19-67 GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF DIRECTORS Garrison Diversion Conservancy District Carrington, North Dakota April 11 and 12, 2019 A meeting of the Board of Directors of the Garrison Diversion Conservancy District was held at the District headquarters in Carrington, North Dakota, on April 11 and 12, 2019. The meeting was called to order by Chairman Royse on at 1:30 p.m. on April 11. DIRECTORS PRESENT Chairman Ken Royse Second Vice Chairman Ken Vein Director Dave Anderson Director Jay Anderson Director Rick Anderson Director Greg Bischoff Director Jeff Breker Director Mark Cook Director Roger Fenstad Director Norman Haak Director Cliff Hanretty Director David Johnson Director Geneva Kaiser Director Bruce Klein Director Kelly Klosterman Director Ward Koeser Director Bill Krivarchka Director Nancy Marquart Director Steve Metzger Director Bill Ongstad (arrived at 2:40 p.m.) Director Jim Pellman Director John Peyerl Director Kenny Rogers Director Mike Tweed Secretary Duane DeKrey DIRECTORS ABSENT Vice Chairman Alan Walter Director Nikki Boote Director Richard Cayko Director Brandon Krueger

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-67

GARRISON DIVERSION CONSERVANCY DISTRICT

BOARD OF DIRECTORS

Garrison Diversion Conservancy District

Carrington, North Dakota April 11 and 12, 2019

A meeting of the Board of Directors of the Garrison Diversion Conservancy District was held at the District headquarters in Carrington, North Dakota, on April 11 and 12, 2019. The meeting was called to order by Chairman Royse on at 1:30 p.m. on April 11. DIRECTORS PRESENT Chairman Ken Royse Second Vice Chairman Ken Vein Director Dave Anderson Director Jay Anderson Director Rick Anderson Director Greg Bischoff Director Jeff Breker Director Mark Cook Director Roger Fenstad Director Norman Haak Director Cliff Hanretty Director David Johnson Director Geneva Kaiser Director Bruce Klein Director Kelly Klosterman Director Ward Koeser Director Bill Krivarchka Director Nancy Marquart Director Steve Metzger Director Bill Ongstad (arrived at 2:40 p.m.) Director Jim Pellman Director John Peyerl Director Kenny Rogers Director Mike Tweed Secretary Duane DeKrey DIRECTORS ABSENT Vice Chairman Alan Walter Director Nikki Boote Director Richard Cayko Director Brandon Krueger

Page 2: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-68 OTHERS Staff members of the Garrison Diversion Conservancy District were present along with others. A copy of the registration sheet is attached to these minutes as Annex I. The meeting was recorded to assist with compilation of the minutes. ANNOUNCEMENTS AND INTRODUCTION Chairman Royse called on guests in the audience to introduce themselves and identify whom they represent. OATH OF OFFICE Tami Norgard, Vogel Law, performed the oath of office for two re-elected directors. READING OF THE MINUTES Motion by Director Fenstad to dispense with a reading of the January 24 and 25, 2019, board minutes and approve them as distributed. Second by Director J. Anderson. Upon voice vote, motion carried. OFFICER AND COMMITTEE REPORTS Chairman - - Chairman Royse provided a summary report on the March 14 Executive Committee meeting. Executive Committee Financials 2018 Audit Jared Mack, EdieBailly, presented Garrison Diversion’s 2018 Audit Report via conference phone. An unmodified opinion was issued on the financial statements, which is the same opinion issued in the previous year. Mr. Mack reported that EideBailly was required to perform an additional single audit in the current year where the capitalization transfers between water state revolving funds. This was in addition to the previous state laws annually performed in the MR&I and O&M Programs. Mr. Mack highlighted changes from the 2017 audit. He also reviewed the summary of auditor results, stating there were no findings of internal control deficiencies or material noncompliance related to the financial statements. Mr. Mack said there also were no deficiencies on the federal program side. An unmodified opinion was issued on the schedule of expenditures of federal awards. Motion by Director J. Anderson to accept the 2018 Garrison Diversion Audit Report. Second by Director Hanretty. Upon voice vote, the following directors voted aye: D. Anderson, J. Anderson, R. Anderson, Bischoff, Breker, Cook, Fenstad, Haak, Hanretty, Johnson, Kaiser, Klein, Klosterman, Koeser, Krivarchka, Marquart, Metzger,

Page 3: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-69

Pellman, Peyerl, Rogers, Royse, Tweed and Vein. Those voting nay: none. Absent and not voting: Boote, Cayko, Krueger, Ongstad and Walter. Motion carried 2018 Final Budget Revisions Cindy Hewitt, Accounting Specialist, Garrison Diversion, referred to the 2018 final budget revisions and reviewed the adjustments with the board. She explained that it is no longer necessary to make budget revisions to revenues unless there is a large change to a category, and budget revisions will only be done for expense items over budget. A copy of the budget revisions are attached to these minutes as Annex II. Ms. Hewitt stated the larger income adjustment to the Irrigation Fund is due to proceeds that were received on the Mile Marker 42L Irrigation Project that were not anticipated in the original budget. Ms. Hewitt also reported conceptual design engineering fees cannot be capitalized according to the auditors. In order for fixed assets to line up with construction in progress, the other engineering fees need to be separated. The fees are the same as in the past but are being re-categorized. Motion by Director Koeser to approve the following 2018 final budget revisions. Income Irrigation Fund Debt Proceeds, increase of $914,312 Contract Revenue, decrease of $914,312 Expenses Irrigation Fund McClusky Canal Irrigation Operations, decrease of $19 Debt Payments Principal, decrease of $881 Interest, increase of $900 GDU O&M Supplies, increase of $32,000 Equipment maintenance, increase of $41,000 Materials, decrease of $73,000 RRV Water Supply Project Professional Services Other Engineering, increase of $588,000 Right of Way, decrease of $588,000 Transfers into General Fund Transfers out to General Fund O&M, decrease of $333,872 O&M, decrease of $333,872 MR&I, decrease of $527 MR&I, decrease of $527 RRVWSP, decrease of $5 RRVWSP, decrease of $5 Transfer into Irrigation Fund Transfers out to General Fund General Fund, increase of $12,854 Irrigation, increase of $12,854

Page 4: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-70 Second by Director Tweed. Upon voice vote, the following directors voted aye: D. Anderson, J. Anderson, R. Anderson, Bischoff, Breker, Cook, Fenstad, Haak, Hanretty, Johnson, Kaiser, Klein, Klosterman, Koeser, Krivarchka, Marquart, Metzger, Pellman, Peyerl, Rogers, Royse, Tweed and Vein. Those voting nay: none. Absent and not voting: Boote, Cayko, Krueger, Ongstad and Walter. Motion carried. Financial Statements Merri Mooridian, Administration Officer, Garrison Diversion, referred to and reviewed Garrison Diversion’s financial statements for the period of January 1, 2019, through March 31, 2019. Copies of the financial statements are attached to these minutes as Annex III. Revenues through March 31 are broken out as follows: General Fund $3,292,642; Operations and Maintenance $918,425; MR&I $2,903,374; Red River Valley Water Supply Project $3,000,000 and Irrigation Fund $667,690. Expenditures were: General Fund $866,701; Operations and Maintenance $703,797; MR&I $2,898,065; Red River Water Supply Project $1,649,445 and Irrigation $242,464. Income through March is $10,782,131 with expenditures of $6,360,472. Garrison Diversion’s reserve accounts total $6,412,849. Deposits in Bremer Bank are $9,743,481, Bank of North Dakota $9,786,761 and $1,000 in Farm Credit Services. Motion by Director Metzger to accept the financial statements for the period of January 1, 2019, through March 31, 2019. Second by Director Marquart. Upon roll call vote, the following directors voted aye: D. Anderson, J. Anderson, R. Anderson, Bischoff, Breker, Cook, Fenstad, Haak, Hanretty, Johnson, Kaiser, Klein, Klosterman, Koeser, Krivarchka, Marquart, Metzger, Pellman, Peyerl, Rogers, Royse, Tweed and Vein. Those voting nay: none. Absent and not voting: Boote, Cayko, Krueger, Ongstad and Walter. Motion carried. 2020 Preliminary Budget Ms. Mooridian referred to and reviewed Version 1 of Garrison Diversion’s 2020 Preliminary Budget. The total anticipated revenue for 2020 is $35,395,170 with total expenses of $34,208,650. It will be thoroughly reviewed and considered at the Executive Committee in June with a recommendation to the full board in July. Budget Timeline Ms. Mooridian referred to and reviewed the Budget Timeline used for budget preparation. This is provided for the board’s information. Committee Assignments Chairman Royse informed the board that all committee assignments have remained the same for 2019. There was discussion in regard to board members serving on more than one committee if there is interest.

Page 5: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-71 Duane DeKrey, Secretary, said there is not much turnover on the board, and once a director gets assigned to a certain committee, they tend to remain on that committee. This does not always allow the newer board members to serve on their committee of preference; therefore, the suggestion was made to allow board members to serve on a second committee. Secretary DeKrey said this should be a board decision. If there are members interested in serving on a second committee, further discussion can be held. Second Vice Chairman - - Second Vice Chairman Ken Vein reported on meetings attended and activities at the state legislature and with the Red River Valley Water Supply Project (RRVWSP) that he has been involved in. Agriculture and Natural Resources Committee - - Director Dave Anderson, Chairman, Agriculture and Natural Resources Committee, reported that the committee met the morning of April 11 to review and approve the 2020 budget for the Oakes Irrigation Research Site (OIRS). Updates were provided on the Oakes Test Area (OTA) Title Transfer and the legislative session. Blaine Schatz, Director, Carrington Research and Extension Center, presented revised draft designs for a headquarters building and a separate rinsate facility. Construction on the rinsate facility will begin this summer. Red River Valley Committee - - Director Jay Anderson, who chairs the Red River Valley (RRV) Committee, provided an update on projects and meetings he has taken part in regarding the RRVWSP. He also gave a summary of the March 8 RRV Committee meeting. Land Acquisition Committee Director J. Anderson informed the board the Land Acquisition Committee met by conference phone on March 20 to review the appraisal on the intake property for the RRVWSP near Washburn and assist with the purchasing process. The amount of land to be purchased would be 2.96 acres and permanent easements of 2.15 acres Director J. Anderson stated that the committee instructed Kip Kovar, District Engineer, Garrison Diversion, and Tami Norgard, Vogel Law, to review the draft appraisal in more detail for any needed changes. If the detailed review results in any major changes, they will get back to this committee before a copy is provided to the landowner. Ms. Norgard was also asked to develop a draft contract in preparation for the potential land purchase. Director J. Anderson also reported the appraisal on the discharge property was recently received. This has been forwarded to the Land Acquisition Committee for their review. RED RIVER VALLEY WATER SUPPLY PROJECT McClusky Canal Water Source RRVWSP Request for 145 cfs Ms. Norgard reported Garrison Diversion submitted a formal request to Reclamation on January 31, 2019, for the additional 145 cfs from the McClusky Canal as an option for the RRVWSP. As a result, Reclamation has suggested that an Environmental Impact Statement (EIS) be conducted.

Page 6: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-72

Ms. Norgard said Reclamation has asked for additional information regarding the RRVWSP in order to comply with NEPA, and Garrison Diversion staff is currently working on a response. Work Plan Update Mr. Kovar referred to and reviewed the RRVWSP Work Plan Update dated February 26, 2019, which provides an update on each of the ongoing task orders. A copy of the update is attached to these minutes as Annex IV. Mr. Kovar reported that the engineering team has submitted the 90 percent complete design drawings and specifications. This includes the intake wet well, discharge structure, first 28-mile pipeline segment, segment one tunnels and geotechnical documents. Once everything becomes final, board approval will be required. Budget Reallocation Mr. Kovar referred to and reviewed the February 27 memo from Black and Veatch regarding the revised scope allocations to existing RRVWSP task orders. He reminded the board that they approved the task order reallocations in January. However, since that time, bidding assistance has been removed due to the NDPDES permit being delayed and additional financial modeling analysis has been added. Mr. Kovar said because of timing, the Executive Committee approved the revised reallocation of task orders at their March meeting. It was also approved by the LAWA Board. Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000 acre-feet of water from the Missouri River using Permit Number 1416A. This is for the RRVWSP and intended for MR&I use. The request was approved and the process of changing the point of diversion will now start. Mr. Kovar added that Garrison Diversion is still waiting on the Sovereign Lands Permit from the State Water Commission that was submitted over a year ago. SB 2020 Legislative Presentation - - Ms. Mooridian, Mr. Kovar and Ms. Norgard provided a PowerPoint presentation as an overview of the 2017-2019 RRVWSP Work Plan, legislative asks for 2019-2021 and the Devils Lake reroute request. This was also shared with the House Appropriations Committee when they met on March 7. Program Management Update - - Ms. Mooridian referred to and reviewed the program management chart dated March 6 explaining any changes that have been made. This shows a simplified project schedule for the current biennium. It is a fluid working document. The top portion of the chart defines the schedule of work required by HB 1020. The bottom portion shows other RRVWSP activities. The chart displays the status of all the work being done on the RRVWSP this biennium, listing start and finish dates of tasks by category. This is a critical tool for planning and continues to be refined. Planning Level Budget - - Ms. Mooridian also referred to and reviewed the two graphics showing the RRVWSP Planning Level Budget, copies which are attached to these minutes as Annex V. The bar chart illustrates the cumulative project expenses.

