MC Full Day Tutorial

10/13/2014 8:30:00 AM

"Getting Started with Risk-Based

Testing"

Presented by:

Dale Perry

Software Quality Engineering

Brought to you by:

340 Corporate Way, Suite 300, Orange Park, FL 32073

888-268-8770 ∙ 904-278-0524 ∙ [email protected] ∙ www.sqe.com

Dale Perry

Software Quality Engineering Dale Perry has more than thirty-eight years of experience in information technology as a programmer/analyst, database administrator, project manager, development manager, tester, and test manager. Dale’s project experience includes large-system development and conversions, distributed systems, and both client/server and web-based online applications. A professional instructor for more than twenty-four years, he has presented at numerous industry conferences on development and testing. With Software Quality Engineering for eighteen years, Dale has specialized in training and consulting on testing, inspections and reviews, and other testing and quality-related topics.

Speaker Presentations

1© SQE Training - STAR West 2014

This page left blank

2© SQE Training - STAR West 2014

Notice of Rights

Entire contents © 2010-2014 by SQE Training, unless otherwise noted on specific

items. All rights reserved. No material in this publication may be reproduced in any

form without the express written permission of SQE Training.

Home Office

SQE Training

340 Corporate Way, Suite 300

Orange Park FL 32073 U.S.A.

904. 278.0524

904.278.4380 fax

www.sqetraining.com

Notice of Liability

The information provided in this book is distributed on an “as is” basis, without

warranty. Neither the author nor SQE Training shall have any liability to any person or

entity with respect to any loss or damage caused or alleged to have been caused

directly or indirectly by the content provided in this course.

3© SQE Training - STAR West 2014

4© SQE Training - STAR West 2014

5© SQE Training - STAR West 2014

6© SQE Training - STAR West 2014

Many of the development models in use today originated with the concepts

developed by Dr. Shewhart in 1938 at Bell Laboratories and extended to

manufacturing and quality control by Dr. Demming in the 1950s.

This concept was called the life cycle of life cycles.

7© SQE Training - STAR West 2014

This page left blank

8© SQE Training - STAR West 2014

9© SQE Training - STAR West 2014

10© SQE Training - STAR West 2014

Static testing: Testing of a component or system at specification or implementation level without execution of that software, e.g., reviews or implementation level without execution of that software, e.g., reviews or static code analysis.

Dynamic testing: Testing that involves the execution of the software of a component or system.

11© SQE Training - STAR West 2014

Testing every possible data value, every possible navigation path through

the code, and every possible combination of input values is almost always

an infinite task which never can be completed.

Even if it were possible, it is not necessarily a good idea because many of

the test cases would be redundant, consume resources to create, delay time

to market, and not add anything of value.

For example, a single screen (GUI) or data stream, with thirteen variables,

each with three values

• To test every possible combination is 3(13) possible combinations

or 1,594,323 tests

• Plus testing of interfaces, etc.

12© SQE Training - STAR West 2014

13© SQE Training - STAR West 2014

14© SQE Training - STAR West 2014

15© SQE Training - STAR West 2014

16© SQE Training - STAR West 2014

17© SQE Training - STAR West 2014

18© SQE Training - STAR West 2014

19© SQE Training - STAR West 2014

20© SQE Training - STAR West 2014

21© SQE Training - STAR West 2014

The purpose of discussing software risk is to determine the primary focus of

testing. Generally speaking, most organizations find that their resources are

inadequate to test everything in a given release.

Outlining software risks helps the testers prioritize what to test and allows

them to concentrate on those areas that are likely to fail or those areas that

will critically impact the customer if they do fail.

Risks are used to decide where to start testing and where to test more.

Testing is used to reduce the risk of an adverse effect occurring or to reduce

the impact of an adverse effect.

22© SQE Training - STAR West 2014

Organizations that work on safety-critical software usually can use the

information from their safety and hazard analysis to identify areas of risk.

However, many companies make no attempt to verbalize software risks in

any fashion. If your company does not currently do any type of risk analysis,

try a brainstorming session among a small group of users, developers, and

testers to identify concerns.

