garret o'connor, transurban: hills motorway m2 upgrade norfolk tunnel widening
DESCRIPTION
Garret O’Connor, Project Director, Transurban delivered this presentation at the 2013 Australian Tunnelling conference. The two day conference is supported by the Australasian Tunnelling Society and brings together tunnelling leaders, engineers and industry experts to share best practice in tunnelling design, construction, safety and maintenance. The 2012 program focussed on updates from Australasia’s current and future projects, plus case studies from leading International projects - sharing best practice and lessons learnt from the forefront of the latest tunnelling projects. For more information about the event, please visit the conference website: http://www.informa.com.au/tunnellingconferenceTRANSCRIPT
![Page 1: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/1.jpg)
1
SYDNEY NETWORK
![Page 2: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/2.jpg)
2
PROJECT SCOPE
![Page 3: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/3.jpg)
3
• Reduce congestion
• New entry/exit points - Windsor Road - Macquarie Park
• Upgraded ITS
• Tunnel widening and systems upgrade
• Cashless tolling
HILLS M2 UPGRADE
![Page 4: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/4.jpg)
4
ORIGINAL TUNNEL
![Page 5: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/5.jpg)
5
ORIGINAL TUNNEL Cross Section
![Page 6: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/6.jpg)
ORIGINAL CONDITON
6
![Page 7: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/7.jpg)
7
TUNNEL REQUIREMENTS
Three 3.5m lanes eastbound and westbound
2.5m breakdown lane
0.5m median shoulder and 0.6m protected walkway
New fire safety deluge system and storage tanks
New HV sub station
New Intelligent Transport System
![Page 8: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/8.jpg)
8
CHALLENGES
• Working next to live traffic. • Non continuous work times
(weekends only). • Requirements to return to an
operational motorway at the end of every shift.
• Maintaining the operational capability of the tunnel for motorway operation requirements during construction.
• Close proximity to the community. • Managing environmental
constraints. • Staging and sequencing.
![Page 9: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/9.jpg)
Widening of an existing tunnel while maintaining traffic flow at all times is a first for Australia
AUSTRALIAN FIRST
9
![Page 10: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/10.jpg)
10
TUNNEL WORK PROGRAMME
Service Relocation
Trench and Niche Excavation
Batter Widening
Tunnel Widening
Drainage and Pavement
Finishings
Project Time Chainage
![Page 11: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/11.jpg)
11
NEW SERVICE TRENCH
![Page 12: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/12.jpg)
Multiple detail excavation methods used
NEW NICHES
12
![Page 13: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/13.jpg)
13
M&E STAGE 1
![Page 14: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/14.jpg)
EXCAVATION CUT IN EASTBOUND
14
![Page 15: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/15.jpg)
15
EXCAVATION CUT IN WESTBOUND
![Page 16: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/16.jpg)
16
CONSTRUCTION VENTILATION 2no. 30m³/sec Low Profile Dust Scrubber
![Page 17: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/17.jpg)
ROCKBOLTING, GROUT & SHOTCRETE
17
Type 1 – 2 m grid Type 2 – 1.5 m grid
![Page 18: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/18.jpg)
ROCKBOLTING, GROUT & SHOTCRETE
18
Grid Layout and Staging
![Page 19: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/19.jpg)
ROCKBOLTING, GROUT & SHOTCRETE
19
24 mm DCP from DSI in 45 mm hole 100 mm SFR Shotcrete
SS cap and grout for 100 year design life
![Page 20: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/20.jpg)
60,000 t rock removed 6,000 No 5m rock bolts installed 6070 m2 of shotcrete applied 4,200 m2 of pavement placed
TUNNEL WIDENING- CIVIL
20
Westbound Eastbound
![Page 21: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/21.jpg)
PORTALS
21
![Page 22: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/22.jpg)
• Deluge with 15 zones per tube. Mains supply only.
• Fire wire for detection. • Six pairs of jet fans per tube. • Three cross passages at 120m
spacing • Egress signage • Lane Usage and Tunnel
Message Signs • Counter-beam lighting
FIRE AND LIFE SAFETY ORIGINAL
22
![Page 23: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/23.jpg)
• Redundant water supply using twin 350,000 l tanks. • Automatic Video Incident Detection. • Ventilation fire mode controlled by wind speed and
pressurisation in non-incident tunnel • Lowered floor of cross passages • Running man signage • Radio Rebroadcast • Symmetrical lighting • Tunnel Closure System with VSLS, VMS, Boomgates and
Traffic Signals
FIRE AND LIFE SAFETY UPGRADE
23
![Page 24: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/24.jpg)
FIRE AND LIFE SAFETY UPGRADE
24
![Page 25: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/25.jpg)
• 1,000+ new lights
• 24.5 km of sub-main cabling
• 7.5 km of new deluge pipework
• 4 x diesel fire booster pumps
• Over 6500 small rock anchors to
support suspended installations
• 8 x new Electric niches
• New 11KV HV power supply
TUNNEL WIDENING- M&E
25
![Page 26: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/26.jpg)
CROSS PASSAGES
26
![Page 27: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/27.jpg)
27
TRAFFIC MANAGEMENT
NOVEMBER 2011 – AUGUST 2012
2 x Eastbound and 1 x Westbound 26 weekends from November 2011
Saturday 20:00 to Monday 5:00 (33 hours)
Eastbound excavation : 2 + 1 Contraflow in Westbound Tube
![Page 28: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/28.jpg)
28
TRAFFIC MANAGEMENT
AUGUST 2012 – APRIL 2013
2 x Eastbound and 2 x Westbound between 8pm – 2pm the next day and throughout weekends
3 x Westbound between 2 - 8pm Mon to Fri (2 lanes in Eastbound Tunnel and 1 lane in
Westbound Tunnel)
Westbound excavation : 2 + 2 Contraflow in Eastbound Tube
![Page 29: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/29.jpg)
29
WIDENED TUNNEL
![Page 30: Garret O'Connor, Transurban: Hills Motorway M2 upgrade Norfolk Tunnel widening](https://reader033.vdocuments.site/reader033/viewer/2022060111/55652d48d8b42a767f8b4eaa/html5/thumbnails/30.jpg)
> Click to edit Master text styles − Second level > Third level
30