Geothermal experience and

scientific drilling in Sweden

Jan-Erik Rosberg,

Engineering Geology, Lund University

Page 2: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

www.sgu.se

Page 3: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Time table: Geothermal

research in Scania 1977 Geothermal research started

at our department

1980 A slim hole drilling in Landskrona. TD 1100m.

------------------------------------------------

1981 A concept for a geothermal plant in Lund were carried out by LTH, Lund Energy and ASEA STAL AB.

1983 Two exploration boreholes were drilled. Flackarp 1 (TD 764 m) and Värpinge 1 (TD 684 m).

1984 Lund Energy decided to build a geothermal heat plant with 2 production wells and 2 injection wells.

1985 January, the first part of the geothermal plant was finished

The second phase was started.

1986 February, the second part was finished. 4 production wells

5 injection wells

2 exploration wells

2001 Project “Deep Geothermal Energy”

2008- Possible expansion

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 4: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

The geothermal Heatplant in

Lund principal

•Aquifer: Campanian sandstone •Production wells: 4 • Injection wells: 5 •Drilling depth: 650 - 800 m •Exploration wells: 2 •Production rate: approx 1600 m3/h •Production temperature: initially: approx 22 °C today: approx 17 °C • Injection temperature: 4-7 °C

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 5: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Location map

Geothermal heat

plant

1.8 km

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 6: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Heat Pump Plant

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 7: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Production and Injection well

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 8: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Screen design

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 9: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Production data

• Daily

• 32 parameters

• From start

1985

• Stored in

database

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 10: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Temperature

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 11: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Measurements (logging) in

wells • Temperature

– Control of temperature changes in the formation

– Use in thermo hydraulic modeling

• Caliper (diameter) – Control of well construction

• Flowmeter – Control of inflow and outflow in the screened section

• Video inspection – Control of well construction

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 12: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Well improvement

• Hydro-jetting (2012-2013)

• Removal of scaling

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 13: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 14: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Deep Geothermal project

• 2 wells (TD 3701m and 1927 m)

• Drilling down and into the

basement

• Fractures were found

• Sandstones between 1300-1900 m

• Temperature above 40 °C

• Not enough water for commercial

use

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 15: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

DGE#1

Page 16: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Casing collapse at 1030 m. Jan-Erik Rosberg, Engineering Geology, Lund University

Page 17: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -
Page 18: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Different Drilling

methods

ROP and Caliper

used and measured

in DGE #1.

Note the transition from

Conventional to Rotary Air

Drilling

In addition Mud hammer test

between 3666 m and 3675 m

Page 19: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Air rotary drilling

Sketch: Peter Jonsson, Engineering geology

Page 20: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

The compressors used for Air Drilling

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 21: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Different Air bit status after 90 m of drilling

Normal wear

Extensive wear

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 22: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

The Numa

Percussion Hammer

assembly

with 12 1/4” button

bit.

(2878 m to 2972 m)

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 23: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Airlifting basement Airlifting

0

20

40

60

80

100

120

2003-03-09

12:00:00

2003-03-10

04:00:00

2003-03-10

20:00:00

2003-03-11

12:00:00

2003-03-12

04:00:00

2003-03-12

20:00:00

2003-03-13

12:00:00

2003-03-14

04:00:00

2003-03-14

20:00:00

Time

SP

P (

bar)

0

5

10

15

20

25

30

35

40

45

Flo

w r

ate

(l/s

)

SPP

Flow

Airsub placed at the depth of 3100 mAirsub placed at the depth of 3690 m

Average flow rate 1.8 l/s and

temperature 85 degC Jan-Erik Rosberg, Engineering Geology, Lund University

Page 24: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 25: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Injection and fall-off test

Injection and fall off test

0

50

100

150

200

2003-10-16

00:00:00

2003-10-16

12:00:00

2003-10-17

00:00:00

2003-10-17

12:00:00

2003-10-18

00:00:00

2003-10-18

12:00:00

2003-10-19

00:00:00

2003-10-19

12:00:00

2003-10-20

00:00:00

Time

Pre

ssu

re (

bar)

0

1

2

3

4

Inje

cti

on

rate

(l/s)

Pressure

Injection rate

Transmissivity 5.0∙10-7 m2/s

(K= 9.9∙10-10 m/s) Jan-Erik Rosberg, Engineering Geology, Lund University

Page 26: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Perforation of dual casing

Perforation runs

(6 SPF)

1895-1905 m

1827-1840 m

1472-1525 m

1827-1853 m

1685-1717 m

1427-1472 m

1427-1530 m

Page 27: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Perforation

Total number of

perforations 5220

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 28: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Estimation of transmissivity

from drawdown and recovery

data

0.1 1. 10. 100. 1000.

0.

100.

200.

300.

400.

500.

Time (min)

Dra

wd

ow

n (

m)

Obs. Wells

DGE#1

Aquifer Model

Confined

Solution

Cooper-Jacob

Parameters

T = 1.14E-4 m 2 /s

1. 10. 100. 1000. 1.0E+4

0.

100.

200.

300.

400.

500.

Time, t/t'

Resid

ua

l D

raw

do

wn

(m

)

Obs. Wells

DGE#1

Aquifer Model

Confined

Solution

Theis (Recovery)

Parameters

T = 5.02E-5 m 2 /s

T= 1.1∙10-4 m2/s T= 5.0∙10-5 m2/s

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 29: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

DGE#2

Page 30: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Hanger Liner at 500 m. From 20" to 13 5/8".

13 5/8" casing

9 5/8" casing/blank

Hanger Liner from 1209,6-1213 m

NOTE: NOT TO SCALE !!

