fy02 annual self-assessment service group 8: maintain roads, parking areas and landscaping
DESCRIPTION
FY02 Annual Self-Assessment Service Group 8: MAINTAIN ROADS, PARKING AREAS and LANDSCAPING. Presented by: Lynn M. Mueller, Chief, Grounds Maintenance & Landscaping Section, PWB James T. Davis, GMLS General Superintendent Stephen H. Reed, Engineering Technician Office of Research Services - PowerPoint PPT PresentationTRANSCRIPT
1
FY02 Annual Self-Assessment Service Group 8:MAINTAIN ROADS, PARKING AREAS MAINTAIN ROADS, PARKING AREAS and LANDSCAPINGand LANDSCAPING
Presented by:
Lynn M. Mueller, Chief, Grounds Maintenance & Landscaping Section, PWBJames T. Davis, GMLS General SuperintendentStephen H. Reed, Engineering Technician
Office of Research ServicesNational Institutes of Health
18 November 2002
2
Table of ContentsTable of ContentsASA Presentation
ASA Template……..……………………….………………………..…….. .5
Customer Perspective……………………….…………………………….. 8Customer Satisfaction …………………….…………………………………….9Customer Segmentation……………………….……………………………….17
Internal Business Process Perspective……………………………….….24Service Group Block Diagram……………………………………………….…26Conclusions from Discrete Services Deployment Flowcharts………………42Process Measures…………………………………………………………… …43
Learning and Growth Perspective……………………………………… .56
Conclusions from Turnover, Sick Leave, Awards, EEO/ER/ADR Data…...65Analysis of Readiness Conclusions……………………………………………66
Financial Perspective……………………………………………………….67Unit Cost………………………………………………………………………… 68Asset Utilization………………………………………………………………….73
Conclusions and Recommendations……………………………………..74Conclusions from FY02 ASA..…………………………………………………75Recommendations………………………………………………………………76
3
GMLS HistoryGMLS History * Serving the NIH Since 1940 * Four Chiefs Over Past 62 Years* Stable, Reliable, Fast Acting Workforce
GMLS MissionGMLS MissionTTo provide a safe, functional and aesthetically pleasing campus grounds environment for all to enjoy.
Directly involved with all 6 1995/2001 Master Plan Goals and related Objectives.
Responsible for that “First Impression”
4
• All NIH Employees• Patients, their Families and Friends• Visitors (consultants, vendors, deliveries,
library users, neighbors, event attendees)• Medical Center Metro Users• Bicyclists and Pedestrians• Contract and Contractor Personnel• Passing Motorists• TV Viewers (NOVA, Documentaries)• Publications
GMLS CustomersGMLS Customers
Everyone who comes on, passes through, or drives by the campus
5
Customer PerspectivePerformance Measure
Customer satisfaction ratings from the ORS Customer Scorecard for each Discrete Service
Customer Value Proposition
Team Leader
DS5: Remove Snow and Ice
DS3: Maintain and Repair Parking Structures
Customer Intimacy Sustain
Ensure a safe, functional and aesthetically pleasing campus grounds environment for NIH employees, patients, visitors and the neighboring community. In addition to general grounds maintenance and landscape construction tasks, GMLS provides assistance for campus special events and support for special requests, provides parking structure cleaning and light repair, provides campus wide pavement repair and maintenance with appropriate signage as well as prompt responses to winter storm emergencies.
Customer segmentation of Discrete Services
DS1: Maintain and Upgrade Campus Landcaping
DS2: Provide Assistance for Campus Special Events and Requests
DS4: Maintain, Upgrade, and Repair Roads, Lots, Walks, and Signage
Product Leadership Harvest
Lynn Mueller, GMLS Section Chief
Operational Excellence Growth
Increase customer satisfaction
Team Members
James T. Davis, GMLS General Supervisor; Stephen H. Reed, GMLS Engineering Technician Theodore E. Youwer, Chief, Office of Administrative Management and Analysis Services, NLM
Performance Objective
Increase understanding of customer base
X
X
6
Minimize unit cost at a defined service level.
Increase understanding of processes.
Performance Objective
Enhance quality of work life for employees in ORS.
Identify methods to measure processes.
