gills road footpath albany auckland · locality plan 20302-s00 r1 154 centreway road orewa auckland...

17
LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email [email protected] DRAWINGS S00 COVER SN1 STRUCTURAL NOTES SN2 STRUCTURAL NOTES S01 EXISTING SITE PLAN S02 PROPOSED SITE PLAN S03 SERVICES S04 BOARDWALK A PLAN S05 - S08 BOARDWALK TYPICAL DETAILS S09 - S10 TYPICAL CONCRETE PATH DETAILS S11 TIMBER POLE RETAINING WALLS PLAN S12 - S13 TIMBER POLE RETAINING WALLS DETAILS S14 TYPICAL SILT CONTROL DETAILS GILLS ROAD FOOTPATH ALBANY AUCKLAND SITE AERIAL LOCALITY PLAN (NOT FOR CONSTRUCTION) TENDER ISSUE

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

LOCALITY PLAN

20302-S00 R1

154 Centreway Road

Orewa

Auckland

P.O. Box 150

Orewa

Auckland

Telephone (09) 426-5702

Email [email protected]

DRAWINGSS00 COVERSN1 STRUCTURAL NOTESSN2 STRUCTURAL NOTESS01 EXISTING SITE PLANS02 PROPOSED SITE PLANS03 SERVICESS04 BOARDWALK A PLANS05 - S08 BOARDWALK TYPICAL DETAILSS09 - S10 TYPICAL CONCRETE PATH DETAILSS11 TIMBER POLE RETAINING WALLS PLANS12 - S13 TIMBER POLE RETAINING WALLS DETAILSS14 TYPICAL SILT CONTROL DETAILS

GILLS ROAD FOOTPATHALBANYAUCKLAND

SITE

AERIAL LOCALITY PLAN

(NOT FOR CONSTRUCTION)TENDER ISSUE

Page 2: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

Project

Title

Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

GENERAL STRUCTURAL NOTES

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleNTS

Scale vert. exag.

SN1

FOUNDATIONS1. Foundation material shall be approved by the Engineer for safe

bearing capacity before construction of Footings. Blinding concrete to be used where necessary, typically not shown on drawings. Foundations are assumed to have a minimum safe bearing capacity of 100kPa unless noted otherwise. This may be deemed satisfied by compliance with NZS 3604 section 3 (ultimate bearing strength of 300kPa). If foundation material is less than 100kPa safe bearing, the Design Engineer is to be contacted for alternative design.

2. Sub grade below Base Course for slabs shall be suitable material compactedto 95% of maximum dry density determined by test NZS 4402:Test 4.1.1. or equivalent, unless otherwise noted.

3. All walls and columns shall be concentric with supporting foundations unlessotherwise noted on drawings.

4. No service excavations shall be formed within a 1:1 line of the underside ofany foundation unless specifically instructed by the Engineer

5. All backfill behind retaining walls is to be approved free-draining material.Drain coils are to be fitted with geotextile 'filtersok' and drain toapproved silt traps.

STRUCTURAL NOTESGENERAL1. These structural drawings shall be read in conjunction with theSpecifications, Architectural, Civil, and Engineering Service documents. Referto Architectural Drawings for all levels, falls, setouts and dimensions.

2. Unless otherwise noted, all levels are in metres, all dimensions are inmillimetres and shall be checked by contractor prior to construction.

3. Dimensions shall not be obtained by scaling from drawings. If in doubt, ask.

4. All discrepencies shall be referred to the Architect or Engineer forresolution before proceeding with the work.

5. The stability of the structure during construction including all temporaryworks and propping are the responsibility of the contractor / builder.

6. All materials and workmanship shall be in accordance with the currentCodes of Practice except where varied by the Specification and/or Drawings.

7. Where proprietary products are specified in the documents, thecontractor may submit an alternative product for approval.

8. Temporary work and propping is the responsibility of the Builder.

ABBREVIATIONS

UB Universal BeamTFB Tapered Flange BeamUC Universal ColumnEA Equal AngleUA Unequal AngleCHS Circular Hollow SectionSHS Square Hollow SectionRHS Rectangular Hollow SectionPFC Parallel Flange ChannelP/C Pre-camberPL Steel PlateSG Stress Graded timber, available in grade 6, 8, 10, and 12G Only available in G8, verified green timber, typically used in wet service

situationsGL Glulam Timberc/c Centre to centre distance (also CRS)

DESIGN LOADS

3. Imposed Loads

LOADINGS

ELEMENTS UDL Qb kPa Pt Loads Qb kN

Decks 2.0 1.8Roofs 0.25 1.1

Dom. Floors 1.5 1.8Comm. Floors 3 - 7 2.7 - 4.5

ELEMENTS LOADING kPa (Plan area)

Timber Framed Walls 0.5Timber Framed Walls

+ Brick Veneer 2.120 Series Masonry 4.125 Series Masonry 5.1

SITE WORKS1. Origin of levels is the Lands and Survey (L&S) datum

- refer to Survey drawings.

2. All drawings to be read in conjunction with the specification.

3. Existing services are shown indicatively only. Before construction commences,it is the contractor's responsibility to locate the position and depth of allservices that could be adversely affected by their operations.Inform Architect of any variations.

4. All work to be in accordance with the Territorial Authority standards.

5. Concrete for site works only to be 10MPa unless noted otherwise.

6. Catchpit positions and grate levels are approximate. Final positions areto suit kerb levels.

7. All work on public drains is to be carried out by an approved llicensed drain layer, to the relevant Territorial Authorities' standards.

8. Temporary batters to have a 1V:1H maximum slope, but also refer toany specific requirements in the geotechnical report.

9. Work to include the stripping of vegetation, topsoil, and any surfacedeleterious matter. This includes the breaking out of substructures andhard paving where required.

10. Care is to be exercised adjacent to existing trees that are to be retained.

11. The subgrade shall be inspected by the Geotechnical Engineer and proofrolled as necessary. Any soft spots shall be over-excavated and compactedback to level with imported GAP65 material.

12. The Contractor shall ensure the subgrade below reinforced concrete slabsis thoroughly soaked prior to slab construction where required to achievenatural optimum moisture content.

CONCRETE

1. Minimum concrete strengths shall be as shown in the specification.

2. Sizes of concrete elements do not include thickness of applied finishes.

3. No penetrations, chases or embedments of pipes other than those shownon the Structural drawings shall be made in concrete members withoutprior approval of the Engineer.

4. Finishes to concrete to be as per specification and Architectural drawings.

5. Contractor to submit all shop drawings of Precast Units prior tocommencement of work.

6. Proprietary Precast components referred to on these drawings shall bedesigned and detailed by the supplier and a copy of the documentationsubmitted to the Engineer.

7. Tolerances to be as per the specification.

8. All penetrations through concrete slabs shall be trimmed by 2-D12 bars to each edge of the penetrations. Trimmer bars to extend 600mm beyond the return of the penetration.