Page 7: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-73 Ms. Mooridian said the program budget is $43.7 million. Of the 2017-2019 appropriation, $10.7 has been expended. An outstanding $5.7 million has been committed. Funds not committed are for early out construction. She added that the table has not been updated since the reallocation of task orders. Once the task order amendments are finalized, the budget will be revised. 2019 RRVWSP Work Plan - - Mr. Kovar referred to the Draft 2019 RRVWSP Work Plan included with the meeting materials, stating the plan is dependent upon what the legislature approves for funding. Hopefully, the project can move forward with early out projects. Mr. Kovar reviewed the proposed work items included in the draft work plan, highlighting the design, bidding and land acquisition portions. A copy of the proposed work plan is attached to these minutes as Annex VI. 2019-2021 Draft Biennium Budget - - Ms. Mooridian referred to the Draft 2019-2021 Biennium Budget, stating this is in follow up to the 2019 RRVWSP Work Plan. If $50 million is received for the RRVWSP this biennium, this budget table illustrates how the funding would be expended. It is for the board’s information and does not require approval until the legislature approves the exact funding amount. Manitoba Correspondence - - Ms. Mooridian referred to a copy of the letter sent to North Dakota’s leadership of the State Senate Appropriations and Energy and Natural Resources Committees from Manitoba’s Minister of Sustainable Development. The letter is regarding the funding for the RRVWSP and their concerns with the project. In the letter, Manitoba asks the legislature to make the funding for the project contingent upon meeting the NAWS level of biota treatment. Garrison Diversion and LAWA have prepared a letter to the senate leadership, Governor Burgum, State Water Commission and State Department of Health, pointing out the RRVWSP differs from NAWS in that it is a state project not a federal project. The letter indicates the level of treatment being considered for the RRVWSP and how it would meet the Boundary Waters Treaty requirements. It also states that NDPDES permit requirements will be followed, which include a level of biota control acceptable to the North Dakota Department of Health. Lastly, the letter points out that Manitoba has seven transbasin diversions without any type of treatment averaging approximately 156,000 cfs. The RRVWSP is only 165 cfs. Copies of the letters are attached to these minutes as Annex VII and Annex VIII, respectively. GENERAL MANAGER’S REPORT Garrison Diversion 2018 Economic Impacts - - Secretary DeKrey referred to the handout prepared by Garrison Diversion and distributed to Central North Dakota legislators illustrating the 2018 economic impacts of Garrison Diversion on Carrington and the surrounding region. A copy of the handout is attached to these minutes as Annex IX. Legislative Report - - Secretary DeKrey provided an update on the Senate and House bills currently being followed by Garrison Diversion this legislative session, including SB 2020, SB 2295, SB 2362, HB 1207 and HB 1320. Copies of the bills are included with the meeting materials for the board’s referral.

Page 8: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-74 North Dakota Insurance Reserve - - Secretary DeKrey referred to the annual meeting notice of the ND Insurance Reserve Fund on May 22. The purpose of the meeting is to elect representatives to the Cities and Counties categories to the board of directors. Since he has a conflict on this date, a representative from Garrison Diversion may attend the meeting and can vote on Garrison Diversion’s behalf with the approval of the board. Motion by Second Vice Chairman Vein authorizing a Garrison Diversion representative to cast votes on behalf of Garrison Diversion at the ND Insurance Reserve Fund’s annual meeting and election on May 22. Second by Director Metzger. Upon roll call vote, the following directors voted aye: D. Anderson, J. Anderson, R. Anderson, Bischoff, Breker, Cook, Fenstad, Haak, Hanretty, Johnson, Kaiser, Klein, Klosterman, Koeser, Krivarchka, Marquart, Metzger, Pellman, Peyerl, Rogers, Royse Tweed and Vein. Those voting nay: none. Absent and not voting: Boote, Cayko, Krueger, Ongstad and Walter. Motion carried. VOUCHER REPORTING Ashley Reisenauer, Accountant, Garrison Diversion, provided the board with a brief educational session on the process to be used for completing expense vouchers. RED RIVER VALLEY WATER SUPPLY PROJECT Financial Presentation - - Ms. Mooridian reported meetings have been held with all of the LAWA board member systems and legislative leadership to present the financial cost of participating in the RRVWSP. During the meetings, each system was shown what it would cost to participate in the project. In that, quite a few assumptions had to be made, including what the cost share might be and that a low interest, long-term loan would be obtained from the state. A PowerPoint presentation was also provided explaining the progress being made on the financial planning process. PROPOSED LAKE AUDUBON WATER CONTROL PLAN Secretary DeKrey reported the Environmental Assessment has not been completed on the Snake Creek Embankment Interim Risk Reduction Measures. Garrison Diversion continues to work with the congressional delegation and the Bureau of Reclamation on this issue. BUREAU OF RECLAMATION REPORT Arden Freitag, Area Manager, Bureau of Reclamation, provided highlights from Reclamation’s quarterly written report, a copy which is attached to these minutes as Annex X. Budget - - Mr. Freitag reported the 2019 rural water budget is $33 million for the Garrison Diversion Unit. The 2020 budget request is at $3.5 million. NAWS - - There is still no word from the appeals court on a ruling for NAWS. All signatures have been obtained on the Memorandums of Understanding for the NAWS Adaptive Management Team. An initial meeting will be set for later this summer.

Page 9: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-75 O&M Agreement - - Reclamation’s regional office is drafting an O&M Transfer Agreement to submit to Garrison Diversion for consideration as an alternative to the existing OM&R cooperative agreement for accomplishing OM&R on the GDU Project. Plans are to have the draft O&M Transfer Agreement completed in the next month so that Reclamation can meet with Garrison Diversion to discuss the differences and advantages of the O&M Transfer Agreement compared to a cooperative agreement. Oakes Test Area (OTA) Title Transfer - - Reclamation has been working on determining the valuation of the OTA. The Dickey-Sargent Irrigation District has made an offer for purchase of the OTA, which was revenue based over the next 40 years. Reclamation is also evaluating its title transfer legislation recently enacted to determine whether it can be used for the OTA. OAKES TEST AREA TITLE TRANSFER Secretary DeKrey added the OTA title transfer issue has also been a topic for discussion with the congressional delegation. Garrison Diversion representatives met recently with our delegation in Washington, DC, regarding this issue. Secretary DeKrey added the parties involved are trying to arrive at a price that DSID is willing to and can afford to pay for the OTA, as well as determining the future operations of the site. MCCLUSKY CANAL UPDATE O&M Update - - Mr. Kovar said Reclamation has agreed to extend the current Five-Year O&M Agreement for one year; however, Garrison Diversion is again paying O&M expenditures from the General Fund because operating funds have not been received from Reclamation. Irrigation Update - - Mr. Kovar said work is continuing on Mile Marker 0 and 0.4 Irrigation Projects. Bidding will, hopefully, take place this spring. TRIP REPORTS Trip reports were provided by members of the board who attended the Family Farm Alliance and National Water Resources Association (NWRA) Conferences. MR&I PROGRAM Construction Report - - Secretary DeKrey referred to the MR&I construction report dated March 31. MR&I expenditures in 2019 are $2,864,047. Remaining approved federal MR&I funds are $9,419,959. A copy of the report is attached to these minutes as Annex XI. Secretary DeKrey reminded the board of the resolution they passed expressing its concern with using MR&I funding for the NAWS Water Treatment Plant. While in Washington, DC, for the NWRA Conference, Garrison Diversion representatives also visited with the delegation about obtaining a separate appropriation for the NAWS Water Treatment Plant. As a result, Garrison Diversion is completing paperwork to be submitted requesting MR&I funding in the amount of $57 million.

Page 10: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

19-76 FY2020 Budget Request - - Chairman Royse referred to a copy of a letter signed by members of Reclamation’s authorized rural water programs asking for funding priority and increased funding levels for the five critical water projects in the President’s 2020 budget request. The letter is addressed to the Office of Budget and Management. He added that he has signed the letter on behalf of Garrison Diversion. STATE WATER COMMISSION REPORT Garland Erbele, State Engineer and Secretary, State Water Commission (SWC), provided a review of the legislation the SWC was involved in this session. Second Vice Chairman Vein asked the status of the Sovereign Land Permit for the RRVWSP. Mr. Erbele said it is a matter of reviewing the application, sending out notices and collecting comments. The process has begun, but he cannot say what step in the process it is at right now. It should be completed in the next two months. FUTURE MEETINGS Chairman Royse reviewed a list of upcoming meetings with the board. OTHER BUSINESS There being no further business to come before the board, the meeting adjourned at 11:15 a.m. (SEAL) Chairman Ken Royse Secretary Duane DeKrey

Page 11: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
lschafer
Typewritten Text
Annex I 19-77
lschafer
Typewritten Text
Page 12: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

GENERAL, O&M, Budget Income Percent 2018

MR&I, RRVWSP and 1/1/2018 Received of Revised

IRRIGATION to to Amount Final

FUNDS 12/31/2018 12/31/2018 Budgeted Budget

GF Admn Charge from Irr Fund 500 1,116 0.0% 500 Lease Income 2,000 2,303 115.2% 2,000 Miscellaneous Income 500 - 0.0% 500 Interest Income 10,000 37,651 376.5% 10,000 Contract Revenue 43,175 31,267 72.4% 43,175 Revenue from Sale of GFAG - - - - Tax Levy 2,978,709 3,498,695 117.5% 2,978,709 State Aid Distribution 220,000 240,530 109.3% 220,000 General Fund Total 3,254,884 3,811,562 117% $3,254,884

Interest Income - 1,476 - -

Revenue from Sale of GFAG - 19,150 - - O&M Contract Revenue 4,341,117 3,756,306 86.5% 4,341,117 O&M Non-project Revenue 500,000 257,775 51.6% 500,000 O&M Project Revenue 5,000 9,056 181.1% 5,000 O&M Total 4,846,117 4,043,763 83% 4,846,117

MR&I Interest Income* - 34 - - MR&I Contract Revenue* 11,741,305 10,837,998 92% 11,741,305 MR&I Total 11,741,305 10,838,032 92% 11,741,305

Interest Income - 58 - - Contract Revenue 10,602,202 7,213,025 68% 10,602,202 RRVWSP Total 10,602,202 7,213,083 68% 10,602,202

Interest Income - 3,823 - - Debt Proceeds - 914,312 - 914,312 Contract Revenue 2,795,000 1,167,078 42% 1,880,688 Irrigation Fund Total 2,795,000 2,085,213 75% $2,795,000

TOTAL $33,239,508 $27,991,653 84% $33,239,508

GARRISON DIVERSION CONSERVANCY DISTRICTINCOME BUDGET ANALYSIS STATEMENT - FINAL JANUARY 1, 2018 THROUGH DECEMBER 31, 2018

lschafer
Typewritten Text
Annex II 19-78
Page 13: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

3/7/19 8:23 AM Budget Revision Revised

2018 Budget

Directors ExpenseDirectors Per Diem $100,000 $100,000Directors Exp $125,000 $125,000

Total Directors Expense $225,000 $0 $225,000

Employee ExpenseEmployee Salaries $575,000 $575,000General Managers Expense $40,000 $40,000

Travel $73,000 $73,000

Administrative Officer $25,000 $25,000District Engineer $12,000 $12,000

Engineer $10,000 $10,000Communications Director $8,000 $8,000

Emp Exp Other $18,000 $18,000Professional Development $22,000 $0 $22,000

Employee Training $20,000 $20,000Wellness Program $2,000 $2,000

Benefits $299,536 $0 $299,536GDCD FICA $51,588 $51,588

Retirement $71,775 $71,775Hospital & Life Insurance $134,704 $134,704

Unemployment Comp $4,846 $4,846Vision / Dental $15,160 $15,160

Workforce Safety Insurance $5,100 $5,100Long Term Disability Ins $4,363 $4,363

Vacation/Sick Leave Liability $12,000 $12,000Total Employee Expense $1,009,536 $0 $1,009,536

Administration Postage $13,000 $13,000Electronic Communications $26,000 $26,000Utilities $40,000 $40,000Meetings & Events $9,000 $9,000Subscriptions $5,000 $5,000Miscellaneous $7,000 $7,000Data Processing $25,000 $25,000Employee Recruiting $5,000 $5,000Supplies $35,000 $35,000Small Office Equipment $17,000 $17,000Dues $14,000 $14,000Insurance $11,000 $11,000Annual Independent Audit $28,000 $28,000

Total Administration $235,000 $0 $235,000

Public EducationGDCD Tours $5,000 $5,000Other Tours $5,000 $5,000ND Water Users $20,000 $20,000ND Water Coalition $14,000 $14,000ND Water Magazine $18,000 $18,000Missouri River Joint Board/MRRIC $15,000 $15,000NWRA Presidency - Dave Koland $0 $0Conferences/Sponsorships $10,000 $10,000Miscellaneous $9,000 $9,000

Total Public Education $96,000 $0 $96,000

GARRISON DIVERSION CONSERVANCY DISTRICT

Final Budget January 1, 2018 to December 31, 2018

lschafer
Typewritten Text
Annex II 19-79
Page 14: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

3/7/19 8:23 AM Budget Revision Revised

2018 Budget

GARRISON DIVERSION CONSERVANCY DISTRICT

Final Budget January 1, 2018 to December 31, 2018

Professional ServicesCommunications $150,000 $150,000Engineering $150,000 $150,000Sundog Web Hosting $4,000 $4,000RRVWSP Development $208,000 $208,000

