G1.2 Community project studies from SUMP Implementation status report Deliverable No.: D1.5 Project Acronym: DYN@MO Full Title: DYNamic citizens @ctive for sustainable MObility Grant Agreement No.: 296057 Workpackage/Measure No.: WP1 / G1.2 Workpackage/ Measure Title: WP1 Sustainable Urban Mobility Planning / G1.2 Community project studies from SUMP Responsible Author(s): Lech Michalski Responsible Co-Author(s): Jacek Oskarbski, Dorota Gajda-Kutowińska, Aleksandra Romanowska Date: 17-11-2015 Status: Final (revised) Dissemination level: Public

Upload: others

Post on 20-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

G1.2 Community project studies from SUMP

Implementation status report

Deliverable No.: D1.5

Project Acronym: DYN@MO

Full Title:

DYNamic citizens @ctive for sustainable MObility

Grant Agreement No.: 296057

Workpackage/Measure No.: WP1 / G1.2

Workpackage/ Measure Title:

WP1 Sustainable Urban Mobility Planning / G1.2 Community

project studies from SUMP

Responsible Author(s):

Lech Michalski

Responsible Co-Author(s):

Jacek Oskarbski, Dorota Gajda-Kutowińska, Aleksandra

Romanowska

Date: 17-11-2015

Status: Final (revised)

Dissemination level: Public

Page 2: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

2 / 83

Abstract

While elaborating the dynamic SUMP in measure G1.1 (Advancing towards dynamic SUMP)

some of the elements of the City’s SUMP were implemented within the CIVITAS DYN@MO

project as pilot projects and some of them were only limited to simulations and studies (with

possible implementation in the future). This document includes descriptions and results of

Gdynia’s activities and tasks which helped preparing a more advanced SUMP for the City:

studies on the PRT line, road traffic modifications/ PT lines distribution and cycling & walking

& pedestrian areas campaigns. Implementation and results of them should improve traffic

management in the City, enhance the state of the environment by reduced congestion and

transport-related pollution and therefore contribute to the better quality of life of the city’s

inhabitants.

Personal Rapid Transit (PRT) is a fast personal transport, combining the features of

passenger personal and public transport in cities. It is a system of "point to point", operated

by small vehicles for a few persons moving at light infrastructure remotely without stopping at

intermediate stops. Preliminary analyses done for the City of Gdynia indicate that most of the

PRT benefits can be achieved through the introduction of PRT to the current transport

system in Gdynia. The scale of these benefits is determined by the location and extent of

connections in the target PRT network. Due to many favourable circumstances, the first step

in the construction of this network should be the construction of the service Gdynia Glowna

(Main Railway Station) – Molo Rybackie with a length of over 2 km, including 7-9 stops. In

this case, the application of PRT technology may have an advantage over other conventional

solutions, also in terms of economic efficiency. In the process of further clarification of the

work on the advisability of implementing PRT in Gdynia, the following is needed:

involvement of residents, the city authorities and experts in the selection of options of PRT

location and technology for the pilot service station Gdynia Glowna – Molo Rybackie,

implementation of traffic forecasts for this service in conjunction with conventional

services and urban transport feasibility study for a decision on further stages of PRT in

Gdynia.

In terms of changes in the traffic organization in the city centre of Gdynia and the public

transport line distribution, possible options were developed. These options will be used to

develop scenarios of changes (more focused on pedestrians, public transport and the

development of the streetscape) with regard to the planned development of public transport

services, including PRT, and the development of basic streetscape. The main changes, that

affect travel conditions in the network, will be the introduction of pedestrian areas (with

greater or lesser availability of public transport). Analyses and forecasts will identify desirable

directions of transformation of the transport system in the coming years of transportation

system modernization.

Promotional campaigns for cycling, walking and pedestrian areas were done for young and

adult inhabitants of Gdynia during which the City noticed the increased numbers of cyclists

and walkers among both target groups. Next to this positive effect the cycling campaigns

among adults also helped to get information – based on GPS devices – about the popularity

of routes in Gdynia. It also became evident that people created a community spirit and tried

to show others how sustainable transport positively influences their and the city’s

Page 3: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

3 / 83

development and health. A description of and further advantages as well as results are

described in this document.

Project Partners

Organization Country Abbreviation

Gdansk University of Technology PL GUT

City of Gdynia PL ZDiZ

Document History

Date Person Action Status Diss. Level

31.02.15 Jacek Oskarbski Draft of IPR for G1.2 Draft SC, TC

15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM

18.06.15 Marcel Braun Final proof-reading and editing Final EC

17.11.15 Dorota Gajda-Kutowinska Update of final version Final EC

Status: Draft, Final, Approved, and Submitted (to European Commission).

Dissemination Level: PC = Project Coordinator, SC=Site Coordinator, TC=Technical Coordinator, EM=Evaluation Manager.

Page 4: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

4 / 83

Table of Contents

1 INTRODUCTION ............................................................................................................................. 9

2 CONCEPT OF PRT STUDY .......................................................................................................... 10

2.1 CHARACTERISTICS AND EXAMPLES OF A PRT SYSTEM ............................................................... 10

2.2 GDYNIA – A POTENTIAL SITE LOCATION FOR THE PILOT IMPLEMENTATION OF A PRT SYSTEM ........ 12

2.2.1 Transport system in Gdynia and trends ........................................................................................... 13

2.2.2 Transport preferences of residents in 2013 ..................................................................................... 14

2.2.3 Mobility and traffic forecasts for 2020 ............................................................................................ 15

2.2.4 The concept of a tram service connecting Gdynia Glowna Railway Station with Molo Rybackie ... 15

2.3 GENERAL CONCEPT OF THE PRT SYSTEM IN GDYNIA ................................................................. 17

2.3.1 Assumptions for the concept ........................................................................................................... 17

2.3.2 The implementation process of PRT ................................................................................................ 17

2.3.3 Final shape of PRT system network ................................................................................................. 18

2.3.4 Feasibility of PRT within the existing streets ................................................................................... 20

2.4 PRT LINE BETWEEN GDYNIA GLOWNA RAILWAY STATION AND MOLO RYBACKIE .......................... 22

2.4.1 Determinants of planning in the downtown area ........................................................................... 22

2.4.2 Planned changes in the downtown area development ................................................................... 23

2.4.3 Options of the service routes Gdynia Glowna – Molo Rybackie ...................................................... 24

2.5 APPROXIMATE COST OF PRT IMPLEMENTATION ......................................................................... 27

2.6 CONCLUSIONS FOR FURTHER ANALYSIS..................................................................................... 27

3 STUDY ON ROAD TRAFFIC MODIFICATIONS AND PUBLIC TRANSPORT SERVICES

DISTRIBUTION ..................................................................................................................................... 28

3.1 ANALYSIS AND ASSESSMENT OF THE CONDITIONS FOR PEDESTRIAN TRAFFIC IN THE CITY CENTRE OF

GDYNIA ………………………………………………………………………………………………………..29

3.1.1 Pedestrian traffic generators .......................................................................................................... 29

3.1.2 Pedestrian traffic measurements .................................................................................................... 30

3.1.3 Conditions of pedestrian traffic on pavements ............................................................................... 32

3.1.4 Density and location of pedestrian crossings .................................................................................. 33

3.1.5 Pedestrian safety ............................................................................................................................. 34

3.1.6 Evaluation of pedestrian traffic conditions ..................................................................................... 35

3.1.7 Assumptions for pedestrian traffic forecasts .................................................................................. 35

3.2 OPTIONS FOR THE DEVELOPMENT OF PEDESTRIAN ZONES .......................................................... 36

Page 5: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

5 / 83

3.3 IMPROVING PUBLIC TRANSPORT ................................................................................................ 45

3.3.1 Analysis and evaluation of public transport system in Gdynia ........................................................ 45

3.3.2 The planned development of public transport ................................................................................ 53

3.3.3 Preliminary options of public transport improvements ................................................................... 55

3.4 CHANGES IN TRAFFIC ORGANIZATION ........................................................................................ 63

4 CONCEPT FOR PROMOTION OF WALKING AND CYCLING ................................................... 66

4.1 GOOD PRACTICES IN EUROPEAN CITIES ..................................................................................... 66

4.2 CAMPAIGNS FOR RESIDENTS AND EMPLOYEES OF COMPANIES IN GDYNIA .................................... 69

4.2.1 Cycling competition for employees of the companies in Gdynia – “I'm going to work by bike” ..... 69

4.2.2 European Cycling Challenge ............................................................................................................ 72

4.2.3 Campaign for 5th

grade pupils of primary school ............................................................................ 77

5 CONCLUSIONS ............................................................................................................................ 80

Page 6: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

6 / 83

List of Figures

Figure 1: System MISTER ....................................................................................................... 11

Figure 2: (a) Basic and perspective road system of the city of Gdynia; (b) The planned street

system in the downtown area .................................................................................. 13

Figure 3: The dimensions of the lane for TRANSLOHR vehicles ........................................... 16

Figure 4: Location of stops within the tram service ................................................................. 16

Figure 5: The concept of the PRT service in the downtown with the location of the

main stops ................................................................................................................ 19

Figure 6: Location of poles and PRT in street cross-section .................................................. 21

Figure 7: Miedzytorze in Gdynia .............................................................................................. 21

Figure 8: Location of local development plans in the northern part of the downtown area

(green – plans adopted) .......................................................................................... 22

Figure 9: Downtown areas ....................................................................................................... 23

Figure 10: Option 1: Gdynia Glowna - Molo Rybackie ............................................................ 25

Figure 11: Option 2: Gdynia Glowna - Molo Rybackie - Teatr Muzyczny with connections to

the Dworzec Morski ............................................................................................... 25

Figure 12: Option 2: Gdynia Glowna - Molo Rybackie with connections to a branch to the

Dworzec Morski and Teatr Muzyczny ................................................................... 26

Figure 13: The main generators of pedestrian traffic in the city centre of Gdynia .................. 30

Figure 14: Pedestrian traffic volume in the city centre of Gdynia per hour in cross-sections . 31

Figure 15: Location of the spots with the highest percentage crossing the street beyond the

pedestrian crossing ............................................................................................... 32

Figure 16: Location of pedestrian crossings in the streets with high pedestrian traffic .......... 34

Figure 17: Location of dangerous intersections where accidents occurred involving

pedestrians in 2010-2012 ...................................................................................... 34

Figure 18: Estimated forecast of pedestrian traffic - the number of pedestrians per hour in

2020 (in the case of the implementation of plans) ................................................ 36

Figure 19: Location of the pedestrian zone based on Option I ............................................... 37

Figure 20: Location of the pedestrian zone based on Option II .............................................. 38

Figure 21: Location of the pedestrian zone based on Option III ............................................. 38

Figure 22: Location of the pedestrian zone based on Option IV ............................................. 39

Figure 23: Location of the pedestrian zone based on Option V .............................................. 39

Figure 24: Location of the pedestrian zone based on Option VI ............................................. 40

Figure 25: Location of the pedestrian zone based on Option VII ............................................ 40

Figure 26: Location of the pedestrian zone based on Option VIII ........................................... 41

Page 7: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

7 / 83

Figure 27: Location of the pedestrian zone based on Option IX ............................................. 41

Figure 28: Location of the pedestrian zone based on Option X .............................................. 42

Figure 29: Location of the pedestrian zone based on Option XI ............................................. 42

Figure 30: Location of the pedestrian zone based on Option XII ............................................ 43

Figure 31: Location of the pedestrian zone based on Option XIII ........................................... 43

Figure 32: Routes of ZKM services in Gdynia ......................................................................... 46

Figure 33: Diagram of trolleybus network in Gdynia ............................................................... 47

Figure 34: Average time loss of public transport vehicles ....................................................... 48

Figure 35: Location of critical sites .......................................................................................... 49

Figure 36: Average travel time from the areas of Gdynia ....................................................... 53

Figure 37: Synthetic indicators cartogram of public transport services in the areas of

Gdynia ................................................................................................................... 53

Figure 38: Planned new and upgraded bus loops ................................................................... 54

Figure 39: Directions of the expansion of trolleybus routes .................................................... 55

Figure 40: Proposed initial locations of bus lanes ................................................................... 62

Figure 41: Example of changes in the organization of movement after the introduction of

pedestrian zones ................................................................................................... 64

Figure 42: Cartogram of traffic volume during the afternoon rush hour – current situation .... 65

Figure 43: Cartogram of traffic volume during the afternoon rush hour – after closing

Starowiejska Street ............................................................................................... 65

Figure 44: Website cycling competition for employees of companies in Budapest ................ 67

Figure 45: Website for the cycling competition for employees in Växjö .................................. 67

Figure 46: European Competition of Cycling website - European Cycling Challenge 2013 .. 68

Figure 47: The campaign website Walk to School Week ........................................................ 69

Figure 48: Cycling competition website for employees of Gdynia companies – “I'm going to

work by bike” ......................................................................................................... 70

Figure 49: Participants from the company Unisoft and the Public Library .............................. 70

Figure 50: Participants from the PEWIK company in edition 2015 ......................................... 71

Figure 51: Final gala of edition 2015 ....................................................................................... 72

Figure 52: Gdynia final ECC2014 – 31 May 2014 ................................................................... 73

Figure 53: General classification in ECC2014 ......................................................................... 74

Figure 54: Heatmap of Gdynia based on the data from the ECC in 2014 .............................. 75

Figure 55: General classification of ECC2015 participants ..................................................... 76

Figure 56: Heatmap for Gdynia after ECC2015 – all weekdays ............................................. 77

Page 8: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

8 / 83

Figure 57: One of the classes participating in the “Race of Poland” ....................................... 79

Figure 58: Distribution of prizes to the winners of the “Race of Poland” ................................. 79

Figure 59: Meeting with students during “Race of Poland” ..................................................... 80

List of Tables

Table 1: Comparison of PRT with other urban public transport systems ................................ 12

Table 2: Approximate reduction of travel time for each connection after implementation of the

PRT system in 2025 ................................................................................................... 20

Table 3: Increases in the built-up areas in regions (based on BP) ......................................... 24

Table 4: The length of the network in different options ........................................................... 26

Table 5: Estimated cost of construction of the system ............................................................ 27

Table 6: LOS criteria for pavements by HCM .......................................................................... 33

Table 7: Microanalysis of the quality of public transport functioning in Gdynia ...................... 50

Table 8: Microanalysis of the quality of public transport functioning in Gdynia ...................... 52

Table 9: Planned routes of services and frequencies of vehicles on weekdays in 2015 ....... 58

Table 10: Planned routes of services and frequencies of vehicles on weekdays in 2015 ..... 59

Table 11: Planned routes of services and frequencies of vehicles on weekdays in 2015 ..... 60

Page 9: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

9 / 83

1 Introduction Within measure G1.2 Community project studies from SUMP of the CIVITAS DYN@MO project, Gdynia is working on detailed studies and analyses for selected SUMP (Sustainable Urban Mobility Plan) measures, including e.g. a PRT line, road traffic modifications, public transport lines distribution and pedestrian areas in Gdynia. The selected measures require decisions as to their role and purpose of implementation as well as their impact on reducing congestion, emissions and noise. The analyses are being conducted by Gdansk University of Technology, with the use of a transport model elaborated within CIVITAS DYN@MO measure G3.1 Traffic model development to expand Gdynia’s SUMP.

The main objectives of measure G1.2 are to:

prepare studies for priority actions identified in the SUMP developed within the BUSTRIP

project,

prepare community project studies which will serve as a basis for updating and expanding

Gdynia’s SUMP,

decrease congestion, reduction of pollutions after implementation of measures set up in

the analyses and studies within community projects.

In general, activities in this CIVITAS DYN@MO measure consist of:

preparation of databases,

analysis of the current state of knowledge on the use of PRT systems, modification of

urban transport services, development of zones and facilities for walking and cycling,

development of alternative solutions in the field of PRT system, bus and trolleybus

services, pedestrian areas in Gdynia,

development and implementation of methods for evaluating the effectiveness of the

measures,

implemented using a multilevel model transport systems,

analysis of the impact of TRISTAR subsystems (TRISTAR is a Tri-City Intelligent Traffic

Management System, including a number of subsystems for e.g. monitoring of traffic,

traffic management and control, parking management, passenger information) on

improvement of the transport network reliability, in the light of simulated changes in the

traffic management,

development of the concept of promoting non-motorized modes of transport,

process of public consultation on the proposed solutions using web-based platform.

As a result of the measure Gdynia will obtain concepts of the solutions for:

use of the PRT system in Gdynia,

modifications to the road traffic and public transport services system,

promotion of pedestrian, cycling traffic and pedestrian zones.

In this measure activities were analysed which can be implemented in the City of Gdynia now

(promotional campaigns for cycling, walking and pedestrian areas), in the short and medium

term (road traffic modification and PT lines distributions), and in the long term (PRT system).

The main factors for the implementation of the described activities are costs and complexity

of preparations. All of the analysed activities have or will have an influence on changing

Page 10: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

10 / 83

travel behaviour and habits of Gdynia’s inhabitants, leading to a change of modal split of

Gdynia, by increasing the percentages of public transport, cycling and walking. The

descriptions, methodology and first results of the tasks within measure G1.2 are described in

this document.

2 Concept of PRT study Within the CIVITAS DYN@MO measure G1.2 Community project studies from SUMP, Gdansk University of Technology elaborated a concept for a PRT study. Based on an analysis conducted using a 3-level transport model, research was done on the advantages and requirements for the implementation of PRT in Gdynia. This task will be not be introduced during the DYN@MO project lifetime, but the analysis conducted are an important basis to introduce PRT in the long term.

