g. daily log of 10 week industrial training
DESCRIPTION
Academia International College Industrial TrainingTRANSCRIPT
AYM BISTARI
INDUSTRIAL TRAINING Daily Log
Muhammad Harussani Bin Abdul Manap
21 st January 2008 to 29 th March 2008
17A Medan Istana 6, Bandar Ipoh Raya, 30000 Ipoh, Perak Darul Ridzuan Tel : 605 2560705 Fax : 605 52560705
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 1 Date 21 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & Interview 10.00 11.00 Designing order placement for Hock Weng Oil Mill SDN. BHD. 11.00 12.00 Designing order placement for Hock Weng Oil Mill SDN. BHD. 12.00 1.00 Designing order placement for Loh & Low Trading 1.00 2.00 Designing order placement for Loh & Low Trading 2.00 3.00 Designing order placement for Hock Heng Biskut 3.00 4.00 Designing order placement for Hock Heng Biskut & Rest For 10 Minute 4.00 5.00 Designing order placement for Kilang Biskut Seng Hoe & Return Home.
Summary of Significant Work for the day The first day of 10 week of industrial training. I came early to meet Pn Zahariah Bt Sarji, the manager of the AYM Bistari for interview and work brief. Then she shows me around the office and introduce me her workers Khalid & Amar. I have been given a work space with one desktop computer. Its use windows Millenniums Edition (Windows ME) and the software that already install are Adobe Photoshop 7.0 and Adobe Illustrator 10. 0.
Most of the day the task is all about designing an order placement for a Halal food product. The order placements contain an image of the product with its description, address and contact number.
The order placement for today is from : • Hock Weng Oil Mill SDN. BHD. (size 50mm x 35mm) • Loh & Low Trading (size 50mm x 35mm) • Kilang Biskut Seng Hoe (size 50mm x 35mm) • Hock Heng Biskut (size 50mm x 35mm)
Software use : • Adobe Photoshop 7.0 • Adobe Illustrator 10.0
Hardware use : • 52x CDRom • 1.44 Floppy A
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 2 Date 22 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Designing order placement for Hotel & Restoran Seri Kangar 11.00 12.00 Designing order placement for Hotel & Restoran Seri Kangar 12.00 1.00 Designing order placement for Hotel & KPW Enterprise 1.00 2.00 Lunch & rest 2.00 3.00 Designing order placement for KPW Enterprise 3.00 4.00 Designing order placement for Restoran FFC 4.00 5.00 Designing order placement for Restoran FFC & Return Home
Summary of Significant Work for the day To improve my work, I bring my own laptop to work as a second computer because of the lack performance of the desktop. Most of the day the task is all about designing an order placement for a Halal food product. The order placements contain an image of the product with its description, address and contact number.
The order placement for today is from : • Hotel & Restoran Seri Kangar (size 50mm x 35mm) • Restoran FFC (size 50mm x 35mm) • KPW Enterprise (size 50mm x 50mm)
Software use : • Adobe Photoshop 7.0 • Adobe Illustrator 7.0 • Adobe Photoshop Element 4.0
Hardware use : • 52x CDRom • 8x DVDRW • 1.44 Floppy A
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 3 Date 23 Jan 2008
Time Work in Progress 8.00 9.00 n/a 9.00 10.00 n/a 10.00 11.00 n/a 11.00 12.00 n/a 12.00 1.00 n/a 1.00 2.00 n/a 2.00 3.00 n/a 3.00 4.00 n/a 4.00 5.00 n/a
Summary of Significant Work for the day Public Holiday Thaipusam
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 4 Date 24 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Designing order placement for Chop Hock Seng Eng 11.00 12.00 Designing order placement for Chop Hock Seng Eng & Receives another task 12.00 1.00 Designing order placement for Mak Andak Enterprise 1.00 2.00 Designing order placement for Mak Andak Enterprise 2.00 3.00 Designing order placement for Mak Andak Enterprise 3.00 4.00 Designing order placement for Hock Weng Oil Mill Sdn Bhd 4.00 5.00 Designing order placement for Hock Weng Oil Mill Sdn Bhd & Return Home
Summary of Significant Work for the day Most of the day the task is all about designing an order placement for a halal food product. The order placement contains an image of the product with its description, address and contact number.
The order placement for today is from : • Chop Hock Seng Eng (size 50mm x 35mm) • Mak Andak Enterprise (size 50mm x 50mm) • Hock Weng Oil Mill Sdn Bhd (size 50mm x 50mm)
Note : The Hock Weng Oil Mill Sdn Bhd order placement already had been done on 21 January 2008. This is the redesign for the placement.
Software use : • Adobe Photoshop Element 4.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 5 Date 25 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Designing order placement for Kelang Beras Hai Hin Sdn. Bhd. 11.00 12.00 Designing order placement for Kelang Beras Hai Hin Sdn. Bhd. 12.00 1.00 Designing order placement for Kelang Beras Hai Hin Sdn. Bhd. 1.00 2.00 Break For Friday Prayer 2.00 3.00 Designing order placement for Fresh House Bakery 3.00 4.00 Designing order placement for Fresh House Bakery 4.00 5.00 Designing order placement for Fresh House Bakery & Return Home.
Summary of Significant Work for the day Most of the day the task is all about designing an order placement for a halal food product. The order placements contain an image of the product with its description, address and contact number.
