EHS-GBP-05 GBF-07 Revision: 00 July 2015 Page 1 of 15 APPLICABILITY This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts Part-1 Project Summary Part-2 Checklist for Green Building Submission Part-3 Green Building Compliance Statement Part-4 Envelope Commitment Sheet Part-5 AC System Compliance Sheet Disclaimer This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment A completed version of this checklist must be included within the Main Submission. The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment. SUBMISSION BOOKLET Regulation : GB 7. Green Building Regulations Prescriptive Compliance sheet (Areas < 500 m 2 ) Procedure : EHS-GBP-7 Procedure for NOC-BP Green Building Submission (Prescriptive compliance Areas < 500 m 2 ) Phase : NOC-BP

Upload: others

Post on 12-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 1 of 15

APPLICABILITY

This booklet comprises the checklists for various elements of the green building regulations and is meant to be used

by the stakeholders concerned for providing accurate information on the project. It comprises the following parts

Part-1 Project Summary

Part-2 Checklist for Green Building Submission

Part-3 Green Building Compliance Statement

Part-4 Envelope Commitment Sheet

Part-5 AC System Compliance Sheet

Disclaimer

This checklist has been developed for project teams to use when compiling the submission documentation for EHS

Review / Assessment

A completed version of this checklist must be included within the Main Submission.

The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be

held accountable for incorrect or incomplete submissions sent for assessment.

SUBMISSION BOOKLET

Regulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m2)

Procedure : EHS-GBP-7 Procedure for NOC-BP Green Building Submission (Prescriptive

compliance Areas < 500 m2 )

Phase : NOC-BP

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 2 of 15

PART-1

PROJECT SUMMARY

Project Name: Click here to enter text. GB Consultant: Click here to enter text.

Plot No: Click here to enter text. Commissioning: Click here to enter text.

specialist

Project: Click here to enter text. Engineer of: Click here to enter text.

description record

Project Contact Name: Click here to enter text.

Contact E-Mail: Click here to enter text.

I, the Project Contact, hereby confirm that:

a. I have reviewed the submission checklist and the contents therein and ascertained that they align with the

main submission package provided to EHS

b. I understand that EHS reserve the right to not assess a submission that is inconsistent with the Regulations,

submission procedures and the guidelines

c. I take complete responsibility for the accuracy and completeness of the submission.

Name: Click here to enter text.

Signature: Date: Click here to enter text.

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 3 of 15

PART- 2

CHECKLIST FOR GREEN BUILDING SUBMISSION [NOC-BP]

Project Name: Click here to enter text.

S.NO DOCUMENT DETAILS ATTACHED

(Yes / No)

REMARKS

1 Proof of Payment of Green Building Review Fee

2 A detailed Green Building Project plan with detailed strategy for complying with

the credits targeted for the project.

3 Supporting documents for “ Category A-General Requirements” as highlighted

under the section “Evidence Required at Design Stage” of Regulation GB-7

4 Supporting documents for “ Category B-Envelope & Energy” as highlighted under

the section “Evidence Required at Design Stage of Regulation GB 7

5 Supporting documents for “Category C-Lighting” as highlighted under the section

“Evidence Required at Design Stage of Regulation GB 7

6 Supporting documents for “Category D- Control Systems” as highlighted under

the section “Evidence Required at Design Stage of Regulation GB 7

7 Supporting documents for “Category E- Water” as highlighted under the section

“Evidence Required at Design Stage of Regulation GB 7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 4 of 15

S.NO DOCUMENT DETAILS ATTACHED

(Yes / No)

REMARKS

8

Supporting documents for “Category F- Environment & Internal Air Quality” as

highlighted under the section “Evidence Required at Design Stage of Regulation

GB 7

9 Supporting documents for “Category G- Sustainable Site” as highlighted under the

section “Evidence Required at Design Stage of Regulation GB 7

10 Supporting documents for “Category H- Operational Sustainability” as highlighted

under the section “Evidence Required at Design Stage of Regulation GB 7

11 Justification for Non Compliance to any specific credit (if any)

Notes

1) The above check-list should be filled up in a professional manner devoid of inconsistencies

2) It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the

submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted.

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 5 of 15

PART- 3

GREEN BUILDING COMPLIANCE STATEMENT [NOC-BP]

Project Name: Click here to enter text.

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

A: General Requirements

1

Integrated Design

Approach for

achieving energy

savings

M AS HIGHLIGHTED IN SECTION A1 OF THE

REGULATION GB-7

2

Post Contract Green

Briefing.

