GigaHouse is a super insulated steel-framed construction system specifically targeting projects where rapid speed of construction and ease of assembly are important. Steel Foam Panel system homes are perfect for residential, commercial and industrial applications. The EPS Panel System is engineered to be fire-proof, water, insect, vermin, mold, hurricane and earthquake resistant. This Green Pre-Fab home is quick to assemble, environmentally friendly and the sustainable answer to the crisis facing our global community- Affordable, Safe and Energy Efficient Housing Barrett Enterprises Inc Introduces GigaHouse Panel System from GigaCrete™

Upload: callie-barrett

Post on 02-Jun-2015

841 views

Category:

Documents


1 download

DESCRIPTION

PanelSystem is designed for the fastest possible means to build a structure that is capable of high performance far beyond conventional construction. The roof system is engineered for 200 mph winds, the walls are R30 minimum, assembly requires a few hand tools with as few as two people. GigaPanels extreme performance \'green\' building steel panel homes truly push the building envelope on performance and sustainability. These easy to Green Pre-Fab units are ideal for any location, easy to ship and ready to build house kits for convenient, home long-term occupancy or emergency shelters.

TRANSCRIPT

Page 1: GigaHouses

GigaHouse is a super insulated steel-framed construction system specifically targeting projects where rapid speed of construction and ease of assembly are important. Steel Foam Panel system homes are perfect for residential, commercial and industrial applications. The EPS Panel System is engineered to be fire-proof, water, insect, vermin, mold, hurricane and earthquake resistant. This Green Pre-Fab home is quick to assemble, environmentally friendly and the sustainable answer to the crisis facing our global community- Affordable, Safe and Energy Efficient Housing

Barrett Enterprises Inc Introduces GigaHouse Panel System from

GigaCrete™

callie
Typewritten Text
callie
Typewritten Text
callie
Typewritten Text
callie
Typewritten Text
Page 2: GigaHouses

GIGAPANEL COMPARATIVE TECHNICAL INFORMATION

ATTRIBUTE WOOD STUD STEEL STUD CMU BLOCK SIPS ICF GIGAPANEL

AVERAGE TRADES REQD 11 11

8 10

9 4

INSULATION R-VALUE 16 16 16 25 25 28+

HURRICANE RESISTANCE NO YES YES NO YES YES

SEISMIC RESISTANCE NO YES NO NO YES YES

VAPOR RESISTANCE NO NO NO NO YES YES

MOLD RESISTANCE NO YES NO NO NO YES

MILDEW RESISTANCE NO YES NO NO NO YES

INSECT RESISTANCE NO YES YES NO YES YES

VERMIN RESISTANCE NO YES YES NO YES YES

FIRE RESISTANCE POOR GOOD GOOD POOR GOOD 9ȄŎŜƭƭŜƴǘ TOXICITY PRODUCED HIGH LOW LOW HIGH LOW VERY LOW

AIR LEAKAGE 0.35 0.35 0.3 0.2 0.09 0.05

TIME TO COMPLETE SLOW SLOW VERY SLOW FAST SLOW VERY FAST

WEIGHT PER kgs./m2 19.5 24.4 244 24.4 268.5 24

RECYCLABILITY % 0.15 0.5 75% 10% 35% 99%

Conclusions

Faster construction times than conventional construction

Significantly reduced labor costs

Reduced project timeline costs

Higher R-Values

Higher resistance levels in all areas

Higher recyclability

Healthier materials

GIGAPANEL SPECIFICATIONS

Engineered up to 200 MPH wind speeds Engineered for all Seismic Zones Mold, Mildew, Insect and Vermin Resistant Meets IBC Fire Testing Standards Meets Steel Framed Construction standards

MATERIALS USED

1.0 to 2.0 lbs. density EPS foam, meets ASTM 84 StuccoMax exterior cementitious coating using natural Limestone fillers, Fiberglass mesh, NO SILICA SAND PlasterMax interior fire rated ceramic plaster direct applied over foam, no gypsum board. Meets NFPA 286, ASTM E84, ASTM E136, ASTM G121, ASTM C587. Utilizing Natural Limestone fillers, Fiberglass mesh, No silica sand is used.

Page 3: GigaHouses

Our mission is to provide the building materials that structurally and environmentally

• GigaCrete is a family of products based on low carbon footprint “Green” ceramic

binders significantly outperforming Portland cement: We never use PORTLAND CEMENT which is a high CO2 producer

• StuccoMax, a waterproof exterior coating that is non-combustible

• PlasterMax, a fire rated abuse resistant coating over foam replacing gypsum board

• All GigaCrete coatings bond permanently to EPS insulation foam, concrete products, bricks and plasters.

• All are one coat applications and fast to apply

• All are abuse resistant, non combustible, no VOC’s, no off-gassing utilizing only safe and healthy materials that will not support the growth of mold or mildew.

outperform today’s conventional building products. Goal is to provide affordable and energy efficient housing GigaPanel building system allows a high performance sustainable home to be constructed at or below stick built prices!

