MF03-HGT 1 of 5 PROJECT: MANOLO FORTICH 1&2 HEP FILE NO.: LOCATION: Bukidnon Province REVISION: CAPACITY: PREPARED BY: GENERATION: DATE PREPARED: MF1 Powerhouse 3 2 Weir 1 (Tanaon) 4 2 Weir 2 (Guihian) 3 2 Weir 3 (Upper Amusig) 3 2 Desander 1 (Tanaon) 1 2 Desander 2 (Guihian) 2 2 Desander 3 (Upper Amusig) 2 2 Surgetank (Lower Amusig) 2 2 Headpond (Guihian) 4 2 MF2 Powerhouse 5 2 Weir (Lower Amusig) 3 2 Surgetank (Dalirig) 1 2 Manolo Fortich 1 (MF1) HEP Manolo Fortich 2 (MF2) HEP Figure 1. Manolo Fortich 1&2 HEP Scheme Name and Location Borehole Test Trial Pit Test MF2scheme,ontheotherhand,hasonlyoneweirwhichwillbesituatedatLowerAmusig.ItspowerhousewillbelocatedatDalirig.The 5600meterslongtunnellinewillpassthroughanoutcropofpredominantlySandstoneandLimestone.Theteamwillberequiringat least nine (9) borehole tests and six (6) test pits for sampling and testing. GEOTECHNICAL TESTING PLAN Preliminary MF03-HGT 00 GEO TEAM - Investigation MW GW-hr Based from the site inspection last November 20 to December 5, 2012 conducted by Project Technical Support Team, there is a need to conduct a soil investigation and geo-mechanics testing on the proposed location of structures to verify the calculation of the Soil Bearing Capacity, Settlement, to re-evaluate the Slope Stability Analysis and to conduct Geophysical Survey. To validate the soil parameters it is recommended to extract samples required for geo-mechanics testing by conducting Boreholes and Test Pits on/near the proposed structures. Below is the summary of the require geotechnical testing for feasibility study. I. Test Location 18-Jan-13 MF 1: MF 2: Table 1. Required Geotechnical Test and Sampling Structure No. of Test Required MF1projecthasthree(3)weirslocatedatTanaon,GuihianandUpperAmusig.ItspowerhouseistobelocatedatLowerAmusig.The waterwillbeconveyedthroughridgesoftheareausingsteelpipes.Theoutcropfortheselocationsispredominantlymetamorphicrock calledquartzSCHIST.Forthesestructurestheteamrequiresatotalof24boreholetestsand18trialpits.Thiswillaidinidentifying bedrock level, discover weak or soft layers within the zone of interest and estimating the stiffness of the material. T-ECD-EXP-PS-HGT Revision no. 00 Effectivity date: July, 2012

Upload: mark-john-ray-ignacio

Post on 14-Sep-2015

216 views

Category:

Documents


0 download

DESCRIPTION

Sample GEO Report

TRANSCRIPT

  • MF03-HGT 1 of 5

    PROJECT: MANOLO FORTICH 1&2 HEP FILE NO.:

    LOCATION: Bukidnon Province REVISION:

    CAPACITY: PREPARED BY:

    GENERATION: DATE PREPARED:

    MF1 Powerhouse 3 2

    Weir 1 (Tanaon) 4 2

    Weir 2 (Guihian) 3 2

    Weir 3 (Upper Amusig) 3 2

    Desander 1 (Tanaon) 1 2

    Desander 2 (Guihian) 2 2

    Desander 3 (Upper Amusig) 2 2

    Surgetank (Lower Amusig) 2 2

    Headpond (Guihian) 4 2

    MF2 Powerhouse 5 2

    Weir (Lower Amusig) 3 2

    Surgetank (Dalirig) 1 2

    Manolo Fortich 1 (MF1) HEP

    Manolo Fortich 2 (MF2) HEP

    Figure 1. Manolo Fortich 1&2 HEP Scheme

    Name and Location Borehole Test Trial Pit Test

    MF2 scheme, on the other hand, has only one weir which will be situated at Lower Amusig. Its powerhouse will be located at Dalirig. The

    5600 meters long tunnel line will pass through an outcrop of predominantly Sandstone and Limestone. The team will be requiring at

    least nine (9) borehole tests and six (6) test pits for sampling and testing.

