gbf-07 submission booklet [noc-bp-small projects]
TRANSCRIPT
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 1 of 15
APPLICABILITY
This booklet comprises the checklists for various elements of the green building regulations and is meant to be used
by the stakeholders concerned for providing accurate information on the project. It comprises the following parts
Part-1 Project Summary
Part-2 Checklist for Green Building Submission
Part-3 Green Building Compliance Statement
Part-4 Envelope Commitment Sheet
Part-5 AC System Compliance Sheet
Disclaimer
This checklist has been developed for project teams to use when compiling the submission documentation for EHS
Review / Assessment
A completed version of this checklist must be included within the Main Submission.
The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be
held accountable for incorrect or incomplete submissions sent for assessment.
SUBMISSION BOOKLET
Regulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m2)
Procedure : EHS-GBP-7 Procedure for NOC-BP Green Building Submission (Prescriptive
compliance Areas < 500 m2 )
Phase : NOC-BP
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 2 of 15
PART-1
PROJECT SUMMARY
Project Name: Click here to enter text. GB Consultant: Click here to enter text.
Plot No: Click here to enter text. Commissioning: Click here to enter text.
specialist
Project: Click here to enter text. Engineer of: Click here to enter text.
description record
Project Contact Name: Click here to enter text.
Contact E-Mail: Click here to enter text.
I, the Project Contact, hereby confirm that:
a. I have reviewed the submission checklist and the contents therein and ascertained that they align with the
main submission package provided to EHS
b. I understand that EHS reserve the right to not assess a submission that is inconsistent with the Regulations,
submission procedures and the guidelines
c. I take complete responsibility for the accuracy and completeness of the submission.
Name: Click here to enter text.
Signature: Date: Click here to enter text.
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 3 of 15
PART- 2
CHECKLIST FOR GREEN BUILDING SUBMISSION [NOC-BP]
Project Name: Click here to enter text.
S.NO DOCUMENT DETAILS ATTACHED
(Yes / No)
REMARKS
1 Proof of Payment of Green Building Review Fee
2 A detailed Green Building Project plan with detailed strategy for complying with
the credits targeted for the project.
3 Supporting documents for “ Category A-General Requirements” as highlighted
under the section “Evidence Required at Design Stage” of Regulation GB-7
4 Supporting documents for “ Category B-Envelope & Energy” as highlighted under
the section “Evidence Required at Design Stage of Regulation GB 7
5 Supporting documents for “Category C-Lighting” as highlighted under the section
“Evidence Required at Design Stage of Regulation GB 7
6 Supporting documents for “Category D- Control Systems” as highlighted under
the section “Evidence Required at Design Stage of Regulation GB 7
7 Supporting documents for “Category E- Water” as highlighted under the section
“Evidence Required at Design Stage of Regulation GB 7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 4 of 15
S.NO DOCUMENT DETAILS ATTACHED
(Yes / No)
REMARKS
8
Supporting documents for “Category F- Environment & Internal Air Quality” as
highlighted under the section “Evidence Required at Design Stage of Regulation
GB 7
9 Supporting documents for “Category G- Sustainable Site” as highlighted under the
section “Evidence Required at Design Stage of Regulation GB 7
10 Supporting documents for “Category H- Operational Sustainability” as highlighted
under the section “Evidence Required at Design Stage of Regulation GB 7
11 Justification for Non Compliance to any specific credit (if any)
Notes
1) The above check-list should be filled up in a professional manner devoid of inconsistencies
2) It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the
submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted.
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 5 of 15
PART- 3
GREEN BUILDING COMPLIANCE STATEMENT [NOC-BP]
Project Name: Click here to enter text.
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
A: General Requirements
1
Integrated Design
Approach for
achieving energy
savings
M AS HIGHLIGHTED IN SECTION A1 OF THE
REGULATION GB-7
2
Post Contract Green
Briefing.
