Georgetown County, South Carolina 129 Screven Street, Suite 239 Post Office Drawer 421270 Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500 E-Mail [email protected] Website http://www.gtcounty.org ADDENDUM #2 TO RFP #17-111 BID NUMBER: 17-111 ISSUE DATE: Thursday, December 07, 2017 OPENING DATE: Wednesday, Dec. 20, 2017 OPENING TIME: 3:00 PM (Eastern NIST) Bid Opening Location: Georgetown County Courthouse, Suite #239, (Purchasing Conference Room) Pre-Bid Conference/Site Inspection: MANDATORY, Wednesday, Nov. 29, 2017 at 1:00PM on Site PROCUREMENT FOR: Marsh Walk Concrete Sidewalk Repair and Replacement Commodity Code(s): 96890 This addendum will amend Bid #17-081, Marsh Walk Concrete Sidewalk Repair and Replacement originally issued on Friday, November 17, 2017. This clarification is being provided to all known and registered correspondents in response to questions received. All addenda and original bid documents are also available online at: www.gtcounty.org, select Quick Links, “Bid Opportunities” and “Current Bids.” Question 1: In the areas where fill is needed to replace wash-out between the sheet piling and the sidewalk, can concrete be used? Response: Concrete may be used for this purpose in isolated locations such that the intended repair does not span a length greater than 10 linear feet parallel to walkway & bulkhead. For locations requiring repairs greater than this length, base material shall be provided and compacted. Question 2: What should be the density requirements for areas where fill is needed? Is compaction testing required? Response: Base material (meeting requirements on Sheet C4.01) shall be compacted to 95% of dry unit weight according to ASTM D 698. Contractor shall specify a provider for third-party testing, subject to approval. Question 3: Can you confirm the size oyster shell fragments should be used to float in the top layers of the tabby sidewalks? Response: No. 3 crushed poultry oyster shells. See Item 6 in Addendum #1. Question 4: Can either plastic trip stops or metal key-ways be used in lieu of dowels to control movement Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 1 of 14

Upload: others

Post on 07-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

Georgetown County, South Carolina129 Screven Street, Suite 239 Post Office Drawer 421270

Georgetown, SC 29442-4200 (843) 545-3083 Fax (843) 545-3500

E-Mail [email protected] Website http://www.gtcounty.org

ADDENDUM #2 TO RFP #17-111 BID NUMBER: 17-111 ISSUE DATE: Thursday, December 07, 2017 OPENING DATE: Wednesday, Dec. 20, 2017 OPENING TIME: 3:00 PM (Eastern NIST) Bid Opening Location: Georgetown County Courthouse, Suite #239, (Purchasing Conference Room) Pre-Bid Conference/Site Inspection: MANDATORY, Wednesday, Nov. 29, 2017 at 1:00PM on Site PROCUREMENT FOR: Marsh Walk Concrete Sidewalk Repair and Replacement Commodity Code(s): 96890 This addendum will amend Bid #17-081, Marsh Walk Concrete Sidewalk Repair and Replacement originally issued on Friday, November 17, 2017. This clarification is being provided to all known and registered correspondents in response to questions received. All addenda and original bid documents are also available online at: www.gtcounty.org, select Quick Links, “Bid Opportunities” and “Current Bids.” Question 1: In the areas where fill is needed to replace wash-out between the sheet piling and the

sidewalk, can concrete be used? Response: Concrete may be used for this purpose in isolated locations such that the intended repair does

not span a length greater than 10 linear feet parallel to walkway & bulkhead. For locations requiring repairs greater than this length, base material shall be provided and compacted.

Question 2: What should be the density requirements for areas where fill is needed? Is compaction

testing required? Response: Base material (meeting requirements on Sheet C4.01) shall be compacted to 95% of dry unit

weight according to ASTM D 698. Contractor shall specify a provider for third-party testing, subject to approval.

Question 3: Can you confirm the size oyster shell fragments should be used to float in the top layers of

the tabby sidewalks?

Response: No. 3 crushed poultry oyster shells. See Item 6 in Addendum #1. Question 4: Can either plastic trip stops or metal key-ways be used in lieu of dowels to control movement

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 1 of 14

Page 2: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

at construction joints? Response: Metal key-ways will not be accepted for use.

TripStop Joints shall be utilized in lieu of typical Construction and Control Joint details. Contract Documents have been revised to reflect the use of TS100S rigid PVC joints throughout and details have been provided regarding installation and required spacing. TripStop shall be used in lieu of both typical joint types. Installation of TripStop in lieu of only Construction Joints shall not be allowed. Alternative rigid PVC jointing materials are subject to prior approval by the Engineer.

Question 5: Is the #2 treated lumber for rail replacement a .06 or .08 specification? What are the

specifications from the original installation? Response: Lumber treatment for rails shall meet the requirements of APWA Use Category UC3B

(Exterior Above Ground, Uncoated). CA-C (Copper Azole, Type C) is acceptable as 0.06 retention value and CA-B (Copper Azole, Type B) shall be minimum 0.10 retention value for UC3B.

Lumber treatment for timber posts subject to installation below grade shall meet the

requirements of APWA Use Category UC4B (Ground Contact, Heavy Duty). Attached, and also available on the website, are the revised plans and drawings associated with Addendum 02.

PART 5 – Index of Drawings, Plans and Project Notes Sheet No. Description Date G0.01 Cover Page 12/07/2017 Addendum 2 G1.01 Phase Index 12/07/2017 Addendum 2 D1.01 Phase 1C – Demolition Plan 12/07/2017 Addendum 2 D2.01 Phase 1E – South Demolition Plan 12/07/2017 Addendum 2 D2.02 Phase 1E – North Demolition Plan 12/07/2017 Addendum 2 D3.01 Phase 3D – Demolition Plan 12/07/2017 Addendum 2 C1.01 Phase 1C 12/07/2017 Addendum 2 C2.01 Phase 1E – South 12/07/2017 Addendum 2 C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum 2

[The remainder of this page intentionally left blank.]

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 2 of 14

Page 3: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

ADDENDUM ACKNOWLEDGEMENT

Bid #17-080 Tax Billing & Collection System: Software & Support

Mandatory Submittal Form

To be returned with the final proposal submission to Georgetown County. COMPANY NAME:

◙ Addendum #1 Received Date: Initialed By:

◙ Addendum #2 Received Date: Initialed By:

□ Addendum #3 Received Date: Initialed By:

□ Addendum #4 Received Date: Initialed By:

□ Addendum #5 Received Date: Initialed By:

□ Addendum #6 Received Date: Initialed By:

If your Bid submission has already been mailed, acknowledgment may be provided by faxing this form to (843)545-3500, or attaching a digital scan and sending by e-mail. .

[THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK]

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 3 of 14

Page 4: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

###

###

###

###

####

####

8##

####

##7

####

####

6##

####

##5

###

####

####

####

4##

###

####

####

##3

###

####

####

####

2D

HC

AD

DE

ND

UM

NO

. 2 R

EV

.12

/07/

171

11G0.01161166.002_INDEX

CO

VE

R P

AG

EG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IR &

RE

PLA

CE

ME

NT

####

####

####

####

GEORGETOWN COUNTYDEPARTMENT OF PUBLIC SERVICES

GEORGETOWN COUNTY | SOUTH CAROLINA

MARSH WALK CONCRETE SIDEWALKREPAIR & REPLACEMENT

SCALE: N.T.S.

VICINITY MAP

SCALE: N.T.S.

LOCATION MAP

PROJECT LOCATION

PROJECT LOCATION

SCALE: N.T.S.

SITE OVERVIEW

G0.01

C1.01

COVER PAGE

C3.01

PHASE 1C - SIDEWALK PLAN

DRAWING INDEX

SHEET TITLE

CIVIL

C2.01 PHASE 1E - SOUTH SIDEWALK PLAN

G1.01 MARSH WALK PHASE INDEX

C2.02

C4.01 CIVIL SECTIONS & NOTESPHASE 3D - SIDEWALK PLANPHASE 1E - NORTH SIDEWALK PLAN

PHASE 1C - DEMOLITION PLANDEMOLITION

PHASE 1E - SOUTH DEMOLITION PLAN

PHASE 3D - DEMOLITION PLANPHASE 1E - NORTH DEMOLITION PLAN

D1.01

D3.01

D2.01D2.02

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 4 of 14

Page 5: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

RIP RAP

MARSH GRASS

MARSH GRASS

MARSH GRASS

W

CRAZY SISTERSMARINA

DREDGEAREA

DREDGEAREA

E

FLAGG STREET

CHANNEL B

CHANNEL C

CHANNEL D

GEORGETOWNCOUNTY

HVAC

HVAC

SHED

UNDERGROUND

LIQUID PROPANE

HVAC

TRANS

SIGN

ELEC

TRANS

SS

SS

OYSTER SHELL BANK

WOOD

DECK

HVAC

PHASE 5

W.B.O.W.

BUBBA'S

LOVE

SHAKCAPT DAVES

DOCKSIDE

MULLET

HUT

CREEK RATZ

CLAW HOUSE DEAD DOG

DRUNKEN

JACK'S

BOVINES

WAHOO'S

PHASE 1A

W.B.O.L.

PHASE 1B

W.B.O.S.

PHASE 1C

CONC.

PHASE 1D

W.B.O.W.

PHASE 1E

CONC.

PHASE 2

W.B.O.W.

PHASE 3A

W.B.O.W.

PHASE 3B

CONC.

PHASE 3DCONC.

PHASE 3C

W.B.O

.W.

PHASE 4AW.B.O.W.

PHASE 4AW.B.O.W.

WALKWAY LEGENDCALLOUT DESCRIPTION HATCH

W.B.O.W. WOODEN BOARDWALK OVER WATERW.B.O.S. WOODEN BOARDWALK OVER SEAWALLW.B.O.L. WOODEN BOARDWALK OVER LANDCONC. CONCRETE SIDEWALK @ GRADE

SCOPE OF WORKPHASE DESCRIPTION AREA [SF] SHEETS

1C CONCRETE SIDEWALK @ GRADE 1,180 C1.011E CONCRETE SIDEWALK @ GRADE 3,448 C2.01, C2.023D CONCRETE SIDEWALK @ GRADE 1,953 C3.01

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

###

###

###

###

####

####

8##

####

##7

####

####

6##

####

##5

###

####

####

####

4##

###

####

####

##3

###

####

####

####

2D

HC

AD

DE

ND

UM

NO

. 2 R

EV

.12

/07/

171

11G1.01161166.002_INDEX

PH

AS

E IN

DE

XG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IR &

RE

PLA

CE

ME

NT

####

####

####

####

SITE LAYOUTSCALE: N.T.S.

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 5 of 14

Page 6: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

PHASE 1DWOOD BOARDWALKOVER WATER

PHASE 1BWOOD BOARDWALKOVER SEAWALL

FLOATING DOCK

RAMP ACCESS RAMP ACCESSFLOATING DOCK

PHASE 1CCONCRETE WALK ON-GRADELENGTH: 118 FTWIDTH: 10 FTAREA: 1,180 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11D1.01161166.002_STR

PH

AS

E 1

C -

DE

MO

LITI

ON

PLA

NG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.PHASE 1C DEMOLITION PLAN

PRIVATE FLOATING DOCK ACCESS.COORDINATE WITH OWNER'S REPRESENTATIVE

FOR CLOSURES.

EXISTING CONCRETE WALKWAY TO BE DEMOLISHED AND REMOVED.

DEMOLITION NOTES:1.) CONTRACTOR SHALL DEMOLISH AND REMOVE PHASE 1C CONCRETE

WALK ON-GRADE IN ITS ENTIRETY.2.) EXISTING SUB-BASE BENEATH EXISTING CONCRETE SHALL BE

REMOVED TO A DEPTH OF 4" TO PREPARE FOR NEW BASE MATERIAL.3.) REMOVE AND DISPOSE OF EXISTING BOTTOM RAILS ADJACENT TO

CONCRETE WALKWAYS INDENTED FOR DEMOLITION. GENERAL DEMOLITION NOTES:1.) COORDINATE ALL DEMOLITION OPERATIONS WITH OWNER'S

REPRESENTATIVE FOR SHUTDOWN PERIODS AND SEQUENCE OFWORK. CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE FOR THE LOCATION OF CONSTRUCTIONBARRICADES TO PROHIBIT PEDESTRIAN TRAFFIC DURING ALLPHASES OF CONSTRUCTION.

2.) DEMOLITION PLANS SHALL BE COORDINATED WITH DRAWINGS FORNEW CONSTRUCTION TO DETERMINE THE EXACT BOUNDARIES OFSPECIFIC DEMOLITION.

3.) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZETHEMSELVES WITH EXISTING CONDITIONS. ANY QUESTIONS ORDISCREPANCIES FOUND IN REGARD TO THE CONTRACT DOCUMENTSSHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OFRECORD IN WRITING. FIELD MEASURE EXISTING CONDITIONS PRIORTO FABRICATION OF OFF-SITE MATERIALS.

4.) THE CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE TO SCHEDULE REMOVAL OF EXISTINGFURNISHINGS ALONG PEDESTRIAN WALKWAY PRIOR TO PHASECOMMENCEMENT.