9. All beams to be suitably propped during construction unless other wised noted.

10. Chamfers shall be formed on all exposed corners, generally 15mm x 15mm

11. Ensure adequate gaps maintained between suspended concrete work and all non-structural elements

12. If construction joints are not shown, their location shall be the contractor's responsibility to suit the site conditions of the design. The Contractor is to allow for all construction joints necessary to complete the work, without causing distress to the structure. Location to be agreed with Architect and Engineer. In general, for slabs on grade, saw cuts (25mm deep x 5mm wide) are to be formed to produce a grid of 6.0m x 6.0m maximum, after the initial cure (approximately 24 - 48 hours after concrete pour).

13. All reinforced concrete slabs shall be cured in accordance with CCANZ "Reinforced Concrete Slab-on-Ground Floors"

1. Steel abbreviationsD12's, D16's etc Deformed grade 300E steel reinforcement to NZS 4671HD12's, HD16's etc Deformed grade 500E steel reinforcement to NZS 4671R6's, R10's etc Plain round grade 300MPa steel shear reinforcement to

NZS 3679.1665, 664, etc Mesh to NZS 3421. Grade 485 MPa.

REINFORCING

2. Minimum bend diameters of Class E steel bars, with yield strength 300MPaor 500MPa

a. Normali. Bar diameter (db) 6-20mm = 5db (dI)ii. Bar diameter (db) 25-32mm = 6db (di)

b. Stirrups or ties For deformed bars:

i. Bar diameter (db) 6-20mm = 4db

ii. Bar diameter (db) 25-32mm = 6db

For plain bars:i. Bar diameter (db) 6-20mm = 2db

ii. Bar diameter (db) 25-32mm = 3db

4. Minimum lap length as follows:a.Masonry lap lengths;

Grade 300 reinforcing = 40 x bar diameterGrade 500 reinforcing = 70 x bar diameter

b.Concrete lap lengths;

6. Welding and re-bending of reinforcement:

· Do not bend Grade 500E bars to diameters less than thosepermitted by NZS 3101 and NZS 3109.

· Do not re-bend Grade 500E microalloy bars of 16mm or less,unless the strict conditions of NZS 3109 can be met.

· Do not re-bend Grade 500E microalloy bars more than 16mmdiameter.

· Do not weld Grade 500E microalloy bars if it can be avoided.· No tack welding of reinforcing shall take place without explicit written

approval of the Engineer.

7. Minimum distribution steel shall be D12 at 300 centres

8. No Grade 500E QT bars shall be used.

9. Reinforcement laps to be to NZS3109. Mesh lap to be one mesh +25mm

10. Adequate support to all reinforcement shall be made by the use ofspacers, stools and / or the like.

11. Notation used for reinforcement fixing:

B/W Both waysB/F Both facesE/F Each faceV VerticalH HorizontalN/F Near FaceBOT BottomABR Alternative bars reversed

For example;

Bar Diameter Type Required Bend Diameter

R6 Stirrup or tie 12mmD10 Stirrup or tie 40mmD12/HD12 Normal 60mmD25/HD25 Normal 150mm

x

x

Ldh

CriticalSection

or 65

db

45.1

°

4db

db

b

0.5di

ConcreteStrength

SteelStrength

Lap Lengthfor Straight

Bars

Lap Lengthfor Hooked

Bars20 MPa 300 MPa 34 x db 17 x db20 MPa 500 MPa 56 x db 27 x db25 MPa 300 MPa 30 x db 15 x db25 MPa 500 MPa 50 x db 24 x db30 MPa 300 MPa 28 x db 14 x db30 MPa 500 MPa 46 x db 22 x db

1. All imposed loads have been calculated in accordance withAS / NZS 1170.1, and structural elements designed for the following loads

2. Permanent Loads

ELEMENTS LOADING kPa (Plan area)

Timber Floors 0.5Timber Decks 0.5Heavy Roof 0.85Light Roof 0.45

5. All Concrete Cover to reinforcing steel to be in accordance with drawings and /or referred to Engineer. Code required minimum values as follows.

Exposure Concrete Strength (MPa) MasonryClassification 17.5 20 25 30 40

Minimum cover (mm) Closed Interior 30 25 25 20 20 35 External (Inland) 50 40 35 30 25 45 Coastal Perimeter 65 50 40 35 30 50 Coastal Frontage* - - 50 45 40 60 Cast against Ground 75 75 75 75 75 - Cast against Ground with DPC 50 50 50 50 50* -

* Within 100m of high tide mark or within 500mm of high tide mark to the directionof the prevailing wind.

d3. Hook definitions;a. A 90° turn plus an extension of at

least 12 bar diameters at the freeend of the bar.

b. A semi-circular turn plus anextension of at least 4 bardiameters but not less than65mm at the free end of the bar.

c. A stirrup hook, which is defined asa 135° turn around a longitudinalbar plus an extension of at least 8stirrup bar diameters for plain barsand 6 stirrup bar diameters fordeformed bars at the free end of the barembedded in the core concreteof the member.

STRUCTURAL TIMBER

1. Timber beam shall be propped until dry to prevent premature creep.

2. All normal timber sizes given are nominal dimensions unless otherwise stated.

3. All glue laminated timber sizes are actual dimensions.

4. Timber treatment shall be specified and shall comply with the recommendationsof the Timber Preservation Authority. Generally all timber to be treated to the requirements of the Building Code. Refer to Architects drawings / specifications.Hazard Hazard Class Examples

Low H1.1 Interior linings, internal wallH1.2 Wall framing, skillion roof framing

Moderate H3.1 Cladding, fascia, wall framingH3.2 Deck bearers, joists,boards

High H4 Fence posts, landscaping timberSevere H5 House piles, retaining wallsMarine H6 Marinas, wharf piles

5. All Structural timber to be stress graded SG8 Pinus Radiata unlessnoted otherwise.

6. Where timber connections are exposed to the weather, all steelconnectors shall be galvanised (unless in the sea spray zone which casethey are to be stainless steel). Faces and edges of steel elements whichrest against tanalised timber shall be painted before positioning. Minimumconnections are 5mm plate and 2/M16 bolts unless noted otherwise.

A

B. NEL

P. JARVIE

I. HUTCHINSON

TENDER ISSUE

AUG 2017

AUG 2017

AUG 2017

FEB 2018

B. NEL

B.N N.B I.H

Page 3: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

Project Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

GENERAL STRUCTURAL NOTES

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleNTS

Scale vert. exag.

SN2

STRUCTURAL STEEL1. Steel members shall be the following grade unless otherwise noted.

Member Grade

TFCs, TFBs, EAs ≤ 100x100 300UAs < 150x90 300UBs, UCs, PFCs, EAs > 100x100 300 plus (typ BHP Australia)UAs ≥ 150x90 300 plus (typ BHP Australia)RHS, SHS, CHS 350

2. All cold formed sections including cold rolled purlins to conform to AS1538 and shall have a minimum yield stress of 450 MPa, unless otherwisenoted.

3. The ends of all hollow sections shall be sealed with 3mm min. steel plate,seal welded unless otherwise noted.

4. All plates shall be 6mm min. unless otherwise noted.

5. All Holding Down bolts and other fixing devices shall have aminimum yield stress of 250 MPa unless otherwise noted.

6. All dry pack non-shrink mortar / grout shall have a compressivestrength of at least 30 MPa.

7. Surface preparation and corrosion protection of steel work shall be inaccordance with the Architectural Specifications U.N.O. Any damage to theprotective coating of steel work shall be made good. Generally all structuralsteel to be hot dip galvanised to a minimum of 600g/m².

