www.antaresgroupinc.com
Gila River Indian Community Renewable Energy Feasibility Study
Presented by:
ANTARES Group Inc. Tim Rooney Anneliese Schmidt Gila River Indian Community DEQ Rudy Mix
March 25, 2014 ANTARES Group Incorporated
![Page 2: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/2.jpg)
www.antaresgroupinc.com
Presentation Outline • Summary of Gila River Indian Community • Project overview • Summary of feasibility study assessment
– Solar projects – Biomass resource assessment – Biomass projects
• Project status and future plans
2
![Page 3: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/3.jpg)
www.antaresgroupinc.com
Gila River Indian Community • Central Arizona;
Maricopa & Pinal Counties
• Akimel O’odham & Pee Posh
• Reservation established 1859
• 374,000 acres • 23,000 members
(17,000 on GRIC) 3
![Page 4: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/4.jpg)
www.antaresgroupinc.com
Project Introduction • Solar and biomass energy feasibility study • Location: Evaluated projects at multiple locations
within Gila River community • Key Participants
– ANTARES (Tim Rooney, Ali Schmidt, Billy Broas)
– GRIC DEQ (Janet Bollman, Dale Anderson)
– GRICUA (Lenny Gold)
4
![Page 5: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/5.jpg)
www.antaresgroupinc.com
Project Objectives • Feasibility study project goals
– Identify available solar and biomass energy resources – Characterize solar and biomass energy technologies – Conduct detailed technical and economic analysis of
potentially viable projects.
• Renewable energy for improved self-sufficiency – On-site energy generation as hedge against rising
natural gas prices (direct tie to GRICUA electric prices) – Environmental and economic benefits
5
![Page 6: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/6.jpg)
www.antaresgroupinc.com
GRIC Solar Feasibility Study
![Page 7: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/7.jpg)
www.antaresgroupinc.com
Solar Resources • High solar resource:
6 – 7 kWh/m2/day • Direct sunlight, good for
PV and concentrating solar technologies
Concentrating Solar Potential (NREL map)
7
![Page 8: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/8.jpg)
www.antaresgroupinc.com
Solar Technology Overview • Technology
– Photovoltaics (PV) • Crystalline Silicon (c-Si) • Thin film
– Concentrating solar power (CSP)
• Location/mounting method – Roof-mounted – Ground mounted
• Tracking capability – Fixed tilt – Single-axis (1-X) tracking
Fixed Tilt Roof mounted PV Carport PV
1-X Tracking Ground Mount PV CSP Power
8
![Page 9: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/9.jpg)
www.antaresgroupinc.com
Solar Projects Evaluated Option Location / Description
Module Type
Mounting Configuration
Tilt Angle (degrees)
Orientation* (degrees)
Capacity (kWDC)
1 A Tribal Governance
Center, roof mount
p-Si Ballasted racking 10 180 491
B CdTe Ballasted racking 5 180 458
2 A Wild Horse Pass Hotel
& Casino, roof mount
p-Si Ballasted racking 10 162 437
B CdTe Ballasted racking 5 162 450
3 A San Tan Brownfield,
ground mount
CdTe Fixed Tilt Racks 25 180 1,109
B CdTe Fixed Tilt Racks 25 180 5,544
4 A Lone Butte Substation,
ground mount
CdTe Fixed Tilt Racks 25 180 5,544
B CdTe 1-X tracking (E-W) - - 5,638
9
![Page 10: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/10.jpg)
www.antaresgroupinc.com
Example Project Renderings Option 2A: Wild Horse Pass
Hotel and Casino (491 kWDC, p-Si)
Option 4B: Lone Butte Substation Ground Mount, 1-X tracking (5.6 MWDC, Thin film - CdTe)
10
![Page 11: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/11.jpg)
www.antaresgroupinc.com
Technical Analysis Results • Thin film slightly better performance due to
temperature and dust tolerance • Higher tilt angle improved annual generation, but more
variable throughout the year • Tracking significantly increased annual generation
Option 4B: Lone Butte Substation 5.6 MWDC, 1-X tracking, CdTe Annual Output 14,533 MWh
0
1,000
2,000
3,000
4,000
5,000
6,000
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1,800,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Peak
Out
put
(kW
)
Mon
thly
Ele
ctri
c O
utpu
t (k
Wh)
Month
PV System Output Peak PV Output
11
![Page 12: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/12.jpg)
www.antaresgroupinc.com
Project Concepts and Considerations • Off-take agreement with GRICUA • Interconnection GRICUA distribution system • Regulatory/permitting needs • Availability of incentives (federal, state, local) • Business and ownership structure
– Financing options – Tribal ownership and operation
• GRICUA or other tribal entity – Private developers ownership or leasing
12
![Page 13: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/13.jpg)
www.antaresgroupinc.com
Economic Analysis
13
![Page 14: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/14.jpg)
www.antaresgroupinc.com
GRIC Biomass Feasibility Study
![Page 15: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/15.jpg)
www.antaresgroupinc.com
Biomass Resources • Rubber plant
(guayule) processing debris
• Urban wood – Pallets, yard debris,
and clean untreated construction wood
• Saltcedar removal • Pellet fuels
Saltcedar removal
Urban wood waste 15
![Page 16: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/16.jpg)
www.antaresgroupinc.com
Saltcedar (Tamarix) Distribution
16
![Page 17: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/17.jpg)
www.antaresgroupinc.com
Resource Assessment Results
Description
Estimated Quantity
(tons / year)
Estimated Cost,
Delivered ($/ton)
Urban wood 20,000 $44/ton
Guayule bagasse 5,000 $45/ton
Saltcedar 90-120 $100/ton *
* Cost to offset a portion of the overall cost to treat and restore heavily infested areas (~$15,000 to $20,000 per acre).
