SAFETY INTEGRITY Page 1of 27 Revision #48, 02/26/2017 GENERAL COMPANY INFORMATION Legal Name of Company: T&T Construction of Central Florida Inc. Year Company Started: 1995 Type of Company: Specialty Subcontractor – Corporation State of Incorporation: Florida Owner / President: Linda Thomas Web Site www.ttcfl.com Main Office Phone Number: (407) 831-5506 Main Office Fax Number: (407) 831-5531 T&T Construction’s excellence to its clients can be seen through its estimating department. Utilizing historical and current data we can price any scenario a client requests. Our estimators are equipped with the latest technology, specialized estimating software coupled with an ever evolving database; our estimates are incredibly accurate and current. The department is capable of assisting clients from job inception; assist by supplying budgetary numbers during the design stages thru final construction pricing, and help with sequencing and scheduling the project. It is our goal to serve our clients with the highest degree of professionalism and courtesy. We at T&T Construction are looking forward to earning your business by building a relationship by bidding your work and, if selected, working with you as part of your construction team. Our production department utilizes our sophisticated projects control programs to ensure accurate document control is adhered to on every project and all correspondence and pertinent project documents are submitted and or transmitted in a professional and timely manner. NOTABLE CURRENT AND/OR COMPLETED PROJECTS Project: Fed Ex Express Start Date: 1/23/2017 Owner: Charleston FX, LLC Completion Date / % Complete: May 2017 General Contractor: Jim Cooper Construction Company Approximate Contract Amount: $1,800,000 Architect: Scope(s) Performed: Foundations, Flatwork, CIP Walls, Mezzanine, TWP, Casting Beds Project Address: Fed Ex Express Charleston Hawthorne Drive North Charlesto, SC Project Details: T&T provided foundations, sloped floors slabs, casting beds, elevated metal deck with concrete, and tilt-up panels. Project: Valmiera Glass Start Date: 01/ Owner: Valmiera Glass Completion Date / % Complete: General Contractor: Kajima Building & Design Group Approximate Contract Amount: $3.1 million Architect: Kajima Associates Inc Scope(s) Performed: Project Address: 168 Willie Paulk Parkway Dublin, GA Project Details: Turnkey concrete scope for Industrial manufacturing plant. Project: Horizon V BTS-16 Start Date: 12/14/2016 Owner: East Group Properties Completion Date / % Complete: 3/2017 85% General Contractor: HGR Construction Inc Approximate Contract Amount: $1,600,000 Architect: Ware-Malcomb Scope(s) Performed: Foorings, Foundations, Industrial Floor SOG, TWP, CIP columns & stairs, Concrete Paving Project Address: 8051 Beacon Lake Drive Orlando, FL Project Details: Spec warehouse space. Turnkey concrete scope

Upload: others

Post on 26-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

SAFETY INTEGRITY

Page 1of 27

Revision #48, 02/26/2017

G E N E R A L C O M P A N Y I N F O R M A T I O N

Legal Name of Company: T&T Construction of Central Florida Inc.

Year Company Started: 1995 Type of Company: Specialty Subcontractor – Corporation

State of Incorporation: Florida Owner / President: Linda Thomas

Web Site www.ttcfl.com Main Office Phone Number: (407) 831-5506

Main Office Fax Number: (407) 831-5531

T&T Construction’s excellence to its clients can be seen through its estimating department. Utilizing historical and current data we can price any scenario a client requests. Our estimators are equipped with the latest technology, specialized estimating software coupled with an ever evolving database; our estimates are incredibly accurate and current. The department is capable of assisting clients from job inception; assist by supplying budgetary numbers during the design stages thru final construction pricing, and help with sequencing and scheduling the project. It is our goal to serve our clients with the highest degree of professionalism and courtesy. We at T&T Construction are looking forward to earning your business by building a relationship by bidding your work and, if selected, working with you as part of your construction team. Our production department utilizes our sophisticated projects control programs to ensure accurate document control is adhered to on every project and all correspondence and pertinent project documents are submitted and or transmitted in a professional and timely manner.

N O T A B L E C U R R E N T A N D / O R C O M P L E T E D P R O J E C T S

Project: Fed Ex Express Start Date: 1/23/2017 Owner: Charleston FX, LLC Completion Date / % Complete: May 2017

General Contractor: Jim Cooper Construction Company Approximate Contract Amount: $1,800,000 Architect: Scope(s) Performed: Foundations, Flatwork, CIP

Walls, Mezzanine, TWP, Casting Beds

Project Address: Fed Ex Express Charleston Hawthorne Drive North Charlesto, SC

Project Details: T&T provided foundations, sloped floors slabs, casting beds, elevated metal deck with concrete, and tilt-up panels.

Project: Valmiera Glass Start Date: 01/ Owner: Valmiera Glass Completion Date / % Complete:

General Contractor: Kajima Building & Design Group Approximate Contract Amount: $3.1 million Architect: Kajima Associates Inc Scope(s) Performed:

Project Address: 168 Willie Paulk Parkway Dublin, GA Project Details: Turnkey concrete scope for Industrial manufacturing plant.

Project: Horizon V BTS-16 Start Date: 12/14/2016

Owner: East Group Properties Completion Date / % Complete: 3/2017 85% General Contractor: HGR Construction Inc Approximate Contract Amount: $1,600,000

Architect: Ware-Malcomb Scope(s) Performed: Foorings, Foundations, Industrial Floor SOG, TWP, CIP columns & stairs, Concrete Paving

Project Address: 8051 Beacon Lake Drive Orlando, FL

Project Details: Spec warehouse space. Turnkey concrete scope

Page 2: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 2 of 27

Project: Millenia Self Storage Start Date: 11/21/2016 Owner: Liberty Investment Properties Inc Completion Date / % Complete: 4/2017 85%

General Contractor: Turner Construction Company Approximate Contract Amount: $560,000 Architect: Scope(s) Performed: Footings, Foundations,

Flatwork, TWP Project Address: 4780 South John Young Parkway Orlando Fl Project Details: Commercial storage facility. Turnkey concrete scope.

Project: Womens Care Florida Start Date: 11/14/2016 Owner: NexCore Group LP Completion Date / % Complete: 4/28/2017 65%

General Contractor: Creative Contractors Inc Approximate Contract Amount: $900,000 Architect: Scope(s) Performed: Fnds, Slabs 1st – 3rd floor, tilt

up Project Address: 5016 West Cypress Street Tampa, FL Project Details: Concrete tilt wall building shell. Turnkey concrete scope.

Project: Jefferson C Distribution Center Start Date: 9/28/2016 Owner: IDI Gazeley Completion Date / % Complete: March 2017

General Contractor: Kajima Building and Design Approximate Contract Amount: $8,600,000 Architect: Macgregor Associates Architect Scope(s) Performed: Foundations, Ductilcrete,

SOG, Tilt-Up and site paving Project Address: 3490 Peidmont Road NE, Suite 900 Atlanta, GA Project Details: T&T performed foundations, hide-a-bed Ductilecrete Floor slab system, Tilt-Up Panels, concrete paving and concrete

Ramps

Project: George Steinbrenner FEP Start Date: 10/1/2016 Owner: Yankee Global Enterprise Completion Date / % Complete: 2/28/2017

General Contractor: Turner Construction Company Approximate Contract Amount: $2,200,000 Architect: Scope(s) Performed: Slabs, foundations, CIP,

demo Project Address: 1 Steinbrenner Drive, Tampa, FL Project Details: Turnkey concrete scope

Project: Center State Logistics Park Start Date: 12. 2016 Owner: GB Lakeland Property Owner Completion Date / % Complete: 7/28/2017

General Contractor: Marcobay Construction Inc Approximate Contract Amount: $4,500,000 Architect: Horton, Harley, & Carter Inc Scope(s) Performed: Foundations, SOG, TWP,

Raps, Planter CIP walls Ductilcrete

Project Address: 8060 SR 33 North Lakeland, FL

Project Details: 600,000 Sq Ft of Industrial Warehouse space.

Project: NFI – QPSI BTS Warehouse Start Date: 07/21/2016 Owner: NFI Real Estate Completion Date / % Complete: 12/01/2016

General Contractor: ARCO Design/Build Northeast, Inc. Approximate Contract Amount: $5,212,701.00 Architect: Ware-Malcomb Scope(s) Performed: Footings, Foundations,

Flatwork, TWP Project Address: 2060 US 130, Florence, NJ Project Details: Industrial Warehouse space

Project: Carlisle Distribution Center Building Start Date: 08/01/2016 Owner: Carlisle Distribution Center I, LLC Completion Date / % Complete: 10/01/2016

General Contractor: The Conlan Company Approximate Contract Amount: $2,625,000.00 Architect: Scope(s) Performed: TWP, Exterior Concrete

Pavement (Dock Apron, Dolly Strip)

Project Address: 45 Logistics Drive, Carlisle, PA

Project Details: Industrial Warehouse space.

Project: Orlando 478K Spec Warehouse Start Date: 07/11/2016 Owner: Becknell Industrial Operating Partnership, LP Completion Date / % Complete: 11/08/2016

General Contractor: Becknell Services, LLC Approximate Contract Amount: $3,511,019.00 Architect: Smith/Roberts & Associates, Inc. Scope(s) Performed: Foundations, SOG, Concrete

Paving, Raps, TWP Project Address: 3650 8th Street, Orlando, FL Project Details: 478,000 Sq Ft of cold dark shell for speculation and or long term lease space near Orlando International Airport.

Page 3: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 3 of 27

Project: Downtown Urban PS8 Start Date: 05/20/2016 Owner: Orange County Public Schools Completion Date / % Complete: 04/20/2014

General Contractor: Williams Company Building Division Approximate Contract Amount: $5,283,179.00 Architect: Scope(s) Performed: Foundations, TWP, Concrete

Beams & Columns,Elevator Pit, SOG Project Address: 6501 Magic Way, Orlando, FL

Project Details: (9) Building with multilevel elements Elementary School With a 3-Strory Parking Garage. All non-prototype buildings.

Project: Crossroads Logistics Center Start Date: 07/05/2016 Owner: Ridgeline Property Group Completion Date / % Complete: 11/04/2016

General Contractor: QEI Construction Group, LLC Approximate Contract Amount: $1,881,135.00 Architect: Herbert, Rowland & Grubic, Inc. Scope(s) Performed: Tilt Wall Panels, Site

Concrete Project Address: 50 MSC Drive, Lickdale, PA Project Details: T&T Construction built the tilt Wall Panels and site concrete scope only for this project, turnkey.

Project: GSA Atlanta Start Date: 04/18/2016 Owner: FD GSA Mercer, LLC Completion Date / % Complete: 11/01/2016

General Contractor: Harvey-Cleary Builders Approximate Contract Amount: $2,950,501.00 Architect: Power Brown Architecture Scope(s) Performed: Tilt Wall Panels

Project Address: 3000 Flowers Road South, Atlanta, GA Project Details: GSA project performing a turnkey contract for foundations, slab on grade, tilt wall panels an cast in place scope.

Project: Bent Oak Industrial Park – Building 400 &

Building 500 Start Date: 05/23/2016

Owner: McCraney Property Company Completion Date / % Complete: 09/19/2016 General Contractor: Marcobay Construction, Inc. Approximate Contract Amount: $3,025,000.00

Architect: C4 Architecture, LLC Scope(s) Performed: Foundations, TWP, Slab on Grade, Bollards, Concrete Paving & Sidewalks

Project Address: 1664 & 1652 Boice Pond Road, Orlando, FL

Project Details: Turnkey concrete scope for Foundations, Slab On Grade and Tilt Wall Panels.

Project: Eden Road Logistics Center Start Date: 06/20/2016 Owner: NP York 58, LLC Completion Date / % Complete: 09/01/2016

General Contractor: Stewart and Tate, Inc. Approximate Contract Amount: $1,912,735.00 Architect: Studio North Architecture Scope(s) Performed: Tilt Wall Panels

Project Address: 1445 Eden Road, Springettsbury, PA Project Details: T&T Construction built the tilt Wall Panels only for this project, turnkey.

Project: Goodman Logistics Center Start Date: 05/09/2016 Owner: Goodman Carlisle, LLC Completion Date / % Complete: 09/12/2016

General Contractor: ARCO Design/Build Northeast, Inc. Approximate Contract Amount: $2,065,618.00 Architect: OGP Architects Scope(s) Performed: Tilt Wall Panels

Project Address: Allen Road and Logistics Drive, Carlisle, PA Project Details: T&T Construction built the tilt Wall Panels only for this project, turnkey.

Project: Finish Tower – Nathan Benderson Park Start Date: 04/18/2016 Owner: City of Sarasota and NB Park Foundation Completion Date / % Complete: 11/01/2016

General Contractor: Benderson Development Approximate Contract Amount: $1,909,000.00 Architect: Fawley Bryant Scope(s) Performed: Concrete & Masonry

Project Address: 5801 Nathan Benderson Circle, Sarasota, FL Project Details: Turnkey seven story structural cast in place structural concrete and CMU.

