Page 1: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply
Page 2: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

ABOUT USGlobal Infrastructure Started the business in India

2007 with the object of providing specialize service in the field civil Infra ,telecommunication , Power energy

,Real state sector , Hospitality , Agro & Allied, Training and Manpower, Security services, Industries under NISE, Export &

Import, Coal Trading & Transportation. since its foundation the company has so far successfully executed many product

providing a wide range of instrumentation services.

Focused professional with more than 10 years of our management associate team experience in Infrastructure Rollout and Operations,

Strategic Planning, Team Management, Project Management, Quality Assurance and Cross-functional Coordination in Telecom industry

Skilled in managing projects involving scoping, design, architecture & sourcing and interacting with the Clients & System Engineering Team for requirements

gathering & analysis

A keen planner with strong skills in client relationship management with proven success of managing large scale projects; impressive career driven by challenges and a

desire to be successful in all endeavours

Facilitating in managing and executing telecom infrastructure development projects for start-ups, large organizations, developing technical

Resources & solutions for greater value addition and increased margins

Carrying out advance planning for resource mobilization, manpower deployment and rendering technical support; ensuring the execution of projects within time,

cost & budgetary parameters- Performing efficient Team Management through monitoring the performance of multi-skilled workforce and guiding them

towards achieving their individual as well as organizational goals

Capabilities in deploying various methodologies to analyse process, recommending modifications to minimize escalations, realizing

operational efficiencies and reducing cycle-time for the enhancement purposes

Proficient in developing maintenance & operations procedures to increase the efficiency; implementing standards and ensuring

adherence to quality standards through in-process checks

Enterprising leader with skills in mentoring and motivating individuals towards maximizing productivity as well as in

forming cohesive team environments.

We have highly qualified and talented professionals who work in tandem so as to meet the exact demands

of our prestigious customers. Our quality controllers test the entire range stringently to ensure zero

defect products. Further, our production unit is fitted with latest machines that enable us to

undertake the bulk consignment of our customers on field.

Page 3: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

CORE COMPETENCIES

WORK ETHICS

Strategic Planning

Operations &Maintenance

TeamManagement

Quality Assurance

Installation &Commissioning

ProjectManagement

Cross- functional

Coordination

FibreManagement

TEAM WORK

QUALITY OUTPUT

ON-TIMEDELIVERY OF

WORK

ENCOURAGE ADOPTION OF

NEW TECHNIQUES

INTEGRITY AND TRUST

TIMELYTECHNICAL

UPGRADATION

INVITGEINNOVATIONS

PERIODICALLY IN SOPHISTICATED LABORATORIES

UNDER CONTROLLED CONDITIONS

Page 4: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

Coordination with Sales and Network planning team (both circle & Corporate) for site finalization, BOQ finalization, budget preparation and approval from Corporate.

Post budget approval PO to be released on vendor for both supply and services in coordination with Commercial team,

Material tracking (inward and outward) and Inventory management.

IP coordination for site RFI,

Site roll-out (2G, 3G and 4G) in co-ordination with the electronics vendors.

Coordination with the central team (CRA) for the WPC and SACFA approval.

Coordination with the vendors for site relocation activities and MW link up gradation.

Coordination with the vendors, IPs and related stake-holders for swap of network from Ericsson to ZTE.

Coordination with the vendor and commercial/finance team for the release of the payments

PROJECT MANAGEMENT RESPONSIBILITY INCLUDES

CHIEF PROJECT ENGINEER OVERRALL ADMINISTRATION SITE MANAGEMENT FIGURE

ENGINEER ELECTICALS- 10

ENGINEERS CIVIL AND MECHANICALS -10

SUPERVISOR AND SITE INCHARGE - 20

MACHINE OPERATORS AND LABOUR (T&P) - 200

OFFICE STAFF - 20

Page 5: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

FINANCIAL GROWTH TURN OVER IN LACS

2011 -2012

2012 -2013

2014 -2015

1350

1420

1614

2013

1542

1804

2013 -2014

2015 -2016

2016 -2017

Page 6: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

ELECTRICALInstrumentation/Electrical like Diesel Generator 60 KVA to 250 KVA, MD Panel, LT Panel, DC Power Plan , UPS, Precision Air Conditioner, Split AC and Battery Bank Video Surveillances System, Access

Control System, Fire Alarm System and Earthling etc.