The order placement for today is from : • Kelang Beras Hai Hin Sdn. Bhd. (size 50mm x 35mm) • Fresh House Bakery (size 50mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 1 Day 6 Date 26 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Repairing artwork 11.00 12.00 Repairing artwork 12.00 1.00 Repairing artwork 1.00 2.00 Return Home. 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Today the manager her self came to inspect my work. After she check all my design, she suggest that the dimension on all product that been design should be in horizontal orientation as it’s more flexible and less consume space. Most of the day the task is all about repairing and redesigning the order placement for all the product that been made. The order placement that before in vertical orientation has been converting to horizontal mode.
The order placement for today (resized) : • Fresh House Bakery (65mm x 70mm) • All products starting from 21 January till 25 January 2008.
Software use : • Adobe Illustrator CS 11.0 • Adobe Illustrator 7.0 • Adobe Photoshop CS2 • Adobe Photoshop 7.0
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 7 Date 28Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & repairing Chop Hock Heng (horizontal) 10.00 11.00 Designing order placement for Super BioEnergize (Perak) Sdn. Bhd 11.00 12.00 Designing order placement for Super BioEnergize (Perak) Sdn. Bhd 12.00 1.00 Repairing artwork 1.00 2.00 Designing order placement for Kilang Memproses Ayam Daging Thian Chai 2.00 3.00 Designing order placement for Kilang Memproses Ayam Daging Thian Chai 3.00 4.00 Designing order placement for Designing Order Placement For Bahari Bin Man (Ikan
Kering) 4.00 5.00 Bahari Bin Man (Ikan Kering) & return home
Summary of Significant Work for the day Nothing new, just completing today task as usual like yesterday.
The order placement for today (resized) : • Chop Hock Heng (horizontal) (50mm x 35mm) • Super BioEnergize (Perak) Sdn. Bhd. (50mm x 35mm) • Kilang Memproses Ayam Daging Thian Chai (50mm x 35mm) • Bahari Bin Man Ikan Kering (50mm x 50mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 9.0
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 8 Date 29 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Designing order placement for Kak Midah Enterprise 11.00 12.00 Designing order placement for Kak Midah Enterprise 12.00 1.00 Repairing artwork 1.00 2.00 Repairing artwork 2.00 3.00 Repairing artwork 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork & Return Home.
Summary of Significant Work for the day Today the manager check all my design and suggest that the dimension on all product that been design should be in horizontal orientation as it’s more flexible and less consume space. Most of the day the task is all about repairing and redesigning the order placement for all the product that been made. The order placement that before in vertical orientation has been converted to horizontal mode.
The order placement for today: • Kak Midah Enterprise (50mm x 50mm) • Kak Midah Enterprise (65mm x 70mm resized)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 9 Date 30 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Check In & analysis task 10.00 11.00 Repairing artwork & Converting Artwork Dimension 11.00 12.00 Repairing artwork & Converting Artwork Dimension 12.00 1.00 Repairing artwork & Converting Artwork Dimension 1.00 2.00 Repairing artwork & Converting Artwork Dimension 2.00 3.00 Repairing artwork & Converting Artwork Dimension 3.00 4.00 Repairing artwork & Converting Artwork Dimension 4.00 5.00 Repairing artwork & Converting Artwork Dimension, Return Home.
Summary of Significant Work for the day Today all design under 50mm x 35mm (height x width) has been modified to 35mm x 50mm (height x width).
The order placement for today (resized) : • Jelly Jack (50mm x 35mm) • Ipoh Frozen Food (50mm x 35mm) • Bernam Bakery (50mm x 35mm) • Kedai Kek Mains (50mm x 35mm) • Needa Bakery (50mm x 35mm) • 3y Bakery (50mm x 35mm) • Red Leaf (50mm x 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Illustrator 7.0 • Adobe Photoshop CS2 • Adobe Photoshop 7.0
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 10 Date 31 Jan 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Converting artwork dimension 10.00 11.00 Converting artwork dimension & scanning picture 11.00 12.00 Designing order placement for Hup Lean Huat SDN. BHD. 12.00 1.00 Designing order placement for Hup Lean Huat SDN. BHD. 1.00 2.00 Designing order placement for Lian Seng Hung Rice Mill Sdn. Bhd 2.00 3.00 Designing order placement for Lian Seng Hung Rice Mill Sdn. Bhd 3.00 4.00 Designing order placement for Menang Rasa Enterprise 4.00 5.00 Designing order placement for Menang Rasa Enterprise
Summary of Significant Work for the day Today all design under 50mm x 35mm (height x width) has been modified to 35mm x 50mm (height x width) and for today order I have to scan their pictures for my resource.
The order placement for today (resized) : • Kean Huat (65mm x 70mm) • Roti Metro Bitara (65mm x 70mm) • Roti & Kek seri Kampar Jaya (65mm x 70mm) • Roti Riau (65mm x 70mm) • Tai Long (65mm x 70mm)
The order placement for today : • Hup Lean Huat SDN. BHD. (50mm x 50mm) • Lian Seng Hung Rice Mill Sdn. Bhd. (65mm x 70mm) • Menang Rasa Enterprise (50mm x 50mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Illustrator 7.0 • Adobe Photoshop CS2 • Adobe Photoshop 7.0 • MiraScan6 •
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 11 Date 1 Feb 2008
Time Work in Progress 8.00 9.00 Preparing for work 9.00 10.00 Receiving new task and scanning source 10.00 11.00 Scanning and editing source 11.00 12.00 Designing order placement for Hok Hin Chang Sdn. Bhd 12.00 1.00 Designing order placement for Hok Hin Chang Sdn. Bhd 1.00 2.00 Break for Friday prayer 2.00 3.00 Designing order placement for Restoran Caterbest Sdn. Bhd. 3.00 4.00 Designing order placement for Restoran Caterbest Sdn. Bhd 4.00 5.00 Designing order placement for Taiping Poultry Trading & return home
Summary of Significant Work for the day Today I have to scan the entire source file as the company did not give any soft copy material. Furthermore, all order for today is in large size.
