Global Design Effort - CFSGlobal Design Effort - CFS
1
DRAFTDRAFT
CFS Global Meeting 29 July 2009CFS Global Meeting 29 July 2009
CONVENTIONAL FACILITIESCONVENTIONAL FACILITIESAND SITING GROUP :AND SITING GROUP :
•Safety documentsSafety documents•3d modeling3d modeling
J.OSBORNE , V.KUCHLER, A.ENOMOTOJ.OSBORNE , V.KUCHLER, A.ENOMOTO
Global Design Effort - CFSGlobal Design Effort - CFS
•LHC chapter of the CLIC/ILC safety repository document under approval
•Can be found on Indico CES site :
•http://indico.cern.ch/conferenceDisplay.py?confId=44870
•Or on CERN EDMS :CERN EDMS 995165 v.1 https://edms.cern.ch/cedar/plsql/doc.info?cookie=8286997&document_id=995165&version=1
FNAL : M&W Zander working on translation of XFEL safety documentFNAL : Hughes Engineering – Alternative tunnel solutions study underway, including safety assessmentsKEK fire safety studies complete
Global Design Effort - CFSGlobal Design Effort - CFS
Deadline for comments on LHC Chapter next CES webex on 9 September 2009
Global Design Effort - CFSGlobal Design Effort - CFS
• All chapters eg LHC, XFEL, CLIC, Americas, ASIA are to be collected in this single document
• The goal is to have all safety reports compiled by Albuquerque
• Executive summary to follow….
Global Design Effort - CFSGlobal Design Effort - CFS
5
3d modeling3d modeling
Since DESY AD&I meeting at the end of May, several Since DESY AD&I meeting at the end of May, several meeting have taken place to better define the tunnel meeting have taken place to better define the tunnel layouts for SB2009. (Weekly CFS with area systems, layouts for SB2009. (Weekly CFS with area systems, Central area meeting in SLAC 20/21 July…)Central area meeting in SLAC 20/21 July…)
Until layouts are better understood, 3d-modeling is ‘on-Until layouts are better understood, 3d-modeling is ‘on-hold’.hold’.
CERN & FNAL (M&W Zander) are on standby to produce CERN & FNAL (M&W Zander) are on standby to produce further models. KEK are investigating possibility of further models. KEK are investigating possibility of using an external consultant to help with3d models.using an external consultant to help with3d models.
Global Design Effort - CFSGlobal Design Effort - CFS
6
CERN have produced a few very preliminary CERN have produced a few very preliminary 3d models further to the DESY meeting 3d models further to the DESY meeting (without lattices !)(without lattices !)
See following slidesSee following slides
Global Design Effort - CFSGlobal Design Effort - CFS
3.2km Damping Ring
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS
Global Design Effort - CFSGlobal Design Effort - CFS