giotan's leasehold improvement estimates for brick and beam offices march 2013

1
UPGRADED OFFICE GIOTAN’S LEASEHOLD IMPROVEMENTS ESTIMATES FOR BRICK AND BEAM OFFICES MARCH 2013 GIO TAN DESIGN ASSOCIATES INC. T 416 926 1937 | www.giotandesign.com PLEASE FILE FOR YOUR FUTURE INTERIOR DESIGN NEEDS [email protected] | [email protected] | [email protected] BASIC OFFICE $34/SQ.FT. – $45/SQ.FT. Typically has a higher ratio of open areas to partitioned offices, meeting rooms, etc… • Painted, insulated drywall partitions from floor to ceiling. • Solid core 7’ painted doors and frames with building standard hardware. • Mechanical, sprinklers and lighting relocation. • Voice/data rough-in and one power outlet per person. • Paint throughout the entire office. • Existing wood flooring. UPGRADED OFFICE $46/SQ.FT. – $58/SQ.FT. Typically has a more equal ratio of open areas to partitioned offices, meeting rooms, etc… • Painted, insulated drywall partitions from floor to T-bar with reveals around doors and frames at ceiling. • Vinyl wall coverings in some principal areas. • Drywall feature ceilings with pot lights and linear diffusers in the reception and boardroom. • 9’, solid core wood veneer doors with standard hardware and sidelights. • Voice/data rough-ins and power outlets as required. • Custom millwork in kitchen/lunchroom, and storage areas. • Existing wood flooring and/or new carpet (32 oz). PREMIUM OFFICE $59/SQ.FT. AND UP Typically has a higher ratio of partitioned offices, meeting rooms, etc… to open areas. • Same as the Upgraded Office with upgraded wall finishes in all major areas. • Wood doors and frames in some areas using superior wood veneers, heavy duty lever hardware, and glass partitions in many areas. • High quality finishes and vinyl wall coverings in reception and boardroom. • Special lighting and drywall ceilings in reception, all meeting rooms and some private offices. • Built-in custom millwork in boardroom, reception, mailrooms, kitchen/lunchroom, storage areas and as required. • Premium wood and stone flooring and/or new carpet (+32 oz) in specified areas. BASED ON THE FOLLOWING ASSUMPTIONS: 1. The costs are only associated with A Class Brick and Beam Buildings. 2. Costs are based on approximately 5,000 – 50,000 sq.ft. Smaller offices may require a larger allowance per square foot and larger offices may require a smaller allowance per square foot due to fixed costs, the applicability of economies of scale, and other factors. 3. Scope of work is a full build-out from base-building conditions. The costs may vary greatly for partially built out spaces. 4. Items such as furniture, building permits, disbursements, communications equipment /cabling, etc... are additional costs. 5. Trades working overtime hours, evenings and on weekends may increase costs beyond the suggested ranges. 6. Does include Mechanical & Electrical Engineers and Interior Designer fees. 7. Does include the costs of HVAC modifications. DISCLAIMER: The prices outlined are only meant to be a rough guideline. Extenuating circumstances such as changing material costs, labour costs, rushed work etc… may affect build out costs. For a more accurate construction quote, please contact Gio Tan Design.

Upload: chris-fyvie

Post on 09-May-2015

779 views

Category:

Real Estate


0 download

DESCRIPTION

office space toronto, toronto office space, office search toronto, office space in toronto, office rentals toronto, commercial office space, commercial real estate toronto, office rent toronto, toronto offices for lease

TRANSCRIPT

Page 1: Giotan's leasehold improvement estimates for brick and beam offices march 2013

upgraded office

gioTaN’s LeasehoLd improvemeNTs esTimaTes for Brick aNd Beam offices march 2013

GIO TAN DESIGN ASSOCIATES INC. T 416 926 1937 | www.giotandesign.com

pLease fiLe for your fuTure iNTerior desigN [email protected] | [email protected] | [email protected]

Basic office $34/sq.fT. – $45/sq.fT.

Typically has a higher ratio of open areas to partitioned offices, meeting rooms, etc…

• Painted,insulateddrywallpartitionsfromfloortoceiling.• Solidcore7’painteddoorsandframeswithbuildingstandardhardware.• Mechanical,sprinklersandlightingrelocation.• Voice/datarough-inandonepoweroutletperperson.• Paintthroughouttheentireoffice.• Existingwoodflooring.

upgraded office $46/sq.fT. – $58/sq.fT.

Typically has a more equal ratio of open areas to partitioned offices, meeting rooms, etc…

• Painted,insulateddrywallpartitionsfromfloortoT-barwithrevealsarounddoorsandframesatceiling.

• Vinylwallcoveringsinsomeprincipalareas.• Drywallfeatureceilingswithpotlightsandlineardiffusersinthereceptionandboardroom.

• 9’,solidcorewoodveneerdoorswithstandardhardwareandsidelights.• Voice/datarough-insandpoweroutletsasrequired.• Custommillworkinkitchen/lunchroom,andstorageareas.• Existingwoodflooringand/ornewcarpet(32oz).

premium office $59/sq.fT. aNd up

Typically has a higher ratio of partitioned offices, meeting rooms, etc… to open areas.

• SameastheUpgradedOfficewithupgradedwallfinishesinallmajorareas.• Wooddoorsandframesinsomeareasusingsuperiorwoodveneers,heavydutyleverhardware,andglasspartitionsinmanyareas.

• Highqualityfinishesandvinylwallcoveringsinreceptionandboardroom.• Speciallightinganddrywallceilingsinreception,allmeetingroomsandsomeprivateoffices.

• Built-incustommillworkinboardroom,reception,mailrooms,kitchen/lunchroom,storageareasandasrequired.

• Premiumwoodandstoneflooringand/ornewcarpet(+32oz)inspecifiedareas.

Based on the following assumptions:

1.ThecostsareonlyassociatedwithAClassBrickandBeamBuildings.

2.Costsarebasedonapproximately5,000–50,000sq.ft.Smallerofficesmayrequirealargerallowancepersquarefootandlargerofficesmayrequireasmallerallowancepersquarefootduetofixedcosts,theapplicabilityofeconomiesofscale,andotherfactors.

3.Scopeofworkisafullbuild-outfrombase-buildingconditions.Thecostsmayvarygreatlyforpartiallybuiltoutspaces.

4.Itemssuchasfurniture,buildingpermits,disbursements,communicationsequipment/cabling,etc...areadditionalcosts.

5.Tradesworkingovertimehours,eveningsandonweekendsmayincreasecostsbeyondthesuggestedranges.

6.DoesincludeMechanical&ElectricalEngineersandInteriorDesignerfees.

7.DoesincludethecostsofHVACmodifications.

disclaimer:Thepricesoutlinedareonlymeanttobearoughguideline.Extenuatingcircumstancessuchaschangingmaterialcosts,labourcosts,rushedworketc…mayaffectbuildoutcosts.

Foramoreaccurateconstructionquote,pleasecontactGioTanDesign.