  • 8/2/2019 G3-Progress Report by IWM

    1/12

    G3: Water governance and community based management

    1

    1. Introduction

    The Ganges basin development challenge is increasing resilience of agricultural and

    aquaculture systems in the Ganges delta focusing water and food security. There are five

    projects namely G1, G2, G3, G4 and G5 having different objectives under Ganges Basin

    Development Challenge (BDC) programme. The Project G3 is entitled Water governanceand community based management As one of the partners of G3 Institute of Water

    modelling (IWM) has been entrusted to carry out the following activities to support

    International Water Management Institute (IWMI); Preparation of baseline GIS maps,

    inventory and condition of drainage sluices & structures, land inundation map with land type(F0,F1,F2, F3 .. ), participatory resource mapping, GIS map showing Mouza area, Mouza

    population & Population density for 5 BWDB polders and 4 LGED subprojects.

    This report contains progress of field survey and data collection work, data processing and

    preparation project base maps and GIS maps for each polder of the study area of G3 and

    inventory of structures.

    2. Study area

    The study area is in the coastal zone of Bangladesh. The southern part of the country

    adjoining the Bay of Bengal is known as the coastal zone. In earlier decades when polders

    were not constructed, low-lying areas of coastal zone were frequently flooded by salt water

    during high tide and most of the area remained fallow and cropping intensity was very low,

    livelihood opportunity was also poor because of less intensive economic activities. In order to

    increase agricultural production by preventing the land of coastal area from frequent tidal

    flooding and salinity intrusion the Coastal Embankment Project (CEP) was implemented in

    accordance with the Master Plan adopted in 1964. Under this program Bangladesh Water

    Development Board (BWDB) had built a series of polders enclosing the low-lying coastal

    areas. Coastal polders are the first large scale human intervention in the coastal area. Over

    the years it is learned that efficient water management involving active participation of local

    community is a prerequisite for polder management in enhancing agriculture and aquaculture

    production.

    The study area of G3 is within the Ganges basin of the coastal zone of Bangladesh, which is,shown in Figure 2.1. The study area includes five BWDB polders namely P-3, P-31, P-30, P-

    43/2f and P-24G and four LGED sub projects namely Bhagirabad-Jainkathi, Jabusha Beel,

    Baganchra-Badurgacha, Latabunia.

  • 8/2/2019 G3-Progress Report by IWM

    2/12

    G3: Water governance and community based management

    2

    Fig 2.1: Study area map of G3

  • 8/2/2019 G3-Progress Report by IWM

    3/12

    G3: Water governance and community based management

    3

    3. Progress of work

    3.1 Field survey and Data collection

    3.1.a Summary of survey work

    IWM has made a comprehensive field survey using state of the art survey technology to

    collect quality information on infrastructure of the polders. The field survey work has been

    started from 15 November, 2011 and substantial progress has been made. The field data

    collection for four BWDB polders (3, 30, 31, 42/2f) and four LGED subprojects (Bhagirabad-

    Jainkathi, Jabusha Beel, Baganchra-Badurgacha, Latabunia) has been completed. The

    summary of the activities carried out for data collection campaign is shown in Table-3.1

    Table-3.1: Summary of survey activity

    3.1.b Survey methodology

    The inventory surveys of existing structures are conducted for the Polder 3, 30, 31, 24G,

    43/2F and 4 LGED subprojects. For the structure inventory the main features survey are

    location (GPS & also village name), type of structure (Pipe, regulator, Box culvert), no of

    vent, size of vent or dia, silt level, sofit level, deck level, Fall board/flap gate, active/inactive,

    condition (good, minor problem, major problem), interviewing of the local people if it is

    Sl.No. Events Specification Location Progress of work Remarks

    1.Inventories of

    regulator

    Location, no. of vents,

    vent Size, silt & soffitlevel, type of Structures,

    Active/ Inactive, Fall

    board/Flap Gate

    Picture

    Polder 3, 30, 31,24G, 43/2F and 4

    LGED subprojects

    All data collection

    except 50% work of24G which will be

    completed by25th

    March-2012

    RTK GPS and Levelmachines are used for

    this survey

    2.

    Inventories of

    Unauthorized

    Structures

    Location

    Type

    Size / Pipe Diameter

    So So So

    3.

