geological survey swayze project swayze, denyes, and dore …

55
41015SE8111 8.7716 DORE 010 GEOLOGICAL SURVEY SWAYZE PROJECT SWAYZE, DENYES, AND DORE TOWNSHIPS, ONTARIO NTS: 41 O 15 RECEIVED j AN 29 1985 MINING LANDS SECTION Robert Bell Geologist Canadian Nickel Company Ltd. Copper Cliff, Ontario December, 1984 i 2- ri i

Upload: others

Post on 04-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

41015SE8111 8.7716 DORE010

GEOLOGICAL SURVEY

SWAYZE PROJECT

SWAYZE, DENYES, AND DORE TOWNSHIPS,

ONTARIO

NTS: 41 O 15

RECEIVED

j AN 29 1985

MINING LANDS SECTION

Robert BellGeologistCanadian Nickel Company Ltd.Copper Cliff, OntarioDecember, 1984

i 2- ri i

SUMMARY AND CONCLUSIONS

The property consists of 359 contiguous claims, of which 237 are covered in this report, located in parts of Swayze, Denyes and Dore townships, approximately 240 km northwest of Sudbury.

A total of approximately 400 kilometres of line was cut and detail mapped at a scale of 1:2500. The claims are underlain by a synclinally folded sequence of volcanics, ranging in composition from ultramafic to felsic, and metasedi- ments. Several areas of pervasive carbonate alteration were outlined. Gold values are very low to weakly anomalous.

In many parts of the property outcrop exposure is very poor, hence prospecting by conventional methods has not upgraded or downgraded the potential for economic deposits.

——————K————————|——

^i__I.

Woman Rlv*r i

FIGURE l Canadian Nickel Company Limited

SWAYZE PROJECT, ONTARIO Location MapSCALE t' 250 000

4101SSE0H1 2.7716 DORE

TABLE OF CONTENTS010C

SUMMARY AND CONCLUSIONS

I.0 INTRODUCTION

2.0 LOCATION AND ACCESS

3.0 PROPERTY

4.0 PREVIOUS WORK

5.0 REGIONAL GEOLOGY

6.0 GEOLOGICAL SURVEY

6.1 Ultramafic Rocks6.2 Mafic Volcanics6.3 Intermediate Volcanics6.4 Acid Volcanics6.5 Metasedimentary Rocks6.6 Intrusive Rocks

7.0 MINERALIZATION

8.0 STRUCTURE AND ALTERATION

9.0 CONCLUSIONS AND RECOMMENDATIONS

10.0 REFERENCES

II.0 CERTIFICATE OF QUALIFICATIONS

Page

l

l

l

3

4

4

666778

9

9

10

10

11

FIGURES

Figure Number Scale

1 General Location Map 1:250,000

2 Claim Map . 1:50,000

3 Geology (Sheets 1-23) 1:2500

Table Number Page

l Geological Legend 5

1.0 INTRODUCTION

As a result of a study made to identify the most promising gold belts with unexplored potential, Canadian Nickel Company Limited (Canico) staked 560 contiguous claims in the Swayze township area in 1981. The present survey covers 237 contiguous claims located in parts of Swayze, Denyes and Dore townships.

The horseshoe shaped claim block covers a synclinally folded sequence of ultra mafic to felsic flows and intrusives, and metasediments. The claims were evalu ated for their gold potential by gridding and detail mapping. Any altered outcrops (carbonatized, sericitized, silicified, pyritized, quartz veins, etc.) were sampled and assayed for gold.

Favourable stratigraphy and alteration were encountered, but gold values were typically very low to only weakly anomalous.

2.0 LOCATION AND ACCESS

The property consists of 237 contiguous claims located in parts of Denyes, Dore and Swayze townships, approximately 240 km northwest of Sudbury, Ontario, and 55 km east of Chapleau, Ontario (Figure 1). The property lies within the Porcupine Mining Division. The NTS is 41-0-15.

Access is by float plane, utilizing numerous lakes located within the claim block. Airbases are located in Sudbury, Gogama, Folyet, and Chapleau.

The northeast corner of the property can now be accessed via a new gravel road, established by Heron Resources, originating in the Ivanhoe Provincial Park near Folyet, and leading to the former Kenty Mine.

3.0 PROPERTY

The property consists of 359 contiguous claims owned by Canico {Figure 2), of which 237 are covered in this report. The claims in Dore township, although contiguous with those in Swayze township, form an isolated block as the connecting claims are not gridded or included in the 237 claims under discussion.

Two years assessment work derived from a 1981 airborne geophysical survey kept the claims in good standing until April, 1984. The claims were then put under extension. Four additional claims in Denyes township were staked in 1984 to close open fractions found within the existing claim block.

The claims are as follows:

P606312.313 Recorded April 14, 1981; currently under extension to Dec. 14, 1984P606317P606320.321P606324.325P607075-080P607100-102 " " "

- 2 -

Claims recorded April 14, 1981 and currently under extension to April 12, 1985:

P574149P574150P574151P574154P576194P576195P588859P588860P588861P588862P588863P588864P588997P588998P588999P589000P605017P605077P605078P605125P605126P605127P605128P605129P605130P605131P605132P605135P606243P606244P606245P606246P606247P606248P606249P606250P606251P606252P606273P606274P606308P606309P606310P606311P606318P606319

P606326 P606327 P606328 P606329 P606330 P606331 P606332 P606333 P606334 P606335 P606336 P606339 P606340 P606341 P606342 P606343 P606344 P606345 P606349 P606350 P606399 P606400 P606401 P606402 P606403 P606404 P606405 P606406 P606407 P606408 P606409 P616410 P606411 P606412 P606413 P606414 P606415 P606416 P606417 P606435 P606436 P606437 P606438 P606439 P606442 P606443

P606444 P606445 P606446 P606447 P606448 P606451 P606452 P606455 P606458 P606459 P606460 P606461 P606462 P606473 P606474 P606475 P606476 P606486 P606487 P606488 P606489 P606490 P606491 P606492 P606496 P606497 P606498 P606499 P606500 P607001 P607002 P607005 P607006 P607007 P607008 P607009 P607010 P607011 P607012 P607013 P607020 P607021 P607022 P607023 P607024 P607025

P607026 P607062 P607073 P607074 P607081 P607082 P607085 P607086 P607088 P607089 P607090 P607097 P607098 P607099 P607106 P607107 P607108 P607109 P607110 P607111 P607112 P607113 P607114 P607115 P607116 P607117 P607118 P607119 P607120 P607121 P607122 P607123 P607124 P607125 P607126 P607127 P607128 P607129 P607130 P607131 P607132 P607133 P607134 P607135 P607136 P607137

- 3 -

Claims recorded April 15, 1981 and currently under extension to April 12, 1985:

P615989 P615997P615990 P615998P615991 P615999P615992 P616000P615993 P616005P615994 P616006P615995 P616007P615996 P616010

Claims staked in 1984:

P616011 P616012 P616014 P616015 P616016 P616025 P616026 P616027

P616030 P616031 P616032 P616035 P616036 P616037 P616040 P616041 P616042

P807250 Recorded June 21, 1984, due Oune 21, 1985 P808244 Recorded Aug. l, 1984, due Aug. l, 1985 P808245 P808246

4.0 PREVIOUS WORK

The discovery of the Kenty Mine in 1931 sparked considerable exploration acti vity throughout the Swayze belt. Gold mineralization at the Kenty Mine is related to quartz-carbonate veining within mafic volcanics and intrusives, and metasediments. Two ore shoots were reported to occur on surface: No. l vein - 6.3 feet wide, 50 feet long, averaging 0.39 oz/ton Au, and No. 2 - 3.7 feet wide, 72 feet long, averaging 0.67 oz/ton Au. Between 1931 and 1934, Kenty Gold Mines Ltd. sank 2 shafts, with some 6,750 feet of lateral development. The number l shaft is 510 feet deep and the number 2 shaft 534 feet deep.

The 1948 Financial Post Survey of Mines reported possible reserves of 69,000 tons in the number one shaft area and 290,000 tons in the number 2 shaft area of undetermined grade.

Vancouver based Heron Resources currently hold the property, and to date have carried out geology, soil sampling, magnetometer and IP surveys, as well as extensive stripping and trenching, dewatering of the number l shaft, and diamond drilling.

Following the discovery of the Kenty Mine, gold was subsequently found on an island in Cree Lake, and later 3500 feet east on the mainland. Gold was reported to be in a quartz-carbonate-sulfide vein system within sheared tuffs and andesite-basalts, averaging 2 feet in width. Flint Rock Mines Ltd. carried out a 34 hole drill program in 1961-62.

Gold was also discovered east of Cree Lake in the early 1930's, south of the lake referred to as Hook Lake. Buffalo-Canadian Gold Mines Ltd. trenched and stripped the showing, and carried out some drilling in the 1930's. Mineralized quartz within "silicified and carbonatized shear zones" assayed from 0.02 to 0.08 oz/ton Au.

- 4 -

Goldstar Explorations Ltd. carried out an electromagnetic survey and sub sequently drilled 5 boreholes in 1964 in Denyes township.

Canadian Nickel Company Ltd. carried out an airborne geophysical survey in the fall of 1981. The magnetometer survey helped to delineate the structure of the area. A series of ultramafic flows, sills and intrusives with a broad, high magnetic signature, was outlined in a horseshoe shape, revealing the synclinal folding present. The electromagnetic survey detected only two medium strength conductors, both attributable to graphitic metasedimerits. Reconnaiss ance geological and humus sampling surveys were carried out prior to gridding.

5.0 REGIONAL GEOLOGY

The claims are underlain by Archean rocks of the Swayze greenstone belt. The belt is about 45 km long and 29 km wide and is truncated at its western extre mity by the Kapuskasing structural zone; the Michipicoten-Wawa belt is probably the westerly equivalent or extension of the Swayze belt west of the Kapuskasing structure. To the east the belt bifurcates, with one arm trending towards the Porcupine area of the Abitibi belt, and the southern arm trending towards Gogama and Shiningtree.

The claims cover a large east-west synclinal structure, which appears to close near the west end of the property. The syncline is slightly overturned, as all structures dip steeply to the north, and plunges to the west. The location of the synclinal axis was traced with the aid of stratigraphic tops indicators such as graded bedding and pillow facings. On the north limb such features face south, but since they dip steeply north, the structure must be overturned.

Basal to the section is a series of ultramafic to mafic flows, sills and intru sives. These are overlain by a series of mafic to felsic flows, frequently fragmental, and tuffs. Several metasedimentary horizons are also present. The core of the syncline is occupied by a thick section of felsic volcanics and intrusives, primarily feldspar porphyritic rhyolites. The section is intruded by numerous dykes and sills of quartz-feldspar porphyry, and 2 minor granite plutons. A broad band of northeast trending metasediments crosses the west end of the property. A strongly magnetic northeast trending diabase dyke crosses the northwest portion of the claim block, slightly obscuring the magnetic interpretation of the western closure of the syncline.

6.0 GEOLOGICAL SURVEY

A total of approximately 400 km of line at 100 m line spacing was cut in Dore, Denyes and Swayze townships to facilitate the geological survey. Pickets were marked at 25 m intervals along the lines. The field data was plotted at the scale of 1:2500 and copies of the maps are appended.

Four additional claims were added to the claim block during the field season. Three were staked in the southwest corner of the block, east of Sylvanite Lake to close a gap in the original staking. A fourth claim was picked up in the northwestern part of the block. This claim had been held by foreign interests at the time of the original staking.

- 5 -

The table below outlines the rock units mapped. Note that no age connotation is implied as volcanism is cyclical. A description of the rock units follows:

TABLE l

LEGEND

6) INTRUSIVE ROCKS 6e lamprophyre6d alkalic aphanitic sill, dykes 6c diabase 6b granite 6a quartz-feldspar porphyry

5) METASEDIMENTARY ROCKS5f felsic polymictic conglomerate5e alkalic conglomerate5d grit, conglomerate, reworked tuff5c quartzite5b shale, argillite, siltstone, interflow sediments5a chert, interflow sediments

4) ACID VOLCANICS4f chlorite-carbonate-sericite schist4e quartz-feldspar-sericite schist4d fragmental4c felsic tuff4b porphyritic rhyolite4a massive rhyolite

3) INTERMEDIATE VOLCANICS3d fragmental, locally reworked intermediate conglomerate3c intermediate tuff3b porphyritic andesite-dacite3a massive andesite-dacite

2) MAFIC VOLCANICS2h granitized basalt2g agglomerate2f fragmental2e basic tuff2d gabbro-thick flow2c porphyritic basalt2b pillowed basalt2a massive basalt

1) ULTRAMAFIC ROCKSle flowtop rubble/brecciaId high MgO basaltle serpentinitel b peridotite {^pyroxenite)la ultramafic flows (komatiite)

Note that tuffs have not been mapped as discrete units; in order to distinguish their composition they are classified as mafic, intermediate, or acid tuffs and coloured accordingly.

- 6 -

6.1 Ultramafic Rocks

The ultramafic rocks occur as a series of ultramafic flows and subvolcanic sills intercalated with mafic flows. Flow textures were found only in the southeast portion of the block, southeast of Dyment Lake, as far west as claim P616025.

The komatiites are characterized by pyroxene spinifex with skeletal crystals ranging in size from l mm to 8 cm. Stratigraphically above^the spinifexoid horizons are flow top breccia-rubble zones, up to several metres thick, con sisting of numerous highly packed subrounded fragments of ultramafic material, often spinifexoid. The rubble zones often grade into poorly developed ultra mafic to (high MgO) basaltic pillows. The entire sequence grades, both laterally and vertically, into "normal" basalts.