8. Bolts, unless noted otherwise;a. Bolts and nuts shall be Grade 8.8 high strength steel to AS 1252: "ISO Metric High Strength Steel Bolts" unless noted otherwise.b. Typically all edge distances to be 30mm U.N.O.c. Gauge distances shall be 70, 90 or 140 as per AISC.d. All bolts shall have at least one washer which shall be not less than twice the nominal bolt size in diameter.e. All bolts shall have a spring washer in addition to the washer

located directly above the nut.f. The bolt shall be selected so that the projection beyond the nut is not less than two threads and not more than10mm.g. Heavy duty square washers to be placed below bolt heads in timber

applications.h. Heavy duty round washers to be placed below bolt heads in steel

applications.i. Do not weld bolts under any circumstances

9. Holing:a. Holes cut for bolts shall be drilled or punched and not gas cut.b. Common detailing components: Standard holes - D+2mm

Standard slotted holes - D+2mm wide and 2.5D long unless noted otherwise.

H.D. bolts - 1.33D composite simple (standard washer) (fabricated washer).

10. Welds:a. All welded connections shall be metal arc welded as shown on the drawings. All welding shall comply with AS 1554:Part 1 "Welding of Steel structures" unless noted otherwise. Welds exposed in the completed building and in particular butt welds of stock lengths shall be neatly finished and ground smooth.b. All butt welds shall be full penetration.c. Welding of hollow sections shall incorporate internal sections or backing plates as necessary to complete the specified weld.d. All welds on drawings unless otherwise noted to be 6mm structural purpose fillet welds all round.

11. Steelwork drawings show the design intent. The Contractor is toprepare shop drawings for review. No fabrication is to commence until shopdrawings are reviewed by the Engineer and written notification issued.

12. All reactions shown are in kN.

13. Where the weight of a steel section is omitted, the heaviest commonlyavailable steel section shall be utilized.

14. All bolts shall be a minimum of M12 and all welds shall be a minimum of6mm continuous fillet (SP)

15. All nuts and turning bolts are to have approved washers. All exposed nuts,bolts and washers to be galvanised and to have protective coatings to matchgeneral steelwork, unless noted otherwise.

16. All rod bracing to be a minimum of grade 300 plain reinforcing bar,unless noted otherwise.

17. All sealed sections to be galvanised shall have vent holes.To be shown on shop drawings.

18. Purlin cleats are to be in accordance with the manufacturer's standard detailsexcept where the top of the flange of the purlin is more than 300mm abovesupporting steelwork 75 x 75 x 8 angle cleats shall be used. Purlins shall befixed using approved flanged bolts and washers.

19. Ceiling systems, ductwork, etc. to be suspended from purlins shall be fixedwith hook bolts through purlin web. The flanges of the purlins orgirts shall not be holed.

20. All dissimilar metals shall be separated by a DPC layer or other method asapproved by the Engineer.

21. All steel elements shall be separated from treated timber by DPC layer orother method as approved by the Engineer.

REINFORCED MASONRY

1. Generally all concrete block masonry construction to be in accordance withNZS 4229:2013, and NZS 4210:2001.

2. Refer to figure 8.1, NZS 4229:2013 for D16 trimmers around openings.

3. The top of all the concrete block walls to be continuous bond beamB1 or B2, as per figure 10.1 and 10.2, NZS 4229:2013.Continuous bond beam type B3 (figure 10.2, NZS 4229:2013) to beprovided at mid-floor level of 2 storey walls.

4. Minimum reinforcing to be as follow unless shown otherwise:

5. In general only load bearing masonry is shown on the structural drawings.All non-load bearing masonry is to be separated from structure by a12mm compressible joint.

6. Concrete blocks shall have a minimum compressive strength of 12.5MPa,to NZS 4210. Density to be greater than 1750kg/m³.

7. Mortar shall comply with the requirements of NZS 4210.

VERTICAL HORIZONTAL VERTICAL HORIZONTAL

RUNNING D12@800crs D12@800crs D12@600crs D12@600crs

STACK D10@400crs D10@400crs D12@400crs D12@400crs

15 SERIES 20 SERIES

8. All cores with reinforcement to be grout filled as a minimum. Additionalcovers filled as noted on the drawings. Grout shall have a slump of 230mm anda compressive strength in accordance with NZS 3604:2011 clause 4.5.3.

9. In general, walls to be full height before grouting cores. Washout portsto be provided at bottom course where vertical bars are located for all wallswhere poured height exceeds 1.2m. Mortar joints to be 10mm thick withblocks fully bedded and perpends filled. Joints to be tooled at exposed orrendered surfaces.

10. Cores are to be cleaned of all mortar fines and droppings throughwashout ports which shall to be closed until inspected by engineer.

11. Grout to be added to ensure fill of cores with a maximum continuouspour height of 3600mm.

12. No construction of masonry on suspended floors is to take place untilfloor is fully de-propped.

13. All grade A masonry to be supervised by a registered mason, includinggrouting. In addition, all grade A & B masonry to be inspected by Engineerprior to grouting, or as required by the local authority.

14. Chasing of load bearing masonry only permitted as shown on theEngineer's drawings.

15. All grout shall be 20 MPa unless otherwise noted.

16. All masonry cells shall be solid filled with grout.

17. Control joints to be provided at no more than 6m centres or to approvalof the Engineer, as per NZS4229:2013

REINFORCED MASONRY RETAINING WALLS

1. The rear face of the blockwork shall be protected with three coatsof flint-kote, or similar approved waterproofing agent.The waterproofing agent shall be subsequently permanentlyprotected with hardiflex soft board or similar prior to placingscoria backfill. The waterproofing shall extend 200mm above theproposed finished ground level.

2. The drainage blanket behind the wall shall be formed with at least a300mm thick layer of 20/7 scoria or 40/20 drainage metal orapproved equivalent. The 100mm draincoil at the base of the wallshall be free draining to a sealed stormwater system. Filter sockshall be placed between the draincoil and the scoria.

3. All concrete cast against and permanently exposed to theunprotected footing excavation shall provide a 75mm minimumcover to the reinforcing steel.

4. If the masonry retaining wall forms a perimeter foundation wall,the 20/7 scoria / 40/20 drainage metal or approved equivalentshall be completed 200mm below the proposed finishedground level. Filter cloth (Terram 2000 or approved equivalent)shall then be placed over the top level surface of the abovementioned approved drainage media. The filter cloth shall lap100mm vertically up the wall and 300mm horizontally over theclay/scoria interface. A 200mm compacted depth of topsoil shallthen be placed over the filter cloth.

5. The ground profile behind the top of the wall shall direct all overlandrun-off away from the rear face of the retaining wall.

6. If specified, the lower concrete floor slab shall be poured andcured prior to backfilling behind the masonry retaining wall.

7. Control joints to be adequately waterproofed (Sikadur Combiflexor approved equivalent).

8. Where rear placed reinforcing is specified by the Engineer,reinforcing shall be placed with maximum 60mm cover from theback face of the wall.

12. Excavation shall be carried out immediately prior to constructingthe retaining wall. Exposed cut batters shall be protected with aweather-proof polythene cover until the wall has been constructed.

