gloucester racf and ilu clement street, gloucester · gloucester racf and ilu clement street,...

25
GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290 Ph (02) 4943 1777 Fax (02) 4943 1577 Email [email protected] ABN 81 094 433 100 P.O. Box 180, Charlestown NSW 2290 GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER NL180351 NOT FOR CONSTRUCTION 2 DA-C01 COVER SHEET, DRAWING SCHEDULE AND LOCALITY PLAN

Upload: others

Post on 21-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

GLOUCESTER RACF AND ILU

CLEMENT STREET, GLOUCESTER

CIVIL WORK DRAWINGS

NewcastleSuite 4, 215 Pacific Hwy, Charlestown NSW 2290

Ph (02) 4943 1777 Fax (02) 4943 1577Email [email protected] ABN 81 094 433 100

P.O. Box 180, Charlestown NSW 2290

GLOUCESTER RACF AND ILU

CLEMENT STREET, GLOUCESTER

NL180351

NOT FOR CONSTRUCTION

2DA-C01

COVER SHEET,

DRAWING SCHEDULE

AND LOCALITY PLAN

AutoCAD SHX Text
1
AutoCAD SHX Text
PRELIMINARY ISSUE FOR COMMENT
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
04.05.18
AutoCAD SHX Text
DRAWING SCHEDULE
AutoCAD SHX Text
DRG No.
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DA-C01
AutoCAD SHX Text
COVER SHEET, DRAWING SCHEDULE AND LOCALITY PLAN
AutoCAD SHX Text
DA-C02
AutoCAD SHX Text
CONCEPT SEDIMENT AND EROSION CONTROL PLAN
AutoCAD SHX Text
DA-C06
AutoCAD SHX Text
CONCEPT STORMWATER AND GRADING PLAN
AutoCAD SHX Text
DA-C07
AutoCAD SHX Text
TYPICAL SECTIONS AND DETAILS
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING SHEET SIZE = A1
AutoCAD SHX Text
DRAWN: DESIGNED: JOB MANAGER: VERIFIER:
AutoCAD SHX Text
VER'D
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
ALL SETOUT TO ARCHITECT'S DRAWINGS, DIMENSIONS TO BE VERIFIED WITH THE ARCHITECT AND ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING WORK. NORTHROP ACCEPTS NO RESPONSIBILITY FOR THE USABILITY, COMPLETENESS OR SCALE OF DRAWINGS TRANSFERRED ELECTRONICALLY.
AutoCAD SHX Text
DRAWING NOT TO BE USED FOR CONSTRUCTION UNLESS VERIFICATION SIGNATURE HAS BEEN ADDED
AutoCAD SHX Text
THE COPYRIGHT OF THIS DRAWING REMAINS WITH NORTHROP CONSULTING ENGINEERS PTY LTD.
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
R. GRIEVE
AutoCAD SHX Text
S. CROFT
AutoCAD SHX Text
C. PIPER
AutoCAD SHX Text
SOURCE: NEARMAPS
AutoCAD SHX Text
RAVENSHAW STREET
AutoCAD SHX Text
CHURCH STREET
AutoCAD SHX Text
CLEMENT STREET
AutoCAD SHX Text
RAIL LINE
AutoCAD SHX Text
GLOUCESTER HIGH SCHOOL
AutoCAD SHX Text
LOCALITY PLAN
AutoCAD SHX Text
2
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
11/05/18
Page 2: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