    GEOTECHNICAL TESTING PLANPreliminary

    MF03-HGT

    00

    GEO TEAM - InvestigationMW

    GW-hr

    Based from the site inspection last November 20 to December 5, 2012 conducted by Project Technical Support Team, there is a need to

    conduct a soil investigation and geo-mechanics testing on the proposed location of structures to verify the calculation of the Soil Bearing

    Capacity, Settlement, to re-evaluate the Slope Stability Analysis and to conduct Geophysical Survey. To validate the soil parameters it is

    recommended to extract samples required for geo-mechanics testing by conducting Boreholes and Test Pits on/near the proposed

    structures. Below is the summary of the require geotechnical testing for feasibility study.

    I. Test Location

    18-Jan-13

    MF 1:

    MF 2:

    Table 1. Required Geotechnical Test and Sampling

    Structure No. of Test Required

    MF1 project has three (3) weirs located at Tanaon, Guihian and Upper Amusig. Its powerhouse is to be located at Lower Amusig. The

    water will be conveyed through ridges of the area using steel pipes. The outcrop for these locations is predominantly metamorphic rock

    called quartz SCHIST. For these structures the team requires a total of 24 borehole tests and 18 trial pits. This will aid in identifying

    bedrock level, discover weak or soft layers within the zone of interest and estimating the stiffness of the material.

    T-ECD-EXP-PS-HGT

    Revision no. 00

    Effectivity date: July, 2012

  • MF03-HGT 2 of 5

    GEOTECHNICAL TESTING PLANPreliminary

    A. Trial Pits

    Surgetank (Dalirig) TP-24 N 8 24' 59.4"

    Lower slope E 124 55' 23.3"

    Surgetank (Dalirig) TP-23 N 8 25' 00.2"

    Upper slope E 124 55' 23.6"

    Weir (Lower Amusig) TP-22 N 8 25' 51.6"

    Left side facing downstream E 124 58' 49.5"

    Weir (Lower Amusig) TP-21 N 8 25' 53.2"

    Right side facing downstream E 124 58' 51.0"

    MF1 Powerhouse TP-20 N 8 24' 59.8"

    Structure location upper slope E 124 55' 22.3"

    MF2 Powerhouse TP-19 N 8 24' 59.5"

    Structure location E 124 55' 21.7"

    MF2 Structure Reference Trial Pit No. Test Location

    Desander 1 (Tanaon) TP-10 N 8 27' 44.3"

    Upper slope downstream E 125 02' 09.3"

    Desander 2 (Guihian)

    E 125 01' 18.1"

    Desander 3 (Upper Amusig)

    Weir 3 (Upper Amusig)

    TP-11 N 8 24' 47.6"

    Upper slope upstream E 125 01' 17.6"

    MF1 Structure Reference Trial Pit No. Test Location

    Desander 2 (Guihian) TP-12 N 8 24' 47"6

    Upper slope upstream

    MF1 Powerhouse TP-1 N 8 25' 51.1"

    Upper slope E 124 58' 56.2"

    MF1 Powerhouse TP-2 N 8 25' 50.1"

    Lower slope E 124 58' 55.6"

    Weir 1 (Tanaon) TP-3 N 8 27' 40.6"

    Right side facing downstream E 125 02' 7.9"

    Weir 1 (Tanaon) TP-4 N 8 27' 40.5"

    Left side facing downstream E 125 02" 06.8"

    Weir 2 (Guihian) TP-5 N 8 24' 48.0"

