global partnership working group – gpwg annual report 2010 ... · and biosafety standards,...

113
Global Partnership Working Group – GPWG Annual Report 2010 Consolidated Report Data ANNEX A* *The information is supplied on a national basis in a format appropriate to each country

Upload: others

Post on 26-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

Global Partnership Working Group – GPWG Annual Report 2010

Consolidated Report Data

ANNEX A*

*The information is supplied on a national basis in a format appropriate to each country

Page 2: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

2Australia1

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committede.g.(July 2002 –

June 2007)

Funds Expendede.g. (July 2002 –

June 2007)Russia Japanese-Russian program to

dismantle nuclear submarinesDismantlement completed (AUD$10 million) All funds have been

fully expended

1 Updated on April 2010

Page 3: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

3Canada

Countryof

Project

Project Description Project Status: Milestones, Implementation Comments FundsCommitted

(June 2002 toMay 2010) in

000's

FundsExpended

(June 2002 toMarch 31

2010)in 000’s

Total Ten Year GP Pledge & Total Approximate Spending (out of $C 1,000,000,000) $ C 650,916.7 $ C 623,228.1Chemical Weapons Destruction

Russia Chemical Weapons Destruction:Railway Construction at theShchuch'ye Chemical WeaponsDestruction Facility.

Canada provided C$33M for the construction of an 18km railway at theShchuch'ye CWDF, through the UK's bilateral Agreement with Russia.The construction of the bridge across the Miass River, supported by aUS$1M contribution from the Nuclear Threat Initiative, was completed inAugust 2007. Construction of the railway was completed in November2008.

$C 33,000.0 $C 33,000.0

Russia Chemical Weapons Destruction:support for key industrialinfrastructure projects at theShchuch'ye Chemical WeaponsDestruction Facility.

Canada committed up to C$10M for key industrial projects at theShchuch'ye CWDF, including the construction of intersitecommunications, which was completed in October 2007, and a localwarning system, which was completed in September 2008.

$C 10,000.0 $C 9,250.0

Russia Chemical Weapons Destruction:provision of equipment for the secondmain destruction building at theShchuch'ye Chemical WeaponsDestruction Facility.

C$55M purchased Russian-built equipment needed to destroy nerve agentmunitions within the second main destruction building (MDB2) at theShchuch'ye CWDF. The majority of the equipment was delivered in 2007and 2008 and two items were delivered in 2009. As of December 2009, allShchuch’ye projects are complete.

$C 55,000.0 $C 54,608.3

Russia Chemical Weapons Destruction:provision of equipment for the twomain destruction buildings at theKizner Chemical Weapons DestructionFacility

Work is underway to provide assistance at the Kizner CWDF, pursuant toa C$100M commitment made by the Prime Minister of Canada at the St.Petersburg G8 Summit in 2006. Given that the two million munitions atKizner are similar to those stored at Shchuch’ye, Canada is providingsimilar destruction equipment for the two main destruction buildings. Acontract for the supply of catalytic reactors was signed in December 2008,a second contract for the supply of two metal parts furnaces and auxiliaryequipment was signed in February 2009 and a third major contract for the

$C 100,000.0 $C 65,678.7

Page 4: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

4supply of the destruction process lines was signed in August 2009. Thecatalytic reactors project was completed in March 2010.

Russia Chemical Weapons Destruction:support to Green Cross International toestablish and operate the IzhevskPublic Information and OutreachOffice.

The Green Cross Public Outreach office in Izhevsk was established toincrease awareness about Russian plans and programs to destroy nerveagent stockpiles at the nearby Kizner chemical weapons storage facility.The office opened in June 2005 and in 2010, Canada provided its sixthannual contribution.

$C 868.3 $C 849.0

Chemical Weapons Destruction: OtherProject-Related Expenses

$C 2,224.1 $C 2,224.1

Nuclear submarine dismantlement and spent fuel managementRussia Comprehensive Nuclear powered

submarine (NPS) dismantlement andde-fuelling of strategic ballistic missilesubmarines (SSBN).

13 NPS have been comprehensively dismantled (11 Victor Class NPS and2 Yankee NPS) and two SSBNs de-fuelled (1 Typhoon Class and oneDelta III Class). Total of 34 reactors de-fuelled with resultant SNFsecured. Railway built in Far East to enable the removal of all SNF fromthe region.

$ C 159,056.2 $ C 158,283

Russia Nuclear submarine dismantlement:support for the EBRD NorthernDimension Environmental Partnership(NDEP).

Canada contributed C$32M to the EBRD-NDEP in FY03/04 to assist inthe remediation of the nuclear legacy in NW Russia.

$C 32,000.0 $C 32,000.0

Russia Nuclear submarine dismantlement:Other Project-Related Expenses

$ C9,965.7 $C 9,965.7

Nuclear and Radiological SecurityRussia Nuclear and Radiological Security:

Projects to strengthen the physicalprotection of facilities that housenuclear material, including materialsdestined for eventual disposition.

Canada has been involved in physical upgrades at six Russian nuclearfacilities. Ten physical protection projects have been completed.Additionally, six projects are at various stages of implementation, whiletwo more have been developed and are awaiting implementation.

$C 56,082.5 $C 43,659.2

Russia Nuclear and Radiological Security:Projects to strengthen the security ofnuclear material during transportation.

Canada is involved in two transportation security physical protectionupgrades projects. These involve the provision of special cargo trucks andrailcars to help ensure the safe and secure transportation of nuclearmaterials between Russian nuclear facilities.

$C 11,171.2 $C 11,138.8

Russia Nuclear and Radiological Security:support to US Dept. of Energy-led

Canada's contribution to the US-led project to shutdown the last Russianweapons-grade plutonium production reactor was completed in June

$C 9,000.0 $C 9,000.0

Page 5: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

5Elimination of Weapons-GradePlutonium Production program.

2005.

Russia Nuclear and Radiological Security:Projects to decrease the overall quantityof proliferation-significant nuclearmaterials in existence

Canada funded fourteen projects at four sites in Russia to help the RussianMinistry of Defense (MOD) to prepare the ground for the disposition of34 tonnes of weapons-grade plutonium. Further, funding was given tohelp design, construct and/or modify facilities storing nuclear materialsawaiting the final disposition process. Some projects also contain atransportation security element.

$C 78,893.6 $C 30,921.7

CIS Nuclear and Radiological Security:IAEA projects to strengthen nuclearand radiological security.

Canadian funding was used to support important physical protectionupgrades and training projects, as well as projects to enhance capabilitiesto prevent the illicit trafficking of nuclear and other radioactive materials.This was done through the IAEA’s Nuclear Security Fund (NSF).

$C 12,354.6 $C 11,299.6

Russia Nuclear and Radiological Security:Projects to secure highly radioactivesources (RTGs) and infrastructuresupport for removal and securing ofRTGs

Canada funded the manufacturing of transportation and shieldingcontainers for safe and secure transportation of RTGs. This project wascompleted in August 2007.

$C 1,251.9 $C 1,259.9

Russia Nuclear and Radiological Security:Remove secure and replace RTGs.

In cooperation with the US Dept. of Energy’s Global Threat ReductionInitiative (GTRI), Canada is funding the removal of 59 RTGs along thenorthern sea route in the Russian Arctic and the Far East, includingdisassembly and replacement by solar panels.

$C 9,000.0 $C 9,000.0

Ukraine Nuclear and Radiological Security:Prevention of illicit trafficking.

In cooperation with US Dept. of Energy’s Second Line of Defense (SLD)program, Canada funded upgrades to key border crossings to help preventthe illicit trafficking of nuclear materials.

$C 9,825.0 $C 9,825.0

Ukraine Nuclear and Radiological Security:European Bank for Reconstruction andDevelopment (EBRD) ChernobylProjects

Responsibility for the EBRD Chernobyl Projects was transferred to theGlobal Partnership Program in 2004. In April 2006, Canada announced aC$8M additional contribution. In FY 08/09, a C$5M contribution wasdonated to the EBRD “Nuclear Safety Fund” in accordance with Canada’straditional cost-sharing burden of 5%.

$C 13,000.0 $C 13,000.0

Nuclear and Radiological Security:securing radiological materials

NRS hosted the Global Initiative to Combat Nuclear Terrorism (GICNT)seminar on securing radiological sources (Ottawa, June 2008).

$C 16.8 $C 16.8

Nuclear and Radiological Security:WINS start-up costs

Canada’s contribution of $500.0 is assisting WINS by funding much-needed staff support and IT infrastructure development.

$C 500.0 $C 317.5

Nuclear and Radiological Security: $C 9,687.1 $C 9,687.1

Page 6: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

6Other Project-Related ExpensesRedirection of Former Weapons Scientists

RussiaandFSU

Redirection of Former WeaponsScientists: International Science andTechnology Center (ISTC)

Canada acceded to the ISTC in March 2004 and contributed $C64,678.2toward efforts to redirect former weapons scientists, including funding of138 projects involving the redirection of over 2843 former weaponsscientists and several sustainability-driven supplemental programs.Intensive efforts continued to identify additional Canadian partners andcollaborators to work on projects with former weapons scientists.

$C 70,476.6 $C 64,528.4

FSUUkraine

Redirection of Former WeaponsScientists: Science and TechnologyCenter in Ukraine (STCU)

Canada acceded to the STCU in April 2006 and has contributed$C10,174.5 toward efforts to redirect former weapons scientists,including funding of 72 projects involving the redirection of over 627former weapons scientists and several sustainability-driven supplementalprograms. Intensive efforts continued to identify additional Canadianpartners and collaborators to work on projects with former weaponsscientists.

$C 10,394.5 $C 10,174.5

Redirection of Former WeaponsScientists: Other Project-RelatedExpenses

$C 2,446.1 $C 2,446.1

Biological Non-Proliferation

Russiaand FSU

Biosafety, Biosecurity and BiologicalNon-Proliferation

Canada’s biological non-proliferation strategy places great emphasis onthe mutually-reinforcing disciplines of biosafety, biosecurity and bioriskmanagement:

• Guidelines: Developing and implementing national biosecurityand biosafety standards, guidelines and regulations, as well assupport to broader biorisk management initiatives such as CWA15793;

• Training: Biosecurity and biosafety training which includesworkshops, development of reference materials and tools, and theestablishment of regional training centers (e.g. Russia, Ukraineand Kazakhstan).

$C 3,838.5 $C 3,658.5

Page 7: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

7• Associations: Providing assistance to engage with the international

biosecurity/biosafety community, and to establish national andregional biosafety associations (including support to the newly-created Biosafety Association for Central Asia and the Caucasus(BACAC)

Canada is also engaged in a multi-faceted program to strengthen existingbiological non-proliferation regimes such as the Biological and ToxinWeapons Convention (BTWC) and UN Security Council Resolution(UNSCR) 1540. This includes:

• Funding the participation of FSU States Parties that wouldotherwise be unable to attend;

• Providing funding to support outreach activities of the BTWCImplementation Support Unit (ISU);

• Support for the development of enabling national legislationrequired under Art. IV of the BTWC.

KyrgyzRepublic

Infrastructure Improvements Canada is assisting the Government of the Kyrgyz Republic to enhancebiosecurity, biosafety, and biocontainment capabilities in the KyrgyzRepublic, including through the design, construction, commissioning andstart-up of a new human & animal health facility in Bishkek. The newlaboratory will serve as the central repository for the consolidation ofdangerous pathogens from several existing, vulnerable facilities in theKyrgyz Republic. As the design and construction of the new lab will takeseveral years, Canada also implemented interim security upgrades at 3existing biological facilities in 2009.

$C 6,738.0 $C 6,733.0

Biological Non-Proliferation: OtherProject-Related Expenses

$C 3,332.1 $C 3,332.1

General GP ProjectsOther Operating Costs $C 44,111.7Outreach and Support $C 174.6

Czech RepublicCountry of Multilateral Initiatives Funds Committed Funds Expended

Page 8: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

8Project

Russia 2007 Chemical WeaponsDestruction

Shchuch'ye chemical weapons destruction site (UK project); thesame amount of funds has been extended annually since 2003

CZK 2 000. 000 CZK 2 000. 000

Ukraine 2004 Nuclear Security IAEA Nuclear Security Fund: “Strengthening Security of NuclearMaterials” (IAEA project UKR/0/008)

CZK 1 000.000 CZK 1 000.000

Ukraine Nuclear Safety IAEA Programme of Technical Cooperation “Action Plans forNuclear Power Plant Lifetime Management” IAEA ProjectUKR/4/013

10 685 000,- CZK(2004-2008)

10 685 000,- CZK(2004-2008)

Armenia Physical Protection IAEA Nuclear Security Fund: “Improvement in the PhysicalProtection System at the Armenian Nuclear Power Plant” (IAEAproject ARM/9/017)

CZK 1 500.000(2006)

CZK 1 500.000(2006)

Armenia Nuclear Safety IAEA Programme of Technical Cooperation “Improvement ofDesign Safety of the Armenian NPP” ARM/9/016

8 400 000,- CZK(2005-2008)

8 400 000,- CZK(2005-2008)

Armenia Nuclear Safety Strengthening of In-Service Inspection through Modern Non-Destructive Testing Methods” IAEA Project ARM/4/004

1 450 000,- CZK(2004)

1 450 000,- CZK(2004)

Moldova Nuclear Security IAEA Nuclear Security Fund - strengthening security of radiationsources and nuclear facilities in Moldova

1 000 000,- CZK 1 000 000,- CZK

Serbia Repatriation of SpentFuel

IAEA TC RER/4/028 Repatriation of spent fuel from Vinca RAresearch reactor

18 000 000,- CZK(2008-2010)

6 000 000,- CZK(2008)

Kyrgyzstan Monitoring Establishment of a Radio-ecological Monitoring and AssessmentNetwork – IAEA TC Project KIG/9/003

1 400 000,- CZK(2008)

1 400 000,- CZK(2008)

Tajikistan,Kyrgyzstan

Radiation Protection Upgrading Radiation Protection Infrastructure in Eastern Europe andCentral Asia – IAEA TC Project RER/9/079

1 220 000,- CZK(2005-2006)

1 220 000,- CZK(2005-2006)

Mexico Incident Management Human Resource Development and Nuclear Technology Support –IAEA TC Project MEX/0/014

350 000,- CZK(2005)

350 000,- CZK(2005)

Bosnia andHerzegovina

Sources Management “Strengthening National Capabilities in Radiation, Waste andTransport Safety in the Mediterranean Region” – IAEA ProjectRER/9/080

500 000,- CZK(2005)

500 000,- CZK(2005)

European Union

Page 9: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

9Overview of EU Council Joint Actions and Council Decisions against the Proliferation of Weapons of Mass Destruction 2

Title Objective and implementing entity Budget and durationCouncil Decision2009/42/CFSP insupport of ArmsTrade Treaty

The overall objective is to promote the participation of allstakeholders in the discussion on an Arms Trade Treaty(ATT), integrate national and regional contributions to theinternational process under way, and to identify the scopeand implication of a possible treaty on the trade in arms.

The project provides for the organisation of a launchingevent, six regional seminars, a final seminar to presentoverall results and a side-event in the margins of the 1stCommittee (UNGA 64th session).

Implementing entity: United Nations Institute forDisarmament Research (Unidir)

Budget: 836.260 EURAdopted: 19.01.2009Official Journal: L 17 - 22.01.2009Duration: 15 months - end: April 2010

Council Decision2008/974/CFSP insupport of HCoC

The EU supports three aspects of the Code as follows:— Universality of the Code,— Implementation of the Code,— Enhancement and improved functioning of the Code.

Implementing entity: Fondation pour la RechercheStratégique

Budget: 1.015.000 EURAdopted: 18.12.2008Official Journal: L 345 - 23.12.2008Duration: 24 months - end: December 2010

Council Joint Action2008/588/CFSP insupport of BTWC

The overall objective is:- to support the universalisation of the BTWC,- to enhance the implementation of the BTWC, including thesubmission of CBM declarations, and- to support the best use of the Inter-Sessional Process 2007-2010 for the preparation of the next Review Conference.

Implementing entity: United Nations Office for DisarmamentAffairs (UNODA) - Geneva

Budget: 1.400.000 EURAdopted: 10.11.2008Official Journal: L 302 - 13.11.2008Duration: 24 months - end: November 2010

Council Joint Action The EU supports the development of capacity of the Budget: 2.316.000 EUR

2 More information is available in the last Six-monthly Progress Report on the implementation of the EU Strategy against the proliferation of Weapons of Mass Destruction, adoptedon 25-26 June 2009, available at: http://www.consilium.europa.eu/uedocs/cmsUpload/st11490.en09.pdf

Page 10: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

102008/588/CFSP insupport of CTBTO

Preparatory Commission of the CTBTO in the area ofVerification by:- Noble gas monitoring: radio-xenon measurements and dataanalysis- Integrating States Signatories in Africa to fully participatein and contribute to the implementation of the CTBTOmonitoring and verification system

Implementing entity: The CTBTO Preparatory Commission

Adopted: 15.07.2008Official Journal: L189 - 17.07.2008Duration: 18 months - end: January 2010

Council Joint Action2008/487/CFSP insupport of theOttawa Convention

The overall objectives are the promotion of theuniversalisation of the Convention, support for fullimplementation of the Convention by States Parties andsupport for the preparations for the Second ReviewConference which will take place in 2009. Maximumsynergy will be ensured with other relevant EU financialinstruments.

Implementing entity: The Geneva International Centre forHumanitarian Demining (GICHD)

Budget: 1.070.000 EURAdopted: 23.06.2008Official Journal: L165 - 26.06.2008Duration: 21 months - end: March 2010

Council Joint Action2008/368/CFSP insupport of theimplementation ofUNSCR 1540

The projects in support of the implementation of UNSCR1540 will take the form of six workshops aiming atenhancing the capacity of officials responsible for managingthe export control process in six subregions (Africa, CentralAmerica, Mercosur, the Middle East and Gulf Regions,Pacific Islands and South-East Asia), so that they can at apractical level undertake implementation efforts of UNSCR1540. The proposed workshops will be specifically tailoredfor border, customs and regulatory officials and willcomprise the main elements of an export control processincluding applicable laws (including national andinternational legal aspects), regulatory controls (includinglicensing provisions, end-user verification and awareness-raising programmes) and enforcement (including commodity

Budget: 475.000 EURAdopted:14.05.2008Official Journal: L127 - 15.05.2008Duration: 24 months - end: May 2010

Page 11: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

11identification, risk-assessment and detection methods).

Implementing entity: United Nations Office for DisarmamentAffairs (UNODA)

Council Joint Action2008/314/CFSP of 14April 2008 onsupport for IAEAactivities in the areasof nuclear securityand verification -IAEA V

The objectives are:- strengthening national legislative and regulatoryinfrastructures for the implementation of relevantinternational instruments in the areas of nuclear security andverification, including comprehensive safeguards agreementsand the Additional Protocol,- assisting States in strengthening the security and control ofnuclear and other radioactive materials,- strengthening States' capabilities for detection and responseto illicit trafficking in nuclear and other radioactivematerials.

Implementing entity: The International Atomic EnergyAgency (IAEA)

Budget: 7.703.000 EURAdopted: 14.04.2008Official Journal: L107 - 17.04.2008Duration: 24 months - end: April 2010

Council Joint Action2008/307/CFSP of 14April 2008 insupport of the WorldHealth Organisationactivities in the areaof laboratory bio-safety and bio-security

The overall objective is to support, the implementation of theBTWC, in particular those aspects that relate to the safetyand security of microbial or other biological agents andtoxins in laboratories and other facilities, including duringtransportation as appropriate, in order to preventunauthorised access to and removal of such agents andtoxins.- Promotion of bio-risk reduction management throughregional and national outreach,- Strengthening the security and laboratory managementpractices against biological risks,

Implementing entity: The World Health Organisation

Budget: 2.105.000 EURAdopted: 14.04.2008Official Journal: L106 - 16.04.2008Duration: 24 months - end: April 2010

Council Joint Action The objectives are: Budget: 500.500 EUR

Page 12: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

122008/230/CFSP of 17March 2008 topromote the EUCode of Conduct onarms exports

(a) to promote the criteria and principles of the EU Code ofConduct on Arms Exports among third countries;(b) to assist third countries in drafting and implementinglegislation to ensure effective control of arms exports;(c) to assist countries in the training of licensing officers toensure adequate implementation and enforcement of armsexport controls;(d) to assist countries in the elaboration of national reports onarms exports and the promotion of other forms of scrutiny inorder to promote transparency and accountability of armsexports;(e) to encourage third countries to support the United Nationsprocess aiming at the adoption of a legally bindinginternational treaty establishing common standards for theglobal trade in conventional arms, and to assist in ensuringthat they are in a position to comply with such possiblecommon standards.