1

1

0

1

1

1

1

1

1

1

1

2

1

1

2

1

1

3

1

1

4

1

1

4

1

1

5

1

1

5

1

1

7

NewcastleSuite 4, 215 Pacific Hwy, Charlestown NSW 2290

Ph (02) 4943 1777 Fax (02) 4943 1577Email [email protected] ABN 81 094 433 100

P.O. Box 180, Charlestown NSW 2290

GLOUCESTER RACF AND ILU

CLEMENT STREET, GLOUCESTER

NL180351

NOT FOR CONSTRUCTION

3DA-C02

CONCEPT SEDIMENT AND

EROSION CONTROL PLAN

AutoCAD SHX Text
SEDIMENT FENCE
AutoCAD SHX Text
SITE BOUNDARY
AutoCAD SHX Text
SECURITY FENCE
AutoCAD SHX Text
DROP INLET SEDIMENT TRAP
AutoCAD SHX Text
CUT OFF SWALE
AutoCAD SHX Text
DIVERSION DRAIN (CLEAN)
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
SEDIMENT BASIN
AutoCAD SHX Text
STOCKPILE
AutoCAD SHX Text
STABILISED SITE ACCESS
AutoCAD SHX Text
SANDBAG SEDIMENT FILTER
AutoCAD SHX Text
BASIN MANAGEMENT NOTES 1. PRIOR TO ANY FORECAST WEATHER EVENT, LIKELY TO RESULT PRIOR TO ANY FORECAST WEATHER EVENT, LIKELY TO RESULT IN SEDIMENT LADEN RUNOFF ON THE SITE, ANY EXISTING DETENTION BASINS/TRAPS SHALL BE DEWATERED TO PROVIDE SUFFICIENT CAPACITY TO CAPTURE SEDIMENT LADEN WATER FROM THE SITE. 2. ANY SEDIMENT LADEN WATER CAPTURED ON-SITE MUST BE ANY SEDIMENT LADEN WATER CAPTURED ON-SITE MUST BE TREATED TO ENSURE IT WILL ACHIEVE COUNCIL'S WATER QUALITY OBJECTIVES PRIOR TO ITS RELEASE FROM SITE. A SAMPLE OF THE RELEASED TREATED WATER MUST BE KEPT ON-SITE IN A CLEAR CONTAINER WITH THE SAMPLE DATE RECORDED. 3. NO ALUMINIUM BASED PRODUCTS MAY BE USED TO TREAT NO ALUMINIUM BASED PRODUCTS MAY BE USED TO TREAT TURBID WATER (FLOCCULATING/COAGULANTS) ON-SITE WITHOUT THE PRIOR WRITTEN PERMISSION FROM AN APPROPRIATE COUNCIL OFFICER. THE APPLICANT MUST HAVE DEMONSTRATED ABILITY TO USE SUCH PRODUCTS CORRECTLY AND WITHOUT ENVIRONMENTAL HARM PRIOR TO ANY APPROVAL. 4. THE CHEMICAL/AGENT (FLOCCULATING/COAGULANTS) USED IN THE CHEMICAL/AGENT (FLOCCULATING/COAGULANTS) USED IN TYPE D AND TYPE F BASINS TO TREAT TURBID WATER CAPTURED IN THE BASIN MUST BE APPLIED IN CONCENTRATIONS SUFFICIENT TO ACHIEVE COUNCIL'S WATER QUALITY OBJECTIVES (TSS < 50mg/L, TURBIDITY < 60 NTU, 6.5 < pH < 8.5) WITHIN THE 5-DAY RAINFALL DEPTH USED TO CALCULATE THE CAPACITY OF THE BASIN, AFTER A RAINFALL EVENT. 5. ALL MANUFACTURERS INSTRUCTIONS MUST BE FOLLOWED FOR ALL MANUFACTURERS INSTRUCTIONS MUST BE FOLLOWED FOR THE USE OF ANY CHEMICALS/AGENTS USED ON-SITE, EXCEPT WHERE APPROVED BY THE RESPONSIBLE PERSON OR AN APPROPRIATE COUNCIL OFFICER. 6. SUFFICIENT QUANTITIES OF CHEMICALS/AGENTS TO TREAT SUFFICIENT QUANTITIES OF CHEMICALS/AGENTS TO TREAT TURBID WATER (FLOCCULATING/COAGULANTS) MUST BE PLACED SUCH THAT WATER ENTERING THE BASINS/SEDIMENT TRAP MIXES WITH THE CHEMICALS/AGENTS AND IS CARRIED INTO THE BASIN/TRAP. 7. ANY BASIN MUST BE DEWATERD AS SOON AS PRACTICAL, ANY BASIN MUST BE DEWATERD AS SOON AS PRACTICAL, ONCE WATER CAPTURED IN THE BASIN ACHIEVES COUNCIL'S WATER QUALITY OBJECTIVES. 8. INSPECT THE SEDIMENT BASINS AFTER EACH RAINFALL EVENT INSPECT THE SEDIMENT BASINS AFTER EACH RAINFALL EVENT AND/OR WEEKLY. ENSURE THAT ALL SEDIMENT IS REMOVED ONCE THE SEDIMENT STORAGE ZONE IS FULL. ENSURE THAT OUTLET AND EMERGENCY SPILLWAY WORKS ARE MAINTAINED IN A FULLY OPERATIONAL CONDITION AT ALL TIMES.
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
CLEAN WATER DIVERSION
AutoCAD SHX Text
TEMPORARY CLEAN WATER DIVERSION
AutoCAD SHX Text
TEMPORARY CONTRACTORS VEHICULAR ACCESS POINT. CONSTRUCT A STABILISED SITE ACCESS IN ACCORDANCE WITH DETAIL SD6-14 OF 'THE BLUE BOOK', OR ALTERNATIVELY PROVIDE A SHAKEDOWN CATTLE GRID AT THE ENTRANCE POINT TO REDUCE THE LIKELIHOOD OF SEDIMENT BEING TRAFFICKED OFF SITE.
AutoCAD SHX Text
SEDIMENT CONTROL FENCE
AutoCAD SHX Text
SITE SECURITY FENCE
AutoCAD SHX Text
INSTALL AND MAINTAIN SEDIMENT FILTERS AND TRAPS TO PROPOSED PITS AND EXISTING PITS. (TYPICAL).
AutoCAD SHX Text
CLEMENT STREET
AutoCAD SHX Text
EROSION AND SEDIMENTATION CONTROL NOTES 1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE APPROPRIATE FOR THE SEDIMENT TYPE(S) OF THE SOILS ON-SITE, IN ACCORDANCE WITH THE 'BLUE BOOK' (MANAGING URBAN STORMWATER - SOILS AND CONSTRUCTION. LANDCOM, 2004), OR OTHER CURRENT RECOGNISED INDUSTRY STANDARDS FOR EROSION AND SEDIMENT CONTROL FOR AUSTRALIAN CONDITIONS. THIS INCLUDES SEDIMENT TRAPS AND LINING OF CHANNELS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING A THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING A DETAILED WRITTEN RECORD OF ALL EROSION AND SEDIMENT CONTROLS ON-SITE DURING THE CONSTRUCTION PERIOD. THIS RECORD SHALL BE UPDATED ON A DAILY BASIS AND SHALL CONTAIN DETAILS ON THE CONDITION OF CONTROLS AND ANY/ALL MAINTENANCE, CLEANING AND BREACHES. THIS G AND BREACHES. THIS RECORD SHALL BE KEPT ON-SITE AT ALL TIMES AND SHALL BE MADE AVAILABLE FOR INSPECTION BY THE PRINCIPAL CERTIFYING AUTHORITY AND THE SUPERINTENDENT DURING NORMAL WORKING HOURS. 3. INSTALL SEDIMENT PROTECTION FILTERS ON ALL NEW AND INSTALL SEDIMENT PROTECTION FILTERS ON ALL NEW AND EXISTING STORMWATER INLET PITS IN ACCORDANCE WITH EITHER THE MESH AND GRAVEL INLET FILTER DETAIL SD6-11 OR THE GEOTEXTILE INLET FILTER DETAIL SD6-12 OF THE 'BLUE BOOK'. 4. ESTABLISH ALL REQUIRED SEDIMENT FENCES IN ACCORDANCE ESTABLISH ALL REQUIRED SEDIMENT FENCES IN ACCORDANCE WITH DETAIL SD6-8 OF THE 'BLUE BOOK'. 