Sustainability Kick-
off
M AS HIGHLIGHTED IN SECTION A2 OF THE
REGULATION GB-7
B: Envelope and Energy
1
Compliance with
Thermal Insulation
System and Best
Practices Energy
conservation
methods
M AS HIGHLIGHTED IN SECTION B1 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 6 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
2
LIMITING /
REVERSING
THERMAL
BRIDGES
M AS HIGHLIGHTED IN SECTION B2 OF THE
REGULATION GB-7
3
Envelope Tightness
(Prescriptive based)
THERMAL
IMAGING
TECHNIQUE
M AS HIGHLIGHTED IN SECTION B3 OF THE
REGULATION GB-7
4 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK
5 Efficient SIZING of
the HVAC systems M
AS HIGHLIGHTED IN SECTION B5 OF THE
REGULATION GB-7
6 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK
7
Selection of A/C unit
with HIGH Energy
Efficiency Ratio
(EER)
M AS HIGHLIGHTED IN SECTION B7 OF THE
REGULATION GB-7
8 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK
9
INTERIOR
LIGHTING
LEVELS
M AS HIGHLIGHTED IN SECTION B9 OF THE
REGULATION GB-7
10
EXTERIOR
LIGHTING
LEVELS
M AS HIGHLIGHTED IN SECTION B10 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 7 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
11
Use of Renewable
sources of energy for
domestic heating
V AS HIGHLIGHTED IN SECTION B11 OF THE
REGULATION GB-7
12
Use of Renewable
sources of energy for
power
V AS HIGHLIGHTED IN SECTION B12 OF THE
REGULATION GB-7
13 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK
14 COMMISSIONING M AS HIGHLIGHTED IN SECTION B14 OF THE
REGULATION GB-7
15
FOR AIR-
CONDITIONED
SPACES
MORE THAN 2000
SQ.M NOT APPLICABLE
BUILDING
ENERGY
SIMULATION
ENERGY
MODELING
16
FOR AIR-
CONDITIONED
SPACES
MORE THAN 2000
SQ.M
NOT APPLICABLE
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 8 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
INDEPENDENT
COMMISSIONING
AGENT
C: Lighting
1
GENERAL
V AS HIGHLIGHTED IN SECTION C1 OF THE
REGULATION GB-7 Use of Solar Day
lighting
Technologies
2
OFFICE PORTION
M AS HIGHLIGHTED IN SECTION C2 OF THE
REGULATION GB-7
Usage of energy
saving high
performance lamps
3 Usage of Electronic
Ballast M
AS HIGHLIGHTED IN SECTION C3 OF THE
REGULATION GB-7
4
WAREHOUSE
PORTION
M AS HIGHLIGHTED IN SECTION C1 OF THE
REGULATION GB-7 Usage of energy
saving high
performance lamps
5 Usage of Electronic
Ballast M
AS HIGHLIGHTED IN SECTION C1 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 9 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
D: Control Systems
1
Use of programmable
thermostats for
HVAC system
M AS HIGHLIGHTED IN SECTION D1 OF THE
REGULATION GB-7
2 Control of External
lights M
AS HIGHLIGHTED IN SECTION D2 OF THE
REGULATION GB-7
3 Interlock of Toilet /
Bathroom fans M
AS HIGHLIGHTED IN SECTION D3 OF THE
REGULATION GB-7
4
Use of Occupancy
Sensor / Motion
Sensor for internal
lighting devices
M AS HIGHLIGHTED IN SECTION D4 OF THE
REGULATION GB-7
5
AUTOMATIC
DAYLIGHT
DIMMING
CONTROLS
(Warehouse areas >
than 2000 m2)
M NOT APPLICABLE
E: Water
1
Usage of Sewage
Treatment Plant
(STP) for treating
Grey Water and
reuse of treated water
in flushing toilets and
other usage not
involving human
direct contact.
V NOT APPLICABLE
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 10 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
2
Performance
Requirements for
Sanitary fittings
(Low Flow / Low
Flush Fittings)
M AS HIGHLIGHTED IN SECTION E2 OF THE
REGULATION GB-7
3
Water efficient
landscaping and
irrigation
systemsDrip
irrigation methods
for vegetation
according to climate
and seasonal
conditions.
