Gilbert Road Light Rail Extension Public Meeting November 15, 2016

Upload: others

Post on 14-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Gilbert Road Light Rail Extension

Public MeetingNovember 15, 2016

Page 2: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Project Team

Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture,

Construction Manager

2Gilbert Road Extension

Public Meeting, November 15, 2016

Page 3: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Future Transit System

Page 4: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Gilbert Road Extension

4Gilbert Road Extension

Public Meeting, November 15, 2016

Page 5: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Gilbert Road Extension Two travel lanes on Main Street One in each direction that will widen to four travel

lanes at Gilbert Road One roundabout Horne

Two stations Stapley Drive, east of intersection Gilbert Road, west of intersection

A park-and-ride/transit center Southwest corner of Main Street and Gilbert Road

5Gilbert Road Extension

Public Meeting, November 15, 2016

Page 6: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Horne Roundabout

6Gilbert Road Extension

Public Meeting, November 15, 2016

Page 7: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Harris Drive Intersection

7Gilbert Road Extension

Public Meeting, November 15, 2016

Page 8: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Stapley Drive Lane Configuration

8Gilbert Road Extension

Public Meeting, November 15, 2016

Miller Street to Stapley Drive

Stapley Drive to Lazona Drive

Page 9: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Stapley Drive Station

9Gilbert Road Extension

Public Meeting, November 15, 2016

Page 10: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Gilbert Road Station

10Gilbert Road Extension

Public Meeting, November 15, 2016

Page 11: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Gilbert Road Park-and-Ride

11Gilbert Road Extension

Public Meeting, November 15, 2016

Page 12: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Park-and-Ride Design Elements

Operator Building/TPSS Design Potential Bus Shelter

Wall Options

3’ Wall 8’ Wall 8’ Perforated Wall

Page 13: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Allen Traction Power Substation (TPSS)

Plan View

Page 14: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Proposed Art–Stapley Drive StationArtist: Hans van Meeuwen

14Gilbert Road Extension

Public Meeting, November 15, 2016

Page 15: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Proposed Art–Gilbert Road StationArtist: John Randall Nelson

15Gilbert Road Extension 

Public Meetings, April 28 and May 3, 2016

15Gilbert Road Extension

Public Meeting, November 15, 2016

Page 16: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Proposed Art–Gilbert Road Park-and-RideArtist: Matt and Maria Salinger, CoLAB studio, LLC

16Gilbert Road Extension

Public Meeting, November 15, 2016

Location

Page 17: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Proposed Art–Gilbert Road Park-and-RideArtist: Roberto Behar and Rosario Marquardt, R & R Studios

17Gilbert Road Extension 

Public Meetings, April 28 and May 3, 2016

Proposed Plaza

17Gilbert Road Extension

Public Meeting, November 15, 2016

Location

Page 18: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Construction Timeline

18Gilbert Road Extension

Public Meeting, November 15, 2016

Page 19: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Utility Relocation and Road Widening Activities include

Utility relocation Demolition of existing roadway, grading and repaving Construction of traffic lanes, curbs, gutter, sidewalks, streetscape

and lighting

19

Page 20: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Track and Station Installations Activities include

Installation of track Installation of overhead power lines Construction of stations and

integration of artwork Construction of park-and-ride facility

and traction power substations

20

Page 21: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Light Rail Testing and Operation

Activities include Signals and

communication Traction power

substation testing Overhead contact

system testing Safety certification

21

Page 22: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

What to Expect

Access maintained to businesses and homes Notification and coordination of construction

activities Modification to traffic lanes and sidewalks Day and night work Scheduled temporary utility interruptions

22

Page 23: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

Stay Connected

Visit project web page:valleymetro.org/gilbertroad Sign up for project

e-mail distribution Complete a

comment card Request a

presentation

23Gilbert Road Extension

Public Meeting, November 15, 2016

Page 24: Gilbert Road Light Rail Extension · Project Team Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture, Construction Manager 2 Gilbert Road

24

Questions and Answers