Matrix GeoTechndogies Ltd. 172 Grand Lake Drive Wellington(Halifax)N.S. Phone (902)860-2726 Fax (902)484-7982 Matrix GeoTechnologies Ltd. Geophysical Survey Assessment Report GRADIENT and DIPOLE-DIPOLE Array TDIP\RESISTIVITY SURVEYS at the Hess Property, Ontario, on behalf of CHAMPION BEAR RESOURCES LTD. Calgary,Alberta M -220 4 8 MSTM6TMGT G Kallfa L Kapllani M Parent February 2001 S-160 ^OSCIENCMSSESSMEM 41I12NE2017 2.22048 HESS 0 10

Upload: others

Post on 16-Oct-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechndogies Ltd. 172 Grand Lake Drive Wellington(Halifax)N.S. Phone (902)860-2726 Fax (902)484-7982

Matrix GeoTechnologies Ltd.

Geophysical Survey Assessment Report

GRADIENT and DIPOLE-DIPOLE ArrayTDIP\RESISTIVITY SURVEYSat the Hess Property, Ontario, onbehalf ofCHAMPION BEAR RESOURCES LTD.Calgary,Alberta

M -220 4 8

MSTM6TMGTG Kallfa L Kapllani M Parent February 2001

S-160

^OSCIENCMSSESSMEM

41I12NE2017 2.22048 HESS 0 10

Page 2: Geophysical Survey Assessment Report - Ontario

1. INTRODUCTION..........................................................................................................................................^

2. General Survey Details................................................................................................................................ 4

2.1. LOCATION...............................................................................................................................^2.2. ACCESS.................................................................................................................................^2.3. SURVEY GRID.......................................................................................................................... 4

3. Survey Work Undertaken............................................................................................................................ 5

3.1. GENERALITIES.........................................................................................................................^3.2. PERSONNEL............................................................................................................................. 53.3. SURVEY SPECIFICATIONS.......................................................................................................... 53.4. SURVEY COVERAGE.................................................................................................................. 73.5. INSTRUMENTATION...................................................................................................................?3.6. PARAMETERS........................................................................................................................... 73.7. MEASUREMENT ACCURACY AND REPEATABILITY.......................................................................... 83.8. DATA PRESENTATION ...............................................................................................................8

4. RESULTS AND INTERPRETATION..........................................................................................................^

4.1. OVERVIEW............................................................................................................................. 10HESS GRID....................................................................................................................................... 114.7. GRADIENT TDIP SURVEY RESULTS.......................................................................................... 114.8. POLE-DIPOLE IP/RESISTIVITY AND QUANTITATIVE SECTION RESULTS ..............................................

5. Contusion and Recommendations..............................................................................................................

LI

Figures 1: General Location..............................................................................................................4

Figure 2: Gradient Array Layout.......................................................................................................6Figure 3: Pole Dipole 0=6 Array ........................................................................................................6

Table l: Reconnaissance Gradient TDIP Survey Coverage ............................................................... 7Table III: Pole Dipole TDIP Survey Coverage ................................................................................... 7Table IV: Decay Curve Sampling Iris IP10 (Cole-Cole windows)....................................................... 8Table VIM : Recommended IP Targets for Follow up at Hess Grid................................................... 12

QS160-February, 2001

41I12NE2017 2.22048 HESS 0 10C

Page 3: Geophysical Survey Assessment Report - Ontario

1.

* MGT Project No:

* Project Name:

* Survey Period:

* Survey Type:

. Client:

* Client Address

QS-160

Hess Property

Feb 6 to Feb 9 , 2001; Feb 16 to Feb 23, 2001.

1) Gradient Time Domain Induced Polarization2) Pole Dipole Time Domain Induced Polarization

Champion Bear Resources Ltd.

200-9 Street S.W.

Calgary,Alberta,T2T 3C4

Client Representative: Mr. Seymour SearsSears, Barry and Associates Ltd.

Objectives:

1. Using IP\Resistivity, to map bulk conductivity and chargeabilitydistributions in order to locate potential base-metal sulphide concentrations associated with diabase dykes for the purposes of drill targeting, and to assist in general geologic mapping of lithology, structure and alteration.

2. The n^-6 Dipole-dipole array was chosen based on its simplicity, cross- sectional imaging capabilities and shallow to moderate depth penetration characteristics. The gradient profiling technique was later chosen due to better signal-to-noise, improved survey economics, and superior lateral resolution and depth penetration.

* Report Type: Summary interpretation, suitable for assessment

QS160-Febmary, 2001

Page 4: Geophysical Survey Assessment Report - Ontario

2. GENERAL SURVEY DETAILS

2.1. LOCATION

* Township or District:

* Province or State:

* Country:

* Nearest Settlement:

2.2. ACCESS

* Base of Operations:

* Mode of Access:

2.3. SURVEY GRID

* Coordinate Reference System:

* Line Separation:

* Station Interval:

* Method of Chaining:

Hess Property

Ontario

Canada

Sudbury, ON

Sudbury.On

Road and Ski-doo trail

Local exploration grid

100 meters

25 meters

Metric, slope-chained

g J1Q11 BtTi Champion Bear Property

Figure 1: Champion Bear Properties General Location

QS160-February, 2001

Page 5: Geophysical Survey Assessment Report - Ontario

, }.'3\-M-l f"-'

; ')lXk -n..

ro- \\\

Mud Lake

^^l ^

r

* j /' M 1/)

\ ~ u i '-Ai yHess TownshipJ

otftzp-i* j *j

n\^.-? \ !^.

\ V-1 ,^-O l/n)\ Cvh,O/ \ f i \ 6

O

(^

•'j s

i *--s

39c?'

r vi\o.i/^ M

s'-.

J/"-

^, 02,

Ys Green J

Lad

^ "^

i \

\Z.Scale 1:20,000

X ~

Figure IB: Location Map - Hess Grid, Champion Bear Resources Ltd.

s*PViS^^^-vb.."1***j,i*#., wao, J... 1.^w,,, !,,.j(f?vSrt:^. 1 ,r^

\\

Page 6: Geophysical Survey Assessment Report - Ontario

3.

3.1. GENERALITIES

* Survey Dates:2001

* Survey Period:

* IP Survey Days (read time):

* Total km Surveyed:

. Standby/BW Days

Feb 6' H to Feb 9 m , 2001; Feb 16" to Feb 23,

12 days

12 days

Gradient Pole Dipole

15.8km 2.7km

0.5 day

3.2. PERSONNEL

* Project Supervisor:

* Project Manager:

* Field Technician:

* Field Assistants:

3.3. SURVEY SPECIFICATIONS

* Array:

* AB (Tx dipole spacing)

* MN (Rx dipole spacing):

* Sampling Interval:

Jack MacNeil, Halifax,N.S.

Maurice Parent.Edmunston.N.B.

Frederick (Brent) Thomas,NFLD

Arthur Andrews,NFLD Tyson Andrews,NFLD

Gradient (see Figure 2 ) Dipole Dipole (see Figure 3)

1.6km Gradient

50 meters Gradient 50 meters Dipole Dipole

50 meters TDIP

Profile Spacing: 50-100m

Total Gradient Blocks: 4 Blocks

Number of Dipole Dipole Lines: 6

QS160-Februay, 2001

Page 7: Geophysical Survey Assessment Report - Ontario

GRADIENT AB s length c

MN = length P ,-P2 (6 x P,-P2 Spread)

GRADIENT ARRAY COVERAGE AREA

Picture 2: Gradient Arrav Lavout

Tx Pole

Infinite Wire

Rx Array (6 d ipoles 0=1 to 6)

l

X-Section Consisting of 6 Readings

Figure 3: Pole-Dipole Roll-Along (11=6) Array Lavout

QS160-February, 2001

Page 8: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnotogies Ltd. TDIP/Resistivity Survey

CHAMPION BEAR RESOURCES, Ltd.

SURVEY COVERAGE

1. Reconnaissance Gradient IP: 1 5.81cm

2. Pole Dipole IP Detail follow up: 2.7 km

3 Total Field Magnetic:

LINEHess

BLOCK MIN. EXTENT MAX. EXTENT

Total

TOTAL (m)15,800

15,800

Table l: Reconnaissance Gradient TDIP Survey Coveraae

LINEHess

BLOCK MIN EXTENT MAX EXTENT

Total

TOTAL (m)2700

2700

Table H: Dipole Dipole TDIP Survey Coveraae

INSTRUMENTATION

3.1.1. TDIP Survey

* Receiver:

* Receiver Settings:

Transmitter:

Transmitter Settings:

Iris ELREC IP6 (time domain f G channels)

Delay time = 1 60 msec.

M1 = 1 40 msec. M2 = 160 msec.M3 = 160 msec. M4 = 160 msec.M 5 = 1 60 msec. M6 = 160 msec.M7 = 160 msec. M8 = 160 msec.M9 = 160 msec. M^ 160 msec.

Power Supply:

Phoenix IPT1

2 sec. On/Off Time .

8 sec. Total duty cycle

Phoenix IP Honda Generator (400 Hz 12.5Kw output)

QS160-February, 2001

Page 9: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnotogies Ltd. TDIP/Resistivily Survey

PARAMETERS

CHAMPION BEAR RESOURCES, Ltd.

3.1.2. TDIP Survey

* Input Waveform: 0 .125 Hz square wave at 5007o duty cycle (2 seconds On/Off)

* Receiver Sampling Parameters: IRIS Cole-Cole windows

* Measured Parameters:

1) Chargeability in millivolts/Volt. 20 time slices are used for the calculation of decay curve parameters1 . Total Chargeability is calculated over an integration period of 20 to 1850ms (Cole - Cole windows).

2) Primary Voltage in millivolts and Input Current in amperes for Resis tivity calculation according to the gradient array geometry factor (Ap pendix C).

Table III: Decay Curve Sampling Iris IP6 (Cole-Cole windows)

MEASUREMENT ACCURACY AND REPEATABILITY

* Chargeability:

Resistivity:

general^ 0.5 mV/V but acceptable to 1.0 mV/V.

less than 50Xo cumulative error from Primary vo- lage input current measurements.

DATA PRESENTATION

3.1.3. Gradient Survey

* Maps:

Plan Maps:

Interpretation Plan Maps:

Posted/contoured plan maps of Total Chargeability and Apparent Resistivity, compiled for all Gradient Blocks, at 1:2500 scale.