2.1 Characteristics and examples of a PRT system

Personal Rapid Transit (PRT) is a fast personal transport, combining the features of

passenger personal and public transport in cities. It is a system of "point to point", operated

by small vehicles for a few persons moving at light infrastructure remotely without stopping at

intermediate stops, moving on the optimal way being selected by the system according to the

criterion of a minimum travel time. PRT is a form of automatic transport without a driver. It is

also an innovative means of public transport, fully circumscribed in the development of

Intelligent Transport Systems. PRT system features include1 2:

small, fully automatic electric vehicles,

lightweight, occupying a small space infrastructure, which can be suspended above the

earth, on the earth or under the earth,

vehicles dependent on the infrastructure, which is reserved exclusively for this system,

vehicles available for the use by individuals or small groups travelling together, through

the choice of a particular route,

service can be accessed 24 hours a day, 7 days a week,

vehicles moving along a fully integrated network and all stations,

a system for providing direct journey from the beginning to the end without stopping at

intermediate stops,

transport system available mainly on request, without a specific timetable.

Research and implementation in the field of PRT has been carried out, among others, in the

Netherlands, the UK, Sweden, Denmark and Poland:

in the Netherlands at Schiphol Airport near Amsterdam the FROG Park Shuttle system

was developed in 1997. In this system vehicles move along two routes in the shape of a

loop, each with a length of 1 km and three stops. In 1999 this system was also used in the

business centre near Rotterdam for connecting the business centre with the underground

1 B. Dunning - Personal Automated Transportation: Status and Potential of Personal Rapid Transit, 2003

2 J. Schweizer - The Case for Personal Rapid Transit (PRT), 2010

Page 11: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

11 / 83

station at a length of 1.3 km. The cost of this system was about $ 3 million (including the

purchase of 3 vehicles).3

in the UK the University of Bristol develops the Ultra system (Urban Light Traffic),

implemented since 2001 in Cardiff (Wales). The system uses battery-powered, four

rubber-wheeled vehicles moving along a special track that runs both on the ground and

above ground. It is a good option for cyclic service facilities such as airports, university

campuses and other large centres of activity (Dunning 2002). The cost of 1 km is

estimated at $ 5 million.4

in Sweden, for the SkyCab system studies were performed and test tracks were

established in several cities and at Arlanda Airport near Stockholm. Also a project for

connecting Linkoping University's campus to the city centre was developed. It includes 21

km of track, 25 stations and more than 100 vehicles. The operating speed is 36 km/ h, the

minimum turning radius is 20 m, with the maximum longitudinal slope of 10%. The cost for

1 km is estimated at about $ 4 million.5

another Swedish system is Flyway, developed conceptually by SwedeTrack. The system

uses 5 passenger vehicles suspended on a beam with cross section of 70x90 cm.6

in Denmark the Danish Technological Institute develops the RUF system (vehicle

prototype and test track). It uses two-mode vehicles without a driver, which can move in

the traffic stream on a single rail. The cost is approximately $ 7 million/ mile.7

in Poland so far there is no service of a PRT system, however work is quite advanced on

the development of a system called MISTER – the Polish innovative system of urban

public transport. Controlled vehicles carry up to five people on request, directly between

any two stops by overground rail infrastructure at a height of about 10 m above the

ground. Stops are small and located at sides, not blocking traffic on the routes.8

Figure 1: System MISTER9

Detailed analyses of PRT systems were carried out under the EDICT (Evaluation and

Demonstration of Innovative City Transport) project in which experiences, recommendations

and examples of PRT systems in cities with various existing public transport systems were

collected. Analyses carried out within the project indicate significant benefits of PRT systems

3 http://faculty.washington.edu/jbs/itrans/parkshut.htm

4 http://www.ultraglobalprt.com/

5 http://www.skycab.se/eng/

6 https://arbedocastione.files.wordpress.com/2010/10/swedetrack3.pdf

7 http://www.ruf.dk

8 http://www.mist-er.eu/

9 http://www.mist-er.eu/

Page 12: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

12 / 83

as regards efficiency costs for constructing and operating of such systems, quality of service,

reception by the public, and the impact on the image of the city.

Within the above project a comparative analysis of the PRT system and urban public

transport was carried out, which indicates that at lower unit costs and providing a much

higher speed, a PRT system ensures maximum capacity, comparable to trams and buses,

but with a several times higher efficiency of the system (Table 1). PRT systems themselves

differ in terms of e.g. cost of the investment, construction details of vehicles, guides, stops

and passenger service rules.

Type of system Bus Tram Underground PRT

Total cost of 1 km of the two-way system [mln EUR] 10 40 150 5

Average schedule speed in peak hours [km/ h] 10 15 30 50

Maximum number of passengers in the vehicle 100 200 1,000 2

Average number of vehicles per 1 km two-way route 8 4 1 100

Maximum capacity [thousands lane/ direction/ h] 4 6 15 5

Normalized relative efficiency of the PRT system

(on example of MISTER vs other systems) 2,5 6,67 10,00 -

Table 1: Comparison of PRT with other urban public transport systems

The purpose and functioning of the PRT is largely dependent on the prospects of

development – from the first stage of having first experiences from the implementing

institution to the last, decisive for the assessment of the impact of the PRT system on the

functioning of public transport in the area.

2.2 Gdynia – a potential site location for the pilot implementation of a PRT system

The City of Gdynia, like most cities, is faced with the problem of an aging population.

Between 2006 and 2010 the number of people above working age increased by 2.38%. In

the economy of Gdynia there is a high share of services in employment, due to the dynamic

development of retail and wholesale trade, financial services, information and communication

technologies (ICT) and high-tech. The city has the ability to attract innovative companies

operating in the high technology sector by developing the Pomeranian Science and

Technology Park (Pomorski Park Naukowo-Technologiczny). On the basis of investors’

activity in the areas of the old shipyard a real chance emerged of sustainable economic

reactivation of the area and the creation of several thousand jobs in the marine industry,

energy and steel structures in the next few years. A positive factor for the development of

tourism in Gdynia is the growing attractiveness of the Baltic Sea Region and expanding

tourism. These factors as well as the prospect of creating a new, modern urban space in the

northern downtown areas can promote the formation of favourable prerequisites for a

Page 13: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

13 / 83

sufficient PRT capacity as well as the social and political will for implementing the latest

technology for transportation, including the construction of the first Polish PRT service.

2.2.1 Transport system in Gdynia and trends

Gdynia has 391 km of roads and streets, of which the basic system is approx. 80 km. In this

system, there are approx. 7,500 intersections, including 9 bi-level intersections and 80

intersections and pedestrian crossings equipped with traffic lights.

Figure 2: (a) Basic and perspective road system of the city of Gdynia10

; (b) The planned street system

in the downtown area11

The public transport system consists of two subsystems in Gdynia:

road service network of public transport (trolleybuses and buses);

Rapid Urban Railway (SKM).

The most important in Gdynia are trolleybus services and diametrical bus services, passing

through the central area of the city. The Public Transport Authority (ZKM) in Gdynia provides

93 services in Gdynia. In 2008 the public transport system in Gdynia was used as follows:

the diametrical route (with SKM) by 35,800 to 116,200 passengers/ day,

Janka Wisniewskiego Street – Hutnicza Street by 14,800 to 57,200 passengers/ day,

the streets connecting the Tri-city Ring Road (Trójmiejska Obwodnica) with the city by

3,800 to 28,400 passengers/ day.

On weekdays the share of municipal and public transport in passenger transport amounts to

45 and 52%. The share of bus journeys is 30%, while 15% are using trolleybuses.

The subsystem of SKM in Gdynia area covers 16 km of electrified double-track service with 9

stops. SKM provides connections: Gdynia with Sopot, Gdansk, Rumia, Reda and

10

City Hall of Gdynia, 2010 11

City Planning Office Gdynia

Page 14: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

14 / 83

Wejherowo, as well as selected journeys from Tczew, Lebork and Slupsk. SKM annually

transports around the area of its operation about 36 million passengers. The share of SKM in

the transport in Gdynia is 10%.

The future development of public transport in Gdynia will include:

the introduction of new bus and trolleybus services in the areas of development,

building management systems and traffic control to allow prioritization for buses and

trolley buses in traffic and the current passenger information at stops,

modernization of existing railway services to serve the adjacent areas of the city and

connections to the airport,

construction of the rail to the central area of the Chwarzno-Wiczlino,

construction of a loop at bus stops and railway depot,

introduction of organizational measures to integrate public transport (joint ticket, linking

schedules).

2.2.2 Transport preferences of residents in 2013

Research in the field of preferences and behaviour of residents of Gdynia conducted by the

ZKM in 2013 indicate that12:

(1) Compared to 2010, the share of residents travelling always and mostly by car increased

respectively by 4% and 1.9%. The share of residents travelling always or mostly by public

transport is the biggest in Witomino (61.3%) and Chylonia districts (57.6%). The districts

with the biggest share of residents travelling always or mostly by car are Wielki Kack

(57.8%) and Oksywie (55.5%).

(2) The residents segments with the biggest share of public transport users (people travelling

always or mostly by PT) are students (82.1%), pensioners (59.3%) and retired (58.4%).

Most of people travelling always or usually by car are in the segments of employed

persons (55.0%) and unemployed (34.2%).

(3) Most of home-work and home-school trips end in Gdynia - respectively 65.7% and 54.9%

or Gdansk – 19.0% and 35.8%. Most of the residents that are working in Gdynia

commute to the city centre (30.1%) and most of the residents studying in Gdynia travel to

school or other place of education to Grabowek district (24.5%).

(4) The average travel time to get to work by car is 21.7 minutes (21.5 minutes in 2010). The

average travel time to get to work by public transport is 40.8 minutes (38.4 minutes in

2010).

(5) The average number of motorised trips per day is 1.57, which is lower than in 2010

(1.61).

(6) The share of public transport in modal split systematically decreases. In 2013 the share

of public transport in modal split was 45.7%. In comparison with 2010 the share of

passenger car increased by 4.4%.

(7) The main reasons for the selection of a passenger car in urban journeys are: greater

comfort; shorter travel time and no need to wait at the bus stop.

12 Communication preferences and behaviour of inhabitants of Gdynia. Marketing Research Report 2013, ZKM Gdynia, March

2013 (http://zkmgdynia.pl/admin/__pliki__/A4_zkmgdynia-PZKMG-raport%202013%20i.pdf).

Page 15: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

15 / 83

(8) The main reasons for the choice of public transport in urban travel by persons with car

are: difficulty with parking at the destination; fees for parking and use of car by another

person.

(9) The most important postulate remains directness, followed by punctuality.

(10) Average rating of Gdynia’s public transport (score from 2 to 5) was 4.27.

2.2.3 Mobility and traffic forecasts for 2020

Traffic forecasts conducted for the Pomeranian region indicate that there will be a further

increase in individual motorisation by 2020. National forecasts predict that in 2020 the

number of vehicles will increase from 13 million to 19 million. It is assumed that the increase

of personal transport will go hand-in-hand with an increase in the standard and model of

living. This trend will affect both urban (an increase in the metropolis by approx. 20%),

regional and interregional transport. In case of transport outside cities and metropolitan areas

the share of tourism and recreational trips will increase. The spatial development of the Tri-

City area and of the sub-regional cities (due to the development of residential function in the

city’s outskirts and suburbs) will also cause a significant increase in demand for transport

services.

Forecasts of modal split in cities by 2020 foresee an increase in the share of private transport

up to 60-70%, which will lead to a significant decrease (20-25%) in the number of

passengers of urban public transport, and especially bus and tram.

For the Tri-City area, 50% increase of motorization means:

20% increase in the mobility of the inhabitants of the Metropolis to 2.6 trips/ person/ day

by 2020,

increase in the total number of car journeys in the years 2004-2020 by 70%,

the share of passenger cars in travel in 2020 will be 35-45%,

the share of public transport travels in 2020 will be 35-45%,

approx. 40% reduction in the average buses occupancy,

approx. 12.5% reduction in the average passenger vehicles occupancy.

2.2.4 The concept of a tram service connecting Gdynia Glowna Railway

Station with Molo Rybackie

The concept includes four options of the tram service. In the preferred option a line

connecting Gdynia Glowna and Molo Rybackie runs under Janka Wisniewskiego Street.

Construction of the tunnel eliminates at least three collisional intersections, which has a

positive effect on the reduction of travel time. The whole area of the designated route is now

largely vacant and buildings are only around the Waszyngtona and Hryniewickiego Streets.

Throughout the whole route of the service a double track with a length of 2,600 m is planned.

The route

tunnel section: from the beginning of the route, via the Janka Wisniewskiego and 3 Maja

Streets,

the section along the disused railway line on the Miedzytorze of 525 meters in length,

along with the track to the repair hall,

the section on the trestle bridge with a length of 560 m for the collision-free intersection

of Weglowa, Wendy and Waszyngtona Streets up to the Hryniewickiego Street,

Page 16: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

16 / 83

the section on the Molo Rybackie of 750 m length from the existing track along

Arkadiusza Rybickiego Street to the end of the pier.

For the TRANSLOHR vehicles (on tires) the width of the area needed for the service should

be (Figure 3):

for the track without poles and fence in the space between the tracks – 5.41 m;

for the track with a fence located in the space between the tracks – 7.0 m;

for the track with poles located in the space between the tracks – 5.81 m;

for the tracks in the area of a stop (on the stop) – from the axis of the track without poles

on the space between the tracks to road curb – 5.60-7.10 m;

for tracks in the stop area (on the stop) – from the axis of the track with poles the space

between the tracks to road curb – 6.10-7.60 m.

Figure 3: The dimensions of the lane for TRANSLOHR vehicles13

Stops and integration points

Within the service six stops as shown in Figure 4 are proposed:

Figure 4: Location of stops within the tram service14

Given the characteristics of the tram in the city centre of Gdynia included in the concept, it

was recognized that the vehicles should meet the following specifications:

13

http://www.newtl.com/en/ 14

Source: R. Wiśniewski, 2010

Page 17: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

17 / 83

maximum speed of 70 km/ h,

the ability to move around on the grade up to 5%,

the ability to move around the curve of the road with a minimum radius of 25 m.,

vehicles must have a control booth on both sides of the composition,

doors shall be located on both sides of the composition.

These conditions can be met by the classic tram (cost 8-9 million PLN) or unconventional

tram (cost 8-12 million PLN).

2.3 General concept of the PRT system in Gdynia

2.3.1 Assumptions for the concept

The overall aim of the city's transport policy is to achieve a socially acceptable level of

transport service by the users while reducing the cost of transport, health and life hazards

and harmful effects on the environment. This goal will be difficult to achieve without recourse

to unconventional technological and organizational solutions. Taking into account that there

is no practicable ability to catch up with the development of roads for the growing automotive

industry, continuation of current policy in most cases does not solve the problem of

congestion, which covers more areas and is more time consuming.

As regards Gdynia’s transport policy in the “Study of conditions and directions of spatial

development” six transportation objectives are included, two of which are related to the need

to promote new technologies in urban public transport:

Objective 2: Improving the quality of public transport service and stopping the decrease in

the share of public transport in passenger transport,

Objective 5: Reducing the negative impact of transport on the living conditions of

residents.

In the records there is neither a clear indication stating the plan to introduce a new type of

transport in the city centre (it includes statements about the light rail means in the region of

Karwiny and Wiczlino districts), nor a discussion over local land use plans of the downtown

and the use of structure of old rail areas for the construction of an alternative transport

infrastructure to road infrastructure.

2.3.2 The implementation process of PRT

Taking into account the local conditions it should be assumed that:

development of PRT will take place in stages,

a PRT network will be an extension of the current network of public transport in the area

and in the fields, where PRT will have a competitive advantage over the current and future

bus or trolleybus service,

an analysis of the transport potential in terms of city-wide and tourist for the analysed

options of the connections should be conducted; the key option should be the axis

Wiczlino district – Gdynia Glowna (Main Railway Station) – Airport Gdynia-Kosakowo

(Port Lotniczy Gdynia-Kosakowo), divided into stages of implementation and

supplemented as necessary in the network.

Page 18: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

18 / 83

The whole process of the development of PRT comprises the step of preparation,

implementation and operation. In the preparation stage, according to the experiences from

abroad, the following steps should be taken:

creation of political support,

feasibility study,

network of stakeholders,

the detailed scope of the system,

analysis of the financial mechanism,

conducting public procurement.

Before starting an in-depth analysis, it is necessary to obtain a positive assessment of the

potential and financial feasibility of the project. This requires identification of:

travel source-target,

system diagram,

system users,

cost estimates.

A diagnostic analysis of PRT deployment conditions in Gdynia indicates that the basic

analytical tasks in further phases of the project should be:

(1) Data analysis to model

option service system,

linear system as a supplement to existing public transport,

network system as a supplement to existing public transport,

network system as an exclusive in downtown,

location of stops and interchanges/ main points of the network: Gdynia Glowna (Main

Railway Station), Dworzec Morski (port for passenger ships), Airport Gdynia-Kosakowo,

Molo Rybackie/ Południowe, Stadion, Park Technologiczny, Witomino district, Karwiny

district, Wiczlino district, Swietojanska Street,

local passenger potential in the corridors affecting PRT - detailing areas, reaching zones.

(2) Analysis of opportunities for PRT over the port channel; this task is to identify how to lead

PRT service over the port channel from the point of view of permissible construction,

length and height of putting a PRT line, in a way that does not interfere with maritime

traffic and have a resistance to atmospheric phenomena (e.g. wind).

(3) Defining the base service indicators, especially in relation to current, real times of

reaching by car (vehicle model) and public transport (according to schedules) between

the main points of the city and the PRT network: Gdynia Glowna (Main Railway Station),

Dworzec Morski (port for passenger ships), Airport Gdynia-Kosakowo, Molo Rybackie,

Molo Południowe, Hala/ Stadion, Park Technologiczny, Witomino district, Karwiny district,

Wiczlino district, Pilsudskiego Str./ Galeria.