Along the north limbs of the syncline no ultramafic rocks were seen. Magnetic mafic rocks occur as intrusives or subvolcanic sills, which are fine to medium- grained and typically oxide rich (magnetite) quartz gabbros in composition.

6.2 Mafic Volcanics

The most frequently exposed rock type on the property is basaltic in compo sition, occuring as massive flows, pillows, tuffs, fragmentals and agglomerate.

The typical basalt is fine-grained, massive, and variably foliated. Pillows are generally absent or poorly developed and hence are poor tops indicators.

Frequently fine-grained basalts can be found which grade into medium-grained varieties, probably representing thick flow centres. Medium to coarse-grained gabbroic basalts, frequently magnetic, are common northwest of Brett Lake.

These coarse-grained basalts are typically oxide rich (magnetite) quartz gabbros, interpreted to be thick flows, and responsible for the broad high magnetic zones delineated by the air magnetometer survey.

Locally the basalts are feldspar porphyritic, with phenocrysts up to several centimetres in size. Fragmental flows are also found locally. Subangular frag ments of basalt and andesite, generally several centimetres in size, occur in a matrix of fine-grained basalt. Finely bedded to massive ash and lapilli tuffs are probably more common than indicated; they are frequently indis tinguishable from mafic flows.

Thin conformable interflow sedimentary horizons are often found between indi vidual basalt flows. These are generally chert and argillite-siltstone. It is assumed many more such horizons are present but not encountered due to their recessive weathering, especially along contacts.

6.3 Intermediate Volcanics

Andesites and dacites were lumped together as intermediate volcanics for mapping purposes. These rocks generally occur as transition phases between the basalts and rhyolites, hence are often located Stratigraphically below

- 7 -

the felsic volcanics. They are typically pale green to greenish-white on weathered outcrops, and light green on the fresh surface. The flows are fine grained, and typically massive. However, a broad band of fragmental andesites {lapilli tuffs) trends easterly north of Brett Lake. Intermediate to felsic subangular fragments, up to several centimetres in size, are found in a matrix of andesitic composition. The fragments are usually aligned subparallel to parallel to the predominant regional foliation. Locally these fragmental s appear reworked, and are hence actually conglomeratic in nature.

6.4 Acid Volcanics

Acid volcanics are very common in the Swayze area. The core of the syncline is occupied by a thick section of rhyolite flows and intrusives, frequently feldspar porphyritic. The claims cover the favourable stratigraphy basal to the acid volcanics, on both limbs of the syncline. Numerous thin lenses and horizons of acid volcanics are intercalated with the basal basalts and koma- tiites. Metasediments such as shales and sandstones appear to have a spatial relationship with the acid volcanics.

Massive rhyolite flows are typically white weathering and white to whitish brown or green on the fresh surface. Subhedral phenocrysts of feldspar, up to several millimetres in size, are very common. The rhyolites are frequently strongly foliated and sericitized, such that they were mapped as sericite schists. Such alteration makes it impossible to distinguish between acid flows and tuffs. Carbonatization along foliation planes is also very common, giving the rocks a rusty weathering colour.

As mentioned above, (feldspar) crystal tuffs are fairly common but difficult to distinguish from feldspar porphyritic flows. Fragmental rhyolite flows can also be found, with angular to subangular fragments of rhyolite, and occasionally chert, within a rhyolite matrix.

Waterlain lapilli tuffs with interstitial pyrite {up to 650 are very common in the northeast corner of the property, in Dore township.

6.5 Met a sedi me ntary Rocks

Metasediments within the claim area represent approximately ID-15% of the rocks exposed. They can be divided into 2 major types:

a) thin interflow sediments representing short breaks or hiatuses between volcanic cycles, and

b) major sedimentary "breaks" representing a lengthy period of erosion and volcanic quiescence.

Metasediments of section (b) occur as a broad band which trends east-west south of Cree Lake, then swings northwest through Halcrow township then north east through Denyes township, crossing to the north of the northwest corner of the claim block. This horseshoe shape mimics the structural sequence found within the claim block, and hence may represent a synclinally folded section basal to the rocks within the claim block.

- 8 -

Metasediments outcropping on the property include:

5a) and 5b) interflow cherts, shales, argillites, and siltstones, found inter calated with volcanic flows. One such horizon in the northwest corner of the property can be traced for l kilometre.

5c) and 5d) quartzites, grits, reworked tuffs. These rocks occur as uncon formable lenses within the volcanics, especially the acid volcanics. They are probably derived from paleotopographic high acid centres and domes. An interesting assemblage of drag folded shales, greywackes, and sandstone is interfingered with acid and basic volcanic rocks in the southwest corner of the property south of Dyment Lake.

5e) "syenitic agglomerate" - this unit, the most unique formation on the pro perty, makes an excellent marker horizon. In hand specimen, it resembles a diatreme breccia, however it occurs as a conformable horizon up to 150 metres thick and can be traced for over a kilometre, south of Dyment Lake. Angular fragments of brick red, fine-grained, occasionally feldspar porphyritic syenite(?) are hosted in a chloritic glassy matrix. Lesser amounts of pyroxene- rich basalt fragments are also present, and to the west subrounded quartz pebbles are present. Pseudo-graded bedding is exhibited, with fragments ranging from metre size blocks to lapilli and ash size. The unit is probably a high- energy agglomerate {the syenitic fragments having been ripped up at depth), although locally it resembles a lapilli or ash tuff.

5f) felsic polymictic conglomerate. This is also a fairly high-energy sedi mentary rock, found interbedded with massive rhyolite flows, north of Freymond Lake and not on the present grid. Subangular to rounded fragments of slate, argillite, chert, quartz, and rhyolite, ranging in size from one millimetre to several centimetres, are hosted in a fine-grained felsic matrix. The rock contains S-5% fine-grained disseminated pyrite and is weakly carbonatized. Pyrite has also replaced fragments of slate and argillite.

6.6 Intrusive Rocks

Intrusive rocks within the claim block can be divided into 4 major types.

a) Quartz-feldspar-porphyry - the claim area is intruded by innumerable sills and dykes of feldspar-quartz porphyry, ranging in width from less than l metre to 50 metres. Individual sills can be traced for up to 1.3 km. These rocks are white to pinkish white both on the fresh and weathered surfaces with numerous phenocrysts of feldspar and locally of quartz. They are dacitic to rhyolitic in composition. There may be a genetic relationship between these rocks and some of the fragmental and or porphy ritic andesite-dacite flows as the two are often on strike with each other. North of Brett Lake a 200 metre wide unit mapped as intrusive porphyry may be a porphyritic acid volcanic flow.

b) Diabase - a major diabase dyke, up to 75 metres wide, crosses the property at 060 to 070 . The diabase is coarse-grained, extremely friable and strongly magnetic. It can be mapped for 9 km across the property and has been traced via geophysics (mag) along strike south of Timmins, through Lake Abitibi and on into Quebec. A thinner northwesterly trending arm branches off the main dyke north of Dyment Lake.

- 9 -

c) Alkalic, aphanitic sills, dykes - these rocks are very fine-grained to aphanitic, with a chilled, quenched appearance. They are generally wine coloured, often magnetic, and contain minor amounts of pyrite. They may represent quenched oxide-rich gabbros.

d) Lamprophyre - a black, medium-grained magnetic biotite lamprophyre dykeoutcrops west of Swayze Lake. The magnetic survey suggests that the dyketrends at 135 .

7.0 MINERALIZATION

Northeast of Swayze Lake a carbonate alteration zone was discovered on claim 607130. Highly carbonatized mafic and felsic tuffs with disseminated pyrite (up to 530 host a number of large quartz veins trending at about 340 and 070 . The veins carry variable amounts of pyrite and chalcopyrite (up to 5ft). All Au assays were low, the highest being 15 ppb.

The gridded claims in Dore township cover felsic lapilli tuffs with an inter stitial pyrite content of up to 6ft. Such rocks are locally anomalous 1n gold, with typical values of 50-80 ppb and a high of 2.12 ppm. A persistent set of thin north-south trending quartz veinlets is present which also carry weakly anomalous gold values.

8.0 STRUCTURE AND ALTERATION

The rocks in the claim area have been folded into a slightly overturned syn cline; all units dip steeply north, and yet pillow facings and graded bedding give contradictory tops on opposite sides of the syncline. Small draa folds indicate that the syncline has a north-westerly plunge, typically 65 towards 3200 .

The ground magnetometer survey indicates that local shearing and faulting is common. Only 2 major faults are obvious. Both trend 340-350 , and both are sinistral with apparent offsets of approximately 500 metres. One fault crosses the eastern end of the Cree Lake grid, passes through the northwest arm of Brett Lake and off the property. The second fault runs up the southeast arm of Dyment Lake. The ground mag survey readily identifies this fault.

The regional structure is well reflected within the outcrops exposed along the shores of the long lake south of Dyment Lake. Intercalated volcanics and sediments show rapid facies variations and are drag folded, Z style, showing a plunge of roughly 65 to the northwest. This suggests an anticlinal axis to the south, which is shown to exist on ODM map 2221. The area is pervasively carbonatized but no anomalous gold values were recorded.

All the rock names used in this report should be prefixed with a "meta", as a regional metamorphism of lower greenschist facies is present. Locally the rhyolitic tuffs and flows, and mafic and ultramafic rocks, have undergone varying degrees of iron-carbonatization. The ultramafic rocks are frequently serpentinized, and locally have undergone a talc-chlorite-carbonate alteration. The rhyolitic rocks have experienced varying degrees of sericitization.

- 11 -

11.0 CERTIFICATE OF QUALIFICATIONS

I, Robert C. Bell, of the City of Sudbury, in the Province of Ontario,

HEREBY CERTIFY:

1. That I reside at 1149 Southview Drive, Sudbury, Ontario, P3E 217.

2. That I am a graduate of the University of Western Ontario, London, Ontario with a degree of Bachelor of Science (1980).

3. That I am a Geologist with the Canadian Nickel Company Limited (subsidiary of Inco Limited) of Copper Cliff, Ontario, POM 1NO.

4. That I have practised my profession as a geologist since 1980, having worked in British Columbia, Ontario, Quebec and the Northwest Territories.

5. That I visited the areas discussed in this report and that the work described in this report was carried out under my supervision.

6. That I am an associate of the Geological Association of Canada.

Dated at Copper Cliff, this 21st. day of January, 1985.

Robert CrBeTT

- 10 -

9,0 CONCLUSIONS AND RECOMMENDATIONS

The claims are underlain by a folded sequence of volcanics and metasediments intruded by late porphyry dykes. The volcanic rocks range in composition from ultramafic to felsic. Favourable alteration such as carbonatization was observed in several areas. Gold values are only rarely anomalous.

Outcrop exposure is generally poor, especially at the western end of the pro perty. Hence vast areas of the property remain essentially unexplored and would require further evaluation via (basal till) reverse circulation drilling, IP, etc.

10.0 REFERENCES

Cunningham, L.J. (1982): Report on the Swayze Township property of Troudor Resources Inc., O.G.S. Assessment Records, Timmins, Ontario.

Donovan, J.F. (1965): Swayze and Dore Townships, O.G.S. G.R. No. 33.

Evelegh, F.J. (1982): Report on Geophysical Surveys, Sylvanite Group ofClaims, Denyes Township, Porcupine Mining Division, Province of Ontario, O.G.S. Assessment Records, Timmins, Ontario.

Lewin, E.M. (1962-63): Drill Logs, Flint Rock Mines Ltd., Swayze Township, O.G.S. Assessment Records, Timmins, Ontario.

MacQuarrie, D.R., and Sheldrake, R.F. (1982): VLF-EM and Magnetometer Survey on the Cree Lake Gold Prospect of Troudor Resources Inc., O.G.S. Assessment Files, Timmins, Ontario.

McKechnie, D.L. (1962): Report on Flint Rock Mines Ltd., Swayze Township, O.G.S. Assessment Records, Timmins, Ontario.

Northern Miner Press Ltd., April 12, 1984; "The Northern Miner".

Phelan, L.G. (1964): Drill Logs, Goldstar Ltd., O.G.S. Assessment Records, Timmins, Ontario.

Rickaby, H.C. (1934): Swayze Gold Area, O.D.M. AR 43, Part 3.

-

FIGURE 2 Canadian Nickel Company Limited

SWAYZE PROJECT, ONTARIO Claim Location Map

SCALE P5OOOO

Canadian Nickel Company LimitedCopper Cliff * Ontario POM 1NO

REGISTERED MAIL

January 23, 1985

Mr. F. W. MatthewsSupervisor, Projects SectionMinistry of Natural ResourcesRoom 6450Whitney Block, Queen's ParkToronto, OntarioM7A 1X1

Dear Mr. Matthews:

Enclosed is a geological report in duplicate being submitted under the Special Provisions Section as assessment work on the following 237 claims located in Swayze, Denyes, and Dore Townships, Porcupine Mining Division,

P574149 P574154 P576194 P588859 P588997 P605017 P605077 P605125 P605135 P606243 P606273 P606308 P606317 P606324 P606339

•51 incl.

•95•64 incl.•9000 incl

•78•32 incl.

•52 incl.•74•13 incl.•21 incl.•36 incl.•45 incl.