Interpreted Gradient chargeability axes, according to strength and resistivity association, geoelectric contacts and areas of priority follow-up, compiled with dipole-dipole, at 1:2500 scale.

C!S160-Febaiary, 2001

Page 10: Geophysical Survey Assessment Report - Ontario

Vatrix GeoTechnotagies Ltd rniP/ResistMty Survey

Digital: Raw data:

Processed data:

CHAMPION BEAR RESOURCES, Lid.

Iris IP-6 digital dump file (See also Appendix D).

Geosoft .XYZ format.

using the following format:

Column 1 = Station/Line position, in meters Column 2 = Station/Line position, in meters Column 3 z Total Chargeability, in mV/V Column 4 z Vp in millivolts Column 5 = Mcc in mV/V Column 6 = Tau in seconds

3.1.4. Dide Dipole Survey

Maps:

Pseudosections:

Digital:

Raw data:

Processed data:

Posted/contoured pseudo depth section maps of combined Apparent Resistivity (interpreted) and Total Chargeability (M), for n^-6, at 1: 2500 scale.

IRIS IP6 digital dump file

Geosoft .XYZ format.

3S160-Febfuary, 2001 10

Page 11: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnotogies Ltd. CHAMPION BEAR RESOURCES, Ltd. TDIP/Resistivity Survey

4.1. OVERVIEW

The following discussion summarizes the results of the Gradient/ Dipole-Dipole TDIP/Resistivity surveys over the Hess Grid, undertaken by Matrix GeoTechnologies Ltd. The exploration target consists of offset dyke deposit, with the mineralization occurring as disseminated to massive sulphides.

The present geophysical interpretation makes use of both the Resistivity and Time Domain Induced Polarization surveyed parameters, but puts particular emphasis on the chargeability parameter, due to its ability to detect and discern sulphide mineralization ranging from disseminate to massive concentrations. Furthermore, given its property wide coverage, the gradient array survey results are relied upon as a bulk conductivity/chargeability mapping tool - with the more limited dipole-dipole coverage used to better define and detail the cross-sectional nature of the TDIP responses at depth. Of note, regarding the differences in information provided by the dipole-dipole and gradient arrays, in contrast to the dipole-dipole array data, which are more localized in their application, the nature of the information obtained, and the depth control, the present gradient surveys map are more regional in character - owing to the broader and stationary Tx array used and the resulting single stationary field distribution for the entire survey. The large transmit dipole employed provides significant depth of investigation in the central region of the grid and the narrow receiver dipoles also offer significant lateral resolution, but are none the less subject to significant volume averaging.

Based on the array geometry chosen, gradient investigation depths approaching 250 meters were obtained - with the deepest penetration in the middle third of the array and shallower depths of investigation progressively closer to the transmit electrodes. The gradient apparent resistivity and chargeability data therefore represent a bulk average, from surface to depth, when observed in plan view- this also contrast the dipole-dipole results, which are best considered in cross-sectional representation format. Furthermore, the gradient array anomaly patterns are essentially subvertical (i.e. without complex, asymmetric pant-leg shapes, as in dpdp), and can be visualized in plan in the same manner as magnetic data. However, in the presence of moderate to shallow dips, the gradient array anomalies tend to be shifted down-dip relative to shallower arrays, such as dipole-dipole - greater discrepancies can also occur with dipole-dipole, owing to the asymmetric array geometry, which tends to bias anomalies towards the infinity pole.

The geophysical interpretation plan presents the interpreted anomaly axes, highlighting the strength and resistivity association of the IP axes to their source/alteration type:

a) High resistivity IP axes, related to either disseminated sulphides or magnetite possibly associated with quartz-carbonate alteration or, alternatively, more felsic/less porous geology and/or bedrock/overburden topographic effects;

b) Nil (flat) resistivity and contact-type IP axes likely correspond to possibly more weakly- altered and/or thin/buried sulphide zones and/or mineralization along geologic contacts, or magnetite/hematite; and

c) Low (conductive) resistivity IP axes representing the key target signature relating to possible massive to stringer sulphides or, alternatively, faulted or clay-altered disseminated sulphides magnetite/hematite.

Clearly, while all anomaly types (high p / low p / nil p), could potentially represent equally valid exploration targets, the high resistivity/high chargeability association best represents the key geophysical target signature, based on the geologic model.

QS160-Februafy, 2001 11

Page 12: Geophysical Survey Assessment Report - Ontario

The chargeability axes identified on the anomaly axis map have been: a) categorized according to their strength (weak, moderate, strong, very strong) using symbols, and b) classified according to their resistivity association (high p, nil p/contact-type, low p) using colored axes. The line-to-line correlation of anomalies into axes is based primarily on the resistivity association (i.e. resistive and conductive anomalies never aligned along the same axis due to likely dissimilar mineralogy l a lteration l origin) - thereby providing some measure of geologic/geophysical control to the interpretation. Note that, due to the relative insensitivity of Gradient to depth of burial, target depths have not been determined for the anomalies of interest.

In order to better highlight the close relationship between the IP (sulphide magnetite) and Resistivity (lithology, structure, alteration), the areas of geophysical interest have been identified on the interpretation plan, using variable cross-hatching styles: a) contrasting zones of resistivity, highlighting potential geological contacts, alteration zones and fault-fracture structure, b) zones of high chargeability, outlining potential regions of increased sulphide mineralization. In addition, fault structures have also been interpreted based on evidence from the TDIP results, generally represented by lower resistivity and lower chargeability.

HESS GRID

GRADIENT TDIP SURVEY RESULTS

The following represent the geophysical interpretation of the gradient survey over the Hess Grid, making use of Resistivity and TDIP surveyed parameters, particularly emphasis on the chargeability parameter, due to its ability to detect and discern sulphide mineralization ranging from disseminate to massive concentrations. Furthermore, given its property wide coverage, the gradient array survey results are relied upon as a bulk conductivity/chargeability mapping tool.

The total chargeability and apparent resistivity show that the Hess Grid is characterized by moderate to strong IP responses, ranging from 10 mV/V to 14 mV/V. This is associated with high/nil resistivity, which form NE-SW bands following - suggesting possible disseminated to semi-massive sulphides. Hence, in addition to more favorable, in terms of strength of chargeability the nil/high resistivity association of the highest priority targets also best fit the geologic target model, likely representing the mineralization along an offset dyke and/or contact deposit type. On the other hand, low resistivity/strong to moderate IP responses are observed, suggesting possible presence of massive mineralization in the property, implying the property is characterized by two type of geophysical targets.

More moderate chargeabilities associated with similar resistivity either indicate more deeply buried mineralization or weaker sulphide/magnetite content.

The gradient chargeability responses at Hess Grid a re characterized by the broad range in strength, varying between weak to very strong (1.0 to 19.4 mV/V) but generally falling in the weak category (avg. 6.0 mV/V) - consistent with non-polarizable geological units and/or moderate overburden cover. The total chargeability shows a well-defined chargeability contact in the north, associated with resistivity contact, likely defining the geological contact between more polarizable units to the north, consistent to intrusives and less polarizable metasediments. The strong measured chargeabilities observed in the central part of the grid are consistent to massive sulphides, when conductive, otherwise important concentration of disseminated sulphides and/or magnetite (when magnetic), particularly when high resistivity. The most important IP axes are generally strike extensive ^200 m), displaying generally strong responses, either reflecting high in concentration or shallow depth of burial along the strike. In addition to, the high IP features display wide, oval shape, occurring along high/low resistivity contacts, suggesting contact deposit types, likely with semi-massive to massive mineralization in the center rimmed by disseminated sulphides.

QS160-February, 2001 11

Page 13: Geophysical Survey Assessment Report - Ontario

The apparent resistivities display a wide range, varying between 195 ohm-m to 77.5 k ohm-m (avg. 19.6k Q-m), indicative of a mixed low porosity bedrock at depth - with the average consistent with outcropped or shallow buried volcanics. Generally, the apparent resistivity plan map shows a more complicated distribution of the geological units, with higher resistivity units in the north and grid center, likely representing intrusives or metavolcanics. The very high resistivity values possi bly reflect the outcropping and/or shallow occurrence. The conductive units likely represent me- '^sediments and/or deep overburden, following the same trends as weak chargeability geology. As n roviously mentioned, the high/low resistivity contact observed in the north, approximately follow-

i q the TL2+OOS, likely represents the geological contact between volcanics and the more porousnetasedimentary units.

Nearly all the strong anomalies present good geophysical targets, especially those exhibiting conductive and nil/contact type resistivity association represent the primary geophysical target - ins list presented in Table VII is designed to help direct follow-up and possibly also DDH-testing into the best portion of the major axes.

LINE

L700E

L600E

L300E

L200E

STATION

4+75S

5+75S

6+25S

3+75S

6+25S

STRENGTH

Strong

Strong

Strong

Moderate

Moderate

RES. ASSOC.

Low

High

Nil/Contact

High

Nil

PRIORITY

1.5

1.5

1.5

2

2

DEPTH COMMENTS

Prominent low resistivity signature associ ated with strong IP. Not strike extensive axis. Likely dipping to south. Geophysical follow-up recommended.Strong IP response centered on high resis tivity axis. Strike extensive; axis (more than 400m). Likely representing mineralization along offset dyke. Geophysical follow-up recommended.Prominent strong IP response centered on high resistivity axis. Located in the same IP axis with the target at L600E, st.5+755. Likely representing contact type of minerali zation. Geophysical follow-up recom mended.Moderate IP signature associated with high/contact resistivity. Wide, oval shape anomaly, likely still open to west, and inter preted as contact type of mineralization. Geophysical follow-up recommended.Moderate IP signature associated with high/contact resistivity. Likely still open to west, and interpreted as contact type of mineralization. Geophysical follow-up rec ommended.

Table VII: Recommended IP Targets for Follow up at Hess Grid

QS160-February, 2001 19

Page 14: Geophysical Survey Assessment Report - Ontario

CHAMPION BEAR "SOURCES. Ud

Hess Grid

The Hess Grid exhibits moderate to strong IP anomalies in plan, dominant high/nil/contact re sistivity association, suggest the possibility of disseminated mineralization. In addition to, low re sistivity/strong chargeability present in the grid likely are related with heavily disseminated to mas sive. The geophysical axes of significance predominate the central part of the survey area. The gradient data shows a NE-SE band of high resistivity/weak to moderate chargeability likely repre senting disseminated volcanics or deeper zones of interest.