5.) ALL ITEMS IDENTIFIED TO BE SALVAGED AND REUSED SHALL BEREMOVED WITH CARE, STORED AND PROTECTED FROM DAMAGEUNTIL SALVAGED ITEMS ARE REQUIRED FOR NEW WORK. IT SHALLBE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/ORREPLACE ANY ITEMS IDENTIFIED FOR SALVAGE AND REUSE THATARE DAMAGED DURING THE DURATION OF THIS CONTRACTED WORK.THE OWNER'S REPRESENTATIVE SHALL BE THE JUDGE OFSUITABILITY FOR SALVAGED ITEMS FOR REUSE IN THE WORK.

DEMOLITION SCOPE OF WORK

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 6 of 14

Page 7: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "A

"M

ATC

H L

INE

"A"

BUBBA'SLOVE SHAK

7'-0

"

7'-0"

11'-0"

PHASE 2WOOD BOARDWALKOVER WATER

EXISTING BULKHEAD

EXISTING VINYL BULKHEAD

EXISTING VINYL BULKHEAD

DOCKSIDE

PRIVATE DOCK ACCESS.

PRIVATE DOCK ACCESS.

EXISTING GUARD RA

EXISTING G

PHASE 1ECONCRETE WALK ON-GRADELENGTH: 350 FTWIDTH: 7 FT - 11 FTAREA: 3,448 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11D2.01161166.002_STR

PH

AS

E 1

E -

SO

UTH

DE

MO

. PLA

NG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.

PHASE 1E DEMOLITION PLAN (SOUTH)GENERAL DEMOLITION NOTES:1.) COORDINATE ALL DEMOLITION OPERATIONS WITH OWNER'S

REPRESENTATIVE FOR SHUTDOWN PERIODS AND SEQUENCE OFWORK. CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE FOR THE LOCATION OF CONSTRUCTIONBARRICADES TO PROHIBIT PEDESTRIAN TRAFFIC DURING ALLPHASES OF CONSTRUCTION.

2.) DEMOLITION PLANS SHALL BE COORDINATED WITH DRAWINGS FORNEW CONSTRUCTION TO DETERMINE THE EXACT BOUNDARIES OFSPECIFIC DEMOLITION.

3.) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZETHEMSELVES WITH EXISTING CONDITIONS. ANY QUESTIONS ORDISCREPANCIES FOUND IN REGARD TO THE CONTRACT DOCUMENTSSHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OFRECORD IN WRITING. FIELD MEASURE EXISTING CONDITIONS PRIORTO FABRICATION OF OFF-SITE MATERIALS.

4.) THE CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE TO SCHEDULE REMOVAL OF EXISTINGFURNISHINGS ALONG PEDESTRIAN WALKWAY PRIOR TO PHASECOMMENCEMENT.

5.) ALL ITEMS IDENTIFIED TO BE SALVAGED AND REUSED SHALL BEREMOVED WITH CARE, STORED AND PROTECTED FROM DAMAGEUNTIL SALVAGED ITEMS ARE REQUIRED FOR NEW WORK. IT SHALLBE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/ORREPLACE ANY ITEMS IDENTIFIED FOR SALVAGE AND REUSE THATARE DAMAGED DURING THE DURATION OF THIS CONTRACTED WORK.THE OWNER'S REPRESENTATIVE SHALL BE THE JUDGE OFSUITABILITY FOR SALVAGED ITEMS FOR REUSE IN THE WORK.

DEMOLITION NOTES:1.) CONTRACTOR SHALL DEMOLISH AND REMOVE PHASE 1E CONCRETE

WALK ON-GRADE AS INDICATED ON THESE PLANS. DEMOLISHCONCRETE WALKWAY BETWEEN EXISTING WOODEN GUARDRAILSWHERE CONCRETE EXTENDS BEYOND RAILS TO BULKHEAD. SAWCUTCONCRETE CLEAN @ CONTROL JOINTS LOCATED ADJACENT TOWOODEN GUARDRAILS. EXISTING CONCRETE BEYOND GUARDRAILSIS NOT COVERED IN THIS SCOPE OF WORK AND SHALL REMAIN INPLACE.

2.) EXISTING SUB-BASE BENEATH EXISTING CONCRETE SHALL BEREMOVED TO A DEPTH OF 4" TO PREPARE FOR NEW BASE MATERIAL.

3.) REMOVE AND DISPOSE OF EXISTING BOTTOM RAILS ADJACENT TOCONCRETE WALKWAYS INDENTED FOR DEMOLITION.

4.) PROTECT EXISTING FLAG POLE WHERE INDICATED ON PLANS.EXISTING SLEEVE BASE FOR POLE SHALL REMAIN IN PLACE DURINGCONSTRUCTION.

LOCATION OF EXISTINGPRIVATELY-OWNED FLAG

POLE TO REMAIN.

STAIR ACCESS. COORDINATEWITH OWNER'S

REPRESENTATIVE FORCLOSURE & BARRICADES.

STAIR ACCESS TO DOCKSIDERESTAURANT.COORDINATE WITH OWNER'SREPRESENTATIVE FORCLOSURE & BARRICADES.

STAIR ACCESS TO BUBBA'SLOVE SHAK.COORDINATE WITH OWNER'SREPRESENTATIVE FORCLOSURE & BARRICADES.

DEMOLITION SCOPE OF WORK

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 7 of 14

Page 8: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "A

"M

ATC

H L

INE

"A" BUBBA

BUBBA'SLOVE SHAK

PHASE 1DWOOD BOARDWALKOVER WATER

EXISTING BULKHEADEXISTING BULKHEAD

ATE DOCK ACCESS.

PRIVATE DOCK ACCESS

EXISTING GUARD RAILS

EXISTING GUARD RAILS

EXISTING GUARDRAILS

FLOATING DOCK

PHASE 1ECONCRETE WALK ON-GRADELENGTH: 350 FTWIDTH: 7 FT - 11 FTAREA: 3,448 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11D2.02161166.002_STR

PH

AS

E 1

E -

NO

RTH

DE

MO

. PLA

NG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.

PHASE 1E DEMOLITION PLAN (NORTH)

EXISTING CONCRETE SLAB OVER BULKHEADS TO REMAIN.

CONCRETE SLAB @ DRUNKEN JACKSBEYOND WOODEN GUARD RAILS TO REMAIN

DEMOLISH CONCRETE SIDEWALKTO CONTROL JOINT LOCATED @WOODEN GUARDRAIL. SAWCUT

105 FT. OF CONCRETE @ LINE OFDEMOLITION.

DEMOLISH CONCRETE SIDEWALKTO CONTROL JOINT LOCATED @WOODEN GUARDRAIL. SAWCUT 55 FT.OF CONCRETE @ LINE OFDEMOLITION.