Technical Support for LAWA $15,000 $15,000Engineering $50,000 $50,000

Legal $50,000 $50,000Financial $12,000 $12,000

Consultants $50,000 $50,000Meeting, Misc. Exp $31,000 $31,000

Prof Services Other $0 $0Legal Services $175,000 $175,000

Total Professional Services $687,000 $0 $687,000

Irrigation DevelopmentND Irrigation Association $50,000 $50,000NDSU Oakes Field Trials $267,875 $267,875Bob Titus Lease $17,000 $17,000Irrigation Development $130,000 $130,000

Total Irrigation Development $464,875 $0 $464,875

RecreationRecreation Matching $375,000 $375,000DWRA Recreation Program $10,000 $10,000

Total Recreation $385,000 $0 $385,000

Irrigation District ExpenseIrrigation District Expenses $4,900 $4,900OTA Title Transfer $20,000 $20,000

Technical Support $20,000 $20,000Legal $0 $0

Total Irrigation District Expense $24,900 $0 $24,900

Maintenance & Repair

Equipment Maintenance $20,000 $20,000Small Yard Equipment Purchases $4,000 $4,000Land & Bldg Maintenance $30,000 $30,000Auto Expense $17,000 $17,000

Total Maintenance & Repair $71,000 $0 $71,000

Capital PurchasesOffice Equip & Furniture $20,000 $20,000Yard Equipment $20,000 $20,000Vehicle $39,000 $39,000Land & Buildings $9,000 $9,000

Total Capital Purchases $88,000 $0 $88,000

General Fund Subtotal $3,286,311 $0 $3,286,311

lschafer
Typewritten Text
Annex II 19-80
Page 15: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

3/7/19 8:23 AM Budget Revision Revised

2018 Budget

GARRISON DIVERSION CONSERVANCY DISTRICT

Final Budget January 1, 2018 to December 31, 2018

Irrigation FundMcClusky Canal Irrigation $2,625,135 ($19) $2,625,116

Construction $2,145,000 $2,145,000Operations $480,135 ($19) $480,116

Debt Payments $169,865 $19 $169,884Principal $117,120 ($881) $116,239Interest $52,745 $900 $53,645

Total Irrigation Fund $2,795,000 $0 $2,795,000

GDU O & MSalaries & Benefits $2,190,283 $0 $2,190,283

Salaries $1,498,145 $1,498,145Benefits $692,138 $692,138

Travel $37,461 $37,461Training $6,500 $6,500Utilities $90,820 $90,820Contracted Services (Eng / Survey) $101,000 $101,000Supplies $421,013 $32,000 $453,013Equipment Purchases $381,040 $381,040Small Equipment Purchases $15,000 $15,000Equipment Rental $14,000 $14,000Equipment Maintenance $141,525 $41,000 $182,525Safety $43,824 $43,824Miscellaneous $15,059 $15,059Materials $323,592 ($73,000) $250,592Overhead Expense $0 $0

Total GDU O & M $3,781,117 $0 $3,781,117

MR&I FUNDState Administration $135,800 $135,800Salaries & Benefits $84,000 $84,000MR&I Project Expenditures $11,500,000 $11,500,000

Total MR&I Fund $11,719,800 $0 $11,719,800

RRV Water Supply ProjectDesign/Construction in Progress $7,602,202 $7,602,202Salaries & Benefits $185,000 $185,000Professional Services $2,766,500 $0 $2,766,500

Other Engineering $0 $588,000 $588,000Right of Way $2,100,000 ($588,000) $1,512,000

Financing/Legal/Administration $666,500 $666,500Construction $0 $0

Total RRVWSP $10,553,702 $0 $10,553,702

TOTAL ALL FUNDS $32,135,930 $0 $32,135,930

lschafer
Typewritten Text
Annex II 19-81
Page 16: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Budget Revision Revised

2018 BudgetTransfers In General Fund

O&M $1,065,000 ($333,872) 731,128 MR&I 21,505 (527) 20,978 RRVWSP 48,500 (5) 48,495Transfer In GF Totals $1,135,005 ($334,404) $800,601

Transfer In Irrgation FundGeneral Fund -$ 12,854$ 12,854$

Transfers Out MRIGeneral Fund (21,505)$ 527$ (20,978)$

Transfers Out O&MGeneral Fund (1,065,000)$ 333,872$ (731,128)$

Transfers Out RRVWSPGeneral Fund (48,500)$ 5$ (48,495)$

Transfers Out General Fund Irrigation -$ (12,854)$ (12,854)$

Total Transfers In/Out All Funds -$ -$ -$

GARRISON DIVERSION CONSERVANCY DISTRICTFinal Budget

January 1, 2018 to December 31, 2018

lschafer
Typewritten Text
Annex II 19-82
Page 17: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Municipal Red River

Operations Rural, and Valley Water

General Maintenance Industrial Supply Irrigation

Fund Fund Fund Project Fund Total

Beginning Bank Balance $3,795,416 $274,847 $3,920 $5,148 $93,777 $4,173,108

Revenues:

Net Change in Assets 534,252 2,627 (60,000) (359,910) 116,969

Interest Income 9,982 684 5 1,373 12,044

Tax Levy 3,196,360 3,196,360

State Aid Distribution 72,127 72,127

Contract Revenue 14,173 867,714 2,903,369 3,000,000 571,183 7,356,439

Irrigation Fund Bond/Loan Proceeds 95,134 95,134

O&M Project Income 150 150

O&M Non-Project Income 49,877 49,877

Total Revenues $3,826,894 $921,052 $2,903,374 $2,940,000 $307,780 $10,899,100

Expenditures:

Director Expense 54,713 54,713

Employee Expense 202,570 525,617 19,022 48,284 795,493

Administrative Expense 37,390 23,474 14,995 75,859

Public Education 34,538 34,538

Professional Services 142,374 6,459 230,746 379,579

Irrigation Development 284,528 284,528

GDCD Recreation Project 86,832 86,832

DWRA Recereation Project 327 327

Irrigation District Expense 2,188 2,188

Maintenance & Repairs 8,425 148,247 132,214 288,886

Capital Purchases 12,816 15,116 27,932

Construction in Progress 1,370,415 1,370,415

MR&I Project Expenses 2,864,048 2,864,048

Principal Debt Payments 92,151 92,151

Interest Payments 2,983 2,983

Total Expenditures $866,701 $703,797 $2,898,065 $1,649,445 $242,464 $6,360,472

Revenues Over Expenditures * $2,960,193 $217,255 $5,309 $1,290,555 $65,316 $4,538,628

Transfer In/Out $196,301 ($177,536) ($5,303) ($13,462) $0 $0

Ending Bank Balance $6,951,910 $314,566 $3,926 $1,282,241 $159,093 $8,711,736

* Depreciation not reflected

Garrison Diversion Conservancy District

Combined Statement of Revenues and Expenses

For the Three Months Ending March 31, 2019

lschafer
Typewritten Text
Annex III 19-83
Page 18: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

General, O&M Income Percentage

MR&I, RRVWSP, Budget Received of Balance

and Irrigation for to Amount of

Funds 2019 March 2019 Budgeted Budget

Revenue:

Irrigation Admin 670$ -$ 0.0% 670$

Lease Income 2,000$ -$ 0.0% 2,000$

Miscellaneous Income 500$ -$ 0.0% 500$

Interest Income 26,325$ 12,044$ 45.7% 14,281$

Tax Levy 3,249,915$ 3,196,360$ 98.4% 53,555$

State Aid 207,775$ 72,127$ 34.7% 135,648$

General Fund Contract Revenue 48,000$ 14,173$ 29.5% 33,827$

O&M Contract Revenue 4,769,615$ 867,714$ 18.2% 3,901,901$

MR&I Contract Revenue 6,181,775$ 2,903,369$ 47.0% 3,278,406$

RRVWSP Contract Revenue 30,583,085$ 3,000,000$ 9.8% 27,583,085$

Irrigation Fund Revenue 1,169,500$ 666,317$ 57.0% 503,183$

O&M Project Revenue 5,000$ 150$ 3.0% 4,850$

O&M Non-Project Revenue 255,000$ 49,877$ 19.6% 205,123$

Total Revenues 46,499,160$ 10,782,131$ 23.2% 35,717,029$

GARRISON DIVERSION CONSERVANCY DISTRICT

INCOME BUDGET ANALYSIS STATEMENT

For the Three Months Ending March 31, 2019

lschafer
Typewritten Text
Annex III 19-84
Page 19: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

General, O&M Expenditures Percentage Balance

MR&I, RRVWSP, Budget Charged Budget Expenditures Spent of

and Irrigation for to 2018 for to Amount Budget

Funds 2018 Budget 2019 March 2019 Budgeted March 2019

Director Expenses $225,000 $215,179 $270,000 $54,713 20.3% $215,287

Employee Expenses $3,556,604 $3,124,984 $3,737,465 $795,493 21.3% $2,941,972

Adminstrative Expenses $476,679 $317,495 $413,045 $75,859 18.4% $337,186

Public Education $96,000 $80,522 $99,000 $34,538 34.9% $64,462

Professional Services $3,554,500 $1,264,388 $3,679,240 $379,579 10.0% $3,299,661

Irrigation Development $464,875 $347,895 $464,875 $284,528 61.2% $180,347

GDCD Recreation Grant Program $375,000 $332,978 $375,000 $86,832 23.2% $288,168

DWRA Recreation Program $10,000 $5,528 $10,000 $327 3.3% $9,673

Irrigation District Expense $24,900 $18,252 $24,900 $2,188 8.8% $22,712

Maintenance & Repairs $1,466,246 $1,092,038 $1,366,970 $288,886 21.4% $1,078,084

Capital Purchases $2,614,040 $2,140,810 $963,000 $27,932 2.9% $935,068

Construction in Progress $7,602,202 $7,055,796 $28,000,000 $1,370,415 4.9% $26,629,585

MR&I Fund $11,500,000 $10,676,267 $6,000,000 $2,864,048 47.7% $3,135,952

Principal on Debt Repayment $116,239 $116,239 $123,000 $92,151 74.9% $30,849

Interest on Debt Repayment $53,645 $53,637 $47,200 $2,983 6.3% $44,217

Total Expenses $32,135,930 $26,842,008 $45,573,695 $6,360,472 14.0% $39,213,223

Transfers In/Out

MR&I $20,978 $20,978 $19,450 $5,303 27.3% $14,147

O&M $731,128 $731,128 $876,550 $177,536 20.3% $699,014

Irrigation ($12,854) ($12,854) $0 $0 0.0% $0

RRVWSP $48,495 $48,495 $30,540 $13,462 44.1% $17,078

Total Transfers Out $787,747 $787,747 $926,540 $196,301 21.2% $730,239

Total Expenses & Transfers Out $32,923,677 $27,629,755 $46,500,235 $6,556,773 14.1% $39,943,462

GARRISON DIVERSION CONSERVANCY DISTRICT

Expense Budget Analysis Statement

For the Three Months Ending March 31, 2019

lschafer
Typewritten Text
Annex III 19-85
Page 20: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

GARRISON DIVERSION CONSERVANCY DISTRICT

RESERVES STATEMENT

March 31, 2019

OPERATING RESERVE $3,872,150.99

Operating Reserve authorized to be established in the amount of $300,000.00

per resolution of the Board dated January 15, 1970. Limit changed to $330,000

by Board action on January 6, 1995. Reserve cap removed by Board action

July 2, 1997.

O&M EMERGENCY RESERVE 822,817.55

O&M Emergency Reserve to be established in the amount of $500,000.00 by

Article 13 (a) of the Master Contract and by action taken by the Board dated

January 16, 1970. Limit changed to $1,500,000.00 July 1980. Reserve capped at

$822,817.55 by Board action July 2, 1997.

DEFICIENCY RESERVE 802,287.54

Deficiency Reserve to be established in the amount of $750,000.00 by Article

13 (b) of the Master Contract. Limit changed to $1,500,000.00 July 1980. Reserve

capped at $802,287.54 by Board action July 2, 1997.

PROJECT DEVELOPMENT RESERVE 915,592.98

Project Development Reserve to be established in the amount of $750,000.00

by resolution of the Board dated July 17, 1969. Limit changed to $1,000,000.00

July 1982. Reserve capped at $915,592.98 by Board action July 2, 1997.

-----------------------

TOTAL GARRISON DIVERSION CONSERVANCY DISTRICT RESERVES $6,412,849.06

=============

lschafer
Typewritten Text
Annex III 19-86
Page 21: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

GARRISON DIVERSION CONSERVANCY DISTRICT

FUNDS HELD IN BANK OF NORTH DAKOTA ACCOUNTS

March 31, 2019

--------------- ------------------------------------------------------------------------------------------- --------------------------

Interest Maturity

FUND Account Name/Reserve Rate Date Cash Balance

--------------- ------------------------------------------------------------------------------------------- --------------------------

General Checking Account 0.010% $1,491,548.30

General Money Market Deposit Account 0.010% 5,460,362.58

General Recreation Matching, Oper. Res. 0.100% 419,448.98

General Recreation Reserve, Oper. Res 0.100% 1,876,097.56

General Accrued Leave Res., Oper. Res. 0.100% 116,104.45

General Operating Reserve 0.750% 11-14-19 47,000.00

General Deficiency Reserve 0.250% 05-22-19 124,146.00

General Project Development 0.250% 05-22-19 252,054.00

TOTAL $9,786,761.87

GARRISON DIVERSION CONSERVANCY DISTRICT

FARM CREDIT SERVICES OF NORTH DAKOTA STOCK

March 31, 2019

--------------- ------------------------------------------------------------------------------------------- --------------------------

Account Name/Reserve Principal Maturity

FUND Account Purpose Balance Date Cash Balance

--------------- ------------------------------------------------------------------------------------------- --------------------------

General Operating Reserve 125,000.00$ 05-01-2025 1,000.00$

for Irrigation

lschafer
Typewritten Text
lschafer
Typewritten Text
Annex III 18-87
Page 22: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BREMER BANK, N.A.