23© SQE Training - STAR West 2014

24© SQE Training - STAR West 2014

Risk Factor

1 Ambiguous Improvement Targets

2 Artificial Maturity Levels

3 Canceled Projects

4 Corporate Politics

5 Cost Overruns

6 Creeping User Requirements

7 Crowded Office Conditions

8 Error Prone Modules

9 Excessive Paperwork

10 Excessive schedule Pressure

11 Excessive Time to Market

1212 False Productivity Claims

13 Friction Between Clients and Software

Contractors

14 Friction Between Software Management and

Senior Executives

15 High Maintenance Costs

16 Inaccurate Cost Estimating

17 Inaccurate Metrics

18 Inaccurate Quality Estimating

19 Inaccurate Sizing of Deliverables

20 Inadequate Assessments

21 Inadequate Compensation Plans

25© SQE Training - STAR West 2014

Risk Factor

22 Inadequate Configuration Control and

Project Repositories

23 Inadequate Curricula (Software Engineering)

24 Inadequate Curricula (Software

Management)

25 Inadequate Measurement

26 Inadequate Package Acquisition Methods

27 Inadequate Research and Reference

Facilities

28 Inadequate Software Policies and Standards

29 Inadequate Project Risk Analysis

30 Inadequate Project value Analysis

31 Inadequate Tools and Methods (Project 31 Inadequate Tools and Methods (Project

Management)

32 Inadequate Tools and Methods (Quality

Assurance)

33 Inadequate Tools and Methods (Software

Engineering)

34 Inadequate Tools and Methods (Technical

Documentation)

35 Lack of Reusable Architecture

36 Lack of Reusable Code

37 Lack of Reusable Data

38 Lack of Reusable Designs (Blueprints)

39 Lack of Reusable Documentation

40 Lack of Reusable Estimates (Templates)

26© SQE Training - STAR West 2014

Risk Factor

41 Lack of Reusable Human Interfaces

42 Lack of Reusable Project Plans

43 Lack of Reusable Requirements

44 Lack of Reusable Test Plans. Test Cases

and Test Data

45 Lack of Specialization

46 Long Service Life of Obsolete Systems

47 Low Productivity

48 Low Quality

49 Low Status of Software Personnel and

Management

50 Low User Satisfaction

51 Malpractice (Project Management)

52 Malpractice (Technical Staff)

53 Missed Schedules

54 Partial Life-Cycle Definitions

55 Poor Organization Structures

56 Poor Technology Investments

57 Severe Layoffs and Cutbacks of Staff

58 Short-Range Improvement Planning

59 Silver Bullet Syndrome

60 Slow Technology Transfer

27© SQE Training - STAR West 2014

28© SQE Training - STAR West 2014

Managers tend to focus on two key elements

• Controlling and managing costs

• Return on investment (ROI)

Marketing and sales people tend to be driven by a singular goal, “competitive

advantage”

• The concerns of marketing and sales are not necessarily related to

functionality, they need an edge

Engineers (developers, analysts, etc.) tend to be focused on the technology

itself

• Driven by the use of “new” technology and techniques

• Not interested in functionality except as it relates to the use of

technology

• Some technically valid decisions may cause functional

problems

29© SQE Training - STAR West 2014

Customers are seeking the answer to a very simple question, “can I do my

job?”

Their view of a product is a tool to do their job

If they can’t use your product to that end, it’s a bad product

30© SQE Training - STAR West 2014

31© SQE Training - STAR West 2014

Quality assurance is part of an organizations’ overall set of processes.

Testing primarily focuses on product risk. Testing is an evaluation activity, it

uses the processes defined within and organization to assess the quality of a

product as defined within the scope of a project. Testing also assesses the

process used within the organization to ensure they are usable, effective and

appropriate. A more accurate acronym for testing is Q/C (Quality Control).

Simply stated: We can think of testing (Q/C) as the application of process to

a product within the context of a project focusing on risks.

32© SQE Training - STAR West 2014

33© SQE Training - STAR West 2014

The concept of risk driven testing applies to all software development models

and processes. It is critical to developing quality software that meets

user/customer expectations and is the focus of both the STEP™ methodology

and many of the new agile development processes.

If you analyze the newer “agile” development methods, this is one of the key

concepts. It’s interesting that this is not really a new concept at all; it has been

around for a couple of decades.

34© SQE Training - STAR West 2014

There are many different software lifecycle approaches: waterfall, spiral,

incremental delivery, prototyping (evolutionary and throwaway), RAD,

extreme programming (XP), SCRUM, DSDM, etc. The key is to know which

process the project is following and to integrate into that process as soon as

possible (reasonable). The later you get involved, the less chance you have

to prevent problems.

35© SQE Training - STAR West 2014

36© SQE Training - STAR West 2014

37© SQE Training - STAR West 2014

Planning is essential for all projects, regardless of type of development

model. There are certain essential decisions that need to be made early in

the project to ensure the project will be a success and that the testing can be

realistically accomplished within the constraints of the project.

38© SQE Training - STAR West 2014

39© SQE Training - STAR West 2014

40© SQE Training - STAR West 2014

41© SQE Training - STAR West 2014

42© SQE Training - STAR West 2014

43© SQE Training - STAR West 2014

In testing it is critical to identify those elements within the scope of the

project that require testing. Once identified those elements need to be

assessed as to what is absolutely critical to the operation of the software and

the user’s needs and expectations and what can possibly be deferred.

Not all elements within the scope of a project are of equal importance.

44© SQE Training - STAR West 2014

This model is based on the risk analysis model within the STEP™ testing

methodology developed by Software Quality Engineering. The general

process can be applied to any type of product and within any type of

development model.

45© SQE Training - STAR West 2014

All project start with something. The only reason to develop or change

software is because one of the stakeholders in an organization has a

problem with the existing processes or systems.

A problem does not necessarily mean that the software does not function,

although there may be problems with the software there cane be other

reasons for someone to want to change the system. The business model

may have shifted or a government entity may have changed some rule or

process. It may be that an internal marketing team is looking to add some

advantages to the system to improve the competitive nature of the system.

Regardless of the reason, software is developed or changed because

someone has a problem, understanding the nature of the problem is

essential to both develop a solution and to ensure it works (test the solution).

46© SQE Training - STAR West 2014

Reference materials include any information available that can assist in

determining the testing objects/conditions.

Some lifecycles do not have formal sources of documentation. No formal

requirements are written. However, there is usually some information about

what type of system is being created, the platform on which it will run, the

goals of the client, etc.

Any information you can gather will help you better understand the test

requirements for this project.

47© SQE Training - STAR West 2014

Different groups have different ideas about software. The more of these Different groups have different ideas about software. The more of these

disparate groups you can combine, the more accurate the picture you will

have of the risks, priorities, and goals for development, and the more

accurate the testing goals and objects/conditions for this project become.

In addition to the stakeholders noted earlier you may also want to consider

others who have knowledge of current and past issues associated with the

system under discussion. Groups such as the help desk and user support

tend to have in-depth knowledge of current as well as past issues.

The key is to include testers in the discussions to help focus the team on the

testing issues and to help determine the priority of the features to be

developed. Testers need to know the risks and issues in order to properly

analyze and design reasonable tests to mitigate/control those risks or to at

least know what level of risk the stakeholders are willing to accept.

48© SQE Training - STAR West 2014

As soon as the project is established and the general focus of the software is

known, either new development or maintenance, the process of risk

assessment begins.

49© SQE Training - STAR West 2014

When designing an inventory or elements/objects to test we need to asses

three different aspects of the software/system

Functional – Identification of “what” the user/customer expects the

system/.application to provide. These are often referred to as “black box” or

specification based elements (as they are typically derived from some form

of specification (document) or model.

Non-Functional – Identifying aspects of the system that need to be tested

that are not necessarily part of the functions required by the user/customer.

i.e. performance, usability, response time, etc. These are characteristics or

attributes of the system and reflect “how” the system works not “what” it

does or how it’s built.

Structural – Identification of the physical elements of the infrastructure,

architecture, design or code that also require testing. There are often

elements within the system that are not part of user/customer’s requirements

but they still need testing. These represent “how” the system is constructed.

50© SQE Training - STAR West 2014

The inventory can be a separate artifact/document or in can be incorporated

into and existing artifact/document such as a risk prioritized requirements

specification, use case model or story backlog. The inventory can represent

an entire system, part of a system or a single requirement, use case or story.

The key to an inventory is to identify what needs to be tested from as many

viewpoints as possible.

51© SQE Training - STAR West 2014

52© SQE Training - STAR West 2014

53© SQE Training - STAR West 2014

The inventory process is an iterative process. You begin the process at

requirements and continue the process at each stage of the development

process. How far you take the process is determined by the scope and risks

associated with the software being tested. In addition to the process being

iterative, it is also cumulative.

The information from requirements is used to improve the requirements

(static testing/reviews), to focus the design, and possibly to improve the

design.

At the design stage of a project the information from the requirements

inventory process is used to evaluate the design and to ensure problems are

corrected and additional items are gathered from the design. This process

can be continued as far as the risks to the project warrant.