In response to the survey objectives, three (3) high priority targets have been identified in the central part of the grid area, which are of significant strength to warrant geophysical follow-up prior DDH-drilling program. For the most part, these also feature high bulk resistivities, consistent with disseminated sulphide mineralization. As many as two (2) lower priority targets are also defined, which either feature weaker chargeability - ground geophysical follow-up is strongly recommended prior DDH-drilling program.

We recommend the interpreted anomalous chargeability zones delineated by the combination of gradient and dipole-dipole surveys, represented as. Quantitative Sections, to be examined by drill-testing. Also, ground magnetic survey can provide useful information regarding the geological structures and the delineation of offset dyke in the property.

Further evaluation of the geophysical results in combination .with existing geoscientific data is also recommended. Drill testing the interpreted geophysical targets described above has been recommended according to target specifications defined based primarily on the combined inter pretation of gradient and dipole-dipole cross-sectional coverage, finalized in Quantitative Sec tions.

The chargeability axes display a variety of strengths and resistivity associations, such that, based on the gradient survey alone, all the most significant anomalies represent equally good tar gets, particularly the conductors - possibly differing only in their type-alteration. Particular atten tion should be given to the probable type of mineralization and alteration indicated by the resistivity association (i.e. high p s silicic, nil p = weak silicic/argillic, low p = argillic or stringer-to-massive). Additional comparisons against recommended ground magnetics could provide insight on the source mineralogy of many IP targets, i.e. magnetic = probable pyrrhotite or magnetite iron forma tion. The continued use of combined geophysical techniques, such as magnetics and TDIP, should prove useful in fully determining physical property distributions and mineral composition throughout the property.

Clearly, we recommend that the ground surveys be extended, as the strongest IP anomalies remain open, and additional geophysical follow-up are strongly recommended in the grids with gra dient survey coverage only, in order to obtain information regarding the depth extension of the geological structures and/or mineralization. Also, as previously mentioned additional ground mag netics survey is recommended helping to define the non-magnetic targets and/or structural geol ogy.

RESPECTFULLY SUBMITTEDf

'5encKallfa L/ / Ludvig Kapllani, Ph.D. Senior Geophysicist Senior Geophysicist

20

Page 15: Geophysical Survey Assessment Report - Ontario

Witrix GeoTechnologies Ltd. ' ' P/Pesistivity Survsy

CHAMPION BEAR RESOURCES, Ltd.

'EORFTICAL BASIS AND SURVEY PROCEDURES

GRADIENT INDUCED POLARIZATION SURVEY

The Gradient Array measurements are unique in that fiey best represent a bulk average of the sur- unding physical properties within a relatively focused sphere of influence, roughly equal to the width of the neiver dipole, penetrating vertically downward from surface t j great depths. These depth of penetration*d lateral resolution characteristics are typically presented in plan.

The resistivity is among the most variable of all geophysical parameters, with a range exceeding f. Because most minerals are fundamentally insulators, with the exception of massive accumulations of etallic and submetallic ores (electronic conductors) which are rare occurrences, the resistivity of rocks de- irids primarily on their porosity , permeability and particularly the salinity of fluids contained (ionic conduc- n), according to Archie's Law. In contrast, the chargeability responds to the presence of polarizeable min- iis (metals, submetallic sulphides and oxides, and graphite), in amounts as minute as parts per hundred. 1 1 the quantity of individual chargeable grains present, and their distribution with in subsurface current•" paths are significant in controlling the level of response. The relationship of chargeability to metallic itent is straightforward, and the influence of mineral distribution can be understood in geologic terms by nsidering two similar, hypothetical volumes of rock in which fractures constitute the primary current flow iths In one, sulphides occur predominantly along fracture surfaces. In t!ie second , the same volume per- rit of sulphides are disseminated throughout the rock. The second example will, in general, have signifi- r tly lowor intrinsic chargeability.

y-ax/s

.LJM N

Bx-axis

Figure B1: Gradient array configuration

3Si60-Febmsy,2001 23

Page 16: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnotogies Ltd. TDIP/Resistivily Survey

CHAMPION BEEAR RESOURCES, Ltd

Using the diagram in Figure B1 for the gradient array electrode configuration and nomenclature: , the gradient array apparent resistivity is calculated:

where: the origin O is selected at the center of ABthe geometric parameters are in addition to a = AB/2 and b = MN/2 X is the abscissa of the mid-point of MN (positive or negative) Y is the ordinate of the mid-point of MN (positive or negative)

Gradient Array Apparent Resistivity:

pa = K —— ohm - metres

where: K =2n

(AM~* -AN' 1 -BM'1

+y

AN =

-b-a) + y

BN =

Using the diagram in Figure 82 for the Total Chargeability:

Measured Voltage Line

positive

negative

One half of Transmit Cycle

"Off Time"

Time Line

Figure B2: The measurement of the time-domain IP effect

From Terraplus\BRGM, IP-6 Operating Manual. Toronto, 1987.

QS160-February, 2001 24

Page 17: Geophysical Survey Assessment Report - Ontario

Matrix Gee-Technologies Ltd. TDIP/Resistivity Survey

CHAMPION BEAR RESOURCES, Ltd.

the total apparent chargeability is given by:

Total Apparent Chargeability:3

Mr = (t)dt millivolts per volt

where t -f fy+i are the beginning and ending times for each of the chargeability slices,

More detailed descriptions on the theory and application of the IP/Resistivity method can be found in the following reference papers:

Cogan, H., 1973, Comparison of IP electrode array; , Geophysics, 38, p 737 - 761.

Langore, L., Alikaj, P., Gjovreku, D., 1989, Achievements in copper sulphide exploration in Albania with IP and EM methods, Geophysical Prospecting, 37, p 925 - 941.

DIPOLE DIPOLE

The collected data sets are reduced, using IP10 receiver, to apparent resistivity and total chargeability as explained in the following figures and equations:

Using the following diagram (Fig. B3) for the electrode configuration and nomenclature:4

POLE-DIPOLE ARRAY

P2 P,na

i i i

Figure B3: Po/e-D/'po/e Electrode Array

3 From Telford, ei al, Applied Geophysics. Cambridge U Press, New York, 1983..4 From Telford, et al., Applied Geophysics. Cambridge U Press, New York, 1983..

QS160-February, 2001 25

Page 18: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnotogies LW. TDIP/ResistMty Survey

CHAMPION BEAR RESOURCES, Ltd.

the apparent resistivity is given by:

VPM v r r n -f 1) a x — 0/im - metres

where:"a" is the MN dipole spacing (metres) "n" is the separation parameter between Ci and PiP2 "Vp" is the primary voltage measured between PiP2 (volts) "l" is the output current between CiC2 (amperes)

' sing the following diagram (Figure B4) for the Total Chargeability:5

Measured Voltage Line One half of Transmit Cycle

"Off Time"positive j

Time Line

negative"On Time" t (0) td

Figure B4: Measurement of the IP Effect in the Time-Domain

the total chargeability.-6 is given by:

T7~ S*IJ i-ltolO

TOW Jt' millivolt - seconds per volt

where f/, tj+i are the beginning and ending times for each of the chargeability slices.

The sets are then ready for plotting, profiling using the Geosoft Sushi program. The Apparent Resistivity and total Chargeability results of the Dipole-Dipole surveys are presented in pseudo section format. All resistivities are in Q-metres and chargeabilities in mV/V.

5 From Terraplus\BRGM, IP-6 Operating Manual. Toronto, 19879 From Tetford, et al., Applied Geophysics. Cambridge U Press, New York, 1983..

QS160-Februay, 2001 26

Page 19: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnologies Ltd. TDIP/Resistivity Survey

CHAMPION BEAR RESOURCES, Ltd.

APPENDIX A. . . . . . ,. .-

STATEMENT OF QUALIFICATIONS

Ludvig Kapllani, declare that

1 l am a consulting geophysicist with residence in Toronto, Ontario and am presently work ing in this capacity with Matrix GeoTechnologies Ltd. of Toronto, Ontario.

2. l obtained a Bachelor's of Science Degree, (B.Sc.), Geophysics, in spring 1976, a Masters of Science Degree, (M.Se.), Geophysics, in June 1986, and a Ph.D in January 1995, Geo physics, from Polytechnic University of Tirana, Albania.

3. l have practiced my profession continuously since May 1976, in North America and Europe.

4. l have no interest, nor do l expect to receive anv interest in the properties or securities of Champion Bear Resources Ltd.

5. l am the author of this report and the staterm nts contained represent my professional opinion based on my consideration of the information available to me at the time of writing this report.

Toronto, Ontario March, 2001

1

udvig Kapllani, Ph.D.

Senior Geophysicist Matrix GeoTechnologies Ltd.

QS160-Febnjary, 2001 27

Page 20: Geophysical Survey Assessment Report - Ontario

M 'ri, GeoTechnologies Ltd. CHAMPION BEAR RESOURCES, Ltd. : tp Resistivity Survey

APPENCMXA

STATEMENT OF QUALIFICATIONS:

l, Gene Kallfa, declare that:

1. l am a consulting geophysicist with residence in Toronto, Ontario and am presently working in this capacity with Matrix GeoTechnologies Ltd. of Toronto, Ontario.

2.l obtained a Bachelor's of Science Degree, (B.Se.), Geophysics, from the Polytechnic Univer sity, in Tirana, Albania, in spring 1987.

3. l have practiced my profession continuous y since May 1987, in North America and Europe.

4. l have no interest, nor do l expect to receive any interest in the properties or securities of Champion Bear Resources Ltd..

5. l am the author of this report and the statements contained represent my professional opinion based on my consideration of the information available to me at the time of writing this re port.

Toronto, Ontario March, 2001

Gene1 KaHfa, B.Sc.

Senior Geophysicist Matrix GeoTechnologies Ltd.

8160-February, 2001 28

Page 21: Geophysical Survey Assessment Report - Ontario

Matrix GeoTechnokxjies LW. TDIP/Resistivity Survey

CHAMPION BEAR RESOURCES, Ltd.