Implementing entity: EU Presidencies

Adopted: 17.03.2008Official Journal: L75 - 18.03.2008Duration: expires 17.03.2010

Council Joint Action2008/113/CFSP of 12February 2008 insupport of markingand tracing ofSALW

The UN Secretariat (Office of Disarmament Affairs),organised in 2008 a series of regional and sub-regionalworkshops in order to allow relevant government officialsand others (including SALW points of contact, lawenforcement officials, members of national coordinatingbodies, and parliamentarians) to become better acquaintedwith the provisions of the International Instrument to EnableStates to Identify and Trace, in a Timely and ReliableManner, Illicit Small Arms and Light Weapons (SALW)

Implementing entity: United Nations Office for DisarmamentAffairs (UNODA)

Budget: 299.825 EURAdopted: 12.02.2008Official Journal: L 40 - 14.02.2008Duration: 12 months - end: February 2009

Council Joint Action Objective: Budget: 1.780.000 EUR

Page 13: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

132007/753/CFSP of 19November 2007in support of IAEAmonitoring andverification activitiesin the DPRK

- to contribute to the implementation of monitoring andverification activities in the DPRK, in accordance with theInitial Actions of 13 February 2007, as agreed in theframework of the six-party-talks.

Implementing entity: The International Atomic EnergyAgency (IAEA Department of Safeguards)

Adopted: 19.11.2007Official Journal: L304 - 22.11.2007Duration: 18 months - end: May 2009

Council Joint Action2007/185/CFSP of 19March 2007 - OPCW

The objective is to support the universalisation of theChemical Weapons Convention (CWC), and in particular topromote the ratification/accession to the CWC by States notParties (signatory States as well as non-signatoryStates) and to support the full implementation of the CWCby the States Parties.- promotion of universality of the CWC,- support for full implementation of the CWC by StatesParties,- international cooperation in the field of chemical activities,as accompanying measures to the implementationof the CWC,- support for the creation of a collaborative frameworkamong the chemical industry, OPCW and national authoritiesin the context of the 10th anniversary of the OPCW

Implementing entity: The Organisation for the Prohibition ofthe Chemical Weapons.

Budget: 1.700.000 EURAdopted: 19.03.2007Official Journal: L85 - 27.03.2007Duration: 18 months - end: 31.07.2009

Council Joint Action2006/184/CFSP of 27February 2006 -BTWC

Overall objective: to support the universalisation of theBTWC and, in particular, to promote the accession to theBTWC by States not Party (signatory States as well as non-signatory States) and to support the implementation of theBTWC by the States Parties.- Promotion of the universality of the BTWC;- Support for implementation of the BTWC by the States

Budget: 867.000 EURAdopted: 27.02.2006Official Journal: L65 - 07.03.2006Duration: 18 months

Page 14: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

14Parties.

Implementing entity: The Graduate Institute of InternationalStudies, Geneva

Council Joint Action2007/528/CFSP of 23July 2007 - CCW

The overall objective of this Joint Action is to support theuniversalisation of the CCW by promoting the accession tothe CCW by States not Party to it and to enhance theimplementation of the CCW.Activities are workshop, regional seminars and publications.

Implementing entity: United Nations Office for DisarmamentAffairs, Regional Centres for Peace and Disarmament of theUN and The Geneva International Centre for HumanitarianDemining

Budget: 828.000 EURAdopted: 23.07.2007Official Journal: L194 - 26.07.2007Duration: 18 months

Council Joint Action2007/468/CFSP of 28June 2007 - CTBTOII

The objective is to support the early entry into force of theTreaty, and need to the rapid buildup of the ComprehensiveNuclear-Test-Ban Treaty (CTBT) verification regime via:- Improvement of the knowledge of Provisional TechnicalSecretariat noble gas measurements;- Support to on-Site Inspection via the support for thePreparations for the Integrated Field Exercise 2008

Implementing entity: The CTBTO Preparatory Commission

Budget: 1.670.000 EURAdopted: 28.06.2007Official Journal: L176 - 06.07.2007Duration: 15 months

Council Joint Action2006/243/CFSP of 20March 2006-CTBTO I

The objective is to improve the capacity of CTBT SignatoryStates to fulfil their verification responsibilities under theCTBT and to enable them to fully benefit from participationin the treaty regime by a computer-based training/self-study.

Implementing entity: The CTBTO Preparatory Commission

Budget: 1.133.000 EURAdopted: 20.03.2006Official Journal: L88 - 25.03.2006Duration: 15 months

Council Joint Action The objective is to strengthen nuclear security in selected Budget: 6.995.000 EUR

Page 15: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

152006/418/CFSP of 12June 2006 - IAEA III

countries which have received EU assistance such as:- Legislative and Regulatory Assistance;- Strengthening the Security and Control of Nuclear andother Radioactive Materials;- Strengthening of States' Capabilities for Detection andResponse to Illicit Trafficking.

Implementing entity: The International Atomic EnergyAgency

Adopted: 12.06.2006Official Journal: L165 - 17.06.2006Duration: expires on 12.09.2007

Council Joint Action2005/574/CFSP of 18July 2005 - IAEA II

The objective is to strengthen nuclear security in selectedcountries which have received EU assistance such as:- Strengthening the Physical Protection of Nuclear Materialsand other Radioactive Materials in Use, Storage andTransport and of Nuclear Facilities;- Strengthening of Security of Radioactive Materials in Non-Nuclear Applications;- Strengthening of States’ Capabilities for Detection andResponse to Illicit Trafficking;- Legislative Assistance for the Implementation of States’Obligations under IAEA Safeguards Agreements andAdditional Protocols

Implementing entity: The International Atomic EnergyAgency

Budget: 3.914.000 EURAdopted: 18.07.2005Official Journal: L193 - 23.07.2005Duration: 15 months

Council Joint Action2004/495/CFSP of 17May 2004 -IAEA I

The objective is to strengthen nuclear security in selectedcountries which have received EU assistance such as:- Strengthening the Physical Protection of Nuclear Materialsand other Radioactive Materials in Use, Storage andTransport and of Nuclear Facilities;- Strengthening of Security of Radioactive Materials in Non-Nuclear Applications;- Strengthening of States' Capabilities for Detection and

Budget: 3.329.000 EURAdopted: 17.05.2004Official Journal: L182 - 19.05.2004Duration: 15 months

Page 16: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

16Response to Illicit Trafficking

Implementing entity: The International Atomic EnergyAgency

Council Joint Action2005/913/CFSP of 12December 2005 -OPCW II

The objective is to support the universalisation of the CWCand in particular to promote the accession to the CWC byStates not Party (signatory States as well as non-signatoryStates) and to support the implementation of the CWC by theStates Parties.- Promotion of universality of the CWC;- Support for implementation of the CWC by the StatesParties;- International cooperation in the field of chemical activities.

Implementing entity: The Organisation for the Prohibition ofthe Chemical Weapons.

Budget: 1.697.000 EURAdopted: 12.12.2005Official Journal: L331 - 17.12.2005Duration: 12 months

Council Joint Action2004/797/CFSP of 22November 2004 -OPCW I

The objective is to support the universalisation of the CWCand in particular to promote the accession to the CWC byStates not Party (signatory States as well as non-signatoryStates) and to support the implementation of the CWC by theStates Parties.- Promotion of universality of the CWC;- Support for implementation of the CWC by the StatesParties;- International cooperation in the field of chemical activities.

Implementing entity: The Organisation for the Prohibition ofthe Chemical Weapons

Budget: 1.841.000 EURAdopted: 22.11.2004Official Journal: L349 - 25.11.2004Duration: 12 months

Council Joint Action2007/178/CFSP of 19March 2007 -

The objective is to assist the Russian Federation indestroying some of its chemical weapons, towards fulfilmentof Russia’s obligations under the Convention on the

Budget: 3.145.000 EURAdopted: 19.03.2007Official Journal: L81 - 22.03.2007

Page 17: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

17Russian FederationIV

Prohibition of the Development, Production, Stockpiling anduse of Chemical Weapons and on their Destruction.This Joint Action supported the completion of the electricitysupply infrastructure at Shchuch’ye chemicalweapon destruction facility, in order to provide a reliablepower supply for the operation of the chemical weapondestruction facility.

Implementing entity: The Ministry of Defence of the UnitedKingdom of Great Britain and Northern Ireland

Duration: 18 months

Council Joint Action2004/796/CFSP of 22November 2004 -Russian FederationIII

The objective is to contribute to reinforcing the physicalprotection of nuclear sites in Russia, so as to reduce the riskof theft of nuclear fissile material and of sabotage byimproving the physical protection for fissile materials at theBochvar Institute in Moscow (VNIINM) of the RussianFederal Agency for Atomic Energy FAAE (formerlyMINATOM).

Implementing entity: The Federal Republic of Germany

Budget: 7.937.000 EURAdopted: 22.10.2004Official Journal: L349 - 25.11.2004Duration: 3 years

Council Joint Action2006/419/CFSP of 12June 2006 - UNSCR1540

The action aimed at addressing three aspects of theimplementation- awareness-raising of requirements and obligations underthe Resolution,- contributing to strengthening national capacities in threetarget regions (Africa, Latin America and Caribbean, Asia-Pacific) in drafting national reports on the implementation ofUNSC Resolution 1540 (2004) and- sharing experience from the adoption of national measuresrequired for the implementation of the Resolution.

Implementing entity: United Nations Office for DisarmamentAffairs (UNODA - formerly the Department forDisarmament Affairs)

Budget: 195.000 EURAdopted: 12.06.2006Official Journal: L165 - 17.06.2006Duration: expires on 12 June 2008

Council Joint Action The project contributed to: Budget: 8.900.000 EUR

Page 18: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

181999/878/CFSP of 17December 1999 -Russian Federation I

- a chemical weapons pilot destruction plant situated inGorny, Saratov region, Russia;- a set studies and experimental studies on plutoniumtransport, storage and disposition.

Adopted: 17.12.1999Official Journal: L331 - 23.12.1999Duration: expires on the date of expiry of the European UnionCommon Strategy 1999/414/CFSP on Russia

Council Joint Action2003/472/CFSP of 24June 2003 - RussianFederation II

This Joint Action aims at financing a unit of experts underthe cooperation programme for non-proliferation anddisarmament in the Russian Federation.

Budget: 680.000 EURAdopted: 24.06.2003Official Journal: L157 - 26.06.2003Duration: expires on the date of expiry of European UnionCommon Strategy 1999/414/CFSP on Russia.

Commission's CBRN assistance programmes - Nuclear Material Accountancy and Control (NMAC) - TACIS/INSC programmes

Projectidentification Title Objective Amount Execution

periode

R5.01/95R5.01/96AR5.01/97AR5.11/03S

Establishment of the RUmethodology and training centre(RMTC) in Obninsk

Specification and procurement of equipment and materialstandards, installation of a calibration laboratory,development of training materials, and conduct of trainingcourses and seminars for instructors, for supporting theRMTC in Obninsk in the education and training of Russianexperts on modern NMAC.

~€ 5 million TACIS1997-2008

R5.02/95R5.03/96CR5.01/97CR5.03/98

R5.03/03S

Establishment of productionstrategy of instrumentation forthe State System ofAccountancy and Control ofnuclear materials in RussiaVNIIA Moscow

Development of a programme concerning the provision ofNMAC equipment for the Russian State System ofAccounting and Control (SSAC), including a strategy toproduce such equipment, and arrangement for the productionand testing of prototypes for high-priority instruments

~€ 3 million TACIS1997-2009

R5.02/96BR5.01/97BR5.12/03S

Design and setup of threelaboratories for independentanalysis, nuclear metrologyanalysis of nuclear material ofunknown origin (BochvarInstitute, RU)

Provision of necessary instruments for three laboratories atVNIINM and training for laboratory staff in their operationin order to improve the analytical capabilities of the Russianorganizations in the areas of NMAC and IT prevention

~€ 3.5million

TACIS1997-2009

R5.04/96 Establishment of the Ural Creation of second training centre in Russia in the region ~€ 1.8 TACIS

Page 19: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

19R5.01/97DR5.04/98

R5.04/03S

Siberian methodology andtraining centre (UrSiMTC) inSnezhinsk

with several large nuclear fuel cycle facilities for NMAC-related training, including performance of a feasibility study,provision of a pilot plutonium storage module, and trainingof future UrSiMTC instructors

million 1997-2009

U5/95

Application to the technicalassistance programme providingeffective assistance incounteracting non-authorisedtransfer of nuclear material inUkraine

Delivery of equipment, development of a handbook, andtraining of the representatives of relevant authorities inUkraine for the detection of IT and identification of thematerial involved

~€ 0.5million

TACIS1999-2001

R5.01/98R5.01/00

Enhancing safeguard system ona pilot plant and supply ofmodern equipment for control ofaccess to nuclear material on allRU NPPs

Feasibility study in respect of the plan to implement acomputerised NMAC system in all nuclear power plants(NPP) in Russia

~€ 0.8million

TACIS2000-2006

K5.01/97K5.01/98

Establishment of facilities formass/volume containment /surveillance and training at Ulbametallurgical plant, Mangyshlakfast breeder reactor, the AlmatyVVR and the Kurchatov reactorsin Kazakhstan

Provision of methodology and equipment, and training to theUlba plant operators and national inspectors in order to fulfilthe safeguards requirements of the IAEA

~€ 3 million TACIS2000-2007

R5.01/02R5.01/02S

Modernisation and enhancementof NMAC at the Mayak RT-1plant

The specific objective is to improve the mass measurementsof Pu and U in hold-ups and in wastes to meet therequirements of the State NMAC

~€ 3 million TACIS2004-2010

TAREG 5.01/05 Integrated Safeguards & IllicitTrafficking – service part

Strengthening non-proliferation regime by enhancing theSafeguards system and in particular the Nuclear MaterialAccountancy and Control (NMAC); counteracting nuclearand radiation terrorism threat; strengthening and improvinginstitutional control by enhancing collaboration andcapacities of national regulatory authorities (12 sub-projects,some of them continuing already started activities)

~€ 14million

TACIS2006-2013

TAREG 05/06S Nuclear Material Accountancy Provision of the first batch of equipment for NMAC € 5.3 million TACIS

Page 20: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

20and Control – procurement ofequipment 1st part

identified by the project TAREG 5.01/05 2008-2011

financing agreementwith beneficiary

countries (Armenia)not yet signed

Nuclear Material Accountancyand Control – procurement ofequipment 2nd part

Provision of the second batch of equipment for NMACidentified by the project TAREG 5.01/05 € 0.5 million INSC

AAP2008

RISK MITIGATION AND PREPAREDNESS RELATING TO CHEMICAL, BIOLOGICAL, RADIOLOGICAL AND NUCLEAR MATERIALS OR AGENTS - Instrumentfor Stability, priority 1

Projectidentification/CRIS number

Title Objective Amount Executionperiode

€ 235 million TACIS1997-2006

n.a.

Retraining former weapon scientistsand engineers through support forInternational Science and TechnologyCentre (ISTC, Moscow) and Scienceand Technology Centre (STCU,Kiev)

The main objective of the Centres is to redirectscientists/engineers' talents to civilian and peaceful activitiesthrough science and technological cooperation. € 15 million

€ 8 million€ 7.5 million

IFS200720082009

AAP 2007 (excluding funding for ISTC/STCU)

145156

Combating illicit trafficking ofnuclear and radioactive materials inFSU countries (Russian Federation,Ukraine, Armenia, Moldova,Georgia, Azerbaijan and Belarus)

The purpose of the action is to supply equipment for detectionof NRM at border check points as it was identified in theprevious phase of the activity financed by TACIS NuclearSafety programme, contributing thus to reduce nuclear andradiation terrorism threat

€ 5 million 11/07/2008 -10/07/2011

145130 Assistance in export control of dual-use goods

The specific objective is to support the development of the legalframework and institutional capacities for the establishment andenforcement of effective export controls on dual-use items,including measures for regional cooperation with a view ofcontributing to the fight against the proliferation of WMD andrelated materials, equipment and technologies

~€ 5 million 19/03/2008 -18/09/2010

145132 Knowledge Management System on The overall objective of the activity is to improve capabilities € 1 million 31/01/2008-

Page 21: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

21CBRN Trafficking of participating states, neighbouring countries of the EU in

South-East Europe and possibly Caucasus, to combat the illicittrafficking and criminal use of CBRN materials

30/04/2010

AAP 2008 (excluding funding for ISTC/STCU)

200523

Knowledge management system onCBRN trafficking in North Africaand selected countries in the MiddleEast

The aim of the project would be to develop a durable co-operation legacy in the area of trafficking of CBRN materials € 1 million 16/03/2009 -

15/03/2011

217540Strengthening bio-safety and bio-security capabilities in Russia and inCentral Asian countries

The project will address shortcomings in the safety/securitypractices of key biological facilities in Russia and the selectedcountries of the Central Asia. The main objectives of theproject are to raise the skills of the personnel working atfacilities (laboratories) handling dangerous biological agents orsupervising those facilities, and to provide additionalequipment, as needed, to ensure an adequate level of bio-safetyand security.

€ 6.8 million 21/09/2009 –21/09/2012

219636

Combating illicit trafficking ofnuclear and radioactive materials inselected FSU and MediterraneanBasin countries and preparation ofborder management activities in theASEAN region

The overall objective of this project is to reduce the threat ofnuclear and radiation terrorism. For this purpose the assistancewill be provided to the partner countries in the improvement ofthe technical and organisational measures for detection ofnuclear and radioactive materials (NRM) illicit trafficking.

€ 6.7 million 2/12/2009 –1/12/1012

216327Assistance to the Russian Federationon control of exports of dual-usegoods

The overall objective of the project is to enhance theeffectiveness of export control of dual use items in the RussianFederation, with a view to contribute to the fight against theproliferation of WMD. The specific objectives will be achievedthrough information exchange with EU exporters, supportindustry and researchers for awareness raising, organisation ofseminars for exporters in the regions of the Russian Federation.

€ 1 million 1/09/2009-1/03/2011

AAP2009 (excluding funding for ISTC/STCU)Project

identification/CRIS number

Title Objective Amount Executionperiod

239471239481 (AA)

CBRN Centre of Excellence – FirstPhase

To set up a mechanism contributing to strengthen the long-termnational and regional capabilities of responsible authorities andto develop a durable cooperation legacy in the fight against the

CBRN threat.

€ 5 million May 2010-May2012

Page 22: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

22

235364

Border monitoring activities in theRepublic of Georgia, Central Asiaand Afghanistan

To enhance the detection of radioactive and nuclear materials atidentified borders crossing and/or nodal points in the Republic

of Georgia, at Southern borders of selected Central Asiancountries with Afghanistan and at the airport of Kabul.

€ 4 million undercontracting

238194

EpiSouth: a network for the controlof health and security threats andother bio-security risks in theMediterranean Region and South-East Europe

To increase through capacity building the bio security in theMediterranean region and South-East Europe € 3 million under

contracting

237437 (service)- (supply)

Redirection of former Iraqi WMDscientists through capacity buildingfor decommissioning of nuclearfacilities, including site andradioactive waste management

To assist Iraq with redirection of scientists and engineerspossessing WMD-related skills and dual-use knowledge through

their engagement in a comprehensive decommissioning,dismantling and decontamination of nuclear facilities

€ 2.5 million undercontracting

Setting up a CBRN Centre ofExcellence for Ukraine and theSouth Caucasus

To set up the CBRN Centre of Excellence for Ukraine and theSouth Caucasus € 0.5 million

modification tothe decision

on-goingKnowledge Management System onCBRN risk mitigation - Evolvingtowards CoE "MediterraneanBasin"

To integrate the existing Knowledge Management Systems,namely for South East Europe and for North Africa, and toprepare the evolution towards a Centre of Excellence in the

Mediterranean Basin dealing with CBRN risk mitigation

€ 0.5 millionmodification to

the decisionon-going

Bio-safety and bio-securityimprovement at the Ukrainian anti-plague station (UAPS) inSimferopol

To contribute to full implementation of the BTWC (Biologicaland Toxin Weapons Convention) in Ukraine, which includes theprevention of illicit access to pathogens by terrorists and other

criminals

€ 4 millionmodification to

the decisionon-going

Assistance in export control ofdual-use goods

Continuation of the on-going activities in this field in the alreadycovered countries, with possible extension to other

regions/countries.€ 5 million

modification tothe decision

on-going

Summation IP 2009-2011 (including AAP 2009)Regional centres of excellence The creation of “CBRN centres of excellence” will aim at

developing comprehensive tailored training and assistancepackages (export control including of dual-use goods,illicit trafficking, redirection of scientists, safety andsecurity culture).