13. Excavations shall be completed in stages to restrict unsupportedlengths of cut batters.

14. Excavations in excess of 1.2 m height or within 1.2 m of a property boundary shall be directly supervised by the Engineer. Notification must be given bythe Contractor, to the Engineer, prior to commencing the excavation.

15. Excavations for concrete encasement shall be carried out by a machine augerto the dimensions detailed on the drawings. All surplus spoil shall beremoved from the site.

16. The augered excavations shall be accurately located, with sufficient allowancefor pole back slope and concrete encasement.

17. Unless otherwise noted, all locating dimensions refer to the front face ofthe poles at the base of the wall.

18. Unless otherwise noted, the ground profile above and below the wall shallbe level and free draining.

19. The foundation encasement shall be Ordinary Grade concrete complyingwith NZS 3109 “Specification for Concrete”, having a minimum 28 daycompressive strength of 20.0 MPa.

20. A 100 mm concrete punch pad shall be provided at the base of theexcavation prior to placing the timber poles.

21. The concrete encasement shall be well compacted by tamping and/orwvibrating ensuring an even concrete encasement cover at the base ofthe wall. The concrete encasement shall be sloped down and away from thepole base to prevent water ponding at the base of the pole.All timber polesshall be accurately placed and adequately braced prior to placing theconcrete encasement. The pole bracing shall not be removed until 48 hoursafter the placement of the concrete encasement.

22. A 100 mm perforated draincoil shall be placed at the base of the rear ofthe wall, prior to placing the 20/7 scoria or 40/20 drainage metal orsimilar approved. The invert of the 100 mm PVC perforated pipe shall be aminimum of 200 mm below the finished ground level in front of the wall.The 100 mm PVC perforated pipe shall be protected with 'filtersok' and be free draining into a sealed stormwater system.

TIMBER POLE RETAINING WALLS

1. Unless otherwise stated, all round poles shall be “Searle” machine peelednormal density pine complying with the requirements ofNZS 3605 “Load Bearing Round Timber Piles” andNZS 3603 “Timber Structures Standard”. “Morbark” machine shaved polesmay only be used at the approval of the Engineer.

2. All poles are expressed as a minimum “Small End Diameter” (SED) with anaverage taper of 6 mm per metre length.

3. Unless otherwise stated all square posts shall be visually graded machinestress graded complying with the requirementsNZS 3603 “Timber Structures Standard”.

4. All poles and posts shall be “tanalised” to a minimum “Tanalith”preservation retention of 16 kg/m³ (H5) or approved equivalent.All poles and posts must be positively identified with their Hazard Class onthe butt end of the pole when delivered to site.

5. Poles or posts shall not be rolled or dropped from the delivery vehicle.Any pole with evidence of handling damage shall not be used andshall be removed from the site.

6. Cutting rebates and / or bored holes within the timber shall be avoidedwherever possible. If necessary, the exposed surfaces shall be liberallycoated with a brush application of either “Ensele”, pentachlorophenol,“Tanalith” concentrated solution or copper napthenate or creosote.Re-protected areas shall not be placed within 300 mm offinished ground level.

7. Unless otherwise noted, concrete encased poles shall be installed SEDupwards whilst driven timber piles shall be installed SED downwards.

8. Unless otherwise noted, all timber poles and posts shall be installed with avertical layback of 1H: 20V and spaced at 1200 centres vertically.

9. All timber rails, unless otherwise noted, shall be rough sawn timber,150 mm deep with a thickness and grade as specified and tanalised to aminimum “Tanalith” preservative retention of 12 kg/m³ (H4) orapproved equivalent.

10. Rails shall be installed horizontally and where possible multi-span withstaggered butt joints. All rails shall be securely nailed to the rear of thetimber poles with 100mm x 4.0mm galvanised flat head nails.

11. The timber face walls shall be continuous both vertically and horizontally.Hit and miss placement and / or galvanised wire netting is not permitted.

STRUCTURAL NOTES

Title

P. WILSON

B. NEL

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

A TENDER ISSUE FEB 2018B.N N.B I.H

Page 4: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

P

P

P

P

P

P

G

6

7

7

7

7

8

8

8

8

8

9

9

9

9

9

9

10

10

10

10

10

10

10

10

11

11

11

11

12

12 12

13

13

14

14

15

15

16

16

17 18 19 20 21

22

22

23

23

23

23

24

24

25

25

25

26

26

26

27

27

2728

28

28

29

29

29 30

30 30

31

31 31

31

31

32

32 32

32

32

33

33 33

33

33

33

34

34

34

35

35

35

36

36

37

37

37

38

38

39

39

40

40

4141

41

41

42

42

43

43

43

44

44

45

45

46

46

47

47

3737

40

41

41

42

43

10

P

P

P

P

13

13

14

14

15

15

16

17

18

19

22

20

21

36

37

38

39

40

43

44

P

36

37

38

39

40

43

44

P

3738

3940

41

42

GILLS ROAD BRIDGE

GILLS ROAD

GOLD STREET

TENNIS COURTS

SIGNIFICANT ECOLOGICALAREA (SEA)

SIGNIFICANT ECOLOGICALAREA (SEA)

LUCAS CREEK

LIVING STREAM ROAD

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

EXISTING SITE PLAN

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:1250 @ A3

Scale vert. exag.

S01

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

N. BROAD

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 5: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

P

P

P

P

P

P

G

6

7

7

7

7

8

8

8

8

8

9

9

9

9

9

9

10

10

10

10

10

10

10

10

11

11

11

11

12

12 12

13

13

14

14

15

15

16

16

17 18 19 20 21

22

22

23

23

23

23

24

24

25

25

25

26

26

26

27

27

2728

28

28

29

29

2930

30 30

31

31 31

31

31

32

32 32

32

32

33

33 33

33

33

33

34

34

34

35

35

35

36

36

37

37

37

38

38

39

39

40

40

4141

41

41

42

42

43

43

43

44

44

45

45

46

46

47

47

3737

40

41

41

42

43

10

P

P

P

P

13

13

14

14

15

15

16

17

18

19

22

20

21

36

37

38

39

40

43

44

P

36

37

38

39

40

43

44

P

3738

3940

41

42

GILLS

ROAD

GOLD STREET

SIGNIFICANT ECOLOGICAL AREA (SEA)

SIGNIFICANT ECOLOGICAL AREA (SEA)BOARDWALK A) 30m OVERALLCHAINAGE 165m - 195m

TIMBER POLE RETAINING WALL 2)10m OVERALL

CHAINAGE 135m - 145m

TIMBER POLE RETAINING WALL 3)10m OVERALL

CHAINAGE 215m - 225m

TIMBER POLE RETAINING WALL 1)6m OVERALL

CHAINAGE 100m - 106mPROPOSED CONCCRETE PATHS - REFER TYPICAL DETAIL

PROPOSED PEDESTRIAN BRIDGE- BY OTHERS

EXISTING ONE LANE BRIDGE 'GILLSROAD BRIDGE'

LUCAS CREEK

LUCAS CREEK

EXTENT OFWORKS

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

PROPOSED SITE PLAN

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:1250 @ A3

Scale vert. exag.