APPENDIX B

INSTRUMENT SPECIFICATIONS

IRIS ELREC 6 Receiver(from IRIS Instruments IP 6 Operating Manual)

Weather proof case

Dimensions: Weight:

Operating temperature:

Storage: Power supply:

V externalInput channels:Input impedance:Input overvoltage protection:Input voltage range:

'' ^ compensation:

f oise rejection:

Primary voltage resolution: accuracy:

Secondary voltage windows:

1 .1 npling rate: Synchronization accuracy: Chargeability resolution:

accuracy:

Battery test: Grounding resistance: Memory capacity:

31 cm x 21 cm x 21 cm6 kg with dry cells7.8 kg with rechargeable bat.-200C to 70"C(-40DC to 70"C wLh optional screen heater)(-400C to 700C)6 x 1.5 V dry cell 5 (100 hr. @ 200C) or2 x 6 V NiCad rechargeable (in series) (SOhrs @ 20"C) or 1 x12

610 Mohmup to 1000 volts10V maximum on each dipole15V maximum sum over eh 2 lo 6automatic 10 V with linear drift correctionup to 1 mV/s50 to 60 Hz powerline rejectiori100 dB common mode rejection (for Rs^)automatic stacking1 nV after stackingQ.3% typically; maximum 1 over wholetemperature rangeup to 10 windows; 3 preset window specs.plus fully programmable sampling.10 ms10 ms, minimum 40 (.iV0.1 mV/Vtypically D.6%. maximum 2% of reading 1 mV/V forVp > 10 mVmanual and automatic before each measurement0.1 to467kohm2505 records, 1 dipole/record

QS160-Febfuary, 2001 29

Page 22: Geophysical Survey Assessment Report - Ontario

Saturday, February 3, 2001.Day-21: Operating: Bear Tag Property Gradient Array

Read 2500 meters. Read L-600W from BL-0+00 to lOOOS; L-700W from 25 N to 975S; L-800W from fiL-C^W to 500S.

Sunday, February 4, 200 1Day-22: Operating; Bear Tag Property Gradient Array

Read 2050 meters. Read L-800W from 500S to 1000S; L-900W from BL-OHX) to 1000S; L-1000W from BL-0+00 to 550S.

Monday, February 5,Day-23: Operating: Bear Tag Property Gradient Array

We went to pick up the equipment and the infinite wires and rods. We went to the Hess property to try and get to L-500E on the lake but there is too much slush on the lake. It took 2 1/2 hours to get the snowmobiles back to the truck. We put a hole in the ice to check how thick h was and there seemed to be only 5 inches. We returned to the motel and called Seymore.

Tuesday, February 6, 2001.Dav-24: Onemtiiw Hess Property Gradient Array

Gradient. Read 2000 meters. Read L-400E from BL-0 to 1000S; L-500E from BL-0 to 1000S. We were lucky to find a trail that brought us to 1 175S on L-500E. After setting up the infinite (500n to 11 75s) on L-SOOE we started reading.

Wednesday, February 7, 2001.Day-25: Operating; Hess Property Gradient Array

Gradient. Read 3400 meters. Read L-300E from BL-0 to 1000S; L-600E from BL-0 to 1000S; L-700E from BL-0 to 700S; L-800E from BL-0 to 700S.

Thursday, February 8, 2001.Day-26: 0.5 Operating: Hess Property Gradient Array

GradientRead 1000 meters. Read L-200E from BL-0 to 1000S. The line cuttershad to finish cutting L-200E. we read the line then picked up the infinite wire androds. We started the dipole-dipole on L-500E.End of Hess Block # A

Logistics Report

Page 23: Geophysical Survey Assessment Report - Ontario

Thursday, February 8,2001.Day-lfo 0.5 Operating; Hess Property Dipole-Dipolg

Read 600 meters. Read L-500E, from 1100S to 500S. We had done gradient also.

Friday, February 9,2001.Way-27: O.S Operating; Hess Property Dipolc-Dipole

Read 500 meters. Read L-500E from 500S to BL-0.0.5 Bad Weather We finished the dipole-dipole survey on block # A and thenpacked the equipment and drove back to Windy Lake Motel. We had freezingrain and it rained hard starting at 11:00 am.

Logistics Report

Page 24: Geophysical Survey Assessment Report - Ontario

Operator Journal:

Project # 0049-3 - February 16 to 23, 2001

Friday, February 16, 2001Day-1: 0.5 Operating: Hess property Gradient array

(Finished the project with the other client this morning.) Then we returned to the Hess property to lay the infinite wire on L-1000E from SOON to 1200S. Block-B.

" ? 3turday, February 17, 2001.; ny-2: Operating: Hess property Gradient array

Read 2800 meters. Read L-800E from BL-0 to 700S, L-900E from BL-0 to 700S, L-1000E from BL-0 to 700S, L-11 GOE from BL-0 to 700S. We were delayed a bit because we had to repair a broken wire on the power board of the generator. Everything is working fine now.

Sunday, February 18, 2001. X-iy-3: Operating: Hess property Gradient array

Read 3100 meters. Read L-1200E from BL-0 to 700S, L-1300E from BL-0 to 700S. End of Block-B. We laid the infinite on L-1500E from 450N to 1200S for Block-C and read L-1300E from BL-0 to 700S, L-1400E from BL-0 to 500S, and L-1500E from BL-0 to 500S.

Monday, February 1 9, 2001Day-4: Operating: Hess property Gradient array

Read 2550 meters. Read L-1600E from 25S to 525S, L-1700E from BL-0 to 500S, and L-1800E from BL-0 to 500S. We set the Block-D infinite on L-2000E from SOON to 11 SOS and read L-1800E from BL-0 to 500S, L-1900E from BL-0 to 550S.

Tuesday, February 20, 2001Day-5: Operating: Hess property dipole-DipOi'e

Read 1700 meters. Read L-300E from BL-0 tolOOOS, L-700E from BL-0 to 700S.

Page 25: Geophysical Survey Assessment Report - Ontario

Wednesday, February 2 1, 2001Day-6: 0.5 Operating: Hess property Dipole-Dipole

Read 1000 meters. Read L-500E from BL-0 to 1000S.0.5 Operating: Hess property Gradient arrayRead 1300 meters. Read L-2000E from BL-0 to 600S and L-2100E from BL-0to 700S on Block-D.

Thursday, February 22, 2001Day-7: Operating: Hess property Gradient array

Read 3200 meters. Block-D. Read L-2200E from BL-0 to 750S, L-2300E from BL-0 to 800S. Block-E, read L-2300E from BL-0 to 800S; L-2400E from BL-0 to 850S. Infinite on L-2500E from SOON to 11508.

Friday, February 23, 2001Day-8: Operating: Hess property Gradient array

BlockE. Read 2850 meters. Read L-2500E from Bl-0 to 900S, L-2600E fromBL-0 to 950S; L-2700E from BL-0 to l GOGS'. We picked up the infinite andequipment and returned to the hotel.END OF HESS PROPERTY

isties Report.

Page 26: Geophysical Survey Assessment Report - Ontario

Matrix Geo Technologies Ltd. Induced Polarization Survey - Sudbury Basin, Ontario

Page 1Property

HessHessHessHessHessHess

HessHessHessHessHessHess

HessHessHessHessHessHess

HessHessHessHessHess

Total:

HessHessHessTotal:

Line #800E900E1000E11 GOE1200E1300E

1300E1400E1500E1600E1700E1800E

1800E1900E2000E2100E2200E2300E

2300E2400E2500E2600E2700E

300E500E700E

FromBL-0BL-0BL-0BL-0BL-0BL-0

BL-0BL-0BL-0

025SBL-0BL-0

BL-0BL-0BL-0BL-0BL-0BL-0

BL-0BL-0BL-0BL-CBL-0

BL-0BL-0BL-0

To700S700S700S700S700S700S

700S500S500S525S500S500S

500S550S600S700S750S800S

800S850S900S950S1000S

1000S1000S700S

Distance (m)7007007007007007004200700500500500500500320050055060070075080039008008509009501000450015800

100010007002700

Survey TypeGradient - Block- BGradient - Block- BGradient - Block- BGradient - Block- BGradient - Block- BGradient - Block- B

Gradient - Block- CGradient - Block- CGradient - Block- CGradient - Block- CGradient - Block- CGradient - Block- C

,

Gradient - Block- DGradient - Block- DGradient - Block- DGradient - Block- DGradient - Block- DGradient - Block- D

Gradient - Block- EGradient - Block- EGradient - Block* EGradient - Block- EGradient - Block- E

Gradient

Dipole-DipoleDipole-DipoleDipole-DipoleDipole-Dipole

Page 27: Geophysical Survey Assessment Report - Ontario

8

\ x \

\ /

8

PR

OF

ILE

S

o g

:OD

l .

"*

JK

i ~

oi ^

(B

t-*

Q.

DO

OD

Page 28: Geophysical Survey Assessment Report - Ontario

Q)

. __

,

P-D J "T

8

PR

OFI

LES

~L2

5^

rn CO —i

rn 73 en

rn Q ~T3 ir

-c CO

l—l

o CO

t en

o 00

1

001

n

— i

r

^-

Q.O

D

01 O

gi II

*"

"l 2

en re

m

S3

1*i

s to

o 1C CO m XJ

X

I m CO

8-o

8

PR

OFI

LES

m

^

en -H m en

m

a

~u IE

-C

CO

l—l

o CO

r o

V

Oj"n

Ni.

Kn

-*o

o i

a o O

00

tn T

Ol QL

ii" 3 en c n 1C

5

ZC

D5

n i—

mm

0

~a

cnn

5C

ox-

i-.* i ~

oi ^ IB

•~

Q.O

J

g i 7

J-r

en

rer

owro

aa

m

ID* 73 73 rn

en

IT

CO

8 8

PR

OFI

LES

rn CO -H rn 73 z en

rn

a ir C

O i—i

o CO

l *—

^ '

, ..

n i

o

JLV*

J

.o

-. ~

M. o

"n

N

-.

f? o o 00

-i DI Q. i

J

SOD

l" "

5*

2.0

cnn

*c o

*-

roi

T! **

^c*

Q

. CO

m

Z-S

-wo

IB

*M8?

o

H ^-

aim

O

M

O a OD m ^ 73 m CO

Page 29: Geophysical Survey Assessment Report - Ontario

K a

8P

RO

FILE

S

5~n

rn CO -H rn X) z CD rn

a

~o

n: -c CO l—l

o CO

a,..