    Right side facing downstream E 125 01' 20.8"

    Weir 2 (Guihian) TP-6 N 8 24' 46.9"

    Left side facing downstream E 125 01' 17.8"

    Weir 3 (Upper Amusig) TP-7 N 8 27' 19.7"

    Right side facing downstream E 124 59' 58.9"

    E 124 59' 58.6"

    Desander 1 (Tanaon) TP-9 N 8 27' 45.5"

    Upper slope upstream E 125 02' 11.3"

    TP-8 N 8 27' 19.8"

    Left side facing downstream

    TP-13 N 8 24' 46.9"

    Upper slope downstream E 125 01' 16.6"

    Desander 3 (Upper Amusig) TP-14 N 8 24' 46.8"

    Upper slope downstream E 125 01' 17.3"

    Surgetank (Lower Amusig) TP-15 N 8 25' 34.5"

    Upper slope E 124 59' 59.5"

    Surgetank (Lower Amusig) TP-16 N 8 25' 34.6"

    Lower slope E 124 59' 59.0"

    Headpond (Guihian) TP-17 N 8 25' 35.3"

    Upper slope E 124 59' 58.9"

    NOTE: Detailed Topographic survey is requested in the slope of the proposed test location for "In-house Slope Stability Analysis". The

    Geo Team is capable of conducting the trial pit testing to determine the Unconfined Compressive Strength, Cohesion, Moisture

    Content and Unit Weight. Trial pit can be terminated once a bedrock formation is encountered.

    The following are the marked location of the Geotechnical Investigation. Test location may vary depending on the final scheme to be

    provided by the Design Team.

    Headpond (Guihian) TP-18 N 8 25' 35.3"

    Lower slope E 124 59' 57.7"

    T-ECD-EXP-PS-HGT

    Revision no. 00

    Effectivity date: July, 2012

  • MF03-HGT 3 of 5

    GEOTECHNICAL TESTING PLANPreliminary

    B. Boreholes

    MF1 Powerhouse BH-28 N 824'58.1"

    Structure location E 12455'16.6"

    MF2 Powerhouse BH-27 N 824'58.3"

    Structure location E 12455'16.8"

    MF1 Powerhouse BH-26 N 824'58.7"

    Structure location E 12455'16.3"

    MF2 Structure Reference Borehole Identification No. Test Location

    MF2 Powerhouse BH-25 N 824'59.3"

    Upper slope E 12455'16.3"

    MF1 Structure Reference Borehole Identification No. Test Location

    MF1 Powerhouse BH-1 N 825'48.8"

    Structure location E 12458'55.3"

    MF1 Powerhouse BH-2 N 825'48.5"

    Structure location E 12458'56.6"

    Weir 1 (Tanaon) BH-4 N 8 27' 44.2"

    Right side lower slope E 125 02' 05.7"

    Weir 1 (Tanaon) BH-5 N 8 27' 44.7"

    Right side upper slope E 125 02' 10.4"

    Weir 2 (Guihian) BH-8 N 824'48.3"

    Left side facing downstream E 12501'19.4"

    Weir 2 (Guihian) BH-9 N 824'49.3"

    Right side facing dowstream E 12501'18.3"

    Weir 3 (Upper Amusig) BH-11 N 824'59.3"

    Left side facing downstream E 12455'16.3"

    Weir 3 (Upper Amusig) BH-12 N 824'58.7"

    Right side facing dowstream E 12455'16.3"

    Desander 1 (Tanaon) BH-14 N 8 27' 46.1"

    Structure location E 125 02' 09.7"

    Desander 2 (Guihian) BH-15 N 824'49.1"

    Structure location E 12501'16.5"

    Desander 2 (Guihian) BH-16 N 824'52.0"

    Structure location E 12501'16.8"

    Desander 3 (Upper Amusig) BH-17 N 8 27' 23.1"

    Upper lower upstream E 125 00' 01.3"