GENERAL DEMOLITION NOTES:1.) COORDINATE ALL DEMOLITION OPERATIONS WITH OWNER'S

REPRESENTATIVE FOR SHUTDOWN PERIODS AND SEQUENCE OFWORK. CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE FOR THE LOCATION OF CONSTRUCTIONBARRICADES TO PROHIBIT PEDESTRIAN TRAFFIC DURING ALLPHASES OF CONSTRUCTION.

2.) DEMOLITION PLANS SHALL BE COORDINATED WITH DRAWINGS FORNEW CONSTRUCTION TO DETERMINE THE EXACT BOUNDARIES OFSPECIFIC DEMOLITION.

3.) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZETHEMSELVES WITH EXISTING CONDITIONS. ANY QUESTIONS ORDISCREPANCIES FOUND IN REGARD TO THE CONTRACT DOCUMENTSSHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OFRECORD IN WRITING. FIELD MEASURE EXISTING CONDITIONS PRIORTO FABRICATION OF OFF-SITE MATERIALS.

4.) THE CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE TO SCHEDULE REMOVAL OF EXISTINGFURNISHINGS ALONG PEDESTRIAN WALKWAY PRIOR TO PHASECOMMENCEMENT.

5.) ALL ITEMS IDENTIFIED TO BE SALVAGED AND REUSED SHALL BEREMOVED WITH CARE, STORED AND PROTECTED FROM DAMAGEUNTIL SALVAGED ITEMS ARE REQUIRED FOR NEW WORK. IT SHALLBE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/ORREPLACE ANY ITEMS IDENTIFIED FOR SALVAGE AND REUSE THATARE DAMAGED DURING THE DURATION OF THIS CONTRACTED WORK.THE OWNER'S REPRESENTATIVE SHALL BE THE JUDGE OFSUITABILITY FOR SALVAGED ITEMS FOR REUSE IN THE WORK.

DEMOLITION NOTES:1.) CONTRACTOR SHALL DEMOLISH AND REMOVE PHASE 1E CONCRETE

WALK ON-GRADE AS INDICATED ON THESE PLANS. DEMOLISHCONCRETE WALKWAY BETWEEN EXISTING WOODEN GUARDRAILSWHERE CONCRETE EXTENDS BEYOND RAILS TO BULKHEAD. SAWCUTCONCRETE CLEAN @ CONTROL JOINTS LOCATED ADJACENT TOWOODEN GUARDRAILS. EXISTING CONCRETE BEYOND GUARDRAILSIS NOT COVERED IN THIS SCOPE OF WORK AND SHALL REMAIN INPLACE.

2.) EXISTING SUB-BASE BENEATH EXISTING CONCRETE SHALL BEREMOVED TO A DEPTH OF 4" TO PREPARE FOR NEW BASE MATERIAL.

3.) REMOVE AND DISPOSE OF EXISTING BOTTOM RAILS ADJACENT TOCONCRETE WALKWAYS INDENTED FOR DEMOLITION.

DEMOLITION SCOPE OF WORK

COORDINATE WITH OWNER'SREPRESENTATIVE FOR

CLOSURE & BARRICADES @ACCESS LOCATIONS

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 8 of 14

Page 9: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "B

"M

ATC

H L

INE

"B"

PHASE 3CWOODENBOARDWALKOVER WATER

EXISTINEXISTING TIMBER BULKHEADEXISTING TIMBER BULKHEAD

MA

TCH

LIN

E "B

"M

ATC

H L

INE

"B"

PHASE 4AWOOD BOARDWALKOVER WATER

PHASE 3D24' UNDER SCOPE OFSEAWALL REPAIR

EXISTING TIMBER BULKHEADEXISTING TIMBER BULKHEAD

PHASE 3DCONCRETE WALK ON-GRADELENGTH: 279 FTWIDTH: 7 FTAREA: 1,953 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11D3.01161166.002_STR

PH

AS

E 3

D -

DE

MO

LITI

ON

PLA

NG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.

PHASE 3D DEMOLITION PLAN (EAST)

SCALE: N.T.S.

PHASE 3D DEMOLITION PLAN (WEST)

DEMOLITION NOTES:1.) CONTRACTOR SHALL DEMOLISH AND REMOVE PHASE 3D CONCRETE

WALK ON-GRADE IN ITS ENTIRETY. DEMOLISH EXISTING CONCRETEUP TO THE INTERSECTION OF PARKING LOT ACCESS PATHS ANDPROVIDE SAWCUT FINISH ON EXISTING CONCRETE TO REMAIN.

2.) EXISTING SUB-BASE BENEATH EXISTING CONCRETE SHALL BEREMOVED TO A DEPTH OF 4" TO PREPARE FOR NEW BASE MATERIAL.

3.) REMOVE AND DISPOSE OF EXISTING BOTTOM RAILS ADJACENT TOCONCRETE WALKWAYS INDENTED FOR DEMOLITION.

EXISTING CONCRETE WALKWAY TO BE DEMOLISHED AND REMOVED.

EXISTING CONCRETE WALKWAY TO BE DEMOLISHED AND REMOVED.

WICKED TUNA'S PARKING

WICKED TUNA'S PARKING

GENERAL DEMOLITION NOTES:1.) COORDINATE ALL DEMOLITION OPERATIONS WITH OWNER'S

REPRESENTATIVE FOR SHUTDOWN PERIODS AND SEQUENCE OFWORK. CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE FOR THE LOCATION OF CONSTRUCTIONBARRICADES TO PROHIBIT PEDESTRIAN TRAFFIC DURING ALLPHASES OF CONSTRUCTION.

2.) DEMOLITION PLANS SHALL BE COORDINATED WITH DRAWINGS FORNEW CONSTRUCTION TO DETERMINE THE EXACT BOUNDARIES OFSPECIFIC DEMOLITION.

3.) THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZETHEMSELVES WITH EXISTING CONDITIONS. ANY QUESTIONS ORDISCREPANCIES FOUND IN REGARD TO THE CONTRACT DOCUMENTSSHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OFRECORD IN WRITING. FIELD MEASURE EXISTING CONDITIONS PRIORTO FABRICATION OF OFF-SITE MATERIALS.

4.) THE CONTRACTOR SHALL COORDINATE WITH OWNER'SREPRESENTATIVE TO SCHEDULE REMOVAL OF EXISTINGFURNISHINGS ALONG PEDESTRIAN WALKWAY PRIOR TO PHASECOMMENCEMENT.

