geosynthetics: can they reduce base thickness? · se strengthening)se strengthening) subgrade &...
TRANSCRIPT
GeosyntheticsGeosynthetics: Can: CanGeosyntheticsGeosynthetics: Can: CanBase Thickness?Base Thickness?
AsAsAsAs
n They Reducen They Reducen They Reduce n They Reduce
Richard Reid, Ph.D., P.E.Richard Reid, Ph.D., P.E.ssociate Dean of Engineeringssociate Dean of Engineering
SDSUSDSUssociate Dean of Engineeringssociate Dean of Engineering
Director, SD LTAPDirector, SD LTAP
OverOver
The Answer The Answer DefinitionsDefinitionsSeparation (betweeSeparation (betweeReinforcement (basReinforcement (basReinforcement (basReinforcement (basFiltration (between Filtration (between VariablesVariablesPerformancePerformance
rviewrview
en subgrade & base)en subgrade & base)se strengthening)se strengthening)se strengthening)se strengthening)subgrade & base)subgrade & base)
SDSUSDSU
The QuThe QuThe QuThe Qu
If I use If I use geosynthetigeosyntheti•• Reduction in base cReduction in base c•• IIncrease in total vencrease in total ve
TheTheTheTheIt DependsIt Depends
uestionuestionuestionuestion
icic x, what will be my:x, what will be my:course? (BCR)course? (BCR)hicle passes? (TBR)hicle passes? (TBR)
e Answere Answere Answere Answer
SDSUSDSU
DefinDefinDefinDefin
Base Course ReductionBase Course Reduction•• Reduction in base layer tReduction in base layer t
geosyntheticgeosynthetic•• Same number of passesSame number of passes
Traffic Benefit Ratio (TBTraffic Benefit Ratio (TB•• Ratio (for same section tRatio (for same section t((
# of cycles of reinforced sec# of cycles of reinforced sec# of cycles of unreinforced s# of cycles of unreinforced s
nitionsnitionsnitionsnitions
n (BCR)n (BCR)thickness due to presence of thickness due to presence of
s but with less bases but with less baseBR)BR)thickness) of:thickness) of:))ction to achieve a given rut depthction to achieve a given rut depthsection to achieve same rut depthsection to achieve same rut depth
SDSUSDSU
TBRTBRTBR vsTBR vsTraffic Benefit RatioTraffic Benefit RatioTraffic Benefit RatioTraffic Benefit Ratio
50,000 ESAL’s 100,000 ESAL’s
BCRBCRs. BCRs. BCRBase Course ReductionBase Course ReductionBase Course ReductionBase Course Reduction
50,000 ESAL’s 50,000 ESAL’s
SDSUSDSU
Types of Types of GeosynGeosynUsed inUsed in
theticsthetics Typically Typically n Roadsn Roads
SDSUSDSU
DefinitioDefinitioDefinitioDefinitio
GeotextilesGeotextiles
ns (ns (con’tcon’t))ns (ns (con tcon t))
SDSUSDSU
DefinDefinDefinDefin
SeparationSeparation•• Provides separationProvides separation
materialsmaterials•• Prevents interminglPrevents intermingl
i ifi tl diffi ifi tl diffsignificantly differensignificantly differen–– Base course contamBase course contam
All fAll f•• Allows free movemAllows free movemGeotextilesGeotextiles
nitionsnitionsnitionsnitions
n between two dissimilar n between two dissimilar
ling of soil layers that possess ling of soil layers that possess t i i di t ib tit i i di t ib tint grain size distributionsnt grain size distributions
minationminationt f t b t lt f t b t lent of water between layersent of water between layers
SDSUSDSU
DefinDefinDefinDefin
ReinforcementReinforcement•• Adds tensile strengthAdds tensile strengthgg•• Embankments over sEmbankments over s•• Construction of steepConstruction of steep•• Construction of steepConstruction of steep•• Reinforcement or stifReinforcement or stif
––GeosyntheticsGeosynthetics have nhave n
GeogridsGeogrids or geotextilor geotextilgg gg
nitionsnitionsnitionsnitions
h to soilh to soilsoft soilssoft soilsp slopes & retaining wallsp slopes & retaining wallsp slopes & retaining wallsp slopes & retaining wallsffening of layers?ffening of layers?no structural numberno structural number
ilesilesSDSUSDSU
ReinforcementReinforcementReinforcementReinforcementt or Stiffening?t or Stiffening?t or Stiffening?t or Stiffening?