2.3.3 Final shape of PRT system network

It is assumed that the route can be built in any place and in such a way that it:

passes over existing tram traction and signalization,

minimum turning radius of 3 m, while the recommended radius to adapt to the needs (if

the radius is too small for the standard speed 50km/ h the vehicles will slow down to

adjust to it)

maximum longitudinal slope – 45 degrees,

Page 19: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

19 / 83

distance between the poles was 20-30 m (greater distance allowed depends on the

design of the pole and guy ropes of the slide),

the minimum distance between the services in opposite directions is about 3 m,

pole height from 8 to 12 m, depending on the local needs of the route,

maintain modular construction of the stops.

A rational approach to implement in the city a new means of transport requires subordinating

the implementation of initial stages of PRT system to a target vision, especially regarding the

target location of individual network elements of PRT. Therefore, the general concept of the

network assumes that it will ultimately form 7 services:

Service 1 (dark blue): Gdynia Glowna – Molo Rybackie,

Service 2 (green): along 10 Lutego Street (from Railway Station Gdynia Glowna to Skwer

Kościuszki),

Service 3 (blue): along the Swietojanska Street (from the 10 Lutego Street to the Wzgorze

Sw. Maksymiliana),

Service 4 (red): along the Wladyslawa IV Street (from service 1 to service 2),

Service 5 (pink): from service 1 to the Teatr Muzyczny (music theatre),

Service 6 (black): from service 1 to the Marine Station,

Service 7 (orange): from service 2 to the Pomorski Park Naukowo-Technologiczny /

Witomino district.

Figure 5: The concept of the PRT service in the downtown with the location of the main stops15

15

Gdansk University of Technology, 2013

Page 20: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

20 / 83

The total length of the network is over 10 km, whereas in the first step the realization of

service 1 with a length of 2.3 km would be taken. Within the option of an extensive network it

is recommended to extend the network with service 6 (black) to Oksywie district and the

Airport Gdynia-Kosakowo and service 7 (orange) to Wiczlino district. The longest analysed

PRT network connection is a connection from the Airport Gdynia-Kosakowo to Wiczlino

district of a length of about 20 km and 34 minutes travel time.

In the targeted PRT network the biggest traffic flows (number of the passengers in the

morning rush hour in both directions) can be expected on the sections:

Molo Rybackie – Oksywie district (more than 2,200 passengers/ h)

Gdynia Glowna (railway station) – Molo Rybackie (1,800 passengers/ h).

The largest reductions in travel time using the PRT system concern the connections with the

areas located outside of the downtown and implemented through the port channel (reduction

of approximately 30 minutes), which is obvious due to the currently relatively low time

accessibility of the areas: Oksywie, Obluze and Pogorze districts. In addition, to these

connections the greatest reductions in time appear on:

Skwer Kosciuszki – Wiczlino district,

Stryjska Street – Dworzec Morski (port for passenger ships).

Table 2: Approximate reduction of travel time for each connection after implementation of the PRT

system in 2025

The PRT network would be linked to the metropolitan railway – PKM. In order to facilitate

passengers’ changing from SKM trains onto the vehicles of the PRT system and ensuring the

attractiveness of travelling with this system, it is necessary to situate in close proximity to

other public transport stops and Park & Ride possibilities.

2.3.4 Feasibility of PRT within the existing streets

The PRT equipment, especially within the stops, requires appropriate space for the system to

function comfortably and safely, without creating an area of conflict with its direct

environment. Within the conducted analysis the position of the PRT poles is critical from the

Page 21: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

21 / 83

point of structural and aesthetic design. According to the principles of designing the distance

between the poles should be in the range of 20 to 30 meters.

In the cross-sections of the streets it is essential to maintain the requirements for gauges of

public roads (poles in the distance > 0.50 m from the edge of the road and the bottoms of the

cabins at a height of at least 4.50 m above the road). Examples of the localization of

technical solutions of the PRT in cross-sections of the streets are shown in Figure 6.

The above analysis shows that the construction of PRT in the existing sprawl faces serious

obstacles, whose identification requires detailed analysis of such a service, and an inventory

of its environment. Hence, a more favourable solution in this respect is the location of a PRT

service in a development area, e.g. in a place where a street is the subject of space planning

and design analysis. These are the northern areas of downtown, called Miedzytorze and

Molo Rybackie (Figure 7).

Figure 6: Location of poles and PRT in street cross-section16

Figure 7: Miedzytorze in Gdynia17

16

Gdansk University of Technology 17

Photo: Kacper Kowalski

Page 22: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

22 / 83

2.4 PRT line between Gdynia Glowna railway station and Molo Rybackie

2.4.1 Determinants of planning in the downtown area

The northern part of the downtown of Gdynia is subject to a number of local land use plans.

Currently, they are (Figure 8):

two adopted plans: 1103 (part of the downtown area, the area of Molo Rybackie) and

1107 (part of the downtown area, the area of Portowa, J. Waszyngtona and Nowa

Weglowa Streets),

serviced draft plan for review 1106 (Part of the downtown area, the area of Weglowa and

Waszyngtona Streets),

the ordinance on the accession to the preparation of a local plan 1108 (part of the area of

downtown, the area of Jana z Kolna and Nowa Weglowa Streets).

From the point of view of this analysis the local plan no. 1108 is crucial. It covers the area of

Gdynia Glowna Main Railway Station and an old post railway lane, located in the axis of the

planned area and having functions essential for carrying out public transport. Parts of the

railway lanes located in the 1103 and 1107 plans are designed for the infrastructure for

pedestrian and bicycle traffic (pedestrian and bicycle way decorated with greenery with

minimum width) in the demarcation services with a width of 10 m. For further analysis of the

area plan no. 1108, the structure shown in the draft of the urban plan was adopted, which

was later abandoned.

Figure 8: Location of local development plans in the northern part of the downtown area (green –

plans adopted)18

18

City Planning Office Gdynia

Page 23: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

23 / 83

2.4.2 Planned changes in the downtown area development

Figure 9: Downtown areas19

In the downtown area there are currently 690,000 m2 of living space. An expansion is

possible to 950,000 m2 in the old quarters and an additional 500,000 – 900,000 m2 in the

new quarters. By 2030 it is possible to double the living space. A similar situation can occur

in the case of the service area. The largest increases will occur in the northern part of the city

centre. This means doubling the traffic generating potential.

Area

Existing

buildings

Buildings

Target sum Increase M

Expansions New buildings

M U M U M U M U %

A1 36468 20513 36468 20513 36468

A2 52463 29511 52463 29511 52463

A3 36874 20742 36874 20742 36874

A4 9224 9209 1489 1604 17147 9295 27861 20108 18637 202

A5 787 982 0 0 45904 25821 46691 26803 45904 583

A6 19828 11154 19828 11154 19828

19

City Planning Office Gdynia

Page 24: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

24 / 83

Area

Existing

buildings

Buildings

Target sum Increase M

Expansions New buildings

M U M U M U M U %

A7 35652 970 9699 8866 30657 15995 76010 46260 40358 113

A8 252160 141840 252160 141840 252160

Total 45663 11161 11188 10470 491501 274871 548355 316931 502692 898

Table 3: Increases in the built-up areas in regions (based on BP)

2.4.3 Options of the service routes Gdynia Glowna – Molo Rybackie

Three options for the line connecting Gdynia Glowna railway station and Molo Rybackie are

taken into account:

Option 1: Gdynia Glowna - Molo Rybackie (base of the pier),

Option 2: Gdynia Glowna - Molo Rybackie - Teatr Muzyczny with connections to the

Dworzec Morski,

Option 3: Gdynia Glowna - Molo Rybackie (the end of the pier) with connections to a

branch to the Dworzec Morski and Teatr Muzyczny.

Page 25: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

25 / 83

Figure 10: Option 1: Gdynia Glowna - Molo Rybackie20

Figure 11: Option 2: Gdynia Glowna - Molo Rybackie - Teatr Muzyczny with connections to the

Dworzec Morski21

20

Gdansk University of Technology

Page 26: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

26 / 83

Figure 12: Option 2: Gdynia Glowna - Molo Rybackie with connections to a branch to the Dworzec

Morski and Teatr Muzyczny22

Services Option 1 Option 2 Option 3

Dark blue service 1,600 m 2,450 m 2,340 m

Black service 1,000 m 1,100 m

Pink service 770 m

Total 1,600 m 3,450 m 4,210 m

Table 4: The length of the network in different options

For the blue service 7-9 stops are indicated: Gdynia Glowna Railway Station, Shopping

Centre (Centrum Handlowe), 3 Maja Street, Wladyslawa IV Street, Wendy Street, Nauta,

Sea Towers (or Molo Rybackie in a short option), Molo Rybackie I, Molo Rybackie II. Stops

of the 3 Maja, Wladyslawa IV, Wendy Streets should be considered as potential interchange

stops in connection with bus/ trolleybus transport. The main stops Gdynia Glowna Railway

Station and the Shopping Centre should have a P&R function.

21

Gdansk University of Technology 22

Gdansk University of Technology

Page 27: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

27 / 83

2.5 Approximate cost of PRT implementation

According to the concept of the developer of the MISTER system, the estimated cost of

implementing the service between Gdynia Glowna and Molo Rybackie is 34-72 million PLN

depending on the option (the cheapest is option 1, option 3 the most expensive). Cost

components are presented in Table 5.

Element Cost in million PLN

Poles and rails in both directions (steel, concrete, land, labour) 7-17

500 vehicles (200 vehicles/ km, one vehicle - approx. 40,000 PLN) 14-34

Automation system and computers 8-12

Stops 5-9

TOTAL 34-72

Table 5: Estimated cost of construction of the system

2.6 Conclusions for further analysis

A preliminary and general analysis of the applicability of PRT systems in Gdynia indicates

that the circumstances for this type of technology in urban transport are rather favourable. A

key opportunity for this approach is the development plan for the northern part of the

downtown area and the conditions in the area are suitable for handling PRT system.

Compared with the construction of a tramway at the junction of Gdynia Glowna with Molo

Rybackie, a PRT service can be a simpler and cheaper solution.

In order to make more accurate assessments of applicability of PRT system in Gdynia and

determination to continue the implementation of works one should:

choose the option and the extent of implementation of the first pilot PRT service with the

involvement of the city authorities and residents,

detail the technical design of such a service engaging PRT professionals,

perform traffic forecasts on this service in conjunction with conventional services of urban

transport, and

conduct a preliminary feasibility study for the decision about the next stages of the

introduction of a PRT system in Gdynia.

Page 28: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

28 / 83

3 Study on road traffic modifications and public transport services distribution

In this chapter, the changes which can contribute to reducing the negative effects of the automotive industry and encourage alternative means of transport are analysed. The effectiveness of the changes and the feasibility and validity of their implementation will be analysed using a multi-level transport model (MST), and evaluated by the decision-makers and the public through consultation. It is possible some changes will be introduced during DYN@MO, but in the majority they are prepared for implementation in the medium term, after the project.

Proposals for change are divided into the following groups, which have been characterized in

the following sections:

streetscape development, planned by the city, which will affect the results of the analysis

and the expected improvements of the road system, aimed at improving traffic safety and

improving the road system hierarchy,

development and the growing importance of public transport (priority for public transport

vehicles at traffic lights and traffic organization, changes of the route of the public

transport service, new services and means of transport), the creation of integration hubs,

intermodal operations,

improvement of the conditions and pedestrian safety, improvement of the image of urban

space, traffic calming, pedestrian zones.

Pedestrian zones are a popular form of creating public space in urban centres. It is an area

entirely for pedestrians without vehicular traffic with priority to pedestrians and producing

conditions for revival of urban life. Such space increases the development and availability of

trade, services, catering and entertainment, thereby creating opportunities for development

of social life. The basic challenges for creating pedestrian zones are:

the criteria and conditions for the creation of such zones,

obtaining social acceptance,

assessment of the consequences of the pedestrian zones introduction.

The introduction of pedestrian zones in the city centre has a positive effect on:

improving conditions for pedestrians and cyclists,

providing new value in the social sphere,

reducing the environmental burden (reduction of noise and emissions),

improving the aesthetic values of the landscape,

frequent selection of bicycles as a means of transport,

increase in the share of residents in public transport,

creating car parks outside the centre (underground, cubic or Park & Ride), in order to

encourage users to change to public transport or cycling.

An analysis of the experiences of European cities shows that the process of introducing

pedestrian zones in city centres continues, develops and is very important for the social and

cultural life of the inhabitants. Therefore, it is believed that through following sustainable

Page 29: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

29 / 83

transport policy and creation of pedestrian zones, Gdynia will introduce changes and new

facilities for pedestrian and cyclists.

3.1 Analysis and assessment of the conditions for pedestrian traffic in the city centre of Gdynia

3.1.1 Pedestrian traffic generators

The main generators of pedestrian traffic in the city centre include: Gdynia Glowna railway

station, municipal hospital (Szpital Miejski of Jozef Brudzinski), City Market, Faculty of

Navigation Maritime Academy, Batory Shopping Centre, Kwiatkowski Shopping Centre,

Gemini Entertainment Centre, the Roman Catholic Church of M. B. Nieustajacej Pomocy and

Saint Piotr Rybak, the Roman Catholic Church of the Sacred Heart of Jesus, Kindergarten

Niezapominajka, Kindergartens no. 7, 16, 51, Primary Schools no. 1, 21, High Schools no.

IX, X, Sports Schools Complex and public spaces: Skwer Kosciuszki, Molo Poludniowe,

Yacht Marina and Park Rady Europy.

Most of the trains travelling to the Tri-City from all over Poland start or end their trip at Gdynia

Glowna railway station. Gdynia Glowna is also a start and end station for regional trains to

Koscierzyna and Hel. It is also one of the SKM (rapid urban railway) stations. The railway

station generates a lot of pedestrian traffic. The municipal hospital of Jozef Brudzinski is the

largest hospital in Gdynia while the “Non-public Healthcare Institution in the Downtown”

(NZOZ) has three clinics in the downtown area: at the Zwirki i Wigury, Abrahama and

Obroncow Wybrzeza Streets. Other traffic generators are: City Market, Faculty of Navigation

Maritime Academy, Batory Shopping Centre, Kwiatkowski Shopping Centre, Gemini

Entertainment Centre. The locations of the main generators of traffic in the city centre of

Gdynia are presented in Figure. 3.1. Most of them are located in the northern part of

downtown north of the 10 Lutego Street.

Page 30: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

30 / 83

Figure 13: The main generators of pedestrian traffic in the city centre of Gdynia23

3.1.2 Pedestrian traffic measurements

Pedestrian traffic counts were conducted in October 2013, on workdays, in the afternoon

rush hours from 15:00 until 18:00 and showed that the main pedestrian streets in the city

centre include:

Plac Kaszubski (2,000 pedestrians/ hr),

part of the Dworcowa Street from the intersection of the Starowiejska Street to the 10

Lutego Street (1,800 pedestrians/ hr),

section of the Dworcowa Street from the intersection with the Starowiejska Street to the

Plac Konstytucji (1,500 pedestrians/ hr),

part of the Wojta Radtkego Street from the intersection of the Dworcowa Street to the

intersection with the 3 Maja Street (1,500 pedestrians/ hr),

the Swietojanska Street from the Plac Kaszubski to the intersection of the Zwirki i Wigury

Street (1,400 pedestrians/ hr),

the Skwer Kosciuszki and the Starowiejska Street (1,300 pedestrians/ hr),

the 10 Lutego Street (1,200 pedestrians/ hr)

part of the Armii Krajowej Street from the section with the Wladyslawa IV Street to the

intersection of the Swietojanska Street (1,100 pedestrians/ hr),

part of the Zwirki i Wigury Street between the Wladyslawa IV Street and the Swietojanska

Street (1,100 pedestrian/ hr)

part of the Swietojanska Street from the intersection of the Zwirki i Wigury Street to the

intersection with the Marszalka Jozefa Pilsudzkiego Avenue (1,100 pedestrians/ hr).

23

https://mapa.targeo.pl/

Page 31: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

31 / 83

Figure 14: Pedestrian traffic volume in the city centre of Gdynia per hour in cross-sections24

Mean values of pedestrian traffic were observed on:

Wojta Radtkego Street, between 3 Maja and Swietojanska Streets (700 pedestrians/ hr),

part of Antoniego Abrahama Street, between the intersections with Starowiejska and Armii

Krajowej Streets (700 pedestrians/ hr),

part of 3 Maja Street, between Wojta Radtkego and 10 Lutego Streets (700 pedestrians/

hr),

Zygmunta Augusta Street (500 pedestrians/ hr).

The streets with little pedestrian traffic are:

Romualda Traugutta Street (450 pedestrians/ hr),

Armii Krajowej Street from the intersection of Swietojanska Street to Park Rady Europy

(400 pedestrians/ hr),

Kazimierza Pulaskiego Street with a part of Jerzego Waszyngtona Street to the Skwer

Kosciuszki (350 pedestrians/ hr),

Jana Kilinskiego Street (450 pedestrians/ hr).

In addition, pedestrians trends were examined regarding crossing the street beyond

pedestrian crossings and it was found that the highest percentage of people cross the

Starowiejska Street (16% of pedestrians), Obroncow Wybrzeza Street (15% pedestrians),

Zwirki i Wigury Street (8% of pedestrians) and at least, Romualda Traugutta Street (3% of

the pedestrians) and Armii Krajowej Street (1.5% of pedestrians). The majority are drivers

who park their cars and do not look for the nearest pedestrian crossing.

24

https://maps.google.com/, Gdansk University of Technology

Page 32: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

32 / 83

Figure 15: Location of the spots with the highest percentage crossing the street beyond the

pedestrian crossing25

3.1.3 Conditions of pedestrian traffic on pavements

In order to analyse the traffic conditions on the pavements of the streets with the highest foot

traffic in the city centre of Gdynia Level of Service (LOS) according to the method HCM-2000

on the pavements located within Starowiejska, Swietojanska Streets and Skwer Kosciuszki

were examined. LOS allows the classification of space with pedestrian traffic within the levels

of A,B, C, D, E, F. Threshold criteria for each LOS for pavements were given (Table 6).

Traffic conditions on the Starowiejska Street were analysed, leading to a LOS C classification

– pedestrians have almost complete freedom in choosing the speed of movement, while the

track of movement depends on other pedestrians. With increased traffic in the opposite

direction and at the intersection of their streams there are conflicts which reduce the speed of

a pedestrian. Similar conditions of pedestrian traffic regarding the level of service are on

Swietojanska Street (the section from Zwirki i Wigury to Marszalka Jozefa Pilsudzkiego

Streets), where LOS C was attributed and along Swietojanska Street from Zwirki i Wigury

Street to the Plac Kaszubski with the section bus bay. The best conditions for pedestrians

are on the Skwer Kosciuszki, where, according to calculations LOS B was given - there is

enough space for choosing normal walking speed and passing other pedestrians, especially

in the one-way flow. Where there is an opposite direction or passing, there are collisions,

slightly reducing the average walking speed and potential intensity. The Skwer Kosciuszki

has the largest area for pedestrians because the level of freedom is larger compared with

pavements located in the Swietojanska or Starowiejska Streets. In contrast, the intensity of

pedestrian traffic in relation to the aforementioned streets is very similar.

25

https://maps.google.com/, Gdansk University of Technology

Page 33: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

33 / 83

LOS Area [m2/per]

Traffic intensity

QPS [os/min/m]Speed [m/s]

Degree of capacity

usage (QPS/C)

A > 5,6 ≤ 16 > 1,30 ≤ 0,21

B > 3,7÷5,6 > 16÷23 > 1,27÷1,30 > 0,21÷0,31

C > 2,2÷3,7 > 23÷33 > 1,22÷1,27 > 0,31÷0,44

D > 1,4÷2,2 > 33÷49 > 1,14÷1,12 > 0,44÷0,65

E > 0,75÷1,4 > 49÷75 > 0,75÷1,14 > 0,65÷1,0

F ≤ 0,75 Changeable ≤ 0,75 changeable

Table 6: LOS criteria for pavements by HCM

It should be noted that the above calculations were performed for typical traffic conditions.

During weekends and public events LOS classification deteriorates significantly.

3.1.4 Density and location of pedestrian crossings

The density of pedestrian crossings on the streets with heavy pedestrian traffic, i.e.

Swietojanska, 10 Lutego, Starowiejska Streets and Skwer Kosciuszki was examined to

locate places and pedestrian preferences to cross the street. All pedestrian crossings are

marked (Figure 16), but in order to determine the distance between major crossings the

criterion was adopted according to which two crossings on the same street at the intersection

are counted as a main one.

The highest density of crossings has Swietojanska Street where eight major crossings on the

1.4 km distance were located. The most densely spaced crossings are between the

intersections of Jana Kilinskiego and Armii Krajowej Streets and the average distance is

177.5 m. In the remaining sections the average distance between the crossings is 230 m.

On Starowiejska Street four main crossings on a length of 700 m of an average distance

from each other of 230 m were located. However, on the 10 Lutego Street there are four

main crossing on a length of 600 m of an average distance from each other of 200 m. At

Skwer Kosciuszki there are pedestrian crossings located with an average distance from each

other of 150 meters. Pedestrian crossings along 10 Lutego Street are located at intersections

with traffic lights.

Page 34: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

34 / 83

Figure 16: Location of pedestrian crossings in the streets with high pedestrian traffic26

3.1.5 Pedestrian safety

A safety analysis of the data on road accidents showed that within three years (2010-2012)

15 accidents occurred involving pedestrians (hitting a pedestrian), in result 16 people

suffered injuries. In 2010, two incidents occurred at the intersections of Wladyslawa IV and

Obroncow Wybrzeza Streets, Wladyslawa IV and Romualda Traugutta Streets (2 persons

injured), in which three people were affected.

Figure 17: Location of dangerous intersections where accidents occurred involving pedestrians in

2010-201227

26

https://maps.google.com/, Gdansk University of Technology

Page 35: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

35 / 83

In 2011, five accidents occurred within the intersection of Swietojanska Street with Skwer

Kosciuszki, 10 Lutego Street with Msciwoja Street, Wladyslawa IV Street with Starowiejska

Street, 3 Maja Street with Starowiejska Street and Zwirki i Wigury Street with Abrahama

Street, in which five people were injured. While in 2012 eight accidents occurred at

intersections of Swietojanska Street and I Armii Wojska Polskiego Street, Wladyslawa IV

Street and Starowiejska Street, Armii Krajowej Street, 10 Lutego Street, Batorego Street,

Obroncow Wybrzeza Street (2 persons injured) and Romualda Traugutta Street, in which

eight people were injured. Critical places as far as pedestrian safety is concerned are

Streets: Wladyslawa IV, Swietojanska, Starowiejska and 10 Lutego.

3.1.6 Evaluation of pedestrian traffic conditions

Pedestrian traffic in the city centre of Gdynia is most heavy in the Plac Kaszubski, in streets:

Dworcowa, Wojta Radtkego near the City Market, Swietojanska, Starowiejska, Skwer

Kosciuszki and 10 Lutego, where large generators of different types of pedestrian are

located. Popular public spaces among locals and tourists are the areas belonging to the

Nadmorska Strefa Prestizu Miejskiego (Maritime Municipal Prestige Zone), which is located

in the northern part of the port area, including the President Dock, the Kutrowe and

Kaszubskie Waterfronts, limited from the south by Kepa Redlowska Cliffs going down into

the sea. The middle part is connected with the centre with the axis of 10 Lutego Street -

Skwer Kosciuszki and Molo Poludniowe. These spaces are often chosen by pedestrians

because of their attractiveness and availability. Swietojanska, 10 Lutego and Starowiejska

Streets are the most densely arranged pedestrian crossings in the city centre. On

Swietojanska Street from the intersection of Jana Kilinskiego and Armii Krajowej Streets are

pedestrian crossings at an average distance from each other of 177.5 m, which is the highest

density of pedestrian crossings within the abovementioned streets, which shows the need for

frequent crossing by the pedestrians in Swietojanska section. Having analysed the tendency

of pedestrians to cross the road beyond the crossings, it turned out that as many as 16% of

pedestrians cross Starowiejska Street anywhere. A similar situation exists in Obroncow

Wybrzeza Street (15% of pedestrians) and Zwirki i Wigury Street (8% of pedestrians).

In term of safety the worst conditions can be found in the streets Wladyslawa IV, 10 Lutego,

Starowiejska and Swietojanska, where in three years (2010-2012) 15 accidents involving

pedestrians (hitting a pedestrian) took place as a result of which 16 people were injured.

These facts concerning the conditions of pedestrian traffic in the city centre of Gdynia are the

reason to analyse the introduction of pedestrian zones in the streets Wladyslawa IV, 10

Lutego, Starowiejska and Swietojanska, where services, trade and catering would develop.

Pedestrians could move freely, relax, meet friends and acquaintances in the traffic-free

public spaces.

3.1.7 Assumptions for pedestrian traffic forecasts

In Gdynia’s downtown areas, there are possibilities of expanding or building new buildings in

the quarters already built and new quarters. In total, at present 700,000 m2 of living space

and it is possible to increase to 950,000 m2 in the old quarters and an additional 500,000–

900,000 m2 in the new quarters. By 2030 it is possible to double the living and services

27

https://maps.google.com/, Gdansk University of Technology

Page 36: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

36 / 83

space. Therefore, the greatest increase in pedestrian traffic can only be done at the Skwer

Kosciuszki, as much as 88%, mainly due to the increase in the service area of nearly 150%

resulting from the construction and development of the Waterfront Poludniowe and the Molo

Rybackie. In the Plac Kaszubski it is projected that pedestrian traffic would increase by 44%:

along 10 Lutego Street about 18%, in Swietojanska Street by approx. 16%, 12% in

Starowiejska Street, and in Dworcowa Street section between 10 Lutego and Wojta

Radtkego Streets by 11%. In the part of Wojta Radtkego Street from the Plac Konstytucji to 3

Maja Street, it is projected that pedestrian traffic will increase by 10%. The volume of

pedestrian traffic will increase in the streets of strategic importance in terms of reaching the

planned investments and they are: Portowa, Jerzego Waszyngtona and Antoniego

Hryniewickiego.

Figure 18: Estimated forecast of pedestrian traffic - the number of pedestrians per hour in 2020 (in the

case of the implementation of plans)28

3.2 Options for the development of pedestrian zones

In order to propose the options and create the concept of the introduction of pedestrian

zones in the city centre of Gdynia in individual streets or sections the following criteria were

chosen:

28

https://maps.google.com/, Gdansk University of Technology

Page 37: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

37 / 83

(1) selected streets that have the highest pedestrian traffic in the city centre;

(2) critical points were taken into account in terms of safety, pedestrian traffic conditions,

crossing the streets beyond the pedestrian crossings and the density of their occurrence;

(3) within the proposed street there is a large area of services, shopping and catering;

(4) close location of the significant pedestrian traffic generators, e.g. train station, shopping

centres, schools, etc.;

(5) streets of historical, cultural and tourist values were selected;

(6) spatial development plans and the location of new public places, traffic generators,

development and service of residential quarters in the downtown, which influenced the

selection of potential street to enter the zones for pedestrians were taken into account;

(7) the authors were implied by the pedestrian forecasts until 2020 and an increase in

pedestrian traffic in different parts of downtown;

(8) streets or their parts were selected that are not part of the main streets of the city

transport network of strategic importance and will not affect the substantial difficulties in

vehicular traffic;

(9) streets were selected which may further increase the attractiveness of the centre,

accelerate the development of trade, catering, reviving the development of urban life;

(10) time assumptions including staging the introduction of pedestrian zones, i.e. the

gradual introduction of zones and closing subsequent parts of the streets. Three stage

proposals depending on the area occupied by a pedestrian zone were suggested.

Options for the introduction of pedestrian zones in the city centre of Gdynia were segregated

into three groups depending on the occupancy area, i.e. small, medium and large areas,

which correspond to the introduction in stages of pedestrian zones.

SMALL AREA

Option I: pedestrian and bicycle traffic zone priority on the section of Swietojanska Street

from the intersection of Zwirki i Wigury Street to the Skwer Kosciuszki with the possibility of

entry for public transport, taxis, residents and commercial vehicles from 6:00-12:00 (the

periods of temporary closure will be consulted and analysed).

Figure 19: Location of the pedestrian zone based on Option I29

29

https://maps.google.com/, Gdansk University of Technology

Page 38: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

38 / 83

Option II: pedestrian zone on the section of Swietojanska Street from the intersection with

Zwirki i Wigury and to Starowiejska Street with the possibility of entry for public transport,

taxis, residents and commercial vehicles from 6:00-12:00.

Figure 20: Location of the pedestrian zone based on Option II30

Option III: pedestrian zone on the section of 10 Lutego Street from the intersection with

Swietojanska Street and Skwer Kosciuszki, with possibility of entry for public transport, taxis,

residents and delivery vans from 6:00-12:00.

Figure 21: Location of the pedestrian zone based on Option III31

30

https://maps.google.com/, Gdansk University of Technology 31

https://maps.google.com/, Gdansk University of Technology

Page 39: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

39 / 83

Option IV: pedestrian zone on Starowiejska Street with possibility of entry for public

transport, taxis, residents and delivery vans from 6:00-12:00.

Figure 22: Location of the pedestrian zone based on Option IV32

Option V: pedestrian zone on Dworcowa Street with the possibility of entry for public

transport, residents, taxis and vans from 6:00-12:00. This option will be analysed in terms of

plans to introduce “Shared Space" in the area at the front of the railway station.

Figure 23: Location of the pedestrian zone based on Option V33

32

https://maps.google.com/, Gdansk University of Technology 33

https://maps.google.com/, Gdansk University of Technology

Page 40: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

40 / 83

MEDIUM AREA

Option VI: pedestrian zone on the section of Swietojanska Street from the intersection with

Zwirki i Wigury Street to Skwer Kosciuszki and with the Skwer Kosciuszki and John Paul II

Avenue, with possibility of entry for public transport, taxis and residents vehicles from 6:00-

12:00.

Figure 24: Location of the pedestrian zone based on Option VI34

Option VII: pedestrian zone on the section of Swietojanska Street from the intersection with

Zwirki i Wigury Street to Starowiejska Street with the Skwer Kosciuszki and John Paul II

Avenue, with possibility of entry for public transport, residents, taxis and delivery vans from

6:00-12:00.

Figure 25: Location of the pedestrian zone based on Option VII35

34

https://maps.google.com/, Gdansk University of Technology 35

https://maps.google.com/, Gdansk University of Technology

Page 41: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

41 / 83

Option VIII: pedestrian zone on the section of Swietojanska Street from the intersection with

the Zwirki i Wigury Street to and with Starowiejska Street, with possibility of entry for public

transport, taxis and residents vehicles from 6:00-12:00.

Figure 26: Location of the pedestrian zone based on Option VIII36

Option IX: pedestrian zone in Dworcowa and Starowiejska Streets with possibility for entry

of public transport, residents, taxis and vans from 6:00-12:00.

Figure 27: Location of the pedestrian zone based on Option IX37

36

https://maps.google.com/, Gdansk University of Technology 37

https://maps.google.com/, Gdansk University of Technology

Page 42: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

42 / 83

Option X: pedestrian zone on the section of Swietojanska Street from the intersection with

Mars. Jozef Pilsudski Avenue to Starowiejska Street, with possibility of entry for public

transport, taxis and residents vehicles from 6:00-12:00.

Figure 28: Location of the pedestrian zone based on Option X38

LARGE AREA

Option XI: pedestrian zone on the section of Swietojanska Street from the intersection with

Zwirki i Wigury Street to and with Starowiejska Street and the Skwer Kosciuszki, with

possibility of entry for public transport, residents, taxis and delivery vans from 6:00-12:00.

Figure 29: Location of the pedestrian zone based on Option XI39

38

https://maps.google.com/, Gdansk University of Technology 39

https://maps.google.com/, Gdansk University of Technology

Page 43: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

43 / 83

Option XII: pedestrian zone on the section of Swietojanska Street from the intersection with

Mars. Jozef Pilsudski Avenue to and with the Skwer Kosciuszki and John Paul II Avenue,

with possibility of entry for public transport, residents, taxis and delivery vans from 6:00-

12:00.

Figure 30: Location of the pedestrian zone based on Option XII40

Option XIII: pedestrian zone on the section of Swietojanska Street from the intersection with

Mars. Jozefa Pilsudskiego Avenue to and with Starowiejska Street, Skwer Kosciuszki and

John Paul II Avenue, with possibility of entry for public transport, residents, taxis and

delivery vans from 6:00-12:00.

Figure 31: Location of the pedestrian zone based on Option XIII41

The inherent task accompanying the introduction of pedestrian zones is a change of the

organization of traffic by closing the intake of some streets and change the direction of traffic

in the streets adjacent to the zone. The experience of European cities indicates that:

the main challenges with creating pedestrian zones are the criteria and conditions for

creation of zones to achieve social acceptance and assessment of the consequences of

their introduction.

40

https://maps.google.com/, Gdansk University of Technology 41

https://maps.google.com/, Gdansk University of Technology

Page 44: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

44 / 83

in obtaining the social acceptance for introducing pedestrian zones, it is important to

conduct consultations, meetings with the authorities and designers with the residents,

retailers and restaurant owners.

a pedestrian area usually is formed along historical streets, which were once

marketplaces often visited by pedestrians, and also being among important squares or

other public spaces.

from the gradual shutdown of pedestrian streets leading to the subsequent increase in

activity in pedestrian zone, there is a revival of urban life, social and cultural development.

The results of the introduction of pedestrian zones in the city centre are:

a positive effect on the growth of walking and cycling, as well as improvement of the

conditions for pedestrians and cyclists, providing new value in the social sphere, reduction

of environmental burden (reduction of noise and emissions), improving the aesthetic

values of the landscape, more likelihood of choosing bicycles as a means of transport,

increase the share of residents in public transport and building car parks on the outskirts

of the city centre (underground, cubic or Park & Ride), in order to encourage users to use

public transport or cycling.

the burden resulting from the exclusion of vehicular traffic from pedestrian streets and

giving the pedestrian priority increase the intensity of vehicles in the alternative streets,

difficulties associated with access to downtown by car drivers and the reluctance to

changes of traffic organization in the city centre, as well as the difficulty in changing habits

and motor vehicles user attitudes.

The main generators of pedestrian traffic in the city centre of Gdynia are located in the

northern part of the district.

The main footways in the city centre include the Plac Kaszubski, Dworcowa Street, part of

the Wojta Radtkego Street from the intersection with Dworcowa to the intersection with 3

Maja, Swietojanska, Starowiejska Streets, the Skwer Kosciuszki as well as the 10 Lutego

Street. In the detailed analysis, it was found that:

average volume of pedestrian traffic occurs on: Wojta Radtkego Street between streets of

3 Maja and Swietojanska, part of Antoniego Abrahama Street between the intersections

with Starowiejska and Armii Krajowej Streets, part of 3 Maja Street between Wójta

Radtkego, 10 Lutego and Zygmunta Augusta Streets.

the streets with little pedestrian traffic are: Romualda Traugutta, Armii Krajowej Streets

from the intersection with Swietojanska Street to the Park Rady Europy, Kazimierza

Pulaskiego Street with a part of Jerzego Waszyngtona Street from Kazimierza Pulaskiego

to the Skwer Kosciuszki and Jana Kilinskiego Street.

the highest percentage of crossing the street not on the pedestrian crossing along:

Starowiejska Street (16% pedestrians), Obroncow Wybrzeza (15% pedestrians), Zwirki i

Wigury Street (8% pedestrians) at least on the streets: Romualda Traugutta (3%

pedestrians) and Armii Krajowej (1.5% pedestrians).

pedestrians have better conditions for walking in the Skwer Kosciuszki, where LOS is at

level B, compared to Starowiejska and Swietojanska Street, where LOS is at level C.

the highest density of pedestrian crossings in the city centre of Gdynia is in Swietojanska

Street, for which eight major crossings are located on the length of 1.4 km . The most

densely located crossings are between the intersections of streets of Jana Kilinskiego and

Armii Krajowej and their average distance from each other is 177.5 m. In the remaining

sections the average distance between crossings is 230 m.