GARRISON DIVERSIONDEPOSIT AND PLEDGING RECAP

3/31/2019

Account Type Balance Int Rate Deposit Insurance / Pledging Status

Collateral Value /

Pledge Amount

Demand Deposit Accounts Subject to limit of $250,000 FDIC Insurance

Non-Interest Bearing Checking (Demand) Accounts FHLB Letter of Credit and Security Pledges collateralizing the excess @ 110%

xxxxx34 Irrigation Fund 159,093.85 0.00%

xxxx61 Operations & Maintenance Fund 314,565.49 0.00%

xxxxx52 Red River Valley Water Supply 1,282,242.23 0.00%

Total Noninterest Bearing Checking Balance 1,755,901.57

Total Demand Deposits $1,755,901.57

Time and Savings Deposits Subject to limit of $250,000 FDIC Insurance

Interest Bearing Checking (NOW) Accounts FHLB Letter of Credit and Security Pledges collateralizing the excess @ 110%

xxxxxx63 Irrigation - Debt Service Reserve Fund 272,034.41 0.27%

xxxxxx62 M R & I Working Fund 3,924.86 0.01%

Total Interest Bearing Checking Balance 275,959.27

Savings Accounts

xxxxx41 Money Mkt Inv - O & M Accr Leave Rsv 134,622.09 1.72%

Total Savings Balance 134,622.09

Certificates of Deposit

xxx591-1 Certificate of Deposit 210,000.00 0.90%

xxx106-1 Certificate of Deposit 350,000.00 0.80%

xxx835-1 Certificate of Deposit 820,000.00 0.80%

xxx021-1 Certificate of Deposit 50,500.00 0.80%

xxx906-1 Certificate of Deposit 250,000.00 0.40%

xxx907-1 Certificate of Deposit 542,000.00 0.40%

xxx385-1 Certificate of Deposit 156,500.00 0.40%

xxxxxx097-1 Certificate of Deposit 228,141.54 0.40%

xxxxxx106-1 Certificate of Deposit 106,317.55 0.80%

xxxxxxxx933-1 Certificate of Deposit 313,538.98 0.80%

xxxxxxxx127-1 Certificate of Deposit 350,000.00 0.80%

xxxxxxxx266-1 Certificate of Deposit 200,000.00 0.80%

xxxxxx301-1 Certificate of Deposit 500,000.00 2.58%

xxxxxx274-1 Certificate of Deposit 500,000.00 2.26%

xxxxxx510-1 Certificate of Deposit 500,000.00 2.49%

xxxxxx929-1 Certificate of Deposit 500,000.00 2.02%

xxxxxx819-1 Certificate of Deposit 500,000.00 2.49%

xxxxxx953-1 Certificate of Deposit 500,000.00 2.58%

xxxxxx746-1 Certificate of Deposit 500,000.00 2.68%

xxxxxx538-1 Certificate of Deposit 500,000.00 2.86%

Total CD Balance 7,576,998.07

Total Time & Savings Deposit Account Balance $7,987,579.43

Pledging Adequacy Calculation

Total Demand Deposits $1,755,901.57

Less: FDIC Insurance Coverage 250,000.00

Demand Deposit Balance to Secure $1,505,901.57

x 110% 1.10

A Pledging Required on Demand Deposits $1,656,491.73

Total Time & Savings Deposit Account Balance $7,987,579.43

Less: FDIC Insurance Coverage 250,000.00

Time & Savings Deposit Balance to Secure $7,737,579.43

x 110% 1.10

B Pledging Required on Time & Savings Deposits $8,511,337.37

A+B=C Total Pledging Required on all Deposits $10,167,829.10

Market Value - Total Securities Pledged $0.00 $0.00

FHLB Letter of Credit $12,000,000.00 $12,000,000.00

D Total Collateral Pledged $12,000,000.00 $12,000,000.00

D-C Pledging Excess $1,832,170.90

lschafer
Typewritten Text
Annex III 18-88
lschafer
Typewritten Text
lschafer
Typewritten Text
lschafer
Typewritten Text
lschafer
Typewritten Text
lschafer
Typewritten Text
Page 23: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Estimated Taxes Tax Int. & Penalty

to be Collected Collections Collections State Aid Dist.

County 2019 Levy Year to Date Year to Date Year to Date

Barnes $76,643.00 $72,646.50 $68.03 $1,398.11

Benson 30,626.00 28,731.00 14.10 1,051.31

Bottineau 57,890.00 53,286.15 81.15 1,131.26

Burleigh 487,306.00 463,557.31 0.00 15,839.45

Cass 794,630.00 752,798.27 353.68 15,378.68

Dickey 37,779.00 35,489.42 39.40 1,087.02

Eddy 12,956.00 12,634.14 14.06 608.58

Foster 23,718.00 23,384.03 16.39 1,515.73

Grand Forks 287,710.00 266,142.82 186.94 3,260.21

Griggs 19,289.00 18,455.73 4.64 607.91

LaMoure 40,088.00 37,399.22 45.12 1,102.30

McHenry 40,343.00 39,075.04 36.67 631.85

McKenzie 263,001.00 228,276.34 164.60 8,150.62

McLean 73,274.00 69,669.82 41.96 2,194.59

Nelson 24,101.00 22,884.82 32.61 580.52

Pierce 29,909.00 27,674.74 38.87 811.67

Ramsey 53,682.00 50,532.86 44.55 1,513.62

Ransom 34,080.00 32,893.72 42.64 0.00

Renville 23,836.00 20,726.99 20.54 741.17

Richland 85,930.00 83,989.22 49.47 0.00

Sargeant 34,673.00 32,639.49 32.49 882.12

Sheridan 13,829.00 13,135.54 8.07 1,081.12

Steele 27,725.00 26,301.19 19.46 526.01

Stutsman 110,941.00 101,430.85 53.27 2,273.85

Traill 50,242.00 48,084.46 59.56 1,007.78

Ward 323,774.00 280,751.95 474.29 5,570.28

Wells 38,211.00 35,311.48 31.85 918.83

Williams 361,504.00 315,994.44 488.47 2,261.97

Totals 3,457,690.00 3,193,897.54 2,462.88 72,126.56

GARRISON DIVERSION CONSERVANCY DISTRICT

Tax Collections Statement

For the Three Months Ending 3/31/2019

lschafer
Typewritten Text
Annex III 18-89
lschafer
Typewritten Text
lschafer
Typewritten Text
Page 24: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Expenditures

Budget Chargeable Budget 2019 Balance of Percentage

1/1/18 to 2018 1/1/1 Actual Budget of Budget

to 12/31/18 Budget to 12/31/19 as of 03/31/19 as of 03/31/19 Spent

GENERAL FUND

Directors Expense

Directors Per Diem $100,000 $97,527 $120,000 $25,886 $94,114 21.6%

Directors Expense $125,000 $117,652 $150,000 $28,827 $121,173 19.2%

Total Directors Expense $225,000 $215,179 $270,000 $54,713 $215,287 20.3%

Employee ExpenseEmployee Salaries 575,000 517,651 598,240 $131,747 $466,493 22.0%General Manager Exp 40,000 26,251 40,000 $4,267 $35,733 10.7%Travel 73,000 40,289 68,000 $7,968 $60,032 11.7%

Admn Officer - Merri Mooridian 25,000 22,909 25,000 $4,745 $20,255 19.0%

Dist. Engr - Kip Kovar 12,000 6,812 10,000 $1,984 $8,016 19.8%

Engineer - Ryan Anderson 10,000 1,833 5,000 $186 $4,814 3.7%

Dir. Comm. - Kim Cook 8,000 3,199 8,000 $423 $7,577 5.3%

Emp Exp Other 18,000 5,536 20,000 $630 $19,370 3.2%

Professional Development 22,000 8,852 22,000 $0 $22,000 0.0%

Employee Training 20,000 8,852 20,000 $0 $20,000 0.0%

Wellness Program 2,000 0 2,000 $0 $2,000 0.0%

Benefits 299,536 241,623 291,920 $58,588 $233,332 20.1%

GDCD FICA 51,588 43,523 45,150 $11,609 $33,541 25.7%

Retirement 71,775 69,736 83,370 $18,787 $64,583 22.5%

Hospital & Life Insurance 134,704 105,651 124,665 $26,888 $97,777 21.6%

Unemployment Comp 4,846 1,160 3,845 ($996) $4,841 -25.9%

Dental / Vision Ins. 15,160 9,055 13,460 $1,875 $11,585 13.9%

Work Force Safety 5,100 472 5,045 ($565) $5,610 -11.2%

Long-Term Disability Ins 4,363 3,309 4,385 $990 $3,395 22.6%

Vacation/Sick Leave Liability 12,000 8,717 12,000 $0 $12,000 0.0%

Total Employee Expense 1,009,536 834,666 1,020,160 $202,570 $817,590 19.9%

Administration

Postage $13,000 $5,559 $7,000 $1,003 $5,997 14.3%

Communications $26,000 $23,633 $26,000 $6,502 $19,498 25.0%

Utilities $40,000 $28,218 $40,000 $9,304 $30,696 23.3%

Meetings & Events $9,000 $4,031 $10,000 $894 $9,106 8.9%

Subscriptions/Publications $7,000 $3,510 $5,500 $2,254 $3,246 41.0%

Miscellaneous $5,000 $1,199 $8,500 $234 $8,266 2.8%

Data Processing $25,000 $14,312 $29,000 $4,278 $24,722 14.8%

Employee Recruiting $5,000 $2,817 $5,000 $0 $5,000 0.0%

Supplies $35,000 $13,998 $35,000 $4,934 $30,066 14.1%

Small Office Equipment $17,000 $13,313 $17,000 $1,115 $15,885 6.6%

Dues $14,000 $7,547 $14,000 $2,770 $11,230 19.8%

Insurance $11,000 $10,850 $16,000 $4,102 $11,898 25.6%

Annual Independent Audit $28,000 $26,890 $28,000 $0 $28,000 0.0%

Total Administration $235,000 $155,877 $241,000 $37,390 $203,610 15.5%

Public Education

GDCD Tours $5,000 $5,000 $12,000 $0 $12,000 0.0%

ND Water Users Ass'n Dues $20,000 $20,000 $20,000 $20,000 $0 100.0%

ND Water Coalition Dues $14,000 $14,000 $14,000 $14,000 $0 100.0%

ND Water Magazine $18,000 $18,000 $18,000 $0 $18,000 0.0%

Missouri River Joint Board/MRRIC $15,000 $13,605 $15,000 $0 $15,000 0.0%

Conference Booth Fees, Sponsorships $10,000 $8,754 $10,000 $126 $9,874 1.3%

Miscellaneous $9,000 $1,163 $10,000 $412 $9,588 4.1%

Total Public Education $91,000 $80,522 $99,000 $34,538 $64,462 34.9%

GARRISON DIVERSION CONSERVANCY DISTRICT

EXPENSE BUDGET ANALYSIS STATEMENT

March 1 - March 31, 2019

lschafer
Typewritten Text
Annex III 19-90
Page 25: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Expenditures

Budget Chargeable Budget 2019 Balance of Percentage

1/1/18 to 2018 1/1/1 Actual Budget of Budget

to 12/31/18 Budget to 12/31/19 as of 03/31/19 as of 03/31/19 Spent

GARRISON DIVERSION CONSERVANCY DISTRICT

EXPENSE BUDGET ANALYSIS STATEMENT

March 1 - March 31, 2019

Professional Services

Communications $154,000 $64,072 $175,000 $3,334 $171,666 1.9%

Engineering $150,000 ($5,947) $175,000 $1,477 $173,523 0.8%RRVWSP Development $208,000 $84,617 $314,000 $33,253 $280,747 10.6%

Technical Support for LAWA $15,000 $0 $15,000 $0 $15,000 0.0%Engineering $50,000 $28,257 $150,000 $0 $150,000 0.0%

