gasification technology conference “ · power plant area (6) boiler area (7) steam turbine area...
TRANSCRIPT
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 1/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
“ GASIFICATION TECHNOLOGY “ GASIFICATION TECHNOLOGY CONFERENCE “CONFERENCE “
San Francisco (USA) San Francisco (USA) –– OctoberOctober, 2007, 2007
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 2/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
IGCC PLANT IGCC PLANT -- Falconara M.maFalconara M.ma“PERFORMANCE UPDATE AND FUTURE ENHANCEMENTS”“PERFORMANCE UPDATE AND FUTURE ENHANCEMENTS”
PAOLO CICCARELLIPAOLO CICCARELLI STEFANO BERTOLINISTEFANO BERTOLINI MAURO BEDETTIMAURO BEDETTIDirector of OperationsDirector of Operations Process Superintendent Process Superintendent Environmental Superintendent Environmental Superintendent
& T& Tech. Develop. Specialist ech. Develop. Specialist
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 3/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
IGCC PLANT LAYOUTIGCC PLANT LAYOUT
OUTFALL SEA WATER
INTAKE
1
2
GASIFICATIONAREA
GASIFICATIONAREA (1) GASIFICATION AREA
(2) ABSORPTION AREA
3
4
5
AUXILIARYSYSTEMS
TO GASIFICATION
AUXILIARYSYSTEMS
TO GASIFICATION
(3) SULPHUR RECOVERY AREA
(4) GREY WATER TREATMENT AREA
(5) AIR SEPARATION UNIT AREA
6
8
7
9
10
11
COMBINED CYCLEPOWER PLANT AREACOMBINED CYCLE
POWER PLANT AREA
(6) BOILER AREA
(7) STEAM TURBINE AREA
(8) GAS TURBINE AREA
(9) ANNEX BUILDING AREA
(10) SEA WATER PUMPHOUSE AREA
(11) SEA WATER INTAKE AREA
132 KV SUBSTATION
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 4/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
MILESTONES OF THE PROJECTMILESTONES OF THE PROJECT
Jan, 1997 Jan, 1997 CONSTRUCTION STARTCONSTRUCTION START--UPUP( Project Financing ~600.000.000€600.000.000€ )
Apr, 2001Apr, 2001 ACCEPTANCE TEST (PAC)ACCEPTANCE TEST (PAC)
2001 2001 –– 20032003 INTERRUPTED OPERATIONINTERRUPTED OPERATION( Availability Factor < 70%< 70% )
2002 2002 -- 20042004 RELIABILITY IMPROVEMENT PROJECT RELIABILITY IMPROVEMENT PROJECT ( Upgrading Investment = 50.000.000 €50.000.000 € )
20042004--20072007 RELIABLE OPERATIONRELIABLE OPERATION( Availability Factor > 90%> 90% )
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 5/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
MAIN UPGRADINGSMAIN UPGRADINGS““RELIABILITY IMPROVEMENT PROJECT” CONCERNED THE RELIABILITY IMPROVEMENT PROJECT” CONCERNED THE
FOLLOWING ASPECTS:FOLLOWING ASPECTS:
AUTOMATIC CONTROL AND EMERGENCY LOGICS OPTIMIZATION;
(Gasifiers load control, ASU Supervision, GT emergency change-over, Master Controller)
UPGRADING OF EQUIPMENT AND PIPING METALLURGY;(Carbon Extraction: Superduplex / Oxygen System: Monel / Grey Water: Hastelloy)
SUBSTITUTION/UPGRADING OF SOME EQUIPMENT(UNDERSIZED, NON SUITABLE MATERIALS, UNRELIABLE)
(Air Intake Filters, Main Air Compressor, Water Flash Separator)
IMPROVEMENT OF PLANT INSTRUMENTATION AND REDUNDANCY
OVERALL TECHNOLOGICAL IMPROVEMENTS(New DeNOx System, Gas Turbine XL Technology, Gasifiers ….)
