global infrastructure profile · site finalization, boq finalization, budget preparation and...
TRANSCRIPT
ABOUT USGlobal Infrastructure Started the business in India
2007 with the object of providing specialize service in the field civil Infra ,telecommunication , Power energy
,Real state sector , Hospitality , Agro & Allied, Training and Manpower, Security services, Industries under NISE, Export &
Import, Coal Trading & Transportation. since its foundation the company has so far successfully executed many product
providing a wide range of instrumentation services.
Focused professional with more than 10 years of our management associate team experience in Infrastructure Rollout and Operations,
Strategic Planning, Team Management, Project Management, Quality Assurance and Cross-functional Coordination in Telecom industry
Skilled in managing projects involving scoping, design, architecture & sourcing and interacting with the Clients & System Engineering Team for requirements
gathering & analysis
A keen planner with strong skills in client relationship management with proven success of managing large scale projects; impressive career driven by challenges and a
desire to be successful in all endeavours
Facilitating in managing and executing telecom infrastructure development projects for start-ups, large organizations, developing technical
Resources & solutions for greater value addition and increased margins
Carrying out advance planning for resource mobilization, manpower deployment and rendering technical support; ensuring the execution of projects within time,
cost & budgetary parameters- Performing efficient Team Management through monitoring the performance of multi-skilled workforce and guiding them
towards achieving their individual as well as organizational goals
Capabilities in deploying various methodologies to analyse process, recommending modifications to minimize escalations, realizing
operational efficiencies and reducing cycle-time for the enhancement purposes
Proficient in developing maintenance & operations procedures to increase the efficiency; implementing standards and ensuring
adherence to quality standards through in-process checks
Enterprising leader with skills in mentoring and motivating individuals towards maximizing productivity as well as in
forming cohesive team environments.
We have highly qualified and talented professionals who work in tandem so as to meet the exact demands
of our prestigious customers. Our quality controllers test the entire range stringently to ensure zero
defect products. Further, our production unit is fitted with latest machines that enable us to
undertake the bulk consignment of our customers on field.
CORE COMPETENCIES
WORK ETHICS
Strategic Planning
Operations &Maintenance
TeamManagement
Quality Assurance
Installation &Commissioning
ProjectManagement
Cross- functional
Coordination
FibreManagement
TEAM WORK
QUALITY OUTPUT
ON-TIMEDELIVERY OF
WORK
ENCOURAGE ADOPTION OF
NEW TECHNIQUES
INTEGRITY AND TRUST
TIMELYTECHNICAL
UPGRADATION
INVITGEINNOVATIONS
PERIODICALLY IN SOPHISTICATED LABORATORIES
UNDER CONTROLLED CONDITIONS
Coordination with Sales and Network planning team (both circle & Corporate) for site finalization, BOQ finalization, budget preparation and approval from Corporate.
Post budget approval PO to be released on vendor for both supply and services in coordination with Commercial team,
Material tracking (inward and outward) and Inventory management.
IP coordination for site RFI,
Site roll-out (2G, 3G and 4G) in co-ordination with the electronics vendors.
Coordination with the central team (CRA) for the WPC and SACFA approval.
Coordination with the vendors for site relocation activities and MW link up gradation.
Coordination with the vendors, IPs and related stake-holders for swap of network from Ericsson to ZTE.
Coordination with the vendor and commercial/finance team for the release of the payments
PROJECT MANAGEMENT RESPONSIBILITY INCLUDES
CHIEF PROJECT ENGINEER OVERRALL ADMINISTRATION SITE MANAGEMENT FIGURE
ENGINEER ELECTICALS- 10
ENGINEERS CIVIL AND MECHANICALS -10
SUPERVISOR AND SITE INCHARGE - 20
MACHINE OPERATORS AND LABOUR (T&P) - 200
OFFICE STAFF - 20
FINANCIAL GROWTH TURN OVER IN LACS
2011 -2012
2012 -2013
2014 -2015
1350
1420
1614
2013
1542
1804
2013 -2014
2015 -2016
2016 -2017
ELECTRICALInstrumentation/Electrical like Diesel Generator 60 KVA to 250 KVA, MD Panel, LT Panel, DC Power Plan , UPS, Precision Air Conditioner, Split AC and Battery Bank Video Surveillances System, Access
Control System, Fire Alarm System and Earthling etc.