12.5

-0^P

o

,— ~

~i vi

C7

in o

-.

nt-H

o

'n N

-i

ft,a

a <

2

Cd 1— 1

O

X*

01

N

-~ n o CD

- a,

IS" 5

1 D

™^

"

Q.C

D

W

ow

a CD m m CO

m

o CO it o f

m

8

PR

OFI

LES

m CO •H rn z CD m

o ~D n: -c CO l—l

n CO

z —l

3

TJ ;

0LO

--

e o

re

mo 0

in S

-O?

^3-H

3

f*t

Dj

^^ l

-- "

Q

. CD

: i

•—re

Jt

n N

--c

cnra

fe^

i "H

O CD rn CO

m CO —i

rn en

rn

Q

~D n -K CO l—

ln CO

8

J__

__

__

L.

8

\\ /

X

\

\

8P

RO

FILE

S

IS

en y

Tgffl

"l 2

9^

en

r r-

j1,t^

. . ^

|A

O

-.

——

o

-n N

r.

O*

01

<n

— -.

O tt o fs) o 00

s.

H l-

'

- - "

CLO

D

m

K ,

Sf

" •*

z en

mT

3

to

VI

O a CD m XI m CO

Page 30: Geophysical Survey Assessment Report - Ontario

8

8

/

\ } \\

g

8

PRO

FILE

S

fi *co i^ ^

CO —H rn 73 CD rn Q

13 CO o CO

CO n o

'en

'i i

,

. .

o IsJ

oo

-,

D ^

T);

;*'

~*

mr-

2**

S-"

0.03

w

O IE ~D i—i

Q CO m 73

3O m CO

a -n y "i rv t-*i

o

l c?

m

^ CO —i

m 73 z CD IE -C

CO o

B

r e

n /

//

\

\

fi *COis B

PRO

FILE

S

z ,—

—i

. 3 ~

D 3D

^ J.

5. S.

8O

ti

t, -.

Ss ;

s-". T < K

1C

OJ

55 s*"

T)

OD

^ i?, s s

en re

o in -D

i—i

Q CD rn 73 m CO

rn

^ CO —i

rn 73 •z. CD rn

o ir CO l—t

o CO

J

8

CO

X f

x/f

^

8 S

PRO

FILE

S

o NJ

ZO

J

cnn

o CD m 3d m CO

Page 31: Geophysical Survey Assessment Report - Ontario

1 o 3

8 CO y CO CO ^ LO CO LO I LO | LO

( ( ilgb b I

1 ) \ 1

i

8 S

31

i t

'

en

a -

Ii

t

8 S

[

^f

/

f 7 7 i**s~

- ,.

H 3 j

\ \ /

s/^

i ^-^

^

\ y \N

,

1 '

S8en

Q

! '

1

8 S

"-i c ^PR

OFI

LES

EASTERN

en rn

ea T) -c CO 1 — 1

o CO

en

n o- m ^~

*-

wLn

i:!i f

i S'CD 70 N

J

^o z"

i0

'K

)

CD

D 3

1 W

-. i

r1

V" ^

D en c :

^

ZC

Dm

" "

o'

2-Q

mn

?!FJ?

^

Q.O

3 W

" ?

- "

'"'C

D

^ a"

S ^

^ ^**

" T

o

Q-g

^ to

3 rn

*i

-i01

g

5"1

to

0

IE I* TJ

i — i

a z DO m "^ TO 73 m CO -

R a g —H

* O t Of -1 n o ? m a CO n jj U -H s o o Oi 8. Cf

8 S

3 i.i,,-'

*

•—

CO

t—O

LH

O

-I

i 1

i 1

^

g

. H 3 i

' P

i

en

8'

LO g LO CO CO CO LO hj

0*

LO | CO 0

,'

ys

i \\

~v. N

\ y7

x

;c

\ i

. v\ 1

s

Sg'

te is^

H

g

Xc/

1

EASTERN

en m Q ~D CO i — i

o CO

b

!n

' \S

-

8 S"

PRO

FILE

S

n ,

3

f ^

ZC

D

" S™

" cT

z ..

w

[Jxi

tn n

05 in

"2

-8

""

SK*"

3

l~~

?1 -:

.i ?

-5

^"a

'z—

D

-HN

-

j,

-0^

-0

ID

5 l:

i- i

I1-

2 s*

wo

o ic

(L*

^*

Q

. CD

"^~i

3

ID

u

^^

3

^

fTl

i.?

co ^ 2

s" s S

"N.

e

^ -l o

Q-

o *

S"™ a

3 m

3 "

5 W

"

**

S

cnra

i ^

ow

rn

' IS)

— * D ^ O 1C 3 i —

i Q

Z OD rn 3

^70 50 rn CO m

g Q g -n -H 3 S J- t; tt O*

-i A m w *, A W ™j

O O 0 b 1

- R

S

3:r

P i -

n

o

en

O ' —

'1

,1

,1

u

, i

i i

U)

8 CO CO CO CO CO CO M S1 CO i CO B

1 /' \ \ \ \ \

\ /'"l

l \\ \

i i

i i \\

^-^ y \ 1

s

S lg

SSm

3 O

5^

t/)

t/l

O

t/

8 S"

71

PRO

FILE

S

CO

rn

2 2

leo

o7^

^

Sf1"

" o*

5

CO

z

SJB

cnn

3*—

1 -"

77

ac -

o x;

~

z

e o"f

~g

' cO

jn

fio* ^

''3

l~™

"~

Tl

?o

-—

iw

C5

^3

^*

—.

| _ ,

z

"0 ?||

S. ?[z

*n S

i

en

S S

c i?

""Q

.CD

w

r*1

a. i^

P'-^cn

^Q

TO

S-iiS

o"1

m~

Ui*

f

Sa

Srn

*"^

11

- ?.

^ i"

^030

~^

* Q

-B d

i a

rn00

-1-

ic

o '

""

^i —

'z"i

*w

"^"

rn0

g

" cn

n CO

CO

n

o**

~

i 3

M

Page 32: Geophysical Survey Assessment Report - Ontario

\ S \ 7MF IP RES X f \ 1 RES IP MF

10K.

100-

i

30.

15-

n

SDK.

5000-

wn

\ ^ / r50" r\ J \~/

•^-^ —

— 5000

____ ^*-•^— - —— —— — -^" ~~ —— ——— """^

. w

30 10K

CDLL!

15 .100 " LLOCtD-

D 17+00 S S+OQ S 5+00 S 4+00 S 3+00 S 2+00 S 1+00 S 0+00

CHAMPION BEAR RES.Hess Gr Id

Line 1300 EBlock C AB~ 1650 metres

MN:: 50m Read Interval 50mEquipnant: ELREC IP-6,

PHOENIX IPT-l and HONDA MG-2

IP Gradient Survey

Scale 1:5000 Date: 01/02/16NTS Ref: BL-Az: TN

EASTERN GEOPHYSICSGEOSOFT (tin) Software for the Earth Sciences, Toronto, Canada

MF IP ^ X ~^\ /' K6S ,P MF CHAMPION BEflR RES.10K-

t

100-

1

30-

-

15-

50K-

-

5000-

sno

s ^. ^ _

-- -- — — — -~-^ ^

50K

JOW

fm

30

.15

Jl

f1CK Hess GrJdLine 1400 E

Block C AB" 1650 netresft MN= 50m Read interval 50m-J Equipment: ELREC IP-6.