1473 m Port Collar

1250 m

1476-1479 m. Tell Tale slot.

1506 m

1507 m

1539 m

1558 m

1569 m

1672,5 m

1702,5 m

1729 m

1927 mTotal depth of drilled well. ( Top gneiss )

Top backfill with gravel

Bottom of Sump in well completion

1560-1563 m Slotted Tell Tale

1566-1569 m Slotted Tell Tale

NOTE: All depths are KB-depths !

Ground level is - 5 m.

LB. 20041201

DGE 02

9,1" OD

W-Wrapped

7" OD, 6" ID

W-Wrapped scr.

9 5/8" OD and 8,535 ID Blanks

6 5/8" OD, 6" ID Blanks

6 5/8" OD, 6" ID Blanks

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 31: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Pumping test pre- and post-

development Pumping test before jetting (7sep,25nov) and after jetting (10jan)

0

50

100

150

200

250

300

0,1 1 10 100 1000 10000

Time (min)

Dra

wd

ow

n (

m)

07-sep

25-nov

10-jan

Average flow rate during

the first 200 minutes

7-sep 33.6 l/s

25-nov 41.7 l/s

10-jan 48.5 l/s

Missing data

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 32: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Well development

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 33: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 34: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Interference

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 35: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

EGS (Enhanced Geothermal Systems)

Plans for EGS

• 5000-7000 m deep

boreholes

• Mudhammer technique

• District heating

• In southern part of

Sweden

www.altarock.com

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 36: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Riksriggen

Jan-Erik Rosberg, Engineering

Geology, Lund University

Page 37: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

In November 2009 the Swedish Research Council awarded Lund University and its co-applicants a grant of 25.8 MSEK, around 3 MUSD. The grant is being used for buying, implementing and running an infrastructure for Deep Core Drilling. VR states that the infrastructure is a National resource to be managed and operated by Engineering Geology in Lund and serving all Swedish universities and researchers.

Main co-applicants were Uppsala University and Luleå Technical University. Other supporting universities were SU, CTH and KTH. In addition, the Swedish Deep Drilling Programme.

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 38: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

< 35 ton total

around 2500 ton

500 – 800 m2

3000 – 5000 m2

WL coring rig WL coring rig

Conv. mud rotary rig

Page 39: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 40: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

P-size H-size

N-size

Core diameter 83/85 mm

Hole diameter 122.6 mm

Core diameter 61.1/63.5 mm

Hole diameter 96 mm

Core diameter 45/47.6 mm

Hole diameter 75.7 mm Depth capacity coring

P-size to around 1050 m

H-size to around 1600 m

N-size to around 2500 m Jan-Erik Rosberg, Engineering Geology, Lund University

Page 41: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 42: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 43: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 44: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 45: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 46: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Type of projects

• Geoscientific projects

• Groundwater exploration

• Geothermal exploration

• CO2-storage

• Civil engineering projects

• etc.

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 47: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

COSC-project in Åre, 2014

Total drilling depth 2495.8 m

COSC: Collisional Orogeny in the Scandinavian Caledonides

Page 48: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

COSC-project objectives

• Study how mountain belts are formed

– Drill through the middle allochthon (Seve

Nappe)

• Heat flow and climate

• Large and small scale water circulation

patterns, present and past

• Deep biosphere

• Verification of geophysical surveys

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 49: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Jan-Erik Rosberg, Engineering

Geology, Lund University

Page 50: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

COSC working

groups

Tectonics and geology

Hydrogeology

Microbiology

Geophysics

Drilling management

and technology

Geothermics

Page 51: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Project organisation

• Lund University (Technical

management)

• Uppsala University (Geoscientific

management)

• Protek (Drilling contractor)

• LarssonDrillingConsultant AB

(Supervisor)

• 52 researchers from 11 countries

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 52: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Drilling operation (overview)

• Installation of HWT-casing

• Core drilling HQ3, 1616 m

• Core drilling NQ3, 1709 m

• Core drilling (6 m core barrel) NQ,

2495.8 m

Geophysical logging, hydraulic testing and

water and gas sampling

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 53: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Results core drilling

• HQ3 1616 m (1/5-8/7),

33- 63 m drilled /day,

100 % core recovery

• NQ 2495,8 m,

around 36 m drilled/day,

100 % core recovery

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 54: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Drill bits HQ3

• Excore 8-9 JET16 10 WW

• Drilled m / drill bit: 13 -173 m

• Average: 72 m/drill bit

• Too low RPM and too high pumping

rate wore out the drill bits

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 55: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

NQ drill bits

• Excore 6-8 JET16 8 WW

• Drilled m/ drill bit: 12 - 288 m

• Average: 112 m/drill bit

• Too low RPM and too high pumping

rate wore out the drill bits

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 56: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Drill bits

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 57: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Too low RPM

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 58: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Bent drill rods

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 59: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Mud system

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 60: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Rod handling

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 61: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Data acquisition system (PJ)

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 62: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Blow Out Preventer (BOP)

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 63: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Special cores for the

microbiologists

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 64: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

64

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 65: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Successful results thanks to

skilled drilling crew

Jan-Erik Rosberg, Engineering Geology, Lund University

Page 66: Geothermal experience and scientific drilling in · PDF fileGeothermal experience and scientific drilling in Sweden ... 2001 Project “Deep Geothermal ... •Drilling depth: 650 -

Summary

• Successful drilling operation

(national records!)

• 2400 m open borehole

• Geoscientists and microbiologist are

satisfied

• 100 % core recovery

• The research has just started….

Jan-Erik Rosberg, Engineering Geology, Lund University