P606349 P606399 P606435 P606442 P606451 P606455 P606458 P606473 P606486 P606496 P607001 P607005 P607020 P607062 P607073

•50•417 incl,•39 incl.•48 incl.•52

•62 incl.•76 incl.•92 incl.•500 incl•02•13 incl.•26 incl.

•82 incl.

P607085 P607088 P607097 P607106 P615989 P616005 P616010 P616014 P616025 P616030 P616035 P616040 P807250 P808244

•86•90•102 incl.•37 incl.•6000 incl•07 incl.•12 incl.•16 incl.•27 incl.•32 incl.•37 incl.•42 incl.

•46 incl.

The report of work covering this submission was forwarded to the Mining Recorder in Timmins and subsequently recorded on December 11, 1984.

I trust that this report will be considered satisfactory by your department.

Yours

W. V. Rodney Exploration Departr

IM/nk

RECEIVED

JA * 2 l J 1985

WINING LANDS SECTION

Exploration subsidiary of

INCO LIMITED

41015SE8111 2 .7716 DORE 900

Mining Lands Section

Control Sheet

File No s3. 77/6-

TYPE OF SURVEY GEOPHYSICAL ^ GEOLOGICAL

GEOCHEMICAL

EXPENDITURE

MINING LANDS COMMENTS:

Signature of Assessor

Date

1985 03 OG Your File: 530/84 Our File: 2.7716

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTliiiwins, OntarioP4N 2S7Dear Sir;RE; lw tice of Intent dated February 8, 1985

Geological Survey on Mining Claims P 574149, et.aal., 1n Swayze, Denyes 4 Dore Townships

The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours sincerely,

S.E. YundtDirectorLand Management Branch

Whitney Block. Room 6643 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-4888

S. Hurst:me

cc: Canadian Nickel Company Limited Copper Cliff, Ontario POM 1NO Attention: I.D. McCasklll

cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario

Encl.

cc: Resident Geologist Timmins, Ontario

Ministry of Natural

jurcesOntario

Technical Assessment Work Credits Date

1985 02 08

File2.7716

Mining RecorderU Reop/t of Work No. 530/84

Recorded Holder

CANADIAN NICKEL COMPANY LIMITEDTownship or Area

SWAYZE. DENYES. DORE TOWNSHIPS

Type of survey and number ofAssessment days credit per claim

i . —— . ————————————————————————i Geophysical1* Elartrnmagnatic

1 Mflf)nttnmat"l: -

lppHinmatrlr

f-;

'Sil:

1 nth.rt", P::':

days

days

days

days

days

.g Section 77 (19) S** "Mining Clalmt AitetMd" column

l' 40| Geologicali: :-" ftanohemiral1

l Man days Q Airborne

Special provision ED Ground

*

days

days

D

0

JH Credits have been reduced because of partialcoverage of claims.

CD Credits have been reduced because of correctionsto work dates and figures of applicant.

#' ;V,::

Mining Claims Assessed

P 574151-54576194-95588859 to 864 incl.588997 to 9000 incl.605017605077-78605125 to 131 incl.605135606244 to 252 incl.606273-74606308 to 313 incl.606317-18606325 to 336 incl.606339-40-41-42606344-45-49-50-99606400-01-02-03-06-07606409 to 417 incl.

P 607098-99-100607106 to 125 incl.607127 to 137 incl.615992 to 6000 Incl.616005-06-07616010-11-12-14-15616025-26-27-30-31-32616035-36-37-40-41-42807250808244-45

606435 to 439 incl. 606442-43-44-46-47-48-51-52-55606458 to 462 incl. 606473 to 476 incl.606486 to 492 incl.606496 to 500 incl.607001-02607005 to 013 incl.607020 to 025 incl.607062607073 to 082 incl.607085-86-88-89-90

Special credits under section 77 (16) for the following mining claims

30 DAYS CREDIT

P 605132 606243606319-24-43 606404-08 607026-97

P 607101-02-26 615^89-90-91

20 DAYS CREDITP 574149-50

606320-21 606405-45 616016 808246

credits have been allowed for the following mining claims

LJ not sufficiently covered by the survey Q Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 77(19)—60:

Ministry ofNaturalResources

1.985 02 089, -111 (o

Your File: 5 30/84

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.For further information, if required, please contact Mr. R.J. Pichette at 416/965-4888.

Yours sincerely,

;.E. YundtDirectorLand Management Branch

Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3S. Hurst:mc

Encls.

cc: Canadian Nickel Company Limited Copper Cliff, Ontario POM l NO Attention: I.D. McCaskill

cc: Mr. G.H. FergusonMining 4 Lands Commissioner Toronto, Ontario

845

Ministry ofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1985 02 08

2.7716/530-84

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Land Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

846 (82/5)

\

•if

SCHEDULE A

P574149P574150P574151P574154P576194P576195P588859P588860P588861P588862P588863P588864P588997P588998P588999P589000P605017P605077P605078P605125P605126P605127P605128P605129P605130P605131P605132P605135P606243P606244P606245P606246P606247P606248P606249P606250P606251P606252P606273P606274P606308P606309P606310P606311P606312P606313P606317P606318

P606319P606320P606321P606324P606325P606326P606327P606328P606329P606330P606331P606332P606333P606334P606335P606336P606339P606340P606341P606342P606343P606344P606345P606349P606350P606399P606400P606401P606402P606403P606404P606405P606406P606407P606408P606409P606410P606411P606412P606413P606414P606415P606416P606417P606435P606436P606437P606438

P606439'P606442P606443P606444P606445P606446P606447P606448P606451P606452P606455P606458P606459P606460P606461P606462P606473P606474P606475P606476P606486P606487P606488P606489P606490P606491P606492P606496P606497P606498P606499P606500P607001P607002P607005P607006P607007P607008P607009P607010P607011P607012P607013P607020P607021P607022P607023P607024

P607025P607026P607062P607073P607074P607075P607076P607077P607078P607079P607080P607081P607082P607085P607086P607088P607089P607090P607097P607098P607099P607100P607101P607102P607106P607107P607108P607109P607110P607111P607112P607113P607114P607115P607116P607117P607118P607119P607120P607121P607122P607123P607124P607125P607126P607127P607128P607129

P607130P607131P607132P607133P607134P607135P607136P607137PSI 5989P615990P615991P615992PSI 5993PSI 5994PSI 5995PSI 5996PSI 5997PSI 5998PSI 5999PSI 6000PSI 6005P616006P616007P616010P616011P616012P616014P616015P616016P616025P616026P616027P616030P616031P616032P616035PSI 6036P616037P616040P616041P616042P807250P808244P808245P808246

Total = 237

Ministry o!NaturalResources

Ontario

t.-

Report of Work(Geophysical, Geological, Geochemical and Expenditures)

f"3 3 l O/

' ^.^ \i

The Mining Act

Instructions: — Please type or print.— If number of mining claims traversed

exceeds space on this form, attach a list. Note: — Only. days credits calculated in the

"Expenditures" section may be entered in the "Expend. Days Cr." columns.

- Do not use shaded areas below.Type of Survey(s)

GEOLOGICALClaim HolderU)

CANADIAN NICKEL COMPANY LIMITEDAddress

COPPER CLIFF. ONTARIO POM 1NOSurvey Company . Date of Sur

CANADIAN NICKEL COMPANY LIMITED ' fflv l W*Nome and Address of Author (of Geo-Technical report)

J. PERRY c/o CANADIAN NICKEL COMPANY LIMITED

Township or Area

SWAYZE .DENYES, DORE TWPS.Prospector's Licence No.

A 17527

vey (from St to), 84 30 , 08 841 Yr. Bay \ Mo. \ Y r.

Total Miles of line Cut

412 km

Credits Requested per Each Claim in Columns at right Mining Claims Traversed (List in numerical sequence)Special Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total(s) here

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Electromagnetic

Magnetometer

Expenditures (excludes power 5 t fiftf?i n6*

Days perClaim

40

Days per Claim

Days per Claim

K K n M f?Type of Work Performed \ [j) {3 ^ lia U V te

Performed on Claim(s) OtU * * tiB4i

A.M.7iftiOilOtll l2il|2|~o|4

Calc ulation of Expenditure Days Credits

Total Expenditures

s . * 15

cTotal

)ays Credits

Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.

ip.

Date RecqrdecLHolder or Agent (Signature)

Dec. 4, 1984 J 'j? W40&S4&/

Mining ClaimPrefix j Number

SE!E SCHEDULE '

1f.

-ft-E^-O-

DEC lRfcciot No

Expend. Days Cr,

A"

R—— H

-i&im

* p E\ — s? — t

1 figtfrf

1

EOf

^

i

Mining ClaimPrefix

CE1c u

19

INDS

Total nu claims cc report of

For Office Use OnlyTotal Days Cr. Dais-"Becorded Recorded 1 j .f l&tf/t

yfl *)(J Date Approved at'Reco/ded

Number

Vft) —————

4984 — —

SECTION

Expend. Days Cr.

Tiber of mining vered by this l)"i~l work. '

-"T S

^•^:. /?,^S2S2Sr/

Certification Verifying Report of Work1 hereby certify that 1 have a personal or witnessed same during and/or after

and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work its completion and the annexed report is true.

Name and Postal Address of Person Certifying

I. D. McCASKILL c/o CANADIAN NICKEL COMPANY LIMITED

COPPER CLIFF, ONTARIODate Certified

POM 1NO Dec. 4, 1984Certified by (Signature) s -s S

G2 (81/9!

SCHEDULE A

P574149 P574150 P574151 P574154 P576194 P576195 P588859 P588860 P588861 P588862 P588863 P588864 P588997 P588998 P588999 P589000 P605017 P605077 P605078 P605125 P605126 P605127 P605128 P605129 P605130 P605131 P605132 P605135 P606243 P606244 P606245 P606246 P606247 P606248 P606249 P606250 P606251 P606252 P606273 P606274 P606308 P606309 P606310 P606311 P606312 P606313 P606317 P606318

P606319 P606320 P606321 P606324 P606325 P606326 P606327 P606328 P606329 P606330 P606331 P606332 P606333 P606334 P606335 P606336 P606339 P606340 P606341 P606342 P606343 P606344 P606345 P606349 P606350 P606399 P606400 P606401 P606402 P606403 P606404 P606405 P606406 P606407 P606408 P606409 P606410 P606411 P606412 P606413 P606414 P606415 P606416 P606417 P606435 P606436 P606437 P606438

P606439 P606442 P606443 P606444 P606445 P606446 P606447 P606448 P606451 P606452 P606455 P606458 P606459 P606460 P606461 P606462 P606473 P606474 P606475 P606476 P606486 P606487 P606488 P606489 P606490 P606491 P606492 P60649S P606497 P606498 P606499 P606500 P607001 P607002 P607005 P607006 P607007 P607008 P607009 P607010 P607011 P607012 P607013 P607020 P607021 P607022 P607023 P607024

P60702B P607026 P607062 P607073 P607074 P607075 P607076 P607077 P607078 P607079 P607080 P607081 P607082 P607085 P607086 P607088 P607089 P607090 P607097 P607098 P607099 P607100 P607101 P607102 P607106 P607107 P607108 P607109 P607110 P607111 P607112 P607113 P607114 P607115 P607116 P607117 P607118 P607119 P607120 P607121 P607122 P607123 P607124 P607125 P607126 P607127 P607128 P607129

PS'07130 P607131 P607132 P607133 P607134 P607135 P607136 P607137 P615989 P615990 P615991 P615992 P615993 P615994 P615995 P615996 P615997 P615998 P615999 P616000 P616005 P616006 P616007 P616010 P616011 P616012 P616014 P616015 P616016 P616025 P616026 P616027 P616030 P616031 P616032 P616035 P616036 P616037 P616040 P616041 P616042 P807250 P808244 P808245 P808246

Total * 237

Ministry of Natural Resources

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

File.

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Type of Survey(s). GeologicalTownship or Ar.a Swayze. Denyes. Dore Twps. ClaimHolder(s). Canadian Nickel Company Limited

Copper Cliff, Ontario POM 1 NO______ Surveycompany Canadian Nickel Company Limited——-^—- Author of Report R- Be11 ' c/0 Canadian Nickel Company Address of A,.thnr Limited. Copper Cliff. Ontario POM 1NO

June 1 - August 30, 1984————Covering Dates of Survey.

Total Miles of Line rut 412 km(linecutting to office)

SPECIAL PROVISIONS CREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.

ENTER 20 days for each additional survey using same grid.

Geophysical

Electromagnetic.

Magnetometer.

Radiometric

Other-^————.

DAYSper claim

Geological.

Geochemical.

40

AIRBORNE CREDITS (Special provision credit* do not apply to airborne surveys)

Magnetometer. .Electromagnetic. . Radiometric(enter day* per claim)

PATF.! J an- 25, 1985 SIHMATTTRF.; ' *fc- ^JjAtrtKbr of Report or Agent

Res. Geol.. .Qualifications.

Previous Surveys File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

'(prefix)' (number)

See Schedule "A"

m

l

TOTAL CLAIMS. 237

837 (6/79)

GEOPHYSICAL TECHNICAL DATA

GROUND SURVEYS — If more than one survey, specify data for each type of survey

Number of Stations _________________________Number of Readings — Station interval ____________________________Line spacing.————Profile scale ———-———^—-——-—-——-—-—--—^-————^———————^——..Contour interval.

Instrument ——yf. Accuracy — Scale constant.

