Parking
10
• November 3 – OCII Final Certification Hearing (am)
• November 3 – SFMTA Board Hearing (pm)
• 2016 – Arena Construction Scheduled to Begin
• 2018 – Scheduled Arena Opening
11
Next Steps
Adam Van de Water Peter Albert
Project Manager, OEWD Manager Urban Planning Initiatives, SFMTA (415) 554-6625 (415) 701-4328 [email protected] [email protected]
12
Questions?