Page 4: GigaHouses

What are GigaCrete’s unique “PanelSystems” “PanelSystems” is not what you think…. It is not a SIP’s panelized building system at all…. It is a patented steel framed insulation system! The building components are structural steel “stud” construction, proven for decades, signed off by a local structural engineer who only has to agree with the calculations of leading structural engineering already completed. We reversed the building process Typically the structural part comes first, then R19 insulation is added in between the studs last, this leaves inefficiencies, thermal leaks and sound transmission through the steel into the home…. Neither fast or ideal. PanelSystems starts with the last component…R28 rigid foam insulation panels with computerized insert channels cut into the foam precisely where structural engineering dictates the steel studs fit to meet code compliance for a steel framed structure! The structural components are then slipped into place and securely attached with self tapping screws….Exactly the same as steel framed construction only this can be done by unskilled labor, purposely made to be very simple, guaranteed square, right the first time, no measuring, no room for errors.

Page 5: GigaHouses

1. Layout steel track on slab and permanently attach to slab

2. Locate wall insulation panels into track

3. Slide down connectors and screw together top and bottom

4. Cut in electrical conduits and secure with insulating foam

5. Coat exterior with 3,500 psi StuccoMax (same day)

6. Coat roof with Gigaroof (StuccoMax)

7. Coat interior with fire rated, 8500 psi PlasterMax

Overview of installation methodology

Page 6: GigaHouses

Panel System Homes can be made from 500 to 7000 sq.ft! Where else can you get a home for only $26.99 per sq foot? Chart shows a 576 sq foot home for $15546.24 FOB Las Vegas NV. Call today to order! 877-904-8424

DESCRIPTION TYPE SIZE SIZE LIN/FT QTY TOTAL

PYRAMID ROOF 24X24 576 footprint 1 1

WALL PANELS EPS 6" thick 102 lin 8 ft high 816 sq ft

WALL STUDS 3.5/8" 18 ga 8 ft 224 1792 lin ft

WALL TRACK 3.5/8" 18 ga 8 ft 204

CEILING LID EPS 6" thick 4x8 sheets 9 288

CEILING LID STUDS 3.5/8" 18 ga 8 ft 168

CEILING LID TRACK 3.5/8" 18 ga 8 ft 72

ROOF PANELS EPS 6" thick 600 sq ft 4x8 600 sq ft

ROOF STUDS 3.5/8" 18 ga 8 ft 548 lin 548 lin

ROOF TRACK 3.5/8" 18 ga 8 ft 496 496

ROOF PLATES 12 ga 90 and straight 8

ROOF TIE DOWNS 5/8" all thread 8 ft 14 112

TRUSS PACKAGE 200 mph 12" 100 lin ft 1 lot 576 sq ft

STUCCOMAX 3/16" + 11 oz mesh 768 sq ft

PLASTERMAX 3/16" + 11 oz mesh 1440 sq ft

ROOF FINISH StuccoMax (non US) 600

Page 7: GigaHouses

Tools needed to build a house : Step Ladder, Screw Gun, Ramset Gun, Tape Measure, Metal Shears, Pry Bar

Page 8: GigaHouses

6” thick PanelSystems components Easy to store and ship.

Page 9: GigaHouses

PanelSystems are designed for rapid assembly by unskilled labor Large wall insulation Panels can be lifted with one hand.

Page 10: GigaHouses

16 linear feet of wall PanelSystems is easily carried into position NO Heavy Machinery Needed.

Page 11: GigaHouses

Step 1: Lay out the bottom tracks according to plans and include water resistant gaskets between the bottom track and the slab.

Page 12: GigaHouses

Step 2: Attach bottom track into the slab with Ramset pins

Page 13: GigaHouses

Step 3: Locate panels next to where they are needed

Page 14: GigaHouses

Step 4: Insert foam panel into steel stud bottom track

Track positioned over moisture gasket and shot into slab. Tools needed: ramset gun, pins and load and tape measure

Page 15: GigaHouses

Panels are laid in place in minutes not days Rooms take shape instantly CNC cut they are guaranteed to be square with studs located exactly where they need to be as per structural engineering specifications NO SPECIAL SKILLS NEEDED No Measuring No Room for Errors

Page 16: GigaHouses

Patented connectors based on “steel framed” construction methods Slide down engineered grooves in panels forming panel to panel connections and the structural members both at the same time.

Note: the PanelSystems designs determine where the structural studs and connectors are placed

Step 5: Insert studs Tools needed: Step ladder Screw gun, Pry bar

Page 17: GigaHouses

Finished top track

Top track inserted into EPS panel and screwed to vertical studs

Page 18: GigaHouses

Exploded view of connections

Page 19: GigaHouses

Section through a typical panel shows double studs connecting panel to panel and either 16” on center for perimeter walls or 24” steel studs as shown above for interior walls.