Sustainability Kick-

off

M AS HIGHLIGHTED IN SECTION A2 OF THE

REGULATION GB-7

B: Envelope and Energy

1

Compliance with

Thermal Insulation

System and Best

Practices Energy

conservation

methods

M AS HIGHLIGHTED IN SECTION B1 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 6 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

2

LIMITING /

REVERSING

THERMAL

BRIDGES

M AS HIGHLIGHTED IN SECTION B2 OF THE

REGULATION GB-7

3

Envelope Tightness

(Prescriptive based)

THERMAL

IMAGING

TECHNIQUE

M AS HIGHLIGHTED IN SECTION B3 OF THE

REGULATION GB-7

4 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

5 Efficient SIZING of

the HVAC systems M

AS HIGHLIGHTED IN SECTION B5 OF THE

REGULATION GB-7

6 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

7

Selection of A/C unit

with HIGH Energy

Efficiency Ratio

(EER)

M AS HIGHLIGHTED IN SECTION B7 OF THE

REGULATION GB-7

8 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

9

INTERIOR

LIGHTING

LEVELS

M AS HIGHLIGHTED IN SECTION B9 OF THE

REGULATION GB-7

10

EXTERIOR

LIGHTING

LEVELS

M AS HIGHLIGHTED IN SECTION B10 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 7 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

11

Use of Renewable

sources of energy for

domestic heating

V AS HIGHLIGHTED IN SECTION B11 OF THE

REGULATION GB-7

12

Use of Renewable

sources of energy for

power

V AS HIGHLIGHTED IN SECTION B12 OF THE

REGULATION GB-7

13 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

14 COMMISSIONING M AS HIGHLIGHTED IN SECTION B14 OF THE

REGULATION GB-7

15

FOR AIR-

CONDITIONED

SPACES

MORE THAN 2000

SQ.M NOT APPLICABLE

BUILDING

ENERGY

SIMULATION

ENERGY

MODELING

16

FOR AIR-

CONDITIONED

SPACES

MORE THAN 2000

SQ.M

NOT APPLICABLE

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 8 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

INDEPENDENT

COMMISSIONING

AGENT

C: Lighting

1

GENERAL

V AS HIGHLIGHTED IN SECTION C1 OF THE

REGULATION GB-7 Use of Solar Day

lighting

Technologies

2

OFFICE PORTION

M AS HIGHLIGHTED IN SECTION C2 OF THE

REGULATION GB-7

Usage of energy

saving high

performance lamps

3 Usage of Electronic

Ballast M

AS HIGHLIGHTED IN SECTION C3 OF THE

REGULATION GB-7

4

WAREHOUSE

PORTION

M AS HIGHLIGHTED IN SECTION C1 OF THE

REGULATION GB-7 Usage of energy

saving high

performance lamps

5 Usage of Electronic

Ballast M

AS HIGHLIGHTED IN SECTION C1 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 9 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

D: Control Systems

1

Use of programmable

thermostats for

HVAC system

M AS HIGHLIGHTED IN SECTION D1 OF THE

REGULATION GB-7

2 Control of External

lights M

AS HIGHLIGHTED IN SECTION D2 OF THE

REGULATION GB-7

3 Interlock of Toilet /

Bathroom fans M

AS HIGHLIGHTED IN SECTION D3 OF THE

REGULATION GB-7

4

Use of Occupancy

Sensor / Motion

Sensor for internal

lighting devices

M AS HIGHLIGHTED IN SECTION D4 OF THE

REGULATION GB-7

5

AUTOMATIC

DAYLIGHT

DIMMING

CONTROLS

(Warehouse areas >

than 2000 m2)

M NOT APPLICABLE

E: Water

1

Usage of Sewage

Treatment Plant

(STP) for treating

Grey Water and

reuse of treated water

in flushing toilets and

other usage not

involving human

direct contact.

V NOT APPLICABLE

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 10 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

2

Performance

Requirements for

Sanitary fittings

(Low Flow / Low

Flush Fittings)

M AS HIGHLIGHTED IN SECTION E2 OF THE

REGULATION GB-7

3

Water efficient

landscaping and

irrigation

systemsDrip

irrigation methods

for vegetation

according to climate

and seasonal

conditions.

