History • Henry Laurence Gantt developed Gantt charts in the second decade of the 20th century. • Gantt charts were used as a visual tool to show scheduled and actual progress of projects. Gantt charts were used on large construction projects like the Hoover Dam started in 1931 and the interstate highway network started in 1956.

Upload: shruthi-das

Post on 13-Apr-2015

30 views

Category:

Documents


1 download

DESCRIPTION

It talks about the history of Gantt Chart

TRANSCRIPT

Page 1: gantt chart.pptx

History

• Henry Laurence Gantt developed Gantt charts in the second decade of the 20th century.

• Gantt charts were used as a visual tool to show scheduled and actual progress of projects.

• Gantt charts were used on large construction projects like the Hoover Dam started in 1931 and the interstate highway network started in 1956.

Page 2: gantt chart.pptx

About GANTT CHARTS• A Gantt chart is a graphical representation

of the duration of tasks against the progression of time.

• A Gantt chart is a useful tool for planning and scheduling projects.

• A Gantt chart is helpful when monitoring a project's progress.

Page 3: gantt chart.pptx

Planning and Scheduling

• A Gantt chart allows you to assess how long a project should take.

• A Gantt chart lays out the order in which

tasks need to be carried out. • A Gantt chart helps manage the

dependencies between tasks.

Page 4: gantt chart.pptx

Monitoring A Project

• A Gantt chart allows you to see immediately what should have been achieved at a point in time.

• A Gantt chart allows you to see how remedial

action may bring the project back on course.

Page 5: gantt chart.pptx
Page 6: gantt chart.pptx

Advantages & Limitations

• Gantt charts have become a common technique for representing the phases and activities of a project work breakdown structure (WBS), so they can be understood by a wide audience.

• Although a Gantt chart is easily comprehended for small projects that fit on a single sheet or screen, they can become quite unwieldy for projects with more than about 30 activities. Larger Gantt charts may not be suitable for most computer displays.

• Because the horizontal bars of a Gantt chart have a fixed height, they can misrepresent the time-phased workload (resource requirements) of a project.