25-30 million In preparation

Page 23: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

23Fighting illicit CBRN trafficking Broaden the geographic scope of its cooperation

programmes to new regions of significance for EUsecurity, including the Middle East and South-East Asia, aswell as parts of Africa.

12-14 million In preparation

Support to bio-safety and bio-security

Priority should be given to increasing bio-safety andsecurity in the Middle East, Former Soviet Union, notablyCentral Asia, South and South-East Asia. Additionalactions in Africa will also be considered.

14-18 million In preparation

Assistance and cooperation onexport control on dual-use goods

This project will consolidate existing actions, reinforcerelated training, and move to new countries in regions ofconcern.

6-10 million In preparation

Support for the retraining andalternative employment offormer weapons scientists andengineers

To reduce the risk of WMD expertise proliferation and theassociated threat to international security.

20-26 million(2010-2011)

In preparation

Support for Multilateral NuclearAssurance (MNA) initiatives

Creation of a nuclear fuel bank of low enriched uranium(LEU) with the objective of sending a positive signal tocountries willing to develop civil nuclear programmes byincreasing the security of fuel supply.

€ 20-25million

In preparation

Page 24: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

24Finland3

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committed

January 2004 - April2010

in 000’s EUR

Funds Expended

January 2004 - April2010

in 000’s EURRussian

Federationand Ukraine

Nuclear material safeguards Long-term projects in 4 areas: cooperation withRussian authorities, development of verificationmethods, participation in multilateralcooperation, support for nuclear materialcontrols in Ukraine

960 790

RussianFederation

Nuclear waste management Long-term cooperation area. Projects includedevelopment of control manuals and methods,training and participation in multilateralcooperation

428 388

RussianFederation

Nuclear safety at Kola NuclearPower Plant

Several long-term projects on technical safetyimprovements have been carried out. Ongoingprojects cover e.g. development of workingmethods, training in non-destructive inspections,improving fire safety and supportingprobabilistic safety analyses

3282 2827

RussianFederation

Nuclear safety at LeningradNuclear Power Plant

Several long-term projects have been completed.Ongoing projects cover e.g. development ofworking methods, enhancing non-destructiveinspection equipment and skills, improving firesafety and supporting probabilistic safetyanalyses

5385 4655

RussianFederation

Nuclear EmergencyPreparedness

Long-term cooperation area. Projects locatedmainly in Northwest Russia. Several projectscompleted. Ongoing projects cover e.g. radiationmonitoring systems for environment and

930 830

3 Updated April 2010

Page 25: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

25personnel as well as testing alarm systems

RussianFederation

and Ukraine

Regulatory Cooperation onnuclear safety

Long-term cooperation area. Projects aim atstrengthening the capacity of nuclear andradiation safety authorities

1305 1100

RussianFederationand Eastern

Europe

Other non-specified internationalprojects on nuclear safety and

safeguards

Covering funding for e.g. cooperation inmultilateral fora, planning, organising andreporting on bilateral cooperation

2170 1870

RussianFederation

Northern DimensionEnvironmental Partnership

(NDEP)

Finland's contribution to the nuclear window ofthe NDEP in 2002-06

2000 2000

Ukraine Chernobyl Shelter Fund Finland's contribution to the EBRD's ChernobylShelter Fund totals EUR 1 000 000 in 2005-07and EUR 380 000 in 2009.

1380 1380

RussianFederation

Elimination of Weapons GradePlutonium Production

Finland's contribution to the ZheleznogorskPlutonium Production Elimination Project,implemented by the US, made in June 2006

500 500

RussianFederation

Contribution to the RussialSpecial Federal Programme of

Destruction of ChemicalWeapons Stockpiles

Delivery and installation of a fixed ChemicalWarfare Agent Detection Network to theChemical Weapons Destruction Facility inGorny completed in 2003. Contribution throughUK programme towards electricity installationsat Shchuch'ye Destruction Facility in 2008 (715000 euros).

1319 715

RussianFederation

Support to non-governmentalorganisations' activities for

facilitating Russian chemicalweapons destruction

Public outreach and information projectsimplemented by Green Cross LegacyProgramme in 2005, 2006, 2007 and 2008(104 550 euros/2008).

810 810

RussianFederation

RTG, Removing radioactivelighthouses from Gulf of Finland

Finland's contribution to the RTG project in2009-2011

1500 466

RussianFederation

EBRD/Nuclear Safety Account Finland's contribution to the NSA in 2009 2000 2000

Ukraine Mobile radiation monitoringlaboratory for Radiation and

Delivery of the mobile radiation monitoringlaboratory, training related to it.

500 500

Page 26: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

26Nuclear safety Authority of

UkraineKyrgyz

RepublicThe Nuclear Smuggling

Outreach Initiative (NSOI)Finland’s contribution will be used to provideradiation detection equipment to the KyrgyzRepublic to detect and deter nuclear smugglingacross its international borders.

250 250

24719 21081

Page 27: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

27France

Country Project description / Detailed ProjectFunding Commitments

Project Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

Russia Contribution to the nuclear window ofthe Northern Dimension EnvironmentalPartnership (NDEP) Support Fund,administered by the European Bank forReconstruction and Development.

The development of the "Strategic Master Plan" forwork in North-Western Russia, associated with thenuclear submarine legacy under the NDEP Fund, willenable improved coordination (as for example inGremikha).

40,000 13,600

Russia Contribution to the MPDG (MultilateralPlutonium Disposition Group) toimplement the Russian weapons-gradeplutonium disposition programme inRussia.

Pending the conclusion of corresponding multilateralagreement (MPDG negotiation).

70,000 USD _(No progressin multilateralnegotiation)

Russia Aida Mox 1: this cooperation project isaimed at providing support to theRussian Federation for thedismantlement of Russian nuclearweapons. Bilateral cooperation initiatedin 1992, to which France contributed upto €70 million.

France proposed to update the equipment providedunder this programme and to allocate €1 million to thisproject in the framework of the Global Partnership.

1,000 0,860

Ukraine Contribution to the EBRD’s ChernobylShelter Fund

Total contribution to the CSF: 47,500,000 €(31,400,000 € before 2002))

22,300 16,100

Lithuania Contribution to the IgnalinaInternational Decommissioning SupportFund.

Decommissioning of the Ignalina nuclear power plant(Lithuania).

1,500 1,500

Russia Kalinin: improvement of the safety ofthe Kalinin nuclear power station, inRussia.

Feasibility study completed for 2 M€. Agreement withRussian Federation for tax exemption signed inFebruary 2007.

2,200 2,200

Page 28: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

28Country Project description / Detailed Project

Funding CommitmentsProject Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

Russia Gremikha: the remediation of theGremikha former naval base consists ofseveral projects, including the removaland dismantlement of "Alfa" nuclearreactors, safe storage of SNF andnuclear waste, as well as remediation offacilities and site.

Feasibility study: supply of nuclear safety equipmentto Russian partners (two contracts fulfilled in 2005)and radiation and engineering survey to be ended in2007.Pre-design studies contract (DON and OBIN) startedin 2006 and were implemented in 2007/2009.Urgent priority works revealed by first stage of theengineering survey in order to improve safety andsecurity of workers and to prepare further work(removal and clean-up of radiological hot spots,refitting utilities and buildings). Sixteen contractssigned in 2007 and 2009 (twelve completed ):

• cloakroom refitting ;• diesel generators maintenance (motors and

building)• dry-dock improvement ;• consolidation of walls and roof of building 19

used for radwaste storage;• radiological situation improvement on the

Open Pad and the SNF inventory;• Development of the means for the intact VVR

SNF handling.• Handling means refurbishment (crane, ..).• Decontamination work in order to be able to

unload the reactor core of “alpha” submarinen°910

� up to 10,000 ->2007, furtherfunding subjectto results offeasibilitystudy

� up to 9,000 =>2007 / 2009

10,010

8,400

Page 29: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

29Country Project description / Detailed Project

Funding CommitmentsProject Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

Works for securisation of spent VVR fuel and Alphaclass cores

• Unloading of reactor core of “alpha” submarinen°910

• Development of handling means for shipmentdamaged VVR fuel out of Gremikha

two contracts signed in 2009 (one completed) andthree other contracts for securisation works at least willbe signed in 2010

Preparation of the sites where the SNF will beremoved (All fuel to interim storage at Atomflot inMurmansk, Alpha core at NIIAR institute inDimitrovgrad and VVR damaged fuel in Mayak)

� up to 6,300 =>2007 / 2010

� up to 6,000 =>2009 / 2010

4,100

2,650

Russia Severodvinsk: the refitting of thenuclear waste incinerator in Zvezdochkashipyard will enable this shipyard toincrease corresponding capacity for thedisposition of solid nuclear waste.

Diagnosis and feasibility study initiated in cooperationwith Russian partners in 2004. This technical phasecompleted in summer 2006 for an amount of 420 k€.The concrete implementation of this project started inDecember 2006. Contracts of 9, 6 M€ signed withAREVA/TA and Zvezdochtka shipyard. Detail designstudies are completed.Oven manufactured and tested in France end of 2008and delivered to Zvezdochtka – Incinerator Building isrefitted end of 2008.Equipment is mounted (October 2009). Tests began inNovember but difficulties occurred in test progress. Sooperation is now replaned to start by autumn 2010..

up to 10,000 forperiod 2004-2008

10,020

Page 30: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

30Country Project description / Detailed Project

Funding CommitmentsProject Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

Russia Dismantlement of Radio isotopicThermoelectric Generators (RTG) inRussia and safe storage of thecorresponding strontium nuclearsources.

• Operation implemented in 2005 and 2007 inclose coordination with Norway (twoagreements signed for 600 K€). Fullycompleted end of 2009.

Experience gained was used to promote bilateralfrench/russian actions in the same field :

• One contract signed in October 2009 is nearcompletion for:dismantlement and replacementof 4 high powerful RTG on the Baltic coast

• Another is being prepared for the removal of 12other RTG on the Baltic coasts.

Overall cost to be adapted to the results of discussions.

up to 5,000(-> 2008) furtherfunding subject toresults ofdiscussions

3,300

Ukraine Disused high active spent sourcesmanagement in Ukraine

Two contracts signed in june and july 2009 preparedfor:

• Radiological measurement devices supply• Design of hot modular cells for extraction of

sources from obsolete irradiation blocks andrelated containers for shipment to futurestorage place.

Work implementation pending solution of taxexemption procurement by Ukrainian ministries.Following work pending signature of an agreementwith Ukrainian governemental authorities.

up to 2,000 0,300

Russia Chemical weapons destruction:environmental survey of the Shchuch’yedestruction facility

Intergovernmental agreement ratified in France andRussia entered in force in May 2007.Contracts signed end of October 2007. Lastoperationnal tests realized in March 2009. The workfully completed end of 2009.

9,000(->2008)

including technicalassistance toFrench

9,000

Page 31: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

31Country Project description / Detailed Project

Funding CommitmentsProject Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

management team

Russia Chemical weapons destruction:realisation of the Shchuch’ye destructionfacility

Purchasing equipment for the second process line ofthe destruction facility in close cooperation with UKand Canada. French-UK agreement and relatedmemorandum of understanding between MOD andCEA signed in April 2007 (Equipment purchase underway) All the equipment was delivered on the site inMarch 2009 on time for operating the destruction ofthe first weapons filled with SARIN.

6,000(->2008)

6,000

Russia Biosecurity and biosafety programmesin Russian biological facilities. Theseprojects focus on immunology andgenetics programmes with commercialpotential.

These projects are implemented in Russia through theISTC between French and Russian laboratories. Fourprojects started in 2006 concerning scientificcollaboration in the field of new therapeutic moleculesand new diagnosis and environmental surveillancetools. Two projects are finished successful; one willfinish in 2010 and one in 2011.

1,400 1,400

To bedetermined

Biosecurity and biosafety programmesin CIS biological facilities. Theseprojects focus on immunology andgenetics programmes with commercialpotential.

These projects will be implemented through the STCUbetween French and CIS laboratories. Projects to bestarted end of 2010.

Under assessment

Russia Redirection of WMD scientists.The project is targeting the support ofindustrial partnerships between Russianlaboratories and French enterprises inorder to create sustainable employment.

A feasibility study assessed an existing demand ofindustrials and a possible match with technical offer ofRussian laboratories beyond existing scientificcooperation.The main part of the project aims to identify, initiateand accompany industrial partnerships between

2,800(2006 – 2009)

2,800

Page 32: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

32Country Project description / Detailed Project

Funding CommitmentsProject Status: Milestones, Observations onImplementation

Funds Committed(from beginningto date)in € (000's)

Fundscontracted oralmostcontracted(to date in €(000’s)

Russian laboratories and French enterprises.The project has been completed at the end of 2009.Twelve industrial partnerships have been launchedwith jobs to be created at the involved Russianinstitutes. Creation of economic value to be confirmedin the long run.

Page 33: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

33Germany

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

FundsCommitted

(06/02 -12/09)

in 000's

FundsExpended

(06/02 -12/09)in 000's

Federal Ministry for Economy andTechnology

Russia o construction of a land based long-term interim storage facility for 150submarine reactor compartments and 28other nuclear objects (sections from nuclearvessels, icebreakers, Lepse) at Sayda Bay;

o dismantlement of nuclear submarinesand preparation of the reactorcompartments for interim storage in SaydaBay;

o reconstruction of Nerpa Ship Yard;o recreation of a ecologically healthy

condition at Sayda Bay;o construction of a centre for

conditioning and long-term storage for allradioactive waste from nuclear submarinesand surface vessels at Sayda Bay.

- the construction site for the long-term interimstorage facility was opened back on July 10,2004; and the first work done in preparation ofconstruction activities. On July 18, 2006 startedthe operation of the first section of the long-term interim storage facility. Currently 33reactors compartments are stored on theconcrete platform by the end of 2009. The long-term interim storage facility was completed atthe end of 2009 (budget EUR 300 million)except for the repair shed for reactorcompartments and some residual road-buildingwork. This completion is scheduled for autumn2010.The ongoing construction work on therepair shed has no effect on the storage offurther reactor compartments.

- the first construction work of the centre forradioactive waste began in 2008. Since 2009work has been done on building thefoundations, rain-water drainage, and firemains. The additional budget for this project isalso EUR 300 million. The regional centre isscheduled to be completed in 2014

2003- 2009330.000 EUR

2010:65.000 EUR

2003- March 2010:353.440 EUR

Federal Foreign Office

Page 34: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

34Russia CW destruction:

Support for construction of CWDF´s inGorny, Kambarka, Leonidowka andPochep

�� Gorny (1995 – 2003)

• Draining facilities for barrels and tanks• Stationary and mobile laboratory• Building for incinerator for liquid and

solid residues• Equipment for CW-destruction by

hydrolysis• Equipment for arsenic extraction by

electrolysis• Equipment for purification of toxic

gas/smoke and toxic water• Relevant engineering and expertise

�� Kambarka

• Construction and delivery of a turn-keyready thermal destruction facility forsolid, liquid and gaseous residuesgenerated during the destruction oflewisite, along with the building tohouse it (building 44)

• Construction of a draining system forLewisite cisterns containing the combatagent (85 cistern draining devices

• Supply of technological equipment forthe safety, temperature control andventilation systems including double-wall, heat-insulating enclosures of the

- started operations in 2003 and had successfullydestroyed the stock of CW end of 2005;

- support by spare part delivery

- agreed between FFO and FAI in 2003- Construction began in 2004.- Kambarka was officially inaugurated in March

2006, destruction of stock ( 6350 t) completed inMarch 2009

- Official hand-over to Russia in March 2007- Delivery of spare parts in spring 2008

343.060 EUR

50.000

(includingbudget

ressourcesearlier than

2002)

153.060

342.940 EUR

50.100

152.840

Page 35: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

355 storage buildings

• Construction and delivery of filtersystems for contaminated buildings

• Production and delivery of 2detoxication modules mounted on 2mobile transborders

• Delivery of spare parts to ensure theoperationability of the equipmentdelivered by Germany

3. Leonidowkaplanned contribution (turn-key ready thermaldestruction facility) was not implemented afterRussian partner decided to constructLeonidowka without German assistance

4. Pochep- construction of a complete building

(building 11), which will contain thethermal destruction equipment for solidand liquid residues including thereaction masses from the destruction,the incinerator and equipment for thethermal treatment of the munition,

- water treatment and air purification.

- German FFO concluded contracts with Germanmain contractor for some preliminary engineeringwork, contract cancelled in September 2006 afterRussian decision to refrain from German assistancein Leonidowka

- intergovernmental agreement in March 2007- laying of foundation stone in June 2008- acceptance procedure for pre-assembled

equipment September 2008- assembly of equipment in the building

completed,- start of operations planned for summer 2010

(Originally upto 140.000)

up to 140.000

4.000

136.000

Page 36: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

36Russia Physical protection of nuclear material

Upgrading security of nuclear material andfacilities in nuclear cities, research institutesand nuclear weapons storage sites in Russia

-- projects in Osjorsk, Seversk, Moscow and othersites successfully completed- further projects in Osjorsk, Seversk, Moscow,Dimitrowgrad and other sites under way.

167.165 EUR 119.500 EUR

Ukraine Physical Protection of nuclear materialUpgrading of the physical protection of a sitefor handling of radioactive sources andinstalling of new equipment for radioactivesources of different origin

Exchange of verbal notes completedImplementation to start 2010

6,4 Mio 0 EUR

MultilateralRussia/FSU Contribution to Nuclear Security Fund of

IAEA1.000 EUR 1.000 EUR

Russia Contribution the Northern DimensionEnvironmental Programme in the RussianFederation Fund

2.000 EUR 2.000 EUR

Contribution to IAEA to implement projectsrelated to nuclear security

10.000 EUR 0 EUR

Page 37: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

37Ireland

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committed(July 2004- June 2007)

Funds Expended(July 2004-June 2007)

NuclearUkraine Chernobyl Shelter Fund

Funds contributed through EBRD€3,420,000 €2,565,000

ChemicalRussia Schuch’ye Chemical Weapons

Destruction Facility

Note - Funds contributed throughthe UK for the installation of theMetal Parts Furnace and towardsthe procurement of otherequipment for the secondmunitions destruction building.

Construction of the Schuch'ye facility hasbeen completed and it is now operating.

€110,000 €110,000

Page 38: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

38Italy

Country ofproject

Project Description Project Status: Milestones, Implementation, Comments FundsCommitted

FundsExpended

€ 117 million € 69 million

Russia Nuclear submarinedismantlement,spent fuel and radioactivewaste management:

A bilateral agreement between the Italian and Russian Governmentshas been signed on November 5th, 2003 and entered into force inNovember, 17th 2005 after ratification by the Italian and the Russianparties for a total funding of 360 Million Euro in 10 years. Theinstitutions responsible for the agreement’s implementation are theItalian Ministry for Economic Development (MSE) and ROSATOM.

Four contracts have been signed with Nerpa shipyard for dismantlingone Yankee Notch class, two Victor class, and one Echo II classnuclear submarines.

€ 20.1 million € 19.6 million

A contract for the unloading of spent nuclear fuel from the reactors ofthe heavy cruiser 090 has been signed. Activities however have beensuspended due to a request of Rosatom.

€ 5.4 million € 0.9 million

Two contracts have been signed for the supply of equipment andsystems for the improvement of Nerpa and Zvyozdochka shipyardinfrastructures.

€ 3.5 million € 3.3 million

Two contracts have been signed for improvements of the physicalprotection systems of Nerpa and Zvezdochka shipyards. Detaileddesign of improvements has been completed. List of equipment to be

€ 0.73 million € 0.32 million

Page 39: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

39purchased is almost completed.

Radioactive Waste Management at Andreeva BayContracts for the design of SRW and LRW treatment facilities and aninterim storage facility of conditioned RW at Andreeva Bay site are inthe final stage of negotiation. Construction of buildings (namely 201and 2029 in the same site, to be used for temporary protection of SRWaccumulated at open air, will start very soon. The contract has anestimated value of 5.5 Meuro.

€1.40million

€ 0.93 million

Transport ship for RW and SNFA contract for the detailed design and construction of a ship for SNFand RW transportation has been signed on 28/07/08. Delivery time willbe the first quarter of 2011.

€ 71.7 million € 36 million

A contract has been signed for the design of 10 containers for storageand transportation of alpha spent nuclear fuel presently at theGremika site. An order for the fabrication of 10 containers will then beissued.

