g alileo t est r ange 21 march 2007, rome raniero pasquali telespazio spa
TRANSCRIPT
Galileo Test Range 21 March 2007, RomeRaniero PasqualiTelespazio SpA
All rights reserved © 2007, Telespazio
A Contribution to the Development of Satellite Navigation
Gtr is the Italian Permanent Laboratory and Centre of Excellence in Satellite Navigation. Gtr main objectives are to support:
the exploitation of knowledge and expertise in the Satellite Navigation domain (R&D, Universities, SME, Industries),
the validation of Galileo signal and of GNSS terminals and applications,
the innovation in GNSS products, application and services market,
the regulation and standardisation processes of Galileo products and applications in Italy and in Europe,
European and international cooperation in GNSS for technological exchange/transfer, bilateral programmes, R&D, and tech evolution studies.
All rights reserved © 2007, Telespazio
Gtr Phases and Actors
Gtr Fase A
Gtr Fase B
Customers Industrial Consortium
Gtr Fase A KO on July 2005 Feb 07 started Acceptance Tests of the Infrastructure By Mid 07 Starting of Pre-Operational Validation Phase
Gtr Fase B By End 07 Starting of Gtr Phase B By End 09 Validating
All rights reserved © 2007, Telespazio
Architecture of Gtr Fase A
Principal elements are:
GTR Analysis and Control Centre: Control Centre, Orbit, Time & synchronisation facility, Integrity Facility, General purpose Lab, Service and conference facilities, training facilities.
GTR Test Area:a network of Pseudolites generate GNSS signal (GPS in Fase A, GPS and Galileo in Fase B) for testing purposes. In FaseA, two pseudolites are relocable/transportable.
GTR Experimental Area:network of Fiducial Differential GNSS stations around Rome to support perfo experiment.
Sensor Stations: to receive and monitor GTR signals, and available GNSS Signal in Space, including Giove
All rights reserved © 2007, Telespazio
Gtr Fase A
\
Roma
TestArea
Experimental Area
Pseudolites Ntw
Differential Stations Ntw
GTR ACC Centre
All rights reserved © 2007, Telespazio
Gtr Fase B:Main functions and improvements
Fase B shall complete GTR infrastructure as realised in Fase A.
Gtr will provide direct access to the “real Galileo signals”, under fully controlled conditions in a terrestrial Environment and a full fledged Laboratories.
Improving Gtr Control Centre and Labs capabilities . Extending number and capabilities of Pseudolites. Extending number of Differential Stations and of Sensors Stations Extending and maintaining different controlled environments areas
for different applications (including indoor, governmental and innovative applications).
All rights reserved © 2007, Telespazio
www.gtr-italy.eu
All rights reserved © 2007, Telespazio
The Visit of Today
• Overall duration14:30 -> 15:30• Three Groups, leaving this room c.a. 10 minutes of
interval– Group 1 reference person MYSELF– Group 2 Refernce Person ANTONIO SALONICO– Group 3 Reference Person RICCARDO NICOLE’
• Each visit shall last c.a. 30 minutes• Transfer on foot
All rights reserved © 2007, Telespazio
GTR BuildingThe Analysis & Control Centre
1700m1700m2 2 over 3 floors:over 3 floors:
GFGF:Service Room + 6 Offices
1F1F:Control Centre + 4 Offices
2F2F:Laboratories + 4 Offices
All rights reserved © 2007, Telespazio
GTR–CCGTR–CC
GTR–LabGTR–Lab
GTR–TLFGTR–TLF
GTR–OLFGTR–OLF
GTR–ILFGTR–ILF
GTR Analysis & Control CentreGTR Analysis & Control CentreGTR Analysis & Control CentreGTR Analysis & Control Centre
GTR Control Centre GTR Laboratory
IntegrityLaboratory
Facility
SignalGenerator
Facility
GTR TimeLaboratory
Facility
GTRProcessing
Facility
OrbitographyLaboratory
Facility
GTR Elements
All rights reserved © 2007, Telespazio
GTR – Ground Floor
The ReceptionThe Reception
The Conference RoomThe Conference Room
All rights reserved © 2007, Telespazio
Mobile Pseudolite