S02

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

PROPOSED OVERALL SITE PLANSCALE 1:1250

Boardwalk

Boardwalk A)

DECK AREA EW'S AREA EW'S VOLUME

50m² 10m² 10m³

POTENTIAL SEAREMOVAL

NIL

ASSET

FOOTPATH 370m² 100m³ NIL

RETAINING WALL 1)

RETAINING WALL 2)

RETAINING WALL 3)

RETAINING WALL X)

EW'S AREA EW'S VOLUME

6m² 2m³

10m² 3m³

10m² 3m³

24m² 12m³

RETAINING WALL

RETAINING WALL X) REFERS TO TWO SMALL WALLSINSTALLED TO BOARDWALK A'S APPROACHES

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 6: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

11

11

11

12

13

14

15

22 23 24

25

26

27

28

29 3031

31

31

32

32

32

33

33

34

35

P

P

13

13

14

14

15

15

16

17

18

19

22

20

21

CHORUS - HIGH CAPACITY FIBRE & COPPER

VECTOR - GAS

CHORUS - HIGH CAPACITY FIBRE

CONTRACTOR TO POTHOLE CHORUSSERVICE BEFORE ESTABLISHING ON SITE

P

2223 2322

ALL LIZARD MANAGEMENT INACCORDANCE WITH BIORESEARCHRECOMMENDATIONS

ALL VEGETATION REMOVAL / PRUNINGIN ACCORDANCE WITH ARBOLABRECOMMENDATIONS

ALLOW TO STOP FOOTPATH 5m FROMEXISTING LEANING POWER POLE

5

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

SERVICES AND PATHS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:500 @ A3

Scale vert. exag.

S03

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

LEGEND:

VECTOR - OVERHEAD POWER

VECTOR - BURIED GAS

CHORUS - HIGH CAPACITY COPPER & FIBRE

CONCRETE FOOTPATH ADJACENT S.E.ASCALE 1:200

SERVICE PLANSCALE 1:500

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 7: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

A

S05

A

S05

2.5m TYPICAL

1.6

5 m

CONCRETE APPROACH SLAB 125mm THICKWITH SE62 MESH PLACED WITH 35MMTOP COVER WITH 4KG/M³ BLACK OXIDE

TIMBER POLE WALL TOSUPPORT APPROACH SLAB -REFER TYPICAL DETAILS

CONCRETE APPROACH SLAB 125mm THICKWITH SE62 MESH PLACED WITH 35MMTOP COVER WITH 4KG/M³ BLACK OXIDE

5/300x50mm SG8JOISTS

QUARTER PINTNOGGING

145x45mm GRIPSERTDECK BOARDS

14 GAUGE x 100mm LONG BUGLEHEAD HEX HEAD SCREW PRE DRILLEDINTO JOIST AND COUNTER SUNK INTODECKING - STAINLESS

1.35m FALLS FROMHEIGHT BARRIER -REFER TYPICAL DETAILS

ROAD CENTERLINE

EDGE OF SEAL

'TOP OF BANK'

'TOP OF BANK'

'BOTTOM OF BANK'

EDGE OF SEAL

0.6

m

0.5

m

0.3

m

RELOCATE EXISTING SIGNS

0.3

m

1.35m FALLS FROMHEIGHT BARRIER

BOARDWALK A)AREA = 50m²

ALL LIZARD MANAGEMENT INACCORDANCE WITH BIORESEARCHRECOMMENDATIONS

ALL VEGETATION REMOVAL / PRUNINGIN ACCORDANCE WITH ARBOLABRECOMMENDATIONS

RELOCATE CHEVRON BOARDS

INSTALL RM7 HAZARD MARKERS TO HANDRAIL

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

BOARDWALK A

PLAN

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:100 @ A3

Scale vert. exag.

S04

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

NOTES:· ALL TIMBER POLES TO BE TREATED TO H5 & TO BE 38MPa· ALL TIMBER JOISTS, BEARERS, BRACES, PACKERS, TPRW

RAILS TO BE TREATED TO H4 (MIN) & TO BE PINE SG8· GRIPSERT DECK BOARDS TO BE TREATED TO H3.2· ALL SITE CUT/TRIMMED TIMBER TO BE SITE COATED WITH

METALEX OR SIMILAR· ALL NAILS, BOLTS, SCREWS BRACKETS TO BE STAINLESS

STEEL (MIN 316) UNLESS NOTED OTHERWISE· STAINLESS STEEL BOLTS TO BE GRADE 316-A4-70· DRAWING TO BE READ IN CONJUNCTION WITH AUCKLAND

TRANSPORT 'TYPICAL WIRE FENCE RR009 & RR010· ALL LIZARD MANAGEMENT TO BE IN ACCORDANCE WITH

BIORESEARCH RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

· ALL VEGETATION REMOVAL TO BE IN ACCORDANCE WITHARBOLAB RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

BOARDWALK A PLANSCALE 1:100

LEGEND:

RETAINED HEIGHT

SIGNIFICANT ECOLOGICAL AREA (SEA)

1.0m

Boardwalk

Boardwalk A)

DECK AREA EW'S AREA EW'S VOLUME

50m² 10m² 10m³

POTENTIAL SEAREMOVAL

NIL

ASSET

FOOTPATH 370m² 100m³ NIL

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 8: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

B-B-

PLAN ON BOARDWALKSCALE 1:20

1000

1600

2/300x50 SG8 BEARERS

2/M12 STAINLESSSTEEL BOLTS w 50mmSQUARE WASHERS

2/M24 STAINLESS STEEL BOLTSw 50mm SQUARE WASHERS

2/M12 STAINLESSSTEEL BOLTS w 50mmSQUARE WASHERS

2/M24 STAINLESS STEEL BOLTSw 50mm SQUARE WASHERS

200mm SED POSTS

450mm Ø CONCRETE FOUNDATION

16

57

5

M12 BOLTS (GALV) WITH50x50x5mm SQUAREWASHERS

50x50x4mm SHS@ 1.2m CRS

NOTCH-OUT TOACCOMMODATE POSTAS REQUIRED

STAINLESS STEELJOIST HANGER

B-

B-

A-A-

SECTION SCALE 1:20

5 JOISTS@ 363mm CRS TYPICAL

1500CLEAR WIDTH

20

0

KEEP EXCAVATIONS / BENCHESTO MINIMUM. BACKFILL BENCHWITH LEAN MIX CONCRETE TOREINSTATE GROUND PROFILEFOLLOWING INSTALLATION &

CONCRETING OF PILES

145x45mm GRIPSERT DECK BOARDS

200mm SED POSTS IN450mm SOCKET

2/M24 STAINLESS STEELBOLTS w 50mm SQUAREWASHERS

5/300x50 SG8 JOISTS

1.35m TALL FALLS FROMHEIGHT BARRIER

M12 BOLTS (GALV) WITH50x50x5mm SQUAREWASHERS

2/300x50 SG8 BEARERS

50x50x4 SHS @1.2m CRS

EDGE OF SEAL

WHITE LINE

2S05

STAINLESS STEEL JOISTHANGER - TYPICAL

DECK BOARDS

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

BOARDWALK TYPICAL DETAILS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleAS SHOWN

Scale vert. exag.