CONSTRUCTION & COMMISSIONING
OPERATION & MAINTENANCE
Planning/Scheduling.
Tray work.
Panel installation.
Cable laying.
Material Management.
Efficient Deployment of Skilled / Unskilled services.
Subcontractor Management.
Adherence to QA/ QC.
Safety Control.
Testing & Commissioning.
Project Handover.
Refurbishing the equipments.
Preventive Maintenance.
Emergency Shutdown.
Routine checks.
Operation of Electrical & Instrumentation System.
Consulting, Detail Engineering, supply installation & commissioning of electrical projects.
Solar System Project
TELECOMINFRASTRUCTURECoordination with the infrastructure providers for the timely infra readiness of the sites including site acquisition, Municipal Approval, commercial power, PCB NoC and other necessary approvals from appropriate authority.
Site acquisition and infra readiness (RFI) Vender built sites which includes the following points after SAM release:
Site Survey.
Site acquisition including legal vetting.
Foundation designing including structural stability certification etc.
Infra material ordering.
Govt compliances like pwd road gampanchat road municipal permission NOC for ROW PCB ctc.
Completion of all infra related activities (civil and electrical) and coordination for the supply of material at site.
Installation of infra material and declaring the site as RFI for Installation of Electronic Equipment’s.
Heading network management of India Telecom circle including delivery & services.
Managing Opex control, executing projects delivery, handling network operations, monitoring KPI’s and SLA targets, ensuring timely sign off on contracted KPI’s from MS partner (Ericsson)
Leading manpower of more than 300 plus across AssamHandling entire network operation/network performance/ network planning/ network rollout.
Network in 4500 Km of OFC route (both active & passive infrastructure).
Reducing Opex/optimization of Capex and developing best practices to reduce cost of circle operations.
Liaising with various departments and maintaining cordial relations with customers.
Reviewing systems, methods & procedures, identifying efficient ways to deliver services and achieving highest levels of customer satisfaction & quality.
Resolving customer complaints, reducing customer churn through proper RF optimization and proposing coverage/capacity sites/IBS/repeaters & BW augmentation wherever required
Manpower optimization and imparting training & development of subordinates
Timely PO to vendors for different activities such as diesel filling, car hiring, transformer repairing, passive infrastructure repairing, FLM & project vendors and making timely payment to vendors
Coordinating with all existing telecom operators including BSNL for POI connectivity and ensuring timely augmentation of POI’s as per traffic utilization
Performing operation review with all 3rd party infra service provider/FRT vendors/DG Vendors/AC vendors on weekly basis for improving operational efficiency and better network performance and maintaining KPI’s
Following up with IP’s for better NWA and issue resolution.
Controlled entire network planning and build up of across the India including 2 MSCs, 4 BSCs and 4 MGWs, 500 BTS, 3000 plus km of OFC route (both access and back bone)
NETWORK PROJECT AND OPERATION
CONDUCTED MANAGEDAudit of all network elements as per TTSL audit process
Planning of capacity & coverage sites and subsequent upgradation of Tx equipment & bandwidth
TEC testing to meet license condition including submission of quarterly drive test report submission to
Imparted training and created development plan for subordinates
Selected vendors, fixed contract rates and liaised with all existing Telecom Operators for POI connectivity and augmentation of POIs
Audit of all network elements as per TTSL audit process
Planning of capacity & coverage sites and subsequent upgradation of Tx equipment & bandwidth
TEC testing to meet license condition including submission of quarterly drive test report submission to
Imparted training and created development plan for subordinates
Selected vendors, fixed contract rates and liaised with all existing Telecom Operators for POI connectivity and augmentation of POIs
PERFORMEDOFC route planning, vendor selection and execution of OFC project in India.