    Desander 3 (Upper Amusig) BH-18 N 8 27' 24.7"

    Upper slope upstream E 125 00' 03.5"

    Surgetank (Lower Amusig) BH-19 N 825'10"

    Structure location E 12455'22"

    Surgetank (Lower Amusig) BH-20 N 825'49"

    Structure location E 12459'17"

    Headpond (Guihian) BH-21 N 825'35.3"

    Upper slope E 12459'57.7"

    Headpond (Guihian) BH-22 N 825'35.5"

    Upper slope E 12459'58.3"

    MF1 Powerhouse BH-3 N 824'58.3"

    Structure location E 12455'16.8"

    Weir 1 (Tanaon) BH-6 N 8 27' 41.2"

    Left side lower slope E 124 02' 05.0"

    Weir 1 (Tanaon) BH-7 N 8 27' 38.7"

    Left side upper slope E 125 02' 09.8"

    Weir 2 (Guihian) BH-10 N 824'48.3"

    Right side facing dowstream E 12501'17.7"

    Weir 3 (Upper Amusig) BH-13 N 824'58.3"

    Right side facing dowstream E 12455'16.8"

    Headpond (Guihian) BH-23 N 825'34.9"

    Lower slope E 12459'58.6"

    Headpond (Guihian) BH-24 N 825'35.3"

    Lower slope E 12459'58.9"

    T-ECD-EXP-PS-HGT

    Revision no. 00

    Effectivity date: July, 2012

  • MF03-HGT 4 of 5

    GEOTECHNICAL TESTING PLANPreliminary

    A. Manolo Fortich 1 (MF1) HEP

    A.2 Eighteen (18) Trial Pits at 3m depth

    A.2.1 Field Work

    A.2.2 Laboratory Tests

    3. Test Pit Sampling - AASHTO Manual of Subsurface Investigation

    1. Moisture Content - ASTM D2216 (for every meter)

    2. Particle Size Distribution - ASTM D422 (for every meter)

    3. Atterberg Limits - ASTM D4318 (for every meter)

    1. Mobilization / Demobilization

    2. Provision of health, safety, security, sanitation, water, power, brushing at site

    including transport needs and all incidental necessities.

    A.1.2 Laboratory Tests

    4. Vertical onshore drilling through soft soil (N50) ASTM D1586-08a

    6. Standard Penetration Test and Split-Barrel Sampling of Soil - ASTM D1586-

    08a

    7. Sampling Shipping and Handling (SPT Boxes, Shelby Tube Boxes, Core Boxes)

    samples 54

    samples 54

    samples 54

    samples 54

    lm 54

    ls. 1

    ls. 1

    204

    tp 18

    samples 72

    ls. 1

    ls. 1

    bh 24

    DESCRIPTION

    1. Mobilization / Demobilization

    2. Provision of health, safety, security, sanitation, water, power, brushing at site

    including transport needs and all incidental necessities.

    3. Hole to Hole transfer set-up

    A.1 Twenty-four (24) Boreholes at 20m depth

    A.1.1 Field Work

    A. Geotechnical Investigation

    NOTE: Geophysical survey is required for all the boreholes to determine if a karstic feature is present within the foundation zone of

    influence.

    8. Geophysical Survey

    1. Moisture Content - ASTM D2216 (for every SPT Sample)

    2. Particle Size Distribution - ASTM D422 (for every SPT Sample)

    lm 72

    II. Proposed Geotechnical Scope of Works

    1

    samples 72

    3. Atterberg Limits - ASTM D4318 (for every SPT Sample)

    4. Unified Soil Classification System (USCS) - ASTM D2487 (for every Particle

    Size Distribution Sample)

    The following are the proposed scope of works for our "Request for Quotation of Geotechnical Engineering Site Investigation".