Legal $50,000 $27,789 $75,000 $19,572 $55,428 26.1%

Financial $12,000 $0 $12,000 $0 $12,000 0.0%

Consultants $50,000 $25 $50,000 $0 $50,000 0.0%

Meeting, Misc. Exp $31,000 $28,546 $12,000 $13,681 ($1,681) 114.0%

Prof Services Other $0 $0 $25,000 $20,150 $4,850 80.6%

Legal Services $175,000 $73,462 $175,000 $84,160 $90,840 48.1%

Total Professional Services $687,000 $216,204 $864,000 $142,374 $721,626 16.5%

Irrigation Development

ND Irrigation Association $50,000 $50,000 $50,000 $0 $50,000 0.0%

NDSU Oakes Irrigation Site $267,875 $267,875 $267,875 $267,875 $0 100.0%

Robert Titus Lease $17,000 $15,917 $17,000 $16,653 $347 98.0%

Irrigation Development $130,000 $14,102 $130,000 $0 $130,000 0.0%

Total Irrigation Development $464,875 $347,894 $464,875 $284,528 $180,347 61.2%

Recreation

GDCD Recreation Grant Program $375,000 $332,978 $375,000 $86,832 $288,168 23.2%

DWRA Recreation Program $10,000 $5,528 $10,000 $327 $9,673 3.3%

Total Recreation $385,000 $338,506 $385,000 $87,159 $297,841 22.6%

Irrigation Districts Expense

Irrigation Districts $4,900 $0 $4,900 $0 $4,900 0.0%

Oakes Title Transfer $20,000 $18,252 $20,000 $2,188 $17,812 10.9%

Technical Support $20,000 $18,252 $15,000 $2,188 $12,812 14.6%

Legal $0 $0 $5,000 $0 $5,000 0.0%

Total Irrigation Districts Expense $24,900 $18,252 $24,900 $2,188 $22,712 8.8%

Maintenance & Repair

Equipment Maintenance $20,000 $12,839 $25,000 $4,250 $20,750 17.0%

Small Yard Equipment Purchases $4,000 $0 $5,000 $0 $5,000 0.0%

Land & Bldg Maintenance $30,000 $20,333 $30,000 $2,347 $27,653 7.8%

Auto Expense $17,000 $11,629 $18,000 $1,828 $16,172 10.2%

Total Maintenance & Repair $71,000 $44,801 $78,000 $8,425 $69,575 10.8%

Capital Purchases

Office Equip & Furniture $20,000 $15,352 $20,000 $0 $20,000 0.0%

Yard Equipment $20,000 $7,100 $20,000 $0 $20,000 0.0%

Vehicle $39,000 $37,950 $33,000 $0 $33,000 0.0%

Land and Buildings $9,000 $0 $15,000 $12,816 $2,184 85.4%

Total Capital Purchases $88,000 $60,402 $88,000 $12,816 $75,184 14.6%

Total General Fund $3,281,311 $2,312,303 $3,534,935 $866,701 $2,668,234 24.5%

lschafer
Typewritten Text
Annex III 18-91
lschafer
Typewritten Text
Page 26: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Expenditures

Budget Chargeable Budget 2019 Balance of Percentage

1/1/18 to 2018 1/1/1 Actual Budget of Budget

to 12/31/18 Budget to 12/31/19 as of 03/31/19 as of 03/31/19 Spent

GARRISON DIVERSION CONSERVANCY DISTRICT

EXPENSE BUDGET ANALYSIS STATEMENT

March 1 - March 31, 2019

IRRIGATION FUNDMcClusky Canal Irrigation: $2,625,116 $2,119,656 $1,000,000 $147,330 $852,670 14.7%

Construction $2,145,000 $1,815,532 $500,000 $15,116 $484,884 3.0%

Operations $480,116 $304,124 $500,000 $132,214 $367,786 26.4%

Debt Payments $169,884 $169,876 $170,200 $95,134 $75,066 55.9%

Principal $116,239 $116,239 $123,000 $92,151 $30,849 74.9%

Interest $53,645 $53,637 $47,200 $2,983 $44,217 6.3%

Total Irrigation Fund $2,795,000 $2,289,532 $1,170,200 $242,464 $927,736 20.7%

GDU O & M

Salaries and Benefits $2,190,283 $1,964,720 $2,398,080 $514,258 $1,883,822 21.4%

Salaries $1,498,145 $1,324,728 $1,496,500 $358,323 $1,138,177 23.9%

Benefits $692,138 $639,992 $901,580 $155,935 $745,645 17.3%

Travel $37,461 $16,649 $31,790 $1,763 $30,027 5.5%

Training $6,500 $3,988 $4,970 $0 $4,970 0.0%

Utilities $90,820 $88,811 $86,940 $20,978 $65,962 24.1%

Contractual Services $101,000 $94,220 $415,240 $6,459 $408,781 1.6%

Supplies $453,013 $452,582 $187,600 $70,855 $116,745 37.8%

Equipment Purchases $381,040 $264,876 $375,000 $0 $375,000 0.0%

Small Equipment Purchases $15,000 $7,974 $0 $5,444 ($5,444) 0.0%

Equipment Rental $14,000 $11,118 $101,400 $9,048 $92,352 8.9%

Equipment Maintenance $182,525 $181,642 $299,970 $27,950 $272,020 9.3%

Safety $43,824 $41,654 $32,520 $9,596 $22,924 29.5%

Miscellaneous $15,059 $11,601 $20,005 $2,496 $17,509 12.5%

Materials $250,592 $89,797 $200,000 $34,950 $165,050 17.5%

Total GDU O & M $3,781,117 $3,229,632 $4,153,515 $703,797 $3,449,718 16.9%

MR&I Fund

Salaries & Benefits $84,000 $79,548 $97,250 $19,022 $78,228 19.6%

State Administration $135,800 $61,205 $65,100 $14,995 $50,105 23.0%

MR&I Project Expenditures $11,500,000 $10,676,267 $6,000,000 $2,864,048 $3,135,952 47.7%

Total MR&I Fund $11,719,800 $10,817,020 $6,162,350 $2,898,065 $3,264,285 47.0%

RRV Water Supply ProjectRight of Way $1,512,000 $2,000 $1,400,000 $384,496 $1,015,504 27.5%

Design/Construction in Progress $7,602,202 $7,055,796 $28,000,000 $998,999 $27,001,001 3.6%

Salaries & Benefits $185,000 $183,757 $152,695 $48,284 $104,411 31.6%

Professional Services $1,254,500 $951,966 $1,000,000 $217,666 $782,334 10%

Financing/Legal/Administration $666,500 $364,685 $1,000,000 $95,229 $904,771 9.5%

Other Engineering $588,000 $587,281 $0 $122,437 ($122,437) 0.0%

Total RRVWSP $10,553,702 $8,193,519 $30,552,695 $1,649,445 $28,903,250 5.4%

TOTAL ALL FUNDS $32,130,930 $26,842,006 $45,573,695 $6,360,472 $39,213,223 14.0%

lschafer
Typewritten Text
Annex III 19-92
lschafer
Typewritten Text
Page 27: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

GARRISON DIVERSION CONSERVANCY DISTRICT

GDCD RECREATION GRANT PROGRAM

OUTSTANDING PROJECTS

July 1, 1990, to February 28, 2019

GRANT OUTSTANDING PROJECTS EXPENDITURES EXPENDITURES ADJUSTMENTS BALANCE

APPROVAL PROJECTS APPROVED 1990 to 1-1-19 to REMAINING

COUNTY PROJECT DATE 2019 12-31-18 2-28-19 02-28-19

Barnes Hi-Line Prairie Gardens &I Orchard Phase III 05-02-18 $ 16,055.00 16,055.00$

Benson City of Maddock 10-07-16 $ 50,000.00 35,110.53 14,889.47$

Burleigh New Generations Park-Splash Pad Only 05-02-18 $ 40,000.00 40,000.00 -$

Cass Reile's Acres Park Development 10-07-16 $ 55,000.00 37,286.74 17,713.26$

Cass Hunter City Park Playgroun 10-03-18 $ 16,071.00 16,071.00$

Eddy Campbell Memorial Park Playground Equip 04-23-15 12,500.00$ 11,945.92$ 554.08$

Foster Courthouse Park 05-02-18 7,383.00$ 7,383.00$

Grand Forks Ryan Lake Playground 05-05-17 $ 5,175.00 3,106.39$ 2,068.61$

Griggs ADA Restroom/Concession Stand 10-07-16 $ 6,125.00 3,977.60$ 2,147.40$

Griggs Binford Rodeo Ground Bleachers 10-07-16 $ 27,500.00 19,096.30$ 8,403.70$

Griggs Hannaford Park Playground 10-03-18 $ 7,309.00 7,309.00$

Lamoure Sunset Park Revitalizations Phase I 05-02-18 $ 37,500.00 23,239.50$ 14,260.50$

McHenry Buffalo Lodge Shelters 05-05-17 $ 2,500.00 2,500.00$

McKenzie McKenzie County Veteran's Park Phase II 10-03-18 $ 50,000.00 50,000.00$

McLean Garrison City Park Restrooms 05-05-17 10,000.00$ 10,000.00$

McLean Wilderness Park Improvement 05-02-18 10,000.00$ 10,000.00$

Nelson McVille Park Frisbee Golf Course 05-05-17 1,500.00$ 1,500.00$

Nelson North Park Bathroom 10-07-16 4,000.00$ 4,000.00$

Nelson Tolna City Park Restrooms 10-03-18 21,933.00$ 21,933.00$

Ramsey East Ditch Rec Site Playground Equipment 04-29-16 9,974.00$ 9,974.00$

Ramsey Creel Bay Dock & Slip 10-03-18 18,750.00$ 18,750.00$

Ransom Dead Colt Creek Hook-ups 05-05-17 6,996.00$ 6,996.00$

Ransom Dead Colt Creek Bathroom Hook-ups 05-02-18 37,500.00$ 37,500.00$

Ransom Lisbon Park District 05-02-18 5,000.00$ 5,000.00$

Renville Mohall Fairgrounds Playground Equipment 04-23-15 10,000.00$ 10,000.00$

Renville Mouse River Planters 10-05-17 250.00$ 250.00$

Renville Mouse River Park Signage 10-03-18 572.00$ 572.00$

Renville/Ward Renville County Gun Club Phase III 05-02-18 23,811.00$ 14,581.44$ 9,229.56$ -$

Richland Kidder Recreation Area Tent Campground 10-07-16 3,000.00$ 3,000.00$

Richland Colfax Park Board 10-03-18 2,925.00$ 2,925.00$

Sargent Silver Lake Improvements 10-05-17 3,559.00$ 3,218.92$ (340.08)$ -$

Sargent Silver Lake Beach Expansion Buoys 05-02-18 644.00$ 644.00$ -$

Sargent Silver Lake Teardrop & Hill Hookups 10-03-18 3,015.00$ 3,015.00$

Sheridan Hoffer Lake Beach Area 04-29-16 2,620.00$ 2,620.00$

Steele Golden Lake Playground Phase II 04-29-16 7,500.00$ 6,589.36$ (910.64)$ -$

Steele Golden Lake Campground Renovation 10-05-17 21,678.00$ 21,678.00$

Stutsman Solien-DeNault Park Sensory Garden 05-02-18 10,000.00$ 3,440.60$ 3,910.38$ 2,649.02$

Traill Mayville Nature Trail 05-05-17 13,500.00$ 13,500.00$

Traill Walking Trail 10-07-16 896.00$ 896.00$

Traill Mayville Island Park Improvement 05-02-18 20,000.00$ 18,738.25$ 1,261.75$

Traill Rainbow Garden Enhancements 10-03-18 13,585.00$ 13,585.00$

Ward Burlington Riverfront Project 04-29-16 50,000.00$ 27,882.81$ 22,117.19$

Ward Ward County Park Improvements 05-02-18 7,934.00$ 7,934.00$

Ward Roosevelt Park Playground 10-03-18 11,782.00$ 11,782.00$

Williams Williams County Parks--Picnic Shelters 04-29-16 35,000.00$ 34,293.75$ (706.25)$ -$

Williams McGregor Dam Vault Toilets 10-05-17 16,656.00$ 16,656.00$

TOTAL $717,698.00 $0.00 $209,460.33 $86,831.72 ($1,956.97) 419,448.98$

lschafer
Typewritten Text
Annex III 19-93
lschafer
Typewritten Text
Page 28: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

1

RRVWSP Work Plan Update February 26, 2019

Goal Spring 2016 Completed Conceptual Design and Cost Estimate Summer 2017 Completed Preliminary Design and Cost Estimate for pipeline and pump

station(s) 2017 - 2018 Complete Phased Final Design and Cost Estimates 2019 - 2027 Phased Bidding and Construction Total draft budget to complete Conceptual, Preliminary and Final designs is $66 million. The ND legislature appropriated $12.359 million for the RRVWSP for the 2015-2017 biennium. The conceptual design phase has been completed; therefore, no further updates will be included in this report. The ND legislature appropriated $30 million for the RRVWSP for the 2017-2019 biennium. Preliminary Design The conceptual design was released in September 2016. The majority of the preliminary design has been completed; of the $10 million cost estimate, approximately $200,000 remains to be expended on the task orders. Moving forward with limited funds, it is cost effective to start project phasing. The Implementation Plan will provide a road map to move forward with items that must be completed first, which includes permit phasing, design phasing and construction phasing.

Final Design The draft preliminary design was released early October 2017. Moving forward with limited funds, it is cost effective to start project phasing. Priority items to move forward first with final design and construction are discharge structure, trenchless crossings and portions of the intake. 1) Pipeline segment 28 miles – This task order will begin final design on a portion of the RRVWSP and is the first of several pipeline design task orders that will be executed to complete the project. Given the current level of state and local funding allocated for the project’s design and construction, the length of the initial segment selected for final design and preparation of construction contract documents is approximately 28 miles. The general location of the 28-mile pipeline segment is in Foster and Wells Counties. The alignment and limits of the pipeline being designed under this task order are identified on the RRVWSP route overview map. This task order will deliver bid ready documents for this 28-mile segment. Estimated cost is $3,840,000.

Status – Letters have been sent to utility companies asking for facility locations and details where crossings might occur. The team is anticipating 90% plans and specification will be ready for review March 2019.