S05

P. WILSON

B. NEL

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

2-

BARRIER CONNECTIONSCALE 1:5

NOTES:· ALL TIMBER POLES TO BE TREATED TO H5 & TO BE 38MPa· ALL TIMBER JOISTS, BEARERS, BRACES, PACKERS, TPRW

RAILS TO BE TREATED TO H4 (MIN) & TO BE PINE SG8· GRIPSERT DECK BOARDS TO BE TREATED TO H3.2· ALL SITE CUT/TRIMMED TIMBER TO BE SITE COATED WITH

METALEX OR SIMILAR· ALL NAILS, BOLTS, SCREWS BRACKETS TO BE STAINLESS

STEEL (MIN 316) UNLESS NOTED OTHERWISE· STAINLESS STEEL BOLTS TO BE GRADE 316-A4-70· DRAWING TO BE READ IN CONJUNCTION WITH AUCKLAND

TRANSPORT 'TYPICAL WIRE FENCE RR009 & RR010· ALL LIZARD MANAGEMENT TO BE IN ACCORDANCE WITH

BIORESEARCH RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

· ALL VEGETATION REMOVAL TO BE IN ACCORDANCE WITHARBOLAB RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 9: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

A-

2.5

m

8m

NO

MIN

AL

EAST COAST BAYS FORMATION

EAST COAST BAYS FORMATION

GILLS ROAD

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

BOARDWALK TYPICAL DETAILS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleAS SHOWN

Scale vert. exag.

S06

P. WILSON

B. NEL

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

NOTES:· ALL TIMBER POLES TO BE TREATED TO H5 & TO BE 38MPa· ALL TIMBER JOISTS, BEARERS, BRACES, PACKERS, TPRW

RAILS TO BE TREATED TO H4 (MIN) & TO BE PINE SG8· GRIPSERT DECK BOARDS TO BE TREATED TO H3.2· ALL SITE CUT/TRIMMED TIMBER TO BE SITE COATED WITH

METALEX OR SIMILAR· ALL NAILS, BOLTS, SCREWS BRACKETS TO BE STAINLESS

STEEL (MIN 316) UNLESS NOTED OTHERWISE· STAINLESS STEEL BOLTS TO BE GRADE 316-A4-70· DRAWING TO BE READ IN CONJUNCTION WITH AUCKLAND

TRANSPORT 'TYPICAL WIRE FENCE RR009 & RR010· ALL LIZARD MANAGEMENT TO BE IN ACCORDANCE WITH

BIORESEARCH RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

· ALL VEGETATION REMOVAL TO BE IN ACCORDANCE WITHARBOLAB RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 10: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

1-

BOARDWALK HANDRAIL ELEVATIONSCALE 1:20

1.35m TALL FALLS FROMHEIGHT BARRIER

M12 BOLTS (GALV) WITH50x50x5mm SQUAREWASHERS

50x50x4mm POSTS

'TYPICAL' FENCE PANELS TRIMMED TO SUITREDUCED POST SPACING - MIN WIRE SIZE7.5mmØ

300x50mm SG8 JOISTS

SUPPLEMENTARY NOGS REQUIRED TO ENSURE POST IS WITHIN200mm OF POST - NOG TO OUTER TWO JOISTS ONLY

FENCE POST CAP INSTALLEDFOLLOWING TRIMMING OF POSTHURRICANE MOTORWAY SECURITY FENCE BYSTEEL & TUBE OR APPROVED SIMILAR

M6 BOLTS & PROPRIETARY BRACKETTO PASS THROUGH POST - TEKSCREWS SHALL NOT BE PERMITTED

DUPLEX COATING FENCE TO COMPRISE POWDERCOATED KARAKA GREEN OVER HOT DIP GALV

3-

TYPICAL BEARER & PILE CONNECTIONSCALE 1:20

4-

ABUTMENT & PATH CONNECTIONSCALE 1:20

900

150

200

2/300x50 SG8 BEARERS2/M24 STAINLESS STEEL BOLTS w50mm SQUARE WASHERS

200mm SED POSTS IN450mm SOCKET

STAINLESS STEEL JOIST HANGERLUMBERLOK JH 45 X 190

300x50mm SG8 JOISTS

150 x 50 SG8 GRIPSERT DECK BOARDS2/300 x 50 SG8 BEARERS BOLTED TO PILE w 2/M24 STAINLESS STEELBOLTS & WASHERS

2 / 900mm LONG M16 GALV. REINFORCING BAR @600mm HOOKED INTO FOOTPATH SLAB. BAR TOHAVE 500 x 50 x 5mm GALV. WASHERS TO TIMBER.

300mm MINIMUM THICKNESSOF DRAINAGE METAL

150 x 50 SG8 RAILS w/2/3.15mmØx90mm NAILS PER POLE

MESH AS REQUIRED WITH35mm TOP COVER

200mm SED POLE450mm Ø CONCRETE FOUNDATION

WITH 20 MPa CONCRETE

LINKAGE BAR

150 x 50 SG8 GRIPSERT DECK BOARDS

DEBOND FIRST 150mm WITH DENSO TAPE2-14 GAUGE x 100mm LONG 316 STAINLESS STEELBUGLEHEAD HEXHEAD SCREWS, TYP. PRE-DRILLED INTOJOIST & COUNTERSUNK INTO DECKING

2-14 GAUGE x 100mm LONG316 STAINLESS STEEL

BUGLEHEAD HEXHEAD SCREWS,TYP. PRE-DRILLED INTO JOIST &COUNTERSUNK INTO DECKING

2-

HANDRAIL BASE PLATE TO CONCRETE PATHSSCALE 1:10

C-C-

HANDRAIL BASE PLATE SCALE 1:10

C-

C-

190

19

03

5

150

75

4-M12 RAMSET TRUBOLTS (GLAV) ORSIMILAR APPROVED

6mm STIFFENER PLATE 5mm FWAR

50x50x4 SHS

190x190x10mm PLATE

50x50x4mm SHS

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

BOARDWALK TYPICAL DETAILS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:20 @ A3

Scale vert. exag.

S07

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 11: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

D-D-

PILE SPLICESCALE 1:10

Ø219

8.2mmSTEEL SPLICE TUBE

BOLTS

FILL VOID BETWEEN TIMBER POLE &STEEL WITH 2 PART EPOXY - SIKADUR

31 CF NORMAL OR SIMILAR

D-

D-

1-

TYPICAL PILE SPLICE DETAILSCALE 1:20

2-

LONGITUDINAL BRACE DETAILSCALE 1:20

200mm SED POST

200mm SED POST

STEEL SPLICE TUBE

M12 - Gr 8.8 GALV

100x

75mm

BRA

CE100x75mm BRACE

M20

M20 STAINLESS

M20 STAINLESS

M20 STAINLESS

M20 STAINLESS

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

M20 - Gr 8.8 GALV

2-14 GAUGE x 100mm LONG 316STAINLESS STEEL BUGLEHEAD HEXHEADSCREWS, TYP. PRE-DRILLED INTO JOIST &COUNTERSUNK INTO DECKING

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

BOARDWALK TYPICAL DETAILS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:20 @ A3

Scale vert. exag.