5. INSTALL SEDIMENT FENCING, OR OTHER SEDIMENT CONTROL INSTALL SEDIMENT FENCING, OR OTHER SEDIMENT CONTROL DEVICES, AROUND INDIVIDUAL BUILDING ZONES/AREAS AS REQUIRED AND AS DIRECTED BY THE SUPERINTENDENT OR APPROPRIATE COUNCIL OFFICER. 6. ALL TRENCHES INCLUDING ALL SERVICE TRENCHES AND SWALE ALL TRENCHES INCLUDING ALL SERVICE TRENCHES AND SWALE EXCAVATION SHALL BE SIDE-CAST TO THE HIGH SIDE AND CLOSED AT THE END OF EACH DAYS WORK. 7. THE CONTRACTOR SHALL ENSURE THAT ALL VEGETATION THE CONTRACTOR SHALL ENSURE THAT ALL VEGETATION (TREE, SHRUB & GROUND COVER) WHICH IS TO BE RETAINED SHALL BE PROTECTED DURING THE DURATION OF CONSTRUCTION. 8. ALL VEGETATION TO BE REMOVED SHALL BE MULCHED ALL VEGETATION TO BE REMOVED SHALL BE MULCHED ON-SITE AND SPREAD/STOCKPILED AS DIRECTED BY THE SUPERINTENDENT. 9. STRIP TOPSOIL IN AREAS DESIGNATED FOR STRIPPING AND STRIP TOPSOIL IN AREAS DESIGNATED FOR STRIPPING AND STOCKPILE FOR RE-USE AS REQUIRED. ANY SURPLUS MATERIAL SHALL BE SPREAD ON-SITE AS DIRECTED BY THE SUPERINTENDENT OR REMOVED FROM SITE AND DISPOSED OF IN ACCORDANCE WITH EPA GUIDELINES. 10. CONSTRUCT AND MAINTAIN ALL MATERIAL STOCKPILES IN CONSTRUCT AND MAINTAIN ALL MATERIAL STOCKPILES IN ACCORDANCE WITH DETAIL SD4-1 OF THE 'BLUE BOOK' (INCLUDING CUT-OFF SWALES TO THE HIGH SIDE AND SEDIMENT FENCES TO THE LOW SIDE). 11. ENSURE STOCKPILES DO NOT EXCEED 2.0m HIGH. PROVIDE WIND ENSURE STOCKPILES DO NOT EXCEED 2.0m HIGH. PROVIDE WIND AND RAIN EROSION PROTECTION AS REQUIRED IN ACCORDANCE WITH THE 'BLUE BOOK'. 12. PROVIDE WATER TRUCKS OR SPRINKLER DEVICES DURING PROVIDE WATER TRUCKS OR SPRINKLER DEVICES DURING CONSTRUCTION AS REQUIRED TO SUPPRESS DUST. 13. ONCE CUT/FILL OPERATIONS HAVE BEEN FINALIZED ALL ONCE CUT/FILL OPERATIONS HAVE BEEN FINALIZED ALL DISTURBED AREAS THAT ARE NOT BEING WORKED ON SHALL BE RE-VEGETATED AS SOON AS IS PRACTICAL.
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
SEDIMENT BASIN SIZING
AutoCAD SHX Text
CONSTRAINT
AutoCAD SHX Text
VALUE
AutoCAD SHX Text
UNITS
AutoCAD SHX Text
CV = VOLUMETRIC RUNOFF COEFFICIENT
AutoCAD SHX Text
0.5
AutoCAD SHX Text
R = 5 DAY, 75 PERCENTILE RAINFALL75 PERCENTILE RAINFALLTH PERCENTILE RAINFALL
AutoCAD SHX Text
25
AutoCAD SHX Text
mm
AutoCAD SHX Text
A = CATCHMENT AREA
AutoCAD SHX Text
3.0
AutoCAD SHX Text
ha
AutoCAD SHX Text
SETTLING ZONE VOLUME (10xCVxRxA)
AutoCAD SHX Text
375
AutoCAD SHX Text
m 3
AutoCAD SHX Text
SOIL LOSS (CALC ABOVE)
AutoCAD SHX Text
307.32
AutoCAD SHX Text
m /ha/yr3/ha/yr
AutoCAD SHX Text
A2 = DISTURBED CATCHMENT AREA
AutoCAD SHX Text
3
AutoCAD SHX Text
ha
AutoCAD SHX Text
SEDIMENT STORAGE VOLUME (0.17xSOIL LOSSxA2)
AutoCAD SHX Text
121
AutoCAD SHX Text
m 3
AutoCAD SHX Text
TOTAL BASIN VOLUME REQUIRED
AutoCAD SHX Text
496
AutoCAD SHX Text
m 3
AutoCAD SHX Text
SITE PARAMETERS
AutoCAD SHX Text
CONSTRAINT
AutoCAD SHX Text
VALUE
AutoCAD SHX Text
SEDIMENT TYPE
AutoCAD SHX Text
D/F
AutoCAD SHX Text
SOIL HYDROLOGY GROUP
AutoCAD SHX Text
D
AutoCAD SHX Text
K = SOIL ERODIBILITY (K-FACTOR)
AutoCAD SHX Text
0.052
AutoCAD SHX Text
R = RAINFALL EROSIVITY (R-FACTOR)
AutoCAD SHX Text
2583
AutoCAD SHX Text
S = 2 YEAR, 6 HOUR STORM INTENSITY
AutoCAD SHX Text
10.9 mm/hr (GLOUCESTER)
AutoCAD SHX Text
LS = SLOPE LENGTH/GRADIENT
AutoCAD SHX Text
1.76 (80m SLOPE @ 7% GRADE)
AutoCAD SHX Text
P = EROSION CONTROL PRACTICE (P-FACTOR)
AutoCAD SHX Text
1.3 (TYPICAL)
AutoCAD SHX Text
C = GROUND COVER (C-FACTOR)
AutoCAD SHX Text
1.0 (TYPICAL FOR STRIPPED SITE)
AutoCAD SHX Text
SOIL LOSS (RUSLE METHOD) (tonnes/ha/yr)
AutoCAD SHX Text
307.32
AutoCAD SHX Text
EROSION HAZARD (TABLE 4.2 BLUE BOOK)
AutoCAD SHX Text
LOW-MODERATE
AutoCAD SHX Text
SEDIMENT BASIN SIZING CALCULATION THE SITE IS LOCATED WITHIN THE GLOUCESTER SOIL LANDSCAPE WHICH HAS THE GLOUCESTER SOIL LANDSCAPE WHICH HAS THE SOIL LANDSCAPE WHICH HAS THE FOLLOWING PROPERTIES (IN ACCORDANCE WITH TABLE C17 OF THE "BLUE BOOK"):
AutoCAD SHX Text
SCALE 1:
AutoCAD SHX Text
0
AutoCAD SHX Text
4
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
16
AutoCAD SHX Text
20m
AutoCAD SHX Text
400
AutoCAD SHX Text
@
AutoCAD SHX Text
A1
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING SHEET SIZE = A1
AutoCAD SHX Text
DRAWN: DESIGNED: JOB MANAGER: VERIFIER:
AutoCAD SHX Text
VER'D
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
ALL SETOUT TO ARCHITECT'S DRAWINGS, DIMENSIONS TO BE VERIFIED WITH THE ARCHITECT AND ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING WORK. NORTHROP ACCEPTS NO RESPONSIBILITY FOR THE USABILITY, COMPLETENESS OR SCALE OF DRAWINGS TRANSFERRED ELECTRONICALLY.
AutoCAD SHX Text
DRAWING NOT TO BE USED FOR CONSTRUCTION UNLESS VERIFICATION SIGNATURE HAS BEEN ADDED
AutoCAD SHX Text
THE COPYRIGHT OF THIS DRAWING REMAINS WITH NORTHROP CONSULTING ENGINEERS PTY LTD.
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
R. GRIEVE
AutoCAD SHX Text
S. CROFT
AutoCAD SHX Text
C. PIPER
AutoCAD SHX Text
1
AutoCAD SHX Text
PRELIMINARY ISSUE FOR COMMENT
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
04/05/18
AutoCAD SHX Text
2
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
11/05/18
AutoCAD SHX Text
3
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
17/05/18
Page 3: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