    Alignment of

    Khal

    All the existing drainage

    khal along with name

    All the planned

    polders and LGEDsubprojects Completed

    Conducted by hand

    GPS and by usingexisting google image

    4.Alignment of

    Embankment

    Surrounding the polders

    mentioning the existing

    condition

    All the planned

    polders and LGED

    subprojects

    All data collectionexcept 50% work of

    24G which will be

    completed

    Hand GPS

    5.

    Location of

    important

    features like

    educational

    institution,

    religious

    Institution,

    ImportantOffice, Hat-

    bazar etc

    Geographical coordinates

    of the feature

    Inside all the

    polders and

    subprojects

    All data collection

    except 50% work of

    24G which will be

    completed soon

    Hand GPS

  • 8/2/2019 G3-Progress Report by IWM

    4/12

    G3: Water governance and community based management

    4

    adequate or not. RTK GPS has been used to establish the reduced level on the deck level of

    the each structure with respect to IWM existing nearest BM/TBM values. Then the another

    team measure the silt level, soffit level, structure dimension by using level machine and tape

    and made interview of the local people for necessary information. During this data collection,

    inventory of the unauthorized structures constructed by the people for the own purpose alsoconducted. The alignment survey of embankment, Khals and roads and the Geographical

    coordinates of the feature in the polders and subprojects have been taken with Hand GPS.

    Picture: IWM engineer working with RTK GPS to establish the reduced level

  • 8/2/2019 G3-Progress Report by IWM

    5/12

    G3: Water governance and community based management

    5

    3.2 Data processing and preparation of GIS map

    Real-Time Kinematic Differential Global Positioning System (RTK-DGPS) technology with

    computer based data storage and processing facility have been used in map production under

    GIS environment. Field data has been collected using WGS84 datum and then the data has

    been transferred into local datum Everest1830 and finally the data has been projected in BTMprojection system as convenient for Bangladesh. It can be mentioned that data for all physical

    features have been collected as point location having coordinates (Latitude and longitude) of

    the features. When the data have been projected the corresponding latitude and longitude

    values have been converted as northing and easting. The northing and easting values of each

    feature have been stored in excel file and from the excel file the shapefile of respective

    feature has been created.

    Using the available shapefile the final map has been prepared. It can also be mentioned that

    besides the field survey data, IWM archive has also been used. For example, Shapefile of

    road and river has been used form IWM archive and homestead boundary has been drawn

    from IWM achieved imagery. Both field data and archived data have been cross-checked to

    each other for better accuracy. In the map several types of physical features have been shown

    such as Water Structure (made by BWDB, LGED and Public), Roads, Khal, River and other

    features like Bridge/Culvert, Office, Religious Institution, Educational Institution, Bazar etc.

    The maps also contain Union and Upazila Boundary. Wherever exists, District Headquarter,

    Upazila Headquarter and Union Complex has been shown in the Map. Each feature in the

    map has been shown with appropriate LEGEND. All the maps have been prepared leaving .5

    inch boarder in left, right and lower side and .75 inch in upper side for good visual

    representation. An index map has also been used to locate the study area with respect toBangladesh. Main concern of the map is to illustrate exact location of various types of

    structures. In the study area, three types of structures are found. These are BWDB structures,

    LGED structures and Public Structures (Structures made by local people are herein called

    Public structures). Public structures mainly include pipes and small gates. These three types

    of structure have been shown with three different LEGENDS. Because of paramount

    importance, structure information has also been presented in a shorter tabular form in the

    Map and detailed structure information has been provided in separate spreadsheet. In that

    case serial number has been maintained both in LEGEND and in table. Other physical

    features in the map have been classified into five broad categories namely educationalinstitution, religious Institution, Important Office, Bazar, Bridge/Culvert and other features.

    Moreover, each feature has been labeled with their name to know exactly what the feature is.

    A sample of baseline GIS map has been shown in Fig 3.2 and a sample of detailed structure

    information has been given in Table 3.2 and 3.3. Some pictures of a BWDB structures of

    Polde-30 is shown in fig 3.3

  • 8/2/2019 G3-Progress Report by IWM

    6/12

    G3: Water governance and community based management

    6

    Fig 3.2: Baseline GIS map of Polder-30

  • 8/2/2019 G3-Progress Report by IWM

    7/12

    G3: Water governance and community based management

    7

    Table 3.2: Sample of detailed BWDB structure information for Polder-30

    Sl no. Structure name Khal name Village Union Easting NorthingVent

    nos

    Vent

    width

    Height

    (m)