Learning and Growth Perspective
Performance Measure
Financial Perspective
Performance Measure
Performance Objective
Increase understanding of customer base
Increase customer satisfaction
Performance Objective
DS1: Analyze the increasing demands on GMLS staff and budget seasonally, over time.
Performance MeasureInternal Business Process Perspective
Complete process maps of Service Group/Discrete Services
Identify and report on process measures for Discrete Services
Maintain & enhance competencies for the future organization.Analysis of Readiness Index
Performance Objective
Awards/Recognition
Contacts/Complaints with EEO/ER/ADR
Sick Leave Usage
Customer segmentation of Discrete Services
Change in Unit Cost for each Discrete Service
Customer PerspectivePerformance Measure
Customer satisfaction ratings from the ORS Customer Scorecard for each Discrete Service
DS2: Pareto analysis on special events requests and required resources
Turnover
Actual assets utilized/planned asset utilization for each Discrete ServiceMaximize utilization of assets.
DS3: Percent of parking garages cleaned by end of each weekend; improve surface maintenance.
DS4: Document increase in demand for special signage over time.
DS5: Improve efficiency and effectiveness of current winter storm support program.
7
5 Discrete Services5 Discrete Services
• Maintain and Enhance Campus Landscape• Provide Assistance for Campus Special
Events and Requests• Maintain Parking Structures• Maintain, Upgrade, and Repair Roads,
Parking Lots and Sidewalks; Provide Appropriate Traffic and Directional Signage
• Remove Snow and Ice
8
Customer PerspectiveCustomer Perspective
9
• Used brief, customized, 5 question general survey with respondent ID and comments
• Randomly selected campus users as respondents
• Results show general overall satisfaction level (6.9 out of 10) with the quality of performance of this Service Group
Customer Satisfaction
10
Customer Survey Questions
1. In general, do you find the NIH campus grounds well cared for? (Grass cut, weeds pulled, litter picked up and flowers and shrubs in good health)
2. Do you find the campus traffic control and informational signs accurate, appropriately located and well maintained?
3. During winter storms do you generally find the NIH roads, sidewalks and building entrances passable and clear of ice and snow?
4. If you drive through or park on the campus, do you generally find the roads and parking lots clean and well maintained?
5. Do you find the parking garages clean?6. Demographic information
11
Customer Survey Results• 300 surveys distributed• 156 returned• 52% return rate• 53 surveys included open-ended comments• Six distribution points:
• Metro to Center Drive• Metro to Natcher Building• Lincoln Drive Bus Shelter across from MLP-8• Building 10/ACRF Parking Garage• Corner of Convent Drive and Lincoln Drive• North Drive at Building 31C
• Overall average was 6.90 out of 10
12
Customer Survey ResultsQuestions 1-5
Survey Results (1 Low - 10 High )
7.06
6.47
6.846.99
7.15
66.26.46.66.8
77.27.4
Grounds Signs Snow Roads ParkingGarages
13
Customer Survey Results
Question 6: Respondent Demographics
119
7
5 20 5 Employees
Contract Employee
Contractors
Visitors
Patients
14
Customer Survey Sample Comments• “I am proud of the NIH campus and first impression
visitors get from seeing the grounds – information signs accurate – maybe make some a little easier to follow; ice and snow removal has improved over the years, thanks; parking lots – still lots of construction.”
• “The weeds are bad between Building 31 and B1 walkway to back of B1.”
• “Job well done.”• “The landscape has been beautiful this year. More
flowers please.”• “I love your bulb show in the spring.”• “I enjoy all the bird habitat.”
15
Customer Survey Results• “Great job on grounds. I indicated low score on ice
because I fell and broke some bones in Jan - ice storm because a crosswalk was icy @ 8 am.”
• “I love the flowers. Makes the environment more friendly.”
• “Grounds are horrible. Mostly weeds especially by Bldg. 10. Trees untrimmed and bushes uncared for.”
• “The landscape is beautifully maintained. I would like to personally thank the company that maintains the grounds! Job well done!!
• “The only comment I have is the campus is well maintained and I enjoy eating lunch on the picnic tables and taking in the beauty of the campus. Thank you for all you do.”