1

1

0

1

1

1

1

1

1

1

1

2

1

1

2

1

3

1

1

3

1

1

4

1

1

4

1

1

5

1

1

5

1

1

7

COMMUNITYCENTRE

FFL116.3

FFL114.8

FFL114.3

FFL115.0

FFL115.2

FFL115.8

FFL116.0FFL114.8

FFL114.3

FFL116.8

FFL116.0

FFL116.5

1

3

4

RACF

FFL115.0

FFL113.0

2

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

2122

23

24

25

26 27 28

FFL115.8

FFL113.8

FFL116.0

FFL115.5

FFL116.8

FFL116.5

FFL116.5

FFL115.5

FFL114.3

FFL114.3

FFL115.2

FFL115.8

FFL116.0

FFL115.0 FFL115.0

FFL115.8

NewcastleSuite 4, 215 Pacific Hwy, Charlestown NSW 2290

Ph (02) 4943 1777 Fax (02) 4943 1577Email [email protected] ABN 81 094 433 100

P.O. Box 180, Charlestown NSW 2290

GLOUCESTER RACF AND ILU

CLEMENT STREET, GLOUCESTER

NL180351

NOT FOR CONSTRUCTION

4DA-C06

CONCEPT STORMWATER

AND GRADING PLAN

AutoCAD SHX Text
REUSE TANK
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
F1
AutoCAD SHX Text
RW (2m)
AutoCAD SHX Text
RW (2m)
AutoCAD SHX Text
RW (2m)
AutoCAD SHX Text
RW (2m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (3m)
AutoCAD SHX Text
RW (1.5m)
AutoCAD SHX Text
RW (1.5m)
AutoCAD SHX Text
RW (1.5m)
AutoCAD SHX Text
PL 115.97
AutoCAD SHX Text
PL 116.47
AutoCAD SHX Text
PL 116.77
AutoCAD SHX Text
PL 116.47
AutoCAD SHX Text
PL 116.27
AutoCAD SHX Text
PL 115.77
AutoCAD SHX Text
PL 115.47
AutoCAD SHX Text
PL 114.77
AutoCAD SHX Text
PL 114.27
AutoCAD SHX Text
PL 114.97
AutoCAD SHX Text
PL 114.97
AutoCAD SHX Text
PL 115.97
AutoCAD SHX Text
PL 115.77
AutoCAD SHX Text
PL 115.17
AutoCAD SHX Text
PL 114.97
AutoCAD SHX Text
PL 114.77
AutoCAD SHX Text
PL 114.27
AutoCAD SHX Text
PL 114.27
AutoCAD SHX Text
PL 113.77
AutoCAD SHX Text
FFL 113.0
AutoCAD SHX Text
PIPE FLOWS UNDER ROADWAY. APPROXIMATE CULVERT SIZE 1.2m x 0.9m BOX CULVERT OR 2 x 750PIPES.
AutoCAD SHX Text
DIVERT EXTERNAL CATCHMENT.
AutoCAD SHX Text
RL 116.2
AutoCAD SHX Text
RL 116.2
AutoCAD SHX Text
5%
AutoCAD SHX Text
5%
AutoCAD SHX Text
1%
AutoCAD SHX Text
4.5%
AutoCAD SHX Text
4.5%
AutoCAD SHX Text
4%
AutoCAD SHX Text
4.5%
AutoCAD SHX Text
2.5%
AutoCAD SHX Text
3%
AutoCAD SHX Text
1%
AutoCAD SHX Text
4%
AutoCAD SHX Text
3%
AutoCAD SHX Text
2%
AutoCAD SHX Text
2%
AutoCAD SHX Text
3%
AutoCAD SHX Text
5%
AutoCAD SHX Text
4.5%
AutoCAD SHX Text
4%
AutoCAD SHX Text
4.5%
AutoCAD SHX Text
4%
AutoCAD SHX Text
CLEMENT STREET
AutoCAD SHX Text
3%
AutoCAD SHX Text
1%
AutoCAD SHX Text
3%
AutoCAD SHX Text
5%
AutoCAD SHX Text
PL 115.47
AutoCAD SHX Text
RL 115.5
AutoCAD SHX Text
RL 115.5
AutoCAD SHX Text
RL 115.8
AutoCAD SHX Text
RL 115.8
AutoCAD SHX Text
RL 116.3
AutoCAD SHX Text
RL 116.3
AutoCAD SHX Text
RL 116.5
AutoCAD SHX Text
RL 116.5
AutoCAD SHX Text
RL 116.0
AutoCAD SHX Text
RL 115.5
AutoCAD SHX Text
RL 115.2
AutoCAD SHX Text
RL 114.5
AutoCAD SHX Text
RL 114.3
AutoCAD SHX Text
RL 114.1
AutoCAD SHX Text
RL 116.0
AutoCAD SHX Text
RL 115.5
AutoCAD SHX Text
RL 115.2
AutoCAD SHX Text
RL 114.5
AutoCAD SHX Text
RL 114.3
AutoCAD SHX Text
RL 114.1
AutoCAD SHX Text
RL 113.5
AutoCAD SHX Text
RL 113.5
AutoCAD SHX Text
RL 113.5
AutoCAD SHX Text
RL 113.5
AutoCAD SHX Text
RL 114.0
AutoCAD SHX Text
RL 114.0
AutoCAD SHX Text
RL 114.0
AutoCAD SHX Text
RL 114.0
AutoCAD SHX Text
RL 114.5
AutoCAD SHX Text
RL 114.5
AutoCAD SHX Text
RL 114.5
AutoCAD SHX Text
2%
AutoCAD SHX Text
1%
AutoCAD SHX Text
4%
AutoCAD SHX Text
2%
AutoCAD SHX Text
4%
AutoCAD SHX Text
3%
AutoCAD SHX Text
3%
AutoCAD SHX Text
2.5%
AutoCAD SHX Text
2.5%
AutoCAD SHX Text
2%
AutoCAD SHX Text
2%
AutoCAD SHX Text
RL 114.7
AutoCAD SHX Text
RL 114.7
AutoCAD SHX Text
RL 114.8
AutoCAD SHX Text
RL 114.8
AutoCAD SHX Text
1%
AutoCAD SHX Text
RL 114.9
AutoCAD SHX Text
CL 112.9
AutoCAD SHX Text
5%
AutoCAD SHX Text
6%
AutoCAD SHX Text
RL 113.0
AutoCAD SHX Text
RL 113.0
AutoCAD SHX Text
EX 115.5
AutoCAD SHX Text
EXISTING 450 x 300 BOX CULVERT
AutoCAD SHX Text
DIVERT EXTERNAL CATCHMENT.
AutoCAD SHX Text
EXTEND EXISTING CULVERT BEYOND NEW ROADWAY.
AutoCAD SHX Text
CONNECT OVERFLOW FROM DOWNPIPES TO STREET DRAINAGE
AutoCAD SHX Text
50% OF RACF ROOF CONNECTED TO 10kL REUSE TANK (INDICATIVE LOCATION). OVERFLOW TO BE DIRECTED TO PROPOSED STORMWATER NETWORK.
AutoCAD SHX Text
CL 112.7
AutoCAD SHX Text
EXISTING 450 x 300 BOX CULVERT
AutoCAD SHX Text
RW (1.5m)
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
RW (0.7m)
AutoCAD SHX Text
RW (0.3m)
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
RW (0.3m)
AutoCAD SHX Text
RW (0.3m)
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
KG
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
RW (0.5m)
AutoCAD SHX Text
RW (0.6m)
AutoCAD SHX Text
RL 115.8
AutoCAD SHX Text
VC
AutoCAD SHX Text
VC
AutoCAD SHX Text
TIE INTO EXISTING KERB
AutoCAD SHX Text
TRANSITION KERB TO 0 HEIGHT OVER 3m
AutoCAD SHX Text
ENTRY ROAD
AutoCAD SHX Text
RL 112.8
AutoCAD SHX Text
RL 113.0
AutoCAD SHX Text
GR
AutoCAD SHX Text
GR
AutoCAD SHX Text
GR
AutoCAD SHX Text
GR
AutoCAD SHX Text
SITE BOUNDARY
AutoCAD SHX Text
STORMWATER PIPE
AutoCAD SHX Text
OVERLAND FLOW
AutoCAD SHX Text
EXISTING STORMWATER PIPE
AutoCAD SHX Text
DRAINAGE PIT
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
CONCRETE HEADWALL
AutoCAD SHX Text
DRAINAGE SWALE
AutoCAD SHX Text
ROCK LOG RETAINING WALL (MAXIMUM HEIGHT)
AutoCAD SHX Text
RW (X.Xm)
AutoCAD SHX Text
PROPOSED FINISHED FLOOR LEVEL
AutoCAD SHX Text
FFL XX.XX
AutoCAD SHX Text
PROPOSED SPOT LEVEL
AutoCAD SHX Text
RL XX.XX
AutoCAD SHX Text
DIRECTION OF GRADE
AutoCAD SHX Text
X.X %
AutoCAD SHX Text
PROPOSED SPOT LEVEL
AutoCAD SHX Text
PL XX.XX
AutoCAD SHX Text
PROPOSED COVER LEVEL
AutoCAD SHX Text
CL XX.XX
AutoCAD SHX Text
EXISTING LEVEL
AutoCAD SHX Text
EX XX.XX
AutoCAD SHX Text
FENCE - TYPE 1
AutoCAD SHX Text
F1
AutoCAD SHX Text
DRAINAGE EASEMENT
AutoCAD SHX Text
INTERNAL ACCESS ROAD REFER TO 'TYPICAL ACCESS ROAD DETAIL'
AutoCAD SHX Text
VEGETATED OVERLAND FLOW PATH - REFER TO 'TYPICAL DRAINAGE CHANNEL DETAIL'
AutoCAD SHX Text
ENTRY ROAD REFER TO 'TYPICAL ENTRY ROAD DETAIL'
AutoCAD SHX Text
VC
AutoCAD SHX Text
PROPOSED KERB AND GUTTER IN ACCORDANCE WITH 'GREAT LAKES COUNCIL' STANDARD DRAWING
AutoCAD SHX Text
KG
AutoCAD SHX Text
PROPOSED VEHICLE DRIVEWAY IN ACCORDANCE WITH 'GREAT LAKES COUNCIL' STANDARD DRAWING
AutoCAD SHX Text
GUARD RAIL
AutoCAD SHX Text
GR
AutoCAD SHX Text
1
AutoCAD SHX Text
PRELIMINARY ISSUE FOR COMMENT
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
27/04/18
AutoCAD SHX Text
SCALE 1:
AutoCAD SHX Text
0
AutoCAD SHX Text
4
AutoCAD SHX Text
8
AutoCAD SHX Text
12
AutoCAD SHX Text
16
AutoCAD SHX Text
20m
AutoCAD SHX Text
400
AutoCAD SHX Text
@
AutoCAD SHX Text
A1
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING SHEET SIZE = A1
AutoCAD SHX Text
DRAWN: DESIGNED: JOB MANAGER: VERIFIER:
AutoCAD SHX Text
VER'D
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
ALL SETOUT TO ARCHITECT'S DRAWINGS, DIMENSIONS TO BE VERIFIED WITH THE ARCHITECT AND ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING WORK. NORTHROP ACCEPTS NO RESPONSIBILITY FOR THE USABILITY, COMPLETENESS OR SCALE OF DRAWINGS TRANSFERRED ELECTRONICALLY.
AutoCAD SHX Text
DRAWING NOT TO BE USED FOR CONSTRUCTION UNLESS VERIFICATION SIGNATURE HAS BEEN ADDED
AutoCAD SHX Text
THE COPYRIGHT OF THIS DRAWING REMAINS WITH NORTHROP CONSULTING ENGINEERS PTY LTD.
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
R. GRIEVE
AutoCAD SHX Text
S. CROFT
AutoCAD SHX Text
C. PIPER
AutoCAD SHX Text
2
AutoCAD SHX Text
PRELIMINARY ISSUE FOR COMMENT
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
04/05/18
AutoCAD SHX Text
3
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
11/05/18
AutoCAD SHX Text
4
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
17/05/18
Page 4: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