5.) ALL ITEMS IDENTIFIED TO BE SALVAGED AND REUSED SHALL BEREMOVED WITH CARE, STORED AND PROTECTED FROM DAMAGEUNTIL SALVAGED ITEMS ARE REQUIRED FOR NEW WORK. IT SHALLBE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR AND/ORREPLACE ANY ITEMS IDENTIFIED FOR SALVAGE AND REUSE THATARE DAMAGED DURING THE DURATION OF THIS CONTRACTED WORK.THE OWNER'S REPRESENTATIVE SHALL BE THE JUDGE OFSUITABILITY FOR SALVAGED ITEMS FOR REUSE IN THE WORK.

DEMOLITION SCOPE OF WORK

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 9 of 14

Page 10: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

PHASE 1DWOOD BOARDWALKOVER WATER

PHASE 1BWOOD BOARDWALKOVER SEAWALL

TRIP

STO

P J

OIN

T

117'-8"7"

10'-0

"

TUR

ND

OW

NE

DG

E

TUR

ND

OW

NED

GE

C4.01

1C4.01

2

FLOATING DOCK

RAMP ACCESS RAMP ACCESSFLOATING DOCK

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

TRIP

STO

P J

OIN

T

PHASE 1CCONCRETE WALK ON-GRADELENGTH: 118 FTWIDTH: 10 FTAREA: 1,180 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11C1.01161166.002_STR

PH

AS

E 1

CG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.PHASE 1C PLAN

NEW CONCRETE SIDEWALK

GENERAL NOTES:1.) ALL CONSTRUCTION BARRICADES INSTALLED DURING DEMOLITION

WORK SHALL REMAIN IN PLACE DURING ALL PHASES OFCONSTRUCTED AND UNTIL APPROVAL IS PROVIDED BY OWNER'SREPRESENTATIVE TO REMOVE. THE CONTRACTOR SHALL MAINTAINBARRICADES FOR THE REQUIRED DURATIONS.

CONCRETE NOTES:1.) PREPARE SITE BY REMOVING ORGANIC/EXPANSIVE SOILS. PROVIDE 4"

OF COMPACTED BASE MATERIAL. COMPACT TO 95% OF STD PROCTOR(ASTM D 698) PER NOTES ON SHEET C4.01.

2.) SLAB-ON-GRADE WALKWAYS SHALL BE A MINIMUM OF 4" THICK WITH3,000 PSI CONCRETE. FIBER MESH REINFORCEMENT ADDITIVE SHALLBE PROVIDED FOR ALL SLAB-ON-GRADE WALKWAYS.

3.) ALL SLAB-ON-GRADE WALKWAYS SHALL BE FINISHED WITH AN OYSTERTABBY SURFACE ACCOMPLISHED PER THE DETAILS PROVIDED ONSHEET C4.01.

4.) TRIPSTOP JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN PERSECTION 2 | SHEET C4.01. PROVIDE JOINTS @ A SPACING NO GREATERTHAN THE LESSER OF 1.5 TIMES THE WIDTH OF WALKWAY OR 10'-0"ALONG THE RUN OF THE SLAB-ON-GRADE WALKWAY AND ATLOCATIONS WHERE INDICATED WITHIN THESE PLANS.

5.) PROVIDE 12" EXPANSION JOINT @ INTERSECTIONS OF SAW CUTEXISTING CONCRETE AND NEW CONCRETE PLACEMENT.

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 10 of 14

Page 11: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "A

"M

ATC

H L

INE

"A"

BUBBA'SLOVE SHAK

7'-0

"

7'-0"

11'-0"

TRIPSTO

P

JOIN

T

TRIPSTO

P

JOIN

T

TUR

ND

OW

N

EDG

E

TRIPSTOPJOINT

TRIPSTOPJOINT

TRIPSTOPJOINT TR

IPS

TOP

JOIN

T

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIPSTOPJOINT

TRIPSTOP

JOINT

C4.01

1C4.01

2

TRIPSTOPJOINT

PHASE 2WOOD BOARDWALKOVER WATER

EXISTING BULKHEAD

EXISTING VINYL BULKHEAD

EXISTING VINYL BULKHEAD

DOCKSIDE

TRIPSTO

P

JOIN

T

TRIPSTO

P

JOIN

T

TRIPSTOPJOINT

TRIP

STO

PJO

INT

TRIPSTOPJOINT

PRIVATE DOCK ACCESS.

PRIVATE DOCK ACCESS.

EXISTING GUARD RA

EXISTING G

TRIPSTO

P

JOIN

T

TRIPSTOPJOINT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIPSTOPJOINT

TRIPSTOPJOINT

PLACE CONCRETE UP TO EXISTINGIN-GROUND SLEEVE FOR POLE BASE.

11'-0"

22'-8

"

44'-10"

49'-4 1/2" 18'-0"

31'-5 1/2"

21'-11 1/2"

14'-1 1/2"

25'-7" 7'-6"

22'-6"

18'-7

"

PHASE 1ECONCRETE WALK ON-GRADELENGTH: 350 FTWIDTH: 7 FT - 11 FTAREA: 3,448 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11C2.01161166.002_STR

PH

AS

E 1

E -

SO

UTH

GE

OR

GE

TOW

N C

OU

NTY

PR

EP

AR

ED

FO

RM

UR

RE

LLS

INLE

T, S

CM

UR

RE

LLS

INLE

T M

AR

SH

WA

LKS

IDE

WA

LK R

EP

AIR

S &

RE

PLA

CE

ME

NT

----

----

----

----

SCALE: N.T.S.

PHASE 1E PLAN (SOUTH)

NEW CONCRETE SIDEWALK

NEW CONCRETE SIDEWALK

8'-9

"

GENERAL NOTES:1.) ALL CONSTRUCTION BARRICADES INSTALLED DURING DEMOLITION

WORK SHALL REMAIN IN PLACE DURING ALL PHASES OFCONSTRUCTED AND UNTIL APPROVAL IS PROVIDED BY OWNER'SREPRESENTATIVE TO REMOVE. THE CONTRACTOR SHALL MAINTAINBARRICADES FOR THE REQUIRED DURATIONS.

CONCRETE NOTES:1.) PREPARE SITE BY REMOVING ORGANIC/EXPANSIVE SOILS. PROVIDE 4"

OF COMPACTED BASE MATERIAL. COMPACT TO 95% OF STD PROCTOR(ASTM D 698) PER NOTES ON SHEET C4.01.

2.) SLAB-ON-GRADE WALKWAYS SHALL BE A MINIMUM OF 4" THICK WITH3,000 PSI CONCRETE. FIBER MESH REINFORCEMENT ADDITIVE SHALLBE PROVIDED FOR ALL SLAB-ON-GRADE WALKWAYS.