Urban Resources – One likely supplier identified – Approval needed to bring on GRIC land
Yulex (guayule) – Yulex considering higher-value uses – Lab results showed high alkali and ash
Saltcedar – Environmental benefits outweigh value
for bioenergy – Restoration field trials are ongoing
(Charles Enos, GRIC DEQ) – Lab results showed high ash; chlorine
and sulfur beyond recommended limits for biomass boiler
17
![Page 18: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/18.jpg)
www.antaresgroupinc.com
Biomass Project Concept Development • Industrial: CHP, thermal • Commercial: heating/cooling • Technology selection
(combustion, gasification) • Site requirements
– Heating/cooling loads – Power use – System layout – Fuel storage needs – Interconnection needs – Water needs
Gila River Industrial Site Locations (Rudy Mix, presentation to DOE Tribal Energy Program)
18
![Page 19: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/19.jpg)
www.antaresgroupinc.com
Biomass Project at Lone Butte Industrial Park
Output Description Quantity Gross Power (kW) 2,010 Net Power (kW) 1,757 Annual Net Energy Output (MWh) 14,056 Annual Biomass Fuel Input (tons/yr) 25,000* Net Electric Efficiency (HHV) 14.4% Constant LCOE - no incentives ($/kWh) $0.24 Constant LCOE - incentives ($/kWh) $0.22
• Power (no suitable thermal loads) • Sized based on biomass availability • Relatively low conversion efficiency (no heat use) • Small system - No benefit from economies of scale • High fuel costs and low incentives
* Wood chips & guayule bagasse 19
![Page 20: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/20.jpg)
www.antaresgroupinc.com
Biomass Project Considerations • Project success factors
– Low (<$30/ton) fuel cost – Use for thermal energy
(year round load best) – Displacement of high cost fuel
(e.g., propane)
• Biogas (AD/engine genset) power prices are the lowest – Requires suitable wastewater
treatment site – If treated sludge is sold, power
price must compensate for lost revenue
20
![Page 21: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/21.jpg)
www.antaresgroupinc.com
Project Status and Lessons Learned • Feasibility Study completed in October 2013 • Solar
– Lone Butte Substation ground mount 5.6 MWDC CdTe PV array (1-X tracking) performed best (LCOE ~ $0.09-$0.10/kWh, no incentives)
– LCOE still higher than current electricity price – As PV costs decline and electricity costs escalate, PV may
be more cost-competitive – PV power improves tribal energy self-sufficiency and
provides a hedge against future natural gas price increases – GRICUA must work with affected utilities for large PV
![Page 22: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/22.jpg)
www.antaresgroupinc.com
Project Status and Lessons Learned – Cont’d • Biomass
– Limited biomass resource and high cost suggests biomass energy not economically viable now
– Saltcedar has technical challenges as fuel and is costly
– However, if sustained funding obtained for riparian area restoration, efforts could yield environmental and employment benefits
![Page 23: Gila River Indian Community Renewable Energy Feasibility Study](https://reader030.vdocuments.site/reader030/viewer/2022020203/5866784c1a28ab45408b498d/html5/thumbnails/23.jpg)
www.antaresgroupinc.com
Contacts Tim Rooney, Project Manager ANTARES Group Inc. (303) 500-1763 [email protected] Anneliese Schmidt, Project Manager ANTARES Group Inc. (707) 774-6048 [email protected] Rudy Mix Gila River Indian Community Department of Environmental Quality (520) 562-2234 [email protected]
23