M AS HIGHLIGHTED IN SECTION E3 OF THE

REGULATION GB-7

4

Water efficient

landscaping and

irrigation systems

Eliminate potable

water use or

irrigation

V

AS HIGHLIGHTED IN SECTION E4 OF THE

REGULATION GB-7

F: Environment and Internal Air Quality

1

Building internal

ventilation and

Minimum Indoor Air

Quality (IAQ)

M AS HIGHLIGHTED IN SECTION F1 OF THE

REGULATION GB-7

2

Control of

Environmental

Tobacco Smoke

M AS HIGHLIGHTED IN SECTION F2 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 11 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

3

Low Emitting Paints,

Coatings, Adhesives

and Sealants

M

AS HIGHLIGHTED IN SECTION F3 OF THE

REGULATION GB-7

4

Usage of Ozone

friendly materials in

Air Conditioning

equipment, thermal

insulation, foam &

firefighting

equipment.

M

AS HIGHLIGHTED IN SECTION F4 OF THE

REGULATION GB-7

G: Sustainable Site & Management

1 Sustainable Site and

Management M

AS HIGHLIGHTED IN SECTION G1 OF THE

REGULATION GB-7

2 Heat Island Effect

Non-Roof M

AS HIGHLIGHTED IN SECTION G2 OF THE

REGULATION GB-7.

3

Heat Island Effect

Roof (Use of light

and heat reflective

colours on roofs)

M AS HIGHLIGHTED IN SECTION G3 OF THE

REGULATION GB-7

H: Operational Sustainability

1

Recycling facility -

Storage and

collection of

Recyclables

M AS HIGHLIGHTED IN SECTION H1 OF THE

REGULATION GB-7

2 Energy Efficient Eqt.

(White Goods) V

AS HIGHLIGHTED IN SECTION GH2 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 12 of 15

ITEM DESCRIPTION

TY

PE

COMPLIANCE REQUIREMENT COMPLIED

Yes / No

LIST OF SUPPORTING

DOCUMENTS ATTACHED.

3 Building user Guide M AS HIGHLIGHTED IN SECTION H3 OF THE

REGULATION GB-7

4 Facility / Building

Services Tuning V

AS HIGHLIGHTED IN SECTION H4 OF THE

REGULATION GB-7

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 13 of 15

PART- 4

ENVELOPE COMMITMENT SHEET [NOC-BP]

Project Name: Click here to enter text.

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA

(DESIGN)

Non Conditioned Spaces

External Walls U – value (Max)

0.08 Btu/hr-ft2-⁰f

0.45 W/m2-⁰c

Non Conditioned Spaces

Roof U – value (Max)

0.074 Btu/hr-ft2-⁰f

0.42 W/m2-⁰c

Air Conditioned Spaces

External Walls U – value (Max)

0.055 Btu/hr-ft2-⁰f

0.3123 W/m2-⁰c

Roof U – value (Max) 0.045 Btu/hr-ft2-⁰f

0.2555W/m2-⁰c

Floors U – value (Max) 0.1 Btu/hr-ft2-⁰f

0.57 W/m2-⁰c

Fenestration

U – value (Max)

0.30 Btu/hr-ft2-⁰f

1.7 W/m2-⁰c

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 14 of 15

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA

(DESIGN)

Shading Coefficient

(Max)

SHGC (Max)

0.29

0.252

VLT (Min) 25 %

Glass

(for skylights architecture)

U – value (Max) 0.335 Btu/hr-ft2-⁰f

1.9 W/m2-⁰c

Shading Coefficient

(Max)

SHGC (Max)

0.20

0.174

VLT (Min) 40 %

Note

1. The envelope values mentioned above should be supported by appropriate calculations

2. It is important to adhere to these values by ensuring proper controls during the construction phase of the project

EHS-GBP-05 GBF-07

Revision: 00 July 2015 Page 15 of 15

PART- 5

AC SYSTEM COMPLIANCE SHEET [NOC-BP]

Project Name: Click here to enter text.

S.No Space / Area being

Air-conditioned Design calculation Proposed System

EER

as per EHS

Regulation

EER

Considered in

Design

Cooling load

(TR)

Air

Quantity

Cooling load

(TR)

Air

Quantity

1

2

3

4

5

6

7

Notes

1. The table should be followed for demonstrating compliance to

a. B5 – Efficient Sizing of HVAC systems

b. B7 - Selection of A/C unit with Energy Efficiency Ratio (EER)

2. This table is applicable to all conditioned areas including cases where a single AC unit is catering to multiple spaces and cases

where a single space is being catered by multiple units

3. It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the

submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted