gdańsk container terminal co
DESCRIPTION
Gdańsk Container Terminal Co. Established in 1998. Our motto. GTK is…. Major advantages:. customer’s approach, professional and comprehensive services including terminal, depot and repair services. high quality standards . good connections to hinterland - PowerPoint PPT PresentationTRANSCRIPT
Gdańsk Container Terminal Co
Established in 1998
Our motto
GTK is…
Major advantages: • customer’s approach,• professional and comprehensive services
including terminal, depot and repair services.• high quality standards.• good connections to hinterland • excellent transit connection to Russia, Belarus,
Ukraine, Slovakia and Czech Republic
Location:
Port of Gdańsk
Szczecińskie Quay
Technical facilities:
• quay length 367 m• ship length up to 205 m• max. draft 9.8 m• open stores 67 417 m2
• reefer plugs – 95 units• ships operated in lo-lo systems• full support for railway wagons.
Technical facilities:
• Ship-to-shore gantry crane- 40 / 60 t• Shore cranes- 40 t• Gantry cranes- 32 / 40 t• Straddle carrier- 40 t• Reach-stackers- 10 t• Mobile harbor crane- 100 t• 95 stations for refrigerated containers
Range of services: • loading / unloading,• all kind of container handling services,• stuffing, stripping, sampling, tallying, shifting ect.• depot services (storage, repairs, washing, cleaning),• goods storage on the yard,• goods storage in the warehouse,• consulting services• assistance in contacts with administration Autorities
and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection)
GTK Co. Strengths:
• strong bussines relations with our customers,
• experienced personnel with deep knowledge of the market and the core of business,
• wide range of services (container terminal, containers’ repairs, container depot, containers’ stuffing & stripping services),
• friendly IT software - SOTeK,
• possibility of an automatic access and transfer the system data based on EDIFACT standard,
• good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal.
0
Railway Companies providing services to GTK Co.:
• PKP Cargo
• Spedcont
• Prokont
• Polzug
• Cargosped
• PCC Intermodal
PORT OF GDAŃSK
CONTAINER FEEDER SERVICES
UNIFEEDER (calling twice a week ):Gdynia- Gdańsk (GTK)- Rotterdam Gdynia- Gdańsk (GTK)- Szczecin -Bremerhaven- Hamburg CMA - CGM (calling once a week ):Hamburg- Gdańsk (GTK)- Kaliningrad - Tallin- Hamburg
TEAM LINES (calling once a week ): Hamburg-Bremerhaven-Szczecin-Gdansk (GTK) - Bremerhaven
ROTTERDAM
BREMERHAVEN
HAMBURG
Tallin
Kaliningrad
Szczecin
Annual handling turnover from 2002 to 2011 (in TEUs)
18776 19855
41184
6907577473
91127
77889 74809
62309
43057
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
TEU
Major shipping lines handled at GTK:
HanjinEvergreenHapag LloydAPLCMA-CGMCoscoUASCMOLHamburg SÜdZIMCSAVChina Shipping
Yang MingEUCONNYK LineK-LineNORASIAANLHyundaiOOCLDELTADELMASDelphis
Business Activity:
• Ship handling: 24 hours a day, 7 days a week,
• Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday.
Contact:Gdańsk Container Terminal Co.
Headquarter: Na Zaspę 3, 80-546 Gdańsk, PolandPort Office:– ul. M. Chodackiego; Szczecińskie Quay
NIP: 583-25-55-159KRS: 0000108214; Register Court in GdańskInitial capital: PLN 500.140,00
Tel.: +(48) 58 737 72 73 +(48) 58 737 72 65Fax: +(48) 58 737 72 75E-mail: [email protected]
Office working hours:8.00 a.m. to 4.00 p.m. from Monday to Friday