CHALLENGELand well and set liner as soon as bit reaches top of reservoir, without a pilot hole, and reduce the overall well cost.
SOLUTIONGuide well placement with real-time data from geoVISION* imaging-while-drilling service.
RESULTS Reduced costs by using LWD data
to land well without having to drill a pilot hole.
Identified the top of target reservoir 15m deeper than expected and landed the well at 0.2-m TVD inside the reservoir without losing reservoir thickness.
Exploit undeveloped thin sands offshore VietnamThe Cuu Long Joint Operating Company (CLJOC), having developed much of the Cuu Long basin offshore Vietnam over the year, was looking to access undeveloped, thin-oil reservoirs to counteract production decline in the field. CLJOC decided to take advantage of thin oil-bearing sands that had been identified during past exploration and development drilling. Operations faced large uncertainties in reservoir thickness and lateral continuity, hydrocarbon content was untested, and there was low confidence in the depth conversion of the top of the structures interpreted from previous seismic data.
The plan was to drill two horizontal wells with objectives to reduce the depth uncertainties for landing the producer well, test the hydrocarbon content, and maximize reservoir contact in the thin sands. In addition, CLJOC wanted to land the second well without a pilot hole to reduce costs for the project.
Measure resistivity at the bit for early indication of reservoir topSchlumberger designed the 8-in section to land as close as possible below the top of the 24 m thick reservoir to prevent loss of sand thickness for the drainage section while also evaluating reservoir quality. To support this objective, the BHA included the geoVISION service for at-bit resistivity measurements to provide the earliest possible indication of an approaching resistivity contrastin this case, the highly resistive hydrocarbon-bearing sandand enable precise geostopping.
CASE STUDY
Drilling
Resistivity-at-the-Bit Measurements Guide Geostopping 0.2-m TVD Below Top of ReservoirgeoVISION service helps CLJOC with precise well placement and eliminates pilot hole, reducing well costs offshore Vietnam
At-bit resistivity measurements from geoVISION service identified the top of the reservoir 15 m deeper than expectations set by offset data. Bit resistivity increased and gamma ray data indicated sand as the well approached the target.
2,171.3
2,172
2,173
2,174
2,175
2,176
2,177
2,178
2,179
2,180
2,181
2,182
TVD TVD TVDSpectroscopy Gamma Ray
Gamma Ray (GR), Real-Time,
arcVISION service
Gamma Ray (GR), Real-Time,
arcVISION service
Array Induction 1-ft Resistivity
Bit Resistivity, Real-Time
Uncorrected Phase-Shift Resistivity for 16-in Spacing at 2 MHz
ohm.m
ohm.mohm.m
ohm.m ohm.m ohm.m
Array Induction 1-ft Resistivity
Phase-Shift Resistivity 40-in Spacing at 2 MHz,
Environmentally Corrected
Uncorrected Phase-Shift Resistivity for 40-in Spacing at 2 MHz
gAPI gAPI gAPI
Bit-resistivity increased when
approaching the reservoir
Top of reservoir
Offset Well 1Well B Offset Well 2
m m m
0 0 0
0.2
0.20.2
0.2 0.2 0.2200 200 200
200
200200
200 200 200
2,187.3
2,188
2,189
2,190
2,191
2,192
2,193
2,194
2,195
2,196
2,197
2,198
2,173.2
2,174
2,175
2,176
2,177
2,178
2,179
2,180
2,181
2,182
2,183
2,184
-
slb.com/geoVISION
*Mark of Schlumberger Other company, product, and service names are the properties of their respective owners. Copyright 2013 Schlumberger. All rights reserved. 13-DR-0096
CASE STUDY: geoVISION service guides precise well placement and eliminates pilot hole offshore Vietnam
Landed well at 0.2-m TVD below top for minimal penetrationDuring landing, the trajectory was adjusted according to key depth markers that were 15 m deeper than expected. When the top of the reservoir was not reached as planned, the decision was made to drop the angle to 86.5 inclination to reduce the drilled measured depth interval. The team landed in the reservoir at 15-m TVD deeper than plan, which was confirmed by bit resistivity readings of 30 ohm.m and hydrocarbon show in the bottoms-up circulation. Based on LWD data, landing point was determined to be at 0.2-m TVD below the top of the reservoir, so the liner could be set without inhibiting the production hole.
The well was precisely landed using real-time data from geoVISION service. The landing section was geostopped based on bit resistivity after penetrating 5 m of the thin target sand, and a pilot hole was successfully eliminated, which reduced the overall well cost.
Using geoVISION service for early indication of the thin target reservoir helped the team geostop the section 0.2-m TVD within the reservoir, preventing loss of sand thickness for the production hole.
TVD,
m
TVD
subs
ea, m
True horizontal length, m
2,160
2,165
2,170
2,175
2,180
2,185
2,190
2,195
2,200
1,7001,640 1,800 1,900 2,000 2,100 2,200
2,110
2,115
2,120
2,125
2,130
2,135
2,140
2,145
2,150
2,155
2,900
Projection at bit
2,920
2,940
2,960
2,980
3,0003,02
03,04
0
3,0603,08
0
3,100
3,120
3,140
3,160
3,180
3,200
3,220
3,2403,26
0
3,3003,32
03,280
Planned Actual