    Pipe dia

    (m)Gate type

    Length

    Barrel (m)

    Sill

    Level

    Sofit

    levelCondition

    Active/

    Inactive

    1 P er B atiaghata Sluice gate P er B atiaghata K hal Per Bati aghata Gangarampur 445167 514210 0.75 Lift Gate 4.80 -0. 13 0.89 Good Ac ti ve

    2 P er Bat ia gha ta Regulat or Bat ia gha ta Khal P er Batiaghat a Ga ngaramp ur 4 45 68 6 5 13 41 0 2 1 .5 0 1.80 0 .0 0 L if t G at e 5 .0 0 - 1.37 0 .4 3 G ood Active

    3 Aushkhali Regulator Kalar Khal Aushkhali Gangarampur 445862 511587 1 1.50 1.80 0.00 Lift Gate 5.00 -0.85 0.95 Good Active

    4 Titokhali Sluicegate No khal Titokhali Gangarampur 446396 509982 1 0.90 0 .90 0.00 Flap Gate 18.00 -0.19 0.71 no gate Active

    5 Kholishabunia Re gul ator Kol atola khal Kholshibunia Gangarampur 446530 508654 2 1.50 1. 80 0.00 Lift Gate 4.80 -0. 76 1.05 Good Ac ti ve

    6 Sukdara Sluice No khal Sukdara Surkhali 447121 506929 0.50 Fall Board 13.00 1.32 1.82 Good Active

    7 Sukdara Sluice No khal Sukdara Surkhali 447885 506522 1 0 .90 0.80 0 .00 Fall Board 13.00 0.03 0.83 Good Active

    8 Amtola Re gul ator Amtola khal Gondamari Gangarampur 448292 505857 2 1.50 1. 80 0.00 Lift Gate 4.00 -0. 75 1.05d/s silted, gate broken,

    ironcap brokenActive

    9 K ashidanga Sluice Kashidanga sluice Kashidanga Gangarampur 448844 504755 0.45 F all Board 13.00 0.98 1.43 no fall board Active

    10 Kaimkhola Hula Slui ce No khal Kai mkhol a hula Gangarampur 4 49452 503210 0.55 Fall Boar d 13.00 0.94 1.49 no nee d, no board Inactive

    11 Mosherdanga Regulator Mosherdanga khal Mosherdanga Gangarampur 449930 502988 1 1.80 1.50 0.00 Lif t Gate 4.00 -0.84 0.96 good, iron cap broken Act ive

    1 2 Barun pa ra Sluice Barun pa ra kh al Barunpa ra Ga ngaramp ur 4 51 05 9 5 03 41 7 1 0 .0 0 0.00 0 .9 0 L if t G at e 1 6.00 - 0.05 0 .0 8 goo d, n o wheel Active

    13 Gopalpur Sluice Gopalpur khal Gopalpur Gangarampur 451663 505162 1 0.80 1.15 0.00 Flap Gate 7.30 0.46 1.61 no gate Active

    1 4 Ka tiang la S lu ice Kat ia ng la k ha l ka tian gla Ga ngaramp ur 4 51 92 2 5 06 46 8 1 1 .5 0 1.20 0 .0 0 L if t G at e 4 .0 0 0 .0 8 1 .28 goo d, i ro n cap brok en Active

    1 5 Kh ej ur to la S luice Khe jur to la d oa ni Khe ju rt ola Ga ngaramp ur 4 51 82 1 50 787 9 1 0 .9 0 1.10 0 .0 0 Flap G at e 1 8.00 - 0.31 0 .79 b ar re l da mm age Inactive

    16 Andaria Re gul ator Khoria nodi Andar ia Gangarampur 451855 508887 2 1.50 1. 80 0.00 Lift Gate 3.70 -0. 49 1.31 ir on cap broke n Ac ti ve

    17 Gagramary Sluice No khal Gagramary Gangarampur 451950 509412 1 0.90 0 .95 0.00 F lap Gate 14.00 0.97 1.92 no gate Active

    18 Fultola mot Sluice No khal Fultola Batiaghata 451638 511173 1 0.90 0.95 0.00 Flap Gate 15.00 -0.05 0.99 good Active

    1 9 K is mot F ul to la Regulat or Bat ia gha ta Khal K is mo t fu lt ola Bat ia gha ta 4 51 01 5 51 283 4 1 1 .5 0 1.20 0 .0 0 L if t G at e 4 .3 0 - 0.32 0 .8 8 rai ling b ro ken Active