3.) ALL SLAB-ON-GRADE WALKWAYS SHALL BE FINISHED WITH AN OYSTERTABBY SURFACE ACCOMPLISHED PER THE DETAILS PROVIDED ONSHEET C4.01.

4.) TRIPSTOP JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN PERSECTION 2 | SHEET C4.01. PROVIDE JOINTS @ A SPACING NO GREATERTHAN THE LESSER OF 1.5 TIMES THE WIDTH OF WALKWAY OR 10'-0"ALONG THE RUN OF THE SLAB-ON-GRADE WALKWAY AND ATLOCATIONS WHERE INDICATED WITHIN THESE PLANS.

5.) PROVIDE 12" EXPANSION JOINT @ INTERSECTIONS OF SAW CUTEXISTING CONCRETE AND NEW CONCRETE PLACEMENT.

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 11 of 14

Page 12: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "A

"M

ATC

H L

INE

"A" BUBBA

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

10'-0

"

C4.01

1C4.01

2

PHASE 1DWOOD BOARDWALKOVER WATER

EXISTING BULKHEADEXISTING BULKHEAD

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

PRIVATE DOCK ACCESS

EXISTING GUARD RAILS

EXISTING GUARD RAILS

EXISTING GUARDRAILS

FLOATING DOCK

6"

22'-6" 30'-0" 30'-0" 30'-0 1/2" 29'-5"

2'-1

1"

12'-1

0"

10'-0"

PHASE 1ECONCRETE WALK ON-GRADELENGTH: 350 FTWIDTH: 7 FT - 11 FTAREA: 3,448 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11C2.02161166.002_STR

PH

AS

E 1

E -

NO

RTH

GE

OR

GE

TOW

N C

OU

NTY

PR

EP

AR

ED

FO

RM

UR

RE

LLS

INLE

T, S

CM

UR

RE

LLS

INLE

T M

AR

SH

WA

LKS

IDE

WA

LK R

EP

AIR

S &

RE

PLA

CE

ME

NT

----

----

----

----

SCALE: N.T.S.

PHASE 1E PLAN (NORTH)

NEW CONCRETE SIDEWALK

EXISTING CONCRETE OVER BULKHEAD.PROVIDE EXPANSION JOINT @ NEW & OLD CONCRETE.

EXISTING CONCRETE BEYOND GUARD RAILS.PROVIDE EXPANSION JOINT @ NEW & OLD CONCRETE.

GENERAL NOTES:1.) ALL CONSTRUCTION BARRICADES INSTALLED DURING DEMOLITION

WORK SHALL REMAIN IN PLACE DURING ALL PHASES OFCONSTRUCTED AND UNTIL APPROVAL IS PROVIDED BY OWNER'SREPRESENTATIVE TO REMOVE. THE CONTRACTOR SHALL MAINTAINBARRICADES FOR THE REQUIRED DURATIONS.

CONCRETE NOTES:1.) PREPARE SITE BY REMOVING ORGANIC/EXPANSIVE SOILS. PROVIDE 4"

OF COMPACTED BASE MATERIAL. COMPACT TO 95% OF STD PROCTOR(ASTM D 698) PER NOTES ON SHEET C4.01.

2.) SLAB-ON-GRADE WALKWAYS SHALL BE A MINIMUM OF 4" THICK WITH3,000 PSI CONCRETE. FIBER MESH REINFORCEMENT ADDITIVE SHALLBE PROVIDED FOR ALL SLAB-ON-GRADE WALKWAYS.

3.) ALL SLAB-ON-GRADE WALKWAYS SHALL BE FINISHED WITH AN OYSTERTABBY SURFACE ACCOMPLISHED PER THE DETAILS PROVIDED ONSHEET C4.01.

4.) TRIPSTOP JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN PERSECTION 2 | SHEET C4.01. PROVIDE JOINTS @ A SPACING NO GREATERTHAN THE LESSER OF 1.5 TIMES THE WIDTH OF WALKWAY OR 10'-0"ALONG THE RUN OF THE SLAB-ON-GRADE WALKWAY AND ATLOCATIONS WHERE INDICATED WITHIN THESE PLANS.

5.) PROVIDE 12" EXPANSION JOINT @ INTERSECTIONS OF SAW CUTEXISTING CONCRETE AND NEW CONCRETE PLACEMENT.

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 12 of 14

Page 13: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

MA

TCH

LIN

E "B

"M

ATC

H L

INE

"B"

TRIP

STO

PJO

INT

7'-0

"

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TURNDOW

N

EDGE

34'-8 1/2"60'-0"52'-1"11'-0"

7'-0

"

5"6'

-7"

3'-1 1/2" 60'-0"

C4.01

1

C4.01

2

PHASE 3CWOODENBOARDWALKOVER WATER

EXISTINEXISTING TIMBER BULKHEADEXISTING TIMBER BULKHEAD

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

MA

TCH

LIN

E "B

"M

ATC

H L

INE

"B"

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

TUR

ND

OW

NE

DG

E PHASE 4AWOOD BOARDWALKOVER WATER

PHASE 3D24' UNDER SCOPE OFSEAWALL REPAIR

37'-10"60'-0"25'-3 1/2"

C4.01

1

C4.01

2

EXISTING TIMBER BULKHEADEXISTING TIMBER BULKHEAD

TRIP

STO

PJO

INT

TRIP

STO

PJO

INT

7'-0

"

PHASE 3DCONCRETE WALK ON-GRADELENGTH: 279 FTWIDTH: 7 FTAREA: 1,953 SF

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11C3.01161166.002_STR

PH

AS

E 3

DG

EO

RG

ETO

WN

CO

UN

TYP

RE

PA

RE

D F

OR

MU

RR

ELL

S IN

LET,

SC

MU

RR

ELL

S IN

LET

MA

RS

H W

ALK

SID

EW

ALK

RE

PA

IRS

& R

EP

LAC

EM

EN

T

----

----

----

----

SCALE: N.T.S.

PHASE 3D PLAN (EAST)

SCALE: N.T.S.

PHASE 3D PLAN (WEST)

NEW CONCRETE SIDEWALK

NEW CONCRETE SIDEWALK

GENERAL NOTES:1.) ALL CONSTRUCTION BARRICADES INSTALLED DURING DEMOLITION

WORK SHALL REMAIN IN PLACE DURING ALL PHASES OFCONSTRUCTED AND UNTIL APPROVAL IS PROVIDED BY OWNER'SREPRESENTATIVE TO REMOVE. THE CONTRACTOR SHALL MAINTAINBARRICADES FOR THE REQUIRED DURATIONS.

CONCRETE NOTES:1.) PREPARE SITE BY REMOVING ORGANIC/EXPANSIVE SOILS. PROVIDE 4"

OF COMPACTED BASE MATERIAL. COMPACT TO 95% OF STD PROCTOR(ASTM D 698) PER NOTES ON SHEET C4.01.