Page 4: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 4 of 27

Project: Haverty’s Distribution Center Expansion Start Date: 12/21/2015 Owner: Haverty Furniture Companies, Inc. Completion Date / % Complete: 04/16/2016

General Contractor: Williams Company Southeast Approximate Contract Amount: $1,052,651.00 Architect: Macgregor Associates Architects Scope(s) Performed: Foundations, Slab On Grade,

Masonry, Elevated SOD, TWP, Concrete Site Paving

Project Address: 7100 Havertys Way, Lakeland, FL

Project Details: The Slab On Grade was constructed with “Ductilcrete” presenting significant value to the owner.

Project: Walmart #110-15 Start Date: 12/09/2015 Owner: Wal-Mart Stores, Inc. Completion Date / % Complete: 10/01/2016

General Contractor: HGR Construction, Inc. Approximate Contract Amount: $1,355,000.00 Architect: Scope(s) Performed: CIP Concrete Systems

Project Address: 16313 New Independence Pkwy., Winter Garden, FL Project Details: Retail and Fuel Station

Project: PCSB “GGG” High School Start Date: 11/02/2015 Owner: Pasco County School Board Completion Date / % Complete: 10/15/2016

General Contractor: Cutler Associates, Inc. Approximate Contract Amount: $5,250,000.00 Architect: Harvard Jolly Scope(s) Performed: Footings, Foundations, TWP,

Delegated Engineering Project Address: 8701 Old Pasco Road, Wesley Chapel, FL Project Details: Provide delegated engineering for tilt wall panels and turnkey concrete services for (9) Buildings with 167,000 SF: 5 ea

(1-Story Buildings) and 2 ea (2-Story Main Buildings) and 2 ea Support Buildings

Project: 4-Corners K-8 Elementary School Start Date: 08/10/2015 Owner: Polk County School Board Completion Date / % Complete: 05/03/2016

General Contractor: Rodda Construction, Inc. Approximate Contract Amount: $3,427,788.00 Architect: Harvard Jolly Scope(s) Performed: Footings, Foundations, TWP,

Delegated Engineering Project Address: 1775 Sand Mine Rd., Davenport, FL Project Details: Provide delegated engineering services and turnkey concrete services for (7) Tilt Wall Buildings

Project: BayCare Integrated Service Center (BISC) Start Date: 11/07/2015 Owner: BayCare Health Systems, Inc. Completion Date / % Complete: 08/05/2016

General Contractor: RR Simmons Construction Corporation Approximate Contract Amount: $2,075,622.00 Architect: RR Simmons Scope(s) Performed: Footings, Foundations, TWP,

Slab On Grade, Sidewalks, Site Concrete Paving Project Address: 7802 E. Telecom Parkway, Temple Terrance, FL

Project Details: Provide Turnkey concrete services for the shell of a 220,920 GSF warehouse and office structure

Project: Duke Linden – Building # 11 Start Date: 11/02/2015 Owner: Duke Realty Limited Partnership Completion Date / % Complete: 05/15/2016

General Contractor: RC Andersen, LLC Approximate Contract Amount: $2,032,727.00 Architect: HGA Architects & Engineers Scope(s) Performed: Tit Wall Panels

Project Address: 901 W. Linden Avenue, Linden, NJ Project Details: Provide labor and materials to form, pour and erect 134,000 SF of 9.25” Tilt Wall Panels

Project: Great Dane Engineering Technology

Center Start Date: 10/05/2015

Owner: Great Dane Trailers Completion Date / % Complete: 05/18/2016 General Contractor: Pope Construction Company Approximate Contract Amount: $1,254,041.00

Architect: Frank A. Neagle, James W. Buckley & Associates

Scope(s) Performed: Tit Wall Panels

Project Address: 131 Technology Circle, Savannah, GA Project Details:

Project: Lebanon Valley Distribution Center Start Date: 09/28/2015 Owner: US Real Estate Limited Partnership c/o

USAA Real Estate Company Completion Date / % Complete: 05/12/2016

General Contractor: R. S. Mowery Approximate Contract Amount: $2,156,475.00 Architect: Macgregor Associates Architects Scope(s) Performed: Tilt Wall Panels

Project Address: 139 Fredericksburg Road, Fredericksburg, PA Project Details: Materials and Labor to form, install reinforcing, cast concrete and erect 186,000 SF of Tilt Wall Panels

Page 5: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 5 of 27

Project: Beall’s Department Store # 56 Start Date: 08/22/2015 Owner: Beall’s Department Stores, Inc. Completion Date / % Complete: 02/08/2016

General Contractor: McIntyre Elwell & Strammer Approximate Contract Amount: $641,245.00 Architect: Ugarte & Associates, Inc. Scope(s) Performed: Foundations, Slabs, Tilt Wall

Panels Project Address: 11201 Park Blvd., N., Seminole, FL Project Details:

Project: Burlington Industrial Park Building #1 Start Date: 07/27/2015 Owner: LION-FGC Burlington, LLC Completion Date / % Complete: 05/25/2016

General Contractor: Peak Construction Approximate Contract Amount: $5,577,427.00 Architect: RGA Architects Scope(s) Performed: Footings, Foundations, Tilt

Wall Panels, Dock Aprons Project Address: 1400 River Rd, Burlington, NJ 08016 Project Details: 146ea 7-1/4” Tilt Wall Panels for a 545,800 SF Warehouse + 148,000 GSF Dock Aprons

Project: GOAA Intermodal Terminal Facility Start Date: 11/16/2015 Owner: Greater Orlando Aviation Authority Completion Date / % Complete: 10/01/2016 98%

General Contractor: Turner-Kiewit JV Approximate Contract Amount: $1,380,000.00 Engineer: Walter P. Moore Scope(s) Performed: Foundation Package (173)

Ea. Project Address: Orlando International Airport, Orlando, FL Project Details: Excavate, form, reinforcing, cast in place, strip forms, backfill and compact

Project: Oxford Pharmaceuticals Start Date: 05/04/2015 Owner: Oxford Pharmaceuticals, LLC Completion Date / % Complete: 04/22/2016

General Contractor: Robins & Morton Approximate Contract Amount: $1,393,816.00 Architect: Nola Van Peursum, LLC Scope(s) Performed: Concrete, Tilt Wall Panels

Project Address: 301 Leaf Lake Pkwy., Birmingham, AL Project Details:

Project: Publix #1475 Start Date: 07/06/2015 Owner: Publix Completion Date / % Complete: 04/29/2016

General Contractor: HGR Construction, Inc. Approximate Contract Amount: $1,828,074.00 Architect: Little Diversified Architectural Consulting Scope(s) Performed: Foundations, SOG,

Eleveated SOD, CIP Retaining Wall, Sidewalks

Project Address: 34 Miller Street Winston Salem, NC

Project Details: Complete poured in place structural concrete package. 50,000 SF of SOG, loading docks, truck well, and sub grade stone work. 55,000 SF of elevated SOD composed of 4” composite slab, 3” insulation, and another 4” topping slab. Installing a 17’ high 12” thick basement retaining wall totaling 558 LF to include 17’ pier columns poured in place. 16,000 SF of heavy duty site paving complete with site sidewalks consisting of exposed aggregate.

Project: Wedgefield K-8 ES Relief School Start Date: 06/10/2015 Owner: Orange County Public School Completion Date / % Complete: 06/08/2016

General Contractor: Pirtle Construction Company Approximate Contract Amount: $2,368,482.00 Architect: Zyscovich, Inc Scope(s) Performed: Footings, Foundations, SOG,

TWP, CMU, Concrete Paving Project Address: 3835 Bancroft Blvd. Orlando, FL Project Details: “Turnkey” concrete work to include 4 buildings for a new relief elementary school. All footings, foundations, SOG elevated slabs and tilt

wall panels, concrete paving, sidewalks and equipment pads.

Project: Burlington Ind. Park Buildings 2 & 3 Start Date: 04/08/2015 Owner: Lion-FGC Burlington,LLC Completion Date / % Complete: 02/15/2016

General Contractor: Frank A. Greek & Sons, Inc. Approximate Contract Amount: $6,927,491.00 Architect: Scope(s) Performed: Foundations, SOG, TWP,

Paving, Flatwork (Dock Aprons, Dolly Pads, Bollards, Ramp

Project Address: Neck & River Road, Burlington Township, NJ

Project Details:

Project: Trade Center 83 Warehouse Start Date: 07/27/2015 Owner: Hillwood Investment Properties Completion Date / % Complete: 02/15/2016

General Contractor: Kinsley Construction Approximate Contract Amount: $1,563,780.00 Architect: Fernando Andrade, AIA Scope(s) Performed: Tilt Wall Panels

Project Address: 1605 Bartlett Drive, York, PA Project Details: 241,844 GSF of 9.25” TWP

Page 6: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 6 of 27

Project: Hobby Lobby Start Date: 05/07/2015 Owner: Hobby Lobby Completion Date / % Complete: 0717//2015

General Contractor: Garrard Construction Group Approximate Contract Amount: $767,256.00 Architect: Bp2 Architecture & Engineering Scope(s) Performed: Footings, Foundations, CIP,

ICF Formed Walls, SOG, TWP, Loading Dock

Project Address: 1051 George Dement Blvd. Bossier City, LA

Project Details: “Turnkey” concrete shell work including footings, foundations, cast in place ICF formed walls, SOG and tilt wall panels, attached loading dock .

Project: AIPO Building C Start Date: 04/13/2015 Owner: Liberty Property Trust Completion Date / % Complete: 11/11/2015

General Contractor: HGR Construction, Inc. Approximate Contract Amount: $1,489,707.00 Architect: C4 Architecture, LLC Scope(s) Performed: Foundations, SOG,

Sidewalks, Concrete Paving, Tilt Panels

Project Address: 2307 Tradeport Drive Orlando, FL

Project Details: SOG (162,990 sq.ft.) Tilt Panels (58,960 sq. ft.) Sidewalks (2,800 sq. ft.) Concrete Pavement (39,300 sq. ft.) CIP Walls(1,200 sq.ft)

Project: UCF Global Building Start Date: 02/23/2015 Owner: University of Central Florida Completion Date / % Complete: 11/15/2015

General Contractor: Clancy & Theys Construction Approximate Contract Amount: $513,409.00 Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete

Project Address: 4000 Central Florida Boulevard, Orlando, FL Project Details:

Project: BP-442 Airside 4 Improvements New

Chiller Plant Start Date: 02/11/2015

Owner: Greater Orlando Aviation Authority Completion Date / % Complete: 10/01/2016 97% General Contractor: Austin Commercial, LP Approximate Contract Amount: $513,409.00

Architect: Scope(s) Performed: Foundations, Steps, Slab on Grade, Walls, CIP Deck, Sidewalks,

Project Address: 4000 Central Florida Boulevard, Orlando, FL

Project Details:

Project: Shaw Building Start Date: 02/02/2015 Owner: Liberty Property Trust Completion Date / % Complete: 06/12/2015

General Contractor: HGR Construction, Inc. Approximate Contract Amount: $1,867,111.00 Architect: C4 Architecture, LLC Scope(s) Performed: Foundations, SOG, Tilt Wall

Panels, Sidewalks, Concrete Paving

Project Address: 10670 Central Port Drive Orlando, FL

Project Details: SOG 196,000 SF, Tilt Panels 74,000 SF, TWP were constructed with massive PIP eyebrow elements at entry creating unique aesthetic designs; sidewalks 6,000 SF, Concrete Paving 42,000 SF, CIP 1,200 SF

Project: Tampa Premium Outlet Start Date: 10/10/2014 Owner: Simon Completion Date / % Complete: 5/10/2015

General Contractor: VCC Approximate Contract Amt: $5,500,000.00 Architect: The Collaborative Architects Scope(s) Performed: Turnkey: Footings/Foundations

SOG & Tilt Wall Panels & CIP Project Address: 2398 Grand Cypress Dr, Lutz, FL 33559

Project Details: Turnkey construction for (9) retail buildings with approximately 400,000 Sq. Ft. of cold dark concrete shell buildings designed with 443 site cast concrete tilt wall panels. Our scope of work also consists of exterior Cast-In-Place elements as well.

Project: Baer’s Furniture Start Date: 10/13/2014 Owner: Baer’s Furniture Completion Date / % Complete: 02/03/2015

General Contractor: RLH construction Approximate Contract Amount: $809,657.00 Architect: Ritter, Miga & Associates, P.A. Scope(s) Performed: Footings, Foundations, Slab

on Grade, CIP, Masonry Project Address: 12105 W, Colonial Drive, Winter Garden, FL Project Details: Turnkey: two story masonry building, including footings, foundations, slab-on-grade, bearing masonry walls, CIP

columns and tie-beams, trash enclosure, glass block & concrete walkway. Footprint = 43,800 SF

Page 7: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 7 of 27

Project: Academy Sports – Alafaya Commons Start Date: October 2014 Owner: Equity One, Inc Completion Date / % Complete: January 2015

General Contractor: TD Farrell Approximate Contract Amt: $812,212.00 Architect: Perry E Seeburger Scope(s) Performed: Ftg’s/Fnd’s, Slab-On-Grade

Project Address: Orlando, FL Tilt Wall Panels & Masonry

Project Details: Scope of work includes turnkey concrete building shell including, footings and foundations, slab-on-grade tilt wall panels and turnkey masonry. The footprint for this building is 60,000 square foot.

Project: Airline Highway Flex Warehouse Start Date: November 2014 Owner: Pinnacle Warehousing, LLC Completion Date / % Complete: February 2015

General Contractor: Alston Construction Company Approximate Contract Amt: $1,825,568.00 Architect: Alston Scope(s) Performed: Ftg’s/Fnd’s, Slab-On-Grade

Project Address: Baton Rouge, LA Tilt Wall Panels, Concrete Paving

Project Details: Scope of work includes turnkey concrete building shell including footings, foundations, slab-on-grade, tilt wall panels and concrete paving. The footprint for this building is 99,135 square feet.

Project: Blue Cross & Blue shield of Georgia Start Date: September 2014 Owner: Blue Cross Blue Shield Completion Date / % Complete: February 2015

General Contractor: Batson Cook Approximate Contract Amt: $2,117,000.00 Architect: Hecht Burdhsaw Scope(s) Performed: Ftg’s/Fnd’s, Slab-On-Grade

Project Address: Columbus, GA Tilt Wall Panels & Slab-On Metal-Deck

Project Details: Scope of work includes turnkey concrete building shell including footings, foundations, slab-on-grade, tilt wall

panels and slab-on-metal-deck. The footprint for this 3-story building is 80,000 square feet.

Project: State Street Parking Garage Start Date: September 2014 Owner: City of Sarasota, FL Completion Date / % Complete: March 2015

General Contractor: AD Morgan Approximate Contract Amt: $4,621,000.00 Architect: Walker Parking / Harvard Jolly / DWJA /

Jensen and Group Scope(s) Performed: Cast-In-Place, Post Tension

Project Address: Sarasota, FL Masonry

Project Details: Scope of work for the 6-Story parking garage for the City of Sarasota Scope of work includes: footings and foundations, horizontal and vertical cast-in-place work, tower crane, post tensioning and masonry.

Project: Eagle Creek Elementary School Start Date: October 2014 Owner: Orange County Public Schools Completion Date / % Complete: March 2014

General Contractor: Clancy & Theys Approximate Contract Amt: $1,020,000.00 Architect: Schenkel Schultz Architects Scope(s) Performed: Ftg’s/Fnd’s, SOG, Tilt Walls

Project Address: Orlando (Lake Nona), FL Slab On Metal Deck, CMU

Project Details: Turnkey concrete shell package for a new elementary school in Orange County Florida. Footprint = 55,000SF Scope of work includes; footings/foundations, slab-on-grade, tilt wall panels and turnkey masonry scope.

Project: New Independence Elementary School Start Date: September 2014 Owner: Orange County Public Schools Completion Date / % Complete: February 2014

General Contractor: Clancy & Theys Approximate Contract Amt: $1,020,000.00 Architect: Schenkel Schultz Architects Scope(s) Performed: Ftg’s/Fnd’s, SOG, Tilt Walls

Project Address: Winter Garden, FL Slab On Metal Deck, CMU

Project Details: Turnkey concrete shell package for a new elementary school in Orange County Florida. Footprint = 55,000SF Scope of work includes; footings/foundations, slab-on-grade, tilt wall panels and turnkey masonry scope.

Page 8: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 8 of 27

Project:

HCC Sciences & Classroom Building

Start Date:

May 2014

Owner: Hillsborough Community College Completion Date / % Complete: September 2014

General Contractor: Cutler Associates Inc. Approximate Contract Amt: $671,851 Architect: Reynolds, Smith & Hills Inc. Scope(s) Performed: Footings, Foundations,

Project Address: 551 24 Street NE Ruskin, FL 33570 Slab-on-grade & TWP System

Project Details: Provide turnkey services for the concrete building shell for the two story Science Lab for Hillsborough Community College. The footprint for this two story building is 17,000 square feet.

Project: Boston Whaler Start Date: May 27, 2014 Owner: Boston Whaler Completion Date / % Complete: July 30, 2014

General Contractor: Birchmier Construction Inc. Approximate Contract Amt: $588,355 Architect: ARC Scope(s) Performed: Concrete Foundations

Project Address: 100 Whaler Way Edgewater, FL 32141 Slab-on-grade

Project Details: 1 story 53,000sf Steel building with exterior CMU boat assembly building addition.

Project: HCVR Hotel & Casino Start Date: June 23, 2014 Owner: The Tribal Casino Gaming Enterprise Completion Date / % Complete: October 2014

General Contractor: The Whiting-Turner Contracting Co. Approximate Contract Amt: $2,350,127 Architect: Cunningham Group Architecture Inc. Scope(s) Performed: Cast-in-place concrete

Project Address: 777 Casino Parkway Murphy, NC 28906

Project Details: Foundations and slab on grade for casino 123ksf Foundations, basement walls, elevator and stair shear walls, slab on grade at hotel

Project: Interstate 130 Warehouse Start Date: July 2014 Owner: Terreno Interstate LLC Completion Date / % Complete: September 2014

General Contractor: Blue Rock Construction Inc. Approximate Contract Amt: $707,500 Architect: Ware Malcomb Scope(s) Performed: Tilt-up panels

Project Address: 130 Interstate Blvd. So. Brunswick, NJ 08831

Project Details: This project consists of a 190,000 sf addition to an existing warehouse in South Brunswick, NJ. We have contracted with Blue Rock Construction, Inc to place, finish and erect 54,000 sf of 9.25” thick tilt wall panels. There are 54 wall panels on this project.

Project: Academy Sports & Outdoors Start Date: May 15, 2014 Owner: Shelbyville Academy Partners, LLC Completion Date / % Complete: August 1, 2014

General Contractor: VCC, LLC Approximate Contract Amt: $873,196 Architect: MJM Architects Scope(s) Performed: Foundations; Tilt-up panels

Project Address: 13401 Shelbyville Rd Suite 140 Louisville, KY 40223 Slab-on-grade

Project Details: This is a complete concrete package job consisting of: Foundations, Slab-on-grade, and Tilt wall panels.

Project: BRRH Women’s Health & Wellness Center Start Date: July 2014 Owner: Boca Raton Regional Hospital Foundation Completion Date / % Complete: October 2014

General Contractor: DPR Construction Approximate Contract Amt: $755,460 Architect: HKS Inc. Scope(s) Performed: Cast-in-place; Slab-on-grade

Project Address: 690 Meadows Road Boca Raton, FL 33486 Foundations

Project Details: Foundations, CIP elevator and stair shear walls 4 stories, Slab on grade 22ksf, Slabs on metal decks 2, 3 ,4 floors

Page 9: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 9 of 27

Project: Frank Theater Start Date: July 1, 2014 Owner: Kite Realty Group Completion Date / % Complete: December 2014

General Contractor: VCC, LLC Approximate Contract Amt: $1,812,142 Architect: ADW architects Scope(s) Performed: Footers, Foundation, SOG

Project Address: 1140 Parkside Main Street Cary, NC 27513 Turnkey, CIP, SOMD, TWP, CIP Project Details: 60,000 SF theaters with 11 movie screens and a bowling center. We are providing turnkey concrete services

for footing, foundations; SOG, Slab-On-Metal Deck, Exterior and Interior tilt wall panels and cast-in-place concrete work. Also includes several sets of exterior and interior concrete pan filled stairs and cast-in-place

stairs. There are 155 tilt wall panels on this project totaling approximately 101,700 SF of wall area. There are several areas of tiered elevated concrete slabs areas, ramps and stairs filled with non-compressible geo-foam and subsequently cast with concrete.

Project: “Citrus Bowl” Renovations & Additions Start Date: February 2014 Owner: City of Orlando Completion Date / % Complete: September 2014

General Contractor: Turner Construction Approximate Contract Amt: $8,630,316 Architect: HNTB Scope(s) Performed: Turnkey CIP Concrete

Project Address: 211 S. Tampa Ave Orlando, Fl 32805 Project Details: Provide turnkey process for the Footings, Pile Caps and Foundations, cast-in-place, SOG & Elevated Slabs.

Project: Middlesex Crossing Building B Start Date: July 15, 2013 Owner: IDI – Industrial Development

International Inc. Completion Date / % Complete: August 15, 2013

General Contractor: Blue Rock Construction Inc. Approximate Contract Amt: $841,916 Architect: Margulies Hoelzli Architecture Scope(s) Performed: Footings; Foundations;

Project Address: 301 Middlesex Center Blvd. Jamesburg, NJ 08831 Tilt-up walls Project Details: Project consisted of 118 tilt wall panels; project was fast paced and completed on time and within budget.

Project: LVIP VII, Lot #61 Start Date: Sept 2013 Owner: Trammel Crow Company & Clarion

Partners Completion Date / % Complete: June 2014

General Contractor: The Norwood Company Approximate Contract Amt: $4,868,948 Architect: Scope(s) Performed: Foundations, footings

Project Address: 2485 Commerce Center Blvd. Bethleham, PA 18018 Tilt wall systems GC Contact Email & Ph. No.

Dwight Lewis [email protected] / 484-889-6609

Project Details:

Project: HealthSouth Rehab of Altamonte Springs Start Date: October 2013 Owner: HealthSouth Corporation Completion Date / % Complete:

General Contractor: Hoar Construction LLC Approximate Contract Amt: $522,228 Architect: Frederick & Associates Architects Inc. Scope(s) Performed: SOG, Ftgs./Fnds/Paving

Project Address: 8315 State Road 434 Altamonte Springs, FL 32714 GC Contact Email & Ph. No.

Rodney Gilchrist [email protected] / 205-423-2305

Project Details: Footings/foundations, SOG, Concrete Paving and Cast In Place work.

Project: University Town Center Start Date: 8/15/13 Owner: Taubman Benderson UTC LLC Completion Date / % Complete:

General Contractor: dck/FWF, LLC Approximate Contract Amt: $3,073,917 Architect: Scope(s) Performed: SOG, SOD, Hardscape

Project Address: 190 N. Cattlemen Rd. Sarasota, FL 34243 GC Contact Email & Ph. No.

Ken Duty [email protected] / 412-230-6990

Project Details: Approximately 1,000,000 SF of Concrete SOG, Elevated Slab On Metal Deck

Page 10: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 10 of 27

Project: Pier Park North Start Date: May 2013 Owner: Casto Development Completion Date / % Complete: October 2013

General Contractor: Hoar Construction Approximate Contract Amt: $3,110,992 Architect: FRCH Scope(s) Performed: Foundations, Footings

Project Address: 15800 Pier Park Parkway Panama City Beach, FL 32413 SOG, CIP, Tilt Wall Systems GC Contact Email & Ph. No.

Mark Cameron (PM) Ph. # (205) 423-2253 Email: [email protected]

Project Details: Turnkey concrete package including footings, foundations slab-on-grade, cast-in-place columns, CIP walls for approximately 357,000 Sq. Ft. of retail product for 4-buildings.

Project: 1st Logistics Warehouse Start Date: 05/20/2013 Owner: FR Leo Lane Property Holding, LP

(1st Industrial) Completion Date / % Complete:

October 2013 General Contractor: Blue Rock Construction, Inc Approximate Contract Amt: $1,389,054

Architect: Margulies Hoelzli Architecture Scope(s) Performed: Turnkey Tilt Wall Services Project Address: 20 Leo Lane, York, PA 17415

GC Contact Email & Ph. No.

Jim Miller Ph. No. 610-481-9119

Project Details: The project consists of a 708,000 sf Class A Warehouse located along Interstate I-83. Our Scope included forming, placing and erecting (150) 9.25" thick tilt wall panels totaling 133,293 sf.

Project: GMC Health & Wellness Center Start Date: March 2013 Owner: Georgia State Financing and

Investment Commission Completion Date / % Complete: May 2014

General Contractor: Skanska USA Building Inc. Approximate Contract Amt: $1,797,858 Architect: Lord Aeck Sargent Inc. Scope(s) Performed: Cast-in-place

Project Address: 201 East Greene Street Milledgeville, GA 31061

Project Details: Foundations, basement walls, pits, CIP elevated floors and beams 22ksf, slabs on metal decks 2-4floors

Project: Faith Assembly of God Youth Center Start Date: April 26, 2013 Owner: Faith Assembly of God Completion Date / % Complete: August 20, 2014

General Contractor: Sonligh Construction Inc. Approximate Contract Amt: $264,771 Architect: Brebbefoerder Architectural Services Scope(s) Performed: Foundations; Slab-on-grade

Project Address: 9307 Curry Ford Rd Orlando, FL 32825 Tilt-up wall; Elevated Deck Project Details: 3 story tilt panel building addition. 43,300sf 1st fl, 29,300sf 2nd fl, 2,630sf 3rd fl.