16
Customer Survey Results
• Many commented on non-GMLS responsibilities• Parking Issues• Trash Receptacles• Building Numbers• Personal Identification • Lighting• GMLS passed those comments on to the
responsible groups• 5 negative comments about the landscape
• Weeds (herbicides no longer used in shrub beds)
17
Customer Segmentation
• Customer population for this Service Group is not easy to quantify:• For “maintain landscaping” -- Anyone traversing or
driving through or by the campus• For “special events” – Group sponsoring an event• For “parking structures” -- Anyone who drives and
parks at any of the 5 MLP Garages• For “snow and ice” – Any pedestrian or vehicle on
campus during winter storms
• We think about our customers in terms of the services we deliver.
18
Customer Segmentation – DS 1
050
100150200250300350
TOTAL NUMBEROF ACRES
TURF
SHRUB
PAVEMENT
BUILDINGS
19
Customer Segmentation – DS 2
NUMBER OF REQUESTS
12
87
8IC
ORS
R&W
COMMUNITY
20
Customer Segmentation – DS 2
2124
26
3235
0
5
10
15
20
25
30
35
1998 1999 2000 2001 2002
No. of IC, R&W, ORS, Community Special Events
21
Customer Segmentation – DS 3
No. of Parking Spaces(total of 4,802)
880
379
1,526464
1,553 MLP-6
MLP-7
MLP-8
NATCHER
ACRF/10
22
Customer Segmentation – DS 4
PAVEMENT MAINTENANCE AREAS89.1 acres
27.2
40.1
10.29.1 1.51
ROADS
PARKINGLOTSSIDEWALKS
DOCKS
PATIOS
BuildingEntrances
23
Customer Segmentation – DS 5
Acres of Area to Clean
27.5
40.2
10.3
9.1 11
Roadways
Parking Lots
Sidewalks
ServiceDocksPatios
347 BuildingEntrances
24
Internal Business Process PerspectiveInternal Business Process Perspective
25
Process Mapping
• The five Discrete Services in our Service Group cover 100% of the mission and responsibilities of the Grounds Maintenance and Landscaping Section
• All GMLS Discrete Services impact the 6 Master Plan Goals
26
Facility Manager IC Requestor
Service GroupMaintain Roads, ParkingAreas and Landscaping
Block Diagram for Maintain Roads, Parking Areas and Landscaping
27
DS 1 - Maintain and Enhance Campus Landscaping
28
Deployment Flow Chart – DS 1Maintain and Enhance Campus Landscaping
Maintain and Enhance Campus Landscaping
DESGMLS ContractorCustomer
Externallygenerated work
orders
Internallygenerated work
orders
Investigated byGMLS
POcreatesGMLS
work order
Is there aproblem?
Can GMLSresolve it?
YES
ProjectOfficercontact
requestor forclarification
NO
Can GMLScontractorresolve it?
NO
GMLSPO
assignswork
Contractorschedules andcompletes work
Resolvedon thespot
YES YES
Are materialsavailable?
Supervisorschedules
work
PO ordersmaterials
YES NO
Receiveand storematerials
Workcompleted
PO inspects workand closes out work
orders
Requiresanother
DESsection
NOYES
Transferrequest to
appropriateDES
section
DES sectionreceives request
29
DS 2 - Provide Assistance for Campus Special Events and Requests
30
Deployment Flow Chart – DS 2Provide Assistance for Campus Special Events and Requests
Provide Assistance for Campus Special Events and Requests
GMLS Project OfficerGMLS Superintendent -
Roads & GroundsGMLS General In-
House StaffOffice of the Chief
Initial request isreceived
Is anInvestigator
needed?
Are specialmaterialsneeded?
Is contractassistanceneeded?
Issue Work Order
Dispatch theappropriate crew
Visit site and/ortalk to requestor
Procure materials
Contractorperforms work
needed
Perform work
Follow up - morning ofthe event
Clean up followingthe event
Final inspection/closeout work order
Schedule contractwork
Schedule Event -Date/time/place
NO
NO
NO
YES
YES
YES
31
DS 3 - Maintain and Repair (minor) Parking Structures
32
Deployment Flow Chart – DS 3Maintain and Repair (minor) Parking Structures
Maintain and Repair Parking Structures
Contractor Facility MangerGMLS
Establishmaintenance visitschedule for year
Complete sweep,sand and leaf
removal and litterpick-up
Fill out work order
Completerequested task
Inspect garages beforeand after each
scheduled workweekend
Workcompleted?