2.) SLAB-ON-GRADE WALKWAYS SHALL BE A MINIMUM OF 4" THICK WITH3,000 PSI CONCRETE. FIBER MESH REINFORCEMENT ADDITIVE SHALLBE PROVIDED FOR ALL SLAB-ON-GRADE WALKWAYS.

3.) ALL SLAB-ON-GRADE WALKWAYS SHALL BE FINISHED WITH AN OYSTERTABBY SURFACE ACCOMPLISHED PER THE DETAILS PROVIDED ONSHEET C4.01.

4.) TRIPSTOP JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN PERSECTION 2 | SHEET C4.01. PROVIDE JOINTS @ A SPACING NO GREATERTHAN THE LESSER OF 1.5 TIMES THE WIDTH OF WALKWAY OR 10'-0"ALONG THE RUN OF THE SLAB-ON-GRADE WALKWAY AND ATLOCATIONS WHERE INDICATED WITHIN THESE PLANS.

5.) PROVIDE 12" EXPANSION JOINT @ INTERSECTIONS OF SAW CUTEXISTING CONCRETE AND NEW CONCRETE PLACEMENT.

12/0

7/20

17

Bid No. 17-111, Addendum 02 Georgetown County, South Carolina Page 13 of 14

Page 14: Georgetown County, South Carolina · 2017. 12. 7. · C2.02 Phase 1E – North 12/07/2017 Addendum 2 C3.01 Phase 3D 12/07/2017 Addendum 2 C4.01 Sections and Notes 12/07/2017 Addendum

4" CONCRETE SLAB.MIN. 3,000 PSI CONCRETE

WITH FIBER MESH ADDITIVE

EXISTING BULKHEAD W/ TIEBACK ANCHORS

WALKWAY WIDTH PER PLANS.

1 SCALE: 1/2" = 1'-0"

SECTION @ CONCRETE SLAB

REPLACE BOTTOM 2x6 RAIL WHEREREMOVED WITH NEW TRT 2x6 FASTENED

TO POST WITH (3) #12 x 3" S.S. SCREWS

EXISTING GUARDPOST & RAILS

COMPACTED BASE MATERIAL

PROVIDE OYSTER TABBY FINISHTO CONCRETE SURFACE

THROUGHOUT.

PROVIDE 4" TRIP STOP "TS100S", ORAPPROVED EQUAL, JOINT WHEREREQUIRED BY THESE PLANS.

2 SCALE: 3/4" = 1'-0"

TRIPSTOP JOINT

PROVIDE OYSTER TABBYFINISH TO CONCRETESURFACE PER DETAIL

BELOW.

CONTRACTOR SHALL UTILIZE TRIP STOP RIGID PVC JOINTING SYSTEM(MODEL TS100S, OR APPROVED EQUAL) IN LIEU OF TYPICALCONSTRUCTION JOINTS AND TYPICAL CONTROL JOINTS, AS IDENTIFIEDWITHIN THESE PLANS.

USE OF TRIP STOPS SHALL BE CONTINUOUS FOR THE ENTIRE LENGTHOF EACH PHASE WITH SPACING DETERMINED BY THE LOCATIONSINDICATED WITHIN THESE CONSTRUCTION DOCUMENTS. WHERE FIELDSPACING IS TO BE DETERMINED, JOINT SPACING SHALL NOT EXCEED1.5 TIMES THE WIDTH OF SIDEWALK, WITH A MAXIMUM OF 10'-0" O.C.SPACING.

TRIP STOP JOINT SPACING:SIDEWALK WIDTH MAXIMUM O.C. TS100S SPACING4 FT 6 FT6 FT 9 FT8 FT 10 FT10 FT 10 FT

SCALE: N.T.S.

OYSTER TABBY FINISH DETAIL

CONTRACTOR TO BROADCASTCRUSHED OYSTER SHELL ONTOUNCURED CONCRETE SURFACEAFTER SCREEDING IN THREESTEPS (BROADCAST 14" OFSHELLS AND FLOAT INTOSURFACE WITH BULL FLOATTHREE SUCCESSIVE TIMES)

PLAN VIEW

SECTION

PROVIDE NO. 3 CRUSHED POULTRYOYSTER SHELLS FOR BROADCASTINGOYSTER TABBY FINISH.

BY

NO

.D

ATE

DE

SC

RIP

TIO

NB

Y

OFSHEET

DE

SC

RIP

TIO

ND

ATE

NO

.AD

DIT

ION

S, S

UB

MIT

TALS

& R

EV

ISIO

NS

EA

RT

HW

R

KS

---

---

---

---

--/--

/--8

--/--

/--7

--/--

/--6

--/--

/--5

---

----

--/--

/--4

---

----

--/--

/--3

---

----

--/--

/--2

DH

CA

DD

EN

DU

M N

O. 2

RE

V.

12/0

7/17

1

11C4.01161166.002_STR

SE

CTI

ON

S &

NO

TES

GE

OR

GE

TOW

N C

OU

NTY

PR

EP

AR

ED

FO

RM

UR

RE

LLS

INLE

T, S

CM

UR

RE

LLS

INLE

T M

AR

SH

WA

LKS

IDE

WA

LK R

EP

AIR

S &

RE

PLA

CE

ME

NT

----

----

----

----

CONCRETE SIDEWALKS:

I.) GENERAL

1.1 PROVIDE CONCRETE SIDEWALKS TO THE LINES AND GRADES SHOWN WITHIN THESE CONTRACT DOCUMENTS.

1.2 THE CONSTRUCTION OF ITEMS UNDER THIS SPECIFICATION SHALL BE COORDINATED WITH OTHER ITEMS OF CONSTRUCTION SOAS TO BE CONSTRUCTED IN PROPER SEQUENCE.

II.) PRODUCTS

2.1 PROVIDE CLASS "A" CONCRETE AS DEFINED BY SECTION 701 & 702 OF THE SOUTH CAROLINA DEPARTMENT OF HIGHWAYS &PUBLIC TRANSPORTATION "STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION", LATEST EDITION.

2.2 THE CONCRETE USED SHALL BE COMPOSED OF A MIXTURE OF PORTLAND CEMENT, COARSE AND FINE AGGREGATES, ANDWATER. ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH OF 3,000 POUNDS PER SQUARE INCH AS SPECIFIEDWITHIN THESE CONTRACT DOCUMENTS.