The order placement for today : • Hok Hin Chang Sdn. Bhd (65mm x 70mm) • Restoran Caterbest Sdn. Bhd. (65mm x 70mm) • Taiping Poultry Trading (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 2 Day 12 Date 2 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing order placement for Robama Enterprise 10.00 11.00 Designing order placement for Robama Enterprise 11.00 12.00 Designing order placement for Shixing Enterprise Sdn. Bhd. 12.00 1.00 Designing order placement for Shixing Enterprise Sdn. Bhd. & return home 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Today work same as yesterday.
The order placement for today : • Robama Enterprise (50mm x 50mm) • Shixing Enterprise Sdn. Bhd. (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 13 Date 4 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Fajar Intan Enterprise 10.00 11.00 Designing for Fajar Intan Enterprise 11.00 12.00 Repairing artwork 12.00 1.00 Repairing artwork 1.00 2.00 Designing for Aromas Enterprise 2.00 3.00 Designing for Aromas Enterprise 3.00 4.00 Designing for Semuasuka Enterprise 4.00 5.00 Designing for Semuasuka Enterprise & return home.
Summary of Significant Work for the day Designing for Rm 250.00 listing.
The order placement for today : • Aromas Enterprise (67mm x 70mm) • Fajar Intan Enterprise (65mm x 70mm) • Semuasuka Enterprise (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 14 Date 5 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing yesterday artwork 10.00 11.00 Designing for Yusnani Enterprise 11.00 12.00 Designing for Yusnani Enterprise 12.00 1.00 Rest 1.00 2.00 Designing for Mama Chop Papa Grill 2.00 3.00 Designing for Mama Chop Papa Grill 3.00 4.00 Designing for Sri Mandah Enterprise 4.00 5.00 Designing for Sri Mandah Enterprise & return home.
Summary of Significant Work for the day Designing for Rm 250.00 listing.
The order placement for today : • Yusnani Enterprise (67mm x 70mm) • Mama Chop Papa Grill (65mm x 70mm) • Sri Mandah Enterprise (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 15 Date 6 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning & Designing for Soon Hock Hin Trading 10.00 11.00 Designing for Soon Hock Hin Trading 11.00 12.00 Designing for Biskut Fajar Enterprise 12.00 1.00 Rest 1.00 2.00 Designing for Biskut Fajar Enterprise 2.00 3.00 Scanning & Designing for Hicomi Sdn. Bhd. 3.00 4.00 Designing for Hicomi Sdn. Bhd. 4.00 5.00 Scanning work files for this Saturday work & return home.
Summary of Significant Work for the day Today there a lot of work because of the public holiday tomorrow. Because of that I’m scanning all work for this Saturday work as my preparation so for this weekend my work will be much easier and faster.
The order placement for today : • Soon Hock Hin Trading (50mm x 50mm) • Hicomi Sdn. Bhd. (35mm x 50mm) • Biskut Fajar Enterprise (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 16 Date 7 Feb 2008
Time Work in Progress 8.00 9.00 n/a 9.00 10.00 n/a 10.00 11.00 n/a 11.00 12.00 n/a 12.00 1.00 n/a 1.00 2.00 n/a 2.00 3.00 n/a 3.00 4.00 n/a 4.00 5.00 n/a
Summary of Significant Work for the day Public Holiday – Chinese New Year
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 17 Date 8 Feb 2008
Time Work in Progress 8.00 9.00 n/a 9.00 10.00 n/a 10.00 11.00 n/a 11.00 12.00 n/a 12.00 1.00 n/a 1.00 2.00 n/a 2.00 3.00 n/a 3.00 4.00 n/a 4.00 5.00 n/a
Summary of Significant Work for the day Public Holiday – Chinese New Year
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 3 Day 18 Date 9 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for D.N.S. Kacang Putih 10.00 11.00 Designing for S.G.H. Marine Foods (M) Sdn. Bhd. 11.00 12.00 Designing for Eng Huat Food MFG Trading 12.00 1.00 Designing for Menglembu Foods Industry 1.00 2.00 Designing for Sang Kee Sdn. Bhd. & return home. 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Today work just designing for Rm150.00 listing from the source that I scan before the public holiday.