€ 0.88 million

Project management and work documentation. €12.78million

€ 7.8 million

Russia Chemical weaponsdestruction:Chemical weaponsdestruction facility inPochep.

Construction of oneportion of the gaspipeline in Schuch’ye.

Bilateral Agreement between Italy and Russian Federation signed on 5November 2003Funding Commitment: €360 million. Ratification pending.

Programme completed in 2004. €7.7 million intwo years.

€ 7.7million.

Page 40: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

40

Further activity inSchuch’ye.

Bilateral Agreement between Italy and Russian Federation signed on17 April 2003, funds allocated, negotiations under way to identify newsector of activity and a new site after original project alreadycompleted.

€5 million

Ukraine Chernobyl ShelterFund

Italy contributed € 33 million since 1997. An additional contribution of€ 8.5 million has been approved by the Parliament.

€ 8.5 million

Italy: Activities in Countries other than Russia and Ukraine in line with the GP objectives

Period Projectcountries

Project type4 Project Name/Summary

Project description Funds5

(Committed/Expended)2005-2008 Iraq Seminars, training

courses,workshops,scientificroundtables andfellowships

Internationalisation ofIraqi institutions andscientific facilities andcollaboration withItalian scientific andacademic centres

4 international workshops; 4 closed roundtables; 7intensive seminars and training courses.59 short term fellowships and 52 long-term fellowships(2-9 months) for retraining at Italian Universities andscientific institutes (205 months in Italy). Project carriedout by the Landau Network – Centro Volta (LNCV).

2005-2008 Iraq Acquisition oftechnical andscientificequipment

Internationalisation ofIraqi institutions andscientific facilities andcollaboration withItalian scientific andacademic centres

Academic publications and technical and scientificequipment provided to selected Iraqi academic andscientific institutions. Project carried out by the LandauNetwork – Centro Volta (LNCV).

€ 2 million

2010 Iraq Training andreorientation

Training andReorientation in thefield of bio-chem

Three phases: a preliminary phase in Iraq, an intensivephase in Italy and a final phase in Iraq. Two modules:Chemical products in agriculture and environmental

€612,872

4 Please indicate activity type, such as seminar/workshop, capacity-building, equipment supply, facilities construction, physical operation, and, in particular, theredirection/engagement of scientists and technicians.5 Please fill in this column where appropriate. For seminar-type activities, information on the funds may not be so significant to the overall purpose of the discussion at the GPWG.

Page 41: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

41technology for peacefulapplications

pollutants and Prevention, evaluation and management ofthe environmental pollution: polluted sites andremediation techniques.24 Fellowships. Project led by the Insubria Center onInternational Security of the University of Insubria

2005-2007 KyrgyzRepublic

Redirection ofscientists andtechnicians

Mechanism of pollutionof the territory byAnthrax agent

Project carried out by the Centro di Referenza Nazionaleper l’Antrace in cooperation with the ISTC.

2008-2010 KyrgyzRepublic

Redirection ofscientists andtechnicians

Mechanism of pollutionof the territory byAnthrax agent (SecondStage)

Project carried out by the Centro di Referenza Nazionaleper l’Antrace in cooperation with the ISTC.

USD 348,370 (fromISTC)

Page 42: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

42Japan

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committed(July 2002 -May 2009)

in 000’s

Funds Expended(July 2002 - May 2009)

in 000’sRussia Pilot project of dismantling a

Victor-III class nuclearsubmarine and improvement ofrelated infrastructure at ZvezdaShipyard

All the works were completed in December2004

JPY854,000 JPY793,977

Russia Project of dismantling a Victor-Iclass nuclear submarine

An implementing Arrangement for thedismantlement of the five nuclear submarineswas signed in November 2005. Contractsconcerning a Victor-I class nuclear submarinewere sigend in September 2006 and thedismantlement project was completed in 2008.

JPY869,864 JPY869,864

(Including Funds fromAustralia and Republic

of Korea)

Russia Project of dismantling threeVictor III Class submarines

An implementing Arrangement for thedismantlement of the five nuclear submarineswas signed in November 2005. Contractsconcerning threee Victor III Class submarineswere signed in August 2007 and one of themhas already been dismantled.

JPY 3,192,989 JPY3,192,989

(Including Funds

from Australia and

Republic of Korea)

Russia Project of dismantling a CharlieI Class submarine

An implementing Arrangement for thedismantlement of the five nuclear submarineswas signed in November 2005. Contractsconcerning a Charlie I Class submarines weresigned in January 2008 and the dismantlementproject was completed in 2009.

JPY 944,013 JPY944,013

Russia Cooperation for the constructionof an On-shore Storage Facilityfor Reactor Compartment atRazboynik bay

In 2007, Japan decided to cooperate for theconstruction of this facility. A series ofnegociations for the implementing arrangementand for the specification of the items whichJapan will provide to Russia are conducted.

- -

Page 43: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

43Russia Cooperative R&D project on

fablication and irradiation ofvibro-packed MOX fuelassemblies

For the period from 2004 to 2009, Japan(PESCO and JAEA) and Russia (RIAR) hascarried out the cooperative R&D program inorder to demonstrate the integrity and reliabilityof vibro-packed MOX fuel assemblies in BN-600 reactor under the contact between MEXTand PESCO. 21 fuel assemblies, which aremade from Russian surplus weapon gradeplutonium (120kg), were fabricated andirradiated,

USD 7,051.5 USD 6,506.5

Ukraine Chernobyl Shelter Fund Contribution to the Chernobyl Shelter Fund - USD 21837FSU IAEA Nuclear Security Fund Contribution to IAEA’s Nuclear Security Fund USD 473 USD 341

Russia andFSU

Redirection of former weaponscientists through ISTC

Japan is a board member of ISTC since itsfoundation in 1994, and contributes to itsactivities and projects. To date, Japan hasfunded more than 200 projects worthapproximately USD 60 million in total.

USD 15,806.7 USD 15,806.7

Period Country of Project Project Type Project Name/Summary Project Description Fundsto be

scheduledKazakhstan provision of

equipmentNuclear security upgrade

project for the UlbaMetallurgical Plant and

Institute of Nuclear Physics

This project aims to improve the security-related equipment of the facilities, by

upgrading protective fence, installing orupgrading surveillance systems, etc..

Up to 500,000,000JPY

(Committed)

to bescheduled

Ukraine provision ofequipment

Extension of the service andmaintenance of the perimeter

protection system andEstablishment of means andequipment for identification

of nuclear materials.

This project aims to improve the security-related equipment of the facilities, by

upgrading protective fence, installing orupgrading surveillance systems, etc., and

provide the equipment of analysis.

Up to 200,000,000JPY

(Committed)

to bescheduled

Belarus provision ofequipment

Modernization of the Systemto Deter the Illicit Traffickingof Nuclear and RadioactiveMaterials at State Borders.

This project aims to improve the security-related equipment of the equipments for

surveillance network at border.

Up to 100,000,000JPY

(Committed)

Page 44: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

44

2003- Asia PolicyDialogue

Asian Senior-level Talks onNon-proliferation (ASTOP)

This dialogue gathers senior governmentofficials in charge of non-proliferationpolicies of ASEAN member states, China,Republic of Korea and countries with acommon interest in the security of the Asianregion such as the United States andAustralia. Participants discuss variousissues related to strengthening of the non-proliferation apparatus in Asia with a viewto deepening their understanding ondesirable non-proliferation measures, theobstacles they would face and possiblesolutions.

n/a

2004,02 Western Africa Seminar IAEA Safeguards Seminar Western Africa Economic CommunitySeminar, in Burkina Faso

n/a

2004,03 Southern Africa Seminar IAEA Safeguards Seminar Southern Africa Development CommunitySeminar, in Namibia

n/a

2004,11 Asia-Pacific Seminar IAEA Safeguards Seminar South Pacific Regional Seminar , inAustralia

n/a

2004,11 The Philippines Seminar IAEA Additional ProtocolSeminar

Seminar on ratification of AdditionalProtocol

n/a

2005,09 International Seminar IAEA Integrated SafeguardsMeeting

Technical Meeting for IntegratedSafeguards, in Vienna

n/a

2005,09 Mexico Seminar IAEA Additional ProtocolSeminar

Workshop on Additional Protocol n/a

2005,1 Northern Africa Seminar IAEA Safeguards Seminar Outreach Seminar Maghreb Region,Morocco

n/a

2006,07 Asia-Pacific Seminar IAEA Additional ProtocolSeminar

Additional Protocol Seminar for Asia &Pacific countries, in Australia

n/a

2007,08 Vietnam Seminar IAEA Additional ProtocolSeminar

National Seminar on the AdditionalProtocol to Vietnam's SafeguardsAgreement

n/a

2004 Asia Seminar Second Regional Meeting of n/a

Page 45: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

45National Authorities of theCWC in Asia, held in Beijing

2004 Middle East Seminar Regional Workshop onpromoting the universality ofthe CWC, held in Malta

n/a

2004 Libya Seminar Assistance Visit to Libya Assistance to the Libyan authorities indrafting their national legislation and otheradministrative measures

n/a

2004 Cambodia Seminar Bilateral Assistance Visit toCambodia, held incooperation with UK &OPCW

n/a

2005 Iraq Seminar 2nd Regional Workshop onpromoting the universality ofthe CWC, held in the Hague,in cooperation with UK,USA, and OPCW

n/a

2005 Asia Seminar Third Regional meeting ofNational Authorities of theCWC in Asia, held in Iran

n/a

2006 Asia Seminar Fourth Regional Meeting ofNational Authorities of theCWC in Asia, held inIndonesia

n/a

2006 Iraq Seminar 3rd Training Course on theCWC for Iraqi Officials, incooperation with UK, USAand OPCW

n/a

2007 The Philippines Seminar Industry Workshop onImplementing the CWC, heldin Manila, in cooperationwith Australia and OPCW

n/a

2007 Asia Seminar Fifth Regional Meeting ofNational Authorities in Asia,

n/a

Page 46: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

46held in Jordan (Amman)

2007 Iraq Seminar 4th Workshop on the CWCfor Iraqi Officials, held inJordan (Amman), incooperation with UK, USAand OPCW

n/a

2008 Cambodia Seminar National AwarenessWorkshop on the ChemicalWeapons, held in PhnomPenh

n/a

2008 Asia Seminar Sixth Regional Meeting ofNational Authorities in Asia,held in Bangladesh (Dhaka)

n/a

2008 Laos Seminar NationalAwarenessWorkshop on theChemical Weapons, held inVientiane

n/a

2009 Japan Seminar G8 Tokyo ConferenceSharing Lessons Learned forAdvanced Management ofBiological Threat(BTEX)

n/a

2009 Japan Seminar Seminar on the ChemicalWeapons Convention andChemical Process SafetyManagement for StatesParties in South East and EastAsia region

n/a

2004 Asia Seminar Asia Non-ProliferationSeminar focusing onMaritime Cooperation

Through this seminar, participants areexpected to: (1) study procedures ofmaritime non-proliferation activities of theweapons of mass destruction, their deliverysystems and their related materials, (2)establish networks among the participating

n/a

Page 47: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

47states, and (3) study the concept of PSI(Proliferation Security Initiative)In FY 2004, a total of 9 officials fromCambodia (2 officials), Indonesia, Malaysia(2 officials), Philippines (2 officials) andThailand (2 officials) participated

2004- Asia Seminar Training Course onImprovements ofImplementation on SecurityExports Controls in Asia

The purpose is to encourage participants tounderstand the significance of securityexport controls and the international trendson non-proliferation, and to enhance theirability to introduce non-proliferationsecurity export control systems and detectthe concerned transaction.In FY 2004, 11 officials from Malaysia,Philippines, Thailand (2 officials),Cambodia, Laos, Vietnam, Myanmar (2officials), China and Mongolia participated.In FY 2005, 5 officials from Cambodia,Thailand (2 officials), Pakistan andMyanmar participated.In FY 2006, 10 officials from Cambodia,Indonesia, Laos, Thailand, Philippines,Malaysia, Myanmar and Vietnamparticipated.In FY 2007, 5 officials from Thailand,Mongolia, Vietnam (2 officials) and Chinaparticipated.In FY 2008, 8 officials from Indonesia (2officials), Thailand (2 officials), Vietnam,Myanmar (2 officials) and Mongoliaparticipated.

n/a

2004- Asia Seminar Export Control Seminars inAsia

The purpose is to strengthen export controlregime in Asia by exchanging and sharingknowledge and information on export

n/a

Page 48: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

48control with government officials of Asiancountries.[Indonesia]It was held in Indonesia on 13 and 14 ofJuly, 2004. Japan dispatched 5 experts and84 officials participated.[Philippines]It was held in Philippines on 16 of July,2004. Japan dispatched 3 experts and 52officials participated.[Thailand]It was held in Thailand on 5 of August,2004. Japan dispatched 5 experts and 53officials participated.[Vietnam]It was held in Vietnam on 12 of August,2004. Japan dispatched 5 experts and 59officials participated.[Cambodia]It was held in Cambodia from 12 ofJanuary, 2005. Japan dispatched 5 expertsand 54 officials participated.[Singapore]It was held in Singapore from 25 to 27 ofJanuary, 2005. Japan dispatched 4 expertsand 104 officials participated.

[Laos]It was held in Laos on 7 of February, 2005.Japan dispatched 5 experts and 69 officialsparticipated.[Brunei]It was held in Brunei on 28 of March, 2005.Japan dispatched 3 experts and 28 officials

Page 49: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

49participated.[Pakistan]It was held in Pakistan on 9 of May, 2005.Japan dispatched 5 experts and 24 officialsparticipated.

2005- Asia Seminar Industrial Outreach Seminar The purpose is to strengthen effectiveexport control in Asia. The seminarprovides companies (inc. Japanesecompanies) in Asia with knowledge andinformation on implementation of exportcontrol, and encourages them to acceleratetheir own efforts towards effective exportcontrol.It was held in ROK in February 2005,Singapore in May 2005, Taiwan in March2006, Hong Kong in September 2006,Thailand and Philippines in February 2007,and Singapore in June 2007, India inFebruary 2008, Malaysia in March 2008,South Korea and Indonesia in October2008, Hong Kong in December 2008,Vietnam in August 2009, Taiwan inSeptember 2009, Singapore in October2009, Indonesia in November 2009, andThailand in March 2010,.Japan dispatched 3 experts while 250workers participated in ROK 2005, 5experts and 200 workers in Singapore 2005,7 experts and 300 workers in Taiwan 2006,6 experts and 150 workers in Hong Kong2006, 5 experts and 120 workers inThailand 2007, 5 experts and 100 workersin Philippines 2007, 5 experts and 300workers in Singapore 2007, 5 experts and

n/a

Page 50: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

50100 workers in India 2008, 6 experts and200 workers in Malaysia 2008, 5 expertsand 150 workers in South Korea, Indonesiaand Hong Kong 2008, 4 experts about 90workers in Vietnam 2009, 4 experts and160 workers in Taiwan 2009, 2 experts and390 workers in Singapore 2009, 5 expertsand 150 workers in Indonesia 2009, and 4experts and 200 workers in Thailand 2010.

2003- Asia Seminar Seminar on Prevention andCrisis Management ofChemical and BiologicalTerrorism

The objective of this seminar is tocontribute to capacity building of Asiancountries, with a view to enhancing crisisand consequence management capacity incase of biological and chemical terrorism,by inviting officials from ministries andagencies responsible for policy-making andcoordination in the field of counter-terrorism and crisis management andproviding them with knowledge andexperience necessary for planning,developing and coordinating comprehensivepolicy on international counter-terrorismcooperation and domestic CT measures.Japan held this seminar from 2003 to 2007,receiving about 150 trainees in total for fiveyears.Officials from Brunei, Cambodia, China,Indonesia, Laos, Malaysia, Myanmar, thePhilippines, Singapore and Thailandparticipated.

n/a

2005- Asia-Pacific Seminar Seminar on the promotion ofaccession to the internationalcounter-terrorism conventionsand protocols

The purpose of this seminar is to encouragepractitioners of countries in Asia-Pacificregion to deepen knowledge of counter-terrorism related international conventions

n/a

Page 51: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

51and protocols including the Convention onthe Physical Protection of Nuclear Materialsand International Convention for theSuppression of Nuclear Terrorism, and tofacilitate their early accession to thoseconventions and protocols.Officials from Brunei, Cambodia, Fiji,Indonesia, Laos, Malaysia, Myanmar,PNG, the Philippines, Singapore, Thailand,Timor Leste and Vietnam have been invitedto this Seminar from FY2003 to 2008.

2006 Asia Seminar The Seminar onStrengthening NuclearSecurity in Asia Countries

Japan and the IAEA hosted this seminar,which was the first international conferenceon the theme of nuclear security was held inthe Asian region. In this seminar,participants made a presentation andexchanged opinions about internationalmeasures for ensuring nuclear security.Officials from Brunei, Cambodia,Indonesia, Laos, Malaysia, Myanmar, thePhilippines, Thailand, Singapore, VietNam, China, Korea.

n\a

Page 52: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

521993- Asia Seminar The Asian Export Control

SeminarLaunched in 1993, the seminar is aimed atreaching a deeper common understandingon the importance of export control.The seminar aims to strengthen the exportcontrol system in Asia countries andregimes.In the 17th Asian Export Control Seminarin January 2010, 33 officials fromBangladesh, Brunei, Cambodia, China,India, Indonesia, Laos, Macao, Malaysia,Mongolia, Myanmar, Pakistan, thePhilippines, Sri Lanka, Chinese Taipei,Thailand, Vietnam were invited.

n/a

2008,08 Asia Seminar Regional Seminar on NuclearSecurity, Safety andSafeguards in Hanoi

The Seminar was held on 18 to 20 August,2008 in Hanoi, Vietnam. The IAEA and theJapan hosted the seminar in order toenhance the aw awareness of Asiancountries that is most important to ensure3Ss in embarking on the use of nuclearenergy. Officials from Vietnam,Bangladesh, Indonesia, Laos, Malaysia,Nepal, the Philippines, Singapore, andThailand participated. The participantcountries have only the experience ofutilizing radiation and the study forintroducing nuclear energy was justinitiated. In this context, it was mostsignificant for Japan, to share in general herknowledge and experience in 3Ss withthose countries having interest in theintroduction of nuclear power.

n\a

Page 53: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

53New Zealand6

Country ofProject

Project Description Project Status: Milestones, Implementation Comments Funds Committed in000’s USD

Funds Expended in000’s USD

RussianFederation

Refurbishment ofPuktysh electricitysub-station to supportthe operation of theShchuch’yeChemical WeaponsDestruction Facility,Kurgan Region

Note: New Zealandchannelled itscontribution to thisproject through theUnited Kingdom

- All arrangements between Russia/UK/NZ and contractorhave been concluded.- Construction work completed on the Puktysh sub-stationon budget and slightly ahead of time. Transfer ofownership to the Federal Agency for Industry (FAI)(formerly the Russian Munitions Agency) took place on30 November 2006.

2004/05: USD 772(NZ$1.2M)

2005/06: USD 435(NZ$700,000)

2004/05: USD 772

2005/06: USD 435

TOTAL: USD1, 207was transferred to theUK for expenditureon this project

RussianFederation

Contribution to theshut-down of thenuclear reactor atZheleznogorsk

Note: New Zealandchannelled itscontribution to thisproject through theUnited States

- Arrangement between NZ and US concluded on 27 June2006

Note: State and Dept of Energy noted in February 2007that they had secured sufficient funding from other donorsand Congress to complete the project.

2005/06: USD 311 2005/06: USD 311was transferred to theUS for this project on30 June 2006.New Zealand fundingtowards this projecthas now been spent.

6 Updated June 2010

Page 54: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

54Ukraine Contribution to help

Ukraine combatnuclear smugglingthrough theimprovement of itsdetection capability

Note: New Zealandis channelling itscontribution throughthe United States.

- Arrangement between NZ and US concluded on 9 May2007. Funding will be directed to the Novoazovsk vehiclecrossing at the Ukraine border.

2006/07: USD 497 2006/07: USD497was transferred to theUS on 1 June 2007.

RussianFederation

Contribution to thedismantlement of adecommissionednuclear submarine inthe Russian Far East.

Note: New Zealand ischannelling itscontribution throughthe Committeeestablished by theAgreement betweenthe Government ofJapan and theGovernment of theRussian FederationConcerningCooperation to Assistthe Destruction ofNuclear WeaponsReduce in theRussian Federation(“the Committee”)

- Arrangement between NZ and the Committee concluded.Funding directed to the handling and processing of liquidradioactive waste, and the processing and storage of solidradioactive wastes generated during defuelling anddismantlement of the Victor III submarine (Hull No. 333)

2007/08: NZD 683(approx. USD545)

2007/08: NZ fundinghas been transferredto this projectfollowing theconclusion of theArrangement.