54© SQE Training - STAR West 2014

These can be specific elements to be tested or they can be aspects

(characteristics, attributes) of elements identified in other work products such

as an expansion of a user story or use case from a testing and risk

perspective.

A single story, use case or requirement may have multiple aspects that

requiring testing. E.g. a function may have inputs, and/or outputs that are

retrieved from and sent to a data store via an interface or transaction and

those elements may have specific relationships (rules or constraints), all of

which need to be tested.

The identified (requirement, story or use case) may also participate in a

larger sequence of events (scenario) that also must eventually be tested to

ensure the identified element works correctly at all levels within an

application or system (end-to-end).

Some aspects of the identified element may also be sensitive to the

environment and so will require additional testing in multiple enrivonments.

55© SQE Training - STAR West 2014

While creating the inventory we may also identify aspects of the identified

elements that are not completely defined or may be vague, incomplete,

ambiguous, etc. These issues and questions are logged to ensure that they

are not lost. S

ome of the identified issues may not be resolvable at the requirements stage

of a project and may be further defined later in the development process.

This is perfectly acceptable, provided the information is logged and tracked

somehow. The information can be part of an existing issues/defect tracking

system, part of a backlog, or may be a separate artifact/document. How it is

managed will depend to a large degree on the development process

employed. The key is not to lose tract of the identified issues and questions.

For incomplete information we would come back to our list of identified

issues and questions at the appropriate time within the development process

and ensure that they have, in fact, been addressed to a reasonable degree

and are now testable.

56© SQE Training - STAR West 2014

Once the requirements have been assessed, the initial inventory created and

any issues and questions logged, the team may have to wait for the system

design (architecture and detail aspects) to be defined.

When the design is ready we can continue the inventory process by

assessing the design in the same manner as we did the requirements. The

existing inventory and the list of known issues and questions is the input into

the next step in the process.

57© SQE Training - STAR West 2014

During the assessment of the design, issues and questions that were

deferred until the design was defined can now be revisited. At this point we

should have additional information that will help us clarify open issues from

the requirements assessment.

At this stage three things are occurring:

1. Identification of additional elements to add to our inventory

2. Resolution of issues and questions from the requirements process

3. Identification of new issues and questions related to the design

How far we take the inventory process depends on the development model,

the organizational processes in place and the level of potential risk. There is

no specific rule as to how far the inventory process if taken within a project.

58© SQE Training - STAR West 2014

Reviewing designs may require additional technical skills that not all testers

have. At least one person on the test team needs to have some technical

skills that relate to the system/product being tested in order to ask critical

questions.

Early tests, especially scenario based tests, developed during the

requirements part of the process can be used as walk through models for

the design.

Walking through a design with a set of functional and non-functional tests

can often reveal problems that would be missed if only looked at from an

engineering perspective. After all, development (software engineering) is the

process of solving a problem with a computer. People solving problems have

a different perspective than those trying to ensure the solution works. This

process may even reveal places where changes can be made to aid in

testing, such as exposing the information in an API or memory table.

59© SQE Training - STAR West 2014

There are some common aspects of applications that can be drawn from the

design specifications.

Updating the inventory will be about providing clarification of earlier issues

and questions raised during the requirements inventory review as well as

adding new objects/elements to the inventory. Many of the elements added

at this point will be technical in nature and late will be tested primarily at the

component or integration stages of development. It is critical to know where

these technical elements exist so that the get proper testing.

May failures discovered in system testing are often symptoms of incomplete

or ineffective testing of technical elements within a product/system.

60© SQE Training - STAR West 2014

Analyzing an individual requirement, use case, story, interface etc. allows the

tester to more accurately understand the scope of testing related to a

particular element/object. This can also help in estimating the scope of effort

required to properly test a particular element/object.

61© SQE Training - STAR West 2014

A single requirement, use case or story may have multiple aspects that need

to be tested. Just as we can be a general list of overall elements/objects to

test we can also construct an inventory specific to a single element.

62© SQE Training - STAR West 2014

Just like a functional aspect can be analyzed for elements to test so can a

structural element. The single element is the interface but there are many

aspects of the interface that need to be tested to ensure it works correctly.

63© SQE Training - STAR West 2014

64© SQE Training - STAR West 2014

65© SQE Training - STAR West 2014

© SQE Training - STAR West 2014 66

67© SQE Training - STAR West 2014

68© SQE Training - STAR West 2014

69© SQE Training - STAR West 2014

70© SQE Training - STAR West 2014

Impact is sometimes referred to as severity.

