GEF Policy reforms • Revision of focal area strategies • Results based management (RBM) • Streamlining of the GEF project cycle • Level playing field among GEF agencies • Resource Allocation Framework (RAF)

Upload: ellery

Post on 12-Jan-2016

51 views

Category:

Documents


2 download

DESCRIPTION

GEF Policy reforms. Revision of focal area strategies Results based management (RBM) Streamlining of the GEF project cycle Level playing field among GEF agencies Resource Allocation Framework (RAF). Revision of focal area strategies. Focus on priority issues Programmatic approach - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: GEF Policy reforms

GEF Policy reforms

• Revision of focal area strategies

• Results based management (RBM)

• Streamlining of the GEF project cycle

• Level playing field among GEF agencies

• Resource Allocation Framework (RAF)

Page 2: GEF Policy reforms

Revision of focal area strategies

• Focus on priority issues

• Programmatic approach

• Measurable results

• Integration across focal areas

• Consistency with the replenishment of GEF4

Page 3: GEF Policy reforms

FA strategies – revision process

• Advisory groups (TAGs and SAG) with external experts, STAP, Conventions

• Drafts and process papers posted on the GEF website

• Comments received from GEF partners and also web-posted

• Revised focal area strategies presented to Council in June ’07

Page 4: GEF Policy reforms

Revised focal area strategies

• Strategic objectives (long-term) with expected impacts

• Strategic programs for GEF-4 with expected outcomes

• Measurable indicators for impacts and outcomes

• Harmonized structure among focal areas

Page 5: GEF Policy reforms

Results based management (RBM)

• Shift from ‘approval culture’ to RBM

• Emphasis on cost effectiveness

• Indicator framework following OECD terminology, to be further developed

• Project log frames will support the RBM

• Transition in reporting (PIR) to RBM, may include GEF-3 projects.

Page 6: GEF Policy reforms

New GEF Project Cycle

• Concept notes (PIFs) and PPG release• Work Program inclusion based on PIFs• Approval of fully prepared projects

• Reduce project preparation to max 2 years• Streamline and simplify required project

documentation• Shift the effort to implementation

Page 7: GEF Policy reforms

Resource Allocation Framework

• Introduced in GEF-4 for BD and CC focal areas

• To cover all focal areas from GEF-5

• Review in 2008

Page 8: GEF Policy reforms

International Waters Focal Strategic Programs for GEF-4

(2007-2010)

Four Strategic Programs

Page 9: GEF Policy reforms

Strategic Program 1:

Restoring and sustaining coastal and marine fish stocks and associated biological diversity

Examples:•Benguela Current •Danube Basin

Page 10: GEF Policy reforms

Strategic Program 2

Reducing nutrient over-enrichment and oxygen depletion from land-based pollution of coastal waters in LMEs consistent with the GPA

Examples:• Danube Basin• Romania Agricultural Pollution

Control • Manila 3rd Sewerage Project

Page 11: GEF Policy reforms

Strategic Program 3

Balancing overuse and conflicting uses of water resources in transboundary surface and groundwater basins

Examples:• Nile Basin Initiative

• Lake Victoria (LVEMP)

• Amazon Basin Management

Page 12: GEF Policy reforms

Strategic Program 4

Reducing Persistent Toxic Substances and Adaptive Management of Waters with Melting Ice

Examples:• Melting Glaciers

– Himalaya/Ganges

• Pesticides in LMEs• Mercury in Goldmining

Page 13: GEF Policy reforms

As always - please do not hesitate to contact us, and we will do our best to support YOU!