- 100 ^ P HOENIX IPT-l and HONDA MG-2

S IP Gradient Survey

-l5+00 S 4+00 S 3+00 S 2+00 S 1+00 S 0+00 Scale 1:5000 Date: 01/02/18

NTS Ref: BL-fl z : TN

EASTERN GEOPHYSICSGEOSOFT (tnl Software for the Earth Sciences. Toronto. Canada

\ ""^7MF IP RES V\ y \ / RES IP MF

10K

100-

-

'-

30

-

15-

-

0

SDK

-

5000-

-

500

~~~~ v.-"- x

^^ _ ^ — -^-5+00 S 4+00 S 3+00 S 2+00 S 1+00 S OH

^SOK

-5000

50000

-30

.15

-0

-IGK

10 UJ

-"^ODC Q-

J

CHAMPION BEAR RES.Hess Gr I d

Line 1500 EBlock C AB* 1650 metres

M^ 50m Read Interval 50mEquipnant: ELREC IP-6.

PHOENIX IPT-l and HONDA MG-2

IP Gradient Survey

Scale 1:5000 Date: 01/02/18NTS Ref: BL-flz: TN

EASTERN GEOPHYSICS

Page 33: Geophysical Survey Assessment Report - Ontario

EASTERN

GEOPHYS

1 — 1

O CO

1 < 1

8 l/) en LO i LO LO to s CO i CO ^ LO o 0 rf z ^

-H ..

" OD ir -"2

Z ^

^ o NJ ro

8 S

3i

l j

1 '

*-*

m t —

ID en

o -.

-.,

l i

r ^

, i

, i

L

l (

\ X

\ \ \

; is

s{

\'

N

\\

\

1 1

1 /"

f*"

C ^^. >

U L?

9

f

|[

bl

' 1

H(—

* (li

—en

a

8

S"

PR

OFI

LES

3 io

,"m

"

ST

o QI

-'

.- "O

n

— "

l in

ff3

^ s

*-

* ^'

n —

- -

Q

. 7*

^ 2

-B

W

2. 5

P - -

^ o e

n

C ^n ^

gO

Q,

!* 1? J

L?

f"11

*"

T

s

aifo

m

ow

IO

i H ) j ^ \

y

"J ; x 2 n n 5 5 CHAMPIO

z OD m DO

3D m CO

S o CO o

-n 3 ~ a \ n o* r rn Q) CO n 7? W -. o o o

b S.

Qt

1 l l

en CO ^ s CO CO cV LO K) to i CO o i C

O

m

C3*

r

CO

^-

1 L^

" m

^S

1 I

S

en S -

S T

O ?-

-c

"*CO

^o

l — l

Z ~

00

Is

l00

i ID

8 5-

^i

j i

i "^

3 K

a-i

1 i

l U

, i

, l

CO

\ \ 1 1 1/

, y

f ^"^

^[

{\

"~"-

--^.

\

^s

\ \

\ \ \

i ii

i i

i \ i /1

i '

i )9"

o s

m

D Se

n o

0 5

8^

b s^

or^

nc

1 ri

c'o

PR

OFI

LES

^

loj

05

m n

~ ir.

?o

"?

-S

*

C

O7C"| _

T

^T. U

T

—J

-1*1*—

' -n

N -

. m

-TJ?

^

Z

(0

QS.

r. i-

S- ^n

S*

10 5

zo

o ic

t7

i—

""

Q,

CD

W~*

J

S

m

H *-*

i-n

n*

— *

^r^

r^

^^

o.30

^ m

f**

l ™*

^

? ^"^

o0

^

5aj

|7^n m

30

*

m " ^

rn

^

aim

CO

f f

wN

)

S o CO o ~n 3 ~ "* C t o l-** o l m b i ?- CO f. ID e in l ^ 6 o (J 3 S. ft*

1 1 :

w 8 LO I CO s D LO M to i (J! 1 C

O

rn

Ss

4m

^sX

I ?o

11

CT 3 ?0

-D i*

3H

H.

n-C CO

-,

o1 —

1 ^ ~

^( —

) C

107

s CD

3 R a 0

??

t f o.-

o o"

8 S

2P

, i

"n

i i

i i

"D

l ,

i U

)

"•N

.

^ /

f

f

\

\

\

\

\

\ s s \ \ \^-.

^

\ 1

i i

i i

y

i '

|3S

ST

J

L '

L^

8 S

^1P

RO

FILE

S

? le

o

n"m

" o

* -*

-.^

z-0

""

^

-^•p

tj zc

o^

_

3:--

en

X-i*'

* o

-.

"^

s o-

r* s

3."

w z

^

B

- "

^ f H

- ^

2. ^?

-.^o

o^

ro^

""S

* S

o

^

* g

- <

rnw

z "^

^ n

'

' 5Q

^ S?

n *

m

,

aim

to

T o

wK

)

Page 34: Geophysical Survey Assessment Report - Ontario

EASTER z en rn Q no n ~"

"^ CO i — i

o CO

1 c 1 G

B'

LO

- i- LO S LO g LO i LO i CO LO i LO 1 LO rt it z ^ t? 0

CD 70 i i ?.

" " ^2o

rs

)

ro K)

3 i

\

9 0 ——

It

t

o* !

~n i

n. ;

o

8 9

^i

i i

i n

ut

ai

i i

i vJ

l ,

i l tO

1 \ \ \\ y i \

} x) ; ;

y \\

\ ' ^N

y y i i i i \ \ i il i

'l r

- l

X3

o

gm

1 i

' i

i — i

en

o ~"

Q

8""*

Q "

H

3?

PRO

FILE

S

5 zaj

O"m

"

~

-1-

|TI

~

~T

^

??

TJ

2c

o*"

,-

3

f- S

u x^

' a

r-

-TQ"5

^

M *

^"n:

*-i

Jj'o

i "o

S30

5

"

C3

.- ^

Q-

T1 *

2 ^

w

Z3ic

J"

F-

CL

CD

W

- sg

s'lS

w S

co

m m

Si S

*"*

-^c

^

n o

Q-

^D^

O fc

"' ^

r^i

m x

"? "L

? *^

Tn

,—

i

H-* Q

^w

—^ 0

1 tt

^^

i1 yn

fn*

S!!

m

ow

-

1 3

K)

m CD a -n 3" f (1 o -1 l m Of -i T CO n a u q^ o 3 O

O Oi s. a

m

:o CO —i

m X3 z en m Q 13 n: ^ CO i — i

o CO

c l

•sj

o LO |.

LO en 8'

CO LO S o CO I LO i CO 1 LO n ID

z —i 77

i? o

77 OD i? -.2 o N

)s^ K

)Is

)

3 3 9 b) i 3E i

D

0b

1

Ri

OQ

i

g2

Bilil

U

l ,

i (-0

x \

\

\

\

\ 1 l \ )/

S ^\\ 1

1 1

/l 1 i 1 1 l \ \ 11

y

S '

Pb

- fe^

1 L

' U

^8

3^

PRO

FILE

S

5

loo

O

i " -

n:

lii't/in

^

j 3D

^

1 1 c

n n

e* ^^

*^g

-w

x *

^ 3

'

~TI

-.

..

f

D -

, ^^

w S

5 i-i

B

IL

X

l~~l

V b

""5

^

m

f" Q

'ic"

j'

—"0

.03

"!3

*m

— "^

lCT

) ^

CO

0"m

fB"t

JlO

'"'

-^^

l"^ 0

0Q

- 33

* Z

7" S

— n

^^

2O^

gtn

H —

rnx

tfin

CO

T

i"*

N]

3-

LO

i

8

s (tn

\ \ \\ \

\

7 \ \ 'fl SCO

8

PR

OFI

LES

rn

^ co -H rn 73 Z en

rn

Q

TJ 1C -•c CO o CO

It

Z ,.

it o

n T3

— *

— m

Oi

b —

-~

— -

i w

CI

-. —

T

TI N

n,8

* •e

Si! r

, ^

Q- 5" 3

o Is)

-. "s* cnn ~

o

l T)

*) 3

j l

^* (9

!- H

.*

tnrt

CO m

^ TD m CO

Page 35: Geophysical Survey Assessment Report - Ontario

— 8"T

I

I I

Sffl -l

LO /

\

f

\ \\ \

\\ \

\

n5^

Sen

8 9

PR

OFI

LES

rn

Dfr co -H rn 3D Z en

rn

a co

t—t

o CO

itz ^

- "

" ^

?S 7

s

n--

Q.

l ? l 3

W

^.-

s o

5f

" ^

^ en

rt

S o

w

O en

m ID-

3d m CO

S O a n t-K

O T m 01 -i LO n n ut - o D O O tt i a

EASTERN

CD m

Q HO :r CO 1 — 4

o CO

i i ! .

I CO ^J CO co LO | CO cB CO fo 8 CO i CO 1 LO n ti ID

Z

— i

IB i^ CD 7a

?-

-(0 o M K

)

D ?

,

},

S 0

3C

T

C

0

t "i

J B

n - ?i

8 S

?

s S

t±i

1 ,

1 O

8 8m

i ,

i LO \

\ y / V N y xX

x ^N

^x

l \4

^

i l

\N\ \ \

\ \ \ \

\ 1 1 ; i i V

i --

r-

T L

^

is '

cS^

g '

5^P

RO

FILE

S

2

zoo

O

Iffg

S

5•T j

^r-

^ 2

yi,

""S

?

5

(D

Q

^

CL

7^*2

3,

. ^

W

Z5

"*— ''

"T (O

^,

3 *

^ ^

, ^*

f—

s O

D

to a"

mJT

5S

" ^

^ x

2 o

aa.

^3

i g^*

3 r

n -n

16 S

^Ti

S

*.

-i '

'3

ui

ra

COT

3

K)

s o 3 3 ~ S S ft M*

0 -1 m t; CO

A A A in o -i o 3 O O tt i b

EASTERN

CD rn

o ~D,

u: CO 1 — 1

o (f)

1 1

8 CO g LO I en y 8 LO *. 8 LO LO g LO g

LO ^ to

n tt n z (— "tA ?s O

) 7o ii "*. -*2

Z

-v^ o ^.

N)

Ki

-J i

y

9 b i— 3 -

n c

* !

-n? X ! si

8 52

. 1

i 1

M

ffi 8M

i i

i i

~0

i Ss

i .

i CO

f f '

\\ 1 1 (

) )

' x

1' l

SS s \ \\

1 1 ^

N \ 1 l V\

i '

S8en

8

-0

L '

L 3

8 8^

PRO

FILE

S

2

zoo

0^m

" ^

^

^

2^

i cn

n ^

? *

""*?

rt"

^

1 **

H

IVi

f ^

*

^ *

* ^

\ f~

*l ^

^

I to

"i

J1 ~

* ~

r ^,

^

T s

" 2

0

^

^

|J~

Q i

t—* o

73

*? H

*

m,

Ull

i C

Om

O

W

*i

SM

Page 36: Geophysical Survey Assessment Report - Ontario

B

"CO

\ \ \ \\\\

\

l l

; \ \

8

PR

OFI

LES

m

^ CO —i

rn 3D Z en

rn

a •n CO 1——

4

O

CO

rtz -H

..

"

o 1-0

g

DDm

0

-0 en

n

rn

aim

O CD m 30 m CO

1 3 S t" n o -i f m

o T tf iences. ^ S o Canada

i c i i -

l'

g CO CO en CO eo CO en l CO i CO 1 CO

m

2LO

zl

m "

g

xi J

" g

en i Ir

31

?.

"

-C

CO

-,o

i— i

z C

O

DV

' K

)CO

-- K

) C

i)

3 J 9 b *—

^4

~n

hb

An

* o

c

R

p ~

^

K S

-

i ,

i CO s

\ 1 l 1 s y \ \ \ \ 1 \

i ^.

'f i

x\ 1 ^

( "X

XN

f l \ \ 1

g |S

1 1

' 1

t — 1

S

813

g 5^

PR

OFI

LES

Tj

^ r

p

f— \

|n,

"S"

^

^

z11

oln

,' V

2

T?'0

m

m

C!

j fc

m ^

"

|y*

Q^

^ i

O

Q-

X)

^en

n rf-

p

r,'

m*

enS

p

w1

3fO