S08

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

NOTES:· ALL TIMBER POLES TO BE TREATED TO H5 & TO BE 38MPa· ALL TIMBER JOISTS, BEARERS, BRACES, PACKERS, TPRW

RAILS TO BE TREATED TO H4 (MIN) & TO BE PINE SG8· GRIPSERT DECK BOARDS TO BE TREATED TO H3.2· ALL SITE CUT/TRIMMED TIMBER TO BE SITE COATED WITH

METALEX OR SIMILAR· ALL NAILS, BOLTS, SCREWS BRACKETS TO BE STAINLESS

STEEL (MIN 316) UNLESS NOTED OTHERWISE· STAINLESS STEEL BOLTS TO BE GRADE 316-A4-70· DRAWING TO BE READ IN CONJUNCTION WITH AUCKLAND

TRANSPORT 'TYPICAL WIRE FENCE RR009 & RR010· ALL LIZARD MANAGEMENT TO BE IN ACCORDANCE WITH

BIORESEARCH RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

· ALL VEGETATION REMOVAL TO BE IN ACCORDANCE WITHARBOLAB RECOMMENDATIONS AND THE RESOURCECONSENT CONDITIONS

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 12: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

TYPICAL CONCRETE FOOTPATH SECTIONSCALE 1:20

750 1.5m PATH

PROPOSED TIMBER DELINEATOR BOLTED TO CONCRETE BEAM

PROPOSED CONCRETEBEAM GABION ROCK

ECOJUTE MULCH MATTING OR SIMILAR

PROPOSED VEGETATION

PROPOSED 125mm THICKCONCRETE PATH w/ BROOM FINISH

PROPOSED TYPICAL WIRE FENCEAS REQUIRED (ADJACENT AREASWITH SUDDEN DROP OFF)

PROPOSED 500mm WIDETIE-IN PAVEMENT REPAIR

500

TIMBER DELINEATORSCALE 1:20

3000300

1350

TIMBER DELINEATOR EX 200x100mm H4 BOLTED TOCONCRETE BEAM

300mm LONG PACKER AT 1.35m CRS

2/M20 STAINLESS STEEL CHEM-SET STUD350mm LONG SIKA ANCHORFIX 3001

SHEET-FLOWSHEET-FLOW

SHEET-FLOW

WHITE

LINE

NOTE:CONCRETE PATH AREA = 370m²

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TYPICAL CONCRETE FOOTPATH

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:20 @ A3

Scale vert. exag.

S09

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 13: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

1-

TYPICAL FOOTPATH REINFORCEMENTSCALE 1:10

S07

2

200150

250

75mm COVER

50mm COVER

500

NO

MIN

AL

1.5m CLEAR WIDTH

BROOM FINISH CONCRETE PATH 25MPa CONCRETE WITH4kg/m³ BLACK OXIDE REINFORCED WITH SE62 MESHOVER 100mm THICK COMPACTED GAP40

EDGE BEAM THICKENING ASREQUIRED

D12 BARS AT 300mm CRS

D12 BARS TOP & BOTTOMPROPOSED 250x250mm

CONCRETE BEAM

TIMBER DELINEATOR EX 200x100mm H4BOLTED TO CONCRETE BEAM

TYPICAL WIRE FENCE

2/D12 BARS TOP & BOTTOM

R6 LINKS AT 300mm CRS

300mm LONG PACKER AT 1.35m CRS

2/M20 STAINLESS STEEL CHEM-SET STUD350mm LONG CRS SIKA ANCHORFIX 3001

RECESS BOLT HEAD & BACKFILLVOID WITH SIKAFLEX TANK

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TYPICAL CONCRETE FOOTPATH

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:20 @ A3

Scale vert. exag.

S10

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 14: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

-S13

-S13

9.6m

'TOP OF BANK'

PROPOSED TIMBER POLE RETAINING WALL

GILLS ROAD

EDGE OF SEAL

ROAD BOUNDARY

0.5

m

0.5

m

1.0

m

TYPICAL STEEL FENCESILT FENCE

-S12

-S12

6.0 m

PROPOSED FILL RETAINING WALL

EDGE OF SEAL EXISTING 225mm Ø STORMWATER LINE

EXTEND EXISTING 225mm ØSTORMWATER LINE BY ONE PIPE LENGTH

SCOUR RESISTANT BLANKET TOPCULVERT OUTLET FORMED WITH200mmØ ROCK

'TOP OF BANK'

TYPICAL STEEL FENCE

0.5

m

0.5

m

1.2

m

SILT FENCE

-

S12

-S12

9.6m

PROPOSED TIMBER POLE RETAINING WALL

PROPOSED TYPICAL FENCE TO WALL

GILLS ROAD

'TOP OF BANK'

EDGE OF SEAL

ROAD BOUNDARY

0.5

m

0.5

m

1.2

m

SILT FENCE

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TIMBER POLE RETAINING WALLS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleAS SHOWN

Scale vert. exag.

S11

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

TIMBER POLE WALL 1SCALE 1:100

TIMBER POLE WALL 2SCALE 1:100

TIMBER POLE WALL 3SCALE 1:100

AUG 2017

AUG 2017

AUG 2017

RETAINING WALL 1)

RETAINING WALL 2)

RETAINING WALL 3)

RETAINING WALL X)

EW'S AREA EW'S VOLUME

6m² 2m³

10m² 3m³

10m² 3m³

24m² 12m³

RETAINING WALL

RETAINING WALL X) REFERS TO TWO SMALL WALLSINSTALLED TO BOARDWALK A'S APPROACHES

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 15: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

TYPICAL POLE RETAINING WALL DETAILSCALE 1:40

TIMBER BARRIER DETAILSCALE 1:40

EMBED

MEN

T D

EPTH

(m

m)

WALL

HEI

GHT

(mm

)

ENCASEMENTDIAMETER (mm)

100

PUNCH P

AD

300mm MIN THICKNESS OF 20/7 SCORIAOR 40/20 DRAINAGE METAL

H5 TIMBERPOLES ATSPECIFIEDCENTRES

TIMBER RAILS CONTINUOUSOVER 3 SPANS. TANALISED TOH4 TREATMENT. REFER TABLEFOR MIN THICKNESS

FIRM CLAYSUBGRADE

TYPICAL FENCE

100mmØ DRAINCOIL WITH FILTERSOKFREE DRAINING TO LOW POINT

FINISHED SURFACE

TYPICAL FENCE

M12 BOLTS - GALV

SILT FENCE MIN 600mm TALL w200mm FABRIC EMBEDMENT

1

20

5 kPa SURCHARGE

NOTES:1. All poles shall be machined peeled and tanalised to a

minimum timber preservation treatment of H5 orapproved equivalent.

2. All poles shall be supplied and installed at the specifiedpole density.

3. The foundation encasement concrete shall have aminimum 28 days compressive strength of 20 MPa.

4. The timber rails shall be rough sawn timber to theminimum thickness and grade as specified. The timberrails should be continuous over three spans and thejoints should be staggered. The rail thickness shouldnot be made up from thinner rails.

5. The timber rails shall be tanalised to a minimum timberpreservation treatment of H4 or approved equivalent.

6. The retaining wall has been designed to supportvertical cuts in original firm clay subgrades only. Anyvariation to this design assumption should be referredto the Engineer.