    5. Unconfined Compressive Strength of Intact core specimen - ASTM D2938 (at

    every 2m interval)

    samples 72

    samples 72

    ls. 1

    Surgetank (Dalirig) BH-33 N 8 25' 00.1"

    Structure location E 124 55' 21.9"

    ls. 1

    ls.

    UNIT EST. QTY

    lm 408

    lm 72

    samples

    4. Unified Soil Classification System (USCS) - ASTM D2487 (for every Particle

    Size Distribution Sample)

    5. Direct Shear Test- ASTM D3080 (for every trial pit bottom) samples 18

    B. Test Reports, Geotechnical Evaluation and Recommendation ls. 1

    MF2 Structure Reference Borehole Identification No. Test Location

    Right side facing dowstream E 124 58' 49.6"

    Weir (Lower Amusig) N 8 25' 52.0"

    BH-30

    BH-31

    Left side facing downstream E 124 58' 49.8"

    Weir (Lower Amusig) N 8 25' 53.3"

    Weir (Lower Amusig) BH-32 N 8 25' 52.6"

    Left side facing downstream E 124 58' 51.0"

    T-ECD-EXP-PS-HGT

    Revision no. 00

    Effectivity date: July, 2012

  • MF03-HGT 5 of 5

    GEOTECHNICAL TESTING PLANPreliminary

    B. Manolo Fortich 2 (MF2) HEP

    QUALITY INFORMATION

    Prepared By: Checked by: Approved by:

    DESCRIPTION UNIT EST. QTY

    A. Geotechnical Investigation

    Comment

    Date

    Engineer I Senior Engineer I Project Investigation Manager

    Carine D. Capsula Allan K. Vargas Victor N. Pelera

    A.1 Nine (9) Boreholes at 20m depth bh 9

    A.1.1 Field Work

    1. Mobilization / Demobilization ls. 1

    2. Provision of health, safety, security, sanitation, water, power, brushing at site

    including transport needs and all incidental necessities.

    ls. 1

    3. Hole to Hole transfer set-up ls. 1

    4. Vertical onshore drilling through soft soil (N50) ASTM D1586-08a lm 153

    6. Standard Penetration Test and Split-Barrel Sampling of Soil - ASTM D1586-

    08a

    lm 27

    1. Moisture Content - ASTM D2216 (for every SPT Sample) samples 27

    A.1.2 Laboratory Tests

    7. Sampling Shipping and Handling (SPT Boxes, Shelby Tube Boxes, Core Boxes) ls. 1

    2. Particle Size Distribution - ASTM D422 (for every SPT Sample) samples 27

    3. Atterberg Limits - ASTM D4318 (for every SPT Sample) samples 27

    4. Unified Soil Classification System (USCS) - ASTM D2487 (for every Particle

    Size Distribution Sample)

    samples 27

    5. Unconfined Compressive Strength of Intact core specimen - ASTM D2938 (at

    every 2m interval)

    samples 77

    A.2 Six (6) Trial Pits at 3m depth

    A.2.1 Field Work tp 6

    1. Mobilization / Demobilization ls. 1

    2. Provision of health, safety, security, sanitation, water, power, brushing at site

    including transport needs and all incidental necessities.

    ls. 1

    3. Test Pit Sampling - AASHTO Manual of Subsurface Investigation lm 18

    A.2.2 Laboratory Tests

    1. Moisture Content - ASTM D2216 (for every meter) samples 18

    2. Particle Size Distribution - ASTM D422 (for every meter) samples 18

    3. Atterberg Limits - ASTM D4318 (for every meter) samples 18

    18

    5. Direct Shear Test- ASTM D3080 (for every trial pit bottom) samples 6

    B. Test Reports, Geotechnical Evaluation and Recommendation ls. 1

    4. Unified Soil Classification System (USCS) - ASTM D2487 (for every Particle

    Size Distribution Sample)

    samples

    T-ECD-EXP-PS-HGT

    Revision no. 00

    Effectivity date: July, 2012