Page 37: Geophysical Survey Assessment Report - Ontario

Resistivity(ohm-m)

RES IP 20K 20

10K.I 9.8.

OJ

Chargeability (mV/V)

10+003

Filter

[1=1 0=2

0=3

0=4

n=5

n=6

10*00 S

Filter

n-1

n=2

0=3

0=4

0=5

0=6

IP RES .20 20K

-9.8 L.10K

.0 uO

9+OOS 5*005 7+00 S 6*OOS 5+OOS 4*OOS 3+OOS 2+00 S 1+00 S1838 1903 1895 1707 9681

1379 -x- 179 -__ 407 —— 820

19K 13K 13K 12K 5912 9085 8315 5454 5632 5213 8838 16K

79K — 3974 ^ 4784O-^—N15K ^ 9966 -—- 15K 3205 — 2977

25*5 C: 4202 4903 .X 9346.' ) '1470

18K

5331

. 1473\\y\i4479 4286 ^ ) .870

4671 2418'-^818——"l

9+OOS 8+OOS 7+00 S 6*OOS 5*OOS 4*OOS 5+OOS 2+00 S 1+00 S1.9 2.4 3.3 7.9

7.5,

11 12

J 4 i- 2 '14

16

13

;yi^}\i / s\-\ ^—o\\xr~^1.4 J 3 ,8 1 1 1 4 18//B.3I ) 20 23 \\3.8/s s//yf \ -^xo f \v\\i1.6 ,X3.5VO 12 14 .^5.8 /y 14 27 23 \\Jrrxvx/ - f \ vv

\Z S .-H///

9.2 6.t 3.7 3.6 2.7 2.4 3.3 3.6

5.1 65

0*00

Filter

0=1

n-2

0=3

0=4

0=5

0=6

0+00

Filter

0=1

0=2

0=3

0=4

0=5

n-6

Topography

Resistivity(ohm-m)

Chargeability(mV/V)

Filter*

* *x c *

* * * *

Line 300 E

Dipole-Dipole Arrayna

a = 50 M-s'

plot point

Logarithmic Contours 1, 1.5, 2, 3, 5, 7.5, 10,.

EQUIPMENT SPECIFICATIONSReceiver:

Settings:ELREC IP-6Delay Time 160 mSec.M1^ 140 mSec. ^ 1 60 mSec.l^ 160 mSec. M^ 1 60 mSec.M5^ 160 mSec. Mfc 1 60 mSec.1^ 160 mSec. M8= 160 mSec.M9^ 160 mSec. M^ 160 mSec.

Transmitter: Phoenix IPT-1 3 kW Settings: 2 Sec. on/off Time

8 Sec . Total Duty Cycle

Generator: Phoenix MG-2 2.5 kVA

Scale 1:500050 A , 50 - - 100 150, - 200 - 250- - 300

(meters)

CHAMPION BEAR RESOURCES

INDUCED POLARIZATION SURVEYHess Grid

Cartier, Ontario

Date: 01/02/21 Operator: M. ParentNTS ref: Baseline Azimuth:

Prepared by: B. d'Eon

Eastern Geophysics Limited

Page 38: Geophysical Survey Assessment Report - Ontario

RES 15K

IP

7635J 6.3,

Resistivity(ohm-m)

Chargeability(mV/V)

Oj Oj

IP RES .13 15K

.6.3 L7635

.0 LO

10+00 SFilter

0=1

o-2

n=3

n-4

n=5

0-6

10*005

Filter

n-1

0=2

0=3

0=4

0=5

n-6

9+OOS WU S—i—i—f- 7+00 S 6+OOS 5*OOS 4+COS 3+OOS 2+00 S 1+00 S

9+OOS ft+OOS-l——l——l——l——l——l——I- 7+00 S 6KXJS 5+OOS 4+OOS 3+OOS 2+00 S 1+00 S

9.10.08 0.4* 1.1 2.5 5.2 6.3 9.4

-0.03- -0.36 -073 -0.0100 ,. 3.4 , 9 .9

-1.1 -1.J -1.4 !! M

4 0.82 -1 -1.9 -1.8 -0.97 0.28 2.2

-0.96 -0.021 -0.13 0.043 v 1.5s. N 5'.'( \V

-2.3 -1.1 -1.1 -1.1 .0.91 1.5.\

7.3 10

-i.9 -4.6 -3.6 -3.1 -0.30 x v\ 1.2

-8.5 -i.3 -3.2 -Z.2 -0.1B

-7.8 -2.S -2.1 -1.8

-4.4 -1.5 -1.6

0+00

530 973 1566 3562 8842 13K 12K 13K 5287 5599 3317 2381 2557 2647 2877 3366 4001 14K

.2180 — 3256^ vx9!4 730 l W y B1 v-._.* J-v "S ^ -f* 2Mt -\\ M

6997 5937 \V 541 —— 476 \ 73 -—— \S;^3St^/ 1 337 2942

'2491 . //'m ' 9021 . 3192 V\ 293-—279 ^- *Q^**^— f l*2 1462

1237 " 7955 ^ 12K// 4129 1573 Y\ IsT"^). •m^^'^. 2878 .^ 1188

9447 7994 — 5153 J 1 818 88fl.

Filter

0=1

o-2

0=3

0=4

0=5

0-6

0+00

Filter

0-1

0=2 0=3 0=4 0=5 0-6

Topography

Resistivity (ohm-m)

Chargeability(mV/V)

Filter

Line 500 E

Dipole-Dipole Arrayno Q

* * * ** 4 * * *

* t * * 4

Logarithmic Contours

\ x , ' a = 50 M \ f'

plot point

1, 1.5, 2, 3, 5, 7.5, 10,..

EQUIPMENT SPECIFICATIONS

Receiver: ELREC IP-6Settings: Delay Time 160 mSec.

M1^ 140 mSec. k^ 160 mSec. M^ 160 mSec. f^ 160 mSec. M5= 160 mSec. M6^ 160 mSec. M7^ 160 mSec. M8= 160 mSec. h^ 160 mSec. M10* 160 mSec.

Transmitter: Phoenix IPT-1 3 kW Settings: 2 Sec. on/off Time

8 Sec. Total Duty Cycle

Generator: Phoenix MG-2 2.5 kVA

Scale 1:500050 O 50 100 150 200 250 300i"j"*jr ~ - "".""y ri-'i"1-'f-'tiiruTr

(meters)

CHAMPION BEAR RESOURCES

INDUCED POLARIZATION SURVEYHess Grid

Cartier, Ontario

Date: 01/02/22 Operator: M. ParentNTS ref: Baseline Azimuth:

Prepared by: B. d'Eon

Eastern Geophysics Limited

Page 39: Geophysical Survey Assessment Report - Ontario

RES IP 29K 19

l

1

14K. 9.7.

1

O. 0.

Resistivity 74(ohm-m) Filter

0=2

0=3

0=5

0=6

Chargeability 7*(mV/V) Filter

0-1

0=2

0=3

0=4

0=5

0-6

::K^Xi i i i i i i i i i i l i i i iS. i i J —— \ — t — * \ "~i iiit

LAKE.

•DOS p 6+pOS ( 5+pOS f WWS|r 3*00 S f 2+00 S 1+00 S 0+00m 1 4K 11K 7311 6B81 4190 SK 3246 3425 3441 8808 IOK

34K N. I3K - 17K / 1 ?K *^ 1flK ^ 7822 ^ 4M — —— 204 759 ?774 17K 14Jf

31K Vs UK 12K 9383 — 7806^/^353 7005EE916 ^s 307^^2538 ^\ 17K

1 1 f /sl^fc^-ijffi/ s \\X?^10K 1 2321^: 137^ 181^r 77*1 -- 1CK -~. 8378 X 1762

* '7 f f f if ^ U.T "SZ&FJ* * * ' ' ^*^ \3087 ' *' 197 " — 185 *r*' 441A v 11K I3K 5815

OOS | 6*00 S | ( 5*pOS ( 4tOOS | 3^S r 2+00 S 1+00 S 0+0011 12 15 18 15 6.6 2.6 -0.46 0.22 0.40 1 2

9.4 8.6,, 15 28 26 i y 4.1 3=2.5 v^ -1.5 0.49 ^ 2.3 ^ 4 3.9

9 J 1 4 J 30 —— 30 20 \U-0.78 "^1.M\ -2.5 0.88 — .1.8 ^^ 3.6

18 .^13 '7 \ 7 -L^^.5'^^^"2 ' 8 0' 07J "4 "1 " 1p *

13 /•X"^N\- 14 llf^3j\j7"^\-2 * -O*4 -*-5

8.5 — 7—^ -O.Oa'^IO 15^^-2.2 -0.35

IP RES .19 .-29K

r9.7 -14K

lr0 -0

Tosography

Resistivitypi|ter (ohm-rn)

0=1

o-2

0=3

0=5

0-6

Chargeability niter (mV/V)

0-1

0=2

0=3

0=4

0=5

n-6

Line 700 E

•r ' lter Dipole-Dipole Array* i a no a

* * * r\.. jOi* * * * l — — l l — — l

****** \ , ' X \ ^7 a = 50 M

Ncf plot point

Logarithmic Contours 1, 1.5, 2, 3, 5, 7.5, 10,. .

EQUIPMENT SPECIFICATIONS

Receiver: ELREC IP-6 Settings: Delay Time 160 mSec.

M^ 140 mSec. Iv^ 160 rnSec. M^ 1 60 mSec. M4= 1 60 mSec. Iv^ 160 mSec. M6^ 160 mSec. M7^ 160 mSec. MQ= 1 60 mSec.M9- 160 mSec. M 10- 160 mSec.

Transmitter: Phoenix IPT-1 3 kW Settings: 2 Sec. on/off Time

8 Sec. Total Duty Cycle

Generator: Phoenix MG-2 2.5 kVA

Scale 1:500050 0 50 100 150 200 250 300

(meters)

CHAMPION BEAR RESOURCES

INDUCED POLARIZATION SURVEY Hess Grid

Cartier, Ontario

Date: 01/02/22 Operator: M. Parent NTS ref: Baseline Azimuth:

Prepared by: B. d'Eon

Eastern Geophysics Limited

Page 40: Geophysical Survey Assessment Report - Ontario

ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES

Transaction No:

Recording Date:

Approval Date:

Client(s):116945

Survey Type(s):

W0170.30695

2001-SEP-12

2001-DEC-05

Work Report Summary

Status: APPROVED

Work Done from: 2001-FEB-01

to: 2001-SEP-12

CHAMPION BEAR RESOURCES LTD.

IP

Work Report Details:

Claim#

S

S

S

S

S

S

S

S

S

S

1210838

1210839

1210840

1210841

1210842

1224157

1229424

1230847

1231178

1231179

Perform

SO

sososoSO

310,504

S256

S3, 330

52,820

S8.710

525,620

Perform Approve

SO

sosososo

S10.760

SO

S3.330

S2.820

S8.710

S25.620

Applied

S800

S6.400

S4,800

S1.600

S2.400

SO

SO

SO

SO

soS16.000

Applied Approve

S800

S6.400

S4.800

S1,600

52,400

SO

SO

SO

50

SO

516,000

Assign

SO

sosososo

S884

S256

53,330

52,820

58,710

516,000

Assign Approve

0

0

0

0

0

1,140

0

3,330

2,820

8,710

S1 6,000

Reserve

SO

SO

soso50

S9.620

SO

50

SO

SO

S9.620

Reserve Approve Due Date

SO 2002-SEP-12

SO 2002-SEP-12

SO 2002-SEP-12

SO 2002-SEP-12

SO 2002-SEP-12

59,620 2002-APR-20

SO 2002-JUN-10

SO 2002-APR-20

50 2001 -DEC-09

SO 2001 -DEC-09

S9.620