Notify contractor orGMLS supervisor
Respondimmediately andcorrects problem
Receive specialrequest
Notify GMLS
NO
YES
Special RequestReceived
Can repairs bedone in house?
YES
Forward request tocontractor
NO
Continue regularmaintenance
GMLS respondsand corrects
problem
33
DS 4 - Maintain, Upgrade and Repair Roads, Parking Lots and Sidewalks
34
Deployment Flow Chart – DS 4Maintain, Upgrade and Repair Roads, Parking Lots and Sidewalks
Maintain, Upgrade and Repair Roads, Parking Lots and Sidewalks
Contractor CustomerGMLS
Monitor pavementconditions
Submit special request(broken glass, dead
animal, etc.)
Problemfound?
Potholes, chipsetc. need repair;
GMLS will repair?
Internal staffcompletes work
Inspect completedwork
Is there aproblem withcompleted
work?
Notify contractor orGMLS supervisor
Continue monitoringpavement conditions
Respond immediatelyto correct problem
Contractorcompletes work
YES
YES
YES
NO
NO
NO
GMLS correctsproblem
35
DS 5 - Remove Snow and Ice
36
Deployment Flow Chart – DS 5Remove Snow and Ice
Remove Snow and Ice
Volunteers Contractor Facility Manager CustomerGMLS Project Officer
Advertise forvolunteers
Sign up asvolunteer
Verify that contractinstrument is in
place
Equipmentprepared for
winter?
Hold Pre-seasonmeeting with snow
and ice workersand assign
responsibilities
Distribute ice meltto specified bldg.
entrances
Complete regularinspection andmaintenance of
equipment
Repair orpurchase
equipment
Is there aninventory of
materials andsupplies?
Maintaininventory
ofmaterials
andsupplies
Procurenecessarymaterials
andsupplies
Monitor weather
B
37
Deployment Flow Chart – DS 5Remove Snow and Ice (con’t.)
Remove Snow and Ice
CustomerFacility ManagerContractorVolunteersGMLS Project Officer
B
Stormpredicted?
Communicatewith Contractor
Mobilize GMLSworkforce
Crew sizesufficient forthis effort?
Call involunteers
Contractortask?
GMLStask?
Callcontractor
Completenecessary snowand ice removal
C
YES
NO
NO YES
NO
YES
Completenecessary snowand ice removal
38
Deployment Flow Chart – DS 5Remove Snow and Ice (con’t.)
Remove Snow and Ice
CustomerFacility ManagerContractorVolunteersGMLS Project
Officer
C
Receive notice ofproblem
GMLS task?
Fixesproblem
D
Problem noted,contact facility
manager
Receives ofproblem
Contactscontractor
Contractor fixesproblem
Can facilitymanager fix the
problem?
FacilityManager
fixesproblem
Forwardsnotice ofproblemto GMLS
Is problemfixed?
YES NO
YES NO
39
Deployment Flow Chart – DS 5Remove Snow and Ice (con’t.)
Remove Snow and Ice
CustomerFacility ManagerContractorVolunteersGMLS Project
Officer
D
Completein progressinspection
Contactcontractoror GMLS
supervisor
YES NO
Problem fixed?
GMLS fixesproblem
Contractor fixesproblem
Complete end ofstorm inspection
GMLS fixesproblem
Contractor fixesproblem
Problem fixed?
Update contractand other records
as necessary
Continue tomonitor weather
NONO
YES
40
DS 4 - Maintain, Upgrade and Repair Roads, Parking Lots and Sidewalks
41
Deployment Flow Chart – Proposed DS 6
Provide and Install Traffic Control SignageProvide and Install Traffic Control Signage
Contractor Police Facility Manages/DESGMLS
Monitor Campussigns
Problem Found
Replacementsign needed?
New signneeded?
GMLS repairssign
Designinformational
sign
Install sign
Complete signageinspection
Submit specialrequest for signage
Submit specialrequest for signage
NO
Are materialsavailable?
Forward to signcontractor
Contractor completessign and forwards to
GMLS
YES
YES
NO
YES NO
42
• Deployment flowcharts were drawn for Landscaping (Snow Removal), Special Events, Garage Cleaning, Pavement Maintenance and Signage.