The order placement for today : • D.N.S. Kacang Putih (50mm x 35mm) • S.G.H. Marine Foods (M) Sdn. Bhd. (50mm x 35mm) • Eng Huat Food MFG Trading (50mm x 35mm) • Menglembu Foods Industry (65mm x 70mm) • Sang Kee Sdn. Bhd. (50mm x 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 19 Date 11 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning work 10.00 11.00 Designing for Bahulu Kepayang Enterprise 11.00 12.00 Designing for Bahulu Kepayang Enterprise 12.00 1.00 Designing for Lee Seng Bee Hoon Factory 1.00 2.00 Rest 2.00 3.00 Designing for Makmur Food Industries Sdn. Bhd 3.00 4.00 Designing for Mei Foo Trading 4.00 5.00 Repairing artwork & return home
Summary of Significant Work for the day
The order placement for today : • Bahulu Kepayang Enterprise (50mm x 35mm) • Lee Seng Bee Hoon Factory (50mm x 35mm) • Makmur Food Industries Sdn. Bhd.(65mm x 70mm) • Mei Foo Trading (50mm x 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 20 Date 12 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 scanning work & designing for Bidor Curry House 10.00 11.00 Designing for Bidor Curry House 11.00 12.00 Designing for Maju Perak Tepong Beras Sdn. Bhd. 12.00 1.00 Designing for Maju Perak Tepong Beras Sdn. Bhd. 1.00 2.00 Designing for Paneram Asli Enterprise 2.00 3.00 Designing for Paneram Asli Enterprise 3.00 4.00 Designing for Soon Huat Hung Sdn. Bhd. 4.00 5.00 Designing for Soon Huat Hung Sdn. Bhd. & return home
Summary of Significant Work for the day
The order placement for today : • Bidor Curry House (50mm x 35mm) • Maju Perak Tepong Beras Sdn. Bhd. (50mm x 35mm) • Paneram Asli Enterprise (65mm x 70mm) • Soon Huat Hung Sdn. Bhd. (50mm x 50mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 21 Date 13 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Searching source from Perak Halal Directory 10.00 11.00 Designing for Ipoh Frozen Food Co. 11.00 12.00 Designing for Ipoh Frozen Food Co. 12.00 1.00 Designing for Khai Fatt 1.00 2.00 Rest 2.00 3.00 Designing for Khai Fatt 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day
The order placement for today : • Ipoh Frozen Food Co. (50mm x 35mm) • Khai Fatt (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 22 Date 14 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Searching source from Perak Halal Directory 10.00 11.00 Designing for Gin Seng Industrial (M) Sdn. Bhd 11.00 12.00 Designing for Gin Seng Industrial (M) Sdn. Bhd 12.00 1.00 Scanning & designing for Great Soya Champion Soya Milk 1.00 2.00 Rest & writing report for practical training 2.00 3.00 Designing for Along Sugarcraft Enterprise 3.00 4.00 Designing for VAV Catering Sdn. Bhd. 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day For a half page advertisement, it will be resize to the Rm200.00 listing size ( 50mm x 50mm)
The order placement for today : • Along Sugarcraft Enterprise (50mm x 35mm) • Gin Seng Industrial (M) Sdn. Bhd. (half page) • Great Soya Champion Soya Milk (half page) • VAV Catering Sdn. Bhd. (65mm x 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 23 Date 15 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning pictures for Tehki Food Industries. 10.00 11.00 Designing for Tehki Food Industries. 11.00 12.00 Designing for M.S. Village Food (M) Sdn. Bhd. 12.00 1.00 Designing for M.S. Village Food (M) Sdn. Bhd. & synchronized work folder 1.00 2.00 Rest & Friday 2.00 3.00 Designing for Chang Jiang White Coffee 3.00 4.00 Designing for Subah Foods Trading 4.00 5.00 Designing for Subah Foods Trading
Summary of Significant Work for the day For a full page advertisement, it will be resize to Rm250.00 listing size (65mm x 70mm) & for half page to the Rm200.00 (50mm x 50mm).
The order placement for today : • M.S. Village Food (M) Sdn. Bhd. (50mm x 35mm) • Tehki Food Industries. (half page) • Chang Jiang White Coffee (half page) • Subah Foods Trading (half page)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 4 Day 24 Date 16 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing artwork 11.00 12.00 Designing for Yi Dah Xing Food Factory (M) Sdn. Bhd. 12.00 1.00 Designing for Yi Dah Xing Food Factory (M) Sdn. Bhd. 1.00 2.00 Return home 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Today most of the work was repairing The Tehki Food Industries because they have submitted a new picture for their product.
The order placement for today : • Yi Dah Xing Food Factory (M) Sdn. Bhd. (Full Page)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 25 Date 18 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning source file 10.00 11.00 Designing for Kamalriah Enterprise 11.00 12.00 Designing for Kamalriah Enterprise 12.00 1.00 Designing for Bota Best Enterprise 1.00 2.00 Rest 2.00 3.00 Designing for Bota Best Enterprise 3.00 4.00 Designing for KPW Kampong Teluk Piai 4.00 5.00 Designing for KPW Kampong Teluk Piai & return home
Summary of Significant Work for the day
The order placement for today : • Kamalriah Enterprise (50mm X 50mm) • Bota Best Enterprise (65mm X 70mm) • KPW Kampong Teluk Piai (67mm X 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 26 Date 19 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Lintang Gemilang Enterprise 10.00 11.00 Designing for Lintang Gemilang Enterprise 11.00 12.00 Designing for Tln Food Industry Sdn. Bhd. 12.00 1.00 Designing for Tln Food Industry Sdn. Bhd. 1.00 2.00 Rest & Scanning source file 2.00 3.00 Designing for Banly Food Industries 3.00 4.00 Designing for Banly Food Industries 4.00 5.00 Repairing artwork & return home
Summary of Significant Work for the day Today I’m supposed to print and submit all my design to the manager for evaluation. But because they are too many works today, I have to delay it.
The order placement for today : • Lintang Gemilang Enterprise (67mm X 70mm) • Tln Food Industry Sdn. Bhd. (50mm X 50mm) • Banly Food Industries (65mm X 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 27 Date 20 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning & designing for Silibin Flour Mills 10.00 11.00 Designing for Silibin Flour Mills 11.00 12.00 Designing for S.M.N. Foods (M) Sdn. Bhd. 12.00 1.00 Designing for S.M.N. Foods (M) Sdn. Bhd. 1.00 2.00 Rest & synchronize folder 2.00 3.00 Scanning & designing for Syarikat Salmi Hj. Tahmin Sdn. Bhd. 3.00 4.00 Designing for Syarikat Salmi Hj. Tahmin Sdn. Bhd. 4.00 5.00 Repairing artwork & create a template for draft print. Return home.