Status of claim is based on information currently on record.

41I12NE2017 2.22048 HESS 900

2001-Dec-11 03:20 Armstrong-d Page 1 of 1

Page 41: Geophysical Survey Assessment Report - Ontario

Ministry ofNorthern Developmentand Mines

Date: 2001-DEC-06

Ministere duDeveloppement du Nord et des Mines Ontario

GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E 6B5

CHAMPION BEAR RESOURCES LTD. 2005-9TH STREET, S.,W., CALGARY, ALBERTA T2T 3C4 CANADA

Tel: (888)415-9845 Fax:(877)670-1555

Dear Sir or Madam

Submission Number: 2 .22048 Transaction Number(s): W0170.30695

Subject: Approval of Assessment Work

We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

Assessment work credit has been redistributed, as outlined on the attached Work Report Summary to better reflect the location of the work.

If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.

Yours Sincerely,

Ron GashinskiSupervisor, Geoscience Assessment Office

Cc: Resident Geologist

Champion Bear Resources Ltd. (Claim Holder)Seymour M Sears (Agent)

Assessment File Library

Champion Bear Resources Ltd. (Assessment Office)

Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:16640

Page 42: Geophysical Survey Assessment Report - Ontario

o oCN

K X

•^t! W i m.- -- g\rr*PJiC-*T - -*H.S'y f *':^—.-ri

, f.nK* rdtie *i*iuy Ji wrtnern En?, aiapp*

nkiid Itrjiijtl III* kjcwlwirii IHtoi iw R fylDlr

efal Infofrnatlon and Limitationsw^H fkuJiiiij mm*.lk:nfiti*3 j i ufrnria'i ITT If.i iJ rdnl- *l4ft C iMTan ixin ^•IFR dn

MINING LAND TENURE

MAP

Date ; Time ot Issue Sep 12 2001

TOWNSHIP/AREA

HESS

16;C3h Eastarr

PLAN

G-4062

ADMINISTRATIVE D ISTRICTS J1 DIVISIONSMining Division Sudbury

Land Titles'Registry Division SUDBURY

Ministry o1 Natural Resources District SUDBURY

TOPOGRAPHIC

D ' •••'

Q ..-.. s ..

LAND TENURE

"S™1 ..-.,,., s ,.Q

m"g"

Q G Q

eQ

LAND TENURE WITHDRAWALS

IMPORTANT NOTICES

LAND TENURE WITHDRAWAL DESCRtPTfONS

J IMS iEtl'j'VLL rrajrtH 04T *il*T ms?i nlK^ Mu'iLi itihnlLiiiitiM

Sb^lS W L.: C !l

h***i rteitftc i

WLL J01 Ww

lundirv li 11 m ay flu hrraiiii rfw •.*rnJ[(n*fl

ItKIV IC-Q^ltl.^ y iiliLS Itnlji w*h^imu^

Cc m*,. JIL.M P nn m , l" Ulilt Tin* U illiUu F 4.

4n u Nm^io beyciuilliiiWllidraMlOr

IMPORTANT NOTICES

Page 43: Geophysical Survey Assessment Report - Ontario

APPARENT RESISTIVITY (ohm-metres)

••'Ut.

Gradient Array-AB-

MN l MSLL-r, ^\ ' \ ",

plot paints

Scale 1:5000O 50 100 150 200 250 300

(metres)

CHAMPION BEAR RESOURCES LTD.HESS GRID

ERMATINGER TWP., ON

TIME DOMAIN IP SURVEYGradient Array

APPARENT RESISTIVITYAB= 1600 metres

Transmitter Frequency Transmitter Current Decoy Curve:

Station Interval: Resistivity Contour Interval: Colour Scale:

O.O525 Hz (5035 duty cycle) 1.0 Amps

Semilogarithmic Windows 10 Gates

50 metres10 levels/log decode

Equal Area Zoning

Survey Date: Instrumentation:

Jan. - Feb. 2001Rx ^ IRIS IP-6 (6 channels)

Tx ^ Phoenix IPT-1 * Hondo 1.5

Surveyed # Processed by: MATRIX GEOTECHNOLOGIES LTD.

DWG. |: QS-160-PLAN-RES-1

41I12NE2Q17 2 .22048 HESS 210

Page 44: Geophysical Survey Assessment Report - Ontario

TOTAL CHARGEABILITY (mV/V)

\

-N

Gradient Array————— AB —————

"x'.. \.

50 O

^r---V ' N ' -'~.-•st*—*c-

plot points

Scale 1:500050 100 ISO 200 250 300

(metres)

CHAMPION BEAR RESOURCES LTD.HESS GRID

ERMATINGER TWP., ON

TIME DOMAIN IP SURVEY Gradient Array

TOTAL CHARGEABILITY AB= 1600 metres

Transmitter Frequency Transmitter Current Decoy Curve:

0.0625 Hz (507. duty cycle) 1,0 Amps

Semilogarithmic Windows 10 Gates

Station Interval: 50 metresChargeability Contour Interval: 0.5, 2.5 mV/VColour Scale: Equal Area Zoning

Survey Date: Instrumentation:

Jan. - Feb. 2001Rx = IRIS IP-6 (6 channels)

Tx = Phoenix IPT-1 * Hondo 1.5

Surveyed 4 Processed by: MATRIX GEOTECHNOLOGIES LTD.

DWG. j : QS-160-PLAN-CHG-1

41112^2017 2.22048 HESS 220

Page 45: Geophysical Survey Assessment Report - Ontario

INTERPRETATION PLAN MAP

<

N

LEGEND

Nil

H

\

Very Strong IP Signature and respective Resistivity Association

Strong IP Signature and respective Resistivity Association

Moderate IP Signature and respective Resistivity Association

High Resistivity Axis and respective IP Association

Nil/Contact Resistivity Axis and respective IP Association

Low Resistivity Axis and respective IP Association

Zone of Geophysical Interest — Increased IP

High Resistivity Zones — Low Porosity Unit

Interpreted Geological Contact or Fault

1st Priority Target (DDH or Follow-up Recommended)

2nd Priority Target (Follow-up Recommended)

2.22

Gradient Array———— AB ————

MN MN

25 O

o o plot points

Scale 1:250025 50 75 100 125 150

(metres)

41I12NE2017 2.22048 HESS 230

CHAMPION BEAR RESOURCES LTD. HESS GRID

TIME DOMAIN IP SURVEY

Gradient Array INTERPRETATION PLAN MAP

ABs 1600 metres

Transmitter Frequency Transmitter Current Decay Curve:

Station Interval:

Interpretation by:

0.0625 Hz (SON duty cycle) 1.0 Amps

Semilogarithmic Windows 10 Gates

50 metres

G-Ka l (fa

Date: Instrumentation:

Jan. -Feb. 2001Rx = IRIS IP-6 (6 channels)

Tx * Phoenix IPT-1 * Honda 1.5

Surveyed A Processed by:

MATRIX GEOTECHNOLOGIES LTD.DWG. tt: QS-160-P LAN-l NT-1

Page 46: Geophysical Survey Assessment Report - Ontario

TOTAL CHARGEABILITY (mV/V)

41I12NE2017 2.22048 HESS240

10.810.29.79.39.18.78.48-27.97.77A727.06.86.6646.26.05.85.6S.35.26.04.74.54.34.13.93.6343.12,8221.81.3

Gradient Array

AB-nv-

j MN!

2.220 4Scale 1:2500

25 O 25 50 75 100 125 150

(metres)

CHAMPION BEAR RESOURCES LTD. HESS GRID

TIME DOMAIN IP SURVEY

Gradient Array TOTAL CHARGEABILITY

^ 1600 metres

Transmitter Frequency Transmitter Current

Decay Curve:

Station Interval: Chargeability Contour interval: Colour Scale:

0.0625 Hz (50* duty cycle) 1.0 Amps

Semilogarithmic Windows 10 Gates

50 metres0.5, 2.5 mV/V

Equal Area Zoning

Survey Date: Instrumentation:

Jan.-Feb. 2001Rx s IRIS IP-6 (6 channels)

Tx ^ Phoenix IPT-1 * Honda 1.5

Surveyed A Processed by:

MATRIX GEOTECHNOLOGffiS LTD.DWG. ft QS-160-PLAN-CHG-1

Page 47: Geophysical Survey Assessment Report - Ontario

APPARENT RESISTIVITY (ohm-metres)

63346.48368.39220. 33579. 28685. 24867. 21779. 19612. 17283. 1S379. 13919. 12413. 11071. 10020.8916.7896.7075.6197.5372.4589.3929.3188.3435.1706.

Resistivity (ohm-tn)

Gradient Array———AB——————0———

2.22048o o pkrt points

Scale 1:250025 50 75 100 125 150

<

41I12NE2017 2.22048 HESS 250

CHAMPION BEAR RESOURCES LTD. HESS GRID

TIME DOMAIN) IP SURVEY

Gradient ArrayAPPARENT RESISTIVITY

s 1600 metres

Transmitter Frequency Transmitter Current Decay Curve:

Station Interval: Resistivity Contour Interval: Colour Scale:

0.0625 Hz (501; duty cycle) 1.0 Amps

Semilogarithmic WindowslOGates

50 metres10 levels/tog decade

Equal Area Zoning

Survey Date: Instrumentation:

Jan. -Feb. 2001Rx = IRIS IP-6 (6 channels)

Tx ~ Phoenix IPT-1 * Honda 1.5

Surveyed S, Processed by:

MATRIX GEOTECHNOLOGffiS LTD.DWG. tt QS--60-PLAN-RES-1