CONSTRUCTION & COMMISSIONING

OPERATION & MAINTENANCE

Planning/Scheduling.

Tray work.

Panel installation.

Cable laying.

Material Management.

Efficient Deployment of Skilled / Unskilled services.

Subcontractor Management.

Adherence to QA/ QC.

Safety Control.

Testing & Commissioning.

Project Handover.

Refurbishing the equipments.

Preventive Maintenance.

Emergency Shutdown.

Routine checks.

Operation of Electrical & Instrumentation System.

Consulting, Detail Engineering, supply installation & commissioning of electrical projects.

Solar System Project

Page 7: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

TELECOMINFRASTRUCTURECoordination with the infrastructure providers for the timely infra readiness of the sites including site acquisition, Municipal Approval, commercial power, PCB NoC and other necessary approvals from appropriate authority.

Site acquisition and infra readiness (RFI) Vender built sites which includes the following points after SAM release:

Site Survey.

Site acquisition including legal vetting.

Foundation designing including structural stability certification etc.

Infra material ordering.

Govt compliances like pwd road gampanchat road municipal permission NOC for ROW PCB ctc.

Completion of all infra related activities (civil and electrical) and coordination for the supply of material at site.

Installation of infra material and declaring the site as RFI for Installation of Electronic Equipment’s.

Page 8: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

Heading network management of India Telecom circle including delivery & services.

Managing Opex control, executing projects delivery, handling network operations, monitoring KPI’s and SLA targets, ensuring timely sign off on contracted KPI’s from MS partner (Ericsson)

Leading manpower of more than 300 plus across AssamHandling entire network operation/network performance/ network planning/ network rollout.

Network in 4500 Km of OFC route (both active & passive infrastructure).

Reducing Opex/optimization of Capex and developing best practices to reduce cost of circle operations.

Liaising with various departments and maintaining cordial relations with customers.

Reviewing systems, methods & procedures, identifying efficient ways to deliver services and achieving highest levels of customer satisfaction & quality.

Resolving customer complaints, reducing customer churn through proper RF optimization and proposing coverage/capacity sites/IBS/repeaters & BW augmentation wherever required

Manpower optimization and imparting training & development of subordinates

Timely PO to vendors for different activities such as diesel filling, car hiring, transformer repairing, passive infrastructure repairing, FLM & project vendors and making timely payment to vendors

Coordinating with all existing telecom operators including BSNL for POI connectivity and ensuring timely augmentation of POI’s as per traffic utilization

Performing operation review with all 3rd party infra service provider/FRT vendors/DG Vendors/AC vendors on weekly basis for improving operational efficiency and better network performance and maintaining KPI’s

Following up with IP’s for better NWA and issue resolution.

Controlled entire network planning and build up of across the India including 2 MSCs, 4 BSCs and 4 MGWs, 500 BTS, 3000 plus km of OFC route (both access and back bone)

NETWORK PROJECT AND OPERATION

Page 9: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

CONDUCTED MANAGEDAudit of all network elements as per TTSL audit process

Planning of capacity & coverage sites and subsequent upgradation of Tx equipment & bandwidth

TEC testing to meet license condition including submission of quarterly drive test report submission to

Imparted training and created development plan for subordinates

Selected vendors, fixed contract rates and liaised with all existing Telecom Operators for POI connectivity and augmentation of POIs

Audit of all network elements as per TTSL audit process

Planning of capacity & coverage sites and subsequent upgradation of Tx equipment & bandwidth

TEC testing to meet license condition including submission of quarterly drive test report submission to

Imparted training and created development plan for subordinates

Selected vendors, fixed contract rates and liaised with all existing Telecom Operators for POI connectivity and augmentation of POIs

PERFORMEDOFC route planning, vendor selection and execution of OFC project in India.

