FY 2020-2025 Proposed Highway Improvement Program HIGHWAY REGION 4 DISTRICT 6 TABLE OF CONTENTS Program Summary State Roadway Project Descriptions Local Roadway Project Descriptions MAPS District 6 Springfield and Vicinity

Upload: others

Post on 13-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

FY 2020-2025 Proposed Highway

Improvement Program

HIGHWAY REGION 4 DISTRICT 6 TABLE OF CONTENTS

Program Summary

State Roadway Project Descriptions

Local Roadway Project Descriptions

MAPS

District 6

Springfield and Vicinity

Page 2: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

6-i

TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION

REGION 4, DISTRICT 6, SPRINGFIELD Overview Highway District 6 encompasses 15 counties in west central Illinois and includes the cities of Springfield, Quincy, Jacksonville, Lincoln and Taylorville, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 6 consists of 2,077 miles of highways and 847 bridges, supporting 11.1 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.24 billion will be provided during FY 2020-2025 for improvements to state highways in District 6. The following table summarizes anticipated accomplishments on the state highway system in District 6 during this time frame.

FY 2020-2025 Programmed Improvements

Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include:

• Interstate 55 from 0.8 mile north of Illinois 16 to 0.7 mile south of County Highway 17 at Farmersville in Montgomery County. Resurfacing on 21.2 miles, a new bridge deck, bridge deck overlays, bridge raising, bridge repair, bridge joint replace/repair, bridge removal, ditch cleaning and slope wall repair are programmed during FY 2020-2025 at a cost of $49.8 million. Of this total,

Roadway Maintenance Interstate NHS (miles) 50 Non-Interstate NHS (miles) 151 Non-NHS Marked (miles) 238 Non-NHS Unmarked (miles) 27 Bridges Interstate NHS (Sq. Ft.) 284,922 Non-Interstate NHS (Sq. Ft.) 192,763 Non-NHS Marked (Sq. Ft.) 137,262 Non-NHS Unmarked (Sq. Ft.) 197,981 Safety/System Modernization Interstate NHS (miles) 0 Non-Interstate NHS (miles) 0 Non-NHS Marked (miles) 0 Non-NHS Unmarked (miles) 0 Safety Locations (number) 42 System Expansion Interstate NHS (miles) 6 Non-Interstate NHS (miles) 4 Non-NHS Marked (miles) 6 Non-NHS Unmarked (miles) 0 New Bridges (Sq. Ft.) 2,070 Preservation

Roads & Bridges ($M) 107.554

Page 3: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

6-ii

resurfacing on 9.3 miles, a new bridge deck, bridge raising, bridge removal, slope wall repair, bridge deck overlay, bridge repair and bridge joint replace/repair are programmed in FY 2020 at a cost of $22.9 million.

• Interstate 55 from south of the Sangamon/Montgomery County line to 0.2 mile north of Lake Springfield Bridge in Sangamon County. Resurfacing on 19.3 miles, bridge deck overlay, bridge joint replace/repair, bridge repair and bridge approach roadway are programmed during FY 2020-2025 at a cost of $40.4 million. Of this total, resurfacing on 7.6 miles and bridge approach roadway are programmed in FY 2020 at a cost of $18.9 million.

• Interstate 55 0.5 mile north of Illinois 54/Sangamon Avenue in Springfield to 2.7 miles south of Illinois 123 in Williamsville. Additional lanes and reconstruction on 7.8 miles, a bridge replacement, bridge widening, bridge new deck, engineering for contract plans, utility adjustments, land acquisition and construction engineering are programmed during FY 2021-2025 at a cost of $137.4 million.

• Interstate 55/Interstate 55 Business from 1.3 miles south of Interstate 55 Business to 0.3 mile north of Illinois 10 west of Lincoln. Resurfacing on 10.7 miles (including ramp repair), bridge joint replace/repair, bridge deck repairs, bridge repair and slope wall repair are programmed in FY 2020 at a cost of $20.7 million. Also included are resurfacing and new shoulders on 1 mile on Interstate 55 Business from east of Old Route 66 to south of 1056th Avenue south of Lincoln that are programmed in FY 2020 at a cost of $1.1 million.

• Interstate 72 over Wabash Avenue and over Northern Southern Railroad 1.2 miles east of Wabash Avenue Interchange in Springfield in Sangamon County. A new bridge deck, slope wall repair and bridge painting are programmed during FY 2020 at a cost of $7.5 million.

• Interstate 155 from 2 miles south of US 136 to Tazewell County line in Logan County. Resurfacing on 4.6 miles (including ramp repair), shoulder repair and bridge repair, bridge deck repairs, bridge joint replace/repair and a bridge deck overlay on structures at US 136 and Emden Road are programmed in FY 2020 at a cost of $8.9 million.

• US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction on 1.4 miles, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $65.9 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $1.3 million. This project has been approved for Illinois Special Bridge Program funding.

• Illinois 57 (3rd Street) from Maine Street in Quincy to south of Marblehead and York Street from 3rd Street to west of 4th Street, including structures at Payson Avenue and Curtis Creek in Adams County. Resurfacing on 7.2 miles, ADA improvements, a parking improvement, new bridge decks, bridge approach roadway, bridge repair, bridge substructure rehabilitation, slope wall repair and scour mitigation are programmed in FY 2020 at a cost of $6.4 million.

• Illinois 100/Illinois 106 over the Illinois River Bridge at Florence. A bridge replacement, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $84.2 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $4.6 million. This project has been approved for Illinois Special Bridge Program funding.