NewcastleSuite 4, 215 Pacific Hwy, Charlestown NSW 2290

Ph (02) 4943 1777 Fax (02) 4943 1577Email [email protected] ABN 81 094 433 100

P.O. Box 180, Charlestown NSW 2290

GLOUCESTER RACF AND ILU

CLEMENT STREET, GLOUCESTER

NL180351

NOT FOR CONSTRUCTION

3DA-C07

TYPICAL SECTIONS

AND DETAILS

AutoCAD SHX Text
KERB AND GUTTER
AutoCAD SHX Text
TYPICAL VERGE DETAIL - CLEMENT STREET
AutoCAD SHX Text
EXISTING PAVEMENT TO REMAIN
AutoCAD SHX Text
FALL 2%
AutoCAD SHX Text
SITE BOUNDARY
AutoCAD SHX Text
SAWCUT LINE
AutoCAD SHX Text
SUBSOIL DRAINAGE
AutoCAD SHX Text
EMERGENCY OVERFLOW WEIR RL 109.00
AutoCAD SHX Text
OVERFLOW PIT
AutoCAD SHX Text
EXTENDED DETENTION
AutoCAD SHX Text
TOP OF BASIN WALL RL 109.30
AutoCAD SHX Text
BIO-FILTRATION MEDIA MATERIAL
AutoCAD SHX Text
OVERFLOW LEVEL RL 108.30
AutoCAD SHX Text
TYPICAL STORMWATER BASIN DETAIL
AutoCAD SHX Text
BIO-FILTRATION OUTLET CONNECTS TO PIT
AutoCAD SHX Text
HEADWALL TO SUIT OUTLET PIPE SIZE
AutoCAD SHX Text
EROSION PROTECTION IN RIPARIAN ZONE IN ACCORDANCE WITH N.S.W OFFICE OF WATER STANDARD SPECIFICATIONS.
AutoCAD SHX Text
1
AutoCAD SHX Text
4 (TYPICAL)
AutoCAD SHX Text
1
AutoCAD SHX Text
4 (TYPICAL)
AutoCAD SHX Text
1m
AutoCAD SHX Text
1m
AutoCAD SHX Text
1m
AutoCAD SHX Text
TYPICAL DRAINAGE CHANNEL DETAIL
AutoCAD SHX Text
2m
AutoCAD SHX Text
2m
AutoCAD SHX Text
2m
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
4
AutoCAD SHX Text
OVERLAND FLOW ~5%
AutoCAD SHX Text
RL 109.00
AutoCAD SHX Text
RL 108.00
AutoCAD SHX Text
FALL 2%
AutoCAD SHX Text
FALL 2%
AutoCAD SHX Text
FALL PROPOSED ROAD TO CENTRELINE PIT NETWORK AT 2% (TYPICAL)
AutoCAD SHX Text
KERB ONLY
AutoCAD SHX Text
KERB ONLY
AutoCAD SHX Text
TYPICAL ENTRY ROAD DETAIL
AutoCAD SHX Text
DISCHARGE TO EXISTING DRAINAGE CHANNEL
AutoCAD SHX Text
RL 107.50
AutoCAD SHX Text
CONCRETE WEIR
AutoCAD SHX Text
VEGETATED EMBANKMENT, REPRESENTATIVE OF A MANNINGS ROUGHNESS OF 0.08
AutoCAD SHX Text
FALL 2%
AutoCAD SHX Text
FALL 2%
AutoCAD SHX Text
FALL PROPOSED ROAD TO CENTRELINE PIT NETWORK AT 2% (TYPICAL)
AutoCAD SHX Text
FLUSH KERB
AutoCAD SHX Text
FLUSH KERB
AutoCAD SHX Text
TYPICAL ACCESS ROAD DETAIL
AutoCAD SHX Text
SITE BOUNDARY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
JOB NUMBER
AutoCAD SHX Text
DRAWING NUMBER
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING SHEET SIZE = A1
AutoCAD SHX Text
DRAWN: DESIGNED: JOB MANAGER: VERIFIER:
AutoCAD SHX Text
VER'D
AutoCAD SHX Text
APP'D
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
ALL SETOUT TO ARCHITECT'S DRAWINGS, DIMENSIONS TO BE VERIFIED WITH THE ARCHITECT AND ON SITE BEFORE MAKING SHOP DRAWINGS OR COMMENCING WORK. NORTHROP ACCEPTS NO RESPONSIBILITY FOR THE USABILITY, COMPLETENESS OR SCALE OF DRAWINGS TRANSFERRED ELECTRONICALLY.
AutoCAD SHX Text
DRAWING NOT TO BE USED FOR CONSTRUCTION UNLESS VERIFICATION SIGNATURE HAS BEEN ADDED
AutoCAD SHX Text
THE COPYRIGHT OF THIS DRAWING REMAINS WITH NORTHROP CONSULTING ENGINEERS PTY LTD.
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
ARCHITECT
AutoCAD SHX Text
R. GRIEVE
AutoCAD SHX Text
S. CROFT
AutoCAD SHX Text
C. PIPER
AutoCAD SHX Text
1
AutoCAD SHX Text
PRELIMINARY ISSUE FOR COMMENT
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
04/05/18
AutoCAD SHX Text
2
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
11/05/18
AutoCAD SHX Text
3
AutoCAD SHX Text
ISSUED FOR APPROVAL
AutoCAD SHX Text
RG
AutoCAD SHX Text
CP
AutoCAD SHX Text
SC
AutoCAD SHX Text
18/05/18
Page 5: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Job No: NL180351 Revision: B Date: 18/05/2018

