LRT4394 About the Project The Gilbert Road Extension will extend light rail on Main Street from Mesa Drive to Gilbert Road in Mesa. At Gilbert Road, there are significant transit connections and the ability to serve the growing transit demand in the East Valley. This extension will attract new riders and increase development opportunities in central Mesa. PROJECT STATUS NEXT STEPS • Approximately 10,000 linear feet of utility lines (communications, water, electrical and waste water) have been installed. • A community celebration was held in the spring to showcase local businesses. • The Shop on Rewards program launched in the fall to encourage the community to shop local. • Impacted business owners can learn more about Valley Metro construction business assistance programs by visiting valleymetro.org/community_outreach. • A public meeting to update the community on the project art and urban design will take place in August 2017. MILES STATIONS 2 PARK-AND-RIDE/ TRANSIT CENTER 1 Underground utility work will be completed in late 2017. Construction will then begin on the roadway to make way for track installation. The extension is scheduled to open in late spring 2019. 1.9 TITLE TYPE GILBERT ROAD LIGHT RAIL EXTENSION FACT SHEET / Q2 2017 valleymetro.org/gilbertroad Michael Book Community Outreach Coordinator mbook@valleymetro.org 602.256.5811 /valleymetro /valleymetroconstruction Join the Gilbert Road Extension mailing list by contacting Michael Book. PROJECT FACTS

Upload: others

Post on 20-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GILBERT ROAD...2011-2015 2015-2016 2016-2019 LATE SPRING 2019 2019 PROJECT SCHEDULE 202 University Dr Alma School Rd Country Club Dr Center St Mesa Dr Stapley Dr Gilbert Rd Lindsay

LRT4

39

4

About the ProjectThe Gilbert Road Extension will extend light rail on Main Street from Mesa Drive to Gilbert Road in Mesa. At Gilbert Road, there are significant transit connections and the ability to serve the growing transit demand in the East Valley. This extension will attract new riders and increase development opportunities in central Mesa.

PROJECT STATUS

NEXT STEPS

• Approximately 10,000 linear feet of utility lines (communications, water, electrical and waste water) have been installed.

• A community celebration was held in the spring to showcase local businesses.

• The Shop on Rewards program launched in the fall to encourage the community to shop local.

• Impacted business owners can learn more about Valley Metro construction business assistance programs by visiting valleymetro.org/community_outreach.

• A public meeting to update the community on the project art and urban design will take place in August 2017.

MILES STATIONS

2PARK-AND-RIDE/ TRANSIT CENTER

1

Underground utility work will be completed in late 2017. Construction will then begin on the roadway to make way for track installation. The extension is scheduled to open in late spring 2019.

1.9

T I T L E

T Y P E

GILBERT ROAD

LIGHT RAIL EXTENSION

FACT SHEET / Q2 2017valleymetro.org/gilbertroad

Michael BookCommunity Outreach Coordinator

[email protected]

/valleymetro

/valleymetroconstruction

Join the Gilbert Road Extension mailing list by contacting Michael Book.

PROJECT FACTS

Page 2: GILBERT ROAD...2011-2015 2015-2016 2016-2019 LATE SPRING 2019 2019 PROJECT SCHEDULE 202 University Dr Alma School Rd Country Club Dr Center St Mesa Dr Stapley Dr Gilbert Rd Lindsay

LRT4

39

4

ROUTE MAP

FACT SHEET / Q2 2017valleymetro.org/gilbertroad

T I T L E

T Y P E

GILBERT ROAD

LIGHT RAIL EXTENSION

PLANNING DESIGN CONSTRUCTION COMPLETION

2011-2015 2016-20192015-2016 LATE SPRING 2019

2019

PROJECT SCHEDULE

202

University Dr

Cou

ntry

Clu

b D

r

Mes

a D

r

Cen

ter S

t

Stap

ley

Dr

Gilb

ert R

d

Lind

say

Rd

Alm

a Sc

hool

Rd

Syca

mor

e

Gre

enfie

ld R

d

Hig

ley

Rd

McKellips Rd

University Dr

Main St

Broadway Rd

Southern AveHar

ris

Dr

Hor

ne

Exte

nsio

n Rd

Superstition Springs

Sycamore/Main St

Gilbert

Rd/Main StMESA

20192019

Park-and-Ride

Transit Center

LEGEND

NValley Metro Rail

Gilbert Road Light Rail Extension

Note: Dates indicate anticipated calendar year openings

Michael BookCommunity Outreach Coordinator

[email protected]

/valleymetro

/valleymetroconstruction

BUDGET

Programmed Expended %Expended Forecast

Construction $120,915,024 $7,392,417 6% $120,915,024

Utilities $5,174,000 $371,814 7% $5,174,000

ROW $14,786,915 $574,517 4% $14,786,915

Public Art $732,189 $78,411 11% $732,189

Design/Management $25,562,383 $15,325,461 60% $25,562,383

Vehicles $16,858,710 $0 0% $16,858,710

TOTAL $184,029,221 $23,742,620 13% $184,029,221

Total budgeted $184,029,221* Excludes Transit Center/OPF Costs

Federal - CMAQ

Federal - STP

Mesa Local Match

City of Mesa TPANS

$9,270,271

$21,392,907

$107,130,157

$46,235,886

FUNDING ($M)