• Review and analysis of the flowcharts show that GMLS is efficient; i.e., limited handoffs, minimum paperwork, quick (usually same day) responses.
• Responses to customers’ concerns often go directly from receptionist to craftsman.
• MS2000 Work Order Recording System allows GMLS to record work categories against man hours.
• Data from this system will be part of ’03 ASA analysis.
Conclusions from Discrete Services’ Deployment Flowcharts
43
Process Measures
• DS1 (Landscaping): Analyze increasing demands on GMLS staff and budget over time
• DS2 (Special Events/Requests): Analysis on special events/requests and required resources
• DS3 (Parking Garages): Percent of parking garages cleaned by end of each weekend
• DS4 (Roads and Signage): Document increase in demand of signage over time
• DS 5 (Snow and Ice): Improve efficiency and effectiveness of current winter storm support program
44
Process MeasuresDS 1 (Landscaping):
Most routine work (25% of GMLS budget) is handled under performance-based service contracts.
• 17% of work (new plantings, renovations and specialized work) is done by GMLS staff
• Demand on GMLS staff time has increased:• Renovations to upgrade aging foundation landscapes.• Removals of sick and dead wild animals increase annually. • Provide more flowers and landscaped passive areas.• Demands to remove cigarette butts and litter increase yearly.• Design/install new landscapes for smaller projects not provided
by General Contractor (budget reductions).• Comply with historical, archeological and environmental
guidelines, regulations and policies.
45
Process Measures – DS 1
ADHERENCE TO TREE POLICY
0
100
200
300
400
500
600
1998 1999 2000 2001 2002
Trees Planted
Trees Lost
TreesTransplanted
Net Gain/Loss
46
Process Measures
DS2 (Special Events and Special Requests): • 100% of this Discrete Service is handled by GMLS
staff.• Security requests increased 900% from 2000 to ’01.
Requests have remained at 2001 level in 2002.• Response to spills steady at about 18/year.• Utility failure excavations greatly vary year to year.• Special Events
• Average about 28/year
• 2002: 35 to date; 8 Community, 8 ORS, 7 R&W, 12 IC
47
Process Measures – DS 2
Total Staff Hours
5%
58%
36%
1%
Police Support
Underground Utilities
Special Events
Other
48
Process Measures – DS 2
Number of Responses
9%
26%
46%
19%
Police Support
Underground Utilities
Special Events
Other
49
Process Measures
DS3 (Parking Garages): • GMLS responsible for 6 wks. following 9/11 to
clean until contractor gained security clearance.• GMLS covered 7 weeks cleaning period between
last contractor changeover.• GMLS must oversee contractor work during off-
hours. Security requirement.• Two planned garages will further stress GMLS
off-hour contractor supervision requirements.• GMLS often called to remove abandoned
contractor debris and provide clean up services.
50
Process Measures – DS 3
Percent of Garages Cleaned Each Weekend
9293949596979899
100101
51
Process MeasuresDS4 (Roads and Signage): • 100% of new construction of roads/sidewalks not
associated with building projects is contracted through GMLS.
• GMLS provides immediate response to pavement failures and parking changes.
• GMLS procures and installs 100% of campus traffic and directional signs.
• GMLS designs most of the directional signs.• GMLS can produce specialty signs for almost
immediate placement. • GMLS attempts to be the ‘Sign Police’ to limit the
proliferation of signs on campus.
52
COST OF MATERIALS FOR SIGNAGE
$0
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
$45,000
$50,000
1998 1999 2000 2001 2002
YEAR
CO
ST
53
0
100
200
300
400
500
600
700
800
900
NO. O
F SI
GNS
NO. OF NEW SIGNS 267 478 534 799 633
NO. OF SIGNS REMOVED 17 29 23 38 30
1998 1999 2000 2001 2002
NUMBER OF NEW AND REMOVED SIGNS PER YEAR
54
Process Measures
DS 5: (Remove Ice and Snow)• About 50 percent is contracted out via purchase
order; about 50 percent is done by GMLS.• Contractor responsible for all labor intensive areas.• GMLS responsible for all mechanical removals.• Numbers & types of storms vary greatly year to year.• Cannot conclude past two mild winters are a long
term trend. • Did not institute new volunteer program last winter.