A. ADDITIVES: FIBER MESH ADDITIVE SHALL BE UTILIZED FOR CONCRETE REINFORCING.

2.3 BASE MATERIAL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, ANDNATURAL OR CRUSHED SAND; ASTM 2940/D 2940M; EXCEPT WITH 100 PERCENT PASSING A 1-INCH (25-mm) SIEVE AND NOT MORETHAN 8 PERCENT PASSING A NO. 200 (0.075-mm) SIEVE.

2.4 RIGID PVC JOINTING MATERIAL: PROVIDE TRIPSTOP TS100S RIGID PVC TYPE-S JOINTING MATERIAL WITH Ø14 x 10" HOT-DIPPED

GALVANIZED PINS AND MANUFACTURER PRODUCED PEGS FOR FORMING.

2.5 PROVIDE NO. 3 CRUSHED POULTRY OYSTER SHELLS FOR APPLICATION OF OYSTER TABBY FINISH REQUIRED TO MATCH EXISTINGCONCRETE FINISH.

2.6 PRIOR TO STARTING WORK, OBTAIN ENGINEER'S APPROVAL OF METHODS, EQUIPMENT, TOOLS, AND MACHINERY FOR HANDLINGMATERIALS AND EXECUTING THE WORK. ENGINEER'S APPROVAL IS FOR ABILITY TO PERFORM WORK ONLY.

III.) EXECUTION

3.1 THE SUBGRADE SHALL BE EXCAVATED AND NEW BASE MATERIAL PLACED IN LAYERS NOT MORE THAN 8 INCHES IN LOOSE DEPTHAT OPTIMUM MOISTURE CONTENT. COMPACT EACH LAYER TO 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TOASTM D 698 STD. PROCTOR. COMPACTED BASE MATERIAL SHALL BE OF DEPTH REQUIRED BY THESE CONTRACT DOCUMENTSAND SHAPED TO LINE, GRADE, AND CROSS-SECTION PRIOR TO THE CONCRETE BEING PLACED. THE SUBGRADE SHALL BE MADETO THE REQUIRED DEPTH AND WIDTH THAT WILL PERMIT THE INSTALLATION AND BRACING OF FORMS.

3.2 ALL SOFT AND YIELDING MATERIAL SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIAL, WHICH SHALL THEN BEREPLACED PER 3.1 REQUIREMENTS ABOVE.

3.3 FORMS FOR SIDEWALKS SHALL BE OF WOOD OR METAL OF A SECTION SATISFACTORY TO MEET THE DESIGN CONDITIONS. THEREINFORCING, IF REQUIRED, SHALL BE PLACED IN POSITION AS SHOWN ON THE DRAWINGS. ALLOW FORMS TO REMAIN IN PLACEFOR A MINIMUM OF 24 HOURS AFTER CONCRETE PLACEMENT.

3.4 THE SECTIONS OF SIDEWALKS SHALL BE DIVIDED INTO BLOCKS BY USE OF A TRIPSTOP PVC JOINT INSTALLED DURING FORMINGWORK. JOINTS SHALL BE PLACED SO AS SPACING BETWEEN JOINTS DOES NOT EXCEED THE LESSER OF 1.5 TIMES THE WIDTHOF WALKWAY OR A MAXIMUM OF 10'-0" SPACING, BEING FORMED. INSTALLATION OF RIGID PVC JOINTS WITH PINS AND PEGSSHALL BE PER MANUFACTURER'S RECOMMENDED INSTALLATION FOR SIDEWALK WIDTHS

3.5 DO NOT PLACE CONCRETE UNTIL SUBGRADE AND FORMS HAVE BEEN CHECKED FOR LINE AND GRADE. MOISTEN SUBGRADE TOPRODUCE A UNIFORM DAMPENED CONDITION AT TIME CONCRETE IS PLACED.

3.6 EXPANSION JOINTS FORMED BY 1/2 INCH PREMOLDED EXPANSION JOINT FILLER SHALL BE PLACED IN ALL SIDEWALKS ADJACENTTO EXISTING CONCRETE. ALL PREMOLDED EXPANSION JOINT FILLER SHALL BE CUT TO FULL WIDTH AND LENGTH OF THEPROPOSED CONSTRUCTION AND SHALL EXTEND TO WITHIN 1/2 INCH OF THE TOP OR FINISH GRADE. EXPANSION JOINT FILLEROF THE THICKNESS INDICATED SHALL BE INSTALLED BETWEEN CONCRETE SIDEWALKS AND FIXED STRUCTURES AND ADJACENTCONCRETE SECTIONS.

3.7 CONCRETE SURFACES SHALL BE PROTECTED FROM THE SUN BY ACCEPTABLE MEANS OF CURING. THE CURING PROCESSSHALL BEGIN AS SOON AS MARRING OF THE NEW CONCRETE WILL NOT OCCUR. WHEN A WATER CURE IS USED THE CONCRETESHALL BE KEPT CONTINUOUSLY WET FOR 72 HOURS. IF THE CONTRACTOR ELECTS TO USE A MANUFACTURED CURINGMEMBRANE, IT SHALL BE APPLIED UNDER PRESSURE BY MECHANICAL SPRAYERS AT THE RATE RECOMMENDED BY THEMANUFACTURER, BUT IN NO CASE AT A RATE LESS THAN ONE GALLON TO EACH 150 SQUARE FEET.

3.8 FINISH CONCRETE SURFACE VARIATIONS SHALL BE NOT MORE THAN 1/8 INCH UNDER A TEN FOOT LONG STRAIGHTEDGE.PROVIDE CONCRETE WORK OF THIS SECTION WITH A WOOD FLOAT FINISH, UNLESS OTHERWISE SPECIFIED. THE EDGES OF ALLCONCRETE SURFACES SHALL BE ROUNDED WITH AN EDGING TOOL HAVING A RADIUS OF 1/4 INCH.

3.9 SECTIONS OF SIDEWALKS THAT ARE DAMAGED DURING CONSTRUCTION AND BEFORE FINAL ACCEPTANCE SHALL BE REPLACEDIN A SATISFACTORY MANNER BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.

3.10 AFTER THE CURING PROCESS HAS BEEN COMPLETED, CONCRETE WALKS AND CURBS SHALL BE BACKFILLED WITH SUITABLEMATERIAL AND THEN TAMPED AND COMPACTED WITH METAL OR WOOD TAMPS. THE FINISH GRADE SHALL BE MADE SMOOTHWITH THE TOP OF THE CONCRETE SURFACE. ALL EXCESS MATERIAL AND DEBRIS SHALL BE REMOVED FROM THE SITE.

3.11 SIDEWALKS SHALL HAVE A OYSTER TABBY FINISH UTILIZING CRUSHED OYSTER SHELLS PER THE PRODUCTS DESCRIPTIONGABOVE AND THE DETAILS PROVIDED IN THESE CONTRACT DOCUMENTS.