1 The Status of Capitol Lake Planning Washington State Capitol Committee October 12, 2010

Upload: olydert

Post on 20-Jun-2015

405 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ga presentation - scc capitol lake 10-12-10a

1

The Status of Capitol Lake Planning Washington State Capitol Committee

October 12, 2010

Page 2: Ga presentation - scc capitol lake 10-12-10a

22

1856: U.S. Coast SurveyDepartment of the Navy

1911: State Capitol CommissionHires Olmsted Brothers and Wilder and White.

1912: Olmsteds write to Gov. Hay suggesting improvements to the inner harbor which “may be accomplished from time to time as opportunity arises”.

CAPITOL LAKESetting the Context

Page 3: Ga presentation - scc capitol lake 10-12-10a

33

1927: Correspondence from Wilder & White to the Capitol Committee:

“Improvement of the water front…has been given very little study on the Olmsted Plan and we believe it would be unfortunate to leave it at this stage.”

CAPITOL LAKESetting the Context

3

 

Wilder & White - undated

1937: The Legislature appropriated $150,000 to create Capitol Lake. The “Des Chutes Water Basin” project would acquire land, construct a parkway, and dam the river. The affected area would become part of the capitol campus.

Page 4: Ga presentation - scc capitol lake 10-12-10a

44

1951: Project completed.

Since 1951 more than 2,000,000 cubic yards have accumulated in the basin. Maintenance dredges have not removed sediment, but simply changed the lake’s shape.

1995: GA prepared proposal for a maintenance dredge.

1997: Dredge proposal withdrawn and CLAMP Committee formed to advise GA on management of the basin.

CAPITOL LAKESetting the Context

TRPC

Page 5: Ga presentation - scc capitol lake 10-12-10a

55

CLAMP Process

2003 through 2009: Estuary Feasibility Studies

Conceptual Model of Estuarine Process Reference Estuary Survey Bathymetric Study Hydraulic &Sediment Transport Model Biological Conditions Report Design and Preliminary Cost Estimates Net Benefit Analysis Community Focus Group -2006 Independent Technical Review Dam Structural Report Dam Condition Assessment Erodability Assessment & Modeling

Sea Level Rise Impacts Cultural and Spiritual Values Report Dredge Design and Cost Estimate Hydraulic Modeling Report Low-lying Infrastructure Report Comparative Fish & Wildlife Report Community Focus Group -2009 Community Economic Values Report Public Involvement Summary Alternatives Analysis Report

1997 through 2002: Capitol Lake Planning Studies

Environmental Impact Study Aquatic Weed Management Plan 10-year Lake Management Plan

Community Involvement

Page 6: Ga presentation - scc capitol lake 10-12-10a

66

CLAMP RecommendationsA “comprehensive estuary recommendation” including:

Restoring an estuary, Cleaning up Budd Inlet, Addressing upstream concerns, and Revising governance of the basin.

Common Outcomes Sought by All CLAMP Members Develop an implementation plan which recognizes:

a. the context of the lake within its larger watershed,

b. the need for long-term solutions which are economically durable, and

c. community interests. Protect Deschutes River fish passage. Develop a cost sharing structure for all beneficiaries. Develop a sediment management strategy. Identify potential funding opportunities.

Page 7: Ga presentation - scc capitol lake 10-12-10a

77

Community Reactions2010: Capitol Lake Improvement and Protection Assn. (CLIPA)

Issues white paper Dredging is needed to address environmental and other damages Continued use of the lake as a sediment trap is the most cost-effective

and environmentally sensitive approach Lack of dredging is damaging downstream interests Effective upstream water quality actions are needed Honors Wilder & White plans and state investments to date

2010: Deschutes Estuary Restoration Team (DERT) Issues open letter Retaining the existing impoundment is a public policy contradiction 65% of restoration costs could come from federal sources Management of the ecosystem should be passed to a state natural

resource management agency

Page 8: Ga presentation - scc capitol lake 10-12-10a

88

Technical ConsiderationsManaged Lake Little change in infrastructure. The operation of the dam provides greater protection against the initial

effects of sea-level rise on downtown flood risk. A large initial dredge is required in addition to regular maintenance

dredging. Dredging inside the lake is more difficult than in Budd Inlet.

Estuary Initial and maintenance dredging are lessened; most sediment is moved to

the shoreline, reducing costs and permitting complexity. Significant infrastructure is required early in implementation (including

building a new 5th Avenue bridge and reinforcement of Deschutes Parkway)

Dual Basin Estuary In addition to estuary alternative considerations, constructing a north basin

barrier involves engineering and environmental uncertainties.

Page 9: Ga presentation - scc capitol lake 10-12-10a

99

Economic Considerations

Managed Lake Relatively little infrastructure cost. Preserves benefits for downstream

marine interests. More dredging is required, initially and with regular maintenance dredging

into the future. Unit costs are higher.Estuary Initial dredging and maintenance dredging quantities and unit costs are

lower. Significant infrastructure expenditure is required early.Dual Basin Estuary Same as estuary, except added cost of north basin barrier.

Page 10: Ga presentation - scc capitol lake 10-12-10a

1010

Environmental ConsiderationsManaged Lake Supports insects as food source for foraging birds and bats. Supports several invasive and non-native species, including exotic

amphibians and mammals. Dam increases risk of predation for migrating salmon. Is expected to make efforts to improve water quality in Budd Inlet more

difficult.

Estuary and Dual Basin Estuary Increased tidal flushing is expected to improve water quality in Budd Inlet. Would improve habitat for anadromous and marine fish. Would restore 260 acres of an ecosystem type that has been significantly

reduced throughout Puget Sound. Loss of nearly all habitat used by freshwater species. Reduced forage

insects for bats and some birds. Potential for all 16 lake-dependent freshwater fish to be eliminated.

Page 11: Ga presentation - scc capitol lake 10-12-10a

1111

Concurrent Activities

Deschutes Water Quality Planning Federal Clean Water Act requires

states to clean up water bodies that don’t meet standards.

Ecology has recently completed an assessment (TMDL) of Deschutes watershed water quality problems.

Ecology has embarked on a multi-year community process for the selection and implementation of appropriate control measures.

The Capitol Lake management decision may affect, and be affected by, control decisions in the TMDL process.

Puget Sound Cleanup Puget Sound Partnership views the

Puget Sound Nearshore Ecosystem Restoration Project (PSNERP) as the “nearshore component” of their Action Agenda.

PSNERP was initiated in 2001 to identify nearshore ecosystem problems and solutions.

PSNERP process may result in significant federal funding for projects to restore Puget Sound.

WDFW and USACE have identified Deschutes estuary restoration as one of 46 candidates for nearshore investment.

Page 12: Ga presentation - scc capitol lake 10-12-10a

1212

Next Steps

The State Capitol Committee and Legislature still must act before any long-term management strategy can begin.

Permitting for such a strategy is projected to take four to six years and involve more than 20 different federal, state, local, and tribal authorities.

GA is requesting funding in 11-13 to begin the process of seeking a permit to conduct a limited dredge of Capitol Lake for flood risk mitigation purposes