    20 K ismot Ful tol a Sluice No khal Kismot fultol a Batiaghata 450895 5 13117 1 0.60 0. 90 0.00 Fall Boar d 14.00 1.23 2.13 d/s silte d, g ood Ac ti ve

    21 Shoilmary Bheeler Khal Shoilmary Batiaghata 446199 516295 1 1.07 1.22 0.00 Lift Gate 5.00 -0.32 0.90 good Active

    22 Shoilmary Kata khal Shoilmary Batiaghata 446878 517738 1 0 .90 1.22 0 .00 Flap Gate 7.30 -0.22 1.00 good Active

    23 Khalishabunia Thakuntole Khal Khalishabunia Batiaghata 445780 515561 1 1.50 1 .80 0.00 Lift Gate 7.70 -0.59 1.24 good Active

    2 4 Cha k Sh oi lm ary C ha k Sh oi lm ary Ch ak S ho ilma ry Bat ia gha ta 4 47 28 0 5 17 75 2 1 0 .9 0 1.10 0 .0 0 Fa ll Board 1 6.00 0 .0 0 0 .00u/s and d/s silted,barrel

    damageInactive

    25 Hogl abunia Sluice gate Hogl abuni a khal Hoglabunia Batiaghata 449704 515434 2 1.50 1. 80 0.00 Lift Gate 4.65 -0. 52 1.28 good Ac ti ve

    26 Hatbati Sluicegate Hatbati khal Hatbati Batiaghata 450517 514985 0.95 Fall Board 15.00 -0.31 0.65 no gate Active

    27Hoglabunia Moddhopara

    SluicegateBalar khal Hoglabunia Batiaghata 449430 516277 0.75 Lift Gate 15.00 -0.04 0.71 good, c/s siltation Active

    2 8 Ut tar Ho glabun ia S luice No k ha l Utt ar H og lab unia Bat ia gha ta 4 48 12 6 51 744 5 1 0 .9 0 1.10 0 .0 0 Fa ll Board 1 5.40 - 0.63 0 .4 5 good , n o gat e Active

  • 8/2/2019 G3-Progress Report by IWM

    8/12

    G3: Water governance and community based management

    8

    Table 3.3: Sample of detailed unofficial structure information for Polder-30

    Sl no. Structure Type Location Union Easting Northing Pipe nosPipe dia

    (m)Made by

    1 Pipe Fultola Batiaghata 451465 511893 1 0.10 Public

    2 Pipe Fultola Batiaghata 451530 511597 1 0.10 Public

    3 Pipe Sholua Gangerampura 446513 509340 1 0.10 Public

    4 Pipe Titokhali Gangerampura 446182 510176 1 0.10 Public

    5 Pipe Malimara Batiaghata 445700 512598 1 0.15 Public

    Fig 3.3: Picture of the structures in Polder-30

    Upper right: Andaria Regulator

    Upper left: Katiangla Sluice

    Lower right: Kaimkhola Hula Sluice

    Lower left: Sukdara Sluice

  • 8/2/2019 G3-Progress Report by IWM

    9/12

    G3: Water governance and community based management

    9

    3.3 Preparation of GIS map showing Mouza data

    The Mouza data (shape files) for all the Polders and Subprojects has already been collected

    form LGED and found some mismatch in the data. With discussion with LGED it is now

    being corrected. After correction this Mouza map will be superimposed to the baseline GIS

    map. The Mouza map will have the information of Mouza area, Mouza population &Population density.

    3.4 Drainage modelling and preparation of inundation map

    The regional model for the coastal area has been updated based on available data. The

    calibrated and validated drainage model for the existing system will be applied to assess the

    existing drainage performance of the present drainage networks in the selected polders and

    sub projects. The drainage model will be developed using two separate module of MIKE 11

    modelling system; rainfall-runoff modelling (hydrological modelling, MIKE11-NAM) and

    hydrodynamic modelling (MIKE11-HD). MIKE-GIS module will also be used for

    inundation and depth duration mapping. The existing calibrated and validated Southwest

    Regional Model will be the basis to develop the drainage model for the proposed study

    incorporating the detail catchments distribution of the river systems, up-dated river cross-

    section data and existing regulators in the study area. Drainage models will be developed for

    five BWDB polders namely P-3, P-31, P-30, P-43/2f and P-24G and four LGED sub projects

    namely Bhagirabad-Jainkathi, Jabusha Beel, Baganchra-Badurgacha, Latabunia.