M AS HIGHLIGHTED IN SECTION E3 OF THE
REGULATION GB-7
4
Water efficient
landscaping and
irrigation systems
Eliminate potable
water use or
irrigation
V
AS HIGHLIGHTED IN SECTION E4 OF THE
REGULATION GB-7
F: Environment and Internal Air Quality
1
Building internal
ventilation and
Minimum Indoor Air
Quality (IAQ)
M AS HIGHLIGHTED IN SECTION F1 OF THE
REGULATION GB-7
2
Control of
Environmental
Tobacco Smoke
M AS HIGHLIGHTED IN SECTION F2 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 11 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
3
Low Emitting Paints,
Coatings, Adhesives
and Sealants
M
AS HIGHLIGHTED IN SECTION F3 OF THE
REGULATION GB-7
4
Usage of Ozone
friendly materials in
Air Conditioning
equipment, thermal
insulation, foam &
firefighting
equipment.
M
AS HIGHLIGHTED IN SECTION F4 OF THE
REGULATION GB-7
G: Sustainable Site & Management
1 Sustainable Site and
Management M
AS HIGHLIGHTED IN SECTION G1 OF THE
REGULATION GB-7
2 Heat Island Effect
Non-Roof M
AS HIGHLIGHTED IN SECTION G2 OF THE
REGULATION GB-7.
3
Heat Island Effect
Roof (Use of light
and heat reflective
colours on roofs)
M AS HIGHLIGHTED IN SECTION G3 OF THE
REGULATION GB-7
H: Operational Sustainability
1
Recycling facility -
Storage and
collection of
Recyclables
M AS HIGHLIGHTED IN SECTION H1 OF THE
REGULATION GB-7
2 Energy Efficient Eqt.
(White Goods) V
AS HIGHLIGHTED IN SECTION GH2 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 12 of 15
ITEM DESCRIPTION
TY
PE
COMPLIANCE REQUIREMENT COMPLIED
Yes / No
LIST OF SUPPORTING
DOCUMENTS ATTACHED.
3 Building user Guide M AS HIGHLIGHTED IN SECTION H3 OF THE
REGULATION GB-7
4 Facility / Building
Services Tuning V
AS HIGHLIGHTED IN SECTION H4 OF THE
REGULATION GB-7
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 13 of 15
PART- 4
ENVELOPE COMMITMENT SHEET [NOC-BP]
Project Name: Click here to enter text.
BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA
(DESIGN)
Non Conditioned Spaces
External Walls U – value (Max)
0.08 Btu/hr-ft2-⁰f
0.45 W/m2-⁰c
Non Conditioned Spaces
Roof U – value (Max)
0.074 Btu/hr-ft2-⁰f
0.42 W/m2-⁰c
Air Conditioned Spaces
External Walls U – value (Max)
0.055 Btu/hr-ft2-⁰f
0.3123 W/m2-⁰c
Roof U – value (Max) 0.045 Btu/hr-ft2-⁰f
0.2555W/m2-⁰c
Floors U – value (Max) 0.1 Btu/hr-ft2-⁰f
0.57 W/m2-⁰c
Fenestration
U – value (Max)
0.30 Btu/hr-ft2-⁰f
1.7 W/m2-⁰c
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 14 of 15
BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA
(DESIGN)
Shading Coefficient
(Max)
SHGC (Max)
0.29
0.252
VLT (Min) 25 %
Glass
(for skylights architecture)
U – value (Max) 0.335 Btu/hr-ft2-⁰f
1.9 W/m2-⁰c
Shading Coefficient
(Max)
SHGC (Max)
0.20
0.174
VLT (Min) 40 %
Note
1. The envelope values mentioned above should be supported by appropriate calculations
2. It is important to adhere to these values by ensuring proper controls during the construction phase of the project
EHS-GBP-05 GBF-07
Revision: 00 July 2015 Page 15 of 15
PART- 5
AC SYSTEM COMPLIANCE SHEET [NOC-BP]
Project Name: Click here to enter text.
S.No Space / Area being
Air-conditioned Design calculation Proposed System
EER
as per EHS
Regulation
EER
Considered in
Design
Cooling load
(TR)
Air
Quantity
Cooling load
(TR)
Air
Quantity
1
2
3
4
5
6
7
Notes
1. The table should be followed for demonstrating compliance to
a. B5 – Efficient Sizing of HVAC systems
b. B7 - Selection of A/C unit with Energy Efficiency Ratio (EER)
2. This table is applicable to all conditioned areas including cases where a single AC unit is catering to multiple spaces and cases
where a single space is being catered by multiple units
3. It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the
submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted