Imagination at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes – Regional Sales Leader November, 2017 GE Proprietary Information—Class III (Confidential) Export Controlled—U.S. Government approval is required prior to export from the U.S., re-export from a third country, or release to a foreign naonal wherever located.

Upload: buituyen

Post on 12-Apr-2018

242 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

Imagination at work

GE POWERSteam Power SystemsNuclear Product line

Gabor Szenes – Regional Sales Leader November, 2017

GE Proprietary Information—Class III (Confidential) Export Controlled—U.S. Government approval is required prior to export from the U.S., re-export from a third country, or release to a foreign na�onal wherever located.

Page 2: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

LP turbine

Condensate extraction

pump

Condenser GeneratorMSR

LP & HP FW heaters

FW tank

HP/IP turbine

Circuit breaker

Reactor feed-water

pump

TURBINE GENERATOR PACKAGE

Step-up transformer

FEEDWATER PACKAGE

Nuclear Business GE SPS Offering - All major components in-house with Products & Projects capabilities

COOLING SYSTEM

Main circulating

water pump

ELECTRICAL PACKAGE (*)INTEGRATED SOLUTIONS FOR TURBINE ISLANDS

(*) With GE Grid Solutions

2

Page 3: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear BusinessGE SPS Projects - Integration ScopeTurbine-generator shaft-line

3

Page 4: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear BusinessGE SPS Projects - Integration ScopeMain pumps and heat exchangers

4

Page 5: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear BusinessGE SPS Projects - Integration ScopePiping

5

Page 6: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear Business GE SPS Products - Nuclear Steam TurbinesProduct portfolio: a platform approach to match all reactors & heat sinks

Reactors segmentation

Turbine configuration LP exhaust selection (e.g. 50 Hz)Typical Cooling Water design temperature

Very Large(@ 3500-4900 MWth)

EPR, APWR,ABWR, ESBWR, APR1400,

CAP1400

ARABELLE 1700 (half-speed)

Large(@ 2500-3500 MWth)

AP1000, ATMEA1,(A)CP(R)1000,

VVER1000, VVER1200

VVER 1300 (TOI) ARABELLE 1000 (half-speed)

Small & Medium(@ < 2500 MWth)

PHWR700, EC6, VVER600, FBRs, SMRs STN series (full-speed)

0 5 10 15 20 25 30 35

LP57

LP69

LP 75 CW in °C

3 LP57

3 LP69

3 LP75 CW temp. in °C

0 5 10 15 20 25 30 35

LP57

LP69

LP 75 CW temp. in °C

2 LP57

2 LP69

2 LP75CW temp. in °C

6

Page 7: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

GE SPS Global Market ApproachMulti-reactor strategy

EPR ESBWR / ABWR

VVER AP1000

Use of pre-engineered platforms covering most of the global market

Page 8: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear BusinessGE SPS in Nuclear – Huge Experience

World n°1 supplier of nuclear steam turbine generators >50% of the world NPPs have a nuclear STG using GE technology (*)

(*) incl. Alstom’s heritage

8

Page 9: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Paks 5+6 (VVER1200)

Jaitapur 1+2 (EPR)Gorakhpur 1+2 (PHWR700)Kaiga 5+6 (PHWR700)Chutka 1+2 (PHWR700)

Wylfa 1+2 / Oldbury 1+2 (ABWR)

Fermi 3 (ESBWR)North Anna 3 (ESBWR)Idaho Nal Lab (NuScale)

South Africa New Build Program

Saudi Arabia NPP program

Ninh Thuan 1 (VVER1200)

HYH 5+6 (ACPR1000)Cangzhou 1+2 (AP1000)Huizhou1+2 (AP1000) Taishan 3+4 (EPR)

Laguna Verde 3+4

Poland

• Sales & tendering phase• Business development phase• Potential / longer term

Opportunities for GE SPS: а good pipeline of opportunities, a multi-reactors marketapproach is needed

Shin Ulchin 3+4Yeongdeok 1+2 (APR1400)

El Dabaa 1-4 (VVER1200)

Nuclear New Build Market 2017-24

9

Jordan 1-2 VVER1000

Temelin 1+2

Page 10: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

Nuclear Business GE SPS - Nuclear Projects Under Execution

Russia

UK

France

China

Baltic

Power: 2 x 1200 MWReactor: 2 x VVER1200Scope: SLP (E. & P.)Client: AAEMStatus: turbine work on hold, generator for U1 complete

Hinkley Point C

Power: 2 x 1750 MWReactor: 2 x EPRScope: TI (E.P.C.)Client: NNBStatus: Contract in force

Taishan

Power: 2 x 1750 MWReactor: 2 x EPRScope: TI (E. & P.)Client: TNPJVCStatus: erection

+ 6 on-going STG units with DongFang Electric

Flamanville 3

Power: 1 x 1750 MWReactor: 1 x EPRScope: TI (E.P.C.)Client: EDFStatus: turbine put under long term preservation

India

Kakrapar & Rawatbhata

Power: 4 x 710 MWReactor: 4 x PHWR700Scope: Turbines (E. & P.)Client: NPCILStatus: manufacturing

South Africa

Koeberg

Power: 2 x 950 MWReactor: 2 x CP1Scope: Eng. uprate studyClient: AREVA, for ESKOMStatus: on-going 10

Finland

Hanhikivi NPP 1

Power: 1 x 1265 MWReactor: 1 x VVER 1200 Scope: TI (EP)Client: RAOS Project OyStatus: Contract in force,

Akkuyu 1-4

Power: 4 x 1255 MWReactor: 4 x VVER1300 (TOI)Scope: SLP (E. & P.)Client: AAEMStatus: Contract in force

Turkey

Rosatom projects

Page 11: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

ProjectIntegration Leading

RESTTurbine

REHXExchanger

REPBPumps

RETGGenerator

GE: HIP Casing, rotors & blading, diaphragms, inner & outer LP casings, bearing, oil pumps.

AAEM auxiliaries., anchoring embedded parts

Exchangers

Generator

Scope of supply for Rosatom project – Split GE-JV AAEM

AAEM; Auxiliaries, ., anchoring embedded parts

GE; Winding bars, segments, casing, press plates, cooler, terminal box, end shields, instrumentation, rotor, exciter, bearings.

Turbine

GE; Continuous Tube Cleaning System, Debris filter, prefabricated HIP MSR piping, turbine bypass valves, desuperheating valves.

AAEM; Bulk piping, valves, table top spring boxes.

Project

AAEM; Main & startup / shutdown feedwater, condensate extraction,

drain recovery.

GE; Condenser Vacuum Pumps.

AAEM; Condenser, Moisture Separator Reheater, LP & HP

Heaters, Deaerator.

GE; Closed Cooling Water.

Pumps

HAK KOM APS AAEM - September 14th 2016

Page 12: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed. 12

GE Company Proprietary & Confidential GE © 2017 – All Rights Reserved

Rosatom‘s public procurement procedureExperience, take-aways to share

GE is working with Rosatom since 2012 and participate in different public procurement procedure covering supply and servicing projects.

The aim of the procurement procedure to ensure the transparency, it leads to• Demanding tendering and translation efforts • Long selection procedure• Qualification requirement are set to ensure widest selection of potential bidders• The main driver of the selection is the competitive pricing

GE has very significant footprint in Hungary which include manufacturing and logistic capacities.We have launched a Vendor qualification project to prepare our potential supplier to the requirements.GE will welcome cost competitive, qualified suppliers from the CEE region for all its NPP project.GE is committed to adjust its sourcing policy for any new tender to the project specific procurement framework agreed between the EPC contractor and the End User.

Page 13: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed. 13

GE Company Proprietary & Confidential GE © 2017 – All Rights Reserved

Project execution with RosatomExperience, take-aways to share

One shall recognize that the NPP projects are extremely complex with many stakeholders and we see that Rosatom is one of the most mature vendor, which offers very competitive value/price ratio with extremely diverse product portfolio and back-end solution.

GE is a proud supplier of the Turbine Island Equipment and Systems. Our experience to share is:• Rosatom has a very strong in-house engineering capacity• Rosatom is a reliable Customer, we have not observed delays in any their

payment obligations.

At the same time projects might have different contractual setup/financing/ permitting/engineering approach.

Joint efforts are expected to achieve sufficient level of standardization of the design and technical specification.

Page 14: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed.

GE’s SUPPLIER PRE-QUALIFICATION

14

Nuclear Safety Culture (ready or willing)

Must be Qualified• Safety• Quality• Commercially• Past experience• Ability to design per the codes• Product meets necessary qualifications/certifications

GE Company Proprietary & Confidential GE © 2017 – All Rights Reserved

Page 15: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class

See tutorial regarding confidentiality disclosures. Delete if not needed. 15

YOUalso adopt

GE Values

• Integrity• Regulatory Excellence• Improper Payments• Supplier Relationship• International Trade Compliance• Anti-Money Laundering• Working with Government• Competition Law• Fair Employment Practices• EHS• Security• Intellectual Property• Cyber Security & Privacy• Controllership• Conflicts of Interest• Insider Trading

Page 16: GE POWER Steam Power Systems Nuclear Product … at work GE POWER Steam Power Systems Nuclear Product line Gabor Szenes –Regional Sales Leader November, 2017 GE Proprietary Information—Class