2) Geotechnical – This task order will allow engineers to drill supplemental borings along the Preliminary Design Report (PDR) pipeline alignment and discharge site and to complete laboratory testing of soil samples collected. These supplemental borings are necessary to characterize subsurface soil conditions not covered by the 2008 investigation. Relevant existing

lschafer
Typewritten Text
Annex IV 19-94
lschafer
Typewritten Text
lschafer
Typewritten Text
Page 29: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

2

soils data from the 2008 investigation will be used to the maximum extent practical to support activities. Estimated cost is $544,000.

Status – All borings and soil resistivity tests are complete. Developed draft Geotechnical Baseline Report and Corrosion Protection Design Guide.

3) Sediment Transport Analysis – This task order will provide information as requested by the North Dakota State Water Commission (SWC) to evaluate the Sovereign Lands Permit for the Missouri River intake, as well as support the overall design of the intake screens. Estimated cost is $396,000.

Status – All field work was completed prior to the river freezing. A request was made to USACE for a river analysis model HEC-RAS. Developed 1D and 3D models and completed geomorphic analyses. The final Sediment Transport Report has been sent to the SWC for review.

4) Trenchless Crossings – This task order is for final design of tunneled or trenchless crossings in the first 28-mile section of pipeline selected for final design. The general outcome of this task order will be the preparation of construction contract documents. Estimated cost is $452,000.

Status – The 90% plans and specifications were ready February 2019. 5) Discharge Site Structure – This task order is for final design of the discharge structure. The general outcome of this task order will be the preparation of construction contract documents. Estimated cost is $508,000.

Status – The 90% designs are available for review.

6) Land Services – This task order is for survey support services, easement and option acquisition for RRVWSP parcels. The RRVWSP pipeline is separated into segment 1, 2a and 2b, 3 and 4. Authorization has been approved to move forward with only segment 1. Estimated cost for segment 1 is $556,446. A second authorization was approved for segment 2a, 2b and 4. Estimated cost is $1,232,839.

Status –Pipeline Segment 1 status; 85% easements signed. The appraisal reports for the intake and discharge land are scheduled to be complete February 28, 2019.

7) Drone Aerial Coverage – This task order is for unmanned aircraft system services for the initial 28-mile pipeline corridor, discharge site and intake site. Oblique view videos will be captured and incorporated into the GIS database. Estimated cost is $71,443.

Status – The intake, discharge and pipeline segment 1 have been completed.

8) Missouri River Intake – This task order is for preliminary design of the Missouri River intake including a submerged crib, a tunnel from the crib to a pumping station on the river bank, and a pumping station, including utility extensions necessary and site civil design in order to develop the site. To support early out construction, final designs will be performed for the wet well, access road for construction vehicles and site drainage. Estimated cost is $1,985,000.

lschafer
Typewritten Text
Annex IV 19-95
Page 30: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

3

Status – USACE has issued NW 12 permit for the intake. The Missouri River Intake Pump Station physical modeling is complete. The intake design passed all Hydraulic Institute tests.

9) NDPDES Permit Application Supplement – This task order provides support documentation on how the proposed RRVWSP water treatment plant meets the established requirements of the Boundary Waters Treaty Act. Estimated cost is $195,000.

Status – The NDPDES permit application was submitted to NDDOH on July 31, 2018.

10) Value Engineering – HDR was selected to complete a value engineering study on the RRVWSP. Estimated cost is $198,539.

Status – The value engineering study workshop was held September 10-14. The draft report was issued on September 28 and the final report was submitted January 1st.

11) Value Engineering Assistance – This task order provides Black and Veatch support services to the value engineering process. Estimated cost is $64,000. 12) StateMod Amendment No. 3 – This task order provides support to respond to GDCD, LAWA, stakeholder and SWC requests for additional analysis. Estimated cost is $193,428. 13) Field Verification of PDR Pipeline Alignment- This task order provides support services to field verify 139 miles of the PDR alignment not currently under design. Estimated cost is $164,000.

Financial Modeling & Stakeholder Outreach 1) Municipal Advisor – Ernst & Young Infrastructure Advisors (EYIA) provides municipal advisory services for the RRVWSP. The overall objective is to develop a robust financial plan to finance the RRVWSP. The model will include construction schedule alternatives, capital debt structure options and on-going operational and renewal costs. Estimated cost is $508,872.

Status – EYIA has refined the financial models based on effective construction schedules and debt financing approaches. The financial model includes quantified market risks and various cost-share alternatives. This work is on hold until further direction is received from stakeholders/policymakers. EYIA’s work is jointly occurring and being incorporated into modeling being completed by AE2S Nexus and Black & Veatch. The models are reviewed by the LAWA Financial Advisory Committee.

2) Financial Modeling/Cost Allocation – The task order is for AE2S Nexus to assist EYIA in development of the overall financial plan and use that plan as the basis for the cost allocation model for each participating system. Estimated cost is $512,175.

Status – The cost allocation model was refined to include a tiered allocation structure, which considers how project users will benefit from the project by assessing water supply needs, as well as access to project water. Feasibility and ability to pay studies are being conducted for roughly ten systems - both large and small systems. This work is in conjunction with the work being completed by EYIA.

lschafer
Typewritten Text
Annex IV 19-96
lschafer
Typewritten Text
lschafer
Typewritten Text
lschafer
Typewritten Text
Page 31: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

4

3) Stakeholder Re-engagement – This task order will provide support in meeting with each of the 35 systems that signed development agreements. The objective of each meeting is to obtain a signed Project Participation Agreement and Water Service Contract. Estimated cost is $398,830.

Status – Stakeholder re-engagement is anticipated to occur Fall of 2018.

Program 1) Program Management – The overall RRVWSP is expected to spend $30 million in the 2017-2019 biennium and potentially $180 million or more the next biennium. The objective of this task order will support the development and maintenance of a variety of program management support tools to help successfully execute the project. The tools and processes are expected to be developed and implemented during this biennium and be ready to support a significantly increased program size in the following biennium. Estimated cost is $491,000.

Status – Program management meeting #1 focused on all aspects of PM, PM #2 focused on the schedule, and other meetings were held developing PM tools and gaining knowledge about program delivery models. Draft Program Management Plan, Construction Management Plan and Design Guidance Manual have been submitted for review.

2) Program Management Information System – This task order will assist GDCD in making initial contact with vendors and to solicit formal submittals from those vendors to provide hardware, software and services. Estimated cost is $43,100.

lschafer
Typewritten Text
lschafer
Typewritten Text
Annex IV 19-97
Page 32: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

$0.0

$5.0

$10.

0

$15.

0

$20.

0

$25.

0

$30.

0

$35.

0

$40.

0

$0

$500

$1,0

00

$1,5

00

$2,0

00

$2,5

00

$3,0

00

$3,5

00

$4,0

00

JulAugSepOctNovDecJanFebMarApr

MayJunJul

AugSepOctNovDecJanFebMarApr

MayJunJul

AugSepOctNovDecJanFebMarApr

MayJunJul

AugSepOctNovDecJanFebMarApr

MayJunJul

AugSep

2015

2016

2017

2018

2019

CUMULATIVE SPEND

MILLIONS

MONTHLY SPEND

THOUSANDSRe

d Ri

ver V

alle

y W

ater

Sup

ply

Proj

ect P

lann

ing

Leve

l Bud

get

2015

-201

7 M

onth

ly A

ctua

l Spe

nd20

17-2

019

Mon

thly

Act

ual S

pend

2017

-201

9 M

onth

ly P

roje

cted

Spe

nd

Cum

ulat

ive

Proj

ecte

d Sp

end

Cum

ulat

ive

Actu

al S

pend

Proj

ecte

d vs

. Act

ual

Mar

ch 2

019

Cum

ulat

ive

Spen

d $2

4,49

8,99

4

lschafer
Typewritten Text
lschafer
Typewritten Text
Annex V 19-98
Page 33: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Red River Valley Water Supply Project

Planning Level Budget

March 31, 2019

Percent

Complete

Current

Estimate

Actual

Expenses

Outstanding

Expenses

Conceptual Design Subtotal 100% 5,302,130$ 5,302,130$ 0$

Preliminary Design

Missouri River Conventional Intake Design 100% 1,010,778$ 1,010,778$ -$

Pipeline Alignment McClusky to Split & Land Services (ROE) 100% 3,436,073$ 3,435,888$ 185$

Pipeline Alignment Washburn-McClusky & Land Services (ROE) 100% 593,683$ 593,115$ 568$

Pipeline from Split to Baldhill Creek (RRV) Land Services (ROE) 100% 574,726$ 574,726$ -$

Land Services (Aerial) 100% 259,694$ 259,694$ -$

Main Pump Station and Break Tank 100% 997,267$ 995,424$ 1,843$

StateMod - includes amendments 1, 2 & 3 97% 616,229$ 596,474$ 19,755$

Pipeline Extensions 100% 627,333$ 627,333$ -$

Discharge Design (Sheyenne/Baldhill) 100% 617,000$ 615,860$ 1,140$

Administration (cost & schedule, communications, LAWA) 100% $ 240,208 240,208$ -$

Legal 100% $ 370,283 370,283$ -$

Financial Modeling 100% $ 363,800 363,800$ -$

Municipal Advisor 100% $ 374,835 374,835$ -$

Workflow Manager 93% $ 150,000 139,367$ $ 10,633

Preliminary Design Subtotal 100% 10,231,909$ 10,197,785$ 34,124$

Final Design

Engineering

Pipeline Final Design - 28 miles 69% 3,840,000$ 2,635,810$ 1,204,190$

Trenchless Final Design 93% 452,000$ 422,557$ 29,443$

Discharge Final Design 83% 508,000$ 419,819$ 88,181$

Land Services - Segments 1, 2a, 2b, 4 26% 1,789,285$ 462,664$ 1,326,621$

Geotechnical 88% 544,000$ 478,852$ 65,148$

Sediment Transport 91% 396,000$ 361,232$ 34,768$

Missouri River Intake Final Design 80% 1,985,000$ 1,580,908$ 404,092$

Upper Sheyenne Discharge Analysis * 99% 36,723$ 36,430$ 293$

Unmanned Aircraft System Services 95% 71,443$ 68,120$ 3,323$

Value Engineering 73% 262,539$ 190,445$ 72,094$

NDPDES Permit Application Supplement 97% 195,000$ 189,834$ 5,166$

Field Verification of PDR Pipeline Alignment 50% 164,000$ 82,767$ 81,233$

Land Acquistion

Acquire Options 10% 134,000$ 13,080$ 120,920$

Acquire Easements 32% 1,164,000$ 371,416$ 792,584$

Acquire Real Estate 0% 78,000$ -$ 78,000$

Financial, Administration, Legal, Etc.

Financial Modeling/Cost Allocation 73% 1,021,047$ 746,390$ 274,657$

Program Management Set Up 99% 491,000$ 484,941$ 6,059$

Program Management Information System 64% 43,100$ 27,748$ 15,352$

Administration (communications, LAWA) 41% 550,000$ 225,060$ 324,940$

Stakeholder Support 11% 398,830$ 43,748$ 355,082$

Legal 26% 600,000$ 157,255$ 442,745$

Undesignated -$ -$

Final Design, Easement & Administration Subtotal 61% 14,723,967$ 8,999,078$ 5,724,889$

Construction

Pipeline Trenchless Construction Upcoming 7,000,000$ -$ 7,000,000$

Discharge Construction Upcoming 2,000,000$ -$ 2,000,000$

Intake Construction Upcoming 4,000,000$ -$ 4,000,000$

Construction Phase Engineering (Trenchless & Intake) Upcoming 500,000$ 500,000$

Construction Subtotal 0% 13,500,000$ -$ 13,500,000$

Total Program Budget 56% 43,758,006$ 24,498,994$ 19,259,012$

2015/2017 State Appropriation $12,359,000 12,359,000$

2015/2017 LAWA Cost Share $1,373,225 1,373,225$

2015/2017 total 13,732,225$

2017/2019 State Appropriation 30,000,000$

RRVWSP Program Budget 43,732,225$

2017/2019 Appropriation Spent to Date 10,766,769$

2017/2019 Committed Outstanding 5,759,013$

2017/2019 Not Committed 13,500,000$

* not subject to local cost share

lschafer
Typewritten Text
Annex V 19-99
Page 34: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Red River Valley Water Supply Project

2019 Draft Work Plan

1

1. Early-Out Projects – Finalize designs in March, advertise and award three construction

contracts, and begin construction of:

a. Trenchless Crossings (contract 5A),

b. Discharge Structure, and

c. Missouri River Intake Pumping Station Wetwell.

2. Complete marine borings in the Missouri River and begin development of geotechnical

reports for the Missouri River Intake.

3. Begin final design of facilities to be built in and under the Missouri River to meet USACE

Nationwide 12 permit schedule requirements.

4. Begin conceptual design of new McClusky Canal Intake and Pumping Station.

5. Investigate routing and begin preliminary design of a new McClusky pipeline, including

wetlands delineation and surveys.

6. Complete final design and associated plans and specifications in June; advertise and award

construction contract for 4-mile pipeline (contract 5A).

7. Complete final design and development of associated plans and specs for 24-mile pipeline

(contract 5B).

8. Begin final design and development of associated plans and specifications for 24-mile

pipeline (contract 4 or 6).

9. Begin advancement of the Biota Water Plant, Main Pumping Station, and Control Valve

Structure designs to a 30-percent completion stage.

10. Land Acquisition

a. Secure required main pipeline easements; obtain options for the McClusky pipeline.

b. Purchase land for Missouri River Intake and Control Valve/Discharge Structures sites.

c. Begin platting, appraisals, and site assessments for acquisition of Hydraulic Break

Tanks, Biota Water Plant, and McClusky Canal Intake and Pumping Station sites.

11. Begin development of a report with strategies and protocol for operating the water supply

system, including Lake Ashtabula releases, to meet project participant needs.

12. Continue use of previously developed program management tools to support financial and

budget tracking, to mitigate project risks, and to monitor schedule and performance.

13. Select a vendor and begin implementation of a Project Information Management System

software solution to manage workflows and organize/retain project data.

14. Obtain a Sovereign Lands Permit for the Missouri River Intake from the State Water

Commission in the February/March timeframe.

15. Continue working to obtain a North Dakota NPDES discharge permit with a draft permit

anticipated by June based on recent discussions with the NDDH. Final permit is expected in

late August.

lschafer
Typewritten Text
Annex VI 19-100
Page 35: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Red River Valley Water Supply Project

2019 Draft Work Plan

2

16. Continue refinement of financial models

a. Finalize Overall Financial Model – Finalize model and incorporate final determinations

for construction schedule, project cost share, local financing structure, and drought

funding plan.

b. State/BND Interface and RTF Forecasting Support/Outreach – Support Garrison

Diversion in relaying key considerations for projected costs as they relate to the State’s

share of the project. Work will include refinement of construction spend schedule to

ensure State understands RTF funding implications as well as further development of

the preferred approach to drought operations funding.

c. Final Cost Allocation Plan – Work with users through LAWA FAC to make final

determinations for cost allocation approach for domestic and industrial nominations.

Work will include ensuring all nominating systems understand final approach and

anticipated long-term obligations and impacts from the project.

d. User Agreement Financial Terms and Conditions – Assist Garrison Diversion and Legal

Team in developing appropriate terms and conditions for agreements considering all

anticipated allocated costs related to project capital, financing, operations, and

renewal.

e. 2019 Local Share Capital Financing Support – Assist in securing first State loan for the

project and executing initial State loan allocations to the users per the agreed upon

terms and conditions.

f. Capital Accounting and Cost Allocation Protocol Development – Develop protocol and

systems required to ensure cost allocation over time remains consistent with final

agreed upon approach for the allocation methodology.

g. Ability to Pay System Scenarios

17. Develop legislative plan for 2019-2021 biennium – Create brochures, presentations,

testimony, and host social and meetings that are all focused on five goals for the 2019

legislative session including: 1) $50MM grant for construction of pipeline segment, land

acquisition, facility and pipeline design, and management and administrative services; 2)

affordable cost-share between state and local users; 3) long-term low interest loan from

the State in the form of a 40-year 2-percent loan; 4) drought operation and funding plan

through State Water Commission budget mitigation fund; and 5) 10- year project funding

plan and construction schedule commitment.

18. Present financial models to stakeholders and policymakers – Assist Garrison Diversion in

working with users to relay and garner feedback from evaluations undertaken under

refinement of financial models discussed above.

19. Finalize and execute Project Participation Agreements

20. Finalize and implement a Memorandum of Understanding between Garrison Diversion and

LAWA

lschafer
Typewritten Text
Annex VI 19-101
Page 36: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Red River Valley Water Supply Project

2019 Draft Work Plan

3

21. Continue communications

a. Develop and distribute RRVWSP Quarterly Newsletter

b. Staff LAWA display booths at appropriate conferences and events

c. Prepare and distribute news releases regarding RRVWSP and LAWA efforts

d. Monitor media

e. Develop articles for ND Water and other potential publications

f. Develop content and monitor social media sites for RRVWSP

g. Maintain RRVWSP and LAWA websites

h. Develop landowner communication tools

i. Develop RRVWSP education tools (videos, presentations, handouts, etc.)

j. Develop communication strategies and execute on content and events that support

goals of 2019 Legislative session

k. Hold a 2019 Water Conference and develop content to support goals of conference

lschafer
Typewritten Text
Annex VI 19-102
Page 37: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VII 19-103
lschafer
Typewritten Text
Page 38: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VII 19-104
Page 39: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VII 19-105
Page 40: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VIII 19-106
Page 41: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VIII 19-107
Page 42: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VIII 19-108
Page 43: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000
lschafer
Typewritten Text
Annex VIII 19-109
lschafer
Typewritten Text
Page 44: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

2018 ECONOMIC IMPACTS

31 FULL-TIME AND 1 PART-TIME

32 EMPLOYEES LIVING & WORKING ACROSS CENTRAL ND

AGRICULTURE

PUBLIC EDUCATION

= $3,165,897 IN TOTAL SPENDING CONTRIBUTING TO THE FOLLOWING REGIONS

*FOR EVERY $1 SPENT LOCALLY, AN ADDITIONAL $0.45 IS GENERATED FOR THE LOCAL ECONOMY (AMIBA.NET/RESOURCES/MULTIPLIER-EFFECT)

COUN

TIES

CITI

ES

MAINTENANCE & REPAIRS CAPITAL PURCHASES$80,522 $1,092,038 $1,660,359

NUMBER OF EMPLOYEES BY COMMUNITIES

Carrington, ND and the Surrounding Region

GARRISON DIVERSION CONSERVANCY DISTRICT

Since 1965, Garrison Diversion has headquartered in Carrington, North Dakota. Being in the heart of North Dakota and providing professional jobs for 32 employees provides opportunity and tax base for the entire region.

Garrison Diversion also proudly supports and purchases from local businesses and providers wherever possible, thus generating additional indirect benefits such as additional jobs for small businesses and community support. Many of our employees volunteer and donate their time and talents to events and nonprofits in the areas they call home.

Everything Garrison Diversion does is linked to the mission to provide a reliable, high-quality and affordable water supply to benefit the people of North Dakota. We work to provide high-quality drinking water, mitigate drought impacts, and support agriculture and industry along with support for recreation and natural resource development. This mission and the work we do continues to be a source of great pride for our staff.

10 - Carrington4 - Wilton4 - New Rockford 3 - McClusky2 - Oakes2 - Mercer

2 - Turtle Lake1 - Jamestown1 - Hurdsfield1 - Velva1 - Baldwin1 - Mandan

$4,590,551 IN ECONOMIC IMPACT*

RECREATION$332,978

• Barnes • Benson • Bottineau • Burleigh • Cass • Eddy

• Grand Forks • Griggs • McKenzie

McLean • Nelson • Ramsey

• Renville • Sargent • Sheridan• Stutsman • Traill• Ward

• Bismarck • Carrington• Cooperstown• Fargo• Jamestown• McClusky

• Minot• New Rockford• Oakes

March 25, 2019

IN 2018 $318,226 WAS INVESTED IN IRRIGATION TRIALS, IRRIGATION DEVELOPMENT, AND SUPPORT FOR THE ADVANCEMENT OF ND IRRIGATION ASSOCIATION.

AGRICULTURE AND IRRIGATION HAVE BEEN PART OF THE GARRISON DIVERSION

PROJECT SINCE ITS INCEPTION

lschafer
Typewritten Text
Annex IX 19-110
Page 45: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

Bureau of Reclamation Activities Garrison Diversion Meeting April 11-12, 2019

Municipal, Rural, and Industrial Program Rural Water Budgets:

State Municipal Rural and Industrial Program

NAWS Final briefs in the State of Missouri appeal were filed on September 7, 2018 and oral

arguments were held on November 8, 2018. There is no schedule for when the Appellate

Court may issue a ruling on this appeal.

Reclamation, GDCD and the State Water Commission have formed a design team to oversee

the design of the Biota WTP which will be located near Max, ND. Design work is ongoing

and scheduled to be completed in 2019. Design work is also ongoing for the project’s intake

within the Snake Creek Pumping Plant. Reclamation is a member of the design team and

participated in a coordination meeting with the Corps of Engineers and the State Water

Commission on March 21, 2019 to introduce the project to them and discuss requirements

they may have for this intake project. Reclamation is also be scheduling Value Engineering

studies for this design effort in June 2019.

Reclamation and GDCD have concurred on the award of the NAWS Westhope and All

Seasons System III Segment (Contract 2-4A) distribution pipeline project. The contract will

be awarded to Kemper Construction Company of Minot ND in the amount of $4,274,260.50.

Reclamation has determined the project is covered under existing environmental and cultural

evaluations. Reclamation hosted an IMA review of the proposed route in November 2018.

DKAO is in the process of preparing a modification to our cooperative agreement to include

this pipeline project in the list of approved construction projects.

Rural Water Budgets

Enacted FY 2019

Request FY 2020

GDU 32.988 3.538 State 15.730 0.000

Tribe 17.258 3.538

Lewis &Clark 15.000 0.100 Fort Peck 30.200 2.431 Rocky Boys 30.000 1.984 E NM 4.347 0.000

Total 112.535 8.053

lschafer
Typewritten Text
Annex X 19-111
Page 46: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

Reclamation is in the process of establishing an Adaptive Management Team. The Province

of Manitoba entered into a Memorandum of Understanding (MOU) with Reclamation which

identifies the goals of the team and each agencies roles and responsibilities. Reclamation

invited other stakeholders to participate as well by signing similar MOUs. These stakeholders

include EPA, ND State Water Commission, ND Department of Health, ND Game & Fish

Department, Garrison Diversion and the City of Minot. Four agencies (ND State Water

Commission, Garrison Diversion, City of Minot and EPA-Region 8) accepted the invitation

and signed an MOU with Reclamation. The ND Game & Fish Department declined the

invitation and the ND Department of Health did not respond to the invitation. An initial

conference call of the Adaptive Management Team will be scheduled later this summer.

Southwest Pipeline Project Contract 1-2A, Supplementary Raw Water Intake - The contractor has completed the

installation of the caisson shaft. Tunneling operation for the intake pipeline began on July

15, 2015 and tunneling operations were halted in early November 2015, due to a failure

within the tunneling section. The contractor then began a new pipe alignment rotated 7

degrees east of the original but a crack in the concrete pipe prevented further progress on the

new alignment. The contractor continues working on a plan to use the horizontal directional

drilling to install the raw water intake pipeline. Reclamation is waiting for direction from the

Project Sponsor as to whether assistance is needed to prepare NEPA compliance for the

proposed action.

Construction progress continues at the Dickinson Water Treatment Plant Residuals Handling

Facility, SWPP Contract 3-2E. This project includes the construction of a 65 ft. by 80 ft.

reinforced concrete and pre-cast concrete building and the installation of piping, pumping,

dewatering equipment, mechanical, electrical and instrumentation systems for the new

Residuals Handling Facility near the Dickinson water treatment plant.

The Richardton and Dodge Pump Station Upgrades project (Contract 4-1E and 4-2B) was

awarded as three contracts October 2018. The General Construction Contract was awarded

to PKG Contracting, Inc. of Fargo in the amount of $5,420,489; the Mechanical Construction

Contract was awarded to Central Mechanical, Inc. of Mandan in the amount of $428,700; and

the Electrical Construction Contract was awarded to Edling Electric Inc. of Bismarck in the

amount of $488,700. The sponsor issued a Notice to Proceed to each contractor on November

14, 2018. DKAO is in the process of preparing a modification to our cooperative agreement

to include this project in the list of approved construction projects.

Other State Municipal Rural and Industrial Projects Reclamation and Garrison Diversion’s working relationship for the State MR&I Program is

defined by the terms of a Cooperative Agreement (R17AC00049) established in 2017. Five

modifications have been completed for this agreement for the purposes of adding

construction projects and/or obligating funds to the agreement. There are currently 20

projects approved for construction under this agreement. The most recent modification

(Modification 05) was executed on March 13, 2019 and included two additional projects

(Northeast Regional Water User District Expansion and the Richardton & Dodge Pump

Station Upgrades) to the scope of work, obligate FY2019 funds totaling $14,785,000 and

extend the period of performance of this agreement through FY2021.

lschafer
Typewritten Text
Annex X 19-112
Page 47: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

DKAO continues to work with our Regional Office to closeout the previous cooperative

agreement (R12AC60014).

Reclamation completed a Categorical Exclusion Checklist (CEC) for the Glenburn Water

Improvements project and both Reclamation Garrison Diversion granted approval for the

project sponsor to advertise this project for bid. Bids will be opened on April 4, 2019.

Indian MR&I Program Standing Rock MR&I System In mid-December the Tribe held a bid opening for the McLaughlin Pump Station project.

Reclamation is working with the Tribe on some follow up actions that need to be addressed

before Reclamation can concur on the award this contract. The tribe will hold a bid opening

April 4th

for the Standing Rock Water Treatment Plant Equipment Procurement Contract

which was advertised following a previously unsuccessful bid opening last fall.

Reclamation assisted the tribal rural water department with the preparation of a water service

contract which the Tribe will enter into with the City of McLaughlin, SD to memorialize the

responsibilities, ownership and costs associated with the delivery of MR&I water to that

community. This water service contract was fully executed in 2019 and will remain in effect

for 25 years. Reclamation is currently assisting the Tribe with the preparation of water

service contract with the community of Selfridge, ND and Fort Yates, ND.

Spirit Lake MR&I System Preliminary design and right-of-way acquisitions continues on several projects including: Ft.

Totten Community Upgrades, Tokio Service Area, and the Warwick Service Area. The

Tribe’s engineering consultant has completed the updated to the Master Plan which sets

priorities and plans construction through the funding of their ceiling.

Fort Berthold Rural Water System The Subsequent Users contract (2017-4) was awarded to Storms Construction (Mandan, ND)

to connect new water users to the existing FBRWS throughout the reservation. The contract

was extended to allow work to be conducted over the winter and likely will be extended

through June 30, 2019

Efforts are underway to prepare and advertise another multiyear Subsequent User contract in

the spring of 2019 to connect new water users to the existing FBRWS, extend main and

secondary transmission pipelines, and master meter vaults throughout the reservation.

Swanberg Construction (Valley City) was awarded the construction contract for the new

Twin Buttes WTP (contract 2017-2) schedule 1, a 350 gpm (expandable to 600 gpm) facility,

located near Twin Buttes. Work interior to the building has been ongoing over the winter.

Reclamation, IHS, U.S. Army Corps of Engineers, TAT Public Works, and FBRW are

collaborating on a shoreline protection project at the Twin Buttes and White Shield Intakes.

The intakes are at risk due to erosion caused by fluctuating reservoir levels during the 2011

flood and subsequent high-water and ice events. The rock rip rap delivery was completed in

August 2017. In spring 2018 IHS awarded the shoreline protection contract to Meyer

Contracting, but work was delayed due to high Lake Sakakawea reservoir levels. In

lschafer
Typewritten Text
Annex X 19-113
Page 48: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

December 2018, under a contract change order, Meyer Contracting conducted the Phase 1

work at White Shield, consisting of repairs to damaged areas on the exposed backup slope

tube steel pipes, re-bedding the slope tubes, installed temporary sheet pile, backfill behind the

sheet pile, and installing geotextile material and rock rip rap to tie into the originally-

proposed design for the permanent shoreline protection work.

The Mandaree water treatment plant discharge pond project (contract 2018-2) was awarded

to Meyer Contracting (Maple Grove, MN) but issues with existing buried utilities and

easements delayed the issuance of the Notice to Proceed. Subsequently it was learned a new

school is being built at Mandaree in 2019, which required changes in the design of the

discharge pond. Construction is anticipated to begin this spring when site conditions allow.

It is expected the Mandaree intake access road will need extensive repairs due to several

landslide events happening there. Unless significant volumes of dirt are moved, and the area

is stabilized, it is anticipated that periodic, significant maintenance will be needed to allow

safe and reliable access to the intake. In spring 2018 a contract was awarded to install H-pile

to stabilize the headwalls, booster station, and a portion of the raw water pipelines; no

substantial movement has been detected since the H-pile was installed. Periodic monitoring

of the landslide area is needed, especially after spring runoff and rainfall events, to ensure the

protected areas remain stationary and unprotected portions of the raw water pipeline do not

start moving.

Turtle Mountain Rural Water System Contract 3-2 Membrane Treatment Improvements / Water Treatment Plant Expansion - The

membrane treatment project will address the formation of disinfection by-products caused by

an organic component in the source ground water. Currently in design with plans

approximately 30% complete.

Turtle Mountain is planning on replacing two old glass-lined tanks 5 miles west of Belcourt

with a new elevated tank, Reservoir A. Final design work is being completed with a tentative

ad date of Spring 2019.

Contract 1-4, Southeast Loop will install approximately 5 miles of new water main along

BIA 9, 12, and 3. This project was awarded on Sept. 7, 2018 to Rich’s Construction for

$1,399,089. Approximately 50% of the job was completed in 2018, with the remainder being

finished Spring 2019.

Two additional projects are in the design phase (HWY 43 Phase 3 & Thorne Reservoir and

Booster Station), tentatively scheduled for 2020 ad dates.

Trenton Indian Service Area The Hilltop Water and Sewer Replacement and PRV Vault project was awarded to Teraflex

Group, LLC for $495,835 and construction work was started summer 2018. The project

installed 2539 LF of water line and will replace the existing Booster Station B with a

Pressure Reducing Valve to connect to the existing Western Area Water Supply mainline.

PRV work will be completed summer 2019.

lschafer
Typewritten Text
Annex X 19-114
Page 49: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

Principal Supply Works

McClusky and New Rockford Canals

Reclamation’s Regional Acquisition Services Group has extended the existing OM&R

cooperative agreement through September 30, 2019 and is working on a funding

modification to obligate an estimated $2,505,000.00 for O&M activities in 2019. They are

also continuing to work on a modification to the cooperative agreement for the McClusky

Canal slide repairs to include all work tasks as proposed by Garrison Diversion and to

obligate an additional $3,295,000 for the slide repairs. In a separate effort, Reclamation’s

Regional Resources Services Group is preparing a draft O&M Transfer Agreement to submit

to Garrison Diversion for consideration as an alternative to the existing OM&R cooperative

agreement for accomplishing OM&R on the GDU Project. Plans are to have the draft O&M

Transfer Agreement completed in the next month so that Reclamation can meet with

Garrison Diversion to discuss the differences and advantages of the O&M Transfer

Agreement compared to a cooperative agreement.

Irrigation Turtle Lake and McClusky Canal Irrigation Areas Reclamation received a request from Garrison Diversion to modify the water service contract

to remove undeveloped areas and add one new pivot, a net addition of 6 acres in 2019.

Reclamation has completed the environmental compliance and is modifying the contracts.

Standing Rock Irrigation Project The Tribe is working on getting easements to allow for construction of 4 additional pivots on

their Eagle Irrigation Unit, near Wakpala SD. They have requested assistance with

inspection and evaluation of the Eagle Unit pipeline and cathodic protection system. The

Tribe plans to rehabilitate the pivot on the Porcupine Unit in 2019, which was approved but

not completed in 2017. The Tribe has been focusing on using their construction funds to

rehabilitate their existing irrigation rather than expand the acreage.

Oakes Irrigation Reclamation and Dickey-Sargent Irrigation District (DSID) signed a Memorandum of

Agreement to pursue title transfer of GDU irrigation facilities at Oakes. Reclamation

presented the valuation determination for Oakes Test Area facilities to DSID on March

20th

. DSID was asked to prepare their proposal for negotiating the title transfer agreement.

Reclamation is also evaluating its title transfer legislation recently enacted to determine

whether it can be used for Oakes. A meeting of the Oakes Test Area Operating Principals

stakeholders was held on April 4, which briefed the stakeholders of the ongoing title

transfer.

Reclamation offered an annual water service contract to Dickey-Sargent Irrigation District

at their March Board meeting. The contract will be the same as prior year contracts,

allowing the District to irrigate up to 5,000 acres.

lschafer
Typewritten Text
Annex X 19-115
Page 50: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

BUREAU OF RECLAMATION: MARCH 2019

Recreation Development

Normal O&M for recreation will continue at the Chain of Lakes recreation area in 2019.

Reclamation has secured the services of a BLM Ranger to help the McLean County Sheriff

Department with law enforcement duties over the 4th

of July 2019 for the Chain of Lakes

Recreation Area and as needed. A tree nursey was started in 2018 between Heckers and New

John’s Lake. The trees will continue to be watered through 2019 until they reach transplant

height. Staff can then use the tree spade to transplant them around the Chain of Lakes

Recreation Area by all the campsites and at a proposed camp host site that is currently being

planned by Reclamation for East Park Lake.

North Dakota Natural Resources Trust

The FY19 funding obligation was $761,000 which is 5% of the State MR&I appropriation as

required by the Dakota Water Resources Act. Reclamation has prepared the Agreement

modification for FY 2019.

Wildlife Program Lonetree Reclamation is finalizing the annual NEPA compliance. The Agreement modification for

FY 2019 is in Region awaiting approval.

Audubon, Arrowwood, and Scattered Tracts The Semi-Annual meeting was held at Arrowwood on March 7

th. The electric fish barrier

was turned on March 20. The Agreement modification for Audubon is complete. The

Agreement modification for Scattered Tracts for FY 19 is in Region awaiting approval. The

Dirt Tour will take place at Audubon and Riverdale this year and is anticipated to occur

either the last week in July or 1st week in August. The Semi-Annual fall meeting is

scheduled for September 25th at Audubon NWR.

lschafer
Typewritten Text
Annex X 19-116
Page 51: GARRISON DIVERSION CONSERVANCY DISTRICT BOARD OF …Water Appropriations Permit - - Mr. Kovar referred to Garrison Diversion’s letter to the State Water Commission requesting 120,000

Pri

or

2019

Fu

nd

ing

So

urc

eF

ed

era

l

MR

&I F

un

dM

R&

I F

un

dS

tate

Fed

era

lT

ota

l F

un

ds

MR

&I F

un

d

Exp

en

dit

ure

sE

xp

en

dit

ure

sG

ran

tM

R&

I F

un

dA

pp

rov

ed

Rem

ain

ing

McLean-S

heridan B

B E

xpansio

n1,3

00,5

25.9

2$

-$

$698,2

88.8

3$735,0

00

$1,4

33,2

88.8

3$132,7

62.9

1

South

Centr

al R

WD

-Logan B

ooste

r S

tation

423,9

55.6

7$

-$

$0

$495,0

00

$495,0

00

$71,0

44.3

3

Burlin

gto

n W

ate

r M

ain

259,7

37.0

0$

-$

$0

$600,0

00

$600,0

00

$340,2

63.0

0

Cass R

ura

l W

ate

r Leonard

2,3

70,0

00.0

0$

-$

$0

$2,3

70,0

00

$2,3

70,0

00

$0.0

0

Casselton W

ate

r T

ow

er

870,2

22.4

9$

9,6

82.3

8$

$0

$1,2

48,0

00

$1,2

48,0

00

$368,0

95.1

3

Gla

dsto

ne W

ate

r M

ain

& S

tora

ge T

ank

-$

-$

$0

$735,0

00

$735,0

00

$735,0

00.0

0

Gle

nburn

Dis

trib

ution *

99,7

50.0

0$

-$

$0

$99,7

50

$99,7

50

$0.0

0

Gle

nburn

Wate

r S

tora

ge *

83,1

97.5

0$

5,0

25.0

0$

$0

$88,2

23

$88,2

23

$0.0

0

Kin

dre

d W

ate

r T

ow

er

446,4

42.9

7$

29,6

39.0

4$

$0

$735,0

00

$735,0

00

$258,9

17.9

9

Makoti W

ate

r S

tora

ge E

xpansio

n

228,8

14.7

3$

102,4

16.3

8$

$0

$1,0

50,0

00

$1,0

50,0

00

$718,7

68.8

9

Mohall

Wate

r T

ow

er

670,0

00.0

0$

-$

$0

$670,0

00

$670,0

00

$0.0

0

NA

WS

-Min

ot W

ate

r T

reatm

ent P

lant

1,7

68,0

76.6

7$

1,9

43,7

25.2

9$

$0

$8,2

15,0

00

$8,2

15,0

00

$4,5

03,1

98.0

4

NA

WS

-Bio

ta T

reatm

ent P

lant

-$

-$

$0

$770,0

00

$770,0

00

$770,0

00.0

0

New

Engla

nd W

ate

r T

ow

er

1,3

88,9

90.5

1$

4,6

56.0

9$

$0

$1,5

92,5

00

$1,5

92,5

00

$198,8

53.4

0

Nort

heast R

egio

nal W

ate

r *

501,0

43.6

3$

51,3

28.4

1$

$0

$1,1

06,0

00

$1,1

06,0

00

$553,6

27.9

6

Rubgy W

ate

r T

reatm

ent P

lant

427,9

56.6

0$

-$

$0

$458,0

00

$458,0

00

$30,0

43.4

0

Sherw

ood S

yste

m L

oopin

g

365,6

04.2

6$

-$

$0

$456,0

00

$456,0

00

$90,3

95.7

4

South

west P

ipelin

e W

ate

r T

reatm

ent P

lant

-$

-$

$0

$400,0

00

$400,0

00

$400,0

00.0

0

Wahpeto

n W

ate

r T

reatm

ent P

lant Im

p.

-$

717,5

75.0

3$

$0

$960,0

00

$960,0

00

$242,4

24.9

7

Westh

ope W

ate

r S

yste

ms Im

pro

vem

ent

248,4

36.7

5$

-$

$0

$255,0

00

$255,0

00

$6,5

63.2

5

To

tal

$11,4

52,7

54.7

0$2,8

64,0

47.6

2$698,2

88.8

3$23,0

38,4

72.5

0$23,7

36,7

61.3

3$9,4

19,9

59.0

1

* O

nly

En

gin

eeri

ng

in

Co

op

era

tiv

e A

gre

em

en

t

Column1

Co

lum

n2

Co

lum

n3

Co

lum

n4

Column5

Co

lum

n6

Co

lum

n7

Gle

nb

urn

Dis

trib

uti

on

612,7

50

$

Gle

nb

urn

Wat

er S

tora

ge

436,7

77

$

NA

WS-

-Bio

ta T

reat

men

t P

lan

t19,5

15,0

00

$

No

rth

east

Reg

ion

al W

ater

Dis

tric

t Ex

pan

sio

n7,4

99,0

00

$

T

ota

ls28,0

63,5

27

$

Fu

nd

ing

Year

2016, 2017 a

nd

2018 P

roje

cts

Co

nstr

ucti

on

no

t in

Co

op

era

tiv

e A

gre

em

en

t

Marc

h 3

1, 2019

GA

RR

ISO

N D

IVE

RS

ION

CO

NS

ER

VA

NC

Y D

IST

RIC

T

MR

&I P

roje

ct

Co

nstr

ucti

on

Rep

ort

Cu

rren

t F

ed

era

l F

un

din

g

lschafer
Typewritten Text
lschafer
Typewritten Text
lschafer
Typewritten Text
Annex XI 19-117
lschafer
Typewritten Text
lschafer
Typewritten Text