Page 55: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

55Kazakhstan Contribution to a US-

led project to assist inborder detection ofnuclear/radioactivesmuggling inKazakhstan.

Note: New Zealandis channelling itscontribution throughthe United States.

- Sites for detection equipment to be installed selected.Awaiting confirmation of project timeline.

2008/09: NZD 685(approx. USD536)

2008/09: NZ fundinghas been transferredto the US followingconclusion of theArrangement.

Russia Contribution to aCanadian-led projectto fund anti-theftradiation detectionequipment for amajor Russiannuclear facility.

Note: New Zealandis channelling itscontribution throughCanada.

- Exchange of letters signed at officials level followingannouncement by Prime Minister’s in April 2010 inOttawa. Funds to be transferred in June 2010.

2009/10: NZD 685(approx. USD472)

2009/10: NZ fundingwill be transferred toCanada in June 2010.

Page 56: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

56Norway

Country ofProject

Project Description Project Status: Milestones, Implementation Comments Funds Committed(06/03 - 06/10)

Funds Expended(06/03 -06/10)

Total GP Pledge: € 100 million € 98,486 million € 92,386 million

Nuclear submarine dismantlement and spent fuel managementRussia Submarine

dismantlementDismantling of two Victor II-class nuclear submarines completed in2004. One Victor III-class submarine dismantled in 2005. One VictorI-class submarine dismantled 2006/7, with contribution of € 200.000from Republic of Korea. Dismantlement of submarine 291 completedin 2009 in cooperation with the UK.

€ 26.2 million € 26.2 million

Russia Submarinedismantlement /radioactive waste

Conversion to land storage in Saida Bay of three triple-compartmentreactor units stored in floating conditions remaining from previouslyNorwegian-financed submarine dismantlement projects. Completedin 2009.

€ 4.2 million € 4.2 million

Russia Arctic MilitaryEnvironmentalCooperation (AMEC)

AMEC project 1.8-2 Transport of November-class submarine 291Grimikha-Polyarny by heavy-lift vessel, September 2006.

€ 3.2 million € 3.2 million

Radioactive SourcesRussia Dismantling of

radioisotopethermoelectricgenerators (RTGs)

Financed removal and dismantlement of 180 RTGs in the RussianBarents Sea Area. € 360.000 contribution from Canada in 2005 and €607.500 from France for projects in 2005-2007. Removal to becompleted during 2009, dismantlement to be completed by 2010.

€ 25.1 million € 25.1 million

Removal and dismantlement of 71 RTGs in the Russian parts of theBaltic Sea Area with installation of alternative energy sources.Removal to start in 2009, scheduled to be completed in 2012/2013.Contributions from Finland through Norwegian project management.

€ 2.5 million € 400.000

Nuclear Security/Safety and physical protectionRussia Safety improvements at

Kola, Leningrad andTsjernobyl NPP

Ongoing, long-term cooperation € 9,8 million € 9 million

Russia Physical protection of Completed € 185.000 € 185.000

Page 57: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

57SNF service ship “Lotta”

Russia Andreyev Bay.Infrastructure andphysical securityprojects

Development of physical protection (active fence, alarms,videosurvailance) at the site (2006), documentation ofsoil contamination in the bay, completion of topographical maps,construction of new access road, access control facilites andadministration/wardrobe/accommodation facilities, documentation ofthe physical state of the pier and rehabilitation during 2007-9.Construction of canteen and training center. Planning of developmentof utilities.

€ 15.5 million € 12.3 million

Multilateral InitiativesRussia Contribution to the

nuclear window of theNDEP Support Fund

Total pledge: € 10 million € 10 million € 10 million

Russia Chemical WeaponsDestruction

Shchuch'ye chemical weapons destruction site (UK project) € 400.000 € 400.000

Russia WMD Expertise ISTC Administrative Operating Budget contributions € 563.600 € 563.600

Norway: Activities in Countries other than Russia and Ukraine in line with the GP objectives

Period Countries of project Project type7 Project Name/Summary

Project description Funds8

(Committed/Expended)2008- Kazakhstan Prov. of

equipmentSecuring BorderCrossings inKazakhstan (Coopthrough US DOE)

Installation ofdetection equipment

for radioactivematerials at Kazakh

border crossings(land, sea, air)

CommittedUSD 837 600

7 Please indicate the types of the activities, such as seminars, capacity-building, provision of equipment, construction of facilities, physical operation, and in particular redirection/engagement of scientists and technicians.8 Please fill in this column where appropriate. For seminar-type activities, the information on the funds may not be so significant for the overall purpose of the discussion at theGPWG.

Page 58: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

58Republic of Korea9

Country ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committed Funds Expended(Jan ’05 – Dec ’09)

Total Expenditure of the Republic of Korea : 3,700,000 USD (10,697,962 USD since 1998)

Russia Nuclear SubmarineDismantlement

The ROK has completed the dismantlement oftwo Victor-Ⅰ class and four Victor-III classnuclear submarines. In 2009, the ROK spent250,000 USD defueling a retired Victor-III classnuclear submarine.* in cooperation with Canada, Norway, andJapan.

1,700,000 USD

Russia Nuclear and RadiologicalSecurity : Elimination of

Weapon-Grade Plutonium

The ROK financed the construction of a fossil-fuel plant to replace graphite-moderated reactorsin Zheleznogorsk, Russia* in cooperation with the U.S.

750,000 USD

Russia Nuclear and RadiologicalSecurity : Enhancement of

Physical Protection

The ROK provided vehicle portal monitors andpedestrian portal monitors for radiationmonitoring at a nuclear site in Mayak, Russia.* in cooperation with Canada.

250,000 USD

Russia andFSU

Redirection of Former WeaponsScientists

The ROK acceded to the ISTC in December 1997and contributed 6,997,962 USD in an effort toredirect former WMD scientists. Its contributionsinclude findings for 60 projects.

6,997,962 USD(since 1998 )

Ukraine Nuclear and RadiologicalSecurity : Strengthening thesecurity of nuclear materials

The ROK financed the removal of unused high-level radioactive sources from the UkraineNational Academy of Sciences Institute ofPhysics (IOP) to Kiev Randon.* in cooperation with the U.S.

* The amount ofcontribution isdetermined on a yearlybasis.

* 2010 funds not yetallocated for specificuse

250,000 USD

9 Updated on June 2010

Page 59: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

59Ukraine Nuclear and Radiological

Security : Second Line ofDefense

The ROK provided vehicle portal monitors andpedestrian portal monitors for radiationmonitoring along the Ukraine border.* in cooperation with the U.S.

300,000 USD

Others(Kazakhsta

n)

Nuclear and RadiologicalSecurity : Second Line of

Defense

In 2009, the ROK financed the installation ofradiation detection and communicationsequipment at the Chimkent International Airport.* in cooperation with the U.S.

250,000 USD

Others(Afghanista

n)

Biosafety, Biosecurity andBiological Non-proliferation

In 2009, the ROK financed the installation ofbiosecurity equipment and sponsored a trainingprogram on its use at the Central VeterinaryLaboratory in Afghanistan.* in cooperation with the U.S.

200,000 USD

Page 60: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

60Russian FederationCountry of

ProjectProject

DescriptionProject Status: Milestones, Implementation Comments Funds

CommittedFunds Expended(June 2002-2010)

Total GP Pledge: 2 billion USDRussianFederation

NuclearSubmarineDismantlement

198 nuclear submarines are decommissioned, including 120 NSM in theNorth-West region and 78 NSM in the Far East.

By the end of 2010, 192 NSM will be dismantled: 118 in the North-Westregion and 74 in the Far East.

6 NSM are to be dismantled: 2 in the North-West region and 4 in the FarEast.

16 nuclear support ships and 21 tanks for liquid radioactive waste storage areto be dismantled after 2010.

Rehabilitation of 4 shore bases (in Andreeva Bay, Gremikha, Sysoeva andKrasheninnikova Bays)

669mln.USD

(2002-2010)

618 mln.USD

RussianFederation

ChemicalWeaponsDestruction

Implementation of the Federal Targeted Program ―Destruction of thechemical weapons stockpiles in the Russian Federation:

1. Chemical weapons of category 3 have been totally destroyed (330 024unfilled chemical munitions, burster and powder charges).

2. Chemical weapons of category 2 have been totally destroyed (3 844chemical munitions filled with phosgene).

3. In December 2002 at the facility in Gorny the destruction of chemicalsweapons of category 1 was started. In December 2005 the destruction of1143,2 tons of poisonous substance was completed, i.e. 100 per cent of thestockpiles of the chemical weapons of category 1 held at this facility.

- In December 2005 at the facility in Kambarka the destruction ofchemicals weapons of category 1 was started. In March 2009 the destructionof 6349 tons of poisonous substance, i.e. 100 per cent of the stockpiles of the

2 bln. USD(2002-2012)

5 bln USD

Page 61: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

61chemical weapons of category 1 held at this facility.

- In August 2006 the facility in Maradikovsky started the destruction ofchemicals weapons of category 1. As of May 1, 2010, 4873.335 tons ofchemical weapons of category 1 has been destroyed, i.e. 70,7% of thestockpiles of the chemical weapons of category 1.

- In September 2008 the facility in Leonidovka started the destruction ofchemical weapons of category 1. As of May 1, 2010, 5269,267 tons ofchemical weapons of category 1 has been destroyed, i.e. 76,5 % of thestockpiles of the chemical weapons of category 1.

- In March 2009 the facility in Shchuchye started the destruction ofchemicals weapons of category 1. As of May 1, 2010, 1325,193 tons ofchemical weapons of category 1 has been destroyed, i.e. 24,3 % of thestockpiles of the chemical weapons of category 1.

4. By April 29, 2003 the Russian Federation completed the first stage of thedestruction of chemical weapons of category 1 (at the facility in Gorny,Saratovskaya oblast, 400 tons of mustard were destroyed, i.e. 1% ofaggregate stockpiles of the chemical weapons of category 1).

- In April 2007 the Russian Federation completed the second stage of thedestruction of chemical weapons of category 1 (8000 tons of poisonoussubstance were destroyed, i.e. 20% of aggregate stockpiles of the chemicalweapons of category 1).

By November 26, 2009 Russia has completed the third stage of thechemical weapons destruction. 17 988,2 tons of chemical weapons has beendestroyed, i.e. 45,03 % of aggregate stockpiles of the chemical weapons ofcategory 1.

5. The construction of the facilities in Pochep and in Kisner is under way, aswell as the increase of production capacities of lines for the destruction ofchemical weapons at the facilities in Maradikovsky, Leonidovka andShchuchye.

Page 62: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

62Sweden10

Country ofProject

Project Area Project: Status and activities in 2009 Funds allocatedin 2009

Georgia Nuclear non-proliferation Continuation of two projects initiated in 2008and which will be terminated in 2010.Contributions to (1) Georgia’s analyticalcapabilities as concern illicit trafficking ofnuclear and radioactive materials and (2) theestablishment of a physical protectioninfrastructure at the Institute of Physics and itssubcritical assembly.

200 000 Euro

Armenia Nuclear non-proliferation Continuation of two projects initiated in 2008and which will be terminated in 2010.Contributions to (1) the conceptual developmentof Armenia’s nuclear materials accountingsystem and (2) support to the development of thenational export control system

100 000 Euro

Belarus Radiation protection and nuclearnon-proliferation

4 projects were initiated in 2007 and ongoing in2009. They will be terminated in 2010. Theyconcern contributions to (1) training incombating illicit trafficking of nuclear andradioactive materials, (2) quality control inmedical radiology, (3) identification andreduction of radiation exposure to naturallyoccurring radioactive materials (4) retrieval andremediation of sites for storage of radioactivematerials at disbanded Soviet military bases.

110 000 Euro

Ukraine Reactor safety Sweden has one large cooperation project in thefield of reactor safety with Ukraine. It concernsthe transfer of the “Periodic Safety Review”method for assessing reactor safety to the owner

650 000 Euro

10 Projects outlined are those which were active in 2009

Page 63: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

63of the Ukrainian nuclear sector, Energoatom.The Yushno-Ukrainsk NPP is used as pilot plantfor the project. The project was initiated in 2007.and will continue till 2011 or 2012.

Ukraine Nuclear non-proliferation Sweden has cooperated with Ukraine in the fieldof nuclear non-proliferation since 1992 and wasUkraine’s first partner in the nuclear field. In2009, there have been cooperation projects in thefields of (1) improving the national exportcontrol system, (2) providing service andupgrading for the nuclear materials accountingsystems in use at Ukraine’s four NPPs (3) andsupport to a training module for nuclearmaterials accounting at the Sevastopol NationalUniversity for Nuclear Energy and Industry. (4)Training was provided for staff from regulatoryagencies in the detection and prevention of illicittrafficking at the George Kuzmich Center inKiev. In cooperation with the Finnish RadiationSafety Authority, STUK, assistance wasprovided to the State Nuclear RegulatoryCommittee of Ukraine’s development ofregulations for inspections pursuant to thesafeguards agreement of Ukraine and theAdditional Protocol.

450 000 Euro

Ukraine Radiation protection andemergency preparedness

Sweden has provided support in 2009 asconcerns (1) the development of a nationalradiation monitoring system and (2) theimprovement of the emergency preparednesssystems in regions with nuclear power plants.Additionally the preparatory work was made forfour large projects that will stretch till 2013 inthe areas of (3) providing support to establishing

175 000

Page 64: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

64strategies and programmes for remediation ofuranium tailings at former Soviet uraniummines; (4) reducing risks from radon andnaturally occurring radiation; (5) quality controlin the medical uses of radiation and (6) radiationprotection of miners in uranium mines. Finally,Sweden has contributed to the (7) projectinitiated by Finland and STUK concerning thedelivery of a vehicle for radiation monitoringand analysis

Russia Nuclear and radioactive wastemanagement

A number of projects were implemented in 2009in nuclear and radioactive waste management.By far the largest project in this area is onewhere (1) SSM and Rosatom in cooperation withspecialized agencies develop a general strategyfor how to handle and store Russia’s enormousvolumes of spent nuclear fuel. The strategyincludes financial calculations and schemes forhow to finance management systems based onvarious degrees of either depositing spentnuclear fuel directly or reprocessing it.Furthermore, there are activities at the AndreevaBay site (2) in the shape of contributions to amultilateral remediation effort and at the samelocation (3) Sweden cooperates with Russianauthorities to develop a landfill for storing verylow level nuclear wastes. At the (4) LeningradNPP and at the (5) Kola NPP respectively,Sweden assists in establishing systems andprocesses as well as equipment for themanagement of nuclear and radioactive waste. Incooperation with Russian authorities, Swedendiscusses (6) the Russian legislation for nuclearwaste issues as well as the classification of

150 000 Euro

Page 65: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

65various waste categories.

Russia Reactor safety In 2009, Sweden has continued its cooperationwith the Leningrad and Kola NPPs as concernsreactor safety. Ten projects were eithercompleted or in process at the Kola NPP andthey cover efforts to provide essential equipmentfor the functional integrity of various safetysystems as well as fire protection andsurveillance and detection equipment for earlydetection of malfunctioning, leakages etc. Fiveprojects in similar fields were implemented or inoperation at the Leningrad NPP in 2009. Mostprojects were coordinated and/or implemented incooperation with Finland.

1500 000

Russia Radiation protection andemergency preparedness

Sweden provided (1) support (equipment andtraining) to Russian entities that are entrustedwith the task of keeping track of the radiationsituation at former naval bases on the KolaPeninsula. Moreover, assistance (2 and 3) wasprovided to the Kola NPP for its internaldosimetri control and radiation protection.

250 000

Russia Nuclear Non-proliferation Four main projects were implemented in 2009and all four stretch over several years and arethus expected to also continue in 2010 and 2011.In cooperation with Rosatom and TVEL,Sweden is assisting (1) the Chepetsk MechanicalPlant in Glazov in the development of a nuclearmaterials accounting system for its productionline of natural uranium. In cooperation withRosatom and Atomflot in Murmansk (2) thedesign for a physical protection system for thevessel “Serebryanka” was prepared and later thesystem will be installed depending on allocatedfunding. Further, Sweden has continued its

1300 000

Page 66: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

66cooperation with (3) regional and federalauthorities regarding the establishment of aregional system for combating illicit traffickingin the Murmansk region. In cooperation withuniversities in the Urals region and in Tomsk (4)various educational efforts are implemented inorder to strengthen the knowledge base in thenuclear non-proliferation field.

Page 67: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

67

SwitzerlandCountry

ofProject

Project Description Project Status: Milestones, ImplementationComments

Funds Committed(July 2002 - Apr. 2009)

Funds Expended(July 2002 - Apr.2010)

Russia Shchuch’ye:Sanitary and Hygiene MonitoringSystem in the Sanitary Zone.

Implementation agreement was signed in 2004.Project was completed in 2006.

500’000 EUR 500’000 EUR

Russia Kambarka:Reconstruction of the electricalsubstation 110/35/10 KV (heavyelectrical engineering equipment).

Implementation agreement was signed in 2004.Project was completed in 2005 (this project wasco-financed with the Netherlands; Netherlandspart was 4’000’000 EUR).

1’600’000 EUR 1’600’0000 EUR

Russia Kambarka:Reconstruction of the electricalsubstation 110/35/10 KV (control-command equipment).

Implementation agreement was signed in 2005.Project was completed in 2006.

1’600’000 EUR 1’600’0000 EUR

Russia Maradykovskyi:Construction of the electricalsubstation 220/110/10 KV.

Implementation Agreement was signed in 2006.Project was completed in 2006.

1’610’000 EUR 1’610’000 EUR

Russia Leonidovka:Construction of the electricalsubstation 110/35/10 KV.

Implementation Agreement was signed in 2007.Project was completed in 2008.

1’910’000 EUR 1’845’000 EUR

Russia Pochep:Construction of the electricalsubstation 110/35/10 KV.

Implementation Agreement was signed in 2008.Project was completed in 2009.

990’000 EUR 983’000 EUR

Russia Financing the Green Cross Officesin Kirov, Penza and Pochep as wellas a part of the annual NationalDialogue Forum in Moscow.

Project was completed in 2008. 2’715’000 EUR 2’620’000 EUR

Russia Purchase of 2000 emergency radioreceivers for the population aroundKambarka CWD site (financedthrough Green Cross).

Project was completed in 2006. 13’000 EUR 13’000 EUR

Page 68: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

68Albania Financing inspections of CW

stockpile by OPCW.Project was completed in 2006. 56’000 EUR 56’000 EUR

Albania Financing inspections by OPCWduring destruction activities.

Project was completed in 2007. 150’000 EUR 150’000 EUR

Page 69: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

69Ukraine

Project proposals currently under consideration by G8 GP donor states- “Raising the possibilities of the State Border Guard Service of Ukraine detachment on preventing of nuclear material illegal transportation via

international communication ways”;- “Decommissioning of irradiation facilities, provision of safe storage of Sources of Ionizing Radiation (SIR)”;- “Edit and publishing of Photo Guide “Storage of scrap-iron and radiation”;- “Improving detection capabilities of the Ukrainian custom service authorities on preventing illicit radioactive materials trafficking via borders and

sea ports”;- “Ensuring of physical protection for the I category highly-enriched nuclear material while its transportation”;- “Customization and implementation of the Classification Search Tool (CST) and Restricted Parties Search Tool (RPST) in Ukraine”;- “Publishing of specialized journal, development and maintenance of web-site “Security and Non-proliferation””;- “Study of the methodology of investigating crimes in the sphere of smuggling and illicit transfer of nuclear materials”;- “Composite radio-protective shields and radiation background on-line monitoring system for nuclear materials storage in the National scientific

center “Kharkiv Institute of Physics and Technology ” (NSC KIPT) of National Academy of Science of Ukraine (NASU)”;- “Strengthening of physical protection of sources of ionizing radiation at the National Scientific Center “Institute of Metrology”;- “Increase of detection capabilities to prevent illegal removal of radioactive materials on check points of active Units of nuclear power plants in

Ukraine, including storage of fresh nuclear fuel and radioactive waste”;- “Improvement of anti-terrorist protection of the operating Ukrainian Nuclear Power Plants”;- Multi- Function Gamma Scanner For Moving Objects Detection With Radiation Material;- Integrated Systems of The Automated Control And Monitoring of Storage And Non Distribution of Nuclear Radiation Materials;- Adaptive Integrated System of Radiation Monitoring For Detection of Radiological Threats.