Page 45: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

45 / 83

critical places in terms of pedestrian safety are: Wladyslawa IV, 10 Lutego, Starowiejska

and Swietojanska Streets, where in three years (2010-2012) were 15 accidents with

pedestrians (hitting a pedestrian), resulting in 16 injured people occurred.

The introduction of pedestrian zones in the city centre of Gdynia can be divided into three

stages. The first is a pedestrian zone on the section of Swietojanska Street between

intersections with Zwirki i Wigury and Starowiejska Streets. The intermediate stage is a

pedestrian zone on the section of Swietojanska Street from the intersection with Zwirki i

Wigury to the Starowiejska Street with the Skwer Kosciuszki and John Paul II Avenue. The

target stage is the pedestrian zone on the section of Swietojanska Street from the

intersection with Mars. Jozefa Pilsudzkiego Avenue to and with Starowiejska Street and

Skwer Kosciuszki with John Paul II Avenue. The above-mentioned zones would operate with

the entry for public transport, taxis, residents and delivery vehicles at certain times. The

introduction of the target stage of pedestrian zone requires closing 24 inlets abutted streets

to the area and change traffic organization in 4 streets from one-way to two-way traffic.

3.3 Improving public transport

3.3.1 Analysis and evaluation of public transport system in Gdynia

The Public Transport Authority in Gdynia (ZKM) as a budgetary establishment of Gdynia is

responsible for the organization of public transport in the city. Their activity includes

organization and management of public urban transport based on a “regular communication

model with elements of competition”. This is a type of public transport organization model

according to which ZKM as a budgetary municipal unit organises public transport (in Gdynia,

Sopot and neighbouring municipalities) but public transport services can be provided by both

public and private companies selected in a tender. The organizational model introduced in

Gdynia assumes separation of the public transport organization activities and introduces

competition in providing the public transport service.

ZKM in Gdynia operates 85 bus lines, and the total length of the bus and midibus routes is

approx. 293.2 km. The longest bus service of ZKM network in Gdynia is service Z. In one

course and in one direction it covers a distance of 31.113 km, while in the summer season

36.065 km. In public bus transport two carriers (Municipal Transport Company in Gdynia and

the Bus Transport Company in Gdynia, both 100% owned by the city) share 80% of the

connections on the services of the ZKM (together with the Trolleybus Transport Company),

mostly within the city of Gdynia. The remaining 20% are provided by private carriers42.

The residents of Gdynia, in almost 99% of cases, move around the city by private (car) or

public transport. According to the data of 2013 the share of public transport in Gdynia is

45.4%. On the first place among chosen means of transport to get around in Gdynia is car,

chosen by 53.1% of the population. In comparison, bus transport was used only by 25% of

the population. Comparing these shares to 2008, bus transport decreased by 5%, while the

42

www.zkmgdynia.pl

Page 46: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

46 / 83

share of trolley trips slightly decreased (by 0.7%) and SKM trips decreased from 7.2 to

6.4%43.

The ZKM network in Gdynia is one of three in Poland with trolleybuses system. The

development of trolleybus transport in Gdynia, also in terms of fleet replacement, started with

some delay in relation to the bus. In 1998 the Trolleybus Transport Company (PKT) was

created. It is owned by the city.

Figure 32: Routes of ZKM services in Gdynia

In 2004, on the basis of an Integrated Public Transport Development Plan prepared by ZKM

in Gdynia, the trolleybus network was extended and tractions modernized. Moreover, 10

modern low-floor trolleybuses Solaris 12 were purchased. In 2009 the project entitled:

"Development of environmental friendly public transport in the Tri-City Metropolitan Area"

started, under which 28 new trolleybuses Solaris Trollino 12 with battery-powered auxiliary

were purchased. These trolleybuses increase the reliability and flexibility of transport.

43

“Communication preferences and behaviors of Gdynia inhabitants in 2013”, Zarzad Komunikacji Miejskiej w Gdyni, Gdynia 2013

Page 47: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

47 / 83

Figure 33: Diagram of trolleybus network in Gdynia44

The range of public transport in Gdynia covers essentially the entire city area. Each

household has access to at least one service. Most routes and trolleybus services run along

the main thoroughfares of Gdynia – Morska, Wielkopolska, Chwaszczynska Streets and

Zwyciestwa Avenue. For the service in the northern part of the city the Estakada

Kwiatkowskiego (Overpass) is very important, on which operate almost all of the services

connecting the districts Pogorze, Obluze and Oksywie with the central part of Gdynia. One of

indicators of availability of public transport is the distance to the nearest bus stop. Within the

districts of Gdynia, which are characterized by high population density, distance between

stops is about 300 meters, which allows quick access to the nearest stop. The downtown

area has very good public transport accessibility. In the main streets running through the city

centre – Swietojanska, Wladyslawa IV and 10 Lutego there are many bus stops operated by

bus and trolleybus services. The routes of most of the services running through the centre of

Gdynia converge in the area of Sw. Maksymiliana intermodal interchange.

Based on the traffic counts made in working day between 7:00–8:00 (morning peak) and

15:00-16:00 (afternoon peak), critical points of public transport were identified (Fig. 3.23).

Earlier analyses conducted as part of a feasibility study for the TRISTAR system indicated

that the sequences with the worst traffic conditions for public transport are:

Morska Street on the section of the intersection with Obwodnica Trojmiasta (Tri-city

Ringroad) – intersection with Slaska Street,

Zwyciestwa Avenue on the section between the intersections with Mars. Jozefa

Pilsudskiego Avenue and Orlowska Street,

Estakada Kwiatkowskiego (Overpass Kwiatkowskiego),

Jana z Kolna Street – Janka Wisniewskiego Street,

Wladyslawa IV Street,

10 Lutego Street,

44

www.zkmgdynia.pl

Page 48: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

48 / 83

Wielkopolska Street – Chwaszczynska Street on the section of the intersection with

Zwyciestwa Avenue,

intersection with the Obwodnica Trójmiasta.

An important aspect of choosing critical locations is also the average time loss of public

transport vehicles on each road sections that may result from the high traffic volume on some

parts of the street or the wrong traffic light settings. An analysis carried out on the basis of

measurements of the 2012 confirms the analysis in 2009.

Analysis of traffic volumes, public transport volume, average speed and time loss of public

transport vehicles allowed on the preliminary determination of six critical, which may be

considered priority measures for public transport or traffic organization.

The collected data shows that most problems occur at:

Estakada Kwiatkowskiego – in the direction of Morska/ Janka Wisniewskiego Street,

Morska Street – in the direction of Slaska Street,

Estakada Kwiatkowskiego – in the direction of district Oksywie,

Wladyslawa IV Street – in the direction of Mars. Jozefa Pilsudskiego Avenue,

Zwyciestwa Avenue (Stryjska Street – Wielkopolska Street) – in the direction of Sopot,

Wladyslawa IV Street – in the direction of 10 Lutego Street,

Zwyciestwa Avenue (Stryjska Street – Wielkopolska Street) – in the direction of the city

centre.

Figure 34: Average time loss of public transport vehicles 45

45

Gdansk University of Technology

Page 49: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

49 / 83

Figure 35: Location of critical sites46

Furthermore, assessing from the average speed public transport vehicles, the worst traffic

conditions are on Mars. Jozefa Pilsudskiego Avenue and 10 Lutego Street. Public transport

routes are relatively short, with many stops, which can result in a low average speed. The

average loss of time in those streets is much lower compared to the other streets. The routes

running along streets Wielkopolska and Morska (to Chylonska) are characterized by very

high time losses by the number of passengers. High weight of average time loss also occurs

along Zwyciestwa Avenue. Share of time losses in travel time is within the range of 41-55%

on all routes which indicates the potential to noticeably increase of the speed of buses and

trolleybuses after the introduction of priorities. The most critical sections in terms of loss of

time based on the passengers are the sections47:

Zwyciestwa Avenue between intersections with Wielkopolska Street and Stryjska Street,

Morska Street between intersections with Chylonska Street and Kwiatkowskiego Road,

Zwyciestwa Avenue between intersections with Wzgorze Sw. Maksymiliana and Mars.

Jozefa Pilsudskiego Avenue,

Morska Street between intersections with Kwiatkowskiego Road and Kalksztajnow Street,

Zwyciestwa Avenue between intersections with Stryjska Street and Redlowska Street,

The average value of this index for the whole measurement was 4.16 man-hours. The least

effective segments in terms of share of losses in an average time during the journey are the

sections:

Warszawska Street between intersections with Slaska Street and Witominska Street,

Wielkopolska Street between intersections with Gornicza Street and Mysliwska Street,

46

Gdansk University of Technology 47

Kuprewicz G., Koncepcja wprowadzenia priorytetów dla transportu zbiorowego w Gdyni z wykorzystaniem systemu sterowania. Projekt dyplomowy inzynierski. Politechnika Gdanska 2013.

Page 50: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

50 / 83

Zwyciestwa Avenue between intersections with Wzgorze Sw. Maksymiliana and

Partyzantow Street,

intersection of Mars. Jozefa Pilsudskiego Avenue and Wladyslawa IV Street – intersection

of Mars. Jozefa Pilsudskiego Avenue and Slaska Street,

intersection of Kilinskiego Street and Wladyslawa IV Street – intersection of Wladyslawa

IV Street and Zwirki i Wigury Street.

The average value for this indicator was 38.4%, which means that nearly 40% of the average

travel time on the network is a waste of time.

Traffic route

Mean

speed

[km/h]

Mean

speed

[s]

Shortest

travel

time [s]

Mean

time

loss [s]

Mean

occupancy

[persons]

Weight

indicator of

time loss

[person-hour]

Share of time

in loss in the

transit time

Pilsudskiego 10,1 190 98 92 580 30,62 48,5%

10 Lutego 13,0 208 105 103 959 55,35 49,5%

Warszawska 15,7 275 127 148 1105 84,44 53,8%

Nowowiczlinska 16,9 255 n. a. n. a. 447 31,67 n. a.

Slaska 17,1 274 160 114 607 46,23 41,6%

Morska I 19,0 774 362 412 2092 449,88 53,2%

Morska II 18,3 554 293 261 847 130,37 47,2%

Wielkopolska 19,9 923 492 431 1706 437,54 46,7%

Kwiatkowskiego 19,3 317 186 131 1134 99,85 41,3%

Zwyciestwa 18,7 534 263 271 2006 297,58 50,7%

Table 7: Microanalysis of the quality of public transport functioning in Gdynia

Gradient of red colour is the gradation of the relevant indicators. The higher the index, which

is more unfavourable, the darker is the red colour in the field in the table below.

Street – the direction 1 intersection 2 intersection

Weight

indicator

of time

loss

[person-

hour]

Share

indicator

SC in the

average

transit

time

Zwyciestwa - Srodmiescie Al. Zwyciestwa Pilsudskiego 16,867 60,71%

Wielkopolska - Srodmiescie Lowicka Wroclawska 11,480 59,10%

Morska II - Sopot Chylonska - Morska Kwiatkowskiego -

Morska 17,893 50,38%

Wielkopolska - Chwaszczyno Zwyciestwa Inzynierska - Koscielna 11,232 55,09%

Wielkopolska - Srodmiescie Inzynierska - Koscielna Zwyciestwa 11,003 57,37%

Zwyciestwa - Srodmiescie Wielkopolska Stryjska 18,697 42,43%

10 Lutego - dojazdowe Armii Krajowej -

Wladyslawa IV Wladyslawa IV 10,023 58,74%

10 Lutego - dojazdowe Wladyslawa IV - Zwirki i

Wigury

Armii Krajowej -

Wladyslawa IV 9,378 57,05%

Pilsudskiego - Rumia Wladyslawa IV Slaska 7,783 64,18%

10 Lutego - dojazdowe Kilinskiego - Wladyslawa IV Wladyslawa IV - Zwirki I

Wigury 5,910 61,72%

Page 51: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

51 / 83

Street – the direction 1 intersection 2 intersection

Weight

indicator

of time

loss

[person-

hour]

Share

indicator

SC in the

average

transit

time

Zwyciestwa - Srodmiescie Partyzantów - Swietojanska Wzgorze SKM 5,540 64,49%

Warszawska - Rumia Wolnosci Morska 5,163 57,32%

10 Lutego - dojazdowe Wladyslawa IV - Zwirki i

Wigury

Kilinskiego -

Wladyslawa IV 5,112 57,42%

Wielkopolska - Srodmiescie Gornicza Mysliwska 4,982 65,78%

Slaska - Rumia Pilsudskiego - Slaska Slaska - Warszawska 5,069 57,06%

Warszawska - Rumia Slaska Witominska 3,671 78,23%

Morska - Sopot Kwiatkowskiego Kalksztajnow 11,626 37,34%

Zwyciestwa - Srodmiescie Stryjska Redlowska 11,578 37,57%

Morska - Sopot Morska Mireckiego 8,868 52,50%

Zwyciestwa - Srodmiescie Nowa Kopernika Partyzantow -

Swietojanska 8,597 53,42%

Wielkopolska - Chwaszczyno Parkowa - Raclawicka Sopocka 9,833 40,41%

Morska - Sopot Mireckiego Grabowo 10,386 37,87%

10 Lutego - dojazdowe Traugutta – Wladyslawa IV Pilsudskiego -

Wladyslawa IV 8,693 47,20%

Zwyciestwa - Sopot Wzgorze SKM Nowa Kopernika 8,329 51,47%

Wielkopolska - Sródmiescie Brzechwy Źrodlo Marii 8,389 43,97%

Kwiatkowskiego - Obluze Wisniewskiego Energetyków -

Wisniewskiego. 7,214 45,82%

10 Lutego - dojazdowe Kilinskiego - Wladyslawa IV Traugutta - Wladyslawa

IV 5,253 43,77%

10 Lutego - dojazdowe Wladyslawa IV Wladyslawa IV - Wójta

Radtkego 5,363 41,46%

Wielkopolska - Srodmiescie Źrodlo Marii Nalkowskiej 5,348 41,54%

Slaska - Sopot Pilsudskiego - Slaska Kielecka - Slaska 5,106 50,28%

Wielkopolska - Srodmiescie Nowowiczlinska Gornicza 5,201 42,12%

10 Lutego - dojazdowe Traugutta - Wladyslawa IV Kilinskiego -

Wladyslawa IV 5,111 44,58%

Zwyciestwa - Sopot Pilsudskiego Wzgorze SKM 5,003 46,53%

Morska II - Rumia Morska - Nr 303 Kartuska - Morska 2,744 58,81%

Pilsudskiego - Rumia Swietojanska Wladyslawa Iv 2,649 57,15%

Pilsudskiego - Gdynia Swietojanska (przy przyst.) Swietojanska 2,539 57,52%

Warszawska - Sopot Witominska Slaska 2,529 58,59%

Morska II - Sopot Kcynska - Morska Morska - Obwodowa 2,112 60,31%

Wielkopolska - Srodmiescie Nalkowskiej Sopocka - Wielkopolska 9,615 36,68%

Zwyciestwa - Sopot Stryjska Wielkopolska 10,539 25,75%

Zwyciestwa - Sopot Harcerska Redlowska 9,278 34,18%

Zwyciestwa - Sopot Redlowska Stryjska 8,379 29,90%

Morska - Rumia Okoniewskiego Grabowo 8,247 28,32%

10 Lutego - dojazdowe Armii Krajowej -

Wladyslawa IV

Wladyslawa IV - Zwirki i

Wigury 6,650 33,47%

Morska - Rumia Kalksztajnow Kwiatkowskiego 7,019 30,46%

Page 52: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

52 / 83

Street – the direction 1 intersection 2 intersection

Weight

indicator

of time

loss

[person-

hour]

Share

indicator

SC in the

average

transit

time

Morska - Rumia Grabowo Mireckiego 6,360 34,34%

Morska II - Rumia Kwiatkowskiego - Morska Chylonska - Morska 6,475 33,54%

Zwyciestwa - Srodmiescie Harcerska Nowa Kopernika 6,307 34,04%

Wielkopolska - Chwaszczyno Inzynierska - Koscielna Wroclawska 5,995 35,49%

Wielkopolska - Chwaszczyno Nalkowskiej Źrodlo Marii 5,855 36,55%

Morska II - Sopot Morska - Wiejska Chylonska - Morska 5,750 35,48%

Morska - Sopot Okoniewskiego Warszawska 5,947 32,88%

Wielkopolska - Sródmiescie Wroclawska Inzynierska - Koscielna 5,237 35,87%

10 lutego - Gdynia Dworcowa 3 Maja 4,930 49,40%

10 lutego - Gdynia 3 Maja Wladyslawa IV 4,756 41,35%

Wielkopolska - Chwaszczyno Źrodlo Marii Brzechwy 5,107 32,94%

Zwyciestwa - Srodmiescie Nawigatorów Wielkopolska 4,474 46,20%

Wielkopolska - Srodmiescie Mysliwska Brzechwy 3,972 51,42%

Morska II - Sopot Morska - Nr 293 Morska - Wiejska 3,841 54,99%

10 Lutego - dojazdowe 3 Maja - Wojta Radtkego 10 Lutego - 3 Maja 4,469 42,24%

Wielkopolska - Chwaszczyno Gornicza Wiczlinska 3,845 49,35%

Wielkopolska - Nowowiczlinska Nowowiczlinska Obwodowa 3,891 41,69%

Wielkopolska - Nowowiczlinska Obwodowa Nowowiczlinska 3,599 52,25%

Morska II - Rumia Kartuska - Morska Morska - Obwodowa 3,505 54,42%

Wielkopolska - Chwaszczyno Mysliwska Gornicza 3,433 54,18%

10 Lutego - dojazdowe Derdowskiego -

Swietojanska Swietojanska 3,275 47,98%

Warszawska - Sopot Nowogrodzka Witominska 3,471 41,34%

Warszawska - Sopot Morska Wolnosci 3,331 42,22%

Slaska - Sopot Slaska - Warszawska Pilsudskiego - Slaska 3,173 43,93%

Pilsudskiego - Gdynia Swietojanska - Zwyciestwa Swietojanska (przy

przyst.) 2,882 49,72%

Zwyciestwa - Sopot Wielkopolska Nawigatorow 2,911 43,97%

10 Lutego - dojazdowe Swietojanska Derdowskiego -

Swietojanska. 2,875 45,41%

10 Lutego - dojazdowe Wladyslawa IV Armii Krajowej -

Wladyslawa IV 2,790 47,96%

Zwyciestwa - Srodmiescie Spoldzielcza Przebendowskich 2,720 42,10%

Morska II - Rumia Morska - Obwodowa Kcynska - Morska 1,436 52,49%

10 Lutego - dojazdowe Armii Krajowej -

Swietojanska Swietojanska 1,828 39,10%

10 Lutego - Gdynia Wladyslawa IV Swietojanska 1,203 42,31%

10 Lutego - Rumia Swietojanska Wladyslawa IV 1,082 42,54%

Table 8: Microanalysis of the quality of public transport functioning in Gdynia

Page 53: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

53 / 83

Figure 36: Average travel time from the areas of Gdynia

48

Figure 37: Synthetic indicators cartogram of public transport services in the areas of Gdynia49

3.3.2 The planned development of public transport

Development of a network of bus connections will occur due to changes in the demand for

transport services. Corrections of the bus system will be implemented as far as possible, on

the basis of research conducted on systematic communication preferences and behaviour of

residents.