Diurnal correction method.Base Station check-in interval (hours). Base Station location and value ___

ELECTROMAGNETIC

Instrument

Coil configurationToil spparatinn

AccuracyMethod: CD Fixed transmitter D Shoot back Q In lineFrequency , . ~...... ,,,, — ,,,.. ,,,... ,,, , ,— ...- .,.,.,,,—.

(specify V.L. F. station)

D Parallel line

—————— 4Parameters measured.

Instrument.Scale constantCorrections made.

^ Base station value and location .

Elevation accuracy.

Instrument -—^—Method D Time Domain D Frequency Domain Parameters - On time __________________________ Frequency —————

— Off time __________________________ Range ———————— Delay time.——————————————————————————

— Integration time —————..^———-—————^— Power.____-_____________________________.—————————————a*

D Electrode array —Q"Z E lectrode spacing .

Type of electrode

SELF POTENTIAL

Instrument_______________________________________ Range.Survey Method ———————————————————————————————————————————

Corrections made.

RADIOMETRIC

Instrument-——.Values measured.

Energy windows (levels) ———^^—^^-^^^—-—————————^^-^—^^^———— Height of instrument___________________________Background Count. Size of detector———-———————^^—^—^^——————————^^^^^—.—..———-Overburden ———.--———.-—.——-—.^^^^——————-—-——-™—.——.—...——

(type, depth - include outcrop map)

OTHERS (SEISMIC, DRILL WELL LOGGING ETC.)

1 Type of survey——————————————————————

Instrument ^——————-—-^—^^^——————-^

Accuracy.^-—™--^^^^^——-——————-————-Parameters measured.

Additional information (for understanding results).

AIRBORNE SURVEYS

Type of survey(s)____

Instrument(s) —————(specify for each type of survey)

Accuracy-——————————^-—.^——(specify for each type of survey)

Aircraft used^-———————-.———————....————.——-—..

Sensor altitude-Navigation and flight path recovery method.

Aircraft altitude_________________________________Line Sparing Miles flown over total area________________________Over claims only.

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

Total Number of Samples. Type of Sample.

(Nature of Material)

Average Sample Weight——————— Method of Collection————————

Soil Horizon Sampled. Horizon Development. Sample Depth———— Terrain————————

Drainage Development———————————— Estimated Range of Overburden Thickness.

ANALYTICAL METHODSValues expressed in: per cent

p. p.m. p. p. b.

D D D

Cu, Pb,

Others—

Zn, Ni, Co, Ag, Mo, As.-(circle)

Field Analysis (.Extraction Method. Analytical Method- Reagents Used——

Field Laboratory AnalysisNo. ^^———^——.

SAMPLE PREPARATION(Includes drying, screening, crushing, aihing)

Mesh size of fraction used for analysis ————

Extraction Method. Analytical Method . Reagents Used——

Commercial Laboratory (- Name of Laboratory— Extraction Method- Analytical Method —— Reagents Used -^—^—-

.tests)

.tests)

.tests)

GeneraL General.

Birc

h A

Pop

lar"

S

pruc

e

Pop

lar

Spr

uce

Ced

ar

Ced

arS

pruc

eJa

ckpi

ne

Pop

lar

Spru

ce

Ced

ar

larg

e P

opla

r B

alsa

mS

pruc

e

Pop

lar

Birc

hP

60

64

73

Pop

lar

Spr

uce

Ced

ar

P 606474

Spr

uce

popl

arB

irch

Bal

sam

Pop

lar

INT

ER

ME

DIA

TE

V

OLC

AN

ICS

frogm

en*a

., lo

cally

rew

orke

d i

inte

rmed

iate

tuf

f po

rphy

ritic

and

esite

-dac

ite

mas

sive

ande

site

-dac

ite

j. P

opla

r l

Spr

uce

Spru

ceB

irch

Ced

ar

Spr

uce

Ald

erB

irch

Jack

pine

P

opla

r C

edar

S

pruc

e

VO

LCA

NIC

S

gror

itize

d ba

salt

aggl

omer

ate

frag

men

tal

basi

c tu

ff

gaS

bro-

thic

k flo

w

porp

hyrit

ic

basa

lt

pillo

wed

bas

alt

mas

sive

basa

lt

Spr

uce

Pop

lar

Ced

arW

hite

pin

e P

opla

r C

edar

B

irch

Ald

er

Birc

hC

edar

, P

opla

r S

pruc

e Ja

ckpi

neC

edar

P

opla

r B

irch

Spr

uce

NjO

TE:

No a

ge c

onno

tatio

ns a

re i

mpl

ied

as v

olca

nism

is

cycl

ical

—i

Birc

h S

pruc

e A

lder

C

edar

Spr

uce

Birc

h A

lder

Spr

uce

Ced

ar

Birc

h

Jack

pine

S

pruc

e

P 60

6476

high

gro

und

--

Ced

ar

Whi

te p

ine

ULT

RA

MA

FIC

R

OC

KS

flow

top

rub

ble

/bre

ccia

high

M

gO b

asal

tse

rpen

tinite

perid

otite

(tp

yroxe

nite

)

ultr

amaf

ic f lo

ws

(kom

atii

te)

Ceda

rP

opla

rB

irch

..S

pru

ce

Ceda

r l

Tag

alde

rs

- Sp

ruce

Birc

h A

lder

B

eech

Jt A

lder

C

edar

P606475

SY

MB

OLS

Ced

ar

Spr

uce

Out

crop

Sub

crop

Flo

at

Clif

f

Bal

sam

Pop

lar

21 S

pruc

e ^f

Ced

arP

opla

r

Ald

erS

pruc

eB

irch

Whi

te

S S

ilver

Birc

h hi

gh g

roun

d ce

dor

Slo

pe d

irect

ion

; m

oder

ate,

ste

epLe

vel

grou

nd

Geo

logi

c co

ntac

tG

eolo

gic

cont

act

(ass

umed

)P

illow

fac

ings

Foha

rion

and

dip

; in

clin

ed,

verti

cal

Bed

ding

; in

clin

ed,

vert

ical

Plu

nge

Join

ting

Sw

amp

outli

ne

Swam

pF

ault

Spr

uce

Pop

lar

fJB

I07

. T

lX 0

1836

6 (*5

Ald

erS

pruc

eB

irch

Birc

h A

lder

G

rass

Spr

uce

Jack

pine

--

B

irch

Pop

lar

Birc

hth

ick

Spr

uce

Silv

ers

Whi

te B

irch

Silv

er a

Whi

te B

irch

. B

alsa

mS

ilver

a W

hite

Birc

h B

alsa

mS

pruc

eS

iivera

Whi

te B

irch

Ald

er

Spr

uce

Birch

Birc

h A

lder

C

edar

Spr

uce

Ald

er

Birch

C

edar

RBI0

8RX

018

367(

^5)

Ced

ar

Spr

uce

A S

ilve

rs W

hite

Birc

hNE

-84-

57,

AN 7

7 RB

ZS.P

ESO

^VPI

O

DE

-84-

40Fi

eld

sam

ple

num

ber

Birc

h A

ider

S

pruc

eRo

ck s

ampl

e nu

mbe

r an

d go

ld a

ssay

in

ppb

Tren

chC

arbo

natiz

ed

Qua

rtz-c

arbo

nate

ve

ins

Cha

lcop

yrite

Pyr

ite

Esk

er

Ced

ar

Ald

er

Birc

hS

iiver

a W

hite

Birc

hS

ilver

3 W

hite

B

irch

Ald

er

Spr

uce

Birc

hC

edar

A

lder

S

pruc

e

Ced

ar

Birc

h A

lder

Silv

er b

irch

Bal

sam

Silv

ers

Whi

te B

irch

P606487

t-

vJac

kpin

eS

pruc

eA

lder

Ced

arS

ilver

Birc

h B

alsa

mP

606488

P 6

06

48

6C

edar

Spr

uce

Birc

h

Alde

rS

pruc

eB

irch

Spr

uce

Ald

erB

irch

Spr

uce

v

Pop

lar

RB

I09

RX

OI8

368K

5)S

pruc

e

v\ir

Ced

arS

pruc

eC

edar

Silv

er a

Whi

te B

irch

Silv

er a

Whi

te B

irch

Bol

sam

Spr

uce

Silv

erb

irch

B

alsa

mA

ide

r C

edar

B

irch

Pop

lar

Birch

Ced

ar

r :: J

OCK

p i m

f™

Spru

ceW

hite

pin

e Ce

dar

Spru

ce

Birc

h

Spr

uce

Ald

erP

opla

r

Spr

uce

Jack

pine

Birc

h A

lder

S

pruc

e

Spr

uce

Birc

hC

edar

Silv

er b

irch

Ash

Ced

or

Spr

uce

Tarn

a ra

kSp

ruce

Ald

erB

irch

f~,4

a R.X

OI8

374(

(5)

Ced

ar

Whi

te p

ine

Spr

uce

Spr

uce

Bal

sam

B

irch

Whi

te p

ine

Ced

arP

opla

r S

pruc

eB

irch

Spr

uce

Bal

sam

B

irch

Pop

lar

Ald

er

Spr

uce

Ced

ar

Whi

te p

ine

Birc

h C

edar

S

pruc

e

Birc

h C

edar

A

lder

P

opla

r

Ced

arSp

ruce

Pop

lar

Spr

uce

Pop

lar

Ald

er

Pop

tar

Ald

er

Ced

arW

hite

pin

eB

irch

Pop

lar

Spr

uce

Pop

lar

Birc

h

Pop

lar -

Ald

er

Ced

ar

Birc

h•P

opla

r B

alsa

mW

hite

pin

e P

opla

rP

opla

r S

pruc

e A

lder

C

edar

Spru

ce

l B

irch,

Popl

arB

irch

Bals

am

Spr

uce

Jack

pine

Spr

uce

Ced

ar

Pop

lar

Birc

h

Pop

lar

Ald

erB

irch

Pop

lar

Ald

erC

edar

Popl

arA

lder

Ced

arP

607

I08

Birc

h,Ja

ckpi

neS

pruc

e P

opla

r

Ash

Whi

te p

ine

high

gro

und

Ced

arPo

plar

Birc

hP

6064

9IP

opla

r S

pruc

eP

60

64

90

Pop

lar

Spr

uce

Ald

er

Birc

hS

pruc

eJa

ckpi

ne

Birc

hP

opla

rB

alsa

m

Spr

uce

Ald

er

Pop

lar

Whi

tepi

ne

Pop

iar

Bal

sam

Spr

uce

Spr

uce

Ald

er

Pop

lcr

Whi

te p

ine

Pop

lar

Spr

uce

Ald

er

Birc

h

Pop

lar

Spr

uce

Ced

arJa

ckpi

ne

Popl

arP

opla

r Sp

ruce

Pop

lar

Ald

er

Birc

h

Pop

lar

Birc

hS

pruc

ePo

plar

Ja

ckpi

ne

Popl

ar P

60

70

0I

P6

06

50

0A

lder

S

pruc

e P

opla

r W

hite

pin

e

Pop

lar

Spr

uce

Ced

ar

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

op

per

Cliff

,

On

tario

PO

M

INO

GEO

LOG

Y SU

RVE

Y

Deny

es, S

wayz

e an

d Do

re T

wps

SW

AY

ZE

PR

OJE

CT

vey

dole

Ju

ne -

Au

gu

st f 1

984

Sup

ervi

sor:

J,

P

ER

RY

July

-August

/83

J. P

erry

, B.

Bel

lC

ompi

led

by

s. A

nder

son,

N.

Nem

eth

R D

enom

me

Dal

e dr

awn

. S

ept. /

84

Dra

wn

by

RO

N

JOH

NSO

N

41015S

E0M

1

2.7

716

DO

RE

mix

ed

Ced

arS

pruc

e B

irch

Bal

sam

Spru

ce

AN52

RX"0

6448

5(5)

crbd'l?

AN

SI R

X064

484

[5]

AN 5

3RX

0644

86(*5

]AN

50

RX 0

6448

3 fc

5]AN

61RX

0644

91 W

]iA

N49

RX

0644

82 (5

)

W^;

*6c-

@!P

;;

AN

62--

06

4492

45*

mat

ure

. P

opla

r

ANSI

RX

OI8

928(

*5)

'l AN

82

RX 0

1892

9 (1

0)qt

z ve

in

P 60

7120

Jack

pine

L

Birch

P60

7II2

P607II9

, ,

'i RX

0)8

365

*5)

P 60

7135

Pop

lar

Jack

pine

Spru

ceP

607I

27P

6071

28-,-

*- 8

4-48

2a

*RX

0530

l3 (

AN 4

7 ,

, RX

064

4801

*5)

--

Pop

lar

Spr

uce

Jack

pme

Spr

uce

AN48

,

, R

X06

448l

(*5

RX

0526

86(I

O)*

)crb

d J XB

.L.