Ukraine

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

1. Security ofRadiologicalSources

To improvesecurity atfacilities withhigh-active

State NuclearRegulatoryCommissionof Ukraine

USANuclearRegula-

tion

16-20.04.07 –seminar conducted“Methods andequipment to

168,845USD

Page 70: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

70

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Status:In progress

radiologicalsources

(SNRCU) Commi-ssion

USANonproliferationandDisarmament Fund

search for orphanedsources”;72 equipment unitsare purchased

- development ofprogram of storageof high-activesources.

16 500 (USD)

(852 668UAH)

16 500(USD)

150 000(UAH)

2 RegulatoryDevelopment -Implementingthe IAEAModel Project

Status:In progress

To accelerateUkraine'sprogress towardmeeting theregulatorymilestones laidout in the IAEAModel Project

SNRCU IAEA,USA

NuclearRegula-

tionCommi-

ssion

USANonproliferation

- equipmentpurchase in August2007 (PC, printers,copy machines,digital photocameras, 86 unitsin total);

Seminars forSNRCU staff wereconducted.

48,000

44,000

48,000

44,000(2006)

Page 71: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

71

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

andDisarmament Fund

USANuclearRegula-

tionCommi-

ssion

Purchases forSNRCUinspections weremade in 2009:- PC equioment

- dosimetricequipment.

- vehicles

- Internet services

114 992(USD)

51 063 (USD)

191 664(USD)

20 111 (USD)

114 992(USD)

51 063(USD)

191 664(USD)

20 111(USD)

3 RegulatoryDevelopment -Acceleratingthe RadioactiveSource RegistryDevelopment

Status:

To registerhigh-activityradioactivesources inaccordance withIAEAguidelines.

SNRCU USA StateDepartment

NonproliferationandDisarmam

-computerequipmentpurchased for theRegistry ofradioactive sources;- software RAISadaptation tonational

112,000 130,177(2005-2007)

2,037,592(UAH)2005-2007

Page 72: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

72

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Completed ent Fund requirements,support andmodernization ofsoftware toautomatic system“Registr”;- training seminarfor the StateRegistry ofradioactive sourcesstaff;- office furniturepurchased for theState Registry ofradioactive sources.

According to theUS NuclearDisarmamentCommission andSNRCUMemorandum sinceApril 2008 USNuclearDisarmamentCommissionprovides supplysoftware supply for

Page 73: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

73

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

automatic system“Register”.

4 RegulatoryDevelopment –The SNRCURegionalOffices Peopleware

Status: InProgress

To improveinspection andenforcementcapabilitiesthroughincreasing staffmembers at theSNRCUregional offices.

SNRCU Regional offices ofthe SNRCU wereprovided by thestaff (80 membersof staff from 96appointed memberstaff)

Project wasimplemented

withoutdonor’s

contribution

1,338,075(UAH)

5 SecuringOrphaned andAt-Risk Sources

Status: InProgress

Removal ofhigh activespent sources(HASS) fromthe facilities ofinsolvententerprises ofUkraine.

Removal ofHASS from thefacilities of theInstitute ofPhysics (Kyiv)

Ministry ofEmergenciesand SNRCU

Ministry ofEmergencies

Germany

USA

Four contracts aresigned and arerealizing withRADON specialenterprises (Lviv,Kharkov, Donetsk,Dnipropetrovsk)

The contract issigned, project is inrealization.

1500000euro

+0.16 mln.

UAH

306820.0USD

+0.2 mln.

UAH

1500000euro

306820.0 USD

196520.6euro

203943.0USD

0.07 mlnUAH

0.08mln.UAH

Page 74: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

74

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Creation of themobile “hot-cell”

Supply of themodernanalyticalequipment forworks withHASS and O(orphaned)

Removal ofHASS from thefacilities of“Electron-gas”

Ministry ofEmergencies

Ministry ofEmergencies

Ministry ofEmergencies

FranceCommissa

riat ofAtomicEnergy

France

USA

The contract onmobile “hot - cell”creation is signed

The contract andlist of supply aresigned

According toagreement with theUS MOE Ministryof Emergencies ofUkraine developedand approved withState NuclearRegulatoryCommittee ofUkraine plan of

80780 euro+

0.1 mln.UAH

191035 euro+

0.03mln.UAH

6 mln.UAH

80780 euro

191035 euro

-

-

0.03mln.UAH

0.02mln.UAH

Page 75: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

75

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

activities onpackaging andtransportation ofradiologicalsources from the“Electron-Gas”facilities.

6 Assistance forCreation ofNewRadioactiveWaste DisposalFacilities

Status: InProgress

ImproveUkraine'sradioactivewaste disposalcapacity so thatall disusedradioactivesources can beremoved to asecure locationwhere theycannot betrafficked.

Creation ofcentralizedstorage forHASS ofUkraine.Development of

Ministry ofEmergencies

RADONenterprise

GreatBritain

Depatment of

Energyand

climatechange of

Technical andeconomic researchwith Highly ActiveSpent RadiologicalSources in Ukrainedeveloped.

The Memorandumof understandingbetween MES andDECC is signed.Designing projectfor creation of

49 970thousand(UAH)

1674824.0pounds

+3.5 mln.UAH

37 530thousand(UAH)

2.1 mln.Pounds

(contracts aresigned up to

322297.0pounds)

370thousand(UAH)

160885.0pounds

2.5mln.UAH

Page 76: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

76

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

draft project,providing stateexpertise of theproject

Completion ofstorageconstruction forHAS removedfrom “Electron-Gas”

Strengtheningsafety of HASSand O atUkr”RADON”enterprices

Ministry ofEmergencies

Ministry ofEmergencies

the UnitedKingdomand Great

Britainand

NorthernIreland

USA

USA

storage is finished,contract is signedand is on the stageof realization

The contract issigned.

Five contracts arecompleted, withKyiv, Odesa, Lviv,Kharkiv,DnipropetrovskRadon specialenterprices.

-

2225000USD

+0.3 mln.UAH

(According tothe contract.)

750000USD

2225000 USD

To bespecified

1089158.96UAH

To bespecified

0.1 mlnUAH

7 ImprovingDetectionCapability atSeaports (IIstage)

To improve theability of theSCSU andSBGS to detectand seize any

State CustomsService ofUkraine(SCSU) andState Border

USA SCSU:-X-ray equipmentsupply to provideproper custom andradioactive control

2500000USD

2500000 USD 1,092,887 Ukraine isnot incharge todo so

Page 77: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

77

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Status: InProgress

unauthorizedpossession orshipment ofnuclear andradioactivematerials atseaports.

Guard Serviceof Ukraine(SBGS)

of goods related toWMD and subjectsto export control;- exploitationtraining on thebasis of CustomsAcademy andCoastal customservice.

SBGS:- study of supply ofnecessarypermanentradiation controlequipment toOdessa, Illichivs’k,Mariupol,Berdyansk,Sevastopol seatrade port;- preparation ofdetailed designs toperforminstallation.

3,500,000 3,500,000 800000USD

(X-raysupply)

8 ImprovingDetectionCapability at

To reduce therisk of illicittrafficking of

SCSUSBGS

IAEA(Canadafunds)

- technicalinstruments CT-30for customs control

528,340 528,340 528,340 Ukraine isnot in

charge to

Page 78: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

78

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

the BelarusianBorder

Status:Completed

nuclear andradioactivematerials atvehicle and railcrossings alongthe Ukrainian-Belarusianborder.

delivered to customservices onUkraine-Belarusborder to stop illicittrafficking(includesendoscope, buster,view mirror, laserdistometer, densitygauge“BusterK910B”);- staff trainingorganized.

do so

9 ImprovingDetectionCapability atthe Ukrainian-Russian Border

Status: InProgress

To reduce therisk of illicittrafficking ofnuclear andradioactivematerials atvehicle and railcrossings alongthe Ukrainian-Russian border.

SCSUSBGS

USA - technicalinstruments CT-30for custom controldelivered tocustoms serviceson Ukraine-Russiaborder to stop illicittrafficking(includesendoscope, buster,view mirror, laserdistometer, densitygauge

3,000,000USD

3,000,000USD

104,650USD

not incharge to

do so

Page 79: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

79

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

“BusterK910B”);SBGS- needs oninstallation ofpermanentradiation controlequipment werestudied;- installation ofradiation controlsystem iscompleted inLuzhanka andNovoazovsk points,Borispol and Odesaairports.- installation of the

radiation controlsystems inDovgansk, Izvarineand Ilovaysk are atthe final stage.

2,000,000USD

10 ImprovingSecurity atGreen Borders(Ukrainian-Belarusian

To reduce risksfrom illicittrafficking ofnuclear andradioactive

SBGS USA - US DefenseDepartment ThreatReduction Agencyhas approved theproject proposal.

2,500,000USD

350,00 USD Ukraine isnot incharge todo so

Page 80: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

80

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

border)

Status: InProgress

materials troughthe state border

- study of needs andtender for supply ofnecessarypermanent radiationcontrol equipmentand other technicalinstruments arecontinues.

11 ImprovingMaritimeSecurity andInterdictionCapability

Status:Completed

To improveUkraine'smaritimeinterdiction anddetectioncapabilities inthe Black Seaand reduce risksof illicittraffickingnuclear andradioactivematerials.

SBGS Sweden - equipmentsupplied;- staff trainingconducted.

120,000 euro 120,000euro

110,000euro

Ukraine isnot in

charge todo so

12 LegalAssistance toImproveProsecution ofNuclear

To ensureprosecution ofall cases ofnuclearsmuggling

WorkingGroupestablished bytheVerkhovna

OSCE,UN ODC

(USAfunds)

Verhkovna Rada ofUkraine in May2007, underinitiative of SSU,has made changes

Financialsupport wascompletelyprovided in2008.

Support wasprovidedtrough

financinginternational

-

Page 81: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

81

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Smuggling

Status: Inprogress

Rada and theSecurityService ofUkraine(SSU)

to art.265 of theCriminal Code ofUkraine (Unlawfulusage ofradioactivematerials”) in termsof strengtheningthe punishment(crimes, mentionedin the article, canbring to nuclearsmuggling).

During theinternationalseminar held inKyiv in March2008 the UN ODCprovided forUkrainian side thematerials “Oncertain issues oflawful regulationactivity concerningradioactivematerials andresponsibility fortheir unlawful use”.

seminar heldin Ukraineand givinganalytical

materials bythe UNODC.In this

regard USconsider

realizationof this

project to befully

financed.

Page 82: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

82

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

The proposalsmade during theseminar still areunder considerationin Ukrainianauthorities.

13 SponsoringInternationalCooperation inNuclearForensics

Status:Implementation didn’t start

To ensureUkraine'sparticipation inthe NuclearSmugglingInternationalTechnicalWorking Group(ITWG).

SNRCU,NationalAcademy ofSciences ofUkraine (KyivInstitute ofnuclearresearches)

Sweden Experts of theInstitute of nuclearresearches didn’t

take a part in ITWG

9000 europer year

- - -

14 Anti-CorruptionTraining andDevelopmentfor the SCSUand the SBGS

Status: InProgress

To reduce theinfluence ofcorruption onthe SCSU andSBGS and itseffects onnonproliferationassistanceprograms.

SCSUSBGS

EUGermanySweden

In 2007 SCSU stafftook part in:- EU Missionseminar onadministrative lawin the sphere ofcorruptioncombating;- EU Mission onanticorruption withparticipation of

Page 83: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

83

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

USA

short term experton anticorruptionissues;- study at theG.C.MarshallEuropean Centerfor Security Studies(Germany),Advanced SecurityStudy (PASS 07-7).

SBGSSBGS togetherwith the UScorporation“Challenges ofmillennium”actively work onestablishment ofpilot office ofinternalinvestigation in theSBGS structure;round tables werecarried out;normative and legalbasis of the office

11 003 126USD

11 003 126USD

around300 000

USD

Ukraine isnot incharge soon

Page 84: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

84

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

activity prepared.15 Anti-Corruption

Training andDevelopmentProgram forUkrainian StateAuthoritiesResponsiblefor ProtectingNuclearMaterials

Status:No funding forrealization

To reduce thelevel ofcorruption inUkrainian stateauthoritiesinvolved incounteringthreats ofnuclearproliferationand nuclearterrorism.

Scientific andTechnicalCenter ofExport andImport ofSpecialTechnologies,Hardware andMaterials(STC)

- Draft project oncorruptionprevention in Stateauthorities for2007-2008 isdeveloped togetherwith SCSU andSBGS.

230,000USD

- - -

16 Creation ofResources forIdentification ofNuclearMaterials inBulk-Form byMeans ofDestructive(Nuclear andChemical)Analysis and by

To obtainaccurate andcomprehensivemeasurementdata concerningproperties,characteristicsand isotopecontent ofnuclear materialcompounds in

NationalAcademy ofSciences ofUkraine(NationalScientificCenter“KharkivInstitute ofPhysics andTechnology”

Japan The expertdelegation of Japanvisited Ukraine inMarch 2009.During the visittechnical, financialand law aspects ofprojects realizationwere discussed.The decision onprojects (##16, 17)

900 000 euro 2 000 000USD

Page 85: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

85

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

Using Up-to-Date AnalyticalEquipment atthe NSC KIPT

Status:Consultationson projectrealization areunder theprocess

bulk-form,which arelocated at NSCKIPT

(NSC KIPT))

17 Extension ofthe Service andMaintenance ofthe PerimeterProtectionSystem at NSCKIPT

Status:Consultationson projectrealization areunder theprocess..

Guaranteeingthe reliableoperation of theexistingperimeterprotectionsystem at theNSC KIPT for aprolongedperiod of time

NationalAcademy ofSciences ofUkraine(NationalScientificCenter“KharkivInstitute ofPhysics andTechnology”(NSC KIPT))

Japan

realization has beensigned onDecember 28,2009.

400 000 euro

Page 86: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

86

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

18 Introduction ofUnifiedInternationalMeasures onPhysicalProtection ofBiologicalPathogenousAgents StorageSites(Strengtheningof PhysicalProtectionSystem of theCrimean Anti-Plague StationandKhmelnytskiyRegionalSanitary-Epidemiological Station)

Status:implementation didn’t start

Improvement ofSystem ofphysicalprotection ofCrimean Anti-Plague StationandKhmelnytskiyRegionalSanitary-Epide-miologicalStation

Ministry ofHealthProtection ofUkraine

EU The EU experts’ delegation visited Ukrainian facilities mentioned above inNovember 2008. Position regarding the project implementation is expecting to beinformed from the EU.

19 Improving Improving Ukrainian Germany Agreement on 5.8 mln. euro 5.8 mln.euro - -

Page 87: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

87

№ Project title Project purpose UkrainianRecipient

State/-sdonor/-s Project activities

Ukraine’sestimated

funds

Declaredfunds

Donor’sfunds

received(spent) inUkraine

Fundsspent byUkraine

physicalprotection ofthe isotopesstorage at theUkrainian StateIndustrialEnterpriseIZOTOP

Status:Agreement onprojectrealization isadopted.

physicalprotection ofradioactivesources and“hot - cell”installation

StateIndustrialEnterpriseIZOTOPMinistry ofIndustrialPolicy ofUkraine

projectimplementation hasbeen adopted onDecember 29, 2009

Page 88: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

88United Kingdom

Country ofProject

Project Description Project Status: Milestones, Implementation Comments FundsCommitted

(06/02 - date)in 000's

FundsExpended

(06/02 -date)in 000's

Total GP Pledge Up to US$750000

GBP309 000

Figures belowin GBP

Figures belowin GBP

Nuclear submarine dismantlement and spent fuel management

Russia Andreeva Bay (a former Russian Navy base)

The Coastal Technical Base at Andreeva Bay inNW Russia is a former naval installation about40 kilometres from the Norwegian border.Around 22,000 SNF assemblies (comprisingabout 30 tonnes of SNF) are held there in verypoor conditions in three Dry Storage Units(DSUs), originally built as storage tanks forliquid radwaste.The UK along with a number of other donors,has been working for some years to develop astrategy, and deliver the necessaryinfrastructure, for the safe, environmentallysound, cost effective and timely removal of theSNF from Andreeva Bay, for eventual transferto the Russian reprocessing facility at Mayak.The immense technical challenge has beencompounded by the complexity and disrepair ofthe site and its infrastructure. A comprehensivestrategy and technical solution for the site wereagreed and endorsed by both Russian andinternational donors in April 2007. This

Note - in addition to the grant aid costs for Andreeva Bayprojects listed below, the UK has provided some £17M forproject management costs and technical advice requestedby Russia

Page 89: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

89important agreement provides for theinfrastructure and SNF handling facilities to bein place by 2014, after which the process ofremoving the SNF can begin.

Over the timescale of the Global Partnership upto £70 million may be committed by HMG forwork at Andreeva in partnership with otherdonor countries

Project Management Consultants Nuvia Ltdprovide project management and technicalsupport to projects on behalf of DECC, thefollowing tasks and projects:

Russia Contracts with the site operator, FSUESevRAO:

Since 2002 a total of six individual tasks have beencontracted with SevRAO covering various early works toprepare the site for future activities associated mainly withSNF removal. All of these tasks are now complete andhave provided a good basis on which to enter theconstruction phase on site. Sweden has co-funded some ofthese tasks. The installation of horizontal biologicalshielding over Dry Storage Units 2A and 2B is now almostcomplete.

An open tender exercise was carried out to select aPrincipal Contractor for UK funded projects on site. TheKurchatov Institute were selected and have won the firstcontract for the implementation of B154. More recentlyThe Kurchatov Institute have been awarded the contractfor radiological improvement works on the Dry StorageUnit 3A.

5,147 5,147

Russia Framework Agreement with FSUE SevRAO The Framework Agreement has been established withSevRAO under which a number of work packages arecontracted as purchase orders. These now total 44individual Purchase Orders covering work in support of

6,777 6,300

Page 90: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

90the SNF removal strategy. The main areas of work coveredby these PO’s are preparation of the site, design andmanagement of the SNF strategy and support as SiteOperator to the main construction projects.

Russia Framework Agreement with The FederalCentre for Nuclear & Radiation Safety(FCNRS)

The Framework Agreement has been established sinceSept ’08 and currently covers 13 individual purchaseorders, mainly associated with the management andtechnical support for design and implementation projects.One specifically covers the implementation of a newbuilding on site (B154), being a new workshop & repairfacility and is the first major new build on site. Anothermajor contract let in 2009 covers the installation ofhorizontal biological shielding over Dry Storage Unit 3A,this will enable safe construction of the future SNFHandling Facility

12,600 5,900

Russia Contract with FCNRS to provide support toRosatom in the Technical Steering Group forAndreeva Bay.

This contract is now closed and the support workscontinued as a purchase order under the FCNRS Framework Agreement.

45.6 42.3

Russia Interim SNF Storage Facility at Atomflot,Murmansk

Construction completed in September 2006 and officiallyopened in September 2006. Fabrication and supply of 50TUK 120 casks completed in 2008. Rosatom have begunfilling casks with hazardous spent nuclear fuel from the‘Lotta’ and to date 15 casks have been filled and placed inthe Interim Storage Facility.

20,800 20,800

Russia Nuclear Powered Submarine Dismantling atZvedochka SRY

Oscar class submarines No 605 and 606 are nowcompletely dismantled, leaving the 3-compartment unit foreach boat. The project was completed to budget and aheadof schedule

10,800 10,800

Russia Documentation Package for Dismantling ofOscar 1 Class Submarines 605 and 606

Now completed to budget and ahead of schedule. 480 480

Russia Infrastructure Items in support of SubmarineDismantling of Oscar 1 Class Submarines 605and 606

The Infrastructure projects which supported the submarinedismantling and SRY enhancement. These are now allcomplete

144 144

Page 91: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

91Russia Victor documentation at Nerpa SRY Documentation preparation & approvals in support of the

dismantling of Victor III Class submarine #296. Jointlyfunded with Norway under a UK lead.Completed to budget and ahead of schedule.

300 300

Russia Victor Dismantling at Nerpa SRY Dismantling of Victor III Class NPS #296 at Nerpa.Completed to budget and ahead of schedule.

2,950 2,950

Russia Victor Infrastructure The UK has funded various infrastructure projects toenhance the environmental and working conditions at theNerpa SRY. These include the provision of radiationmonitoring equipment, ventilation equipment, SRWstorage pad & containers. These works are now allcomplete.