BY DATE

Prepared SC 18/05/2018

Checked CP 18/05/2018

Admin LD 18/05/2018

CONCEPT STORMWATER MANAGEMENT PLAN at

1-25 Clement Street, Lot 40 DP 1227815, Gloucester for

Anglican Care

Site

Page 6: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Table of Contents

1. INTRODUCTION 2

2. MIDCOAST COUNCIL CONSULTATION 4

3. STORMWATER QUANTITY MANAGEMENT STRATEGY 5

4. STORMWATER QUALITY MANAGEMENT STRATEGY 8

5. ROAD LAYOUT AND GRADING 11

6. CONCLUSION 12

APPENDIX A – CONCEPT CIVIL DESIGN DRAWINGS

APPENDIX B – MIDCOAST COUNCIL CORRESPONDENCE

Page 7: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

1. Introduction

1.1 General

Northrop Consulting Engineers have been engaged by Anglican Care to undertake a Concept Stormwater Management Plan for the proposed development located at 1-25 Clement Street, Gloucester (Lot 40 DP 1227815).

This report has been prepared with consideration to and generally in accordance with the State Environmental Planning Policy - Housing for Seniors or People with a Disability 2004 (SEPP HSPD), which is the code that the development is to be assessed against. In the absence of specific design information within SEPP HSPD, we have referred to Gloucester Shire Council Draft Development Control Plan 2010 and Greater Taree Council’s Development Design Specifications - Stormwater Drainage Design.

The purpose of this report is to address the issues associated with the proposed development of the site, in particular:

• Flooding Assessment

• Management of Stormwater Quantity

• Management of Stormwater Quality

• Roadways and pavement

This report intends to discuss issues relating to the site at a level appropriate for a Development Application submission and should be read in conjunction with drawings DA-C01– DA-C07 (refer Appendix A). It does not attempt to provide detailed design solutions to all issues; rather it will investigate the feasibility of solutions based on information that we have gathered to date from a number of sources and provide outcomes which will be developed further at Construction Certificate and Construction phases of the project.

1.2 Site Description

The site is located on the western side of Clement Street, with an existing educational facility to the north and an existing residential subdivision to the south. The site is undeveloped and covers approximately 3.0 Ha.

A natural swale runs from north-east to south-west through site, eventually reaching an existing 1st order watercourse on the south-western section. The site generally slopes towards the swale at grades varying between 1 and 10%.

As a part of the new development it is proposed that a Residential Aged Care Facility (RACF), 28 Independent Living Units and a Community Centre will be constructed.

Page 8: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Figure 1 Site Plan

N Existing swale

Page 9: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

2. MidCoast Council Consultation

Consultation has been undertaken with MidCoast Council during the design phase of the development. The following information was provided regarding flooding assessment, stormwater quantity, stormwater quality and rain tanks.

2.1 Flooding Assessment

Consultation with MidCoast Council was undertaken in relation to determining flooding requirements for the proposed development on the subject site. Council’s Development Engineer, Mr Aaron Kelly, advised that the site was situated above Probable Maximum Flood (PMF) level from Gloucester River. A copy of the correspondence is included in Appendix B. All habitable floor levels associated with the development will therefore be constructed above the PMF level. The levels proposed for the RACF, Independent Living Units, the Community Centre and the roadways are shown on the drawings in Appendix A.

2.2 Water Quality Objectives

A review of Gloucester Draft Development Control Plan 2010 did not identify any requirement for treatment targets. Additionally, the SEPP HSPD provides only qualitative direction, with Clause 36 (a) stating ‘The proposed development should control and minimize the disturbance and impacts of Stormwater runoff on adjoining properties and receiving waters by, for example, finishing driveway surfaces with semi-pervious material, minimizing the width of paths and minimizing paved areas.’.

Council advised that the site is within a drinking water catchment, and therefore water quality treatment is required, refer to Appendix B for a copy of the correspondence. Northrop have therefore referred to ‘Greater Taree Council Development Design Specifications 5 and 7’ as a guide for water quality objectives for the development. Greater Taree Council forms part of the MidCoast Council Local Government area, so was considered relevant to the development site. The specifications note that Water Sensitive Urban Design (WSUD) methods should be incorporated in all developments and stormwater runoff quality shall meet the Australian Rainfall Quality (ARQ) guidelines. The ARQ stormwater treatment objectives have therefore been adopted as the pollutant load reduction targets for the development.

2.3 Water Quantity Objectives

MidCoast Council’s engineering department advised that the site should limit post development flows to that of undeveloped flows leaving the site. Council also noted that the preferred outcome is for the required detention volume to be integrated into the development, where possible, in the form of rain tanks and in car parking areas. The required storage volume has been found to be too large to be entirely integrated into the form of the development, and therefore some end of line storage will be required. Integrated storage opportunities will be investigated through detailed design, when 3D modelling of the site is developed. The size of the proposed end of line detention basin is therefore considered worst case, and would ideally be reduced during detailed design.

2.4 Rain Tanks

It is noted that Section 11.1 of the Gloucester Shire Council Draft Development Control Plan 2010 requires 2,000 litre rain tanks for each development. As the development will be assessed against the SEPP HSPD, Council advised that the requirements of the DCP will be superseded. Section 36 (b) of SEPP HSPD requires that “the proposed development should include, where practical, on-site stormwater detention or re-use for second quality water uses”. In this instance, we have allowed for a nominal 10,000 litre re-use tank attached to the RACF for landscape irrigation.

Page 10: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

3. Stormwater Quantity Management Strategy

3.1 Stormwater Quantity Targets

The proposed development will consist of impervious roadways, footpaths, hardstand and roof areas. As such, there will be an increase in impervious area which will increase the stormwater runoff from the site. To reduce the peak post-developed flows to equal or less than that of pre-developed conditions, on-site stormwater detention is proposed.

3.2 On-Site Detention

On-site detention is to be provided in the form of integrated storage, such as garden beds, car parking areas and the rain tank, as well as an end of line detention basin. For development application purposes, the end of line basin has been sized to accommodate the full storage requirements. As the development progresses to detailed design, and 3D modelling of the site is undertaken, opportunities for integrated storage would be identified. It is expected that this would reduce the size of the end of line basin. The site catchment area associated with the proposed detention basin was hydraulically modelled using the computer-based runoff routing model, DRAINS. The modelled catchment area may be viewed below in Figure 2.

Figure 2 - Schematic of catchment area

SITE CATCHMENT

DETENTION BASIN LOCATION

Page 11: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Peak hydrographs for the catchment area have been determined for both pre and post-developed site conditions by comparing a range of storm durations for the 20%, 10%, 5%, 3% and 1% Annual Exceedance Probability (AEP) storm events. The peak hydrographs have been used to determine the detention volume required.

For the purposes of runoff modelling, pre-developed site conditions considered a greenfield site (0% impervious area with no detention basin). For the post-developed site conditions, the catchment area was modelled as 60% impervious and included a 600m3 detention basin with a 5 metre weir and 300mm outlet orifice.

The estimated peak discharge from the catchment for the pre-developed and post-developed conditions, as predicted by the DRAINS analysis, can be seen in Table 1 below.