Project: The Flats at Easley Mills Start Date: April 30, 2012 Owner: Flats at Carrs Hill, LP Completion Date / % Complete: Dec. 1, 2012

General Contractor: RB Kennedy Approximate Contract Amt: $1,550,000 Architect: Gary B. Coursey Scope(s) Performed: Foundations, Footings

Project Address: 592 Oconnee St SOG, CIP, Post Tensioning Project Details: Turnkey structural concrete package including detention pond, footings, foundations slab-on-grade, CIP

columns, CIP walls, Post Tensioning supported slab and reinforcing steel for a 102,000 SF 2-Story apartment

Project: Langtree at the Lake Start Date: July 2, 2012 Owner: Private Completion Date / % Complete: Jan. 15, 2013

General Contractor: Samet Corporation Approximate Contract Amt: $3,630,000 Architect: JHS Architectural Scope(s) Performed: Footings, Foundations

Project Address: 433 Langtree Road SOG, SOD-PT & CIP Mooresville, NC 28117

Project Details: 112,000 Sf of concrete work including footings, foundations, slab-on-grade, walls, columns, Supported slabs (one podium Post Tension slab), slab-on-metal deck. This is a multi-family apartment project.

Project: 330 Treemont Start Date: August 16, 2012 Owner: Treemont Corp. Completion Date / % Complete: Dec. 15, 2012

General Contractor: Samet Approximate Contract Amt: $1,628,000.00 Architect: Trillium Scope(s) Performed: Footings, Foundations

Project Address: 335 Doggett St Charlotte, NC 28203 CIP, SOG, Post Tension

Project Details: Turnkey structural concrete package, footings, foundations, cast-in-place columns and beams, reinforcing, 122,000 SF apartment project.

Page 11: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 11 of 27

Project: Parkway Shops Jacksonville Start Date: August 2012 Owner: Parkway Shops, Inc Completion Date / % Complete: Dec. 20, 2012

General Contractor: RJ Raymond Approximate Contract Amt: $738,000 Architect: Wah Yee Associates Scope(s) Performed: Footings, Foundations

Project Address: 1-95 & Duval Rd Jacksonville, FL SOG, Tilt Wall Systems

Project Details: Three retail shops consisting of Marshall’s, BJ’s and TBD. A total of 83,000 SF of building footprint contracted. Providing a turnkey contract for footings, foundations, slab-on-grade and tilt wall systems.

Project: LA Fitness Windemere Start Date: April 18, 2012 Owner: LA Fitness Completion Date / % Complete: August 18, 2012

General Contractor: RB Kennedy Approximate Contract Amt: $585,000 Architect: Cuhachi & Peterson Scope(s) Performed: Footings, Foundations

Project Address: 4768 The Grove Drive Orlando, FL 32819 SOG, Tilt Wall

Project Details: This facility consists of approximately 45,000 SF of slab-on-grade. Work contracted is for the footings, foundations, and tilt wall systems.

Project: Nephron Pharmaceuticals Phase I Start Date: June 18, 2012

Owner: Nephron Pharmaceuticals Completion Date / % Complete: March 2013 General Contractor: Jack Jennings Approximate Contract Amt: $3,700,000

Architect: Associated Consulting International Scope(s) Performed: Footings, Foundations Project Address: 4500 12th Street Extension West Columbia, SC 29172 SOG, SOD, Tilt Wall, CIP

Project Details: This is a multi-story pharmaceutical manufacturing facility having approximately SF of work contracted.

A combination of concrete work includes footings, foundations, slab-on-grade, slab-on-deck, cast-in-place, and tilt wall systems. There is approximately 350,000 SF of flat concrete work contracted on this job.

Project: Nephron Pharmaceuticals Phase II Start Date: September, 2012 Owner: Nephron Pharmaceuticals Completion Date / % Complete: March 2013

General Contractor: J. Raymond Approximate Contract Amt: $3,400,000 Architect: Associated Consulting International Scope(s) Performed: Footings, Foundations

Project Address: 4500 12th Street Extension West Columbia, SC 29172 SOG, SOD, Tilt Wall, CIP

Project Details: This is a multi-story pharmaceutical manufacturing and shipping/warehouse facility having approximately 150,000 SF of work contracted.

A combination of concrete work includes footings, foundations, slab-on-grade, slab-on-deck, cast-in-place, and tilt wall systems. There is approximately 250,000 SF of flat concrete work contracted on this job.

Project: Kubota Start Date: April 2012 Owner: Kubota Completion Date / % Complete: August 2012

General Contractor: Kajima Approximate Contract Amt: $2,700,000 Architect: Kajima Scope(s) Performed: Footings, Foundations

Project Address: 1001 McClure Industrial Dr. Slabs-On-Grade, CIP Jefferson, GA. 30549

Project Details: Horizontal concrete work for a new 500,000 plus sq. ft. Kubota tractor plant consisting slabs-on-grade, Cast-In-Place pits & Trenches, Cast-In-Place walls, and concrete site paving.

Project: Advanced Individual Training Barracks

Company Operations Facility (COF) Start Date: April, 2012

Owner: US Army Completion Date / % Complete: December 2012

General Contractor: Yates Construction Approximate Contract Amt: $863,000 Architect: US Army Corps of Engineers Scope(s) Performed: Turnkey Horizontal &

Vertical Concrete Work Project Address: Ft. Jackson, SC Earth Ex., Footings, Fnd’s

SOG, Elevated Decks

Project Details: (3) Story structure totaling 91,207 sq. ft., consisting of footings, foundations, slab-on-grade, slab-on-elevated metal decking. (1) 1068 sf slab for a covered assembly and a 2000 sf slab for a lawn maintenance building. This project also has cast-in-place concrete knee walls included in our SOW for the building.

Page 12: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 12 of 27

Project: BTC Complex Dining Facility and Starship Renovations

Start Date: March 2011

Owner: Dept of the Army, Norfolk Division, Corp of Engineers

Completion Date / % Complete: December 2011

General Contractor: Balfour Beatty Construction ,LLC Approximate Contract Amt: $1,000,000 Architect: Woolpert KZF Scope(s) Performed: Foundations

Project Address: 5500 Manningcault Blvd SOG Ft. Jackson, SC SOD, CIP

Project Details: 70k sf of slab-on-grade 34k sf of slab-on deck 1200 lf of CIP wall ranging from 2 feet to 16 feet tall

Project: 4th Brigade Combat Complex (Heavy)

COF/Covered Hardstand Start Date: June 2011

Owner: US Army Corp of Engineers, Savannah District

Completion Date / % Complete: March 2012

General Contractor: Caddell Construction Approximate Contract Amt: $1,900,000 Architect: Corps of Engineers-Savannah District Scope(s) Performed: Foundations

Project Address: Ft. Stewart, GA SOG SOED, CIP

Project Details: (2) 27,000 sf Ready Maintenance Facilities (SOG,SOD,CIP Vaults) (2) 15,000 sf Administration Buildings (SOG,SOD) (2) 17,000 sf Covered Hardstands, 13,000 sf of sidewalks, 206,000 sf of 8” Site paving

Project: Project Roosevelt Start Date: 6-15-11 Owner: Unlisted Completion Date / % Complete: Feb 2012

General Contractor: Whiting-Turner Approximate Contract Amt: $1.9 million Architect: Gensler Architect Scope(s) Performed: Footings, Foundations

Project Address: Kings Mountain, NC Slab-On-Grade Cast-In-Place Concrete

Project Details: 100,000 Sq. Ft. Data Center, with CIP retaining walls.

Project: Shaw AFB USAFCENT Headquarters Building

Start Date: June 2011

Owner: NAVAC Southeast Completion Date / % Complete: November 2011 General Contractor: Roy Anderson Corp Approximate Contract Amt: $340,000

Architect: Eley Guild Hardy Scope(s) Performed: Foundations Project Address: Shaw AFB Bldg 1130 SOG

Shaw AFB, SC SOD, CIP Project Details: 25k sf of slab-on-grade

25k sf of slab-on deck CIP Walls

Project: Cypress Springs Elementary School Start Date: August 1, 2011 Owner: Orange County Public Schools Completion Date / % Complete: August 2012

General Contractor: Walker GC Approximate Contract Amt: $1,000,000 Architect: Stottler, Stagg & Associates Scope(s) Performed: Footings, Sla-On-Grade

Project Address: 10401 Cypress Springs Parkway Tilt Wall Orlando, FL 32825-8802 Sidewalks

Project Details: (6) Buildings (2) new ground up and (4) existing. Foundations, Slab on Grade, Elevated Slab, Tilt Panel, & Sidewalks

Project: Manatee Technical Institute Start Date: 7/18/2011 Owner: Manatee County School Board Completion Date / % Complete: June 2012

General Contractor: HCBECK Approximate Contract Amt: $1.9 Million Architect: Fawley-Bryant Scope(s) Performed: Cast-In-Place Concrete

Project Address: 5275 60th St. East Tilt-up Concrete Bradenton, FL 34203 Site Concrete Work

Project Details: Three 2 story buildings and three single story buildings all connected by interior corridors Building Footprint: 200,000 SFT. 265 Tilt-up Panels Scope includes: Footings, slab on grade, tilt panels, slab on deck, cast in place walls, Structure for Central

Energy Plant, dumpster pads, tilt-up monument sign, sidewalks and site paving.

Page 13: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 13 of 27

Project: Florida Technical College Start Date: May 30, 2011 Owner: Florida Technical College Completion Date / % Complete: Sept. 30, 2011

General Contractor: First Builders Approximate Contract Amt: $350,000 Architect: Leonard Feinberg Architect Scope(s) Performed: Footings, Sla-On-Grade

Project Address: Challenger Prkwy. Tilt Wall Orlando, Fl Sidewalks

& Dumpster Pads Project Details: A 40,000 Sq. Ft. educational facility in Orlando, Fl. Consisting of tilt wall construction and conventional

structural steel with built up roofing.

Project: Cape Fear Community College Start Date: June 21 2011 Owner: Cape Fear Group Completion Date / % Complete: July 2012

General Contractor: Shelco Approximate Contract Amt: $2,600,000 Architect: LS3P Scope(s) Performed: CIP Foundation Walls

Project Address: 502 Front St. Slab-On-Grade Wilmington, NC Slab-On-Elevated Decks

Project Details: Turnkey concrete work for a single building having (5) stories at 44,000 Sq. Ft. each. Our work also includes the hard-scape concrete cast-in-place walls throughout the site with varying heights from 6 Ft. to 20 high.

Project: Pinch a Penny Headquarters Start Date: November, 2010 Owner: CEPCOT Corporation Completion Date / % Complete: October 2011

General Contractor: Hardin Approximate Contract Amt: $2,416,000 Architect: Fleischman Garcia Scope(s) Performed: Tilt Wall Systems

Project Address: Largo, FL CIP Concrete Site Concrete / Masonry

Project Details: This project consists of (2) each buildings, one two story office building and one single story warehouse building. Both buildings total 196,960 sq. ft. Both buildings have CMU infill walls. There is a loading dock dumpster pads and sidewalks associated with this project as part of our scope.

Project: Plant Vogtle – Operations Training

Facility Start Date: October 2010

Owner: Southern Nuclear Operating Company Completion Date / % Complete: February 2011 General Contractor: Dunn SE d/b/a RJ Griffin & Company Approximate Contract Amt: $400,000

Architect: Design Form Inc. Scope(s) Performed: Footings, Foundations Project Address: 7821 River Road Slab-On-Grade, Tilt Wall

Waynesboro, GA Concrete Installation

Project Details: Excavation for our work, form and pour cast-in-place concrete, slab-on-grade, tilt wall construction. This is a tilt up building having approximately 75,000 sq. ft. of floor space.

Project: Kohl’s Department Store # 11061 Start Date: August 2010 Owner: Kohl’s Department Stores Completion Date / % Complete: September 2010

General Contractor: Engineered Structures, Inc. Approximate Contract Amt: $860,000 Architect: Bowen Associates Scope(s) Performed: Earth Excavation

Project Address: US 29 & Towncenter Dr. Footings, Foundations Charlottesville, VA SOG, Tilt Wall Panels, CIP

Project Details: 87,534 Sq. Ft. foot print with a 6,300 elevated slab on metal deck. This project had rock sub-base and Foundation insulation. We self performed 95% of all work with our own forces.

Page 14: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 14 of 27

Project: Ft. Gordon AIT Barracks Start Date: June 01, 2010 Owner: US Army Completion Date / % Complete: August 08, 2010

General Contractor: Yates Construction Approximate Contract Amt: $372,818 Architect: Michael Baker, Jr., Inc. Scope(s) Performed: Footings, Foundations

Project Address: USACE SOG, CIP Walls, Ft. Gordon, GA CIP Vault Lid, Slab on

Elevated Deck

Project Details: This is a (2) story structural steel building with brick veneer. T&T Construction is providing all layout, equipment, labor & materials, supervision and home office support for excavations and backfill for our scope of work which includes footings, foundations, slab-on-grade, slab-on-elevated metal deck, cast-in- place walls and cast-in-place concrete vault lid. We also included mechanical, electrical & plumbing pads. T&T Construction provided a “Turnkey” proposal for all work.