48

Jacek OSKARBSKI, Michal MISZEWSKI: Ocena funkcjonowania systemu transportu zbiorowego w Gdyni z wykorzystaniem programu VISUM, AUTOBUSY Technika Eksploatacja Systemy Transportowe, nr 3/2013 49

Jacek OSKARBSKI, Michal MISZEWSKI: Ocena funkcjonowania systemu transportu zbiorowego w Gdyni z wykorzystaniem programu VISUM, AUTOBUSY Technika Eksploatacja Systemy Transportowe, nr 3/2013

Page 54: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

54 / 83

Increasing the number of bus routes is planned in particular in the area of Gdynia-West

(Gdynia – Zachod), as a result of a gradual increase in the number of inhabitants of this

district. The relatively high flexibility of the bus route planning as a means of transport of the

street is to allow matching of the bus services to the newly established network of roads and

streets.

For proper operation of the subsystem of bus public transport, construction of new loops and

(or) the modernization of existing ones is assumed50.

Figure 38: Planned new and upgraded bus loops51

The construction of a new bus loop in the Gdynia-West district will be determined by a

detailed development plan of the area. With the development of housing and settlement the

development of bus routes within the Gdynia public transport network in areas such as

Koleczkowo, Bojano and Chwaszczyno, located beyond the administrative boundaries of

Gdynia, is planned. These connections require co-financing by the local municipalities of

Szemud and Zukowo.

The renewal of the bus fleet will continue. All new buses will be low-floor vehicles. All old

buses will be withdrawn from public transport in Gdynia in the coming years. The number of

buses in operation will result from the determined-to-date transportation needs and funding

opportunities for transport services. The organization of bus transport by a specialized

administrator will allow a high degree of flexibility in terms of a rolling stock in use. Taking

into account the preferences of residents as regards the role of trolleybus transport and

considering the current and potential role of trolleybuses, resulting from the set of

determinants of its development in the coming years, it is planned to expand the network of

trolleybus transport.

50

Integrated development plan for public transport in Gdynia in the years 2004-2011, ZKM Gdynia. 51

Marszk P., Koncepcja wprowadzenia priorytetów dla transportu zbiorowego na wybranych ulicach Gdyni z wykorzystaniem pasów autobusowych. Projekt dyplomowy inzynierski. Politechnika Gdanska 2013.

Page 55: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

55 / 83

Figure 39: Directions of the expansion of trolleybus routes 52

In the coming years it is not expected to withdraw trolleybuses from any currently operated

routes. In addition, the need to modernize trolleybus fleet is assumed. Brand new, low-floor

trolleybuses will be purchased for each subsequent stage of the network built. Every year, a

minimum of six of new or used low-floor trolleybuses will be put into service. The

development of trolleybus transport in Gdynia defines the task WP2 (Clean vehicles) and

measure G2.1 CIVITAS DYN@MO according to which two Li-Ion hybrid trolleybuses were

purchased. Measure G2.1 was carried out by purchasing and testing two trolleybuses

equipped with an additional power source in the form of lithium-ion batteries. For these

hybrid trolleybuses a new route was selected – existing trolleybus line no. 21 was extended

by the section of Kosciuszko Square in the city centre of Gdynia. This solution allows the

trolleybuses to operate in new areas where there is no catenary. It also allows increasing the

reliability of the trolleybus transport system in Gdynia. A regular route with these trolleybuses

with lithium-ion battery for the new service was launched in May 201553.

3.3.3 Preliminary options of public transport improvements

The options described below for the years 2015, 2025 and 2035 are assumptions. The

proposals are the result of a preliminary analysis and discussions with representatives of the

Board of Public Transport (ZKM) in Gdynia.

Transport service in Gdynia-Zachod (West) will be determined by the implementation of a

specific option of the operation of rail transport.

52

Marszk P., Koncepcja wprowadzenia priorytetów dla transportu zbiorowego na wybranych ulicach Gdyni z wykorzystaniem pasów autobusowych. Projekt dyplomowy inzynierski. Politechnika Gdanska 2013. 53

www.pktgdynia.pl

Page 56: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

56 / 83

In each of the options in the northern part of the city operates the extension of the route PKM

- Airport, with stops Gdynia-Port (at Energetykow), Gdynia Pogorze (the interchange) and

Gdynia Obluze Gorne (the interchange). The differences between the options are as follows:

Option I (stagnation)

PKM service without extension – only the stop interchange Gdansk-Osowa Kielnienska

would be added.

Option II (currently in force – on the basis of existing plans)

From the PKM service Polana Krykulec branch service is planned (without station, operating

between to and from Gdynia Glowna) to Wiczlino, on the main service of PKM a new stop is

created Gdansk-Osowa Kielnienska.

Option III (new project – currently promoted)

From the PKM service a branch service is foreseen - at the height of the former Polifarb

(former railway siding to Polifarb), along Nowak-Jezioranskiego, Wiczlinska and

Chwarznienska streets to Os. Sokolka (district), from then through the forest to the Polana

Krykulec. On the new section of track fairly closely stops are planned. On the route via

Wiczlino light rail vehicles are planned to operate, being more similar to trams rather than

trains. These trams would operate on the route Gdynia Glowna – Gdansk-Osowa, with a

frequency of every 15-20 minutes. On the main PKM service an interchange stop Gdansk-

Osowa Kielnienska is being built.

Road transport service

In each option, the construction of trolleybus network throughout the route of the Nowak-

Jezioranskiego and the Nowa Chwarznienska to the intersection with the current

Chwarznienska, on the east side of the Obwodnica Trojmiejska is assumed. It is also

assumed that the new trolleybus routes will be operated by the battery-powered trolleybuses,

enabling its use on the linear part of the route.

Option I

23 – extension to the loop at the PKM stop Gdansk-Osowa Kielnienska

32 – a new trolleybus PKM service, Gdynia-Karwiny – Dabrówka – the Nowaka-

Jezioranskiego – the Nowa Chwarznienska – Chwarzno – Witomino – Sródmiescie Gdynia,

all day service, every 15 minutes, providing on the common section of 140, 147 and 160 ride

every 3-4 min (140, 147 and 160 as early as 2025, every 15 min – all day)

140 – extended to PKM stop Gdansk-Osowa Kielnienska

141 – extended every 15 min to Cmentarz Dabrowa, via Chwarzno and the Nowaka-

Jezioranskiego, every second 141 under the new number 241 – the Os. Sokolka (service

241 – extended to Kosakowo - the task will be to support the new development between

Pogórze Górne and Kosakowo)

33 – a new trolleybus service, up to Rdestowa street same as 181, next the Nowaka-

Jezioranskiego extended to Os. Sokolka

Page 57: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

57 / 83

240 and 260 – two local services (midibuses), serving the furthest regions of Wiczlino,

connecting them with the Os. Sokolka

272 – on the PKM Karwiny – Wiczlino Wybudowanie (or southern part of Wiczlino), every 15

min (supplementary in coordination 140)

Q – a new fast service, with a stop at PKM Gdansk-Osowa Kielnienska – Kukawka – Kacze

Buki – Nowaka-Jezioranskiego – Nowa Chwarznienska – Obwodowa Trójmiasta – Trasa

Kwiatkowskiego – Janka Wisniewskiego – Gdynia city centre – Wezel Franciszki Cegielskiej

(all day service, every 15 minutes)

Y – a new fast service, with a stop at PKM Gdansk-Osowa the Kielnienska – Kukawka –

Kacze Buki – Nowaka-Jezioranskiego – Nowa Chwarznienska – Obwodowa Trójmiasta –

Trasa Kwiatkowskiego – Oksywie Dolne (peak service every 30 minutes, a supplement to X)

Option II

272 – not in service, no. Q and Y, in return a new service 247 with a stop at Gdansk-Osowa

Kielnienska to the railway station in the area of Os. Sokolka will be implemented, every 15

minutes

Option III

272 – not in service, no. Q and Y, due to the attractiveness of rail service two more local

midibuses services – 247 and 272, connecting the areas of the districts with stops of light rail

(tram)

Moreover, in other areas of the city:

141 and 194 – extension via Czernicki street to the railway station Gdynia Pogorze (service

for Suchy Dwor with another service – local, 294), new peak services 260 (from the

Dickmana) and 263 (from Babie Doly) to the railway station, Gdynia Obluze Gorne

Initially option III is taken into account, with a light rail transport for Wiczlino.

The following tables show the plans for the development of public transport services for the

coming years. The planned changes are highlighted in red.

Page 58: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

58 / 83

Table 9: Planned routes of services and frequencies of vehicles on weekdays in 2015

travel frequencies

5-8 8-13 13-18 18-21

TROLLEYBUS SERVICE

20GDYNIA DWORZEC PKP - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - CISOWA SKM15 - - -

21GDYNIA DWORZEC GŁÓWNY PKP - 10 Lutego - Świętojańska - al.

Zwycięstwa - SOPOT: al. Niepodległości - SOPOT REJA30 30 30 -

22

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - Chylońska - CISOWA SKM

- 15 15 20

23

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI

15 15 15 20

24

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - DĄBROWA MIĘTOWA

15 15 15 20

253 MAJA HALA - Wójta Radkego (return:: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Owsiana - CISOWA SKM15 15 15 20

26ORŁOWO SKM "KLIF" - al. Zwycięstwa - al. Piłsudskiego - Śląska -

Warszawska - Morska - CISOWA SIBELISUA15 15 15 20

27

CISOWA SKM - Chylońska - Morska - Warszawska - Śląska -

al. Piłsudskiego - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Nowowiczlińska - Rdestowa - Chwaszczyńska - KACZE BUKI

15 15 15 20

28

3 MAJA HALA - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - Kartuska -

Jaskółcza - Chabrowa - PUSTKI CISOWSKIE

15 15 15 20

29

GRABÓWEK SKM - Zakręt do Oksywia - Morska - 10 Lutego -

Świętojańska - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Gryfa Pomorskiego - OSIEDLE FIKAKOWO

30 30 30 -

30

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - CISOWA SIBELIUSA

15 15 15 -

31'

SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI

60 60 60 60

31''SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - DĄBROWA MIĘTOWA60 60 60 60

Service Route

Page 59: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

59 / 83

Table 10: Planned routes of services and frequencies of vehicles on weekdays in 2015

travel frequencies

5-8 8-13 13-18 18-21

TROLLEYBUS SERVICE

20GDYNIA DWORZEC PKP - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - CISOWA SKM15 - - -

21GDYNIA DWORZEC GŁÓWNY PKP - 10 Lutego - Świętojańska - al.

Zwycięstwa - SOPOT: al. Niepodległości - SOPOT REJA30 30 30 -

22

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - Chylońska - CISOWA SKM

- 15 15 20

23

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI - KUKAWKA - PKM GDAŃSK OSOWA KIELNIEŃSKA

15 15 15 20

24

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Miętowa - Cynamonowa -

Łanowa - DĄBROWA CMENTARZ

15 15 15 20

253 MAJA HALA - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Owsiana - CISOWA SKM15 15 15 20

26ORŁOWO SKM "KLIF" - al. Zwycięstwa - al. Piłsudskiego - Śląska -

Warszawska - Morska - CISOWA SIBELISUA15 15 15 20

27

CISOWA SKM - Chylońska - Morska - Warszawska - Śląska -

Piłsudskiego - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Nowowiczlińska - Rdestowa - Chwaszczyńska - KACZE BUKI

15 15 15 20

28

3 MAJA HALA - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - Kartuska -

Jaskółcza - Chabrowa - PUSTKI CISOWSKIE

15 15 15 20

29

DEMPTOWO - Skarbka - Kartuska - Chylońska - Morska - 10 Lutego

- Świętojańska - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Gryfa Pomorskiego - OSIEDLE FIKAKOWO

30 30 30 40

30

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - CISOWA SIBELIUSA

15 15 15 -

31'

SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI

60 60 60 60

31''SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - DĄBROWA MIĘTOWA60 60 60 60

32

PKM Gdynia Karwiny - Wielkopolska - Chwaszczyńska -

Nowowiczlińska - Rdestowa - Nowaka-Jeziorańskiego - Nowa

Chwarznieńska - Chwarznieńska - Rolinicza - Kielecka - Wzg. Św.

Maksymiliana - Świętojańska (return: Władysława IV) - Jana z

Kolna (return: Dworcowa - 10 Lutego) - GDYNIA DWORZEC

GŁÓWNY PKP

30 30 30 40

33

CHWARZNO SOKÓŁKA - Wiczlińska - Nowaka-Jeziorańskiego -

Rdestowa - Nowowiczlińska - Chwaszczyńska - Wielkopolska -

Sopocka - SOPOT: Malczewskiego - Niepodległości - SOPOT REJA

15 15 15 20

Service Route

Page 60: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

60 / 83

Table 11: Planned routes of services and frequencies of vehicles on weekdays in 2015

travel frequencies

5-8 8-13 13-18 18-21

TROLLEYBUS SERVICE

20GDYNIA DWORZEC PKP - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - CISOWA SKM15 - - -

21GDYNIA DWORZEC GŁÓWNY PKP - 10 Lutego - Świętojańska - al.

Zwycięstwa - SOPOT: al. Niepodległości - SOPOT REJA30 30 30 -

22

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - Chylońska - CISOWA SKM

- 15 15 20

23

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI - KUKAWKA - PKM GDAŃSK OSOWA KIELNIEŃSKA

15 15 15 20

24

STOCZNIA GDYNIA - al. Solidarności - Janka Wiśniewskiego -

Gdynia Dworzec Główny PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Miętowa - Cynamonowa -

Łanowa - DĄBROWA CMENTARZ

15 15 15 20

253 MAJA HALA - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Owsiana - CISOWA SKM15 15 15 20

26ORŁOWO SKM "KLIF" - al. Zwycięstwa - al. Piłsudskiego - Śląska -

Warszawska - Morska - CISOWA SIBELISUA15 15 15 20

27

CISOWA SKM - Chylońska - Morska - Warszawska - Śląska -

Piłsudskiego - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Nowowiczlińska - Rdestowa - Chwaszczyńska - KACZE BUKI

15 15 15 20

28

3 MAJA HALA - Wójta Radkego (return: Jana z Kolna) -

Świętojańska - 10 Lutego - Morska - Chylońska - Kartuska -

Jaskółcza - Chabrowa - PUSTKI CISOWSKIE

15 15 15 20

29

DEMPTOWO - Skarbka - Kartuska - Chylońska - Morska - 10 Lutego

- Świętojańska - al. Zwycięstwa - Wielkopolska - Chwaszczyńska -

Gryfa Pomorskiego - OSIEDLE FIKAKOWO

30 30 30 40

30

GDYNIA DWORZEC GŁÓWNY PKP - Wójta Radkego (return: Jana

z Kolna) - Świętojańska - al. Piłsudskiego - Śląska - Warszawska -

Morska - CISOWA SIBELIUSA

15 15 15 -

31'

SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - Rdestowa - Chwaszczyńska -

KACZE BUKI

60 60 60 60

31''SOPOT REJA - al. Niepodległości - al. Zwycięstwa - Wielkopolska -

Chwaszczyńska - Nowowiczlińska - DĄBROWA MIĘTOWA60 60 60 60

32

PKM Gdynia Karwiny - Wielkopolska - Chwaszczyńska -

Nowowiczlińska - Rdestowa - Nowaka-Jeziorańskiego - Nowa

Chwarznieńska - Chwarznieńska - Rolinicza - Kielecka - Wzg. Św.

