global pharmaceutical manufacturer - quality road & jurong sites – singapore

4
EECO2 Case Study Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore Pharma Manufacturing & laboratories

Upload: eeco2

Post on 22-Jun-2015

1.695 views

Category:

Business


0 download

DESCRIPTION

Pharma Manufacturing & laboratories

TRANSCRIPT

Page 1: Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore

EECO2 Case Study

Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore

Pharma Manufacturing & laboratories

Page 2: Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

Benefits:

Delivering Global Energy Saving Solutions The core expertise & experience within EECO2 is not the usual Consultant format as we all come from a design & build background, commercially grounded and totally focused upon the identification & cost effective delivery of identified energy savings. Core Objective of all services:Use our acquired experience & knowledge to provide cost effective, energy & emission reduction solutions from initial opportunity identification through implementation & verification of savings delivered globally.

Project Benefits:

Energy savings delivered  = 2.2m kWhr/pa Energy cost savings = S$347,000 Emissions reduction = 985 te CO2 Simple pay back = 1.3 years Further energy savings identified = 2.5m kWhr/pa

Page 3: Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore

EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]

About the Project:

Facility: Pharma Manufacturing & laboratories Issue: Very high energy demand driven by original HVAC design & layout

Brief: Reduce energy demand without compromising on Compliance or Laboratory safety Solution:

Reduce existing air change rates  Reduce existing fresh air volume Improve plant operational maintenance Optimise BMS system  Recommended upgrading laboratory fume cupboards to VAV Recommended upgrade & control of warehousing Facilities

Conclusion:

EECO2 supported HVAC design review, project scoped out & managed local test & balance & BMS Contractors to complete project – project successfully completed also produced a prioritised Action Plan to implement further savings.

Page 4: Global Pharmaceutical Manufacturer - Quality Road & Jurong sites – Singapore

Contact Details:

General Enquiries & SalesTel: +44 (0) 1625 660 717Email: [email protected]

Technical SupportTel: +44 (0) 1625 660 717Email: [email protected] EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JN

Connect with us:

Follow us on Linkedin

Like us on Facebook

Follow us on Twitter

Add us on Google Plus