OO

OO

N

Tag

ald

ers

RBI6

RX

0526

90(IO

)P

6071

26

P 60

7129

P 60

7134

-.

larg

e P

opla

rR

6I04

RX

018

364^

5)

P 60

712*

P 6

07

3

P 60

71 8

Tag

alde

r, B

irch

Pop

lar

Jack

pine

--

Pop

lar

--

Spr

uce

P 607 3

0Ta

g al

ders

, C

edar

Jack

pme

Po

pla

rTa

g al

ders

C

edar

sw

amp

*,7\P

607I3

3

P 60

7114

Pop

lar

Jack

pine

high

gro

und

Ced

ar

Jack

pine

P

opla

r

R82

6 ,

RX 0

5 27

00(1

0)/q

tz v

n cp

.py

RB RB2

4 RX

052

697

RB

25/R

X 0

5269

8P

6071

222a

.e R

B 21

cr

bd

RX 0

5269

4(10

)

NE

-84-

50

,^R

X 0

4314

7(10

)fet

y 3 a

crbd

RB

II yl

RX

0526

87(I

O)

c/B

irch

/Spru

ce

RX0

43I5

9 *5

NE

-84-

72

Jack

pme

Pop

lar

P 60

7115

P 60

7132

P 60

7131

P 60

7124

P 60

7116

P 60

7123

ackp

ine

apla

r v

bJ

Lake

i

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y S

UR

VE

Y

projec

t; S

WA

YZE

P

RO

JEC

T

J. Pe

rry,

B. B

ell

Com

pile

d Dy

5.

And

erso

n, N

. Nem

eth

R

41

0I5

SE

01

11

2

.77

16

DO

RE

Lake

Spru

ce

Birc

h . \i-

2a

IOO

OO

N Ced

ar

Swam

p

Za

RX05

2683

(IO)

Birc

h

Jack

pine

Pop

lar

Birc

hJa

ckpi

ne P60

7I36

2b2d

'Rfl4

2*.

Pop

lar

Pin

e

Pop

lar

Pop

lar

2a'

E-84

-9

-^RX

049

591(

51

SRB

l 72

aP

ine

Pop

lar

Map

le

Ald

er

Map

le

Pop

lar

Ald

er

Pop

lar

Jack

pine

^, * R

X 05

2684

(10)

P 60

7134

2d 4 ^

2d

P 60

7133

9500

N

P 60

7132

UJ

Pop

lar

Ald

er

Pop

lar

Birc

hA

lder

Pop

lar

Ald

er

Birc

hPo

plar

Ald

er

2aP

opla

r

Ald

erA

lder

Pop

lar

Birc

h

'2a

v

Pop

lar

lP

6071

37-

Pop

lar

Pine

B

irch

Map

le

Pop

lar

Birc

h M

aple

i

dens

e A

lder

Pop

lar

Map

le

Ald

er

Pop

lar

Birc

h

Birc

h A

lder

P

opla

r

Pop

lar

Pin

e B

irch P6

0627

3

NE-8

4-| 8

Pop

lar

Map

le

Pop

lar

Ald

er

Map

le

Birc

h P

opla

r

Ald

er

Map

le

Ald

er

Pop

lar

Mop

le

Pop

lar

Ald

er

Map

le

Birc

h

Birc

h P

opla

r S

pruc

e

P58

8864

Birc

h P

opla

r A

lder

Mm

. A

sh

Spr

uce

Birc

h

.Pop

lar

Birc

h Po

plar

Ald

er

Map

le

Pop

lar

Ald

er

Map

le

Pop

lar

Birc

h

Ald

er

Birc

h1 e . — —

- \ \

r i

Po

pla

r

Popl

arM

aple

Ald

er'

— —

P

ine

\

Map

le

Aid

erM

aple

\ \A

lder

Pop

lar

^ . ——

——

--" -'

P5f

f ^ _ _

jS

pruc

eA

lder

Map

le

Pop

lar

/f^

^^

j

Pop

lar

Map

le

^——

— —

" f

Map

leP

opla

r

Spr

uce

^

^v^ \

3886

3

Pop

lar

Pine

f

f ^^^\

s**

i ^——

——

^

i

i s

^,, J

u?

p B

irch

t

Bal

sam

Birch

Bal

sam

x x

Pop

lar

Ald

er

Pop

lar

Ald

er

^ •i

Pop

lar

Ald

er

s

Birc

hP

opla

r A

lder

^

R

Birc

hAs

hM

aple

P*5i

f ^j\

Birc

h A

lder

dens

e A

lder

Pop

lar

Birc

h A

lder

AN 26

Pop

lar

JacK

pine

Map

le

Pop

lar

dens

e A

lder

P

opla

r

Map

le

Pop

lar

Birc

h

Map

le

Birc

h

Pop

lar

Birc

h

Pop

lar

Birc

h P

opla

r

P 58

8997

Pop

lar

Birc

hB

irch

Ald

er

P 58

8998

! Pop

lar

Ald

er

Birc

h A

lder

P

opla

r

Pop

lar

Birc

h

Pop

lar

Ald

er

Pop

lar

Pine

B

irch

Pop

lar

Birc

h P

opla

r A

lder

Pop

lar

Birc

h A

lder

.Birc

h A

lder

,

Pop

lar

Birc

h A

lder

Pop

lar

Pine

P 60

6274

Pop

lar

Birc

hA

lder

Birch

P

op

lar

Ald

er

Pop

lar

Ald

erA

lder

Bi

rch

Pop

la r

Birc

hP

opla

rA

lder

Birc

h A

lder

P 60

6247

Birc

h A

lder

—- ii,

B

irch

Ald

er

Pop

lar

Ald

er

Ced

arP

opla

rB

irch

P 60

6248

Pop

lar

Map

le

s:i

Spr

uce

RX 06

4476

*5

RX06

4475

('5

AN 29

P58

8859

Tr

P 58

8860

Larg

e Ja

ckpi

ne

Birc

h

Jack

pine

P

opla

rR6

14

RX 0

5268

9(50

] 2a

cr

bd.p

y

Pop

lar

Jack

pine

mat

ure

Pop

lar

Pop

lar

Jack

pine

Pop

lar

JacK

pine

P 58

8861

AN

4RX

064

465(

10)

Spr

uce

Birc

h Ja

cKpi

ne

Pop

lar

Spr

uce

Birc

hJa

ckpi

ne

Birc

h. 8

4-26

WR

X 06

4462

(10)

*^

RX04

9598

(t5]

T l Ja

ckpi

ne

Pop

lar

Ced

ar P58

9000

P588

999

Spr

uce

Pin

e B

ircri

Jack

pine

B

irch

Spr

uce

Jack

pine

rt:

Jack

pine

A

Birch

/Aid

er^

Popl

ar / S

pruc

e

P606

243

Tag

alde

rs

.,M

tn.

Ash

P

opla

r B

irctl

P606

245

Jack

pine

B

irch

Pop

lar

Spr

uce

Jack

pine

B

irch

RX06

4477

(*5)

P606

244

RB11

7 (

RXO

B372

k5P

6062

46

AN 3

3 Sp

ruce

RX

0644

74(*

5]P

opla

r S

pruc

eP

opla

r Ja

ckpi

ne

Birc

hB

irch/

Spr

uce

Birc

h P

opla

rSp

ruce

Birc

hP

opla

rA

lder

Birc

h

Pop

lar

Ald

er

11 P

opla

r/S

pruc

e B

irch

Birc

h Ja

ckpi

ne

Spr

uce

Birc

h Ja

ckpi

ne

Spr

uce

Birc

h Ja

ckpi

neP

6062

52PE

G RX

0526

81(1

0]C

edar

B

irch

Spru

cei f c

tt^4^

S^:t^

i ;'A^

RBII6

R

KO

W37

IMN

E-84

-24

RX 0

4959

7 5!

P 60

6249

Spr

uce

Pop

lar

Birc

hJa

ckpi

ne

Pop

lar

Pop

lar

Jack

pine

Bre

tf La

keP

6062

50TR

ENCH

Birc

hR

X064

478(

IO)

Spr

uce

Ced

ar —

Ta

g al

ders

—2

Spr

uce

Sw

amp

Jack

pine

, B

alsa

m

Birc

hP

6062

5I.

41

01

5S

E0

11

I 2

.77

16

D

OR

E2

20

8 16 2O

9 17 21

10 18 22

1 II 19 23

2 12 24 28

X 13 35 29

4 K 26 30

5 27 31

6 15

7

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y

SW

AY

ZE

P

RO

JEC

TD

enye

s, S

way

ze a

nd

Dor

e Tw

ps-f

R ^

Y

P 60

5129

P 60

5130

P 60

5126

P 60

5127

Bir

chJa

ckpi

ncP

opla

r, A

lder

Jack

pine

, B

irch

P 60

5017

5888

59\

RX 0

6446

7(5)

S

pruc

e, P

opla

r f

\

P 60

5128

P 60

5125

P 60

5078

P 57

6194

Jack

pine

,Spr

uce

l Ja

ckpi

ne,

Spru

ceB

irch

Jack

pine

Spr

uce,

Birc

h \

P 58

8861

Sp

ruce

Ced

arS

wam

p

.i

- ~

~'-

. -.

-

'"'^

''v* -

*^l

nift!L

!'r''[

1-

ijrir

::

:;i'

-

" ;'-

- •

" "^

!J ^

'^r^

vT

lv^

1 ^'^

^L '

z '

•-To

g-al

ders

-

" .

-^U^

-4**

J^—

—^"

W*-

^^-'*

---^

--.^

••-"

^Bii^

!?.^

^il

li!i.s2

asaJ

*1"''

"r"'"

-. "

'"^--"

"V

- "•"

r " "

P 60

5135

Popl

ar

P57

4I5I

P 60

5132

P 57

6195

Ceda

r, ta

g-al

ders

P 57

4154

^-Jid

aWJf

tM^

P60

5077

NE-8

4-35

,

, RX

043

140(

^5)

crbd

Birch

/Sp

ruce

Ja

ckpi

ne

" '

41015S

I11

2.7

71

6

DORE

P 57

4149

10

50

0 N

IOO

OO

N

95O

O N

4101

SS

E01

11

2.7

71

6

DO

RE

8 16 20

9 17 21

IO 18 22

1 II 19 23

2 12 24 26

3 13 25 29

4 14 26 30

X 27 31

6 15

7

July

-Aug

ust/8

3

Cana

dian

Nick

el Co

mpan

y Li

mite

dL

o p p

P -

r O

M

GEO

LOG

Y S

UR

VE

Y

SW

AY

ZE

PR

OJE

CT

Deny

es, S

wayz

e an

d Do

re T

wps.

Superv

isor

J.

PE

RR

Yv'

v :.;

'. Ju

ne -

Aug

ust

7 19

84

Com

p.ie

d Dy

S

And

erso

n, N

Nem

eth

| D

raw

D,

RO

N

JOH

NS

ON

_

__

__

_R

. D

enom

me

Sca

le

1=25

00-t-

....

....

. .1

Sep

t 7

84

j

41 O

/ 15

Pop

lar

Jack

pine

Spr

uce

Spr

uce/

Ta

mar

ck

Mus

keg

l

Spr

uce/

Mus

keg

l.RX

0189

31 (

5)

PVP

607I

OO

P 60

7077

P 60

7078

CI

AN 1

09

RX 0

1893

7(5]

py

Jack

pine

P

opla

r S

pruc

e

P 60

7099

Ir

PE33

RX 0

5292

5 (5

0)

Spr

uce/

Birc

h

PE35

RX 0

5292

7 (7

5) C

u 15

ppm

In

55

ppm

Pb

5 pp

m Ag

0-5

ppm

Cu'

25 p

pm-—

VP3

P60

7076

P 60

7101

RX

0529

29(8

0pE

38

P60

7098

X04

3l8l

(?-I2

pp

Spr

uce

Birc

h

Spru

ce/

Bir

ch

Ald

er

Birch

/Sp

ruce

Popla

r/S

pru

ce

^^C

?

RX 0

4318

4(51

—'

spruce

\P60

7097

8B

irch

Spr

uce/

Birc

h A

lder

AN99

RX

OI89

32[3

0)

2aRX

052

944

(20)

PE

55

AN 7

3 RX

1892

2 5

Spru

ce/

Birc

hPE

42

(10)

R

X05

2930

Cu

* 5

ppm

,~

rnniit

~i A

f'T*

10

ppm

Birch

/ S

pruc

e

"P607075

P 60

7102

^-

Ald

er / S

pruc

e

Birc

h

Spr

uce /

Jack

pine

4C

E 84

-84

RX

043I

65(IO

)A

lde

r/ P

opla

r

VP2I

RX

043

197(

4751

AN

I02

RXO

I893

3fl-5

3ppm

!

P 60

7086

6070

81S

pruc

e /

Birc

h *

VP(4

RX

043I

90(*

5)

R X 0

4318

9 (*

5^

Spr

uce

S B

irch

P 60

707

Ag

f-5 pp

m Jo

ckpi

ne17

X

043I

93II5

)Cu

10

pp

m Zn

80

ppm

Pb

5

ppm

Ag

^5

ppm

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y S

UR

VE

Y

Deny

es, S

wayz

e an

d D

oreT

wps

SW

AY

ZE

PR

OJE

CT

-):te

Ju

ne -

Aug

ust /

1984

J. P

erry

, B. B

ell

Com

pile

d Dy

S

.And

erso

n,N

.Nem

eth

Dro

wn

n,

RO

N

JOH

NSO

N

4101

5SE

B11

1 2

.77

16

D

OR

E

Den

se

alde

r yo

ung

popl

ar

thic

k al

der

Birc

h, P

opla

r

T

Ald

er

Birc

h P

opla

r S

pruc

e

/41

015S

E01

11

2.7

71

6

DORE

2G

0

8 16 20

9 17 21

10 18 22

1 II 19 23

2 12 24 28

3 13 25 29

4 14 26 30

5 27 31

6 15X

July

-Aug

ust/8

3

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y SU

RVE

Y

SW

AY

ZE

PR

OJE

CT

J.

PE

RR

Y

——

——

——

—J.

Per

ry,

B. B

ell—

——

Com

pile

d by

S.

