gis for pipeline assets management · 2019-03-20 · abu dhabi national oil companyadnoc gas...

15
ABU DHABI NATIONAL OIL COMPANY ADNOC GAS PROCESSING GIS FOR PIPELINE ASSETS MANAGEMENT SPEAKER: BANU PRAKASH CHITRALA HUSAM EDDEAN JAMIL

Upload: others

Post on 14-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

ABU DHABI NATIONAL OIL COMPANYADNOC GAS PROCESSING

GIS FOR PIPELINE ASSETS MANAGEMENT

SPEAKER: BANU PRAKASH CHITRALA

HUSAM EDDEAN JAMIL

Page 2: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

ADNOC GAS PROCESSING

HSE MOMENT

Page 3: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

ADNOC LIFE SAVING RULESA

DN

OC

GA

S P

RO

CE

SS

ING

| G

IS F

OR

PIP

EL

INE

AS

SE

TS

MA

NA

GE

ME

NT

3

H S E M O M E N T

Page 4: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

AGENDA

INTRODUCTION

PIPELIEN LIFE CYCLE – GIS ROLE

GEOSPATIAL DATA MATURITY; SURVEY, GDB MODEL, RESULTS

LESSONS LEARNT (SURVEY)

GIS PORTAL

4

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 5: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

INTRODUCTION

GIS at ADNOC Gas

Triggers; business needs (Operations & Maintenance), eNOC, CRS, Geomaturity

Enterprise GIS Implementation Roadmap development

As Is Study, Gap Analysis, enterprise GIS Implementation Plan

Enterprise GIS Implementation Phases

Phase 1; Enterprise GIS Foundation – Infrastructure & (Geospatial) Data

Phase 2; Business Applications

Phase 3; Business Integrations

5

O V E R V I E W

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 6: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

PIPELINE LIFE CYCLE – GIS ROLE

6

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T Planning

Pre-

Feed/FeedEPC Contracts Commissioning Decommission

GIS

Maintain All Historical/Old Data

Engineering & Design Data

Operation Data Integrity Data Inspection DataAnalysis data

HCA/ HSE/…

Other data:

Railway, Roads, OH, Base map

Page 7: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GEOSPATIAL DATA MATURITY

As-built drawings / Pipe books

Inspection Data – ILI Survey

Satellite Imagery

Survey

7

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Need for Survey – Geospatial data of pipelines was:

Incomplete

Inconsistent

Outdated

Multiple sources

Unreliable / Inaccurate

P I P E L I N E D A T A S O U R C E S ; W H Y S U R V E Y ?

Page 8: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GEOSPATIAL DATA MATURITY

Topo survey

Corridor features like fences, fence gates, KM markers, Other markers,

crossings, stations, etc.

Pipeline Survey (AG/UG)

UG pipelines – Ground Penetrating Radar (GPR) techniques.

AG pipelines – Traditional Topo survey techniques

Specifications

Connect to AD GRS network

Survey in UTM WGS 84 (Zone 39 & 40) projection

Accuracy tolerance (+/- 15cm)

8

S U R V E Y M E T H O D O L O G Y

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 9: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

9

GEOSPATIAL DATA MATURITYG E O S P A T I A L F E A T U R E S

Pipelines Features/On-line

Centerlines Depth Of Cover

Insulation Flange

Appurtenance/Supports

Instrument Device

WeldKM/KP Valve

Scraper structure

CP Features: TP/ JB/FB/BB

Corridor/Off-Line

Fence

Fence gate

Markers

Crossings

Culverts

Sites

GCP

Geometries

Tee

• Pipeline Name,

• Pipeline Tag, Product Type,

• Pipeline Length,

• Above/ Under Ground segments,

• Valve Tag & Type,

• Support Tag & Type,

• Crossing Type & name,

• Scrapper Tag &Type,

• CP feature Tag & Types,

• Fence owner, Gate Width,

• Site Name and type

• Depth Of Cover, Ground Level and ROW level

• Wall thickness

• Material Type

Attributes

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 10: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GEOSPATIAL DATA MATURITY

10

G E O D A T A B A S E M O D E L – M I G R A T I O N ; A P D M T O P O D S

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 11: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GEOSPATIAL DATA MATURITY

11

D E L I V E R A B L E S

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Raw Data

Downloaded from survey equipment for all corridors

Geodatabase

Pipeline online / offline features delivered as GDB;

Individually in both UTM Zone 39 & 40

Mosaic in UTM Zone 39

Detailed Project Report (DPR)

Documentation on project approach, method statement, GDB model, teams, equipment used,

certification, project lessons, etc.

Page 12: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GEOSPATIAL DATA MATURITY

12

A C C U R A C I E S

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T The survey data is verified against existing historical excavations/trail pits done by AGP NOC teams.

95% of data falls in sub-meter positional accuracy

97% of data falls in sub-meter accuracy for depth of cover

Page 13: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

LESSONS LEARNT

13

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

CONSTRAINTS /

STOPPERSCONSTRAINT DESCRIPTION SOLUTIONS / WORKAROUNDS

TECHNOLOGY LIMITATIONS

GPR can detect pipelines buried within 4-6mtrs

Positional accuracy declines with depth

Can’t detect non-metallic pipelines

As-built drawings / alignment sheets / pipe books / ILI

Pipe-Tally/ trial pits / satellite images / aerial photos as

reference

ACCESS TO FACILITIES Access Permits to sensitive installations

As-built drawings / alignment sheets / pipe books / ILI

Pipe-Tally / trial pits / satellite images / aerial photos as

reference

TERRAIN Pipelines/facilities in Sand dunes/Sabkhas/HDD

locations

As-built drawings / alignment sheets / pipe books / ILI

Pipe-Tally/ trial pits / satellite images / aerial photos as

reference

WEATHER Hot & humid desert conditions Start early and take mid-day breaks

NON - STANDARDIZATION

Potential results of non-standardization due to multiple

survey teams;

Requirements understanding in multiple teams.

chances of multiple raw data formats.

Requirements briefing sessions

Standard template for raw data capture.

Page 14: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

GIS PORTAL

14

AD

NO

C G

AS

PR

OC

ES

SIN

G |

GIS

FO

R P

IPE

LIN

E A

SS

ET

S M

AN

AG

EM

EN

T

Page 15: GIS For Pipeline Assets Management · 2019-03-20 · abu dhabi national oil companyadnoc gas processing gis for pipeline assets management speaker: banu prakash chitrala husam eddean

ADNOC GAS PROCESSING

THANK YOU