PR/PO, GR/IR and OFC route implementation as per deadline
Installation &commissioning, testing, operations& maintenanceof ZTE CDMA System/ Alcatal make TX equipment
Planning of MSC & BSC infra, budget preparation and implementation
Prepared RF,TX and Infra BOQ and network reports such as BSS, Switch KPI and TRAI reports
OUR PROJECT COMPLETED AND ON GOING
NAME OF WORK & W/O NUMBER
ASSTT. VALUE (IN US DOLLAR)
CLIENT ADDRESS
PROJECT NAME: Flood Management of River
Dikrang alongwith river training work on both banks embamnkment in Lakhimpur
District (Assam).
Water resource department, Chandmari,
Guwahati-03department
$ 133859.00
PROJECT NAME: Earthwaork in forming embankment etc. with contractors own earth including mechanical
compaction and rebuilding /strengthening/extension of box culvert of different span
all measure bridge from bridge No.201 to br No.289 including other connected
ancillary work between chainage no. 235 km to 296 km between station Dubia to
North Lakhimpur in connection gauge
conversation of Balipara to North Lakhimpur section.
department
PROJECT NAME: Construction and
maintenance of rural road under Pradhan Mantri Gram
Sadak Yojana (ADB, RCIP 2013-2014 batch in
Lakhimpur district package No.AS15119)
PROJECT NAME: Construction of road four
lining Numaligarh to Dergaon NHIDCL
NF Railway construction Organization, Maligaon.
$ 822729.75
Enhanced value$ 986484.58
APWD Govt. of Assam
HCC JV STPL $ 1406250/-
$ 857655.88
OUR PROJECT COMPLETED AND ON GOING
NAME OF WORK & W/O NUMBER
ASSTT. VALUE (IN US DOLLAR)
CLIENT ADDRESS
PROJECT NAME: Earthwork in forming embankment etc. with contractors own earth
including mechanical compaction and
rebuilding/strengthening/extension of box culvert of
different span all
measure bridge from bridge no.82 to br no.200 including
other connected ancillary work between chainage no. 184 km to 242 km between station Monabari to Dubia in
connection guauge conversation of Balipara to North Lakhimpur Section.
department
NF Railway construction organization, Maligaon
$ 816382.35
Enhanced Value$ 1158005.58
PROJECT NAME: Provision of back bone drain (length
2.75 Km as per Sr. DEN/MLG’s Drg
No.M/01/2009) at Station yard of Mehendipathar
Songsak State Highway and provision of goods and
station approach Road and 3 No. of minor bridges 1
X1.8 dia HP).
PROJECT NAME: Contraction of Rajiv Gandhi
Path Connecting Rani to Kanyadhara Road upto
Durga Mandir Chainage 515.00 to
Chainage 8985.00 M under 3054 non plan (M&R) for the
year 2014 to 2015
NF Rly. West Garo Hill Meghalaya
$ 525091.66
APWD $ 781774.88
OUR PROJECT COMPLETED AND ON GOING
NAME OF WORK & W/O NUMBER
ASSTT. VALUE (IN US DOLLAR)
CLIENT ADDRESS
PROJECT NAME: Rehabilitation and
argumentation of the four lining Numaligarh to Jorhat Section from KM 402-50 to KM 453.00 of NH-37 accept construction of Dergaon by pass from Km 426.800 to
KM 437.420 in the State of Assam under SARDP-NE
PASE-A project on EPC Basis.
HCC $ 1250000
PROJECT NAME: Supply staking and spreading of 50
mm size machine crash, ballast along the cess and depot from chainage no.
242 km to 235 km between section Dubia excluding year
to Gohpur in connection with gauge conversation work of Balipara North
Lakhimpur Gauge Conversation.
NF Railway Maligaon STPL $ 1063599.15
PROJECT NAME: Construction of road from Ngbang to Gamchuck to Ululoni via Damkalghat including cross draining
works and routine maintenance of the works
for five years under PMGSY (Ph-XI) Package No.
AS-04-29 for the contract.