Maksymiliana - Świętojańska (return: Władysława IV) - Jana z

Kolna (return: Dworcowa - 10 Lutego) - GDYNIA DWORZEC

GŁÓWNY PKP

15 15 15 20

33

CHWARZNO SOKÓŁKA - Wiczlińska - Nowaka-Jeziorańskiego -

Rdestowa - Nowowiczlińska - Chwaszczyńska - Wielkopolska -

Sopocka - SOPOT: Malczewskiego - Niepodległości - SOPOT REJA

15 15 15 20

Service Route

Page 61: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

61 / 83

Initial proposals of dedicated lanes for public transport vehicles

After recognizing the sections of the routes where impediments occur to the movement of

public transport vehicles, the possibility of separating the space designated for buses,

trolleybuses and possibly taxis should be considered. In the case of bus lanes basic

predefined location selection criteria will be:

the number of lanes (min. 2),

the traffic volume of public transport (min. 10 cars/ hour),

the traffic volume of all vehicles (up to 3,200 vehicles/ hour),

the size of the existing and projected passenger traffic volume (min. 500 persons/ hour).

Based on physical observation of traffic in the streets of Gdynia in peak hours, and analysis

of the intensity cartograms of traffic and public transport passenger traffic the following

possible locations of bus lanes were selected:

(1) Wladyslawa IV Street – in the direction of Mars. Jozefa Pilsudskiego Avenue,

(2) Wladyslawa IV Street – in the direction of 10 Lutego Street,

(3) Estakada Kwiatkowskiego – in the direction of district Oksywie,

(4) Estakada Kwiatkowskiego – in the direction of Morska/ Janka Wisniewskiego Street,

(5) Morska Street – in the direction of Slaska Street,

(6) Morska Street – in the direction the Estakada Kwiatkowskiego,

(7) Zwyciestwa Avenue-Stryjska Street – in the direction of Sopot,

(8) Zwyciestwa Avenue-Stryjska – in the direction of centre,

(9) Chwaszczynska Street – in the direction of Trójmiejska Obwodnica,

(10) Chwaszczynska Street – in the direction of Wielkopolska Street (Centre),

(11) Zwyciestwa Avenue – in the direction of Sopot,

(12) Zwyciestwa Avenue – in the direction of Centre.

Preliminary analysis shows better expected efficiency and feasibility of the lanes marked in

green in Figure 40, although it is reasonable to analyse all the options with the developed

multilevel transport model.

In addition, the analysis of the assumptions of functioning of dedicated lanes at certain

periods of time will be done (e.g. during transport peaks hours or beyond).

In prognostic periods it will be reasonable to examine the construction or separation of bus

lanes along Kielecka, Rolnicza (need to change traffic organization) and Chwarznienska

(separate lane that could function interchangeably in two directions, depending on the traffic

volume – e.g. in the morning in the direction of the Centre, in the afternoon towards

Chwarzno). The construction of dedicated lanes along the Wielkopolska – Chwaszczynska

should be considered).

It also should be remembered to check the possibilities of building separate lanes on newly

designed or planned streets.

Page 62: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

62 / 83

Figure 40: Proposed initial locations of bus lanes54

Within the CIVITAS DYN@MO project options of leaving the public transport service in

pedestrian zones (described in Chapter 2) will be tested. Also options for the improvement of

public transport in the area of the square in front of Gdynia Glowna Railway Station and in

54

Marszk P., Koncepcja wprowadzenia priorytetów dla transportu zbiorowego na wybranych ulicach Gdyni z wykorzystaniem pasów autobusowych. Projekt dyplomowy inzynierski. Politechnika Gdanska 2013.

Page 63: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

63 / 83

the surrounding street system (e.g. lane for public transport vehicles along Wojta Radtkego

Street or leaving this street only for public transport) will be considered.

3.4 Changes in traffic organization

The inherent element regarding the introduction of pedestrian areas and improvements to

public transport is a change of the organization of the vehicular traffic by closing the intake of

some streets and changing the direction of traffic on the streets adjacent to the zone or

narrowing cross-sections of the streets available to individual transport in case of the

introduction of dedicated lanes for public transport. An additional element which was taken

into account was to improve traffic safety and streamlining of certain intersections for public

transport vehicles (improved operability, reducing time loss), through the construction of

dedicated lanes for slip roads as well as bus gates.

The introduction of zones with pedestrian priority requires closing of the inlets of the streets

Romualda Traugutta, Jana Kilinskiego, Zwirki i Wigury, Obroncow Wybrzeza, Jozefa

Wybickiego, Zygmuntowskiej, 10 Lutego, Stefana Zeromskiego, Jerzego Waszyngtona,

Karola Olgierda Borchardta, Kazimierza Pulaskiego, Antoniego Abrahama, Zygmunta

Augusta, Msciwoja i Ofiar Piasnicy. The intersection with the Swietojanska with the streets

Jana Hieronima Derdowskiego, Plac Kaszubski and Al. Marszalka Józefa Pilsudskiego and

the intersection of the Starowiejska with Dworcowa (marginal parts of the zone) would be

passable except for the possibility of entry into the Swietojanska and Starowiejska. It is also

proposed to allow passing through the area at the intersection of the Swietojanska and Armii

Krajowej for easy access from the north to Kamienna Gora. Closing this intersection could

cause dissatisfaction of the neighbourhood residents and too large volume of vehicular traffic

on Al. Marszalka Józefa Pilsudskiego, which would be the only alternative route from the

centre to Kamienna Góra. It would be possible to pass through the intersections of the

Starowiejska with the streets Wladyslawa IV and 3 Maja for easy access to the northern part

of the downtown and the Stocznia Remontowa. The speed of passing through a pedestrian

zone on the aforementioned intersections would be limited to a speed limit of 30 km/ h. The

different options will be detailed during the analysis.

It is suggested to change the organization of traffic on the Traugutta, where there is one-way

traffic in the direction of the Wladyslawa IV. After implementing the pedestrian zone, the

Traugutta should be a two-way street, since the entry ban on the Swietojanska would lead to

impossibility of entry into the section of the Traugutta between the streets Wladyslawa IV and

the Swietojanska and exit on the section between the Swietojanska and the Generala Jozefa

Bema. Road geometry allows the introduction of a second lane using parking spaces. In

addition, one-way traffic should be reorganized into two-way on the streets in the Jana

Kilinskiego, part of the Antoniego Abrahama between the streets Starowiejska and 10

Lutego, Zygmunta Augusta and Msciwoja. There is one-way traffic in the Jana Kilinskiego in

the direction of the Juliusza Slowackiego and the change of traffic organization will allow

entrance into the Jana Kilinskiego from the Juliusza Slowackiego and exit from the Jana

Kilinskiego in the direction of the Wladyslawa IV. The streets Msciwoja and Zygmunta

Augusta are one-way streets towards the Starowiejska, while the Antoniego Abrahama runs

in the opposite direction. With the introduction of the pedestrian zone in the Starowiejska the

Page 64: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

64 / 83

aforementioned streets should support two-way vehicular traffic. With the introduction of the

pedestrian zone in the street Starowiejska aforementioned streets should support two-way

vehicular traffic, which must be analysed in detail using MST. Examples of changes in traffic

organization are shown in Figure 41.

Figure 41: Example of changes in the organization of movement after the introduction of pedestrian zones

55

55

Jobski W., Koncepcja wprowadzenia stref ruchu pieszego w Sródmiesciu Gdyni. Projekt dyplomowy inzynierski. Katedra Inzynierii Drogowej. Politechnika Gdanska 2013.

Page 65: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

65 / 83

Figure 42: Cartogram of traffic volume during the afternoon rush hour – current situation56

Figure 43: Cartogram of traffic volume during the afternoon rush hour – after closing Starowiejska

Street57

In the next stage of the analysis the intersection modernizations (turning relations) that are

designed to improve traffic safety and reduce time loss for public transport vehicles

(modernizations along with gates and priorities for public transport vehicles) will be analysed.

56

Gdansk University of Technology 57

Gdansk University of Technology

Page 66: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

66 / 83

4 Concept for promotion of walking and cycling

In this chapter the campaigns which are implemented during CIVITAS DYN@MO are described. They focuse on cyclists and pedestrians in Gdynia and their aim is to encourage people to use bikes as their main mean of transport, especially in spring and summer. Campaigns are being held since 2014 and will continue in the next years.

According to the current modal split, prepared on the basis of market research conducted by

the Public Transport Authority in 2013, 45.4% of the population uses public transport as the

main mean of transport, 53.1% of the car, and only 0.8% use bicycle travel as a primary

means of movement.

The Development Strategy of Gdynia includes as targets:

improving the availability and quality of life in the city,

create a functional network of public roads,

integration of various forms of public transport in Gdynia and the Tricity,

reduce nuisance around the city,

better connectivity between different areas of the city,

use development opportunities arising from the location of the city at the intersection of

two pan-European transport corridors.

In 2013, Gdynia conducted a bike audit with the BYPAD certification programme, which was

done as a result of the development plan for cycling in Gdynia. The document indicated the

most important barriers and problems of Gdynia in the field of cycling and a number of

actions to be implemented in 2014-2016 were identified. According to the plan it is assumed

to increase the share of cycling by 1% each year, to 6% in 2020 and 10% in 2023.

For several years in Gdynia efforts are being made aiming at changing the attitudes and

behaviour of the inhabitants, and increasing their awareness of sustainable transport.

Through educational and promotional activities the city primarily promotes cycling and

walking, keeping in mind public transport. The campaigns were directed to two target groups:

residents of the city and/ or employees of companies with a registered office in Gdynia,

5th year elementary schools pupils in Gdynia.

In chapter describes the concept of a campaign to promote cycling and walking, and the

creation of pedestrian zones in Gdynia based on good practice examples from Budapest,

Växjö, Bologna and the UK.

4.1 Good practices in European cities

Cycling competition for employees of companies in Budapest – Bringázz and munkába!

Since autumn 2008 in Hungary there is a competition for employees commuting to work by

bike. People willing to participate in the competition are signing up on the competition

website. Every time they travel to work by bike they enter data on this trip to the competition

Page 67: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

67 / 83

website. Participants who have completed a minimum of eight trips by bicycle take part in the

main prize draw.

Figure 44: Website cycling competition for employees of companies in Budapest58

Cycling competition for employees of companies in Växjö – SydostTrampar

A cycling competition for employees of companies in Växjö is organized twice a year. Both

the spring and autumn edition last for six weeks each. Participants can register those bike

rides that are associated with travel in their leisure time, with daily urban travel (e.g. travel to

and from work) or business trips.

Figure 45: Website for the cycling competition for employees in Växjö59

The results are presented in relation to individual participants and companies and include

such information as the number of kilometres travelled, calories burned, saved money and

CO2 not emitted.

58

www.kerekparosklub.hu/bam 59

www.sydosttrampar.se

Page 68: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

68 / 83

European Cycling Challenge – Bologna

The City of Bologna, together with SRM - Agency, Mobility and Local Public Transport in

Bologna, in 2012 initiated the European Cycling Challenge (EEC) - European Bike

Competition, an event to promote urban cycling in all cities in Europe.

The first edition of the European Cycling Challenge - European Bike Contest, was held in

May 2012. The first ECC was a huge success. It has been noticed on the international level,

which resulted in receiving the CIVITAS 2013 award in the category “public participation”.

Since then the European Bike Competition continues throughout May each year, and its

objective is a competition among European cities (each of them has its official team) in the

use of bicycles as a mode of transport in the city. The participants track their daily bicycle

trips with GPS and a free app for smartphone or/ and the Endomondo internet platform, used

as a basis for calculating the total number of kilometres cycled in the city. Classification of

the participants, both at national and European levels, is updated in real time, making it a fun

way for residents, friends and acquaintances to compete against each other. At the end of

the competition, some cities are organizing the awards ceremony.

This initiative showed that bicycle travel is a very common phenomenon in Europe, and

people do not just ride their bike on the weekend for recreational purposes. Using bikes can

be an effective tool for reducing pollution and road congestion.

The competition has also become an important instrument for cities, as the behaviour of

cyclists still is not as well-known as the behaviour of car drivers. Each city participating in the

contest receives a lot of detailed data relating to cycling, which has been converted into heat

maps.

Figure 46: European Competition of Cycling website - European Cycling Challenge 201360

Campaign Walk to School Week in the UK

The campaign “Walk to School” is to encourage parents, children and young people to go to

school on foot. One of the elements of the campaign is a week of walking to school, which

takes place each year in May. In 2012, students received travel diaries in which they

60

www.europeancyclingchallenge.eu/ecc2013

Page 69: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

69 / 83

recorded how much walking to school is done in a week. Every day “came” to another city in

Great Britain and answered the riddle associated with sustainable transport. The pupils were

asked to reach from the farthest westernmost place in England (Land’s End) to the

northernmost settlement of Great Britain (John o’Groats).

Figure 47: The campaign website Walk to School Week61

4.2 Campaigns for residents and employees of companies in Gdynia

4.2.1 Cycling competition for employees of the companies in Gdynia – “I'm

going to work by bike”

The 2013 edition of the “I am going to work by bike” competition was attended by 100

employees of Gdynia companies. The contest lasted for 18 weeks, starting on 20 May 2013.

The aim of the competition was to encourage employees of companies having their

registered office or branch in Gdynia to travel to/ from work by bicycle, as competitive and

enjoyable alternative to travel by car.

In 2013 the participants of the “I am going to work by bike” competition did a total of 7,646

trips and drove 78,218 km. If the same distance would have been driven by car, 19.5 tons of

CO2e would have bene emitted to the atmosphere. What’s more, riding a bike instead of a

car saved more than 31,000 PLN on fuel costs.

61

www.livingstreets.org.uk

Page 70: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

70 / 83

Figure 48: Cycling competition website for employees of Gdynia companies – “I'm going to work by

bike”62

The competition, “I'm going to work by bike” held in 2014 was attended by over 700 people

from 74 Gdynia companies. The contest lasted for 18 weeks, starting on 1 April 2014.

In summary, the participants of the “I'm going to work by bike” travelled more than 42,000

trips, covering more than 421,000 km on bike. If cyclists covered the same distance driving a

car, over 105 tons of CO2 would have been emitted to the atmosphere. 21,066 trees would

be needed to clean the atmosphere of pollutants emitted in a year. What’s more, riding a bike

instead of a car saved more than 168,530 PLN on fuel costs.

Figure 49: Participants from the company Unisoft (left, by Unisoft) and the Public Library (right, by

MBP)63

In terms of individual performance and the best results in terms of the number of kilometres

travelled obtained: Anna Socha from the Public Library in Gdynia (5,196 km), Mr. Mieczyslaw

Solek of Military Unit 3660 (4,760 km) and Mr Peter Parkitny from the company Modena Sp.

z o.o (4,350 km).

In the category of “number of rides” the best results were obtained by: Ms Malgorzata Kobus

Vita-Med Care Center Medical Sp. z o.o. (202 trips), Andrzej Machalinski the Baltic General

62

www.konkursrowerowy.pl 63

www.konkursrowerowy.pl

Page 71: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

71 / 83

Cargo Terminal Sp. z o.o. (190 trips) and Mr. Zbigniew Rasmus from the company TREFL

SA (188 trips).

People who live in Gdynia accounted for 57% of all participants in the competition, 21% of

the inhabitants of Gdansk, the people of Rumia and Reda more than 10%, and the

inhabitants of Sopot 5% of the participants of the competition. Most people travelled to work

by bike at a distance of 5-9 kilometres (29% of cyclists).

In the 2015 edition "I'm going to work by bike" was attended by 98 local companies, 994

participants in total. The contest started on 1 April and lasted five months. During this time

period, participants cycled together over half a million km in more than 60,000 trips, they

circled the earth 14 times. With regard to the environment, if the same distance would have

been driven by car, about 102 tons of CO2 would have been emitted into the atmosphere.

During the competition cyclists were awarded by 6,420 delicious breakfasts. Boxes consisted

of variety of sandwiches, fruit and desserts. Every participant who made four trips to/ from

work by bicycle in the previous week received such a breakfast. As a result, the competition

motivated employees of companies to systematically travel by bicycle.

Cyclists who cycled a minimum of 35 trips or 280 km could win 30 sets of prizes for about

100 EUR and the grand prize – an electric bicycle.

Figure 50: Participants from the PEWIK company in edition 201564

The best companies were also awarded in edition 2015:

The number of trips in terms of the number of participants from a company: 1st place –

Centre of Youth Cooperation, 2nd place ex aequo – Net-Cargo Sp. z o.o and Baltim Sp. z

o.o,

The number of kilometres per number of participants in a company: 1st place – Municipal

Social Welfare Centre, 2nd place ex aequo – BMG Goworowski Sp. z o.o. and Hamar,

The highest percentage of employees participating in the competition who have

completed a minimum of 35 trips to /from work by bike: 1st place – CMA CGM Poland Sp.

z o.o, 2nd place ex aequo: Municipal Public Library and Scorpion Security.

64

www.konkursrowerowy.pl

Page 72: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

72 / 83

Figure 51: Final gala of edition 201565

The next edition of the campaign is planned for 2016. As there an increasing interest of

people working in Gdynia, it is anticipated that the campaign will be much bigger, but the

basic idea will of the campaign remain.

4.2.2 European Cycling Challenge

In 2014 the City of Gdynia took part for the first time in the European Cycling Challenge. The

aim of this competition is to promote urban cycling among a wide audience, including all

residents and people who move by bike around Gdynia and:

promote active lifestyles among the target group,

promote urban cycling trips, especially in commuting to jobs, schools, etc., but also for

leisure,

strengthen a culture of cycling in the city,

acquire data for use in the management of mobility, e.g. for the development of thermal

maps,

strengthen the image of Gdynia in the international arena as a pro cycling city,

develop an action plan included in the Sustainable Urban Mobility Plan.