Ande

rson

, N

.Nem

eth

__

__

__

__

_R

Den

omm

e_^_

_^__

__

Scal

e 1=

2900

, R -

Deny

es, S

wayz

e an

d D

oreT

wps

.

RON

JOH

NSO

N

June

- A

ugus

t / 1

984

Sept

/

84

NTS

41

O

X 15

90

0O

N.

9 D

OO

N

85

00

N.

80

00

N.

rch

jpla

r

der

H- —

— —

Birc

hP

opla

rA

lder

tall

Pop

lar

Ald

er

Pop

lar

p 6

06

4

Birc

hA

lder

Pop

lar

Spr

uce

^*~~

*tt

^ f

u Ash

S

pruc

e sw

amp

4c

i

Jack

pine

Spru

ceB

irch

thic

k C

edar

Ald

er

4

thic

k C

edar

A

lder

V

.DE-

84-5

9l R

X 05

3015

(10)

Spr

uce

Jack

pine

4

Ald

erB

irch

Pop

lar

fDE

-84-

60

2a tall

Pop

lar

Ald

er

A Vta

ll P

opla

r A

lde

r

Ced

ar

Pop

lar P

6064

42Sp

ruce

thic

k

Jack

pine

Birc

hPo

plar

8

thic

k A

lder

Jack

pine

P

opla

r

Ald

er

4^06448

Ald

er

Pop

lar

Pop

lar

Spr

uce

no b

edro

ck

Ald

er

Pop

lar

Jack

pine

B

irch

Ald

er

Pop

lar

Bal

sam

Jack

pine

.DE

-84-

65

*6o

Jack

pine

P

opla

r

Spr

ue*

39

Pop

lar

Ald

er

Pop

lar

Ald

er

Ald

er

Pop

lar

Ald

er

Pop

lar

Jack

pine

Pop

lar

4,S

pruc

e

Birc

h

Ash

Po

pla

r

Pop

lar

Bal

sam

Spr

uce

Spr

uce

A

'DE

-84-

66

F6a Ja

ckpi

ne

Birc

h S

pruc

e

Jack

pine

Birc

hS

pruc

e

Pop

lar

Ald

erB

irch

Jack

pine

Bir

chA

lder

Birc

h Sp

ruce

Pop

lar

Ald

er

Jack

pine

Pop

lar

Ald

er

Birc

hJa

ckpi

ne

Spr

uce

Jack

pine

S

pruc

e

tall

Pop

lar

Birc

h A

lder

Ald

er

Birc

h

lino

bed

rock

Ald

er

Birc

h

P60

6438

A?

Spru

ce

Birc

h

Bal

sam

S

pruc

e B

irch

Bir

ch

Aid

er

Pop

lar

Ald

er

P606

443

Pop

lar

Spr

uce

Ald

er

Birc

h

Birc

h A

sh

Jack

pine

B

irch

Birc

h As

h

Pop

lar

Ald

er

Pop

lar

Ald

er

Ald

er

Pop

lar

Jack

pine

Birc

h P

opla

r

Jack

pine

Birc

hA

lder

Birc

h A

lder

Ja

ckpi

ne

Spr

uce

Ald

erB

irch

Spr

uce

6a V

Spr

uce

Jack

pine

P

opla

r

Jack

pine

Pop

lar

Spru

ce

DE

-M-6

8 60 S

pruc

e B

irch

W

Spr

uce

Ald

er

Ald

er

Pop

lar

DE-

84-7

0

Jock

pine

Po

plar

Pop

lar

Alde

r

Jack

pine

B

irch

Ald

er

Ald

er

Ash

Pop

lar

Ald

er

4Ja

ckpi

ne

Spr

uce

Birch

Pop

lar

Ald

er

Jack

pine

P

opla

r B

irch

Ald

er

Spr

uce

Birc

h Ja

ckpi

ne

Spr

uce

Ald

er

Spru

ceA

lder

\

sk

Pop

lar

Spr

uce

Spr

uce

mus

keg

Ald

er

Spr

uce

•-_R

6064

47Ja

ckpi

neB

ircli

Spr

uce

Birc

hJa

ckpi

ne

Pop

lar \ S

thic

k Al

der

Spr

uce

M

V

i

Pop

lar

Bal

sam

Jack

pine

bA

lder

As

h

Pop

lar

Ald

er

Spr

uce

mus

keg

Pop

lar

Spr

uce

Spru

ce

mus

keg

Spr

uce

Ald

er

Pop

lar

Spr

uce

Ald

er

Pop

lar

Spr

uce

tall

Pop

lar

Ald

er

tall

Pop

lar

Ald

er

Ald

er

Spr

uce

P 60

6437

4th

ick

Spr

uce

Ald

erth

ick

Ald

er

thic

k S

pruc

e m

uske

g

Spr

uce

mus

keg

Ald

er

Spr

uce

mus

keg

Ald

erS

pruc

em

uske

g

Jack

pine

Birch

Spr

uce

i

Spru

ce

Jack

pine P

6064

44S

pruc

e B

irch

l th

ick

wet

Ald

ers

thic

k S

pruc

e

Ald

er

Jack

pine

S

pruc

eB

irch

Jack

pine

P

opla

r

Jack

pine

P

opla

rS

pruc

e B

irch

!*

79 N

T

ie

Line

l no

l be

droc

k

^S

Jack

pine

Popl

arSp

ruce

S

Spr

uce

Ald

er

mus

keg

thic

k

Ald

er

thic

k A

lder

Spr

uce

Spr

uce

Pop

lar

Pop

lar

Spr

uce P6

0644

6

Pop

lar

Spr

uce

Jack

pine

Spr

uce

Birc

h

thic

k A

lder

P

opla

r

thic

k A

lder

P

opla

r

Pop

lar

Jack

pine

Spr

uce

84

N Ti

e Li

ne ,

.

Pop

lar

Jack

pine

Spr

uce

Spr

uce

Birc

h A

irier

Spr

uce

Pop

lar

Ald

er

l ^

f fl

pavp

r l

Beav

er

Pond

Jack

pine

Jack

pine

Ald

er

Jack

pine

P606

436

k,f—

Ald

er

Jack

pine

Jock

pine

S

pruc

e

, Ald

erB

irch

,-——

-

^, J

ackp

ine

Spr

uce

A ipru

ce

Ald

er

Pop

lar

Jack

pmi

Jack

pine

Pop

lar

Jack

pine

:: J

ackp

ine

(S--

Po

plar

A

lder

Ja

ckpi

ne

Jack

pine

P

opla

r

Ald

er

Pop

lar

85

00

N

Jack

pine

:-

Jack

pin

e

Pop

lar

l'.

Jock

pine

" P

6064

35P

opla

r Ja

ckpi

ne

thic

k S

pruc

e

4th

ick

wet

A

lder

S

pruc

e

Jack

pine

S

pruc

e

thic

k A

lder

Spr

uce

tall

Pop

lar

Spr

uce

80

00

N

X 16 20

9 17 2i

iO 18 22

i ii 19 23

2 12 24 28

3 13 25 29

4 14 26 30

5 zr 31

6 15

7

•Jul

y-A

ugus

t /8

3

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

opp

er

Clif

f ,

Onta

rio

PO

M

INO

GEO

LOG

Y S

UR

VE

Y

SW

AY

ZE

PR

OJE

CT

Sup

ervi

sor

J.

PE

RR

Y

J. P

erry

, B.

Bef

l by

S

.And

erso

n, N

.Nem

eth

R. D

enom

me-

—.—

——

.

Scale

: 1=

2500

FIG

UR

E

Deny

es, S

wayz

e an

d Do

re T

wps

Inst

rum

en

t.

Dra

wn

by :

RO

N

JOH

NSO

N

File

Surv

ey d

ate

June

- A

ugus

t X

1984

Date

dro

wn .

Sept

. f

84R

evis

ed

N.T.

S.

41

O X

15

P60

6435

Pop

lar

Joct

tpin

e l

Ald

er

P606

404

RX

043I

77K

5J;

P606403

RX OI8

353(*5

)

* P

6064

02P 606405

Spru

ce

.Mus

keg P

606406

P606459

RX

OI8

97I(

<5)

'3C

Birc

h

Jock

pin

eBirc

hP60

6409

P606

408

P 60

6411

P 60

6410

P60

6407

A J

ackp

ine

::

Pop

lar

Birc

h

Pop

lar

Spr

uce

A

Jock

pin

P 60

6416

P 60

6417

4P

6063

08

Nick

el Co

mpan

y Li

mite

dCa

nadia

nC

op

pe

r C

liff

, Q

ntQ

n o

PO

M

INO

GEO

LOG

Y S

UR

VE

Y

Den

yes,

Sw

ayze

and

D

ore

Twps

.pro

ject

SW

AY

ZE

PR

OJE

CT

Sur

vey

date

J

une

- A

ugus

t f

1984

J. Pe

rry,

B. B

ell

Com

pile

d by

S

.And

erso

n, N

.Nem

eth

R.D

enor

nme

Dra

wn

by

RO

N

JOH

NS

ON

4101

5SE

0111

2

-771

6 DO

RE

rb

Birc

hW

hite

pin

eS

pruc

ehi

gh g

roun

d C

edar

P 60

6399

Pop

lar

high

gro

und

Ceda

rW

hite

pin

e

Ced

ar4a

DE-

84-5

7 R

X053

0I4{

5)C

edar

S

pruc

e f *

Whi

te p

ine

Popl

arC

edar

Whi

te p

ine

Pop

lar

Spr

uce

P6

06

40

2

P60

640I

Popl

ar

Red

pine

P 60

6400

Spr

uce

Pop

lar

Birc

h

Tag

QM

er s

wam

pP

opla

r S

pruc

e

Popl

ar

Birc

h S

pruc

eC

edor

P

opla

r B

irch

Spr

uce

Pop

lar

Spr

uce

Ald

er

P6064II

P 60

6412

P 60

6413

P 60

7023

P607022

P60

702I

Ced

ar

swam

p

ANI7

I ,

RXO

I895

8(*5

. ,2

a

Ced

ar

Spr

uce

Tag

ald

er

swam

pP

6064

15 r

P 60644

P60

7024

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

op

pe

r C

liff

,

On

tario

P

OM

1N

O

GEO

LOG

Y

Deny

es, S

wayz

e an

d D

oreT

wps

SW

AY

ZE

PR

OJE

CT

Sur

vey

date

J

une

- A

ugus

t X

1984

Superv

isor

! J

. P

ER

RY

July

-Aug

ust/8

3J.

Per

ry,

B.B

eli

Com

pile

d Dy

S

.And

erso

n,N

.Nem

elh

Deno

mm

eD

ate

draw

n .

Sep

t. /

84

Dra

*n b

y R

ON

JO

HN

SO

N

4101

5SE

0111

2

.77

16

D

ORE

Birc

h B

alsa

m

Spr

uce

Pop

lar

Ced

ar

Birc

h S

pruc

e la

rge

Ced

ar

Pop

lar

larg

e ce

dar

Pop

lar

Spr

uce

larg

e P

opla

r S

pruc

e Ba

lsam

6070

01

^f^^

S2

^^P

6070

02hi

gh g

roun

d C

edar

P

opla

r

Spru

ce

P 6

07

10

7

P 60

6499

P60

6498

Ced

ar-

Spr

uce

-Tag

ald

ers

high

gro

und

Ced

ar

Pop

lar

Birc

h P

opla

r Sp

ruce

W

hite

pin

e

P 60

7006

Spr

uce

mos

tly i

mm

atjr

e b

ush

P 60

7005

P 60

7013

P6

07

02

0

P 60

7021

Topb

oot 8 o

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y

SW

AY

ZE

PR

OJE

CT

Den

yes,

Sw

ayze

and

D

ore

Twos

Surv

ey d

ale

June

- A

ugus

t i 19

84

J. P

erry

, B.~B

eTl

by

S. A

nder

son,

N.N

emet

h pt n

o m m

eD

raw

n hy

RO

N JO

HN

SON

4101

5SE

0111

2

.77

16

DO

RE

Pine

S

pruc

e --

P

opla

rB

irch

Sway

ze

L ok

e

larg

eJ-

Pop

lar

Jack

pine

4101

5SE

0111

2.7

716 D

OR

E310

8 16

1

2O

9 17 21

10 18 22

1 M 19 23

2 X 24 28

3 13 25 29

4 14 26 3O

5 27 31

6 15

*

- Jul

y-A

ugus

t/83

Cana

dian

Nick

el Co

mpan

y Lim

ited

Cop

per

Clif

f ,

On

tario

P

OM

1N

O

GEO

LOG

Y

SW

AY

ZE

PR

OJE

CT

Superv

isor.

J

, P

ER

RY

Com

pile

d by

J Pe

rry,

B Be

ll——

——

S.

Ande

rson

, N. N

emet

h R.