SDSUSDSU
Base ImpBase ImpBase ImpBase Imp
Lateral Shear Lateral Shear FlowFlow
•FlowFlow
Lateral Restraint Due to Lateral Restraint Due to FrictionFriction
provementprovementprovementprovement
• Lateral Restraint–– Confinement of the aggregate Confinement of the aggregate Confinement of the aggregate Confinement of the aggregate
base during loadingbase during loading–– Results in increase in STIFFNESS Results in increase in STIFFNESS
of the base materialof the base materialof the base materialof the base material–– Improved/reduced vertical Improved/reduced vertical
stress distribution applied to stress distribution applied to
t b dt b dpavement subgradepavement subgrade
SDSUSDSU
DefinDefinDefinDefin
FiltrationFiltration•• Prevent soil migrationPrevent soil migrationgg•• Prevent soil from migPrevent soil from mig
layerlayerlayerlayer•• Used below ripUsed below rip--rap/arrap/ar
drainage systemsdrainage systemsdrainage systemsdrainage systemsGeotextilesGeotextiles
nitionsnitionsnitionsnitions
nngrating into base/drainage grating into base/drainage
rmor materials and in rmor materials and in
SDSUSDSU
When May We RWhen May We RWhen May We RWhen May We R
When subgrades arWhen subgrades armust be added to smust be added to s
educe Thickness?educe Thickness?educe Thickness?educe Thickness?
re soft and additional base re soft and additional base stabilize subgradestabilize subgrade
SDSUSDSU
When To UseWhen To UseWhen To Use When To Use
When subgrade forWhen subgrade for•• Has a high percentaHas a high percenta•• Is exposed to waterIs exposed to water•• Has the potential toHas the potential to
GeosyntheticsGeosyntheticsGeosyntheticsGeosynthetics
r separation/filtration:r separation/filtration:age of finesage of finesr for extended periods of timer for extended periods of timeo migrate into the baseo migrate into the base
SDSUSDSU
What Affects BWhat Affects BWhat Affects BWhat Affects B
Subgrade strengthSubgrade strengthAggregate characteAggregate charactegg ggg gDesign requiremenDesign requiremenGeosyntheticGeosynthetic propepropeGeosyntheticGeosynthetic propeprope
Each case is projecEach case is projec
Base ReductionBase ReductionBase ReductionBase Reduction
eristicseristicstt
ertiesertiesertieserties
ct and product uniquect and product unique
SDSUSDSU
Possible ValuePossible ValueReduction & TrafReduction & TrafReduction & TrafReduction & Traf
Base course reductBase course reduct•• For geotextiles (20For geotextiles (20--•• For For geogridsgeogrids (30(30--5050•• Minimum base thickMinimum base thick
Traffic Benefit RatioTraffic Benefit Ratio•• For geotextiles (1.5For geotextiles (1.5For geotextiles (1.5For geotextiles (1.5•• For For geogridsgeogrids (1.5 (1.5 ––
es of Thickness es of Thickness affic Benefit Ratioaffic Benefit Ratioaffic Benefit Ratio affic Benefit Ratio
tiontion--33%)33%)0%)0%)kness is 6”kness is 6”oo55 –– 10)10)5 5 10)10)
70)70)
SDSUSDSU
FinalFinalFinal Final
GeosyntheticsGeosynthetics, whe, wheappropriate base mappropriate base mimprove traffic beneimprove traffic beneGeosyntheticsGeosynthetics maymaysections if properly sections if properly •• It will never make aIt will never make a
PointsPointsPointsPoints
en properly installed using en properly installed using materials, will always materials, will always efit ratioefit ratioy allow for reduced base y allow for reduced base
designeddesigneda low quality material better!a low quality material better!q yq y
SDSUSDSU