Project: BT Barracks Start Date: July 15, 2010 Owner: US Army Completion Date / % Complete: November 28, 2011

General Contractor: Clark / Caddell a Joint Venture Approximate Contract Amt: $808,000 Architect: LS3P Associates, LTD Scope(s) Performed: Footings, Foundations

Project Address: Ft. Benning, GA Slab-On-Grade, CIP Stairs Slab-On-Deck, Misc. Pads

Project Details: Our turnkey contract consists of all concrete work associated with (2) each 3 story barracks buildings having 63,000 sq. ft. of building area. Included are slabs-on-grade, slabs-on-elevated deck, cast in place stairs, boot washes and misc. concrete mechanical pads.

Project: Capital Medical Center Start Date: May 10, 2010 Owner: Capital Medical Completion Date / % Complete: July 12, 2010

General Contractor: Mid State Corporation Approximate Contract Amt: $475,500 Architect: John E Chapman Scope(s) Performed: Footings, Foundations

Project Address: 2466 Flowood, Dr SOG, Dumpster Enclosure Flowood, MS Tilt Wall Panels w/Thin Set

Brick Project Details: This is a single story building with a 31,827 sf footprint. T&T Construction provided a turnkey proposal for

All equipment, labor and materials and supervision to complete the work for the footings, foundations, Slab-On-Grade and Tilt-Wall Panel system with embedded thin set brick. T&T Construction holds a Contractors License with the State of Mississippi.

Project: Kohls Lake Wales Start Date: March 15, 2010 Owner: Kohls Department Stores Completion Date / % Complete: June 15, 2010

General Contractor: J. Raymond Approximate Contract Amt: $370,000 Project Address: 2803 Ridge Way Scope(s) Performed: Horizontal & Vertical

Lake Wales, FL Concrete Work Architect: Scott & Goble Architect, P.C. Tilt-Wall Panels

Project Details: This is a single story retail store designed for tilt-wall construction. T&T Construction is contracted to

perform the concrete work for the perimeter and interior footings, concrete slab-on-grade, and (44) tilt-wall panels on a “Turnkey” basis. T&T Construction is performing all excavations, backfill & concrete pumping associated with the contract.

Project: Vehicle Maintenance Instructional Facility Start Date: March 15, 2010 Owner: US Army Completion Date / % Complete: October 10, 2010

General Contractor: Carothers Construction, Inc. Approximate Contract Amt: $1,758,500 Project Address: 10350 Vernam Ave. Scope(s) Performed: Footings, Foundations

Ft. Benning, GA Slab-On-Grade, Site Paving Architect: STOA Architects Bollards

Project Details: Single story 184,000 sq. ft. facility plus 178,000 sq. ft. of concrete site paving. Our contract consists

of all turnkey horizontal and vertical concrete work and concrete filled pipe bollards.

Page 15: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 15 of 27

Project: Faith Assembly of God Start Date: April 1, 2010 Owner: Faith Assembly of God Completion Date / % Complete: December 31, 2010

General Contractor: Sonlight Construction Approximate Contract Amt: $2,000,000 Project Address:

4875 Robin Drive Scope(s) Performed: Horizontal & Vertical Concrete

work St. Cloud, Florida 34772 Tilt-Wall Panels

Architect: Dwight Brennfoerder (Form/Pour/Erect)

Project Details: This is a multi-story facility having (3) floors total. There is 155,186 sf on the 1st floor, 73,100 sf on the 2nd floor and 23,500 sf on the 3rd. floor. The work provided in our scope is foundations, slab-on-grade slabs on-elevated deck, cast-in-place concrete and tilt-wall panels.

Project: Ormond Beach Middle School Start Date: March 8, 2010 Owner: Volusia County Schools Completion Date / % Complete: September 24, 2010

General Contractor: H.J. High Construction, CO. Approximate Contract Amt: $612,000 Project Address: 151 Domocilio Ave. Scope(s) Performed: Masonry CMU

Ormond Beach, Fl., 32174 Brick Veneer Architect: Starmer Rainaldi Planning and

Architecture

Project Details: This is a (1) story building that T&T Construction is providing a turnkey contract for the load bearing CMU

walls and brick veneer. The building is approximately 40,000 sf and will serve as a café and music center.

Project: ESPN Broadcast Facility ~ Marquee Entry Sign

Start Date: December 7, 2009

Owner: Walt Disney Imagineering Completion Date / % Complete: December 29, 2009 General Contractor: The Whiting-Turner Contracting

Company Approximate Contract Amt: $69,500

Project Address: 610 South Victory Way Scope(s) Performed: CIP Concrete Lake Buena Vista, FL 32830 Masonry

Architect: Walt Disney Imagineering

Project Details: This is an 8' Wide x 130' Long Foundation and has a radius Masonry Wall and a poured Concrete Cap. Turnkey contract for Foundation with Radius and 8" CMU Wall and Cast in Place Concrete Cap

Project: 3rd Army Headquarters Complex Start Date: August 31, 2009 Owner: US Army Completion Date / % Complete: April 2010

General Contractor: Caddell Construction Approximate Contract Amt: $5,200,000 Architect: LS3P Associates, LTD Scope(s) Performed: Concrete Work

Project Address: Shaw AFB Footings/Foundations Sumter, SC SOG, SOD, CIP Walls

Project Details: This military project consists of (3) buildings. A TEMF building having 15,623 sq. ft. of footprint, an HHC building having a footprint of 25,633 sq. ft. and a C2F building with 337,206 sq. ft of footprint. T&T contracted the footings, foundations, slab-on-grade, slab-on-elevated deck, cast-in-place walls, plus 425,838 sq. ft. of concrete site paving.

Project: Kissimmee Fire Station #11 Start Date: July 2009 Owner: City of Kissimmee, FL Completion Date / % Complete: December 2009

General Contractor: Wharton-Smith Approximate Contract Amt: $452,000 Architect: Bentley Architects and Engineers, Inc. Scope(s) Performed: Footings & Foundations

Project Address: 343 North Clyde Ave. CIP Concrete & Site Concrete Kissimmee, FL Masonry

Project Details: This is a 16,200 sq. ft. fire station facility. Our scope of work entails all concrete work including slab-on-grade, slab-on-elevated deck, cast-in-place concrete beams & columns and concrete site work. T&T’s contract also included all of the masonry associated with the project which had an excess of 23,000 load bearing architectural split face blocks. T&T is also installing a brick veneer on the exterior. T&T Construction provided the required WBE certification to Wharton – Smith mandated for this project.

Page 16: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 16 of 27

Project:

Magic Recreation Center “Goldenrod” Start Date: August 2009

Owner: Orlando Magic Recreational Centers Completion Date / % Complete: December 2009 General Contractor: Turner Construction Company Approximate Contract Amt: $580,000

Architect: Schenkel Schultz Architecture Scope(s) Performed: Footing / Foundations Project Address: Goldenrod Park Slab-On-Grade, Tilt-Wall

Winter Park, FL. Masonry

Project Details: T&T contracted all concrete work associated with the 17,500 sq. ft. building including footings, foundations, slab-on-grade, CIP (48) 30 ft. high tilt-wall panels and all masonry for the project. T&T also contracted the HM Door Frames in the masonry and tilt-wall openings. Provided required WBE certification for this project.

Project: Magic Recreation Center “Silver Star” Start Date: TBD Owner: Orlando Magic Recreational Centers Completion Date / % Complete: TBD

General Contractor: Turner Construction Company Approximate Contract Amt: $580,000 Architect: Schenkel Schultz Architecture Scope(s) Performed: Footing / Foundations

Project Address: Silver Star Park Slab-On-Grade, Tilt-Wall Orlando, Fl. Masonry - CMU

Project Details: T&T contracted all concrete work associated with the 17,500 sq. ft. building including footings, foundations, slab-on-grade, CIP (48) 30 ft. high tilt-wall panels and all masonry for the project. T&T also contracted the HM Door Frames in the masonry and tilt-wall openings. Provided required WBE certification for this project.

Project: Duval County Unified County

Courthouse Facilities Start Date: December 2009

Owner: Duval County Completion Date / % Complete: March 2011 General Contractor: Turner Construction Company Approximate Contract Amt: $2,500,000

Architect: KBJ Architects Scope(s) Performed: Masonry - CMU Project Address: 337 West Adams St.

Jacksonville, FL.

Project Details: This is a new courthouse facility in excess of 800,000 sq. ft. of courtroom and detention space. Our scope of work entails all CMU work on all levels of the facility. There are (52) courtrooms with a holding cell beside each one built with solid poured & reinforced CMU’s. This project requires the usage of JSEB (Jacksonville Small Emerging Businesses) and or MWBE’s local to Duvall County and or the City of Jacksonville. To date T&T Construction has provided 134% worth of JSEB and or MWBE participation on this project.

Project: Ft. Benning TSBC II – Barracks Start Date: April 2009 Owner: Army Corps of Engineers Completion Date / % Complete: October 2009

General Contractor: The Whiting – Turner Contracting Co. Approximate Contract Amt: $1,740,970 Architect: Clark-Nexsen Architecture &

Engineering Scope(s) Performed: Site-Concrete

Project Address: Ft. Benning, GA Building - Concrete Masonry

Project Details: 97,000 sf of a single (3) story barracks buildings with masonry load bearing walls. Our work includes but is not necessarily limited to, earth excavation, fine grading, backfill and compaction, stone sub base under slabs, slab-on-grade slab-on-elevated decks, hollow core topping at 2nd & 3rd floors and roof levels. Work also includes screen walls and foundations and MEP pads at all floors. Our contract also includes 30k sf of site paving, (4) metal building pads and 8” & 12” CMU work.

Project: 108th. ADA complex – Ft. Bragg Start Date: August 2009 Owner: U.S. Army Corps of Engineers Completion Date / % Complete: April 2010

General Contractor: Caddell Construction Approximate Contract Amt: $1,283,31 Architect: U.S. Army Corps of Engineers Scope(s) Performed: Structural & Non-Structural

Project Address: Ft. Bragg NC CMU

Project Details: There are (14) buildings including (4) Barracks, a Battalion Headquarters, an Administrative Building and a Troop Readiness Building. T&T Construction is providing “Turnkey” solutions for all CMU work and Brick Veneers. All exterior walls are load bearing CMU.

Page 17: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 17 of 27

Project: Wallace Creek Regimental Complex Start Date: March 15, 2009 Owner: US Corps of Engineers Completion Date / % Complete:

General Contractor: Caddell / Yates a Joint Venture Approximate Contract Amt: $6,346,877 Architect: NAVFAC Scope(s) Performed: Concrete

Project Address: Trailer 25 Parachute Rd. Masonry Camp Lejeune, NC Precast – Hollow Core

Project Details: This project involves the construction of (22) buildings of varying sizes and elevations. There is 250,000 SF in the basic footprint per the design. The buildings range from single story up to (5) story buildings. T&T Construction is providing on time “Turnkey” contracts for the concrete footings & foundations, grade beams, slabs-on-grade, slabs-on-decks, hollow core slabs and the topping for the hollow core slabs.

Project: Lake County Elementary School “J” Start Date: June 2009 Owner: Lake County School Board Completion Date / % Complete: February 2010

General Contractor: Welbro Building Corp. Approximate Contract Amt: $ 2,096,173 Architect: Schenkel Shulz Scope(s) Performed: Slab-On-Grade, Slab-on-metal

Project Address: Plymouth Sorrento Rd. & Wallick Rd. deck, Elevated slabs, CIP concrete

Sorrento, FL Masonry

Project Details: T&T Construction is providing a “Turnkey” scope of work for all materials, labor, equipment and incidentals for all excavation, backfill, final grade for footings, foundations, slab-on-grade, place and finish for elevated slabs and all cast-in-place concrete. T&T is also providing a “Turnkey” masonry scope of work for all CMU and or brick. This is a (2) story facility with 119,000 sq. ft. of space.

Project: Bachelor’s Enlisted Quarters Start Date: February 23, 2009 Owner: US Army Corps of Engineers Completion Date / % Complete:

General Contractor: Caddell Construction Approximate Contract Amt: $3,021,262 Architect: Naval Facilities Engineering Scope(s) Performed: Excavations/Backfill/Comp

action Project Address: New River – Camp Lejeune Site - Concrete

North Carolina Building - Concrete

Project Details: This is a single (3) story building having 89,000 sq. ft. of area. T&T Construction is providing all of the excavations, final grading and backfill and compaction for footings, foundations and slab-on-grade for our work. T&T is also providing a “Turnkey” contract for all equipment, materials, supervision and labor for all of the above work including slab-on-grade and slabs-on-elevated decks and associated site concrete.