The main goal of this campaign is that over one month (May) the target group of the

competition covers as many kilometres by bicycle as possible. In the task, many partners

and sponsors took part:

Promotion Department of the Municipal Council of Gdynia prepared Gdynia graphics

ECC2014, and produced posters, roll-ups and leaflets, and has provided ECC a stall in

the Infobox,

The organizers of the Festival of Cycling in Gdansk, enabled Gdynia to have a stand at

the Bike Festival in Gdansk (30 March 2015), where the ECC2014 was promoted and

participants registered for the competition,

Association “Rowerowa Gdynia” along with the Pomeranian Science and Technology

Park (PSTP) organized the final event - a journey through the streets of Gdynia along with

a family picnic under the Pomeranian Science and Technology Park,

ECC2014 promotion in pizzerias “Da Grasso” by attaching leaflets to every order,

Restaurant Malika, U Muzyk’uff Centrum Nauki Experyment, Park Trampolinowy

JumpCity, OPEC, PPNT and Promotion-Pl sponsored prizes for the final event.

65

www.konkursrowerowy.pl

Page 73: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

73 / 83

The following means were used to promote the initiative:

social media: Mobile Gdynia profile on Facebook,

Town Hall – newspaper with the information of Council and the Mayor of Gdynia,

municipal website and the website of the Road and Greenery Authority w Gdynia

NGOs cycling organizations

urban mass events.

On 31 May 2014 the final event was held in Gdynia. It was attended by a total of approx. 250

people. In the opinion of the participants and organizers it was a very big success.

Figure 52: Gdynia final ECC2014 – 31 May 2014

The European Cycling Challenge 2014 was attended by as many as 32 cities from 12

countries! The statistics for all participating cities are as follows:

Number of participants: 16,949

Number of kilometres covered: 1.56 million

Total travel time: 14.21 years

Calories burned: 50 million

Snickers bars burned: 206,185

Also two other Polish cities took part in the competition: Warsaw and Lodz.

In the general classification, i.e. the number of kilometres travelled by members of the

municipal teams, the Municipality of Gdynia took the 5th place with a score of 80,655.88 km!

Regarding the number of kilometres travelled per 1,000 inhabitants Gdynia took the 4th place:

approx. 310 km/ 1,000 inhabitants. The number of kilometres travelled per active participants

Gdynia took the 6th place: approx. 195 km/ 1 participant.

Gdynia took part in the European Cycling Challenge in 2014 as part of the CIVITAS

DYN@MO project. It is part of a campaign to promote cycling, walking and pedestrian areas.

Page 74: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

74 / 83

Figure 53: General classification in ECC2014

European Statistics Cycling Challenge 2014 in Gdynia:

Number of participants: 748 (486 men, 282 women),

Kilometres travelled: 80,655.88,

Calories burned: 1,326,091,

Burnt Snickers bars: 5,468,

Fuel savings: 32,262 PLN.

The top five cyclists of Gdynia team were rewarded gift sets during the final event on 31 May

2014.

Throughout the competition, cyclists tracked their trips via GPS. With this data, using the

programme prepared by the Foundation “Fenomen” in Lodz, a thermal map of Gdynia and

surrounding areas was prepared, which indicates the most frequented roads for cyclists. This

map is of particular value because it can become a valuable tool for the city of Gdynia

authorities to develop and consolidate its cycling infrastructure. On its basis many interesting

conclusions can be drawn that should be taken into account in further investments.

Page 75: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

75 / 83

Figure 54: Heatmap of Gdynia based on the data from the ECC in 2014

In 2015 Gdynia repeated its participation in the European Cycling Challenge. The general

level of competition increased, more cities participated in the contest. The City of Gdynia

changed a bit the promotion of the event for inhabitants: City staff went to Gdynia’s schools

and public spaces such as shopping areas.

The competition appointed a dedicated application called Cycling365 which was available for

smartphones with Android, Windows Phone and iOS. Beside this app, it was possible to

track cyclists’ routes by Endomondo, which is the most popular tracking tools for activities in

Poland and do it manually point by point on the virtual map.

At the end of May 2015, again in cooperation with the association “Rowerowa Gdynia” and

the Pomeranian Science and Technology Park, a family cycling picnic was organised.

In the general classification, the City of Gdynia achieved 11th place with more than 42,000

kilometres cycled within the borders of Gdynia and 67,935 km in total.

Page 76: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

76 / 83

Figure 55: General classification of ECC2015 participants66

As in 2014, data from GPS devices was used to elaborate information about cycling traffic in

Gdynia. Based on data general and detailed heatmaps (districts, selected crossroads) were

prepared with cycling traffic for working weekdays and weekends. Moreover, it was possible

to count the average speed on chosen streets, sections and number of cyclists at each point

(virtual cyclist counters). The data is very useful to plan the development of cycling

infrastructure in Gdynia and shows which roads are used by cyclists during leisure time and

by daily commuters.

66

http://cyclingchallenge.eu/classifiche/classifica-statistica/

Page 77: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

77 / 83

Figure 56: Heatmap for Gdynia after ECC2015 – all weekdays67

In 2016 Gdynia will continue participating in the European Cycling Challenge. The city’s main

goal is to appoint more and more users to gather as much information as possible about

cycling habits for further development of this mean of transport in Gdynia. The tender

procedure for this campaign is currently under preparation. The City of Gdynia will start

promotion in April 2016, one month before the next edition.

4.2.3 Campaign for 5th grade pupils of primary school

From 14 April to 5 June 2014, 5th grade pupils of Gdynia primary schools took part in the

“Race for Poland”, organized in the framework of the CIVITAS DYN@MO project. The

competition was attended by eight classes of three elementary schools in Gdynia.

67

www.mobilnagdynia.pl

Page 78: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

78 / 83

Based on interviews with teachers and experiences of the Department of Education of the

City of Gdynia and consultation with schools during meetings with stakeholders in the

development of Gdynia’s Sustainable Urban Mobility Plan (SUMP) it was agreed that 5th

grade pupils are the best target group, because:

in most of Gdynia’s primary schools young people in this age group prepare for a bike

card test,

thus expanding their knowledge of safety and behaviour in traffic;

in contrast to 4th grade pupils, the children have come to terms with the new system of

teaching, i.e. subjects taught by different teachers, not just with the class teacher,

classroom changes, new subjects, etc.;

in contrast to 6th grade pupils, the children do not focus on the final tests completing

primary school and choosing a high school;

in the younger grades of primary schools (1-3) and preschool groups the Municipality of

Gdynia conducts other actions of educational - promotional incentives to choose

alternative means of transport.

The campaign included ten 5th grades of primary schools in Gdynia (ca. 300-450 students).

The aim of the campaign was to encourage students (12 and 13 year olds) to travel by

bicycle. Each child participating in the campaign was asked to ride on the bike as many

kilometres as possible. The participants of the contest cycled in 80 days a total distance of

40,000 km, which is like travelling around the world. Classes involved in the project have

been equipped with GPS devices. Children, after each trip, put the information from the GPS

to the website of “race”. The class that won the race rode a total of 2,500 km.

The objectives of the campaign were to:

increase the share of cycling and walking among the target group,

promote active lifestyles among the target group,

promote cycling and/ or walking among the target group,

Walking and cycling trips may include those carried out:

from home - school - home,

when going out, trips related to school activities,

leisure trips.

As part of this campaign, the participants were equipped with GPS tracker device type (Mini-

locator), so that the cycling and walking routes could be saved. Participants exchanged

devices in such a way that each of them could take these at least once.

The way in which the device may be assigned to students for the day remained to be

determined by the class. An important principle of this campaign is that the individual

participants do not compete with each other, but that entire classes compete with each other.

The results of each trip were saved in an application (like Google Maps), so one could create

a ranking of classes with the highest number of kilometres travelled. This application was a

subpage on the Mobile Gdynia website (www.wpp.mobilnagdynia.pl).

The distance travelled was presented to participants in a simplified graphical form, with

marked points - Polish cities, which could be reached to obtain an adequate number of

kilometres. The actual number of kilometres covered by the participants is multiplied by a

Page 79: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

79 / 83

factor (e.g. 10, 100), which will enable them to travel virtually on long distances on the map

of Poland.

The top three classes have been awarded in the form of e.g. a trip to the cinema, theatre or

Science and Technology Park - Centre for Science Experiment.

Figure 57: One of the classes participating in the “Race of Poland”

During the campaign, each school received surveys to collect the opinions of teachers on the

observed changes in travel behaviour, as well as to verify the effectiveness of the campaign.

Of the eight classes that took part in the campaign, four classes filled in the survey. The

results obtained in the surveys “before” and “after” the competition were compared in terms

of the impact of the change of the competition and in terms of choice of transport mode of

travel to school.

Figure 58: Distribution of prizes to the winners of the “Race of Poland”

More than 46% of the students are of the opinion that the contest encouraged them to more

frequent walking and riding a bicycle in their spare time, and 17% of the students believe that

the contest encouraged them to more walking and riding a bicycle in traveling to/ from

school. The cost of this campaign amounted to approx. 29,000 PLN.

In 2015, the competition was attended by eight primary schools from Gdynia, including 24

classes. A total number of 560 students competed to win the main, attractive prizes. The

winners were classes 5A from Primary School No. 23 and 5C from Primary School No. 20.

Page 80: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

80 / 83

On the podium stood also class 5A from Primary School No 17. In addition to the three main

prizes were distributed over 300 individual awards for the students who were particularly

active during the contest. A before and after campaign was conducted. Polls show that the

competition has a big effect on the activity of students. Even after the end of the campaign

students were cycling and walking.

Figure 59: Meeting with students during “Race of Poland”

For 2016 an evolution of the campaign is planned. After consultation and agreement with

local policy makers and those responsible for the development of cycling in Gdynia, the

competition will encompass all primary school students. Due to the limited capacity of the

dedicated website for the contest, it won’t be used anymore. Instead the focus will be on

traditional methods like paper notebooks of trips and stickers to check the frequency of

children’s trips. The campaign will be held in May 2016 and will be part of a regional, bigger

campaign on sustainable mobility among young students. It will be called “Rowerowy Maj”

and will encourage children to travel by bike, foot or public transport instead of being brought

by car by their parents. The tender procedure is under preparation and should be ready in

February 2016. This contest is planned to continue also after the DYN@MO project.

5 Conclusions The City of Gdynia is one of the Polish leaders in planning and implementing sustainable

mobility measures. Some of them were described in this document. They’re very useful in

elaborating Gdynia’s SUMP, which is also innovative on the national scale.

All mentioned tasks were implemented or will be implemented in the future if they still will

have reasonable economic and social justification. The leaders of the City of Gdynia are

aware that the development of transport infrastructure is not the only one way to develop

sustainable mobility in the city, thus ‘soft’ measures are also implemented. It is important to

increase the use of means of public transport, not only cycling and walking and some of the

tasks will hence be dedicated to them.

For sure, the city centre is for people and decreasing the number of cars in this area should

be an obligatory policy for Gdynia and other sustainable cities and towns in Europe. The

City’s efforts should be on ensuring trouble-free, fluent and safe access between each district

and the city centre.

Page 81: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

81 / 83

References and related websites

Andréasson, I. (2001) Innovative Transit Systems Survey of current developments, The Swedish

Agency for Innovation systems Report VR 2001:3 ISBN 91-89588-03-07, ISSN 1650-3104

Anderson J. E. (1986) Automated Transit Vehicle Size Considerations

Anderson, J. E. (2010) Some Lessons from the History of Personal Rapid Transit (PRT),

http://faculty.washington.edu/jbs/itrans/history.htm, 25.02.2010

Dunning, B., Ford, I. (2003) Personal Automated Transportation: Status and Potential of Personal

Rapid Transit Main Report Advanced Transit Association January 2003

EDICT (2005) Evaluation and Demonstration of Innovative City Transport, Final Report Project

Reference No: EVK4-CT-2001-00058, FIFTH FRAMEWORK PROGRAMMEKEY ACTION “CITY OF

TOMORROW AND CULTURAL HERITAGE”, January 2005

Irving, J. H. , Bernstein, H., and Buyan J. (1978) Fundamentals of Personal Rapid Transit D. C. Heath

and Company, Lexington Books

Jamroz, K., Guminska L., Kustra W. (2010) Analizy i prognozy wskaźników efektywnosci dla Studium

Wykonalnosci Zintegrowanego Systemu Zarzadzania Ruchem TRISTAR w Gdansku, Gdyni i Sopocie

w zakresie zarzadzania transportem publicznym

Mikosza O. (2010) Materialy konferencyjne, VI Konferencja Naukowo-Technologiczna „Systemy

transportowe - Teoria i Praktyka” 2009, http://www.mister.com/images/MISTER-2009-09-ST-

Katowice.pdf, 24.02.2010

Mikosza, 0. (2006) Uproszczona analiza zdolnosci przewozowej indywidualnego systemu transport

miejskiego MISTER

Mikosza, O. (2009) Oferta PPP dla miast dot. Budowy systemów transportu miejskiego MISTER

Mobility 2030 (2004) Meeting the Challenges to Sustainability, World Business Council for Sustainable

Development, 2004, http://www.wbcsd.org/web/publications/mobility/mobility-full.pdf, 26.02.2010

Niche (2010) Guideservices for implementers of Personal Rapid Transit (PRT) NICHES+, prepared for

European Commission under the Seventh Framework Programme for R&D, Sustainable Surface

Transport, www.niches-transport.org

PG (2002) Koncepcja ogólna systemu zarzadzania ruchem na obszarze Gdyni, Politechnika Gdanska,

Katedra Inzynierii Drogowej listopad 2002

Piskorz J. (2013) Koncepcja PRT (Personal Rapid Transit) dla Gdyni i ocena efektywnosci systemu.

Praca dyplomowa magisterska. Politechnika Gdanska 2013

Plech J. (2013) Analiza mozliwosci wprowadzenia Personal Rapid Transit na terenie miasta Gdyni,

Praca dyplomowa magisterska. Politechnika Gdanska 2013

Schweizer, J. (2010) The Case for Personal Rapid Transit (PRT),

http://advancedtransit.org/pub/2006/CaseForPRT.PDF, 21.01.2010

SRAS (2010) Samodzielny Referat Analiz Statystycznych Urzedu Miasta Gdyni,

http://www.gdynia.pl/bip/gdynia/w/liczbach/419_30106.html, 1.03.2010

Page 82: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

82 / 83

Tamila, R., Wiczkowski, F. (2013) Koncepcja PRT w Gdyni. Praca dyplomowa inzynierska.

Politechnika Gdanska 2013

Tegner, G. (2004) Comparison of Costs between Bus, PRT, LRT and Metro/rail from European

Demonstration of Innovative City Transport (EDICT)

Tegner, G. (2007) The Need for PRT – 2007, http://www.advancedtransit.org

UM Gdynia (2010) Studium uwarunkowan i kierunków zagospodarowania przestrzennego Gdyni,

http://www.gdynia.pl/g2/2008_03/15872_fileot.pdf, 7.03.2010

UM Gdynia (2010) Zintegrowany plan rozwoju transportu publicznego w Gdyni w latach 2004-2013,

http://www.zkmgdynia.pl, 5.03.2010

UM Gdynia (2011) Zintegrowany Plan Zrównowazonego rozwoju Obszarów Miasta Gdyni w zakresie

miejskich obiektów kulturalnych, obiektów uslugowych i handlowych oraz dzialan rewitalizacyjnych

(ZIPROM), Gdynia grudzien 2011

Wisniewski, R. (2010) Projekt linii tramwajowej Gdynia Glówna – Molo Rybackie. Praca dyplomowa

Politechnika Gdanska 2010

ZKM (2010) Preferencje i zachowania komunikacyjne mieszkanców Gdyni w 2010 r. Raport z badan

marketingowych, http://www.zkmgdynia, 6.03.2010

Rhubarb Studio (2015) Heatmaps for Gdynia based on GPS data after ECC 2015

http://www.ztkut.it.pw.edu.pl/prt-sitin/?p=1

http://www.eco-mobilnosc.pw.edu.pl/prt-sitin/?p=2

http://ec.europa.eu/research/environment/newsanddoc/article_2650_en.htm

http://www.advancedtransit.org/pub/2002/prt/

http://www.austrans.com/index.php?option=com_frontpage&Itemid=1

http://www.taxi2000.com/index.html

http://www.ultraprt.com/cms/index.php?page=overview

http://www.vectusprt.com/prt/overview.php

http://www.citycoaster.com/en/home.html

http://www.2getthere.eu/Personal_Transit/

http://faculty.washington.edu/jbs/itrans/Masdar.htm

http://www.gdynia.pl/wydarzenia/70_62198.html

http://www.mist-er.com/component/poll/1-czy-mister-jest-dobry-.html

http://synchronicitywarsaw.blogspot.com/2008/05/centrala-holon.html

http://www.mist-er.com/galeria/category/2-opole.html

http://www.mist-er.com

http://www.mist-er.com/files/artykul-mikosza01.pdf

http://openprtspecs.blogspot.com/search?q=mister

http://www.mist-er.com/MISTER_Ogolnie-2008.pdf

http://www.mist-er.com/

http://www.gdynia.pl/bip/gdynia/w/liczbach/419_30103.html

http://www.gdynia.pl/wszystko/o/gdyni/liczby/102_30097.html

http://www.prtcons.com/definition.html

http://mobilnagdynia.pl

http://www.gdynia.pl/

Page 83: G1.2 Community project studies from SUMP · 15.04.15 Aleksandra Romanowska Preparation of final draft Final draft PM 18.06.15 Marcel Braun Final proof-reading and editing Final EC

D1.5 Implementation Status Report G1.2: Community project studies from SUMP November 2015

83 / 83

https://www.facebook.com/MobilnaGdynia

http://www.cyclingchallenge.eu/

http://cycling365.eu/#/

https://www.facebook.com/europeancyclingchallenge/?fref=ts

http://www.civitas.eu/

http://www.eltis.org/

http://audycje.tokfm.pl/audycja/Skolowani/22

http://thecityfix.com/