2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Test structure fabrication: procedures, documentation and status. G. Riddone 13.05.2008. Acknowledgements: C. Achard, S. Atieh, J. Kovermann, R. Zennaro, M. Taborelli. Content. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/1.jpg)
2nd collaboration meeting on X-band Accelerator Structure Design and Test-Program
Structure fabrication
Test structure fabrication: procedures, documentation and status
G. Riddone
13.05.2008
Acknowledgements: C. Achard, S. Atieh, J. Kovermann, R. Zennaro, M. Taborelli
![Page 2: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/2.jpg)
2 G. Riddone,13.05.2008
Content
• Introduction • Production cycle• QA system• Status of the production• Conclusions
![Page 3: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/3.jpg)
3 G. Riddone,13.05.2008
Introduction
• Accelerating structures– 30 GHz (CERN): disks and quadrants– 11.4 GHz (CERN, KEK, SLAC): disks and
quadrants– 12 GHz (CERN): disks
• PETS– 30 GHz (CERN): quadrants– 11.4 GHz (SLAC): octants– 12 GHz (CERN): octants
• rf components (CERN)– Hybrids - Splitters– Loads– Directional couplers– Attenuators – Phase shifters– Flanges
![Page 4: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/4.jpg)
4 G. Riddone,13.05.2008
Production cycle for acc. structures
Production cycle: 24 weeks from RF design (included) to power test (excluded) Aim: 10 structures per year
![Page 5: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/5.jpg)
5 G. Riddone,13.05.2008
From rf design to the tech. specification
rf design: 4 weeksmechanical design: 4 weeksTech. Spec. + bidding: 6 weeks
3D Part, design parametrization introduced to minimize errors
![Page 6: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/6.jpg)
6 G. Riddone,13.05.2008
QA system
• We have to ensure that a physical components meet its requirements and perform satisfactorily in operation At any moment we should be able to trace the history of the components
Engineering Data Management System used at CERN EDMS• for archiving and approval of documents• for information flow among different teams, including
external suppliers/collaborators
![Page 7: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/7.jpg)
7 G. Riddone,13.05.2008
EDMS for RF structures
Traveller: document containing the history of the component
Daily notification mail with new documents
![Page 8: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/8.jpg)
8 G. Riddone,13.05.2008
Traveller (1)
![Page 9: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/9.jpg)
9 G. Riddone,13.05.2008
Traveller (2)
XX
X
X
X
X
X
X
X
X
![Page 10: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/10.jpg)
10 G. Riddone,13.05.2008
In addition:Logbook for each structure
It has been defined:- Who initiates the traveller - For each step, role and responsibility- Who closes the traveller and put it in EDMS
When a step is completed, the person in charge of the step, sends a mail to a defined list of people to launch the following step.After each step the structure is put back in its box and stored in the dedicated cupboard in b169
A new rf laboratory has been prepared for the structure inspection, assembly and tests
Traveller (3)
X
![Page 11: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/11.jpg)
11 G. Riddone,13.05.2008
Production Item Firms
Accelerating structures(8 weeks: allocated fabrication time)
Greenfox (FI), IMTEC (FI)VDL (NL), Micron-Cluny (FR)Megic (IT), Unitek (IT)Kugler (DE)
(KERN, LT Ultra-Precision under qualification) + collaborations with KEK and SLAC
PETS (14 weeks: allocated fabrication time) + couplers
IMP (IT), CINEL (IT), VDL (NL)G&P vacuum (SP), Unitek (IT)
rf components CINEL (IT), VDL (NL)Gycom (RU)
![Page 12: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/12.jpg)
12 G. Riddone,13.05.2008
Ac. structure overview table (1)
VG1
C10
CLIC G
![Page 13: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/13.jpg)
13 G. Riddone,13.05.2008
Ac. structure overview table (2)
CLIC G
![Page 14: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/14.jpg)
14
Accelerating structures
G. Riddone,13.05.2008
CLIC vg1 quadrant damped
Iris shape accuracy
- Specified: +/- 2.5 mm
- Obtained: - 5, +10 mm
No tuning needed
11.4 GHz
![Page 15: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/15.jpg)
15 G. Riddone,13.05.2008
Accelerating structures
Disk structure (technology resumed in 2007 following change of frequency)Machining by diamond turning (+milling for damped structures) specified shape accuracy of +/-1 mm in the iris region
30 GHz 11.4 GHz
150 mm
300 mm
Disk undamped
Disk damped
![Page 16: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/16.jpg)
16 G. Riddone,13.05.2008
PETS overview
![Page 17: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/17.jpg)
17
PETS production
G. Riddone,13.05.2008
11.4 GHz
275 mm
![Page 18: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/18.jpg)
18
PETS production
G. Riddone,13.05.2008
12 GHz
1 m
Cooling circuit assembly jig
Pieces for PETS assembly and supports
![Page 19: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/19.jpg)
rf components
G. Riddone,13.05.200819
Hybrids
GYCOM, RussiaFirst prototype in Dec 2007 - Series (x9) in June
RF and mechanical design, CERNFabrication in CINEL, Italy and VDL, Holland
Prototypes under completion - Series (x8) at CERN in July
Dry (stainless steel) RF load
Attenuator/phase shifter
Scaled from 30 GHz CERN version. GYCOM Russia.
First prototype in May - Second unit in Jul - Series (x3) in AugRF and mechanical design, CERNFabrication in CINEL, ItalyFirst prototype in May - Series (x4) in June
Directional couplers
Splitter order under way
![Page 20: G. Riddone 13.05.2008](https://reader035.vdocuments.site/reader035/viewer/2022062814/568166ec550346895ddb3902/html5/thumbnails/20.jpg)
20 G. Riddone,13.05.2008
Conclusions
• A project-oriented production follow-up has been put into place a quality assurance system has been defined
• All the relevant documents available in EDMS: exchange of information within CERN and with external collaborators
• Detailed scheduled with clear milestones allow to follow the production and take preventive and correction actions
• Production cycle for accelerating structure takes approximately 6 months
• Several firms have been qualified for the manufacturing of the acc. structures, PETS and rf components. As much as possible splitting of contracts to minimize the risk. Collaboration with KEK And SLAC is a real benefit
• First accelerating structure at 11.4 GHz arrived last week. Preliminary rf results are promising. To be tested at SLAC.
• PETS bars and related components at 11.4 GHz under assembly and preparation.