Project: MATOC for AIT/BT Barracks & WIT Facilities Start Date: January 20, 2009 Owner: US Corps of Engineers Completion Date / % Complete: March 15, 2009

General Contractor: Clark Construction / Caddell Construction, Co.

Approximate Contract Amt: $1,529,000

Architect: US Corps of Engineers – Ft. Worth Dist. Scope(s) Performed: Foundations / Slab-On-Grade

Project Address: Ft. Benning, GA Elevated Slabs / CIP Walls Ft. Benning, GA CIP Stairs & Site Concrete

Project Details: Provide turnkey services for all concrete and related work including excavation, grading and backfilling, for four barracks approximately 150,000 sq. ft. total. One Storage /Lawn Maintenance Building, One Latrine and One Track Shelter. CIP work at the Arms Vault, House Keeping Pads, (4) Chiller Equipment pads, & (15) Boot Wash Stations. There are (4) 2-Story Barracks involved with an option for (1) additional.

Project: Ft. Benning Simulator Complex Start Date: January 12, 2009 Owner: US Corps of Engineers Completion Date / % Complete: August 1, 2009

General Contractor: Caddell Construction, Co. Approximate Contract Amt: $1,980,000 Architect: US Corps of Engineers – Savannah

Dist. Scope(s) Performed: Foundations / Slab-On-

Grade Project Address: James Town Rd. Elevated Slabs / CIP Walls

Ft. Benning, GA CIP Stairs & Site Concrete

Project Details: T&T contracted all concrete and related work including excavation, grading and backfilling, for (3) buildings to be constructed for this project.

Page 18: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 18 of 27

Project: Darden Data Center Start Date: March, 2008 Owner: Darden Completion Date / % Complete: August, 2009

General Contractor: Hardin Approximate Contract Amt: $1,403,000 Architect: Perkins & Will Scope(s) Performed: Footings, Foundations

Project Address: 3829 Taft Vineland Rd SOG, Tilt-Wall Orlando, FL Slab-On-elevated Decks

Project Details: A 496,000 Sq. Ft. footprint for the main building consisting of cafeteria, kitchen, conference center Data center and 1050 car parking deck. There was also a 5,000 square foot fitness center. A separate equipment building was built consisting of Tilt-Wall construction. This was a Gold Leed job.

Project: RSTB SOF Battalion Complex & TEMF Start Date: November 11, 2008 Owner: Army Corps of Engineers Completion Date / % Complete: February 15, 2009

General Contractor: ACC Construction, Co. Approximate Contract Amt: $237,893 Architect: US Corps of Engineers Scope(s) Performed: Concrete Formwork / CIP

Project Address: Ft. Benning, GA Slab-On-Grade Columbus, GA

Project Details: Furnish all labor & materials & equipment for concrete formwork, pipe bollards, concrete place & finish, for vault tops, elevator pit, and maintenance pit.

Project: Oakleaf High School Start Date: October 27, 2008 Owner: Clay County School District Completion Date / % Complete: November 15, 2009

General Contractor: MM Parrish Construction Company Approximate Contract Amt: $1,020,000 Architect: Harvard – Jolly Architecture Scope(s) Performed: Masonry

Project Address: 4035 Plantation Oaks Blvd. CMU Block Orange Park, FL. 32065 Exterior Brick Veneer

Project Details: This school of (11) buildings with one, two and three stories each. Total square footage is 298,086. The estimated block count is at 105,183 and the brick count estimated is at 32,956.

Project: Ft. Benning Reception Center Start Date: November 2008 Owner: US Government Completion Date / % Complete: March 3, 2009

General Contractor: Caddell Construction Company Approximate Contract Amt: $2,600,000 Architect: US Army Corps of Engineers Scope(s) Performed: Footings, Foundations,

SOG Project Address: 2nd. Infantry Division Elev. Slabs, CIP Walls

Ft. Benning, GA Pads & Stairs

Project Details: 118,000 sf for 2 Floors of concrete slab-on-grade, slab-on-composite deck, retaining walls, CIP walls, stairs, and exterior mechanical rooms, chiller yard and two chiller pads.

Project: Premier Beverage Start Date: November 3, 2008 Owner: Premier Beverage Company Completion Date / % Complete: June 18, 2009

General Contractor: R.R. Simmons Construction Corp. Approximate Contract Amt: $4,340,490 Architect: R.R. Simmons Construction Corp. Scope(s) Performed: Footings, Foundations

Project Address: 6031 Madison Ave. SOG, Tilt-UP Walls Tampa, FL 33619 Paving / Sidewalks

Project Details: 587,400k sf Warehouse With a 2nd. Story Office Building at the Front and Storage Mezzanine having 143 screen Panels, elevated slabs on composite Deck, 123k sf Tilt-UP Panels, 66k sf paving + sidewalks

Project: Osceola Middle School CC Start Date: July 6, 2008 Owner: Osceola School Board Completion Date / % Complete: August 31, 2009

General Contractor: Turner Construction Company Approximate Contract Amt: $1.97 Million Architect: Schenkel Shultz Scope(s) Performed: Footings, Foundations

Project Address: 2551 West Side Blvd. SOG, Tilt-UP Walls Kissimmee, FL Conc. Fill for Stairs

Project Details: Two New Multi Purpose School Buildings, with 128,000 sq. ft. of building area. T&T contracted for the “turnkey” scope of work associated with footings, foundations, slab-on-grade, slab-on-elevated deck and (199) Tilt-UP Concrete Wall Panels, and CIP concrete for metal pan stairs and landings, columns, CIP walls, concrete site paving and sidewalks.

Page 19: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 19 of 27

Project: SATOC Training Barracks Start Date: March 12, 2008 Owner: US Government Completion Date / % Complete: December 31, 2008

General Contractor: Clark / Caddell Approximate Contract Amt: $7.9 Million Architect: US Army Corps of Engineers Scope(s) Performed: Footings, Foundations

Project Address: 9869 Senelon St. SOG, Sab-On-Elev. Deck Ft. Benning, GA CIP Stairs, Conc. Rf. Decks

Project Details: (2) separate Sites – 1,400,282 Sq. Ft. of SOG and SOD, (10) 2-Story Barracks, Two Battalions, One Dining Facility, Two Latrines, One Physical Training Center, Two Storage Facilities, Four-Four Boot Wash Areas at The Sand Hill site. Harmony Church Site Includes – (1) Barracks, (1) Battalion, (1) Brigade, (1) Dining Facility, (2) Latrines, (2) Storage Facilities, (44) Boot Wash Stations

Project: Target West Melbourne T-2547 Start Date: October 1, 2008 Owner: Target Corporation Completion Date / % Complete: December 1, 2008

General Contractor: Williams Company Approximate Contract Amt: $0.9 Million Architect: RSP Architects Scope(s) Performed: Footings, foundations

Project Address: 4305 Norfolk Parkway. Unit 103 SOG West Melbourne, FL Masonry

Project Details: Retail – Single Story building contract work consisting of footings, foundations, Site Cast Concrete Wall Panels with Brick Form Liners, and the Thin Brick Units (masonry)

Project: Kohl’s Lady Lake Start Date: March 24, 2008 Owner: Kohl’s Department Stores Completion Date / % Complete: August 1, 2008

General Contractor: RA Rogers Approximate Contract Amt: $1.3 Million Architect: Scott & Goble Architects Scope(s) Performed: Conc. Footings,

foundations Project Address: 492 Hwy. 441 SOG, Grade. Beams.

Lady Lake, FL Conc. Tilt-UP Panels

Project Details: Retail department store – contract work for footings, foundations, Slab-On-Grade, Tilt-UP Wall Panels

Project: Ormond Beach Middle School Start Date: August 1, 2008 Owner: Volusia County School Board Completion Date / % Complete: May 6, 2009

General Contractor: H.J. High Construction Company Approximate Contract Amt: $2.2 Million Architect: Starmer Ranaldi Planning &

Architecture Scope(s) Performed: Footings, Foundations

Project Address: 151 Domicilio Ave. SOG, Masonry Walls Ormond Beach, FL 32174 Stairs

Project Details: Contract work for Excavation / Backfill / Compaction for Slab-On-Grade, Fine Grading, Slab-On-Grade Elevated Slabs On Deck, Metal Stair Pan Fill, Masonry Walls

Project: Maitland MS & Dommerich ES Start Date: July 16, 2008 Owner: OCPS Completion Date / % Complete: July 07, 2009

General Contractor: Welbro Building Corporation Approximate Contract Amt: $2.6 Million Architect: Rhodes + Brito - Orlando Scope(s) Performed: Foundations, Pads

Project Address: Dommerich ES 1900 Choctaw Tr. SOG, Tilt-Up Walls Maitland, FL Masonry

Project Details: Public School Project consisting of 148 Tilt-UP Wall Panels, 105k sf of SOG, 57k sf slab on Metal Deck Site work Package with sidewalks, CIP Walls, Tilt-UP Dumpster Enclosure Walls & Concrete Paving

Project: The Pavilion At Port Orange Start Date: June 30, 2008 Owner: Pavilion At Port Orange Completion Date / % Complete: February 1, 2009

General Contractor: EMJ General Contractor Approximate Contract Amt: $1.1 Million Architect: Artech Design Group, Inc. Scope(s) Performed: Footings, foundations

Project Address: 5501 S. Williamson SOG, Tilt-UP Walls Port Orange, FL

Project Details: 1001,000sf Retail Contract for fine Grading, Backfill, Footings, foundations, slabs and Tilt-Up Wall Panels.

Page 20: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 20 of 27

Project:

West Volusia Town Center Phase II Start Date: June 23, 2008

Owner: Dale A. Suthoff Family Limited Partnership

Completion Date / % Complete: December 1, 2008

General Contractor: First Builders Approximate Contract Amt: $0.9 Million Architect: Cuhaci & Peterson Scope(s) Performed: Footings, Foundations

Project Address: NWC Harley Strickland Blvd. SOG, Tilt-Up Walls Orange City, FL

Project Details: Retail – (5) Buildings With Tilt-Up Wall @ Perimeter Having a 51,200sf Footprint – Single Story With Loading Dock & Ramp, CIP Retaining Walls

Project: Celebration C-5 Start Date: May 30, 2008 Owner: Duke Realty Completion Date / % Complete: January 1, 2009

General Contractor: Duke Realty Approximate Contract Amt: $1.1 Million Architect: C4 Architecture Scope(s) Performed: Footings, Foundations

Project Address: 1390 Celebration Blvd. SOG, Tilt-UP Walls Orlando, FL.

Project Details: 34,000sf Concrete Tilt-Up Wall Building. Contracted slab-On-Grade Floors, Slab-On-Deck & Tilt-Up Wall

Project: Church In The Son Start Date: March 2008 Owner: Church In The Son, Inc. Completion Date / % Complete: May 2009

General Contractor: Collage Companies Construction Approximate Contract Amt: $0.5 Million Architect: Daniel Cook & Associates Scope(s) Performed: Building Concrete

Project Address: 4484 John Young Parkway Site Concrete Paving Orlando, FL

Project Details: This is a 50,072 sq. ft. worship facility. T&T Construction was responsible for the slab-on-grade, slab- on-elevated deck, (27) tilt-wall panels, CIP walls, the stadium saver step system, and all of the site paving dumpster pads and sidewalks.

Project: Intellicenter Start Date: October 2007 Owner: Koll Development Company Completion Date / % Complete: September 2008

General Contractor: The Beck Group Approximate Contract Amt: $1.8 Million Architect: Forum Studio Scope(s) Performed: Footings, Foundations

Project Address: 12653 Telecom Dr. Tilt-Wall, Slab-On-Grade Temple Terrace, FL. Slab-On-Elevated Deck

Project Details: Four-story office building totaling 211,637 sq. ft. of tenant space. Scope of work included construction of (38) wall panels independently braced on the exterior, an elevator shaft, cast-in-place walls, and concrete sidewalks, loading dock and roof deck. Intellicenters are a new innovative office space concept that have been built in Texas, California, North Carolina, Georgia and Florida. More Intellicenters are planned.