Volunteer help not needed.• 2001 Remove Ice and Snow ASA concluded GMLS
compares very favorably to other like facilities.
55
Process Measures – DS 5
Contractor Cost
$8,177
$61,385
$118,242
$63,107
$27,720
$0
$20,000
$40,000
$60,000
$80,000
$100,000
$120,000
$140,000
'97-'98 98-'99 99-'00 00-'01 01-'02
56
Learning and Growth PerspectiveLearning and Growth Perspective
57
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
12 16 21 30 27 20 42 13 41 3 24 23 7 18 1 2 10 11 17 31 26 25 40 28 37 29 33 39 5 32 36 38 4 8 9 14 15 19 34 35 43
Service Group Turnover Rate (Oct 2001 - June 2002)
Service Group Number
Tu
rno
ve
r R
ate
58
0
10
20
30
40
50
60
70
80
14 3 9 31 8 17 43 38 36 33 41 12 30 32 28 18 29 21 39 20 16 24 27 40 35 5 23 42 19 4 34 15 37 25 26 1 2 10 11 13 7
Average Hours of Sick Leave Used(Oct 2001 - June 2002)
Service Group Number
Av
era
ge
Ho
urs
59
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
9 43 1 2 10 11 40 42 7 41 12 4 5 28 39 35 32 33 8 15 36 38 34 37 29 17 14 31 16 30 19 18 13 20 21 3 24 26 25 23 27
Average Number of Awards Received(Oct 2001 - June 2002)
Service Group Number
Av
era
ge
nu
mb
er
60
Average Number of EEO Complaints (Oct 2001 - June 2002)
Service Group Number
A
ve
rag
e N
um
be
r
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
20 7 26 38 36 1 2 3 4 5 8 9 10 11 12 13 14 15 16 17 18 19 21 23 25 27 28 29 30 31 32 33 34 35 37 39 40 41 42 43
61
0.00
0.05
0.10
0.15
0.20
0.25
0.30
7 23 16 3 31 13 9 20 25 26 17 36 38 37 29 32 39 1 2 4 8 10 11 12 14 15 18 19 21 27 28 30 33 34 35 40 41 42 43
Average Number of ER Cases (Oct 2001 - June 2002)
Service Group Number
Av
era
ge
Nu
mb
er
62
0.00
0.05
0.10
0.15
0.20
0.25
7 9 30 24 33 34 3 23 26 25 5 20 21 31 29 39 28 32 36 16 38 1 2 4 8 10 11 12 13 14 15 17 18 19 27 35 37 40 41 42 43
Average Number of ADR Cases (Oct 2001 - June 2002)
Service Group Number
Av
era
ge
Nu
mb
er
63
Learning and Growth Data Table
Over a week sick leave per employee
About 1 award for every employee
No Turnover 1 EEO case out of 17 employees
5245 4 0 0.00 164 41 2 0.50 1 0.25 0 0.00 0 0.0052453 5 0 0.00 196 39 6 1.20 0 0.00 0 0.00 0 0.0052454 1 0 0.00 64 64 1 1.00 0 0.00 0 0.00 0 0.0052455 7 0 0.00 317 48 6 0.90 0 0.00 0 0.00 0 0.00
Service Group 8
Total17 0 0.00 740 44 15 0.90 1 0.06 0 0.00 0 0.00
No ER and ADR cases
64
Summary of Service Group 8 Learning and Growth Data
• No turnover • Over a week sick leave used per employee• About one award for every employee• No EEO complaints, no ER or ADR cases
out of 17 employees
65
• Relatively high level of Sick Leave use justified by employees requesting Sick Leave following all night winter storm duty.
• Limited Award Pool calls for careful determination of outstanding contributions (On-The-Spot Awards) over the year and year end Performance Awards.
Conclusions from Turnover, Sick Leave, Awards, EEO/ER/ADR Data
66
• GMLS currently has the resources to meet all routine demands and most emergency requests.
• Qualified 8(a) contractors on hand.• Budget allows procurement of necessary equipment.• GMLS provides immediate responses to DPS
security and emergency environmental requests.• 9/11 emergency response highlighted potential
weakness for prolonged (months) or multi-faceted responses.
• Due to the mild ’01-’02 winter, Remove Ice and Snow overtime was at a minimum. Majority of OT went to Security. A normal winter OT could have severely compromised the budget.