Once the inventory has been built, the next step is to determine the Impact

and likelihood of something going wrong with each of the elements identified

in the inventory.

• Determine the impact (loss or damage) and likelihood (frequency or

probability) of the feature or attribute failing.

While some organizations like to use percentages, number of days/years

between occurrences, or even probability “half lives,” using a set of simple

categories such as the ones listed in the slide above typically provide

sufficient accuracy.

If the likelihood or impact of something going wrong is none or zero, then

this item could be removed from the analysis. However, the removal should

be documented.

• This is not recommended. Just leave it in the inventory, it will

naturally drop to the bottom.

71© SQE Training - STAR West 2014

Many of the factors that affect likelihood are technical in nature. In

development much of the code developed is about handling the errors and

exceptions that occur within the system. There is typically more code

covering the errors and exceptions than there is code implementing the

general rules and processes requested b y the stakeholders.

72© SQE Training - STAR West 2014

73© SQE Training - STAR West 2014

74© SQE Training - STAR West 2014

Impact is typically viewed as the impact on the user of the product./system.

Impact is normally assessed from a business perspective, what is the

damage to the business should an identified risk occur.

75© SQE Training - STAR West 2014

76© SQE Training - STAR West 2014

Most organization use a combination of both methods.

• Qualitative helps express risk in terms a person can understand.

• Quantitative is then used in conjunction with qualitative categories

to create a matrix with each risk given a weighted priority.

Each qualitative category needs to be defined in the organization’s overall

process directives. Ideally, there needs to be several examples of each risk

assessment category to aid people is determining which category is

appropriate to the object they are assessing.

Risk is in the eye of the beholder as noted earlier.

• Any two people may look at the same event and see an entirely

different set of issues. What is critical to one may be trivial to the

other.

77© SQE Training - STAR West 2014

Likelihood = The probability or chance of an event occurring (e.g., the

likelihood that a user will make a mistake and, if a mistake is made, the

likelihood that it will go undetected by the software).

Impact = The damage that results from a failure (e.g., the system crashing or

corrupting data might be considered high impact).

Something could have a low likelihood (technical) risk and yet have a very

high impact (business) risk and vice-versa. It is the combination of the two

factors that helps to determine the overall risk level for a particular element.

78© SQE Training - STAR West 2014

Within an organization it may be necessary to set up different risk models for

different products/systems. This is not a problem as not all products/systems

should necessarily follow the exact same model.

The “quantitative” factors can be changed and adjusted as needed, however,

the “qualitative” elements should remain consistent across different risk

models. This will ensure that risks are assessed the same across the

organization and still allow for adjustments for differences in relative risk

levels.

By adjusting the “quantitative” factors we can allow for applications that have

more business than technical risk and vice-versa but still have a consistent

model that can be used across the organization.

79© SQE Training - STAR West 2014

Under likelihood and impact, there may be differences of opinion as to the

risk. It can be high business risk but low technical risk, etc. So you may have

to compromise on an acceptable level of risk.

The numbers are calculated using the values from our original matrix (page

70 and multiplying them.

H = High which has a value of 3

M = Medium which has a value of 2

L = Low which has a value of 1

80© SQE Training - STAR West 2014

Make adjustments and sort by the agreed priority. We now have a risk-based

assessment of what needs to be tested.

81© SQE Training - STAR West 2014

Of course, successful prioritization of risks does not help unless test cases

are defined for each risk—with the highest priority risks being assigned the

most comprehensive tests and priority scheduling. The object of each test

case is to mitigate at least one of these risks.

If time or resources are an issue, then the priority associated with each

feature or attribute can be used to determine which test cases should be

created and/or run. If testing must be cut, then the risk priority can be used

to determine how and what to drop.

• Cut low risk completely (indicated by the horizontal line).

If you plan to ship the low risk features, you may want to consider an across

the board approach, where the high risk features are fully tested and the

lower risk are tested a little less based on the level of risk associated with

the feature. So medium risk elements get less that high but mode than low

risk elements. At least that way, the features do not ship untested (risk

unknown). This will entail some additional risk as higher risk features get

less testing.

82© SQE Training - STAR West 2014

Appendix has an expanded version of the FMEA (Failure Modes and Effects

Analsys) model as well as the ISO 9126 quality model.

83© SQE Training - STAR West 2014

84© SQE Training - STAR West 2014

85© SQE Training - STAR West 2014

Risk mitigation/Risk control: The process through which decisions are

reached and protective measures are implemented for reducing risks to, or

maintaining risks within, specified levels.