PROJECT NAME: OFC Construction of NFS Project
Marlad, Mankhoor, & Manglore CEQ
APWD Govt. of Assam
TCIL NFS Project
$ 2795880/-
$ 93750/-
OUR PROJECT COMPLETED AND ON GOING
NAME OF WORK & W/O NUMBER
ASSTT. VALUE (IN US DOLLAR)
CLIENT ADDRESS
PROJECT NAME: Rajeev Gandhi Rural Electrification Distt. of Bishawanath and
North Lakhanpur,
Assam Electricity Board (APDCL) JV JK
$ 793650/-
PROJECT NAME: OFC Construction work Kaliachak
Babla Laksmipur, Naoda Ratua-Fatepur-Barsoi, Malda, West Bengal,
Joramtop to Gero Arunachal Pradesh, Gopal Chowk, Koch Vihar, West Bengal
MP Birla Group/VTL Airtel Project
$ 328125/-
PROJECT NAME: OFC Construction of
Dhenkanal-Berhanpur, Seragarh-Badagarh-Surada-
Makundapur, Balangir-Atgaon-Mahalei-Rusuda-Burom-I-Sinakhaman-Naikensira, Bhuvneshwar,
Odisha
MP Birla Group/VTL Airtel Project
$ 859375/-
PROJECT NAME: OFC Construction of Gingeer-Desur,
Dharampuri-Patti, Kancheepur-Kam, B
Mallapura, Ulundurpetta-illur TN,
Porur-Pudupa State of Tamu Nadu
PROJECT NAME: Construction of
Multipurpose Hall (Sadbhavna Mandab) at
Imphal East CD-II Manipur
MP Birla Group/VTL Rate not disclose
MOBEDS GOVT OF MANI-PUR
$873015
OUR PROJECT COMPLETED AND ON GOING
NAME OF WORK & W/O NUMBER
ASSTT. VALUE (IN US DOLLAR)
CLIENT ADDRESS
PROJECT NAME: Electrification of Generator 60 to 250 KVA, PD Panel, LT Panel, DC Power Plant, UPS,
Precision Air Conditioner, Split AC and Battery Bank,
Video Surveillances Systems, Access Control System, Fire Alarm System and Earthing
work
GTL Airtel, Reliance, Jio, NCC Associates Company
$ 396825
OUR PRESENCEIN INDIA….
DELHI / NCR
LUCKNOW
GURGAON
KOLKATTA
BANGALORE
PATNA
HYDERABAD
MUMBAI PUNE
NAGPUR
AHEMDABADBHOPAL
MADURAI
ASSAMAJMER
WORK PORTFOLIO
ASSAM PUBLIC WORK
DEPARTMENT (APWD) UNDER
AACP
PMGSY
ARURAL ROAD
COMPONENT IMPROVEMENT OF
ROAD UNDER CENTRAL ROAD
FUND
WATER MANAGEMENT
WORK WITH WATER RESOURCES DEPARTMENT
ASSAM ELECTRICITY
BOARD (APDCL)IT AND ITES COMPANY
ARURAL ROAD
COMPONENT IMPROVEMENT OF
ROAD UNDER CENTRAL ROAD
FUND
NSF PROJECT MP BIRLA GROUP
NARULA GROUPAIRTEL GTL RELIANCE
JIO NCCHCC AND JV
GOVT. OF MANIPUR PSU
(MOBEDS)
STPL
BHARTIA INFRA PROJECT LIMITED
JK KHANDAMPERSAND
SYSTEM PRIVATE LIMITED
MINISTRY RAILWAYS
OUR CLIENT LIST
Head OfficePadma Lakshmi Complex,2nd floor Rajghar Road Chandmari ,GuwahatiKamrup 781003 Assam
Corporate OfficeAmrapali Villa No - B107 Noida Sector 121 UP
Contact Number - 9854210188 ,9354296326Email - [email protected] - www.globalinfrasstructure.com
GLOBAL INFRASSTRUCTURE
INNOVATION, QUICK
IMPLEMENTATION AND CONTINUOUS
IMPROVEMENT