7. The timber pole retaining wall shall be constructed inaccordance with the construction specification includedwith these specific design details.

8. The wall shall be constructed with a 1 in 20 verticallayback.

9. When a permanent hand-stand surface, driveway and/orthe like is constructed to the top of the retaining wall,it is recommended that the hard-stand surface is bothreinforced and secured with galvanised steel tiesthrough the top of each pole. Refer to the engineerfor specific construction details and recommendations.

10. Storm water and ground water should be divertedaway from the wall so that ponding does not occur.

11. These drawings are to be read in conjunction with thestandard specifications provided within the structuralcalculations.

RETAINING WALL DESIGNED IN ACCORDANCE WITH ASSUMED SOILPROPERTIES

DESIGN PARAMETERS:

UNIT WEIGHT OF RETAINED SOIL, gs = 18 kN/m³SOIL UNDRAINED SHEAR STRENGTH, Su = 50 kPaACTIVE COEFFICIENT OF EARTH PRESSURE, Ka = 0.5LIVE LOAD SURCHARGE, Q = 12 kPa

POLE SPACING = 1200mmPOLE DENSITY = NORMAL (38MPa)GRADE OF MACHINED TIMBER = SG8

POST CONNECTION DETAILSCALE 1:20

2/50 x 150 x 600mmLONG H4 TIMBER FIXEDTO BACK OF RAILING TOACCEPT COACHSCREWS

TIMBER RAILS

M12 COACHSCREWS200mm LONG

POST

TIMBER WEDGE TO SUIT

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TIMBER POLE RETAINING WALL

WALL 1 & 3

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:40 @ A3

Scale vert. exag.

S12

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

RETAINING WALL 1 & 3

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 16: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

TYPICAL POLE RETAINING WALL DETAILSCALE 1:40

TIMBER BARRIER DETAILSCALE 1:40

EMBED

MEN

T D

EPTH

(m

m)

WALL

HEI

GHT

(mm

)

ENCASEMENTDIAMETER (mm)

100

PUNCH P

AD

300mm MIN THICKNESS OF 20/7 SCORIAOR 40/20 DRAINAGE METAL

H5 TIMBERPOLES ATSPECIFIEDCENTRES

TIMBER RAILS CONTINUOUSOVER 3 SPANS. TANALISED TOH4 TREATMENT. REFER TABLEFOR MIN THICKNESS

FIRM CLAYSUBGRADE

TYPICAL FENCE

100mmØ DRAINCOIL WITH FILTERSOKFREE DRAINING TO LOW POINT

FINISHED SURFACE

TYPICAL FENCE

M12 BOLTS - GALV

SILT FENCE MIN 600mm TALL w200mm FABRIC EMBEDMENT

1

20

5 kPa SURCHARGE

NOTES:1. All poles shall be machined peeled and tanalised to a

minimum timber preservation treatment of H5 orapproved equivalent.

2. All poles shall be supplied and installed at the specifiedpole density.

3. The foundation encasement concrete shall have aminimum 28 days compressive strength of 20 MPa.

4. The timber rails shall be rough sawn timber to theminimum thickness and grade as specified. The timberrails should be continuous over three spans and thejoints should be staggered. The rail thickness shouldnot be made up from thinner rails.

5. The timber rails shall be tanalised to a minimum timberpreservation treatment of H4 or approved equivalent.

6. The retaining wall has been designed to supportvertical cuts in original firm clay subgrades only. Anyvariation to this design assumption should be referredto the Engineer.

7. The timber pole retaining wall shall be constructed inaccordance with the construction specification includedwith these specific design details.

8. The wall shall be constructed with a 1 in 20 verticallayback.

9. When a permanent hand-stand surface, driveway and/orthe like is constructed to the top of the retaining wall,it is recommended that the hard-stand surface is bothreinforced and secured with galvanised steel tiesthrough the top of each pole. Refer to the engineerfor specific construction details and recommendations.

10. Storm water and ground water should be divertedaway from the wall so that ponding does not occur.

11. These drawings are to be read in conjunction with thestandard specifications provided within the structuralcalculations.

RETAINING WALL DESIGNED IN ACCORDANCE WITH ASSUMED SOILPROPERTIES

DESIGN PARAMETERS:

UNIT WEIGHT OF RETAINED SOIL, gs = 18 kN/m³SOIL UNDRAINED SHEAR STRENGTH, Su = 50 kPaACTIVE COEFFICIENT OF EARTH PRESSURE, Ka = 0.5LIVE LOAD SURCHARGE, Q = 12 kPa

POLE SPACING = 1200mmPOLE DENSITY = NORMAL (38MPa)GRADE OF MACHINED TIMBER = SG8

POST CONNECTION DETAILSCALE 1:20

2/50 x 150 x 600mmLONG H4 TIMBER FIXEDTO BACK OF RAILING TOACCEPT COACHSCREWS

TIMBER RAILS

M12 COACHSCREWS200mm LONG

POST

TIMBER WEDGE TO SUIT

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TIMBER POLE RETAINING WALL

WALL 2

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

Scale1:40 @ A3

Scale vert. exag.

S13

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

RETAINING WALL 2

A TENDER ISSUE FEB 2018N.B P.J I.H

Page 17: GILLS ROAD FOOTPATH ALBANY AUCKLAND · LOCALITY PLAN 20302-S00 R1 154 Centreway Road Orewa Auckland P.O. Box 150 Orewa Auckland Telephone (09) 426-5702 Email info@hc.co.nz DRAWINGS

DEEP TRENCH

NOTE:POST SPACING CAN BE INCREASED FROM 2m TO4m IF SUPPORTED BY A 2.5mmDIAMETER HIGH TENSILE WIRE ALONG THE TOP WITH CLIPS

STEEL WARATAH OR WOODENFENCE POST (No. 3) DRIVEN

200 x 200mm

FLOW

COMPACTEDBACKFILL

200mm UPSLOPERETURN FABRIC

600m

m H

IGH

GEO

TEXT

ILE

FABRIC

FABRICFILTER

MINIMUM 400mm INTO GROUND

EVERY 200mm.

SILT FENCENTS

HAY BALE

PLACE AND STAKE HAY BALES,TWO STAKES PER BALE

COMPACTED BACKFILL

STAKE

BACKFILL AND COMPACT THE EXCAVATED SOIL

AS SHOWN, ON THE UPHILL SIDE OF THE

BARRIER TO PREVENT PIPING

BAILING TWINE

TRENCH 100 mm DEEP

NOTE:

HAY BALE BARRIERNTS

Project Title Sheet No.

No. DrawnRevision

GILLS ROAD FOOTPATH

ALBANY

AUCKLAND

20302

TYPICAL SILT CONTROL DETAILS

PO Box 150, Orewa 0946

154 Centreway Road, Orewa 0931

Ph: 09 426 5702 www.hc.co.nz

Chk. Appd. Date

Job No.

Design

Checked

Drawn

Approved

ScaleAS SHOWN

Scale vert. exag.

S14

N. BROAD

N. BROAD

P. JARVIE

I. HUTCHINSON

AUG 2017

AUG 2017

AUG 2017

AUG 2017

A TENDER ISSUE FEB 2018N.B P.J I.H