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 6/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
GAS TURBINE PICTURESGAS TURBINE PICTURES
NEW GT AIR INTAKE FILTERNEW GT AIR INTAKE FILTER
NEW GT BLADESNEW GT BLADES“XL VERSION”“XL VERSION”
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 7/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
MAIN AIR COMPRESSOR PICTURESMAIN AIR COMPRESSOR PICTURES
NEW AIR COMPRESSOR NEW AIR COMPRESSOR MOTORMOTOR
(24MW)
NEW AIR COMPRESSOR ROTORNEW AIR COMPRESSOR ROTOR(5 STAGES)
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 8/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
RUNNING HOURS and AVAILABILITYRUNNING HOURS and AVAILABILITYIGCC - Operating Hours [%]
0%
20%
40%
60%
80%
100%
2001 2002 2003 2004 2005 2006 2007YEARS
OPE
RATI
NG H
OUR
S [h
]
IGCC - Gross Power Output [MWh]
0
250
500
750
1000
1250
1500
1750
2000
2250
2500
2001 2002 2003 2004 2005 2006 2007YEARS
GPO
[GW
h]
GPO [GWh]2001 13872002 14752003 14622004 22522005 21682006 21412007 2200
*Expected
OH [h]2001 64.2%2002 68.8%2003 62.4%2004 95.3%2005 90.4%2006 89.7%2007 91.0%
*Q3 - 2007
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 9/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
ANNUAL OPERATING PLANT RESULTSANNUAL OPERATING PLANT RESULTS
91.0%89.7%90.4%95.0%TOTAL AVAILABILITY
90.1%88.3%87.6%90.4%AVAILABILITY at SYNGAS
2 (A + B)1 (C)2 (B - A)1 (A)NUMBER of INSPECTIONS
6434338187UNSCHEDULED S/D [h]
523870504252SCHEDULED S/D [h]
64118.7243403DIESEL OPERATION [h]
5901773776747943SYNGAS OPERATION [h]
Q3-2007200620052004
CONTINUOUS REDUCTION OF DIESEL OIL OPERATIONCONTINUOUS REDUCTION OF DIESEL OIL OPERATION
DECREASE IN UNSCHEDULED SHUTDECREASE IN UNSCHEDULED SHUT--DOWN HOURSDOWN HOURS
PRESERVING EXCELLENT PLANT AVAILABILITYPRESERVING EXCELLENT PLANT AVAILABILITY
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 10/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
FUTURE ENHANCEMENTS
CO2 CAPTURE CO2 CAPTURE STUDIESSTUDIES
REDUCTION OF NOx EMISSIONREDUCTION OF NOx EMISSION
HYDROGEN PRODUCTION HYDROGEN PRODUCTION FROM SYNGASFROM SYNGAS
BIOFUEL COBIOFUEL CO--GASIFICATIONGASIFICATION
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 11/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
SCOPE OF THE PROJECTSCOPE OF THE PROJECTSupply Biofuels to Gasification mixed with heavy residues
GOALSGOALSRespond to increasing requests to improve environmental protection. Increase the environmental friendly value of the IGCC Technology.
Access to “Green Certificate System”
TARGETTARGETTo produce 20-30 MW of “green energy” by feeding ~5 ton/h of biofuel
into Gasifiers (7-10% of the overall power production)
BIOFUEL COGASIFICATION
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 12/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
STEPS OF THE PROJECTCOMPLETE FAMILIARIZATION WITH AUTHORITY REGULATIONS
IDENTIFICATION OF THE MOST SUITABLE BIO-FUELS(compatible both with technology and legislation )
ECONOMICAL EVALUATION
FEASIBILITY TESTS
GENERAL BIO FUEL SUPPLY CONTRACTS
DETAILED ENGINEERING OF PLANT MODIFICATIONS
FINALIZATION OF LEGISLATIVE PERMISSIONS(approval of plant modifications and authorization of incentive rates)
PLANT MODIFICATION
CO-GASIFICATION START UP
IN PROGRESSIN PROGRESS
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 13/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
STRENGTHS &WEAKNESSESCOGASIFICATION STRENGTHSCOGASIFICATION STRENGTHS
ENVIRONMENTALLY COMPATIBLE TECHNOLOGY
MILD REDUCTION OF CO2 EMISSION
EASY TO BE IMPLEMENTED (just minor plant modifications needed)
ECONOMICAL VALUE OF GREEN CERTIFICATES
INCREASE PLANT PROFITABILITY
COGASIFICATION WEAKNESSESCOGASIFICATION WEAKNESSESHIGH COSTS OF CONVENTIONAL BIOFUELS (in continuous increase);
LACK OF A CLEAR AUTHORITY REGULATION
UNCLEAR LIST OF ACCEPTED BIOFUELS (Glycerin ?)
RAW BIO-PRODUCTS NOT EASILY AVAILABLE (for about 50000 t/y)
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 14/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
INTEGRATION WITH EXISTING PLANT
IGC
C P
LA
NT
–Fa
lcon
ara
M.m
a 15/25
S. Bertolini
“2007 GASIFICATION TECHNOLOGY CONFERENCE” October 14-17, 2007 – San Francisco (USA)
“ GASIFICATION TECHNOLOGY “ GASIFICATION TECHNOLOGY CONFERENCE “CONFERENCE “
San Francisco San Francisco –– OctoberOctober 14th14th--17th, 200717th, 2007
www.apienergia.com