Summary of Significant Work for the day Today I create my own artwork print template and listing index for later preference. All this week and last week artwork have been synchronized and being added to my draft print template and index listing. The index listing is under flash format (.SWF)
The order placement for today : • Silibin Flour Mills (65mm X 70mm) • S.M.N. Foods (M) Sdn. Bhd. (65mm X 70mm) • Syarikat Salmi Hj. Tahmin Sdn. Bhd. (65mm X 70mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 28 Date 21 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Z.N.S. Sepakat Enterprise 10.00 11.00 Designing for Z.N.S. Sepakat Enterprise 11.00 12.00 Printing artwork for evaluation 12.00 1.00 Designing for Diamond Trading Co. 1.00 2.00 Rest & designing for Diamond Trading Co. 2.00 3.00 Repairing artwork 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork & return home
Summary of Significant Work for the day After all artwork been evaluated, the manager wants me to repair some of my artwork. Most of her comment basically about how to make the product appearance more interesting and desirable. The product must been clean, clear and natural. That’s mean, no effect should been apply to the product such as border or stroke line. Then the background must be plain and associate with the product main theme. Overall all the design are good and she like it a lot, but some company does want any fancy design as they want simple and less colorful. So, nothing we can do about it accept to follow their desire as they are the customer and buyer.
The order placement for today : • Z.N.S. Sepakat Enterprise (50mm X 35mm) • Diamond Trading Co. (50mm X 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 29 Date 22 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing artwork 11.00 12.00 Designing for South Pacific Trading Co. 12.00 1.00 Designing for South Pacific Trading Co. 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Repairing artwork 3.00 4.00 Designing for Impiana Rasa Enterprise 4.00 5.00 Designing for Impiana Rasa Enterprise Return home
Summary of Significant Work for the day Most of the day, my task is about repairing the evaluated artwork. After the artwork been repaired. It will be print with its final form (product on top with its dimension & description below it, as what it will look in the magazine) and it will be compiled with its order form. Then I will give it to En. Khalid as he then will deliver it to their respective office for their conformation of their product design.
The order placement for today : • South Pacific Trading Co. (65mm X 70mm) • Impiana Rasa Enterprise (50mm X 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 5 Day 30 Date 23 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Scanning source from VSnack 10.00 11.00 Designing for Pertubuhan Peladang Kawasan Hutan Melintang 11.00 12.00 Designing for Pertubuhan Peladang Kawasan Hutan Melintang 12.00 1.00 Repairing artwork 1.00 2.00 Repairing artwork & return home. 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Today is the 30 day of my 10 week industrial training. It’s already been one month since I’m start working with this company. So I decided to start my practical report and asking the manager for the company profile. So it could be added to section one (company profile) of my practical report.
The order placement for today : • Pertubuhan Peladang Kawasan Hutan Melintang (50mm x 35mm)
Software use : • Adobe Illustrator CS 11.0 • Adobe Photoshop CS2 • MiraScan6
Hardware use : • 8x DVDRW • BenQ Scanner
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 31 Date 25 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for PCK Processing & Marketing Enterprise 10.00 11.00 Designing for PCK Processing & Marketing Enterprise 11.00 12.00 Designing for Setia Selama Enterprise 12.00 1.00 Designing for Setia Selama Enterprise 1.00 2.00 Rest 2.00 3.00 Scanning & designing for Kedai Kek Manis 3.00 4.00 Designing for Kedai Kek Manis 4.00 5.00 Designing for Hotel .& Restoran Seri Kangar & return home
Summary of Significant Work for the day Today I’m redesigning Hotel & Restoran Seri Kangar as I have the source file. The previous design was in the old desktop and since I can’t get any work out from it (because there is no port for USB or Floppy disk for transferring file). So I redesign it.
The order placement for today is: • PCK Processing & Marketing Enterprise (50mm x 50mm) • Setia Selama Enterprise (50mm x 50mm) • Kedai Kek Manis (50mm x 35mm) • Hotel & Restoran Seri Kangar (50mm x 35mm)*Redesign
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 32 Date 26 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing order placement for Ayam Bing Enterprise 10.00 11.00 Designing order placement for Viatak Enterprise 11.00 12.00 Designing order placement for Viatak Enterprise 12.00 1.00 Designing order placement for Restoran FFC 1.00 2.00 Rest 2.00 3.00 Designing order placement for Sunshine Bakery Sdn. Bhd. (Sri Lacoa Foods Sdn. Bhd.) 3.00 4.00 Designing order placement for Sunshine Bakery Sdn. Bhd. (Sri Lacoa Foods Sdn. Bhd.) 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day I’m creating a new design for Restoran FFC today. The previous design was in the old desktop and since I can’t get any work out from it (because there is no port for USB or Floppy disk for transferring file). Because there not much work, so redesign it.
The order placement for today is: • Viatak Enterprise (Quarter Page) • Ayam Bing Enterprise (70mm x 65mm) • Sunshine Bakery Sdn. Bhd. /Sri Lacoa Foods Sdn. Bhd. (50mm x 50mm) • Restoran FFC (50mm x 35mm)*Redesign
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 33 Date 27 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Y. Nazla Enterprise 10.00 11.00 Designing for Y. Nazla Enterprise 11.00 12.00 Designing for Teratai Serasi Enterprise 12.00 1.00 Designing for Teratai Serasi Enterprise 1.00 2.00 Rest & designing for Norimam Enterprise 2.00 3.00 Designing for Norimam Enterprise 3.00 4.00 Designing for Rasa Bestari Enterprise 4.00 5.00 Designing for Rasa Bestari Enterprise & return home.
Summary of Significant Work for the day
The order placement for today is: • Y. Nazla Enterprise (70mm x 65mm) • Teratai Serasi Enterprise (50mm x50mm) • Norimam Enterprise (70mm x 65mm) • Rasa Bestari Enterprise (Quarter Page)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 34 Date 28 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Pusing Ria Sdn. Bhd 10.00 11.00 Designing for Pusing Ria Sdn. Bhd 11.00 12.00 Designing for Academy of Phytobiophysics & Houstic Science Sdn. Bhd. 12.00 1.00 Repairing evaluation artwork 1.00 2.00 Rest 2.00 3.00 Designing for Academy of Phytobiophysics & Houstic Science Sdn. Bhd. 3.00 4.00 Designing for Khim Heong Foodstuffs 4.00 5.00 Designing for Khim Heong Foodstuffs & return home.
Summary of Significant Work for the day
The order placement for today is: • Pusing Ria Sdn. Bhd (Quarter Page) • Academy of Phytobiophysics & Houstic Science Sdn. Bhd. (Full Page) • Khim Heong Foodstuffs (Full Page)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 35 Date 29 Feb 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Dindings Poultry Processing Sdn. Bhd 10.00 11.00 Designing for Dindings Poultry Processing Sdn. Bhd 11.00 12.00 Designing for Perusahaan Makanan AL Din (Pending) 12.00 1.00 Repairing artwork 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Redesign VAV Catering 3.00 4.00 Redesign VAV Catering 4.00 5.00 Redesign VAV Catering & return home.
Summary of Significant Work for the day The manager doesn’t want to give me any more new task as she wants me to do some research on design by learning from other work. She wants me to be more creative and innovative in designing. She gives me a collection of and advertisement in form of booklet, flyers and catalog for me to revise. Not to completely copy their ideas, but just for reference and ideas for me to think and use it in my work. So for the evening, task, she wants me to redesign my previous work for VAV Catering.
The order placement for today is: • Dindings Poultry Processing Sdn. Bhd. (Full Page) • Perusahaan Makanan AL Din (50mm x 35mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 6 Day 36 Date 1 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing for Perusahaan Makanan Al Din 10.00 11.00 Designing for Perusahaan Makanan Al Din 11.00 12.00 Repairing artwork 12.00 1.00 Repairing artwork 1.00 2.00 Return home 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day
The order placement for today is: • Perusahaan Makanan Al Din (50mm x 35mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 37 Date 3 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Redesign VAV Catering 11.00 12.00 Redesign VAV Catering 12.00 1.00 Redesign VAV Catering 1.00 2.00 Rest 2.00 3.00 Redesign VAV Catering 3.00 4.00 Redesign VAV Catering 4.00 5.00 Printing VAV Catering & return home.
Summary of Significant Work for the day Today there are no new tasks as I’m suppose to finish redesigning VAV catering. After complete designing it and has satisfied my manager with the new one, I’m making a hard copy of it (print) so it could be compile with it’s form.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 38 Date 4 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork for print 10.00 11.00 Repairing artwork for print 11.00 12.00 Repairing artwork for print 12.00 1.00 Repairing artwork for print 1.00 2.00 Rest 2.00 3.00 Repairing & Printing artwork 3.00 4.00 Printing error, analyzing and solving the problems. 4.00 5.00 Return home
Summary of Significant Work for the day There are printing errors today. After I have printed my artwork, I realized all picture are blur and hard to see. It’s seemed that it has a low resolution color. So, I have to adjust it’ color profile and save it in high resolution. This problem probably occurs after I formatting my laptop last weekend and the software that I have install probably not complete.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 39 Date 5 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Printing artwork & compiling form 11.00 12.00 Printing artwork & compiling form 12.00 1.00 Repairing artwork 1.00 2.00 Rest 2.00 3.00 Repairing artwork 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork & return home
Summary of Significant Work for the day Today I’m just printing and compiling my completed artwork with their order form. Then correcting and repairing an artwork that has been evaluated.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 40 Date 6 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Printing artwork 10.00 11.00 Searching Halal Certificate Numbers. 11.00 12.00 Searching Halal Certificate Numbers. 12.00 1.00 Searching Halal Certificate Numbers. 1.00 2.00 Rest 2.00 3.00 Repairing Pertubuhan Peladang Kawasan Hutan Melintang 3.00 4.00 Repairing Pertubuhan Peladang Kawasan Hutan Melintang 4.00 5.00 Printing artwork & compiling form. Return home.