    3.5 Participatory resource mapping

    The participatory mapping for the selected polders and subprojects will be started after

    finishing the baseline map. Participatory mapping for drainage problems, cropping pattern

    and land use map for Kharif-I, Kharif-II and Rabi/Boro for the year 2010-2011 has already

    been started. The drainage subsystem delineation will be done consulting with the local

    people. In polder 3, there are some locations where conflicts between farmers and fishermen

    are present due to rice and shrimp cultivation. These conflict spots will be located by

    discussing with the local people and then will be updated in the GIS map. The work plan of

    participatory resource mapping is given in Table 3.4.

  • 8/2/2019 G3-Progress Report by IWM

    10/12

    G3: Water governance and community based management

    10

    Table 3.4:Work Plan for Participatory Resource Mapping

    Activities Date (17/3/2012-11/5/2012)

    18/3-19/3 20/3-22/3 24/3-29/3 31/3-5/4 7/4-12/4 14/4-19/4 21/4-27/4 28/4-3/5 6/5-14/5 15/5-18/5

    Team mobilization (2 teams, 4 persons) Team No. 1 & 2

    Training (2 teams, 4 persons) Team No. 1 & 2

    Development of inundation Maps

    Latabunia, Baganchra-Badurgacha FCD,Jabusa Beel FCD

    Jainkati-Bhagirabad FCD Subprojects and Polder-31, Polder-30, (Team-1)

    Polder 3 (Team-2)

    Assessment of condition of internal canals in a participatory way

    Latabunia, Baganchra-Badurgacha FCD,Jabusa Beel, Polder-31,

    Polder-30,Jainkati (Team-1)

    Polder 3 (Team-2)

    Development of cropping pattern for the year of 2010-2011

    Latabunia, Baganchra-Badurgacha FCD,Jabusa Beel, Polder-31,Polder-30,Jainkati (Team-1)

    Polder 3 (Team-2)

    Delineation of drainage sub-system in the maps Latabunia,Baganchra-Badurgacha FCD,Jabusa Beel, Polder-31, Polder-

    30,Jainkati (Team-1)

    Polder 3 (Team-2)

    Development of Maps showing conflict hot spots Latabunia,

    Baganchra-Badurgacha FCD,Jabusa Beel, Polder-31, Polder-

    30,Jainkati (Team-1)

    Polder 3 (Team-2)

  • 8/2/2019 G3-Progress Report by IWM

    11/12

    G3: Water governance and community based management

    11

    Activities Date (17/3/2012-11/5/2012)

    18/3-19/3 20/3-22/3 24/3-29/3 31/3-5/4 7/4-12/4 14/4-19/4 21/4-27/4 28/4-3/5 6/5-14/5 15/5-18/5

    Historical development of a particular area Latabunia,

    Latabunia, Baganchra-Badurgacha FCD,Jabusa Beel, Polder-31,Polder-30,Jainkati (Team-1)

    Polder 3 (Team-2)

    Development of inundation Maps

    Assessment of condition of internal canals in a participatory way

    Development of cropping pattern for the year of 2010-2011

    Delineation of drainage sub-system in the maps

    Development of Maps showing conflict hot spots

    Historical development of a particular area

    Polder 43_2F (Team-1)

    Polder 24 (WMA G (Team-2)

    Data Check and Compilation

    Submit to IWM for GIS Map preparation

  • 8/2/2019 G3-Progress Report by IWM

    12/12

    G3: Water governance and community based management

    12

    3.6 Review of policies and practices for coastal zone management

    Two extensive review reports 1)BWDB Initiatives Experiences towards Participatory Water

    Resources Management and 2) Review of Policies in Water Sector and Related Sectors

    that relate to Coastal Zone Management have been prepared and submitted.

    BWDB Initiatives Experiences towards Participatory Water Resources Management

    analyzed and describes the chronological development of participatory water resource

    management practice under BWDB since 1972. The report also evaluated how the

    experiences and lesson learned were internalized within BWDB and the Government policy.

    Review of Policies in Water Sector and Related Sectors tha t relate to Coastal Zone

    Management reviewed the existing water sector policies and those of the related sectors that

    relate to Coastal Zone Management. The report reviewed as many as 18 policies and

    analyzed and outlined their relevancy to the Coastal Zone Management.