Table 1 - Pre-developed flows versus post-developed flows

Storm Event Pre-developed

Peak Discharge (m3/s)

Post-Developed

Peak Discharge (m3/s)

20%AEP 0.597 0.420

10%AEP 0.702 0.487

5%AEP 0.841 0.655

2%AEP 0.958 0.826

1%AEP 1.100 0.998

Table 1 shows that the stormwater quantity target is achieved, with post-developed peak discharges lower than pre-developed peak discharges for all modelled storms. DRAINS output files can be provided upon request.

The basin is proposed to be located at the south-western end of the existing drainage channel, as shown in Northrop drawing DA-C06. The basin is intended to make use of the natural fall of the land, minimising the extent of earthworks. The formation of the basin will imitate a typical dam, representative of the surrounding rural area. The floor of the basin will contain a bioretention filter area, as described in Section 4, which will be free draining via pervious filter media and subsoil drainage. The basin will therefore be an ephemeral basin.

Stormwater runoff from the development will be conveyed to the basin by a pit and pipe network, and open channel. The basin outlet will consist of a piped outlet and an emergency overflow weir, which will cater for the internal site catchment, as well as the external catchment from Clement St.

3.3 External Catchment

Survey of the site and surrounding area has identified two 450mm diameter reinforced concrete stomwater culverts that discharge into the site at the eastern boundary. Both culvert outlets align with existing channels that traverse the site.

As shown in Northrop drawing DA-C06, the proposed development will include construction of kerb and channel for the full site frontage to Clement Street. As part of the verge works, new kerb inlet pits will be constructed over the existing culverts and divert flows to the retained drainage channel through the centre of the site.

It is noted that the low point in Clement street does not align with the retained drainage channel. Instead, in the event of inundation of the pit and pipe network, surcharge would be conveyed through the site via the entry road to the retained drainage channel. The entry road has been designed to accommodate the 1%AEP storm event from the external catchment, assuming the pipe network is

Page 12: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

100% blocked. The scenario was modelled using the DRAINS software package. A summary of the data and results is provided below.

Catchment Area 1.8Ha

1% AEP flow 0.81m³/s

Flow depth 0.1m

Velocity 1.96m/s

Velocity x Depth 0.2m²/s

Figure L2 Appendix L of the Floodplain Development Manual provides advice on hydraulic and hazard categorization based on flooding depth and velocity. The results above can be classified as ‘Low Hazard’.

3.4 Overland Flow Paths

A key feature of the proposed development is the retention of the existing drainage channel alignment through the centre of the site. The channel has been sized to accommodate the 1% AEP event with 500mm freeboard. The scenario was modelled using the DRAINS software package. A summary of the data and results is provided below.

Catchment Area 5.2Ha

1% AEP flow 2.51m³/s

Flow depth 0.5m

Velocity 1.31m/s

Velocity x Depth 0.64m²/s

The results above are situated within the transition zone between ‘Low Hazard’ and ‘High Hazard’ of Figure L2 Appendix L of the Floodplain Development Manual. It is therefore proposed that pool fencing be provided to prevent pedestrian access to the central channel. Noting the vulnerability of the intended residents, consideration was given the effect of the Probable Maximum Flood (PMF) event on the channel. The PMF was calculated nominally as 3 x 1%AEP, and gave the results below:

1% AEP flow 7.53m³/s

Flow depth 0.82m

Velocity 1.75m/s

Velocity x Depth 1.43m²/s

The flow above can be contained within the channel, with a freeboard of approximately 180mm. The results above can be classified as ‘high hazard’ in Figure L2, which further supports the proposed safety fencing. Consideration has also been given to overland flow through the site during major storm events, to ensure no trapped low points, and that stormwater can be conveyed safely through the development. The intended overland flow paths are shown on Northrop drawing DA-C06.

Page 13: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

4. Stormwater Quality Management Strategy

4.1 Stormwater Quality Philosophy and Targets

The proposed development will involve the construction of roadways, footpaths, hardstand and roof areas which will increase the mean annual pollutant load generated by the site. In accordance with Clause 36 (a) of the SEPP HSPD, the proposed development will include controls to minimise the impact of stormwater runoff on receiving waters. The controls will consist of vegetated swales and an end of line bio retention system to reduce the pollutant load in line with the selected treatment targets.

As described in Section 3.2 of this report, and in the absence of Council nominated treatment targets, we have adopted those nominated in Australian Rainfall Quality guidelines. Chapter 1, Section 1.4.3, Table 1.2 of ARQ nominates the Stormwater treatment objectives for Victoria and New South Wales, as reproduced in Table 2 below:

Table 2 – Stormwater Treatment Objectives for Victoria and New South Wales

Pollutant Stormwater Treatment Objective

Total Suspended Solids (TSS)

80% retention of average annual load

Total Phosphorous (TP) 45% retention of average annual load

Total Nitrogen (TN) 45% retention of average annual load

Gross Pollutants Retention of litter greater than 50mm for flows up to the 3-month ARI peak flow

Coarse Sediment Retention of sediment coarser than 0.125mm for flows up to the 3-month ARI peak flow

Oil and grease No visible oils for flows up to the 3-month ARI peak flow

4.2 Treatment Train Assessment

To substantiate the effectiveness of the proposed water quality control measures, stormwater quality modelling was undertaken using the Model for Urban Stormwater Improvement and Conceptualisation (MUSIC) V6.3.0. Rainfall and potential evapotranspiration (PET) data was obtained from the MUSIC website and set up using the meteorological template build tool. The model used Gloucester rainfall data from 1993-2010 with a 6-minute timestep and Taree PET data, as this was the closest available data to the site.

Modelling was completed in accordance with the “NSW MUSIC Modelling Guidelines” (BMT WBM, 2015). The pervious area parameters adopted were consistent with that of a silty clay loam, based on a geotechnical investigation undertaken at the site and presented in Douglas Partners Geotechnical and Preliminary Site Investigation report 91290.00.

The catchment area was broken down into seven sub-catchments to effectively simulate the proposed treatment measures along the treatment train. Figure 3 below illustrates the sub-catchments and a schematic of the model is shown in Figure 4.

Page 14: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Figure 3 - Modelled Catchments

Figure 4 - MUSIC Model Layout Schematic

The source nodes adopted to represent the development were Urban Residential, Urban Sealed Road, Urban Roof, Urban Mixed and Urban Revegetated Land. The residential node was used to represent the ILUs and the impervious percentage adopted was 80%.

Page 15: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

The treatment train incorporates:

• Primary treatment via a 10kL rainwater tank connected to the RACF; and

• Secondary treatment via a bioretention basin and two vegetated swales.

Treatment nodes were created within the MUSIC model to represent the water quality treatment devices. A description of each of these measures is included below.

4.3 Rainwater Tank

Runoff from approximately 50% of the RACF roof will be collected and diverted to a 10kL rainwater tank located adjacent to the building. The only re-use demand for input in the MUSIC model was external re-use. A re-use demand of 151kL/yr was adopted, based on the “NSW MUSIC Modelling Guidelines” (BMT WBM, 2015) for outdoor uses for a single dwelling. The proposed system satisfies 84% of re-use demand which is considered an acceptable design outcome.

All downpipes reporting to the tank will be connected to a first flush device located prior to the tank inlet.

4.4 Bioretention Basin

To attain the stormwater quality targets, a bioretention basin will be located within the proposed detention basin. The basin will direct water to the bioretention trench where, through infiltration, it will collect and treat stormwater runoff from the proposed development, before discharging treated stormwater to the existing channel.

The bioretention basin has been modelled with a filter area of 150m2, a filter depth of 0.4m and an extended detention depth of 0.3m. Parameters for the bioretention basin were adopted in accordance with the “NSW MUSIC Modelling Guidelines” (BMT WBM, 2015).