Den

omm

e___

___

Scal

e:

1=25

00

SH

EE

T 12F

IGU

RE

Are

aDe

nyes

, Swa

yze

and

Dor

eTw

psIn

str

um

ent

Dra

wn

by

RO

N

JOH

NS

ON

File

Surv

ey d

a'e

Jun

e-A

ug

ust

X

1984

Dat

e dr

awn

. Se

pt f

1984

Rev

ised

NT

S

4 l

O f

15

p60

7132

:: P

60625I

Popl

ar

Jack

pine P 60

6252

1Bi

rch

P60

6248

P60

6274

I*a

P60

6249

no60

6250

/, C

edar

sw

amp

^X

80

00

N8

DO

ON

e 16 20

9 f7 21

10 18 22

1 II 19 23

2 12 24 28

3 X as 29

4 14 26 30

5 27 31

——

——

Julv

-Aua

ust/

83

——

— 1

6 15

7

Cana

dian

Nick

el Co

mpan

y Lim

ited

Cop

per

CU

ff ,

Onta

rio

P

OM

IN

O

GEO

LOG

Y

SWAYZE PROJECT

Sup

ervi

sor

j,

PE

RR

Y

J. Pe

rry,

B. B

ell

Com

pile

d by

.s.A

nder

son,

N.N

emet

h __

____

___R

. Den

omm

e—^

—^

^Sc

ale:

1 =

2500

SHEE

T

13FIG

URE

Are

aDe

nyes

,Sw

ayze

and

Do

reTw

ps.

Inst

rum

ent

Dra

wn

Dy;

RO

N

JOH

NS

ON

File

'

Surv

ey d

ote

June

- A

ugus

t /

1984

Dot

e dr

own

. S

ept.

f 19

84

NT.

S

41 0

/15

90

00

N.

9000N

8500 N

85

00

N

80

00

N8

000

N

UJ O

o

in

o

o

o

UJ

O

O

LJ O

O o If) CM

UJ o O in

in (M

l8 16 20

9 17 21

10 18 22

1 M 19 23

2 12 24 28

3 13 25 29

4 X 26 30

5 27 31

6 15

7

July

-Aug

ust/8

3

41

01

5S

E0

1I1

2

.77

16

D

OR

E3

30

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

op

pe

r C

liff

, O

nta

rio

PO

M

INO

GEO

LOG

Y

projec

t-. S

WA

YZE

P

RO

JEC

T

Sup

ervi

sor.

J.

P

ER

RY

~

J. P

erry

, B.

Bel

l C

ompi

led

by;s

.And

erso

n,N

.Nem

eth

________R

Den

om

me_

____

_

Sca

le:

M 2

500

SH

EE

T

14FI

GU

RE

Deny

es, S

wayz

e an

d D

oreT

wps

Inst

rum

ent

Dra

wn

By

RO

N

JOH

NS

ON

Fde'

Surv

ey d

ale

June

- A

ugus

t /

198

4

Dat

e dr

own

Sept

Rev

ised

'

NT

S41

O

X 15

3P

W-"

W

j'-rt

iH*

-SV

'Vri

lWSW

-:-

* i*

MM

**

mi*

i PI i in

li nm

iiMB

imiii

iMiin

i'ii

" IIIH

JIM m

iMiiii

iiipii

uw*i

PE47

5o

RX

052

932 (

'5

Cu <

5 pp

m Zn

15

ppm

Pb <

5ppm

P60

7086

Jack

pine

S

pruc

e

Spr

uce

Mus

keg

VPII

, ,

RX 04

3187

(5]

Spr

uce/

Birc

h Ja

ckpi

ne45

* f

RXO

I899

9^5)

VP

IO

RX04

3186

(5)

P 60

7081

P 60

7074

Jack

pine

Sp

ruce

Tag-

aide

r

Swam

p

P 60

7082

s"

8500 N

80O

O N

8500

N

8OO

ON

4l0

15S

Eai1

l 2

.77

16

D

OR

E

l3

40

8. 16 20

9 17 Z\

10 18 32

1 II 19 23

Z 12 24 28

3 13 25 29

4 14 26 3O

5 27 31

6 X7

-Jul

y-A

ugus

t/83

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y

SW

AY

ZE

PR

OJE

CT

Sup

ervi

sor

J.

PE

RR

Y"T

15De

nyes

, Swa

yze

and

Dor

eTw

ps.

J. P

erry

, B.

Bel

lC

ompi

led

Dy

S.A

nder

son,

N.N

emet

h _

__

__

__

R.

Den

omm

eSc

ale

h 25

00

June

-A

ugust

/1984

Dra

wn

nv

RO

N

JOH

NS

ON

Sept

. X

1984

j

, ' ^

41

0/1

5

Jack

pine

Pop

lar

Spru

ceta

ll Po

plar

A

lder

Jack

pine

Po

pla*

1

tall

Popl

a Sp

ruce

Ja

ckpi

neP

6064

47Sp

ruce

mus

keg

Jack

pine

Pop

lar

P 60

6445

tall

Popl

ar

Jack

pine

B

irch

P60

6446

tall

Popl

ar

Spru

ceSp

ruce

mus

keg

Spr

uce

mus

keg

~-

Popl

ar

Jack

pine

.. P

opla

r Ja

ckpi

neP

6064

58Ja

ckpi

ne

Pop

lar

P60

6448

P60

6455

Jack

pine

Po

plar

Jack

pine

A

lder

Jack

pine

B

irch

Jack

pine

Popl

ar

Ald

erac

kpm

e Po

plar

Jack

pine

Spr

uce

:: J

ackp

ine

Birc

hSp

ruce

mus

keg

Jack

pine

Po

plar

A J

ackp

ine

Popl

arJa

ckpt

ne

Birc

h Po

plar

Jack

pine

Sp

ruce

Jack

pine

Pop

lar

Jack

pine

Po

plar

Sp

ruce

-

Spru

ce

mus

keg

Jack

pine

Po

plar

Popl

ar

Jack

pine

open

m

uske

g Sp

ruce

sw

amp

Jack

pine

Birc

hPo

plar

Spru

ce

Tag

alde

rJa

ckpi

ne

Birc

hJa

ckpt

ne

Spru

ceP

opla

rJa

ckpi

neB

irch

Jack

pine

Sp

ruce

Spr

uce

mus

keg

Jack

pine

Po

plar

Jack

pine

"

Popl

arJa

ckpi

ne P606

456

Spru

ce

mus

keg

Spru

ce

mus

keg

J837

9K5)

•""•

'^G

thic

k Sp

ruce

m

uske

gSp

ruce

m

uske

gth

ick

Spru

ce

mus

keg

Ald

er

, Sp

ruce

V

sw

amp

Spru

ce

mus

keg

- -

Popl

ar

Jack

pine

Popl

ar

Jack

pine

Gol

dsta

r &

M5

Jack

pine

B

irch

Ald

ersw

amp

R 6

06451

Spru

ce

mus

keg

Jack

pine

Sp

ruce

Jack

pine

S

pruc

eth

ick

Spru

ce

mus

keg

-84-

63

m 0

5301

7(10

)no

sam

ple

Jack

pine

Sp

ruce

thic

k Sp

ruce

Spru

ce

Birc

h Ja

ckpi

ne

-^ S

pruc

e RB

I38

-- J

ackp

ine

P60

6454

tall

Pop

lar

Jack

pine

P 60

6452

Jack

pine

P

opla

r;: P

opla

r Ja

ckpi

neth

ick

Spr

uce

mus

keg

Jack

pine

S

pruc

eJa

ckpi

ne

Pop

lar

Gol

dst

B H.

44S

0S.

P606

453

Spr

uW

JL

mus

keg

~

Lil

*

RBI3

9 Jack

pine

Po

plar

sg s

S&

s^i

*P

opla

r Ja

ckpi

nePo

plar

Jo

ckpi

ne

Jack

pine

Popl

arSp

ruce

-:

Ba

lsam

^

Pop

lar

Jack

pine

Po

plar

•Jac

kpin

eBi

rch

Popl

ar

Jack

pine

A

lder

--

Sond

y Ov

erbtt

rden

toll

Popl

ar

Spru

ce

Ald

erJa

ckpt

ne

Birc

h

Spru

ce

Popl

ar

Jack

pine

Spru

ce

mus

keg

Spru

cem

uske

gSp

ruce

m

uske

gRB

98

, r,

RX

OI8

358(

*5)

Jack

pine

Pop

lar

Birc

h

open

Spr

uce

mus

keg

swam

p

Popl

ar

Spru

ceSp

ruce i

mus

keg

Spru

ce

mus

keg

P 60

6318

P 60

6317

P 60

6316

P 60

6315

Jack

prne

P

opla

rP

opla

r Sp

ruce

Spru

ce

mus

keg

open

Spr

uce

mus

keg

swam

pop

en S

pruc

em

uske

g sw

amp

Jack

pine

Sp

ruce

Jack

pine

Bi

rch

Spru

ce

mus

keg

Spr

uce

Jack

pine

Jack

pine

P

opla

rth

ick

Spr

uce

Ced

ary J

ackp

ine

Popl

arS

pruc

e Ja

ckpi

neJa

ckpi

ne

Spr

uce

Spr

uce

Jack

pine

SITE

^G

o/ds

tar

8.H

. 2

Q B

H 7

2501

NR

B95

RX 0

1835

71*5

]Ja

ckpi

ne

Spr

uce

Spru

ce

mus

keg

larg

e P

opla

r

r: J

ackp

ine

Spru

ce

Pop

lar

Jack

pine

Ba

lsam

A

B

irch

Spru

ceP

6063

21Ta

g al

ders

As

hJa

ckpi

ne

Pop

lar

Spru

ce

P 60

6322

P 60

6320

Jack

pine

Popl

ar

*P60

6323

Birc

h Ja

ckpi

neP

6063

19Ja

ckpi

ne

Birc

hPo

plar

Ja

ckpi

neJa

ckpi

ne

v

Popl

arla

rge

Popl

ar

Jack

pine

Jack

pine

Popl

ar

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

oppe

r C

liff

, O

nton

o P

OM

IN

O

GEO

LOG

Y SU

RVE

Y

SWA

YZE

PRO

JEC

TD

enye

s,Sw

ayze

and

D

oreT

wps

Superv

isor!

J

. P

ER

RY

Surv

ey d

ate.

Jun

e -

Au

gu

st/1

98

4Ju

ly -A

ug

ust

/63

Dote

dra

wn;

S

ept.

/ 84

awn

by

RO

N

JOH

NS

ON

Com

pile

d by

.3. A

nder

son,

N. N

emet

h R.

Den

omm

e

41

01

5S

Ee

it1

2.7

71

6

DOR

E

P60

6459

Pop

lar

Jack

pine

r--v

Spru

ceAN

22 1

, f

RX 0

1897

3 (l4

5fe

238p

pm

W 0

)897

2

Spru

ceB

irch

Jack

pine

AN27

2 RX

018

993

(10)

P 60

6308

,,

RX

OI8

989l

lO)4

^qtz

sto

ckw

ork

P 6

06

45

8P

opla

rS

pruc

eJa

ckpi

neP

8072

50AN

261

RX 0

1898

8(10

]P

6063

09::

Jac

kpin

e v S

pruc

eqt

z vn

sS

pruc

eB

irch

Pop

lar

Pop

lar

Spr

uce

s^ J

ackp

ine

Jack

pine

P

opla

r

P60

6460

y S

pruc

e jQ

Ckp

ine

Pop

lar

P60

6462

6063

14..

P 60

6312

:: S

pruc

e P

opla

r A

A

lder

P 60

6311

Spr

uce

P 60

6313

2cR

B87

RXO

I835

5(<5

)

P 60

6324

2dfD

E-8

4-O

I

4Ja

ckpi

ne

— S

pruc

e ^.

F^

opla

rP

6063

27P

6063

28,

P606

323

DE-8

4-26

l

RX 0

5300

7(5)

P 60

6325

P 60

6326

60O

O N

Bi

rch

Popl

ar

Jack

pine

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y SU

RVE

Y

Deny

es, S

wayz

e an

d D

ore

Twos

SW

AY

ZE

PR

OJE

CT

J. P

erry

, B.B

ell

Com

pile

d Dy

S

.And

erso

n,N

.Nem

etti

Dro

wn

Cy

RO

N

JOH

NS

ON

date

. Ju

ne -

Aug

ust ;

' 198

4

R e M

i s e j

4I0

1S

SE

0111

2.7

71

6

DO

RE

36

0

70OON

7OOON

6500 N

65OON

6000 N.

O O in

LJ O 8 m

Ul O O in

m

6000 N

UJ o

o

o

to

/8 16 20

9 17 21

10 V 22

\ II 19 23

2 12 24 28

3 13 25 29

4 14 26 30

5 27 31

6 15

7

' Jul

y-A

ugus

t/63-

1 D

7

71

K

DO

RE

Cana

dian

Nick

el Co

mpan

y Li

mite

dpp

e-

Ci-"

'NO

GEO

LOG

Y

SW

AY

ZE

PR

OJE

CT

Superv

isor

J.

PE

RR

Y~7

j.T

erfy

,"B

.Bel

i"'"

"Co

mpi

led

by

S.An

ders

on, N

.Nem

eth.

________R

. Den

omm

e _ .

__.

Sca

le

h 2

50

0

18

—lF

IGU

RE

Deny

es, S

wayz

e an

d Do

reTw

ps.

Dra

wn

Dy

RO

N

JO

HN

SO

N

File

date

J

une

- A

ugus

t f

I984

Dj'e

^S

e

NTS

4

I O

/I5

Ceda

r""

Spru

ce (w

et)

P607020

Topb

oot

Lake

Dym

ent

Lake

7500

N

70

00

N,

7OO

ON

6500

N.

6500

N

600O

N.

6000 N

4101

5SE

6111

2

.77

16

DO

RE3

80

8 16 20

9 17 21

10 18 22

1 11

Ss'

x x

23

Z 12 24

28

3 13 25 29

4 14 26 30

5 27 31

6 15

7

July

-Au

qu

st/8

3-

Cana

dian

Nick

el Co

mpan

y Li

mite

dC

oppe

r C

liff

, PO

M

INO

GEO

LOG

Y SU

RVE

Y

pr0jec

, SW

AYZ

E P

RO

JEC

TS

uper

viso

r J.