Project: JC Penny’s - Davenport Start Date: November 27, 2007 Owner: JC Penny’s Corporation Completion Date / % Complete: June 9, 2008

General Contractor: Whiting - Turner Approximate Contract Amt: $0.77 Million Architect: Nudell Architects Scope(s) Performed: Footings, Foundations

Project Address: 6200 Grandview Parkway SOG, Tilt-UP Wall Panels Davenport, FL 33837

Project Details: Retail Store – Concrete Footings, Foundations, Slab-On-Grade, Tilt-UP Wall Panels, Sidewalks, Loading Dock

Project: Promenade South – Universal Plaza Start Date: October 29, 2007 Owner: HLR Limited Company Completion Date / % Complete: November, 21, 2008

General Contractor: Daniel Corporation of Winter Park, Inc. Approximate Contract Amt: $0.83 Million Architect: Architecture , Inc. Scope(s) Performed: Footings, Foundations

Project Address: 5859 Turkey Lake Rd. SOG &Tilt-Up Wall Panels Orlando, FL 32819

Project Details: 3-Story Retail Buildings consisting of, Slab-On-Grade, Slab-On-Metal Deck Tilt-Up Wall Construction

Page 21: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 21 of 27

Project: New Advantage Start Date: July 2, 2007 Owner: NAC Group Inc. Completion Date / % Complete: April 14, 2008

General Contractor: Bay Area Builders Approximate Contract Amt: $0.69 Million Architect: JVB Architect, LLC Scope(s) Performed: Footings, Foundations

Project Address: 9901 16th. St. North SOG St. Petersburg, FL

Project Details: Retail – 42,100 SF Building With (43) Tilt-Up Wall Panels Plus 14, 900 sf Slab-On-Metal Deck

Project: Plantation Crossings Start Date: February 13, 2007 Owner: Kimco Middleburg Completion Date / % Complete: July 27, 2007

General Contractor: Amore Construction Company Approximate Contract Amt: $1.1 Million Architect: ADW Architects Scope(s) Performed: Concrete Fnd’s & Slabs

Project Address: 1587-1 Brannan Field Rd. Tilt-Up Wall Panels Middleburg, FL

Project Details: Retail – Excavation and backfill for concrete work, Slab-On-Grade, Tilt-Up Wall Panels

Project: JC Penny Start Date: February 12, 2007 Owner: JC Penny Company, Inc. Completion Date / % Complete: August 21, 2007

General Contractor: Whiting - Turner Approximate Contract Amt: $835,128 Architect: Nudell Architects Scope(s) Performed: Footings, Foundations

Project Address: 2001 Osceola Parkway SOG, Tilt-Up Walls Kissimmee, FL

Project Details: Contract work for, Concrete Footings, Foundations, slab-On-Grade and Concrete Tilt-Up Wall Construction

Project: Lake Cay Retail & Publix Start Date: July, 2007 Owner: Fourth Quarter Properties 121, LLC Completion Date / % Complete: January 18, 2008

General Contractor: J. Raymond Construction Corporation Approximate Contract Amt: $1.98 Million Architect: David Taulbee Scope(s) Performed: Concrete Flat-Work

Project Address: 9751 Universal Blvd, St. Cloud, Florida

Tilt and Masonry

Project Details: Multiple Tilt-Up retail buildings with Entry-Ways and a Masonry Publix Grocery Store. This project is one

of a very few Publix Plaza’s utilizing both conventional and tilt-up construction techniques. T&T was uniquely suited for this project because we self-perform both concrete and masonry trades.

Project: Kohl’s Department Store # 11230 Start Date: August, 2007 Owner: Kohl’s Department Stores, Inc. Completion Date / % Complete: August 1, 2008

General Contractor: Keene Construction Approximate Contract Amt: $0.82 Million Architect: Scott & Goble Architects Scope(s) Performed: Concrete Foundations,

Project Address: 7413 Narcoossee Road, Orlando, Florida

Slabs and Tilt Panels

Project Details: Stand alone 88,000 Square Foot Kohl’s Department store with Tilt Panel exterior walls. This project is

one of many “large-box” retail buildings that T&T Construction has completed in the past several years.

Project: Jeld-Wen Manufacturing Expansion Start Date: September, 2007 Owner: JELD-WEN Inc. Completion Date / % Complete: April 16, 2008/100%

General Contractor: Houchin Construction, Inc, Approximate Contract Amt: $ 0.9 Million Architect: Architectural Resource Group, Inc Scope(s) Performed: Concrete Foundations,

Project Address: 1700 Avenue A Kissimmee Florida, 34746

Cast in Place Walls, Slabs and Tilt Panel Exterior

Project Details: 100,000 SF Addition to and existing manufacturing facility. Heavy-Duty slab system for current and

future fork lift traffic reinforced with NovoMesh 1050 Steel Fibers mixed with the concrete.

Page 22: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 22 of 27

Project: Orange County Avalon Elementary Start Date: September, 2007 Owner: The School Board of Orange County Completion Date / % Complete: June 13, 2008

General Contractor: Walker & Company Approximate Contract Amt: $ 1.215 Million Architect: Reynolds, Smith & Hills, Inc Scope(s) Performed: Concrete Foundations,

Project Address: 2149 Crown Hill Blvd., Orlando, Florida 32828

Slabs and Tilt Panels

Project Details: New construction of a 2-Story Orange County Elementary School. Concrete scope of work included

Foundations, 62,000 SF of Slab on Grade, 35,000 SF of Elevated Slabs and 40,000 SF of Tilt Panels.

Project: Hilton Grand Vacation Resort – Ruby Lake Development

Start Date: July, 2007

Owner: Hilton Hotels Corporation Completion Date / % Complete: November 21, 2008 General Contractor: Turner Construction Company Approximate Contract Amt: $ 1.7 Million

Architect: HKS Architects, Inc. Scope(s) Performed: Masonry (Regular CMU) Project Address: 7803 Palm Parkway

Orlando, Florida 32836

Project Details: Two 14-Story Cast in Place Concrete towers (by others) requiring regular CMU masonry infill work to

Complete the interior patrician walls as well as exterior balcony supports and privacy walls.

Project: Indian River Community College Public Safety Training Complex

Start Date: May, 2007

Owner: Indian River Community College Completion Date / % Complete: November 28, 2008 General Contractor: H.J. High Construction Approximate Contract Amt: $ 3.625 Million

Architect: Florida Architects, Inc. Scope(s) Performed: Concrete Flatwork, CIP Project Address: 3209 Virginia Avenue,

Ft. Pierce, Florida 34981 Walls & Stairs, Tilt Panels

Project Details: Eight - Building Complex consisting of tilt wall shell buildings with cast in place concrete stairs and a

6-Story CIP fire training tower. Many of the tilt panels had cast in place thin-brick veneer.

Project: The Loop West Complex Start Date: August, 2007 Owner: Loop West LLC c/o The Wilder Co. Completion Date / % Complete: June 5, 2008

General Contractor: Keene Construction Company of CFL Approximate Contract Amt: $ 1.40 + Million Architect: Cuhaci & Peterson Architects Scope(s) Performed: Concrete Foundations,

Project Address: 3180 North Thacker Ave. Kissimmee, Florida 34741

Slabs and Tilt Panels

Project Details: Multi-Building Retail complex consisting primarily of One-Story 15K to 35K Square Foot building with tilt

panel exterior walls. Buildings are constructed in phases in close proximity to existing buildings.

Project: Melbourne High School Gym Ph-I Start Date: July, 2007 Owner: School Board of Brevard County Completion Date / % Complete: November 21, 2008

General Contractor: Skanska USA Building Inc. Approximate Contract Amt: $ 1.64 Million Architect: BRPH Companies, Inc. Scope(s) Performed: Concrete Foundations,

Project Address: 74 Bulldog Blvd. Slabs, CIP Beams, Tilt Walls and Brick Masonry

Melbourne, Florida 32901 Project Details: New construction of a gymnasium utilizing both conventional concrete / masonry construction methods

as well as tilt-up construction techniques. Perimeter tilt panels with cast in thin-brick veneer were used.

Project: Memorial Middle School Start Date: July 2007 Owner: OCPS Completion Date / % Complete: September 2008

General Contractor: Balfour Beatty Approximate Contract Amt: $1 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Masonry

Project Address: 2220 29th St Regular & Specialty CMU Orlando, FL

Project Details: This project consisted of nine buildings, four newly constructed buildings, four remodels and one relocated building. A total of 129,000 regular CMU and 6,700 specialty CMU were used. 30 foot high columns were constructed of 12 inch ground face block to independently support CIP stairs and landings.

Page 23: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 23 of 27

Project: Target T-2366 NE POLK County Start Date: May 28, 2007 Owner: Target Corporation Completion Date / % Complete: December 2, 2007

General Contractor: Williams Company - Southeast Approximate Contract Amt: $1.1 Million Architect: RSP Architect Scope(s) Performed: Conc. Foundations, SOG

Project Address: 43535 Hwy 27 Tilt-UP Wall Panels Davenport, FL 33837

Project Details: Excavation / Backfill, Fine Grade 1/10 +/-, Loading Docks, Slab-On-Grade, Sidewalks, Garden Concrete Concrete Paving Tilt Wall Panels, Interior/Exterior bollards, Site Cast Spandrel Wall Panels

Project: Super Target T-2264 Winter Garden Start Date: December, 2006 Owner: Target Corporation Completion Date / % Complete: April, 2007

General Contractor: Williams Company - Southeast Approximate Contract Amt: $ 1.6 Million Architect: RSP Architects Scope(s) Performed: Concrete Foundations,

Project Address: Winter Garden, FL SOG, Tilt Panels

Project Details: 170,000 SF Retail Space with Tilt Panel exterior walls. This project was one of three Super Target Stores that T&T Construction completed simultaneously. The other two projects are listed below.

Project: Super Target T-2289 Oldsmar Start Date: December, 2006 Owner: Target Corporation Completion Date / % Complete: May, 2007

General Contractor: Ryan Companies US, Inc. Approximate Contract Amt: $ 1.8 Million Architect: RSP Architects Scope(s) Performed: Concrete Foundations,

Project Address: 11627 W. Hillsborough Ave, Tampa FL 33635

SOG, Tilt Panels

Project Details: 170,000 SF Retail Space with Tilt Panel exterior walls. (Project 2)

Project: Super Target T-2235 Brandon South Start Date: November, 2006 Owner: Target Corporation Completion Date / % Complete: April, 2007

General Contractor: Williams Company - Southeast Approximate Contract Amt: $ 2.0 Million Architect: RSP Architects Scope(s) Performed: Concrete Foundations,

Project Address: Gornto Lake Rd. & Bloomingdale Ave Riverview, FL 33569

SOG, Tilt Panels

Project Details: 175,000 SF Retail Space with Tilt Panel exterior walls. (Project 3)

Project: OCPS West Orange High School Start Date: December, 2006 Owner: Orange County School Board Completion Date / % Complete: October 10, 2008

General Contractor: Clark Construction Approximate Contract Amt: $ 7 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete Foundations,

Project Address: 1625 South Beulah Road, Winter Garden, FL 34787

SOG, Tilt Panels, CIP

Project Details: A High School project consisting of (9) buildings utilizing (337) concrete tilt panels for the design. Cast in

place elevated walk ways and stairs required specialty formwork and skilled craftsmen to complete. This project had approximately 500,000 sq. ft. of buildings.

Project: West Volusia Town Center Start Date: October, 2006 Owner: Realty Capital TCN Worldwide Completion Date / % Complete: April, 2007

General Contractor: J. Raymond Approximate Contract Amt: $ 2.4 Million Architect: Cuhaci & Peterson Architects Scope(s) Performed: Concrete Foundations,

Project Address: 907 Harley Strickland Blvd. Orange City, FL 32763

SOG and Tilt Panels

Project Details: Retail center complex consisting of multiple tenants separated by tilt panel walls. Total project covers

over 156,000 square feet. T&T’s Design build services were utilized to assist the owner in reducing the overall project cost and reducing the total time required for construction.

Page 24: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 24 of 27

Project: Villages at Hunter’s Creek Phase II Start Date: September, 2006 Owner: Pelloni Development Corporation Completion Date / % Complete: May, 2007

General Contractor: Pertree Constructors Approximate Contract Amt: $ 2.65 Million Architect: Bock & Partners Architecture Scope(s) Performed: Concrete FND, SOG, CIP

Project Address: West Park Plaza, Orange County, FL Masonry

Project Details: Retail - Multiple building complexes constructed utilizing conventional concrete & masonry construction methods.

Project: Central Florida Educators Federal

Credit Union Headquarters Start Date: July, 2006

Owner: Central Florida Educators FCU Completion Date % Complete: April 20, 2007/100% General Contractor: The Beck Group Approximate Contract Amt: $2.0 Million

Architect: Little Architecture Scope(s) Performed: Concrete Foundations, Project Address: 1000 Primera Blvd., Lake Mary, FL SOG, Tilt Panels, SOD

Project Details: Architecturally complex two-story class-A office building with tilt-panel and spandrel glass facade.

This Prestigious Project Won An ABC EIC Award For 2008

Project: Holler Honda Orlando Start Date: July, 2006 Owner: Holler Honda Completion Date % Complete: February, 2007

General Contractor: Suncoast Autobuilders Approximate Contract Amt: $720,000 Architect: Suncoast Design Group, Inc. Scope(s) Performed: Concrete FND, SOG, CIP

Project Address: 2001 Semoran Blvd, Orlando FL Masonry

Project Details: Retail - Two story auto dealership with complete showroom and vehicle service bays.