4.5 Vegetated Swales

Two trapezoidal shaped open channels are proposed at the stormwater outlets to convey runoff to the bioretention basin. A typical section can be seen in drawing DA-C07.

4.6 Results

The MUSIC modeling results for the receiving node are shown in Table 3 below.

Table 3 - MUSIC Model Result Summary (outlet node)

Source Load

(kg/yr) Residual

Loads (kg/yr) Percentage Reduction

Target Objectives

Total Suspended Solids (TSS) 2270 250 89.0 85

Total Phosphorous (TP) 4.11 1.34 67.4 45

Total Nitrogen (TN) 29.5 15.2 48.4 45

Gross Pollutants 359 8.06 97.8

Table 3 shows that the proposed storm water quality management strategy is predicted to achieve the load reduction targets, as estimated by MUSIC. MUSIC data files can be provided upon request.

Page 16: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

5. Road Layout and Grading

5.1 Subdivision Roads

Drawings DA-C06 and DA-C07 (Appendix A) show the layout of the proposed internal road network as well as the preliminary typical road cross-section. The proposed internal road network has been designed to achieve adequate stormwater conveyance and to have compliant disabled access from the road to the proposed ILUs.

5.2 Road Grading

Preliminary grading for all proposed internal roads has been prepared in accordance with MidCoast Council’s - Gloucester Development Control Plan which follows Austroads Standards. Maximum longitudinal grades adopted for the internal roads are approximately 1 – 5%, with the exception of the 6% entry road from the roundabout at southern end.

5.3 Pedestrian Access

Pedestrian access throughout the development is proposed to be via the road network as it will be a low-risk environment with low speeds and minimal car movements. The roads are graded between 1-5% which generally complies with the accessibility grades nominated in AS1428.1. The site access leading into the site from the roundabout on clement street is shown as 6%, and is not intended for pedestrian access due to the proximity to the roundabout.

5.4 Road Types

Typically, road surface treatments throughout the development will consist of an inverted crown bituminous flexible seal with flush kerbs, in accordance with the Gloucester DCP. The entry road will be provided with upright kerb to provide sufficient capacity to convey stormwater.

Roads have been designed to have a two-way cross-fall towards the centerline of the road aiding in directing storm water towards the proposed storm water drainage network.

It is anticipated that the proposed driveways will be constructed using either bitumen or concrete.

5.5 External Works

It is proposed that kerb and channel will be constructed for the full site frontage to Clement Steet, to tie in with the existing kerb on Ravenshaw Street. Construction of the new kerb will include shaping of the verge to comply with Council’s typical requirement being a nominal 2% crossfall towards the carriageway.

As noted in Section 3.3, construction of the new kerb and channel will include provision of kerb inlet pits at the location of the existing drainage culverts. Drainage pits at the low point in Clement Street will be sized to convey the minor event to the proposed central drainage channel. Surcharge from major storm events, or in the event of blockage, will be conveyed in the entry road to the central drainage channel, as described in Section 3.3.

Page 17: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

6. Conclusion

Given the results of the above investigations, it is reasoned that the development meets SEPP HSDP and MidCoast Council’s requirements.

As confirmed by MidCoast Council, flooding from external waterways is not expected to impact the proposed development. Flooding from the upstream and internal catchments will be managed through the provision of a drainage channel through the centre of the site, sized to accommodate the 1% AEP with a 500mm freeboard. Consideration has been given to overland flow paths to ensure that there are not trapped low points within the development.

To comply with SEPP HSPD Clause 36 (a), the proposed development will control and minimise disturbance and impacts of stormwater runoff on adjoining properties and receiving waters, as follows:

• In collaboration with MidCoast Council, the pollutant load reduction targets have been

established to comply with those nominated in Chapter 1, Section 1.4.3, Table 1.2 of Australian Rainfall Quality guidelines; and,

• The treatment of stormwater for waterborne pollutants to achieve the selected treatment targets is achieved through the proposed treatment train. This includes the use of a rainwater tank, a bioretention basin and three swales.

To comply with SEPP HSPD Clause 36 (b) the proposed development will include on-site stormwater detention and re-use for second quality water uses, as follows:

• Runoff from approximately 50% of the RACF roof will be connected to a 10kL tank for reuse in landscape irrigation;

• Stormwater from the ILUs, Community Centre and roadways will be conveyed to the combined stormwater detention and water quality treatment basin, before being discharged into the adjacent water; and,

• The proposed detention basins will reduce post-developed peak discharge to below the pre-developed peaks.

To comply with SEPP HSPD Clause 38 (b) the proposed development will provide attractive, yet safe, environments for pedestrians and motorists with convenient access and parking for residents and visitors, as follows:

• Building and ground levels throughout the site have been set to ensure that grades generally comply with AS1428.1, in all locations with pedestrian access.

Page 18: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

Limitation Statement Northrop Consulting Engineers Pty Ltd (Northrop) has been retained to prepare this report based on specific instructions, scope of work and purpose pursuant to a contract with its client. It has been prepared in accordance with the usual care and thoroughness of the consulting profession for use by Anglican Care. The report is based on generally accepted practices and standards applicable to the scope of work at the time it was prepared. No other warranty, express or implied, is made as to the professional advice included in this report.

Except where expressly permitted in writing or required by law, no third party may use or rely on this report unless otherwise agreed in writing by Northrop.

Where this report indicates that information has been provided to Northrop by third parties, Northrop has made no independent verification of this information except as expressly stated in the report. Northrop is not liable for any inaccuracies in or omissions to that information.

The report was prepared on the dates shown and is based on the conditions and information received at the time of preparation.

This report should be read in full, with reference made to all sources. No responsibility is accepted for use of any part of this report in any other context or for any other purpose. Northrop does not purport to give legal advice or financial advice. Appropriate specialist advice should be obtained where required.

To the extent permitted by law, Northrop expressly excludes any liability for any loss, damage, cost or expenses suffered by any third party relating to or resulting from the use of, or reliance on, any information contained in this report.

Page 19: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

APPENDIX A

Concept Civil Design Drawings

Page 20: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290
Page 21: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290
Page 22: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290
Page 23: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290
Page 24: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

APPENDIX B

MidCoast Council Correspondence

Page 25: GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER · GLOUCESTER RACF AND ILU CLEMENT STREET, GLOUCESTER CIVIL WORK DRAWINGS Newcastle Suite 4, 215 Pacific Hwy, Charlestown NSW 2290

1

Chris Piper

From: Chris Piper

Sent: Tuesday, 13 March 2018 12:56 PM

To: '[email protected]'

Subject: Gloucester RACF

Hi Aaron,

Thanks for the phone call just now, we’ll progress with design based on our discussion, summarised below.

• The proposed site is well above PMF level and does not need to be investigated further;

• On site detention (OSD) is to limit post development flows to pre development flows.

• OSD should consider rain tanks / car park for storage opportunities, and avoid a damn where possible.

• Amenity of the OSD outcome is key.

• The site catchment falls within a drinking water catchment.

• While not explicitly described in the DCP, water quality will need to be considered. The central channel

provides a good opportunity for treatment.

• There are not any documented treatment targets, however Northrop will undertake and provide the results

of MUSIC modelling to identify the treatment achieved

Please let me know if I have misunderstood any of the above. Thanks again for your assistance.

Kind regards

Chris Piper Senior Engineer Northrop Consulting Engineers Pty Ltd M: 0407 9404 81 F: 02 4943 1577 Level 1, 215 Pacific Highway Charlestown NSW 2290 PO Box 180 Charlestown NSW 2290 www.northrop.com.au