Page 20: GigaHouses

Pre-cut “T” sections

Page 21: GigaHouses

Pre-cut corner sections

Page 22: GigaHouses

Column made from 4 pre-cut corners

Columns are used for additional

Structural support, HVAC (heating ventilation air conditioning

systems) Plumbing and venting chases. Typically used in corners

Page 23: GigaHouses

90 Corner and T connected together

Page 24: GigaHouses

Foundation to wall connection

Hurricane anchors… solid steel connection from the roof to the foundation

Page 25: GigaHouses

Step 6: Laser level and brace walls before adding roof trusses

Page 26: GigaHouses

Step 7: Roof trusses added to walls a few hours after building walls

Page 27: GigaHouses

Compression ring holds 200 mph roof trusses securely together

Page 28: GigaHouses

Step 8: Install doors and windows

Page 29: GigaHouses

Window or door panel layout

Page 30: GigaHouses

Step 9: Roof panels are laid onto trusses and studs slid into location holes

Page 31: GigaHouses

Step 10: Roof studs are screwed to trusses with steel brackets

Page 32: GigaHouses

Roof panels from inside the house, showing stud perlins

Page 33: GigaHouses

Step11: StuccoMax is direct applied over the foam insulation panels

Page 34: GigaHouses

Window and Door trims cut from EPS foam are covered with StuccoMax

Page 35: GigaHouses

Step 12: Colored GigaRoof spray applied directly over the EPS foam Roof is R – 45 G

Page 36: GigaHouses
Page 37: GigaHouses

GigaCrete coatings are added directly to the EPS foam, note the imbedded mesh. Interior PlasterMax and Exterior StuccoMax are used

Page 38: GigaHouses

Gutter system integrated into moulding for rain collection~ Doors added

Page 39: GigaHouses

Conduits are pre cut into panels ready to pull wiring.

Page 40: GigaHouses

Electrical wiring inside chase

Conduit or plumbing passing through walls

Page 41: GigaHouses

Retrofit electrical after house is completed

Note the conduit and box is Foam glued into place and excess foam shaved flat, ready to be coated with PlasterMax

Walls are rasped where needed to make flat

Cut flush

Foam not yet cut -----

-----

PlasterMax Mesh

Page 42: GigaHouses

Foam shapes are precut and fitted over trusses

Page 43: GigaHouses

PlasterMax applied directly over EPS foam panels. All seam lines are covered over to create a seamless and durable ceramic finish.

Page 44: GigaHouses

Foam sheets are screwed into the steel studs

Fire rated PlasterMax applied over the EPS foam

Ceiling underside of roof panels and beams covering structural roof trusses

Page 45: GigaHouses

Finished PlasterMax over the foam interior wall panels

Note: Optional storage area above bedroom and bathroom

Page 46: GigaHouses

Optional Magnesium board ceilings (no gypsum board) With PlasterMax knockdown texture coating

Page 47: GigaHouses

Step15: Window trims are added, screwed into steel studs, patched and ready for paint.

Page 48: GigaHouses

Step16: StuccoMax is washed to remove dust particles, primed and painted.

Page 49: GigaHouses

Simonton vinyl windows ( no wood ) comes in all standard sizes

Page 50: GigaHouses

End Result= Very energy efficient and virtually maintenance free living environment

Page 51: GigaHouses

StuccoMax 3/16” thick TOUGH ENOUGH TO DRIVE A TRUCK ON StuccoMax (exterior) is sprayed or troweled over foam

Page 52: GigaHouses

The PanelSystems are ideal tent replacements creating secure shelters. Uses include HOMELAND SECURITY DOD, GOVERNMENT BUILDINGS, MILITARY F.E.M.A. FOREIGN AID AND DISASTER RELIEF SECURED FACILITIES AND SAFE ROOMS. FACILITIES REQUIRING HIGH SECURITY PROTECTION FROM EXTERNAL THREATS INCLUDING TERRORISM, HURRICANES,TORNADOS,EARTHQUAKES,FIRES,VANDALISM AND THEFT. Due to the materials lightweight and ease of rapid assembly, there may be no faster building method in the world than the GigaCrete panelsystem . PanelSystems can be used for single family housing or multi story applications, schools, hospitals, orphanages, retail centers, churches, temples, and many types of commercial structures. One factory can create onsite employment for thousands of un-skilled workers and quickly rebuild a devastated area, providing safe and affordable shelter.

GIGAHouse SYSTEMS HAVE SO MANY USES

Page 53: GigaHouses

SUSTAINABLE “PanelSystems”

build strong, build safe, build fast

1. Completed rapidly with supervised local labor 2. Simplicity = speed = reduced cycle time=language barriers are minimized 3. High “R” values means less operating costs to heat or cool 4. Only healthy materials are used 5. No Portland cement used in the house structure 6. Exterior StuccoMax is WATERPROOF 7. Interior PlasterMax is the Worlds only fire rated, 8500+ psi abuse

resistant plaster designed specifically for applications over insulation foam

Barrett Enterprises Inc~ The Green Building Products Store. 877-904-8424 When ordering mention code BE GREEN”! Shipped FOB Las Vegas NV

Green Pre-Fab homes~ Quality home, Strength to withstand natural disasters