Risk type: A specific category of risk related to the type of testing that can

mitigate (control) that category. For example the risk of user-interactions

being misunderstood can be mitigated by usability testing.

86© SQE Training - STAR West 2014

Murphy’s Law: “If anything can go wrong, it will, and will do so at the worst

possible time”.

87© SQE Training - STAR West 2014

88© SQE Training - STAR West 2014

89© SQE Training - STAR West 2014

90© SQE Training - STAR West 2014

91© SQE Training - STAR West 2014

92© SQE Training - STAR West 2014

93© SQE Training - STAR West 2014

This page left blank

94© SQE Training - STAR West 2014

95© SQE Training - STAR West 2014

96© SQE Training - STAR West 2014

97© SQE Training - STAR West 2014

98© SQE Training - STAR West 2014

99© SQE Training - STAR West 2014

100© SQE Training - STAR West 2014

101© SQE Training - STAR West 2014

102© SQE Training - STAR West 2014

103© SQE Training - STAR West 2014

104© SQE Training - STAR West 2014

105© SQE Training - STAR West 2014

Although exploratory testing primarily relies on the skills and knowledge of

the tester and tends to be more dynamic than traditional technique-driven

design, it too can be more formalized. Using the inventory process as part

of an exploratory test process can add structure to the definition of the areas

to be investigated rather than relying only on the skills of the individual

tester.

106© SQE Training - STAR West 2014

107© SQE Training - STAR West 2014

The goal is to avoid gaps in the testing as well as to avoid overlapping

testing too much.

Depending on how you define your inventories, based on generic groupings

or application specific groupings, the idea to decide who will test which

objects at what stage/level.

Some objects cannot be tested until later stages of the process (i.e.,

scenarios and usage based objects). Conversely some elements, such as

field edits, valid ranges, error messages etc., are best tested in the earlier

stages. These code logic elements, created by the programmers, are best

tested at that stage of the process. Finding such errors late in the process

can be very costly.

108© SQE Training - STAR West 2014

109© SQE Training - STAR West 2014

This page left blank

110© SQE Training - STAR West 2014

111© SQE Training - STAR West 2014

112© SQE Training - STAR West 2014

These three aspects of test execution have to be evaluated together.

Looking at any single aspect provides no real useful information.

113© SQE Training - STAR West 2014

© SQE Training - STAR West 2014 114

Requirements Coverage:

• Which requirements have been tested?

• What are the key risk indicators?

• Degree of coverage for each requirement

• Relative to defined tests

• Failure rates

• Defect information (density, patterns, trends, root cause, etc.

Design Coverage

• Have we addressed key design issues?

• Do we require coverage measures?

• Integration complexity

• Interface (API) coverage

• What are the key risk indicators?

• Failure rates within the design

• Defect information (density, patterns, trends, root cause, etc.

115© SQE Training - STAR West 2014

Risk Coverage

• Are we covering the high risk areas first?

• Are the executed tests balanced across the risk areas or narrowly

focused on specific risk areas?

• What risks areas are still unaddressed?

• What is the level of risk in untested elements?

Code Coverage

• What percentage of the code has been tested?

• Which coverage measures are important?

• Statement coverage

• Decision/branch coverage

• Condition coverage

• Path coverage

• Key measures such as cyclomatic complexity

• Other code coverage measures

116© SQE Training - STAR West 2014

117© SQE Training - STAR West 2014

© SQE Training - STAR West 2014 118

© SQE Training - STAR West 2014 119

120© SQE Training - STAR West 2014

121© SQE Training - STAR West 2014

© SQE Training - STAR West 2014 122

123© SQE Training - STAR West 2014

124© SQE Training - STAR West 2014

125© SQE Training - STAR West 2014

126© SQE Training - STAR West 2014

127© SQE Training - STAR West 2014

128© SQE Training - STAR West 2014

129© SQE Training - STAR West 2014

130© SQE Training - STAR West 2014

131© SQE Training - STAR West 2014

132© SQE Training - STAR West 2014

133© SQE Training - STAR West 2014

134© SQE Training - STAR West 2014

135© SQE Training - STAR West 2014

136© SQE Training - STAR West 2014

137© SQE Training - STAR West 2014

138© SQE Training - STAR West 2014

139© SQE Training - STAR West 2014

140© SQE Training - STAR West 2014

141© SQE Training - STAR West 2014

142© SQE Training - STAR West 2014

Web site references

General testing sites for research etc.