PR/PO, GR/IR and OFC route implementation as per deadline

Installation &commissioning, testing, operations& maintenanceof ZTE CDMA System/ Alcatal make TX equipment

Planning of MSC & BSC infra, budget preparation and implementation

Prepared RF,TX and Infra BOQ and network reports such as BSS, Switch KPI and TRAI reports

Page 10: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PROJECT COMPLETED AND ON GOING

NAME OF WORK & W/O NUMBER

ASSTT. VALUE (IN US DOLLAR)

CLIENT ADDRESS

PROJECT NAME: Flood Management of River

Dikrang alongwith river training work on both banks embamnkment in Lakhimpur

District (Assam).

Water resource department, Chandmari,

Guwahati-03department

$ 133859.00

PROJECT NAME: Earthwaork in forming embankment etc. with contractors own earth including mechanical

compaction and rebuilding /strengthening/extension of box culvert of different span

all measure bridge from bridge No.201 to br No.289 including other connected

ancillary work between chainage no. 235 km to 296 km between station Dubia to

North Lakhimpur in connection gauge

conversation of Balipara to North Lakhimpur section.

department

PROJECT NAME: Construction and

maintenance of rural road under Pradhan Mantri Gram

Sadak Yojana (ADB, RCIP 2013-2014 batch in

Lakhimpur district package No.AS15119)

PROJECT NAME: Construction of road four

lining Numaligarh to Dergaon NHIDCL

NF Railway construction Organization, Maligaon.

$ 822729.75

Enhanced value$ 986484.58

APWD Govt. of Assam

HCC JV STPL $ 1406250/-

$ 857655.88

Page 11: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PROJECT COMPLETED AND ON GOING

NAME OF WORK & W/O NUMBER

ASSTT. VALUE (IN US DOLLAR)

CLIENT ADDRESS

PROJECT NAME: Earthwork in forming embankment etc. with contractors own earth

including mechanical compaction and

rebuilding/strengthening/extension of box culvert of

different span all

measure bridge from bridge no.82 to br no.200 including

other connected ancillary work between chainage no. 184 km to 242 km between station Monabari to Dubia in

connection guauge conversation of Balipara to North Lakhimpur Section.

department

NF Railway construction organization, Maligaon

$ 816382.35

Enhanced Value$ 1158005.58

PROJECT NAME: Provision of back bone drain (length

2.75 Km as per Sr. DEN/MLG’s Drg

No.M/01/2009) at Station yard of Mehendipathar

Songsak State Highway and provision of goods and

station approach Road and 3 No. of minor bridges 1

X1.8 dia HP).

PROJECT NAME: Contraction of Rajiv Gandhi

Path Connecting Rani to Kanyadhara Road upto

Durga Mandir Chainage 515.00 to

Chainage 8985.00 M under 3054 non plan (M&R) for the

year 2014 to 2015

NF Rly. West Garo Hill Meghalaya

$ 525091.66

APWD $ 781774.88

Page 12: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PROJECT COMPLETED AND ON GOING

NAME OF WORK & W/O NUMBER

ASSTT. VALUE (IN US DOLLAR)

CLIENT ADDRESS

PROJECT NAME: Rehabilitation and

argumentation of the four lining Numaligarh to Jorhat Section from KM 402-50 to KM 453.00 of NH-37 accept construction of Dergaon by pass from Km 426.800 to

KM 437.420 in the State of Assam under SARDP-NE

PASE-A project on EPC Basis.

HCC $ 1250000

PROJECT NAME: Supply staking and spreading of 50

mm size machine crash, ballast along the cess and depot from chainage no.

242 km to 235 km between section Dubia excluding year

to Gohpur in connection with gauge conversation work of Balipara North

Lakhimpur Gauge Conversation.

NF Railway Maligaon STPL $ 1063599.15

PROJECT NAME: Construction of road from Ngbang to Gamchuck to Ululoni via Damkalghat including cross draining

works and routine maintenance of the works

for five years under PMGSY (Ph-XI) Package No.

AS-04-29 for the contract.

