Strasbourg/Mulhouse Fast Test Box with LEDs
GOAL :
bonding test before and after (and during ?) one thermal cycle
J.P. Ernenwein (UHA), G. Gaudiot (IReS), T. Goeltzenlichter (IReS), J.M. Helleboid (IReS), C. Hoffmann (IReS)
SUMMARY :
ARC + TRHX + Peltiers cooling + LEDs SFH 4501 + Pulser 2 channels + LEDs driver card + copper box inside polyurethane + one module
Modules Test Meeting, 05/12/2001
LEDs array supports
Transport Plate
Guiding system
Copper piece for cold air forced circulation
Dry air input : used only at beginning
Peltier elements
Copper Box inside Polyurethane
Supercool DL-290 :cooling power/Peltier =100W @ ? T=40°C
Fan (1W) Hybrid (3W)Module
Leakage = 6W
Front end card
LEDs control
LEDs = SFH 4501, 950 nm, 5 mm diameter : 32/array ie 128 for 4 arrays
Distance between 2 LEDs emitting center = 4.57 mm :
pulser
LED light
10ns
Pulser 2 outputs
ARC
NI PCI I/O card for LEDs switch
Delay and different shapes
LEDs arrays in box
logic
LEDs control
Temperature/Humidity control : one TRHX system from Vienna (M. Friedl) : has a TTL output used to switch on/off Peltiers elements
Readout with ARC system on external trigger
LED selection with Labview software
Status :- LEDs arrays and control card are ready
(we have 3 setups)
- Box (mechanics) will be ready soon .
- We can give some LEDs.
- We have one ARC system.
- We have one TRHX system and Peltiers.
- Low voltage supplies are available, but for high voltage we plan to buy a Keithley one.
Strasbourg/Mulhouse LEDs test bench