EECO2 Case Study
Global Pharmaceutical Manufacturer– Buenos Aires – Argentina
Effervescent Sachets Manufacturing Area – low relative humidity required
![Page 2: Global Pharmaceutical Manufacturer – Buenos Aires – Argentina](https://reader035.vdocuments.site/reader035/viewer/2022080211/55875d8cd8b42ae1788b471f/html5/thumbnails/2.jpg)
EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]
Benefits:
Delivering Global Energy Saving Solutions The core expertise & experience within EECO2 is not the usual Consultant format as we all come from a design & build background, commercially grounded and totally focused upon the identification & cost effective delivery of identified energy savings. Core Objective of all services:Use our acquired experience & knowledge to provide cost effective, energy & emission reduction solutions from initial opportunity identification through implementation & verification of savings delivered globally.
Benefits:
Energy savings = 1.5m kWhr/pa Energy cost savings = £58,000 Emissions reduction = 686 te CO2 Simple pay back = 11 months
![Page 3: Global Pharmaceutical Manufacturer – Buenos Aires – Argentina](https://reader035.vdocuments.site/reader035/viewer/2022080211/55875d8cd8b42ae1788b471f/html5/thumbnails/3.jpg)
EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]
About the Project:
Facility: Effervescent Sachets Manufacturing Area – low relative humidity required Issue: Very high energy demand driven by original HVAC design & unable to meet Product critical conditions during summer months Brief: Reduce energy demand without compromising on product quality or ComplianceSolution: Solution: • Reduce existing air change rates • Reduce existing fresh air volume • Install new VSD’s to the supply air fans • Replace the existing supply air diffusers to improve air distribution • Re-commission & balance the complete manufacturing areas HVAC system • Supported upgrade of BMS system, installation of VSD’s • Maintenance upgrade of filtration & control valve replacement • Completed product risk assessments, Engineering Change Control documentation & all required Regulatory documentation covering the changes
![Page 4: Global Pharmaceutical Manufacturer – Buenos Aires – Argentina](https://reader035.vdocuments.site/reader035/viewer/2022080211/55875d8cd8b42ae1788b471f/html5/thumbnails/4.jpg)
EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JNTel: +44 (0) 1625 660 717 |Email: [email protected]
Conclusion and Comments:
Conclusion:EECO2 supported HVAC design review, recommissioned HVAC system & supported BMS & HVAC upgrade also design of new supply air diffusers Site Director commented:The savings delivered during Phase 1 has exceeded our expectations & the quality Team have supported the risk based approach used to deliver the savings. We now move on to Phase 2 upgrade which is much more demanding but the confidence & structure knowledge we gained during phase 1 we help us deliver our target for 2011.
![Page 5: Global Pharmaceutical Manufacturer – Buenos Aires – Argentina](https://reader035.vdocuments.site/reader035/viewer/2022080211/55875d8cd8b42ae1788b471f/html5/thumbnails/5.jpg)
Contact Details:
General Enquiries & SalesTel: +44 (0) 1625 660 717Email: [email protected]
Technical SupportTel: +44 (0) 1625 660 717Email: [email protected] EEC02 LimitedSuite 9, The GreenFountain Street, MacclesfieldCheshire, SK10 1JN
Connect with us:
Follow us on Linkedin
Like us on Facebook
Follow us on Twitter
Add us on Google Plus