www.Stickyminds.com

www.techwell.com

www.sqaforums.com

www.softwareqatest.com

www.testingeduction.org

Sites for open source elements (tools etc.)

www.sourceforge.net

www.opensourcetesting.org

www.pairwise.org

www.pairwise.org/tools.asp

Sites related to performance, performance services and statistics

Performance-testing.org

www.sandvine.com

TPC.org

www.internetworldstats.com

www.keynote.comwww.keynote.com

www.webtrends.com

www.shunra.com

www.alexa.com

www.mentora.com

www.plunkettresearch.com

Sites related to usability etc.

www.useit.com

www.nngroup.com

www.webpagesthatsuck.com (yes this is a serious site)

sumi.ucc.ie

www.wammi.com

General security related sites

www.sans.org

www.nist.gov

csrc.nist.gov

143© SQE Training - STAR West 2014

This page left blank.

144© SQE Training - STAR West 2014

145© SQE Training - STAR West 2014

146© SQE Training - STAR West 2014

Related terms:

FMECA

SFMEA

SFMECA

Every product has modes of failure. The effects represent the impact of

failures.

— adapted from the Quality Training Portal

147© SQE Training - STAR West 2014

— adapted from the Quality Training Portal

148© SQE Training - STAR West 2014

149© SQE Training - STAR West 2014

FMEA can be applied at any level and should be done iteratively.

150© SQE Training - STAR West 2014

151© SQE Training - STAR West 2014

— adapted from the Quality Training Portal

152© SQE Training - STAR West 2014

153© SQE Training - STAR West 2014

154© SQE Training - STAR West 2014

155© SQE Training - STAR West 2014

156© SQE Training - STAR West 2014

ISO 9126 extract

6.1 Functionality

The capability of the software product to provide functions, which meet stated and implied

needs when the software is used under specified conditions. This characteristic is concerned

with what the software does to fulfill needs, whereas the other characteristics are mainly

concerned with when and how it fulfils needs. For a system, which is operated by a user, the

combination of functionality, reliability, usability and efficiency can be measured externally by

quality in use.

Subcategories

6.1.1 Suitability - The capability of the software product to provide an appropriate set of

functions for specified tasks and user objectives.

6.1.2 Accuracy - The capability of the software product to provide the right, or agreed

results, or effects with the needed degree of precision.

6.1.3 Interoperability - The capability of the software product to interact with one or

more specified systems.

6.1.4 Security - The capability of the software product to protect information and data 6.1.4 Security - The capability of the software product to protect information and data

so that unauthorized persons or systems cannot read or modify them and authorized

persons or systems are not denied access to them.

6.1.5 Functionality compliance - The capability of the software product to adhere to

standards, conventions or regulations in laws and similar prescriptions relating to

functionality.

6.2 Reliability

The capability of the software product to maintain a specified level of performance when used

under specified conditions. Wear or ageing does not occur in software. Limitations in reliability

are due to faults in requirements, design, and implementation. Failures due to these faults

depend on the way the software product is used and the program options selected rather than

on elapsed time. The definition of reliability in ISO/IEC 2382-14:1997 is "The ability of functional

unit to perform a required function...". In this document, functionality is only one of the

characteristics of software quality. Therefore, the definition of reliability has been broadened to

"maintain a specified level of performance..." instead of "...perform a required function".

Subcategories

6.2.1 Maturity

The capability of the software product to avoid failure as a result of faults in the

software.

157© SQE Training - STAR West 2014

6.2.2 Fault tolerance - The capability of the software product to maintain a specified

level of performance in cases of software faults or of infringement of its specified

interface.

NOTE The specified level of performance may include fail safe capability.

6.2.3 Recoverability - The capability of the software product to re-establish a specified

level of performance and recover the data directly affected in the case of a failure.

NOTE 1 Following a failure, a software product will sometimes be down for a certain

period of time, the length of which is assessed by its recoverability.

NOTE 2 Availability is the capability of the software product to be in a state to perform

a required function at a given point in time, under stated conditions of use. Externally,

availability can be assessed by the proportion of total time during which the software

product is in an up state. Availability is therefore a combination of maturity (which

governs the frequency of failure), fault tolerance and recoverability (which governs the

length of down time following each failure). For this reason it has not been included as a

separate subcharacteristic.

6.2.4 Reliability compliance - The capability of the software product to adhere to

standards, conventions or regulations relating to reliability.