Summary of Significant Work for the day Today my task is to find a Halal Certificate serial numbers in halal listing. This is due to some form doesn’t write their own halal numbers in their order form. Then I have to search thorough all my artwork and write down all the numbers in their listing.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 41 Date 7 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing artwork 11.00 12.00 Repairing artwork 12.00 1.00 Repairing artwork 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Repairing artwork 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork
Summary of Significant Work for the day Repairing and put down the halal numbers in the listing. Then all half page advertisement order that previously has been converted to Rm200 (50mm x 50mm) listing format will be change to Rm250 (70mm x 65mm) format.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 7 Day 42 Date 8 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing artwork 11.00 12.00 Repairing artwork 12.00 1.00 Repairing artwork & return home. 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day All quarter page advertisement order that previously has been converted to Rm150 (50mm x 35mm) listing format will be change to Rm200 (50mm x 50mm) format.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 43 Date 10 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Arrived late because of traffic (10:03 A.M.) 10.00 11.00 Redesign Aromas Enterprise 11.00 12.00 Repairing Aromas Enterprise 12.00 1.00 Colleting & preparing an artwork for printing 1.00 2.00 Rest & updating daily log & week report. 2.00 3.00 Repairing Ayam Bing & Taiping poultry 3.00 4.00 Printing artwork 4.00 5.00 Return home
Summary of Significant Work for the day Repairing & printing artwork. Then compile it with its form.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 44 Date 11 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing & redesign artwork 10.00 11.00 Repairing & redesign artwork 11.00 12.00 Repairing & redesign artwork 12.00 1.00 Repairing & redesign artwork 1.00 2.00 Rest 2.00 3.00 Repairing & redesign artwork 3.00 4.00 Repairing & redesign artwork 4.00 5.00 Repairing & redesign artwork. Return home
Summary of Significant Work for the day Artwork that needs to be repaired are:
• Aromas Enterprise • Ayam Bing (change background color) • Banly • Chop Huat Food • Chop Hock Seng Eng • Kamalriah • Lintang Gemilang • Taiping Poultry • Teratai Serasi
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 45 Date 12 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Designing for Spring Food Supplies Sdn. Bhd 11.00 12.00 Designing for Spring Food Supplies Sdn. Bhd 12.00 1.00 Designing for Syarikat Chip Guan Flour Products Manufacture 1.00 2.00 Rest 2.00 3.00 Designing for Syarikat Chip Guan Flour Products Manufacture 3.00 4.00 Repairing artwork 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day Designing today task
The order placement for today is: • Spring Food Supplies Sdn. Bhd. (50mm x 35mm) • Syarikat Chip Guan Flour Products Manufacture (50mm x 35mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 46 Date 13 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing artwork 11.00 12.00 Designing for Jati Store SPM Jati Enterprise 12.00 1.00 Designing for Jati Store SPM Jati Enterprise 1.00 2.00 Rest 2.00 3.00 Designing for Akimi Enterprise 3.00 4.00 Repairing evaluation artwork 4.00 5.00 Repairing evaluation artwork & return home.
Summary of Significant Work for the day Repairing & redesign evaluation artwork.
The order placement for today is: • Jati Store SPM Jati Enterprise (50mm x 35mm) • Akimi Enterprise (70mm x 65mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 47 Date 14 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing evaluation artwork 10.00 11.00 Continue designing for Akimi Enterprise 11.00 12.00 Designing for Akimi Enterprise 12.00 1.00 Repairing evaluation artwork 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Colleting & preparing an artwork for printing 3.00 4.00 Repairing evaluation artwork 4.00 5.00 Colleting, repairing & preparing an artwork for printing. Return home.
Summary of Significant Work for the day Today I discovered many typing errors in my artwork. After manage and synchronized all my work files, I realize there are some artwork that is finish during last week that not printed yet. In addition, some of profile are differ from its original form. So I have to make a lot of correction. After I have printed all my artwork for evaluation, I’m collecting and sorting all file to be input in a database.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 8 Day 48 Date 15 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Repairing Silibin Flour Mill 11.00 12.00 Repairing Silibin Flour Mill 12.00 1.00 Synchronize work file & return home. 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Repairing and synchronized artwork for database.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 49 Date 17 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Creating a database & synchronize work file 11.00 12.00 Creating a database & synchronize work file 12.00 1.00 Repairing Sri Mandah 1.00 2.00 Rest 2.00 3.00 Repairing Sri Mandah 3.00 4.00 Repairing artwork for printing 4.00 5.00 Synchronize artwork/ work file & return home.
Summary of Significant Work for the day Base on last week data that I have collected, I’m creating a database for further reference and guides. Furthermore, with this database I will help me create a better list in my report.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 50 Date 18 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork & synchronize artwork/ work file 10.00 11.00 Repairing Akimi Ent. 11.00 12.00 Printing artwork & compiling 12.00 1.00 Scanning picture 1.00 2.00 Rest 2.00 3.00 Searching pictures for Akimi Ent. (Pecal & gado) on internet & magazine. 3.00 4.00 Repairing Akimi Ent. 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day The manager wants the Akimi Enterprise to be repaired and try to put a picture of pecal or gadogado. Since there is no such pictures in any of the magazine, I try to search through the internet and manage to found it.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2 • Adobe Photoshop Element 4.0
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 51 Date 19 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Synchronize artwork/ work file for print 10.00 11.00 Synchronize artwork/ work file for print 11.00 12.00 Designing Restoran Nasi Kandar Habib 12.00 1.00 Designing Restoran Nasi Kandar Habib 1.00 2.00 Rest 2.00 3.00 Designing Sin Weng Hoo Trading Sdn. Bhd. 3.00 4.00 Designing Sin Weng Hoo Trading Sdn. Bhd. 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day Repairing & printing artwork. Then compile it with its form.
The order placement for today is: • Restoran Nasi Kandar Habib (50mm x 50mm) • Sin Weng Hoo Trading Sdn. Bhd. (70mm x 65mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 52 Date 20 Mar 2008
Time Work in Progress 8.00 9.00 n/a 9.00 10.00 n/a 10.00 11.00 n/a 11.00 12.00 n/a 12.00 1.00 n/a 1.00 2.00 n/a 2.00 3.00 n/a 3.00 4.00 n/a 4.00 5.00 n/a
Summary of Significant Work for the day Public Holiday – Maulidur rasul
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 53 Date 21 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Designing L.I Enterprise 11.00 12.00 Designing L.I Enterprise 12.00 1.00 Repairing Akimi Ent. 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Repairing Fajar Intan 3.00 4.00 Repairing Semuasuka 4.00 5.00 Repairing Eng Huat MFG Trading & return home
Summary of Significant Work for the day Designing & Repairing artwork.