Analysis of Readiness Conclusions
67
Financial PerspectiveFinancial Perspective
68
• DS1: (Landscaping)• Unit: Acre (461.4)
• 182 NIH acres of lawn and shrubs• 279.4 NIHAC acres of fine lawn and shrub beds
• GMLS: $590K/17% of the Budget• Contractors: $834K/23% of the Budget• $3,086.00/acre/year (people, equipment, supplies)• LMI 1996 Benchmark: $2,857.00
• +/- $3,217.00 w/ 2% inflation factor since 1996
Unit Cost Measures
69
• DS2: (Special Events and Requests)• Unit: 1 avg. request; $1,105.00/event (26 hr.x $42.50)• Average 28 events/yr. = $30,940.00 • Purchase @ 4 new picnic tables/year = $1,200.00• Potential of up to 68 Special Events per year.
Unit Cost Measures
70
• DS3: (MLP-Garage Cleaning)• Unit: Cleaning cost per parking space (4,802 spaces)• GMLS: $125K/4% of the Budget• Contractors: $235K/7% of the Budget • $74.97/parking space/year (people, equipment,
supplies) or $1.44/space/52 weekly cleaning • 48 contractor cleanings scheduled per year.• GMLS cleans other 4 weekends.• 8(a) contractor unit price steady from 2000 through
2003.
Unit Cost Measures
71
• DS4: (Pavement Maintenance & Signs)• Unit: Paved Acre (96.9 total)
• 89.1 NIH acres• 7.8 NIHAC acres
• GMLS: $380K/11% of the Budget• Contractors: $700K/20% of the Budget• $11,145.00/pavement acre/year• New contract under negotiations: Contractor Unit
Prices expected to return to 1999 units.• Higher level of maintenance will be provided
• Lower unit prices
• Negotiated 8(a) contract.
Unit Cost Measures
72
• DS5: (Remove Ice and Snow; FY ’02)• Unit: Per Average Storm (past 5 years)(13.2/yr)• 120 GMLS man hours for Average 8 hour Storm
• GMLS: $42.50/man hour = $5,100.00• Contractor: $6,130.00/8 hour response unit• Materials Costs (sand/salt/de-icers): $2,430.00
• $13,660.00/storm (GMLS and contractor combined)• Contractor Unit Cost will remain steady through 2003.• “Volunteer” costs paid by their own Section. • Material costs can vary depending upon storm type.
Unit Cost Measures
73
• GMLS facilities adequate to house contractor and GMLS operations.
• GMLS general and specialized equipment able to meet routine and most emergency calls for action.
• Some specialized equipment idle time ‘excessive’ due to seasonality or specific use of equipment, i.e., snow removal, utility excavations, spill responses, tree transplanting, leaf vacuum
• Emergency response equipment must be ready to go
• Employee resources are 100% utilized because most employees can do just about any job.
• Employee cross-training required since 1972.
Asset Utilization Measures
74
Conclusions and RecommendationsConclusions and Recommendations
75
Conclusions from FY02 ASA• GMLS relied upon for overall campus beautification.• GMLS provides specialized services not covered by
GMLS contractors or by other campus contractors.• GMLS “puts out the fires” and “fills in the cracks”• GMLS able to quickly provide services that would take time
to procure through credit cards, purchase orders or contract, i.e., immediate plant transplanting or pruning, spill clean ups, dead animal removal, pothole & trip hazards, blowing litter
• 5 of 6 GMLS contracts are negotiated 8(a). • 8(a) generally higher cost than competitive open bid
76
• Make “Provide Signage” a discrete service in ’03.• Reduce the number of repetitive traffic control signs.
• In cooperation with the NIH Police
• Initiate snow removal Volunteer Response Teams. • Establish during ’02-’03 season
• Initiate a campus wide “Litter Reduction Campaign.”• Campaign initiated by GMLS with PWB oversight• Encourage No Smoking on the grounds (Director’s decision)
• Hold contractors responsible for repairing their damage to the landscape.
• Inform Project Officer in charge of contractor• Encourage stronger contract language
• Hold contractors responsible for full cleanup of staging and material storage areas.
• P.O.’s must conduct final inspections of all work areas
Recommendations