461 461

Russia November dismantling at Nerpa SRY Dismantling of November Class NPS #291 at SRY Nerpa,jointly funded with Norway under UK lead. These worksare now all complete.

1,969 1,969

Note: - for all of the submarine dismantling projects theUK has so far expended some £2. 62M on projectmanagement and technical support costs.

Russia AMEC (Arctic Military EnvironmentalCooperation Agreement)

Projects to: recover & process polystyrene used forbuoyancy); develop safe transportation technology(including construction of pontoons);and radio-ecological monitoring of sunken NPS B-159have all been successfully completed.

New projects to address issues of common interest to RFand UK Navies may be developed subject to constructiveRF re-engagement.Note: For AMEC the UK will have expended £4.36M forproject management and technical advice by the end ofMarch 2010

3,860 3,860

Page 92: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

92Russia Spent Nuclear Fuel store at Mayak The UK has funded a feasibility study and relicensing of

of a spent fuel store at Mayak to receive SNF in TUK 108fuel casks that will be received from Andreeva Bay,Gremikha and other areas around NW Russia.

324 324

Russia EBRD (Northern Dimension EnvironmentalPartnership)

The “Operations Committee” for the fund met during 2006and authorised a few early priority projects (Lepse, atGremikha and Andreeva) prior to the completion of adetail strategy for disbursement of the funds (the StrategicMaster Plan). EBRD and the IAEA Contact Expert Groupheld a workshop on 12th April to discuss the SMP – PhaseII and the co-ordination of projects supported by the fundwith bilateral projects supported by GP donor countries.The UK made an additional contribution to the fund of£8.6M in March 2010 for Andreeva Bay projects.

10,000 18,673 (theUKcontributionwith EBRD)

Nuclear Security and physical protectionRussia Nuclear Security and physical protection Nuclear Security Workshops for staff with front line role in

delivering security in RF, FSU and worldwide. In Russianor English. Up to six courses to be delivered in 2010.

1,863 1,290

Russia Nuclear Security and Physical Protectionupgrades Nikiet Institute Moscow

Physical protection project at NIKIET buildings inMoscow completed; entered 3 year sustainability phase.

2,500 2,400

Russia Nuclear Security and Physical ProtectionupgradesKarpov Institute Obninsk

Physical protection programme at Karpov Institute ofPhysical Chemistry, Obninsk. Project 99% complete andentering sustainability phase

2,300 2,130

Russia Nuclear Security and Physical Protectionupgrades at Gatchina site of the RadiumInstitute

Nuclear Security and Physical Protection upgrades atGatchina site of Radium Institute. Tender assessmentundertaken March 09; contract signed and procurementunderway. Forecast completion March 2011.

1,200 228

Russia Nuclear Security and Physical Protectionupgrades at Moscow Institute of Physics andEngineering

First phase construction of inner security boundarycompleted summer 08. Second phase underway due tocomplete summer 2010.

1,996 1,628

Page 93: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

93

Russia Kurchatov Institute Physical Protection Programme at second Kurchatov site inMoscow. Project complete and entering 3 yearsustainability phase.

766 746

Russia Nuclear Security and Physical ProtectionupgradesInstitute of Power and Physics Engineering,Obninsk

Physical protection programme at IPPE Obninsk. Firstphase including refurbishment of access control completedspring 09. Second phase incl perimeter refurbishmentcompleted spring 2010. Entering sustainability phase.

5,200 4,843

Russia Nuclear Security and Physical ProtectionupgradesFGUP Atomflot

Physical protection programme, enhancing security of innernuclear zone and provision of new guardhouse at Atomflotsite. Completed autumn ’08.Under sustainability contract via US DOE supervision.

3,200 3,200

FSU IAEA Nuclear Security Fund A further £4m provided March 2009 to the IAEA's NuclearSecurity Fund. Current projects include upgrades toradwaste facilities in Tajikistan (due to complete summer10) and Kazakhstan (complete summer 09), and toperimeter security at Armenia NPP (complete spring 10).Further cooperation planned to support IPPAS missions andnuclear security work worldwide

6,750 2,750

Russia Sustainability Programme Three year sustainability programme under development forfive institutes (IPPE, Nikiet, Karpov, Kurchatov, Radium)including spares inventory support, maintenance trainingand through life management awareness development.

1,500

FSU:(Russia,Ukraine,Lithuania,Armenia),Bulgaria,Slovakia,Romania

Nuclear Safety Programme Since the re-launch of the Nuclear Safety Programme in2003-04, 292 project proposals have been processed. Intotal 139 projects have been approved and 102 contractshave been awarded. Details on Russia and Ukraine aregiven below

14,400 14,400

Page 94: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

94Russia Nuclear Safety Programme 23 contracts awarded worth a total £3,262k.

Ukraine Nuclear Safety Programme 13 contracts awarded worth a total of £2,111k

Ukraine Chernobyl Shelter and associateddecommissioning funds(the UK contribution)

UK has contributed significant funds for the ChernobylShelter and EBRD managed Nuclear Safety Funds.

40,000 40,000

Ukraine Nuclear Security and Physical Protection.Vector 2 Complex

UK has committed to fund the design stage of the proposedcentralized store for Highly Active Spent Sources at Vector2 Complex. The Construction phase is to be funded incollaboration with EU funding.

WMD ExpertiseRussia Closed Nuclear Cities/Centres Partnership

Programme (CNCP): facilitation ofemployment opportunities for former nuclearweapons personnel in Russia, with parallelprogrammes in Kazakhstan, Ukraine,Uzbekistan,, Armenia, Georgia and Belarus.

Programme of investment grants, training, commercial partnering andeconomic development assistance well under way in five closed nuclearcities in Russia (Sarov, Seversk, Snezhinsk, Zheleznogorsk and Ozersk)and the various nuclear physics etc institutes in Kurchatov, Almaty,Kharkov, Kiev, Sevastopol, Tashkent, Samarkand, Yerevan, Tbilisi andMinsk. Following the signing of a UK/RF Memorandum ofUnderstandingand close working relationship with ISTC and STCU, this Programmeismaking a meaningful contribution to addressing the threat posed byunemployed or under employed nuclear scientists and technicians. As atMarch 2010 about 110 UK funded Russia and some 75 CIS grantprojectsare being supported and around 3000 jobs are to be created over theduration of these projects. Over 55% of these are for former nuclearscientists and technicians.

23,400 21,600

Page 95: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

95Elimination of Weapons Grade Plutonium Production - Zheleznogorsk

Russia Contribution to US led Elimination of Weapons GradePlutonium Production programme through replacement ofenergy producing capacity of reactor with a fossil fuel plantbeing built at Sosnovoborsk

11,500 11,500

Assisting with the decommissioning of the fast breeder reactor, AktauKazakhstan Collaboration with the USDOE on engineering and training

projects to ensure the safe and irreversible shutdown andsubsequent decommissioning of the BN350 reactor at Aktauplus the removal, repackaging, transportation and interimstorage of the spent nuclear fuel, liquid metal coolant andother radioactive and hazardous materials.

5,100 5,100

Russia Chemical Weapons Destruction,Shchuch’ye:- Infrastructure

1. Construction of railway from CW storagesite to Shchuch'ye Chemical WeaponDestruction Facility (CWDF) on behalf ofCanada.

The railway was completed in December 2008 and is usedto transport munitions from the storage site for destruction(Canada £17.9M and NTI US$0.58M).

Page 96: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

962. Implementation of further infrastructureprojects in support of Shchuch'ye CWDF onbehalf of UK, Canada and other donors.

2. Water Supply: construction of 3 water wells and layingof twin 9km pipeline completed in February 2003. £2.2M -UK funded.The UK has implemented several projects intended toprovide a reliable electrical power supply for the CWDF:- The UK (£5M), Czech Republic (£0.05M ), EU (£0.9M)

and Norway (£1.5M ) procured equipment for theShchuchanskaya electricity substation in 2004.- Refurbishment of the Puktysh electricity substation

was completed in 2006; New Zealand provided £0.7M, andUK £0.2M.- Equipment to complete the Shchuchanskaya electricity

substation and associated sites was delivered on site inOctober 2007. Construction and installation work wascompleted in January 2009. This project was funded by UK(£5.14M), Belgium (£0.1M), Czech Republic (£0.2M), theEU (£2M), Finland (£0.55M), Ireland (£0.02M), TheNetherlands (£2.4M), Norway (£0.3M), and Sweden(£0.4M).The Canadian-funded Local Public Address System(£1.2M) for providing early warning to local residents of aCW incident was completed in September 2008.The Canadian-funded Inter-Site Communications project(£1.7M) was completed in October 2007. This providesimproved communications between the storage anddestruction facilities at Shchuch’ye.

2,200

5000

200

5,140

2,200

5000

200

5,140

Page 97: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

97Chemical Weapons Destruction –Equipment ProcurementProcurement of main process equipment forthe second munitions destruction building atthe Shchuch'ye on behalf of Canada, UK,France and other donors.

Most of this equipment has been funded by Canada.Procurement, delivery and support to installation of theMetal Parts Furnace were completed in 2008, funded bythe UK (£5.05M), the Netherlands (£1.07M) and Ireland(£0.06M). Delivery of the Catalytic Reactors (Canada -£6.7M) was completed in Feb 2007.The key Destruction Processing Line equipment (Canada- £9.7M) was delivered in July 2008.Five further equipment packages have been completed:- Package 1 – Standard and non Standard Equipment

(Canada - £4.5M) completed in August 2009.- Package 2 APCS and Sampling (Canada - £2.73M)

was completed in December 2008.- Package 3 – Gas Analysers (Canada - £2.3M) was

completed in December 2008.- Package 4 – Venturi Scrubber (Canada - £0.2M) was

completed in December 2008.- Package 5 – consisting of 7 separate contracts for

procurement of process equipment for Building 1A(£4.4M) funded by France (£3.1M) and UK (£1.3M).

All items delivered by January 2009 except one, deliveredin November 2009.- Motor Control Centre for MPF (UK - £0.16) and

Exhaust fans (UK £0.64M) manufacture complete2009, due for delivery to site 2010.

£

5,050

1,300

160

640

£

5,050

1,300

122

570

Page 98: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

98FSU and

othercountries

Biological non-proliferation and otherredirection of WMD expertise projects.

Georgia Redirection of scientists / capacity building;sustainability phase

IPI programme (two multi-year projects) to help theInstitute of Plant Immunity (IPI) develop a sustainable longterm future as a key element of the Georgian agriculturalsector, as well as develop into a key centre for plant andcrop health advice for the region. Assistance has includedfunding for studies of plant and crop disease, renovationand re-equipment, management training and strategicplanning.

818 818

Bioscientist engagement programme;biosafety/biosecurity;sustainability phase

The GG18 programme is a 3 year virology project insupport of the regional DTRA multipathogen programme;includes disease surveillance, diagnostic development andtraining. This programme started January 2010.

464 39

Anthrax immune response study Work at NCDC Tbilisi examining immune response inpatients vaccinated with different Vaccine types

23 6

Tajikistan Bioscientist redirection/engagementprogramme; capacity building: Arbovirusmonitoring.

This project will include the complex monitoring of naturalfoci of arbovirus on the territory of the Republic ofTajikistan. Project started Feb 2010.

290 144

Page 99: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

99Bioscientist redirection/engagementprogramme; capacity building:Malaria survey

Complex study of malaria mosquitoes and their naturalenemies, elaboration of measures on regulation of numberof mosquitoes in southern areas of Tajikistan. Projectstarted Jan 2010

290 138

Kyrgyzstan Bioscientist engagement programme; capacitybuilding

Training in the safe handling and subsequent isolation ofviruses from field samples; subsequent development ofdiagnostic techniques. 1st phase of project complete.Further 1 year project (field sampling) due to commencesummer 2010.

130 50

Bioscientist engagement programme; capacitybuilding

Prevention of the distribution of infectious diseases bytrans-boundary rivers of the South of Kyrgyzstan with thepurpose of maintenance of bacteriological safety in FerganaValley. Co funded with Canada

177 177

Iraq Bioscientist engagement programme; capacitybuilding

Added value to Iraqi capacity building programme. 170 115

AzerbaijanBiosafety Training BSL2 Biosafety training pilot course development and

delivery in Baku.54 54

Other Bioscientist redirection/engagement; capacitybuilding; training, etc.

Support to a variety of biological non-proliferationinitiatives in FSU and elsewhere.

3700 3700

Page 100: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

100UNITED STATES

PROGRAMS IN RUSSIA, UKRAINE, AND OTHER FSU COUNTRIES

Country ofProject

Project Name/Description Project Status: Milestones,Implementation Comments

TotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)GRAND TOTAL $8,413,692 $7,792,001

U.S. DEPARTMENT OF ENERGY (DOE) $4,641,945 $3,713,794Russia & Ukraine Security enhancements at additional sites completed,

radioisotopic thermoelectric generators (RTGs)secured, and orphan radioactive sources recovered.Development of LEU fuel to allow conversion ofRussian and Russian-supplied research reactorscurrently using HEU fuel continues. Russia hasreceived Russian-origin HEU fuel returned fromother countries. The WWR-M reactor in Ukrainewas converted to LEU. Upgrades completed andunderway at sites in Ukraine.

$202,464 $128,395

Other FSU

Global Threat Reduction Initiative (GTRI): GTRIprojects reduce and protect vulnerable nuclear andradiological materials located at civilian sitesworldwide.

BN-350 Spent Fuel Disposition Project: Contract inplace between Kazakhstan integrating contractor andRussia for prototype cask fabrication. Securityenhancements at additional sites completed,radioisotopic thermoelectric generators (RTGs)secured, and orphan radioactive sources recovered.The VVR-SM reactor in Tashkent, Uzbekistan wasconverted to LEU. Upgrades completed and workunderway in: Azerbaijan, Belarus, Kazakhstan,Kyrgyz Republic, Tajikistan, and Uzbekistan.

$142,406 $183,391

Page 101: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

101Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Russia & Ukraine International Material Protection and

Cooperation: Second Line of Defense: Risk andvulnerability assessments of nuclear facilities;installation of modern equipment to correctvulnerabilities; training and equipment to supportinstalled upgrades and installation of radiationdetection equipment to detect illicit smuggling ofnuclear or radiological materials. Installation ofradiation detection equipment to detect illicitsmuggling of nuclear or radiological materials and, inprior years, Proforce upgrades.

Secured hundreds of nuclear warheads and hundredsof metric tons of nuclear material at approximatelyeight percent of the Russian nuclear weaponsmaterial storage and warhead sites of concern,including 50 Russian Navy nuclear sites, 25 RussianStrategic Rocket Forces sites, one 12th MainDirectorate site, two RosAtom Weapons sites, 16Civilian sites, four sites in Ukraine, and 172buildings. Installed radiation detection equipment ata cumulative total of 160 sites in Russia and six sitesin Ukraine.

$2,172,446 $1,768,391

Other FSU International Material Protection andCooperation: Material protection, control andaccounting (MPC&A) support and the Second Line ofDefense program which installs radiation detectionequipment to detect illicit smuggling of nuclear andradiological materials.

Completed MPC&A upgrades to 9 sites and 11buildings in 6 countries outside of Russia andUkraine. Installed radiation detection equipment at acumulative total of 47 sites and 19 Megaports outsideof Russia and Ukraine.

$123,953 $84,483

Russia & Ukraine Nonproliferation and International Security:Export controls, scientist redirection, warheaddismantlement, and nuclear infrastructure support.

Warhead Dismantlement and Fissile MaterialTransparency (WDFMT): Cooperation with Russianinstitutes to develop technology related todismantlement transparency.Export Control: Projects under way to improveexport licensing, government outreach to industry,and interdiction of dual-use goods.

$108,672 $68,859

Other FSU(Kazakhstan,Kyrgyzstan,Armenia,Azerbaijan, Georgia,Tajikistan,Turkmenistan)

Nonproliferation and International Security:Export controls, international safeguards.

Export Control (Kazakhstan, et al): Projects underway to improve export licensing, governmentoutreach to industry, and interdiction of dual-usegoods. Civil nuclear power reactor security upgrades,including training. Basic security upgrades ofArmenian plant completed.

$14,987 $32,840

Page 102: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

102Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Russia Elimination of Weapons Grade Plutonium

Production (EWGPP): Construction of fossil-fuelenergy plants to allow shutdown of Russia's threeremaining weapons-grade plutonium productionreactors in Seversk and Zheleznogorsk.

Seversk: Shipped Boiler 5. Started North Heat Lineconstruction. Reactors shutdown ahead of schedulein April 2008 and June 2008. Zheleznogorsk:Started modification of boiler building. Beganinstallation of Boilers 1 and 2. Obtained ADE-2decommissioning approval. Reactor shutdownestimate: December 2010. Contributions receivedfrom Canada, UK, Netherlands, Finland, NewZealand, and the Republic of Korea.

$1,132,310 $990,107

Russia Plutonium Disposition: Pursuant to the 2000 U.S.-Russian Plutonium Management and DispositionAgreement (PMDA), the U.S. and Russia have eachcommitted to dispose of 34 metric tons (MT) ofsurplus weapons-grade plutonium. The U.S. hascommitted $400M to support the Russian program,subject to availability of future appropriations andRussia has agreed to fund the remaining costs.

On April 13, 2010, the United States and Russiasigned a Protocol amending the 2000 PlutoniumManagement and Disposition Agreement in whicheach country commits to dispose of no less than 34metric tons of surplus weapons-grade plutonium --enough in total for 17,000 nuclear weapons.

$319,182 $64,688

FSU Regional International Nuclear Cooperation Program(INCP): Comprehensive, cooperative effort toimprove safety at Soviet-designed nuclear powerplants through joint projects in eight Eurasiancountries.

Support Ukraine's efforts for fuel diversification withthe completion of the Ukraine Nuclear FuelQualification Program (UNFQP) and delivery of 42fuel assemblies; support the validation andimplementation of symptom-based emergencyoperating procedures; provide technology transfer toimprove operational safety and safety analysiscapabilities. Assisting in the decommissioning of theBN-350 reactor in Aktau, Kazakhstan.

$124,488 $168,177

Russia Highly Enriched Uranium (HEU) Transparency:Monitoring of the conversion of 500 MT of RussianHEU from dismantled nuclear weapons to LEU foruse in U.S. nuclear power reactors.

Monitored the conversion of a total of about 345 MTof the planned 500 MT of Russian HEU to LEU infiscal year 2008 -- the IAEA equivalent of nearly13,800 nuclear weapons. Program completion is ontrack for 2013.

$125,772 $108,793

Page 103: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

103Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Russia & Ukraine Global Initiatives for Proliferation Prevention

(GIPP): GIPP advances global nonproliferationefforts by helping to impede transfers of weapons ofmass destruction expertise to terrorist organizationsand rogue states. The program engages former WMDscientists and technical personnel in civilian activities,redirecting their expertise to peaceful purposes, andfosters nonproliferation norms among these scientists,helping to integrate them into larger scientific andbusiness communities. The Nuclear Cities Initiative(NCI) assisted with downsizing excess Russiannuclear weapons program facilities and wascompleted in 2006.

GIPP has engaged more than 16,000 personnel (60%with WMD experience or expertise) at more than 180former Soviet WMD facilities. GIPP activitiesresulted in the creation of almost 5,000 jobs in theFSU, bringing over $21 million in FSU revenue and$250 million in private investment finance based onthe results of program projects in the United Statesand the FSU.

$166,212 $108,038

Other FSU(Armenia, Belarus,Kazakhstan)

Global Initiatives for Proliferation Prevention(GIPP): GIPP advances global nonproliferationefforts by helping to impede transfers of weapons ofmass destruction expertise to terrorist organizationsand rogue states. The program engages former WMDscientists and technical personnel in civilian activities,redirecting their expertise to peaceful purposes, andfosters nonproliferation norms among these scientists,helping to integrate them into larger scientific andbusiness communities.

GIPP has engaged more than 16,000 personnel (60%with WMD experience or expertise) at more than 180former Soviet WMD facilities. GIPP activitiesresulted in the creation of almost 5,000 jobs in theFSU, bringing over $21 million in FSU revenue and$250 million in private investment finance based onthe results of program projects in the United Statesand the FSU.

$9,053 $7,632

U.S. DEPARTMENT OF DEFENSE (DoD) $3,015,303 $3,417,557Russia Arctic Military Environmental Cooperation

(AMEC): Projects were executed in cooperation withthe Quadrilateral Program (UK, Russia, Norway,U.S.) to minimize ecological security risks associatedwith military activities in the Arctic. DoD was thelead U.S. agency, in cooperation with U.S.Departments of Energy and State, and the U.S.Environmental Protection Agency (EPA).