PROJECT NAME: OFC Construction of NFS Project

Marlad, Mankhoor, & Manglore CEQ

APWD Govt. of Assam

TCIL NFS Project

$ 2795880/-

$ 93750/-

Page 13: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PROJECT COMPLETED AND ON GOING

NAME OF WORK & W/O NUMBER

ASSTT. VALUE (IN US DOLLAR)

CLIENT ADDRESS

PROJECT NAME: Rajeev Gandhi Rural Electrification Distt. of Bishawanath and

North Lakhanpur,

Assam Electricity Board (APDCL) JV JK

$ 793650/-

PROJECT NAME: OFC Construction work Kaliachak

Babla Laksmipur, Naoda Ratua-Fatepur-Barsoi, Malda, West Bengal,

Joramtop to Gero Arunachal Pradesh, Gopal Chowk, Koch Vihar, West Bengal

MP Birla Group/VTL Airtel Project

$ 328125/-

PROJECT NAME: OFC Construction of

Dhenkanal-Berhanpur, Seragarh-Badagarh-Surada-

Makundapur, Balangir-Atgaon-Mahalei-Rusuda-Burom-I-Sinakhaman-Naikensira, Bhuvneshwar,

Odisha

MP Birla Group/VTL Airtel Project

$ 859375/-

PROJECT NAME: OFC Construction of Gingeer-Desur,

Dharampuri-Patti, Kancheepur-Kam, B

Mallapura, Ulundurpetta-illur TN,

Porur-Pudupa State of Tamu Nadu

PROJECT NAME: Construction of

Multipurpose Hall (Sadbhavna Mandab) at

Imphal East CD-II Manipur

MP Birla Group/VTL Rate not disclose

MOBEDS GOVT OF MANI-PUR

$873015

Page 14: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PROJECT COMPLETED AND ON GOING

NAME OF WORK & W/O NUMBER

ASSTT. VALUE (IN US DOLLAR)

CLIENT ADDRESS

PROJECT NAME: Electrification of Generator 60 to 250 KVA, PD Panel, LT Panel, DC Power Plant, UPS,

Precision Air Conditioner, Split AC and Battery Bank,

Video Surveillances Systems, Access Control System, Fire Alarm System and Earthing

work

GTL Airtel, Reliance, Jio, NCC Associates Company

$ 396825

Page 15: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

OUR PRESENCEIN INDIA….

DELHI / NCR

LUCKNOW

GURGAON

KOLKATTA

BANGALORE

PATNA

HYDERABAD

MUMBAI PUNE

NAGPUR

AHEMDABADBHOPAL

MADURAI

ASSAMAJMER

Page 16: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

WORK PORTFOLIO

Page 17: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

ASSAM PUBLIC WORK

DEPARTMENT (APWD) UNDER

AACP

PMGSY

ARURAL ROAD

COMPONENT IMPROVEMENT OF

ROAD UNDER CENTRAL ROAD

FUND

WATER MANAGEMENT

WORK WITH WATER RESOURCES DEPARTMENT

ASSAM ELECTRICITY

BOARD (APDCL)IT AND ITES COMPANY

ARURAL ROAD

COMPONENT IMPROVEMENT OF

ROAD UNDER CENTRAL ROAD

FUND

NSF PROJECT MP BIRLA GROUP

NARULA GROUPAIRTEL GTL RELIANCE

JIO NCCHCC AND JV

GOVT. OF MANIPUR PSU

(MOBEDS)

STPL

BHARTIA INFRA PROJECT LIMITED

JK KHANDAMPERSAND

SYSTEM PRIVATE LIMITED

MINISTRY RAILWAYS

OUR CLIENT LIST

Page 18: Global Infrastructure Profile · site finalization, BOQ finalization, budget preparation and approval from Corporate. Post budget approval PO to be released on vendor for both supply

Head OfficePadma Lakshmi Complex,2nd floor Rajghar Road Chandmari ,GuwahatiKamrup 781003 Assam

Corporate OfficeAmrapali Villa No - B107 Noida Sector 121 UP

Contact Number - 9854210188 ,9354296326Email - [email protected] - www.globalinfrasstructure.com

GLOBAL INFRASSTRUCTURE

INNOVATION, QUICK

IMPLEMENTATION AND CONTINUOUS

IMPROVEMENT