6.3 Usability

The capability of the software product to be understood, learned, used and attractive to the

user, when used under specified conditions. Some aspects of functionality, reliability and

efficiency will also affect usability, but for the purposes of ISO/IEC 9126 they are not classified

as usability. Users may include operators, end users and indirect users who are under the

influence of or dependent on the use of the software. Usability should address all of the

different user environments that the software may affect, which may include preparation for

usage and evaluation of results.

Subcategories

Understandability - The capability of the software product to enable the user to

understand whether the software is suitable, and how it can be used for particular tasks

and conditions of use. This will depend on the documentation and initial impressions

given by the software.

Learnability - The capability of the software product to enable the user to learn its

application. The internal attributes correspond to suitability for learning as defined in

ISO 9241-10.

158© SQE Training - STAR West 2014

Operability - The capability of the software product to enable the user to operate and

control it.

NOTE 1 Aspects of suitability, changeability, adaptability and installability may affect

operability.

NOTE 2 Operability corresponds to controllability, error tolerance and conformity with

user expectations as defined in ISO 9241-10.

NOTE 3 For a system which is operated by a user, the combination of functionality,

reliability, usability andefficiency can be measured externally by quality in use.

Attractiveness - The capability of the software product to be attractive to the user. This

refers to attributes of the software intended to make the software more attractive to

the user, such as the use of color and the nature of the graphical design.

Usability compliance - The capability of the software product to adhere to standards,

conventions, style guides or regulations relating to usability.

6.4 Efficiency - The capability of the software product to provide appropriate performance,

relative to the amount of resources used, under stated conditions. Resources may include other

software products, the software and hardware configuration of the system, and materials (e.g. software products, the software and hardware configuration of the system, and materials (e.g.

print paper, diskettes). For a system which is operated by a user, the combination of

functionality, reliability, usability and efficiency can be measured externally by quality in use.

Subcategories

6.4.1 Time behavior - The capability of the software product to provide appropriate

response and processing times and throughput rates when performing its function,

under stated conditions.

6.4.2 Resource utilization - The capability of the software product to use appropriate

amounts and types of resources when the software performs its function under stated

conditions. Human resources are included as part of productivity.

6.4.3 Efficiency compliance - The capability of the software product to adhere to

standards or conventions relating to efficiency.

6.5 Maintainability

The capability of the software product to be modified. Modifications may include corrections,

improvements or adaptation of the software to changes in environment, and in requirements

and functional specifications.

159© SQE Training - STAR West 2014

Subcategories

6.5.1 Analysability - The capability of the software product to be diagnosed for

deficiencies or causes of failures in the software, or for the parts to be modified to be

identified.

6.5.2 Changeability - The capability of the software product to enable a specified

modification to be implemented. Implementation includes coding, designing and

documenting changes. If the software is to be modified by the end user, changeability

may affect operability.

6.5.3 Stability - The capability of the software product to avoid unexpected effects from

modifications of the software.

6.5.4 Testability - The capability of the software product to enable modified software to

be validated.

6.5.5 Maintainability compliance - The capability of the software product to adhere to

standards or conventions relating to maintainability.

6.6 Portability - The capability of the software product to be transferred from one environment

to another. The environment may include organizational, hardware or software environment.

Subcategories

6.6.1 Adaptability - The capability of the software product to be adapted for different

specified environments without applying actions or means other than those provided

for this purpose for the software considered. Adaptability includes the scalability of

internal capacity (e.g. screen fields, tables, transaction volumes, report formats, etc.). If

the software is to be adapted by the end user, adaptability corresponds to suitability for

individualization as defined in ISO 9241-10, and may affect operability.

6.6.2 Installability - The capability of the software product to be installed in a specified

environment.

NOTE If the software is to be installed by an end user, installability can affect the

resulting suitability and operability.

6.6.3 Co-existence - The capability of the software product to co-exist with other

independent software in a common environment sharing common resources.

160© SQE Training - STAR West 2014

6.6.4 Replaceability - The capability of the software product to be used in place of

another specified software product for the same purpose in the same environment. For

example, the replaceability of a new version of a software product is important to the

user when upgrading. Replaceability is used in place of compatibility in order to avoid

possible ambiguity with interoperability. Replaceability may include attributes of both

installability and adaptability. The concept has been introduced as a sub characteristic of

its own because of its importance.

6.6.5 Portability compliance - The capability of the software product to adhere to

standards or conventions relating to portability

161© SQE Training - STAR West 2014

This page left blank