The order placement for today is: • L.I Enterprise (70mm x 65mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 9 Day 54 Date 22 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Designing AR Homeopathy & Herba 10.00 11.00 Designing AR Homeopathy & Herba 11.00 12.00 Printing artwork & synchronize file 12.00 1.00 Repairing Syarikat Chip Guan Flour 1.00 2.00 Return home 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day Designing & Repairing artwork for evaluation.
The order placement for today is: • AR Homeopathy & Herba (70mm x 65mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 55 Date 24 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing Restoran Nasi Kandar Habib 10.00 11.00 Repairing Sin Weng Hoo Trading Sdn. Bhd. 11.00 12.00 Repairing Sin Weng Hoo Trading Sdn. Bhd. 12.00 1.00 Repairing Sin Weng Hoo Trading Sdn. Bhd. 1.00 2.00 Rest 2.00 3.00 Designing Ayam AA Enterprise Sdn. Bhd. 3.00 4.00 Designing Ayam AA Enterprise Sdn. Bhd. 4.00 5.00 Repairing artwork & return home.
Summary of Significant Work for the day Repairing evaluation artwork.
The order placement for today is: • Ayam AA Enterprise Sdn. Bhd. (50mm x 50mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 56 Date 25 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing artwork 10.00 11.00 Designing Seri Selaseh Enterprise 11.00 12.00 Designing Seri Selaseh Enterprise & artwork evaluation 12.00 1.00 Redesign Restaurant C U Village 1.00 2.00 Rest 2.00 3.00 Redesign Restaurant C U Village 3.00 4.00 Designing second sample of Restaurant C U Village 4.00 5.00 Designing second sample of Restaurant C U Village & Return home.
Summary of Significant Work for the day Today I have to repaired and create a quarter page advertisements for the Restaurant C U Village. This advertisement already been design by the others staff in the graphic department. But since he is not available, and the manager need the design today so she can show it to the client for their product evaluation. So, task is given to me and after repaired it, she wants me to create a second sample so that the client can choose which one is the better.
The order placement for today is: • Seri Selaseh Enterprise (70mm x 65mm) • Restaurant C U Village (Quarter Page Advertisement)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 57 Date 26 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing Seri Selaseh Enterprise 10.00 11.00 Redesign Ayam AA Enterprise Sdn. Bhd. (Poultry sample) 11.00 12.00 Redesign Ayam AA Enterprise Sdn. Bhd. (Frozen food sample) 12.00 1.00 Repairing Ayam AA Enterprise Sdn. Bhd. 1.00 2.00 Rest 2.00 3.00 Designing Yee Lee Trading Co. Sdn. Bhd. 3.00 4.00 Designing Yee Lee Trading Co. Sdn. Bhd. 4.00 5.00 Designing Yee Lee Trading Co. Sdn. Bhd.
Summary of Significant Work for the day Today I have to redesign Ayam AA Enterprise Sdn. Bhd. and create 2 listing design of Rm150.00 format (50mm x 35mm). Both samples will be put under Poultry & Frozen Product category.
The order placement for today is: • Yee Lee Trading Co. Sdn. Bhd. (Half Page)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 58 Date 27 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Compiling form & updating database 10.00 11.00 Repairing Yee Lee Trading Co. Sdn. Bhd. 11.00 12.00 Repairing Ayam AA Enterprise 12.00 1.00 Printing artwork for evaluation 1.00 2.00 Rest 2.00 3.00 Designing Red Leaf Coffee Manufacturing 3.00 4.00 Designing Red Leaf Coffee Manufacturing 4.00 5.00 Repairing Artwork & return home
Summary of Significant Work for the day Most tasks for today are printing artwork for evaluation.
The order placement for today is: • Red Leaf Coffee Manufacturing (50mm 35mm)
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 59 Date 28 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Synchronized files & update database 10.00 11.00 Repairing Seri Selasih Enterprise 11.00 12.00 Repairing Seri Selasih Enterprise 12.00 1.00 Repairing artwork 1.00 2.00 Rest & Friday Prayer 2.00 3.00 Repairing & printing artwork 3.00 4.00 Preparing report 4.00 5.00 Preparing report & return home.
Summary of Significant Work for the day Preparing work report for supervisor’s comment & verification. Repairing artwork & completing unfinish task.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW
Daily Log
Name : Muhammad Harussani Bin Abdul Manap Matric No / Course : 120505010 / Diploma in Multimedia Technology I.C. No : 870907 08 5663 Department : Graphic
Week 10 Day 60 Date 29 Mar 2008
Time Work in Progress 8.00 9.00 Preparing 9.00 10.00 Repairing & printing artwork 10.00 11.00 Repairing & printing artwork 11.00 12.00 Synchronized files & update database 12.00 1.00 Preparing report for evaluation 1.00 2.00 Return home & end of Industrial Training. 2.00 3.00 3.00 4.00 4.00 5.00
Summary of Significant Work for the day For the final day, I’m completing and creating a backup disk for all files and artwork for the company reference. I’m also submitted my daily report for the supervisor’s to check , evaluated and stamp.
Software use : • Adobe Photoshop CS2 • Adobe Illustrator CS2
Hardware use : • 8x DVDRW • BenQ Scanner 4300