gilbert road light rail extension · project team valley metro city of mesa jacobs engineering,...
TRANSCRIPT
Gilbert Road Light Rail Extension
Public MeetingNovember 15, 2016
Project Team
Valley Metro City of Mesa Jacobs Engineering, Designer Stacy and Witbeck/Sundt, a Joint Venture,
Construction Manager
2Gilbert Road Extension
Public Meeting, November 15, 2016
Future Transit System
Gilbert Road Extension
4Gilbert Road Extension
Public Meeting, November 15, 2016
Gilbert Road Extension Two travel lanes on Main Street One in each direction that will widen to four travel
lanes at Gilbert Road One roundabout Horne
Two stations Stapley Drive, east of intersection Gilbert Road, west of intersection
A park-and-ride/transit center Southwest corner of Main Street and Gilbert Road
5Gilbert Road Extension
Public Meeting, November 15, 2016
Horne Roundabout
6Gilbert Road Extension
Public Meeting, November 15, 2016
Harris Drive Intersection
7Gilbert Road Extension
Public Meeting, November 15, 2016
Stapley Drive Lane Configuration
8Gilbert Road Extension
Public Meeting, November 15, 2016
Miller Street to Stapley Drive
Stapley Drive to Lazona Drive
Stapley Drive Station
9Gilbert Road Extension
Public Meeting, November 15, 2016
Gilbert Road Station
10Gilbert Road Extension
Public Meeting, November 15, 2016
Gilbert Road Park-and-Ride
11Gilbert Road Extension
Public Meeting, November 15, 2016
Park-and-Ride Design Elements
Operator Building/TPSS Design Potential Bus Shelter
Wall Options
3’ Wall 8’ Wall 8’ Perforated Wall
Allen Traction Power Substation (TPSS)
Plan View
Proposed Art–Stapley Drive StationArtist: Hans van Meeuwen
14Gilbert Road Extension
Public Meeting, November 15, 2016
Proposed Art–Gilbert Road StationArtist: John Randall Nelson
15Gilbert Road Extension
Public Meetings, April 28 and May 3, 2016
15Gilbert Road Extension
Public Meeting, November 15, 2016
Proposed Art–Gilbert Road Park-and-RideArtist: Matt and Maria Salinger, CoLAB studio, LLC
16Gilbert Road Extension
Public Meeting, November 15, 2016
Location
Proposed Art–Gilbert Road Park-and-RideArtist: Roberto Behar and Rosario Marquardt, R & R Studios
17Gilbert Road Extension
Public Meetings, April 28 and May 3, 2016
Proposed Plaza
17Gilbert Road Extension
Public Meeting, November 15, 2016
Location
Construction Timeline
18Gilbert Road Extension
Public Meeting, November 15, 2016
Utility Relocation and Road Widening Activities include
Utility relocation Demolition of existing roadway, grading and repaving Construction of traffic lanes, curbs, gutter, sidewalks, streetscape
and lighting
19
Track and Station Installations Activities include
Installation of track Installation of overhead power lines Construction of stations and
integration of artwork Construction of park-and-ride facility
and traction power substations
20
Light Rail Testing and Operation
Activities include Signals and
communication Traction power
substation testing Overhead contact
system testing Safety certification
21
What to Expect
Access maintained to businesses and homes Notification and coordination of construction
activities Modification to traffic lanes and sidewalks Day and night work Scheduled temporary utility interruptions
22
Stay Connected
Visit project web page:valleymetro.org/gilbertroad Sign up for project
e-mail distribution Complete a
comment card Request a
presentation
23Gilbert Road Extension
Public Meeting, November 15, 2016
24
Questions and Answers