Projects included: buoyancy and safe transportationof decommissioned nuclear submarines todismantlement sites, spent nuclear fuel caskdewatering technologies, and radio-ecologicalmonitoring at a radioactive waste processing site.

$7,956 $6,495

Page 104: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

104Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)FSU Regional International Counterproliferation Program (ICP) Projects include WMD counterproliferation

education and training by DoD, FBI, and DHSinteragency teams for civilian law enforcement andborder officials in the FSU.

$43,356 $40,862

DoD COOPERATIVE THREAT REDUCTION (CTR) PROGRAMS $2,963,991 $3,370,200Russia Strategic Offensive Arms Elimination (SOAE):

Destruction of: strategic weapons delivery systemsunder START Treaty; ICBMs and their silo or mobilelaunchers, SLBMs and their launchers, strategicnuclear powered ballistic missile submarines and theirreactors.

Current projects include: Completed elimination ofall SS-24 missiles in 2008. Continued activities toeliminate SS-25 road-mobile launchers, SS-25missiles, SS-19/18 missiles and delivery systems,SS-N-20 missiles and launchers. Coordination withRussia and Canada also continues for elimination ofTyphoon and Delta III class SSBNs.

$407,971 $703,816

Ukraine Strategic Nuclear Arms Elimination (SNAE):Elimination of strategic weapons delivery systems.

Continue to support the safe storage of up to 160Solid Rocket Motors from dismantled SS-24 ICBMsand will continue to provide funding for empty motorcases after Ukraine removes the propellant.

$13,833 $77,001

Russia Nuclear Weapons Storage Security (NWSS):Enhancement of security, safety, and control ofnuclear weapons in storage.

Site security upgrade installations were completed bythe end of calendar year 2008. Activities to sustainsystems and improve training facility infrastructureare expected to continue over the next several years.

$452,008 $600,697

Russia Nuclear Weapons Transportation Security(NWTS): Enhancement of security and safety ofnuclear weapons during shipment.

Project averages 48 shipments of nuclear warheads tosecure storage or dismantlement facilities per year,with close and productive cooperation with theRussian MOD. Activities are expected to continueover the next several years.

$208,417 $170,913

Regional Defense and Military Contacts: U.S. and Eurasiandefense, military, and other security communities.

Bilateral defense consultations, exchange visits,sponsorship of exercises, and traveling contact teamsinclude focus on enhancing nonproliferationcooperation.

$53,274 $42,239

Regional Program Support: Expenses related toadministrative and advisory support, and conduct ofaudits and examinations.

Continue support of six overseas offices in the FSU,project development costs, and advisory andassistance contracted support.

$103,854 $106,766

Page 105: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

105Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Regional Biological Threat Reduction Program (BTRP):

Consolidate and secure dangerous pathogencollections and research, enhance capacity to detect,diagnose, and report bioterrorism attacks and potentialpandemics, catalyze strategic research relationships,and when applicable eliminate excess dual-usetechnologies and BW infrastructure. These projectsprevent the proliferation of BW-related technology,pathogens, and expertise and counter bio-terrorism.

Russia: The Russian Government maintains itsaversion to entering into an agreement on BTRP.BTR implementation is under a MoU between theU.S. and ISTC that provides the necessaryprotections, exemptions, and A&E rights. Limitedengagement continues on select biological researchprograms and biosecurity and biosafety projects.

Other FSU: BTRP projects continue in Azerbaijan,Georgia, Ukraine, Uzbekistan, and Kazakhstan.Georgia BTRP recovering from setbacks due torecent conflict with Russia and achieved an initialoperating capability in Oct 2008. Uzbekistan andKazakhstan have experienced some delays as a resultof bureaucratic challenges. Armenia BTRP initiatedin 2008. Expansion into other FSU and non-FSUnations planned through Future Years DefenseProgram (FYDP).

$706,030 $598,219

Ukraine WMD Proliferation Prevention Initiative (WMD-PPI): Projects provide comprehensive land andmaritime capabilities to detect and interdict WMD andrelated materials on the Moldovan border and BlackSea. Limited assistance provided for the ChornobylExclusion Zone interior border.

Project providing surveillance system equipment,testing and training for border with Moldova. Projectproviding maritime WMD detection and interdictioncapabilities to Black Sea coastal waters and ports.Conducted assessment of the Chornobyl ExclusionZone patrol area of the State Border Guard Service.

$108,043 $79,456

Regional(Azerbaijan,Kazakhstan,Uzbekistan)

WMD Proliferation Prevention Initiative (WMD-PPI): Projects provide equipment for border posts andtraining to prevent illicit cross-border trafficking.

Assisting Azerbaijan to detect and interdict illicitWMD trafficking along the Caspian maritime borderand adjacent waters. Kazakhstan Caspian maritimeborder project and portal monitor installation inUzbekistan were terminated due to lack ofcooperation.

$193,952 $149,464

Page 106: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

106Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Russia CW Elimination Program: Construction of CW

destruction facility at Shchuch'ye for nerve agent-filled, man-portable, tube and rocket artillery andmissile warheads.

Construction at Shchuch'ye near completion, one oftwo main processing buildings commenced CWelimination in March 2009.

$716,609 $841,628

U.S. DEPARTMENT OF STATE AND OTHER AGENCIES $756,444 $660,650Russia Export Control and Related Border Security

(EXBS) AssistanceCurrent projects include: internal complianceprogram, product identification tool, targeting andrisk management project to detect high-riskshipments.

$12,089

Ukraine Export Control and Related Border Security(EXBS) Assistance

Current projects include internal complianceprogram, inspection/detection equipment purchase,commodity identification for customs officials, andother training for customs officials and border guardsto inspect, detect, and identify items ofnonproliferation concern.

$11,539

Other FSU Export Control and Related Border Security(EXBS) Assistance

Projects support drafting and implementing exportcontrol laws and regulations; licensing assistance;enforcement; training industry about compliance; andprovision of related equipment.

$146,985

$170,137

Page 107: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

107Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Global Threat Reduction (GTR)

The Science Centers Program engages formerweapon scientists through the International Scienceand Technology Center (ISTC) in Moscow and theScience and Technology Center in Ukraine (STCU) inKyiv.

The Bio-Chem Redirect (BCR) Program engagesformer biological and chemical weapons scientists inredirection and sustainability efforts. Civilian researchprojects are conducted in collaboration with U.S.government technical experts at the U.S. Departmentof Health and Human Services, U.S. Department ofAgriculture, and the U.S. Environmental ProtectionAgency.

The Bio-Industry Initiative (BII) reconfigures large-scale former Soviet biological weapons productionfacilities for civilian biotechnology purposes andengages former weapons personnel in projects aimedat accelerating drug and vaccine development tocombat highly infectious diseases.

Approximately 300 cooperative research projectsfunded since June 2002. U.S. is working with theCenters on promoting the economic self-reliance ofinstitutes. Since 2003, the U.S. has graduated 87institutes to financial self-sustainability from Stateassistance through the Science Centers.BCR continues to emphasize the development ofstrong, targeted projects and training activities toprovide long-term sustainability for priorityinstitutes, especially those institutes with alreadystrong funding streams, and to “graduate” FSUscientists and institutes from U.S. assistance. BCRwill particularly focus on under-employed and under-engaged personnel.As part of efforts to provide sustainablenonproliferation, BII continues to develop and fundworkshops, training opportunities, research grants,and capacity-building to meet its mandate.

$273,299 $233,283Regional (Russia,Armenia,Azerbaijan, Belarus,Georgia,Kazakhstan,Kyrgyzstan,Moldova, Tajikistan,Ukraine, andUzbekistan)

The Preventing Nuclear Smuggling Program(PNSP) addresses critical gaps in the capabilities ofpartner nations to combat smuggling in nuclear andradioactive materials, by supporting projectsdeveloped by the U.S. Nuclear Smuggling OutreachInitiative and through other means. PNSP engagesthose countries seen to be most important to the globaleffort to combat smuggling of nuclear or highlyradioactive materials.

PNSP is helping to secure radioactive materials,improve border security, strengthen laws againstnuclear smuggling, expand international forensicscooperation, and develop and evaluate nationalresponse plans.

$6,842 $6,842

Page 108: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

108Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)FSU Regional(Russia, Armenia,Azerbaijan, Belarus,Georgia,Kazakhstan,Kyrgyzstan,Tajikistan, Ukraineand Uzbekistan)

Nonproliferation and Disarmament Fund (NDF):Established in 1994, the NDF allows the United Statesto rapidly respond to unanticipated or unusuallydifficult, high-priority nonproliferation anddisarmament opportunities, circumstances, orconditions. NDF's mission includes the following:

-- Halt the proliferation of nuclear, biological, andchemical weapons, their delivery systems,radiological materials, and related sensitive and/ordangerous materials;

-- Destroy or neutralize existing weapons of massdestruction (WMD), their delivery systems, andrelated sensitive materials and infrastructure;

-- Facilitate the detection and interdiction of WMD bytracking, controlling, and securing dangerousmaterials, including fissile material, radiologicalmaterial, pathogens, and chemical agents orprecursors;

-- Limit the spread of advanced conventionalweapons; and

-- Buttress and supplement U.S. diplomatic efforts topromote bilateral and multilateral nonproliferation anddisarmament activities.

Since 2002, NDF-supported projects have included aborder security training facility for WMD detection;assisting the International Criminal PolicyOrganization in promoting measures to restrict BW-related activities worldwide; acquisition,decontamination, and destruction of dual-useequipment to ensure that it cannot be used forpurposes of developing a BW capability;dismantlement of a formerly dedicated BWproduction facility; security of collections ofdangerous pathogens and establish key elements of anational system to provide long-term security ofhigh-risk radioactive sources; activities aimed toshutdown a BN-350 nuclear reactor; reconfigure andrenovate for civilian use a vaccine manufacturingfacility; deployment of radiological detection andcharacterization equipment to 10 countries that arehigh risk for proliferation of radioactive materials;upgrades to nuclear safeguards and security systemsto protect highly-enriched uranium from theft ordiversion; reconfiguration of animal biologicsproduction factories into peaceful, transparent,commercial entities; provision on a case-by-casebasis of interdiction activities conducted under theProliferation Security Initiative; and enhancements tothe Wassenaar Arrangement Information System.

$144,080 $130,744

FSU Regional Nuclear Regulatory Commission: Support forIAEA-sponsored Code of Conduct on the Safety andSecurity of Radioactive Sources (NRC)

Ongoing project to support nuclear safety andsecurity regulators in the countries of the FSU toimplement key provisions of the Code of Conduct(including, for example, development of a nationalregistry of radioactive sources).

$12,270 $12,270

Page 109: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

109Country of

ProjectProject Name/Description Project Status: Milestones,

Implementation CommentsTotalFunds

Committed(6/2002 -9/2009)

(US$ in thousands)

TotalFunds

Expended(6/2002 -9/2009)

(US$ in thousands)Russia Nuclear Safety and Security Regulatory Oversight

Program: Implemented by the U.S. NuclearRegulatory Commission (NRC)

Ongoing project to enhance nuclear safety andsecurity regulatory oversight of operating nuclearpower plants in the Russian Federation.

$2,884 $3,964

Ukraine Nuclear Safety and Security Regulatory OversightProgram: Implemented by the U.S. NuclearRegulatory Commission (NRC)

Ongoing project to enhance nuclear safety andsecurity regulatory oversight of operating nuclearpower plants in Ukraine.

$3,953 $5,979

Other FSU(Armenia, Georgia,Kazakhstan)

Nuclear Safety and Security Regulatory OversightProgram: Implemented by the U.S. NuclearRegulatory Commission (NRC)

Armenia: Ongoing project to enhance nuclear safetyand security regulatory oversight of the ArmenianNuclear Power Plant.

Georgia: Completed project to enhance nuclearsafety and security regulatory oversight ofradioactive materials in the Republic of Georgia.

Kazakhstan: Completed project to enhance nuclearsafety and security regulatory oversight ofradioactive materials and the decommissioning ofnuclear facilities in Kazakhstan.

$7,421 $8,049

Ukraine Contributions to Chornobyl ShelterImplementation Plan (SIP): Provided through theU.S. Agency for International Development (USAID)

As of April 2007, the U.S. government has provided$174 million out of its total commitment of $203million for the Chornobyl SIP.

$135,082 $89,382

Page 110: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

110

PROGRAMS IN NON-FSU COUNTRIES (NOT INCLUDING UNITED STATES)

Country of Project Project Name/Description Project Status: Milestones,Implementation Comments

Total FundsCommitted

(6/2002 -9/2009)

(US$ in thousands)

GRAND TOTAL $1,713,313

U.S. DEPARTMENT OF ENERGY (DOE) $1,316,733Worldwide (approx. 90countries)

Global Threat Reduction Initiative (GTRI): GTRIprojects reduce and protect vulnerable nuclear andradiological materials located at civilian sites worldwide.

Convert research reactors from HEU to LEU, remove excessand unwanted sealed radioactive sources and vulnerablenuclear material, protect nuclear and radiological buildings.

$210,680

Worldwide (approx. 50countries)

International Material Protection and Cooperation:Second Line of Defense (DOE): Risk and vulnerabilityassessments of nuclear facilities; installation of modernequipment to correct vulnerabilities; training and equipmentto support installed upgrades and installation of radiationdetection equipment to detect illicit smuggling of nuclear orradiological materials. Installation of radiation detectionequipment to detect illicit smuggling of nuclear orradiological materials and, in prior years, Proforce upgrades.

$1,028,815

Worldwide (approx. 70countries)

Nonproliferation and International Security: Exportcontrols, scientist redirection, warhead dismantlement, andnuclear infrastructure support.

$68,038

Central/Eastern Europe(Bulgaria, Lithuania,Romania)

International Nuclear Cooperation Program (INCP):Comprehensive, cooperative effort to improve safety atSoviet-designed nuclear power plants through joint projects.

$9,200

U.S. DEPARTMENT OF DEFENSE (DoD) $103,185

Page 111: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

111Country of Project Project Name/Description Project Status: Milestones,

Implementation CommentsTotal FundsCommitted

(6/2002 -9/2009)

(US$ in thousands)Central/Eastern Europe(Albania, Bosnia &Herzegovina, Bulgaria,Croatia, Kosovo,Macedonia,Montenegro, Poland,Romania, Serbia,Slovakia, Slovenia),South America, Asia

International Counterproliferation (ICP) Program:Created by Congress in 1995, the ICP Program's mission isto counter the spread of weapons of mass destruction, itsmaterials, and components across the borders and throughthe territories of participating nations. It is an interagencyprogram, consisting of subject matter expert instructors andcourse materials drawn from DoD, the FBI, and DHS.

Projects include WMD counterproliferation education andtraining by DoD, FBI, and DHS interagency teams tocivilian law enforcement and border officials inCentral/Eastern Europe, and limited awareness training inSouth America and Asia. Since inception in 1995, programhas trained more than 10,000 border and customs officialsand law enforcement personnel in counterproliferationawareness, and WMD detection, investigation, andinterdiction. Currently scheduled to deliver 19 WMDcounterproliferation training events through December 2010.

$48,499

Albania Cooperative Threat Reduction (CTR) Program:Chemical Weapons Destruction Program

$34,686

Regional New Initiatives: Identify potential growth areas for CTRinside and outside the FSU. Initiate new CTR projectsfollowing a Secretary of Defense determination and aSecretary of State concurrence.

Completed two congressionally mandated NationalAcademy of Sciences studies and developed initial bio-engagement strategies for Pakistan and Afghanistan.

$20,000

U.S. DEPARTMENT OF STATE AND OTHER AGENCIES $293,395Latin and SouthAmerica (Mexico,Panama, Argentina,Brazil, Chile)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control systems upto international standards.

$8,278

South Asia (India,Pakistan, Bangladesh,Sri Lanka, Afghanistan)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control systems upto international standards.

$13,554

Southeast Asia(Indonesia, Philippines,Thailand, Singapore,Vietnam)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control systems upto international standards.

$14,001

Middle East (Jordan,Oman, Saudi Arabia,UAE, Yemen)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control systems upto international standards.

$12,745

North Africa(Morocco, Algeria,Tunisia, Egypt)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control system up tointernational standards.

$4,984

Page 112: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

112Country of Project Project Name/Description Project Status: Milestones,

Implementation CommentsTotal FundsCommitted

(6/2002 -9/2009)

(US$ in thousands)Sub-Saharan Africa(Kenya)

Export Control and Related Border Security (EXBS)Assistance

Providing bilateral and regional assistance in support ofdeveloping partner states' strategic trade control system up tointernational standards.

$1,608

Non-FSU Nonproliferation and Disarmament Fund (NDF):Established in 1994, the NDF allows the United States torespond rapidly to unanticipated or unusually difficult, high-priority nonproliferation and disarmament opportunities,circumstances, or conditions.

$130,300

Poland, Djibouti,Croatia

Proliferation Security Initiative (PSI) - Nonproliferationand Disarmament Fund (NDF) and Nonproliferation,Anti-terrorism, Demining and Related Programs account(NADR): Various ground and maritime interdictionexercises.

Completed $35

Indonesia, Thailand,Malaysia

NDF Biosecurity Legal/Regulatory Assistance Completed $993

Iraq Nuclear Facility Dismantlement and Disposal Project:Training and equipment to help Iraq make preparations todismantle and dispose of their former nuclear facilities.

$2,250

Worldwide. Non-FSU Biological Security Engagement (BEP): Provides technicaland financial assistance to improve laboratory biosafety andbiosecurity in high-risk areas through securing biologicallaboratories, best practices trainings, capacity building, andcooperative research and development.

BEP helped address global biosecurity risks frombioterrorism and infectious disease outbreaks throughproviding technical assistance, training, and workshops instrengthening biosafety and biosecurity capabilities anddeveloping safe, secure, and sustainable lab capacitybuilding with national standards for comprehensivebiological security.

$70,200

Worldwide, Non-FSU Chemical Security Engagement (CSP): Provides technicaland financial assistance to improve chemical security bestpractices in laboratory and industrial settings worldwide.

CSP provided training, travel grants, and technical assistanceto engage chemical scientists and engineers from theacademic and industrial sectors with the goal of improvingchemical security and safety best practices and raising threatawareness.

$7,200

Worldwide Partnership for Nuclear Security (PNS): Providestechnical and financial assistance to engage nuclearscientists, engineers, and technicians and improve nuclearsecurity best practices.

PNS provided travel grants and technical assistance toengage nuclear scientists and engineers with the goal ofimproving nuclear security best practices and raising threatawareness.

$2,100

Page 113: Global Partnership Working Group – GPWG Annual Report 2010 ... · and biosafety standards, guidelines and regulations, as well as support to broader biorisk management initiatives

113Country of Project Project Name/Description Project Status: Milestones,

Implementation CommentsTotal FundsCommitted

(6/2002 -9/2009)

(US$ in thousands)Iraq and Libya WMD Personnel Engagement and Redirection:

Iraqi Scientist Engagement Program engages formerWMD personnel in civilian activities with an emphasis onIraq reconstruction efforts.Libya Scientist Engagement Program responds to therequest of the Government of Libya, in conjunction with itsdecision to dismantle its WMD programs, for assistance inreorienting their former WMD scientists toward civiliancareers that can enhance Libya’s economic development.

The Iraq and Libya scientist engagement programs providedtraining, travel grants, research and development grants, andtechnical expertise to engage and redirect scientists,technicians, and engineers to peaceful, civilian pursuits.

$21,000

Afghanistan, Pakistan,Democratic Republic ofthe Congo (DRC)

The Preventing Nuclear Smuggling Program (PNSP)addresses critical gaps in the capabilities of partner nationsto combat smuggling in nuclear and radioactive materials.

PNSP is working with Afghanistan, Pakistan, and the DRCto improve anti-nuclear smuggling and nuclear forensicscapabilities by providing funding for individuals toparticipate in the annual Nuclear Forensics InternationalTechnical Working Group.

$72

Regional Latin America Nuclear Regulatory Commission: Support for IAEA-sponsored Code of Conduct on the Safety and Security ofRadioactive Sources (NRC).

Ongoing project to support nuclear safety and securityregulators in Latin American countries to implement keyprovisions of the Code of Conduct (including, for example,development of a national registry of radioactive sources).

$875

Worldwide Domestic Nuclear Detection Office conducts technicalexchanges with foreign partner nations to enhance efforts todevelop concepts for implementation of national-levelnuclear and radiological detection architectures. Thisincludes exchanges on technical nuclear forensics and jointtesting / characterization of R/N detection systems.(DHS/DNDO)

$3,200