PE

RR

Y

~

J. Pe

rry7

8. B

ell"

""

Com

pile

d by

s.

Ande

rson

, N.N

emet

h_

__

__

___

R. D

enom

mt.^

____

_Sc

ale:

l-

2500

SH

EFT 19

FIG

UR

E

Deny

es,S

way

ze a

nd D

oreT

wps

.In

^lru

me

nt

Dra

wn

by

RO

N

JOH

NS

ON

File

'

Surv

ey d

ote

June

- A

ugus

t /

1984

Dot

e dr

own

Sept

. /

84

NTS

0/1

5

Birc

h

Spr

uce

Pop

lar

Spr

uce

Balsa

m

Pop

lar

P 60

6320

5500 N

50

00

N.

45

00

N

P 60

6323

5 D

OO

N

45

00

N

410I

5SE

C11

1 2

.77

16

D

OR

E

l 3308 16 V

9 17 21

10 18 22

1 II 19 23

2 12 24 28

3 13 25 29

4 14 26 30

5 27 311 —

——

Jul

y-A

uqus

t/83

——

6 15

7

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y S

UR

VE

Y

SW

AY

ZE

PR

OJE

CT

Superv

isor

J.

PE

RR

Y

. , B

."Bel

T"

Com

pile

d Oy

S.

Ande

rson

, N

.Nem

eth

Sca

le

1 = 2

500

20De

nyes

, Swa

yze

and

Dore

Twp

s.

Dra

wn

by

RO

N

JOH

NS

ON

sir

jev

ds'e

Ju

ne -

Aug

ust

X 19

84

i S

ept.

7 84

" -

~

~-

-~

—T

~

~

--—

— -

-

NTS

4

t 0/1

5

P 60

6323

Pop

lar

Bal

sam

Spr

uce

Jack

pi n

eR

X05

3004

N5)

Pop

lar

Bal

sam

3al

DE

-84-

07H

T/

RX

0530

02("

5)i

A S

pruc

e P

opla

r

Jack

pme

A S

pruc

eS

pruc

e

Jack

pme

Pop

lar

Jack

pine

A P

opla

r a:

S

pruc

eJa

ckpm

e P

opla

rSp

ruce

Ja

ckpi

neB

alsa

mP

606332 l

spruce

P 606334

DE-

84-3

3 *2

a

P 60

6333

mus

keg

*4*

Ald

erP

opla

rA

lder

Spr

uce

Pop

lar

Jack

pine

A

lder

Birc

hP

opla

rA

lder

2aA

DE-

84-3

7G

olds

tar

BM l

T?

N 226

45"N

i (

core

]P

opla

rA

lder

Spr

uce

Jack

pme

Pop

lar

Birc

hJa

ckpi

ne

Pop

lar

Bal

sam

Pop

lar

mus

keg

Ald

er

Bal

sam

Pop

lar

Spr

uce

Pop

lar

Spr

uce

Pop

lar

Ald

erSp

ruce

Pop

lar

P 6

06

33

8

Spru

e.

Pop

lar

VS

pruc

e ; 't'

mix

ed b

ush

V

P 606339

Spr

uce

Pop

lar

E-84

-14

RX 0

5300

3(^5

)

Spr

uce

Jack

pine

Ba

lsam

Jack

pine

Sp

ruce

v Ja

ckpi

ne

Spr

uce

Pop

lar

5000 N

AN

45O

ON

LJ

O o

o ro

tun i: ir

- n

7l8 16 2

0

9 17

^2

!

L/

X

10 18 22

i II 19 23

2 12

ui

J

Spru

ce

!

Pop

lar

Pop

lar

Birc

h ;

2-j

Jack

pine

,-

L '

Jfi

RB 7

9| i

R6 B

OM

calc

areo

us

f

u O o o ro

Cana

dian

Nick

el Co

mpan

y Lim

ited

llT™

-™0'*

3 13

4567

SH

EE

T

FIG

UR

E

GEO

LOG

Y S

UR

VE

Y

s-^3

^/

21

24 28

25 29

26

27

Pro

ject

; S

WA

YZ

f

30

3I

Sup

ervi

sor^

J,

P

ER

RY

i P

RO

JEC

T Ar

ea:D

enye

s, S

way

ze a

nd

Dor

e Tw

ps.

Inst

rum

ent;

Sur

vey

date

Ju

ne -

August/ 1

984

ik J

ackp

ine

Birc

h j

\ '

i H. Sp

ruce

Pop

lar

——

— t —

——

——

——

——

——

——

——

——

| op

en

Pop

lar

Jack

pine

f i

J ^

——

— J

ul,^..,,

83 —

——

co

mp

.|ed

^ P

jgjF

.,^

Dra

wn

by ;

RON

JOH

NS

ON

D

**T

^

""^

R D

enom

me

Sept

. X

84

[lS

cale

: 1 =

2500

File

N

TS

. 4

0/1

5

r Pop

lar

Jack

pine

^ :

*2a

'*"i

"".^

P 60

6349

V ~ P

opla

r S

pruc

e ~

Birc

h i

Jack

pine

"v

Pop

lar

Birc

h ,^

S

pruc

e ,s

Ja

ckpi

ne

f A

l

t \^

A

4t0

15

SE

eU

1t

2.7

71

6

DO

RE

JacK

pme

Pop

lar

Spr

uce

Pop

lar

Jack

pine

Pop

lar

Jack

pine

Cedo

rP

opla

rB

irch

Ald

erP

opla

r As

hC

edar

P

opla

r A

Ald

er

Sire

n Ja

ckpi

ne

Spr

uce

Pop

lar

Jack

pine

P6

06

33

0P

6063

29P

6063

31

Ced

arP

opla

rS

pruc

eth

ick

Ald

erP

opla

r

Ced

ar

Spr

uce

Birc

h

Ald

er

Birc

h

Pop

lar

,. C

edar

Ba

lsam

B

irch

Jack

pin

e Sp

ruce

Ced

arP

opla

rS

pruc

ePo

plar

S

pruc

e

Ald

erJa

ckpi

ne

Pop

lar

Ald

er

Birc

h P

opla

r

Bals

am

.. B

irch

Jack

pine

S

pruc

e C

edar

550O

NSp

ruce

Pop

lar

Jack

pine

Jack

pine

--

P

opla

rP

opla

r Sp

ruce

C

edar

Pop

lar

Spr

uce

Pop

lar

Spr

uce

Bal

sam

P

opla

r

Ald

er

Birc

hP

opla

r

Pop

lar

Spr

uce

Jack

pine

P 60

6341

P 6

06

34

2

Ced

arA

lder

Birc

h P

opla

rC

edar

Spr

uce

Pop

lar

P60

6340

Bal

sam

•~

Pop

lar

Ald

er

Birc

h As

h

Pop

lar

Ced

ar

Ald

erB

irch

popl

arJa

ckpi

neSp

ruce

Pop

lar

Pop

lar

Spr

uce

Jack

pine

Pop

lar

Birc

h A

lder

Jack

pine

TP

Pop

lar

wet

Spr

uce

L

Ceda

r'

Jack

pine

Pop

lar

Spru

ce

Ald

er

Birc

h Sp

ruce

Jack

pme

Birc

h

4c AN 1

58

RXO

I895

2(*5

)Ja

ckpi

ne

Pop

lar

P 60

6343

dPff

l 016

336 (

j)~

~ '

RX

OI8

954

5 AN

160

RX

0180

53 (

5b

-w |5

4RXQ

ie95

0(*5

)sj

tss*

**3^*^

'

-—--

—.j"

^ iR

o 73

c cr

bd

RX 5

1833

7 [f 5

Jack

pine

S

pruc

e

P80

824

Ald

er

Birc

h S

pruc

e

P 6

06

35

0P

opla

rSp

ruce

Ja

ckpi

nePo

plar

Spr

uce

Pop

lar

Spr

uce

Ced

ar

Pop

lar

Spr

uce

Birc

hP

opla

r C

edar

Sp

ruce

JacK

pine

Pop

lar

Pop

lar

Spru

ce

Ced

ar

,. P

opla

r S

pruc

e

2:

Pop

lar

v J

ackp

ine

Birc

hSp

ruce

Popl

arS

pruc

eJa

ckpi

ne

Spru

ce

Ced

ar

Tarn

ara

kS

pruc

e m

uske

g

-——

Spr

uce

Ale

ler

- N

——

1— —

'

^\

] y-^

Spru

ce

\

6a

Pop

lar

Jack

pine

' Bil

ehAl

der

Spru

ce

qtt

vn

i4)

R6 70

D'

R

XOI8

335(

*5)

:

\ \

\ -

\

Spru

cem

uske

g

Spru

cem

uske

g

Birc

h Ja

ckpi

neP

opla

r

Jack

pine

;

Spr

uce

f Pop

lar

Spr

uce

t Pop

lar

Jack

pine

r* —

-.

. -

l P

opla

r Ja

ckpi

ne

Spru

ce

Pop

lar

Ald

er

Spr

uce P 606345

Jack

pine

Pop

lar

Spr

uce

Spr

uce

mus

keg

Birc

h

Pop

lar

Spru

ce

thic

k A

lder

Pop

lar

Spr

uce

42 +

75

Tie

Li

ne

Cana

dian

Nick

el Co

mpan

y Lim

ited

Cop

per

Clif

f,

Ont

ario

P

OM

IN

O

GEO

LOG

Y S

UR

VE

Y

SW

AY

ZE

PR

OJE

CT

Deny

es, S

wayz

e an

d Do

re T

wos

Surv

ey d

ote

: Ju

ne

-Au

gu

st/

198

4

, -^

J.

Per

ry,

B Be

. C

ompi

led

by-s

. And

erso

n, H

Nem

eth

R.P

finom

me

Dra

wn

by;

RO

N

JOH

NS

ON

P 61

6040

HE

-84-

100

RX 0

43I7

2(<5

}P

6160

05P

8082

44 2a**

RX

018

321(

20)

P 61

6014

Ced

ari ^

Popl

ar

P 61

6036

'AN 18

1 RX

018

965

(5

P 61

6015

P 61

6006 2.

P808

245

P 61

6011

Po"

ar

Pop

lar

Jack

pine

Birc

h S

pruc

e

RX 0

1832

9(53

RXO

I833

0(IO

)

P 80

8246

33(5)

^

^ggs^

toD

cic

nio

Jc

1'^^^^;^

g^^^^l6

0l2

sf

7^-^

y^-'^.^

'^i^

^S

^v^?^^"

1;-^-*

s.,

^c

^'•^

^^i^

^^^^^^^

.RX

018

332

(10]

5b,C

qtz

vn*

P6I

60I6

P 61

6042

P 61

6037

P 61

6007

Cana

dian

Nick

el Co

mpan

y Li

mite

d

GEO

LOG

Y S

UR

VE

Y

Area D

enye

s, S

way

ze a

nd D

ore

Twps

projec

t S

WA

YZE

P

RO

JEC

TSu

rvey

daf

e: J

une

-Aug

ust f

1984

, w

J. Pe

rry,

B. B

ell

Com

pile

d by

-s. A

nder

son,

N-N

emet

h R-

Den

omm

eD

raw

n by

: R

ON

JO

HN

SO

N

P 61

5997

Ald

er

Birc

h l

Spru

ce

6I60

35

P 61

5992

P 61

6030

titt*

*3^i

x8g8

t *

P 61

6025

P 61

5999

P 61

5993

P 61

6026

P6I6

03I

6160

36P

6159

96

_ J

ockp

ine

Popl

ar

Spru

ceP

6I60

27\

Ceda

rP

6159

95

P 61

5994

P 61

6037

41

01

5S

E*1

11

2

.77

16

DO

RE

^b—

-^—

c^-~

——

—..

——

——

._

v lo

^

-*-

P 61

5940

P 61

5953

P 61

5963

P 61

5928

P 61

5958

V ^R

X 05

7943

(*5)

RX05

7940

(20)

P 61

9546

P 61

5935

7"io~

73

l——

.—.—

.

Siftf

cx 05

7944

(

P 61

5952

P 615

959

LA

KE

P 6

9547

P 61

5934

P 615

962

P 61

5941

8X05

7971

(10)

s

- —

*^" rw

W^*-^^

P 61

5951

P 615

961

P 61

9548

-

P 615

942

6159

33

P 615

930

Fore

ign

P 61

5960

CU

CK

OO

LA

KE

P 615

931

P 61

5932

For

eign

P6I

5943

P 61

595 O

, liSX 1

0609

9(4,

5)k

8X10

6096

(2,8

)

Cana

dian

Nick

el Co

mpan

y Lim

ited

Cop

per

Clif

f ,

Ont

ario

P

OM

l N

O

NOTE: GEOLOGICAL LEGEND ON SHEET 27

GEO

LOG

Y S

UR

VE

Y

Area:

Deny

es, S

wayz

e an

d Do

re T

wp.

Proje

ct; S

WA

YZE

PR

OJE

CT

Surv

ey d

ate:

Ju

ly - A

ugus

t. 19

83S

uper

viso

r.

T. M

ocG

IBB

ON

Dra

wn

Dy!

R

.A.J

OH

NS

ON

Com

pile

d by

.BO

B B

ELL

.C.B

ATT

OC

HIO