Project: Lake Sumter CC Science Building Start Date: August, 2006 Owner: Lake Sumter Community College Completion Date / % Complete: May, 2007

General Contractor: PPI Construction Management Approximate Contract Amt: $1.2 Million Architect: STH Architectural Group, Inc Scope(s) Performed: Concrete Foundations,

Project Address: Leesburg, FL SOG & Tilt

Project Details: 26,500 SF Two-story Science building. Tilt panel exterior walls with Thin-Brick veneer cast into the panels.

Project: SuperTarget T-2209 Suncoast Building Start Date: January 17, 2006 Owner: Target Corporation Completion Date / % Complete: August 25, 2006

General Contractor: Williams Company Approximate Contract Amt: $2.1 Million Architect: RSP Architects, LTD Scope(s) Performed: Concrete Foundations,

Project Address: 16400 SR 54 SOG & Tilt Odessa, FL 33556

Project Details: Fine Grade / Backfill, Compaction, Footings, SOG, Sidewalks, Concrete Paving, Loading dock, Tilt Walls

Project: Robb & Stuckey at Millennia Start Date: November, 2005 Owner: Robb & Stuckey Completion Date / % Complete: April, 2006

General Contractor: Williams Company Approximate Contract Amt: $ 800,000 Architect: OB Architecture, Inc. Scope(s) Performed: Concrete FND, SOG, CIP

Project Address: Millennia Blvd., Orlando, FL Masonry CMU & Veneer

Project Details: Retail - One two-story building and one single-story building with masonry walls and exposed integral colored split-faced veneer.

Project: Windoor Manufacturing Facility Start Date: September, 2005 Owner: Windoor Manufacturing Completion Date / % Complete: April, 2006

General Contractor: Pertree Constructors, Inc. Approximate Contract Amt: $2.7 Million Architect: Horton, Harley & Carter, Inc Scope(s) Performed: Concrete Foundations,

Project Address: ICP, Parcel 10, Lot 2, Orlando, FL SOG, Tilt & Masonry

Project Details: 300,000 SF Manufacturing and distribution facility. Tilt panel exterior walls, 136 total, with interior Masonry walls.

Page 25: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 25 of 27

Project: Silo Bend, Buildings 19 & 20 Start Date: July, 2005 Owner: Liberty Property Trust Completion Date / % Complete: December, 2005

General Contractor: Itasca Construction Associates Approximate Contract Amt: $1.02 Million Architect: Horton, Harley & Carter, Inc Scope(s) Performed: Concrete Foundations,

Project Address: 8900 Brittany Way, Tampa, FL SOG & Tilt Walls

Project Details: Two building project totaling approximately 100,000 SF of slab on grade and 130 tilt wall panels.

Project: Circle Square Commons Start Date: July, 2005 Owner: On Top of The World Communities Completion Date / % Complete: August, 2006

General Contractor: Edwards Construction Services, Inc. Approximate Contract Amt: $ 2.4 Million Architect: Spillis Candela, DMJM Scope(s) Performed: Foundations, SOG,

Project Address: 8447 S.WE. 99th St., Ocala, FL C.I.P. Beams, Masonry

Project Details: Six building retail / entertainment complex. Complex masonry wall construction incorporating cast in place tie beams and columns.

Project: Target Pinellas Park Start Date: January, 2005 Owner: Target Corporation Completion Date / % Complete: May, 2005

General Contractor: Williams Company Approximate Contract Amt: $ 1.39 Million Architect: RSP Architects Scope(s) Performed: Concrete Foundations,

Project Address: 7200 US Rt. 19 Pinellas Park, FL 33718 SOG and Tilt Panels

Project Details: Approximately 125,700 SF of Slab on Grade and 62 Tilt Panels.

Project: OCPS Discovery Middle School Start Date: July, 2004 Owner: Orange County Public School System Completion Date / % Complete: March, 2005

General Contractor: Walker & Company Approximate Contract Amt: $ 1.7 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete FND, Slabs

Project Address: 11398 Lake Underhill Rd. Tilt Panels & Tie-Beams Orlando, FL

Project Details: Eight Building Complex, 156,000 SF of Slab on Grade, 245 Tilt Panels, Form Liner Applications. Kept project on schedule while repairing damage from hurricane’s Charlie and Frances.

Project: OCPS Hunters Creek Middle School Start Date: July, 2004 Owner: Orange County Public School System Completion Date / % Complete: February, 2005

General Contractor: PPI / ACE, LLC Approximate Contract Amt: $ 1.7 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete FND, Slabs

Project Address: 2850 Taft-Vineland Rd. Orlando, FL Tilt Panels & Tie-Beams

Project Details: Eight Building Complex, 156,000 SF of Slab on Grade, 245 Tilt Panels, Form Liner Applications. Kept project on schedule while repairing damage from hurricane’s Charlie, Frances & Jeanne.

Project: OCPS McCoy Elementary School Start Date: September, 2004 Owner: Orange County Public School System Completion Date / % Complete: October, 2005

General Contractor: Turner Construction Approximate Contract Amt: $ 1.3 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete FND, Slabs

Project Address: 5225 Semoran Blvd. Orlando, FL Tilt Panels, Side Walks

Project Details: 7th school of this design to be constructed by T&T Construction. Approximately 63,000 SF footprint with 37,000 SF of elevated slab on deck. Tilt panels with 4” x 12” x ½” thin brick form-liner system.

Project: OCPS Cypress Springs Elem. School Start Date: July, 2004 Owner: Orange County Public School System Completion Date / % Complete: March, 2005

General Contractor: Walker & Company Approximate Contract Amt: $1.4 Million Architect: Schenkel Shultz Architecture Scope(s) Performed: Concrete FND, Slabs

Project Address: 3148 Sanctuary Point Blvd. Orlando, FL Tilt Panels, Side Walks

Project Details: Approximately 63,000 SF footprints with 37,000 SF of elevated slab on deck. Tilt panels with 4” x 12” x ½” thin-brick form-liner system. One of three Elementary Schools completed by T&T in 2005.

Page 26: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 26 of 27

Project: KOHL’s Orange City Start Date: May, 2005 Owner: KOHL’s Corporation Completion Date / % Complete: September, 2005

General Contractor: Keene Construction Company Approximate Contract Amt: $ 0.98 Million Architect: TSA Scope(s) Performed: Concrete Foundations,

Project Address: Orange City, FL SOG and Tilt Panels

Project Details: Retail - Approximately 90,000 SF of SOG and 58 Panels. T&T was given two weeks (initial layout to panel erection) to have all panels standing. Panel erection started on day 12.

Project: Target East Orlando Start Date: November, 2004 Owner: Target Corporation Completion Date / % Complete: September, 2005

General Contractor: Williams Company Approximate Contract Amt: $ 1.17 Million Architect: RSP Architects Scope(s) Performed: Concrete

Project Address: 3850 N Goldenrod Rd. Orlando, FL Tilt

Project Details: Retail - 125,000 SF Tilt Job incorporating Masonry sections with tilt wall panels.

Project: Osceola County Sheriffs Complex Start Date: January, 2004 Owner: Osceola County, Florida Completion Date / % Complete: October, 2004

General Contractor: Centex Rooney Construction Company Approximate Contract Amt: $ 1.1 Million Architect: HLM Design Scope(s) Performed: Concrete Foundations,

Project Address: Partin Settlement Rd, Kissimmee FL SOG, SOD, Tilt Panels

Project Details: Worked with GC for 9-months during the design build process. Contracted with Structural Engineer to design tilt panel attachment points. 66,000 SF building SOG & Elevated Slab. Thin brick form-liner.

Project: Target - Seven Springs Start Date: March, 2004 Owner: Target Corporation Completion Date / % Complete: July, 2004

General Contractor: Williams Company Approximate Contract Amt: $ 1.25 Million Architect: RSP Architects Scope(s) Performed: Concrete

Project Address: 2900 Little Rd. New Port Richey, FL 34655 Tilt

Project Details: Retail - 140,000 SF slab on grade with 72 tilt wall panels. To assist the GC’s project schedule, T&T Construction began laying out the foundations and had all tilt panels erected and braced in 23 days

Project: Belk - Viera Florida Start Date: February, 2004 Owner: Belk Department Stores Completion Date / % Complete: May, 2004

General Contractor: Wilson & Company, Inc. Approximate Contract Amt: $ 617,000.00 Architect: Artech Design Group – Charlotte, NC Scope(s) Performed: Concrete Foundations,

Project Address: 2261Town Center, Viera, FL 32940 Slab on Grade, Tilt Wall

Project Details: Retail - Single story, 66,000 SF slab on grade department store with tilt walls. Erected three large spandrels panels

and plumb set one side of the building walls to avoid conflict with adjacent masonry building.

L A R G E S T C O M P L E T E D P R O J E C T T O D A T E

Project: University of Florida Oak Hammock Start Date: November, 2002 Owner: Oak Hammock Foundation Completion Date / % Complete: April, 2004

General Contractor: Weitz - PPI Pre-ODP Contract Amt: $ 10.95 Million Architect: RDG Schutte, Wilscam + Birge Scope(s) Performed: Concrete SOG / SOD

Project Address: 2012 W. University Ave. Gainesville, FL Cast-in-Place Work

Project Details: 780,000 Total SF, 2 – five story buildings, 3 – two story buildings, and 7 – single story buildings. Cast in Place Beams, columns, and slabs. Comprehensive foundation and slab on grade work.

Page 27: GENERAL COMPANY INFORMATION - T&T …ttcfl.com/wp-content/uploads/2017/03/Resume48_new.pdfhighest degree of professionalism and courtesy. We at T&T Construction are looking forward

Page 27 of 27

T&T CONSTRUCTION IS A “CERTIFIED 8W-WOSB CONTRACTOR” Surety & Insurances

BONDING AGENT: (CONTACT) Brett M. Rosenhaus with Nielson & Rosenhaus & Associates

PH. # (561) 432-5550, address is 400 South 5th. Ave. Ste. 201, Lake Worth, FL 33463.

Bonding Capacity per Single Project = $6,000,000.00 Bonding Aggregate = $20,000,000.00

LIABILITY INSURANCE - WE ARE INSURED THROUGH - AMERISURE FOR $1 MILLION PER OCCURRENCE / $2 MILLION AGGREGATE PLUS $5 MILLION ADDITIONAL UMBRELLA; PAUL ZICCARDI IS OUR AGENT WITH LASSITER-WARE AS THE AGENCY PH. # 407-628-3441, PO BOX 940159, MAITLAND, FL. 32794-0159.

G E N E R A L C O N T R A C T O R R E F E R E N C E S

V E N D O R R E F E R E N C E S

F I N A N C I A L R E F E R E N C E S

Banking: CNL Bank Banking Contact: Ben Lalikes Ph. # (407) 585-2181 Bank Address: 200 EAST NEW ENGLAND AVE. WINTER PARK, FL. 32789 FEDERAL ID # 59-3274034

MAIN GEOGRAPHICAL AREAS WE SERVE -SOUTHEAST PORTION OF THE UNITED STATES & MID-ATLANTIC REGIONS-

WE ARE LICENSED IN THE FOLLOWING STATES

FLORIDA – GEORGIA – ALABAMA – MISSISSIPPI – LOUISIANA – NORTH CAROLINA - SOUTH CAROLINA – VIRGINIA

PENSYLVANNIA – NEW JERSY – KENTUCKY T&T CONSTRUCTION PROVIDES SAFE, ON-TIME, QUALITY, COMPETATIVE “TURNKEY” SOLUTIONS FOR VERTICAL & HORIZONTAL CONCRETE WORK INCLUDING, TILT-WALL SYSTEMS, CAST-IN-PLACE, SLAB-ON-GRADE, POST TENSIONING SYSTEMS, CONCRETE PAVING SERVICES OF ALL TYPES THROUGHOUT THE SOUTHEAST & MID-ATLANTIC PORTION OF THE UNITED STATES FOR, BUT NOT NECESSARILY LIMITED TO, THE FOLLOWING TYPES OF CONSTRUCTION PROJECTS:

COMMERCIAL – EDUCATION – RETAIL – WAREHOUSE & DISTRIBUTION CENTERS – MANUFACTURING

WORSHIP – MILITARY – MULTI-FAMILY – HOSPITALITY – AUTO DEALERSHIPS HIGHER EDUCATION – JUDICIAL – HEALTHCARE/LIFE SCIENCES

T&T CONSTRUCTION ALSO PROVIDES TURNKEY MASONRY SERVICES THROUGHOUT THE SOUTHEAST

OTHER INFORMATION AVAILABLE UPON REQUEST

PLEASE CONTACT:

JB SACK – MANAGER OF BUSINESS DEVELOPMENT Office: 407-831-5506 X368 Fax Number: 407-831-5531Cell Number: 407-832-9218

Whiting – Turner Bob Minutoli - VP 407-370-4500 Clark Construction John Omran 813-636-4422 RR Simmons Randy Simmons 813-632-5553

Construction Materials LTD., Inc Kelly Easterling 800-239-3841 R&R Rebar Fabricators, Inc. Vic Hall 813-685-6717 Preferred Materials, Inc. Jean Kraycik 888-992-1400