Page 4: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$164,000 MADISON CO LINE TO 0.8 MI N OF ILL 16

1CRACK & JOINT SEALING MACOUPINMONTGOMERY

I 55

PRESERVATION - PAVEMENTS

2020$22,450,000 0.8 MI N OF ILL 16 TO 0.6 MI N OF ILL 108Miles = 9.27

9STANDARD OVERLAY

BRIDGE NEW DECK

BRIDGE RAISING

BRIDGE REMOVAL/DEMOLITION

SLOPEWALL REPAIR

MONTGOMERYI 55

Roadway Information Miles AADT Truck Pct NHS

28,820 32.2 Y 7.39

Structure Information Str Number AADT Truck Pct NHS

250 N30680044

14,450 Y320680048

14,450 Y320680049

REHABILITATION - PAVEMENTS

2020$430,000 UNDER TR 235 (N 13TH AVE) & TR 48 (E 2ND RD) 1.1 MI N & 2.3 MI N OF ILL 16 & UNDER ILL 108

1BRIDGE DECK OVERLAY

BRIDGE REPAIR

BRIDGE JOINT REPLACE/REPAIR

MONTGOMERYI 55

PRESERVATION - BRIDGES

2021-2025$12,100,000 0.6 MI N OF ILL 108 TO 1.3 MI S OF WAGGONERMiles = 6.71

6DESIGNED OVERLAY

BRIDGE JOINT REPLACE/REPAIR

DITCH CLEANING

MONTGOMERYI 55

Roadway Information Miles AADT Truck Pct NHS

29,548 31.1 Y 5.03

REHABILITATION - PAVEMENTS

6 - 1

Page 5: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$13,600,000 1.3 MI S OF WAGGONER TO 0.7 MI S OF CH 17 AT FARMERSVILLEMiles = 5.21

8DESIGNED OVERLAY MONTGOMERYI 55

Roadway Information Miles AADT Truck Pct NHS

31,100 32.0 Y 5.21

REHABILITATION - PAVEMENTS

2021-2025$1,200,000 UNDER CH 16 E OF WAGGONER AVE & UNDER TR 37 S OF FARMERSVILLE

1BRIDGE DECK OVERLAY MONTGOMERYI 55

PRESERVATION - BRIDGES

2021-2025$2,100,000 UNDER CH 16 E OF WAGGONER AVE

1BRIDGE NEW DECK MONTGOMERYI 55

Structure Information Str Number AADT Truck Pct NHS

200 N180680041

REHABILITATION - BRIDGES

2021-2025$3,600,000 UNDER CH 17

1BRIDGE NEW DECK MONTGOMERYI 55

Structure Information Str Number AADT Truck Pct NHS

4,250 N120680037

REHABILITATION - BRIDGES

2021-2025$2,100,000 UNDER TR 17

1BRIDGE NEW DECK

BRIDGE REPAIR

MONTGOMERYI 55

Structure Information Str Number AADT Truck Pct NHS

50 N600680036

REHABILITATION - BRIDGES

6 - 2

Page 6: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,100,000 UNDER TR 7

1BRIDGE NEW DECK MONTGOMERYI 55

Structure Information Str Number AADT Truck Pct NHS

75 N210680035

REHABILITATION - BRIDGES

2021-2025$9,000,000 S OF SANGAMON / MONTGOMERY CO LINE TO BRUSH CREEK 0.7 MI S OF ILL 104Miles = 5.44

1DESIGNED OVERLAY SANGAMONMONTGOMERY

I 55

Roadway Information Miles AADT Truck Pct NHS

32,200 28.1 Y 0.03

32,744 30.2 Y 3.86

REHABILITATION - PAVEMENTS

2021-2025$10,200,000 BRUSH CREEK 0.7 MI S OF ILL 104 TO N OF GLENARM INTCHGMiles = 6.23

1DESIGNED OVERLAY SANGAMONI 55

Roadway Information Miles AADT Truck Pct NHS

38,032 26.0 Y 2.98

REHABILITATION - PAVEMENTS

2021-2025$2,300,000 OVER ILL 104 INTCHG & UNDER HORSE FARM RD 1.8 MI N OF ILL 104

1BRIDGE DECK OVERLAY

BRIDGE JOINT REPLACE/REPAIR

BRIDGE REPAIR

SANGAMONI 55

PRESERVATION - BRIDGES

2020$18,900,000 N OF GLENARM INTCHG TO 0.2 MI N OF LAKE SPRINGFIELD BRIDGEMiles = 7.59

2STANDARD OVERLAY

BRIDGE APPROACH ROADWAY

SANGAMONI 55

Roadway Information Miles AADT Truck Pct NHS

39,853 23.2 Y 5.33

REHABILITATION - PAVEMENTS

6 - 3

Page 7: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$7,000,000 OVER ILLINOIS CENTRAL RR S OF SPRINGFIELD

1BRIDGE NEW DECK SANGAMONI 55

Structure Information Str Number AADT Truck Pct NHS

19,200 Y220840112

19,200 Y220840113

REHABILITATION - BRIDGES

2020$158,000 I-55: LAKE SPRINGFIELD BRIDGE TO 0.2 MI N OF SOUTHWIND RD & I-72: FARMINGDALE RD TO W OF OLD CHATHAM RD & 0.4 MI E OF I-55 (N) TO 0.5 MI E OF OVERPASS RD (INSIDE SPFLD MPO)

1CRACK & JOINT SEALING SANGAMONI 55

I 72

PRESERVATION - PAVEMENTS

2021-2025$1,600,000 UNDER W LAKE SHORE DRIVE

1BRIDGE NEW DECK SANGAMONI 55

I 72

US 36

Structure Information Str Number AADT Truck Pct NHS

4,150 N120840092

REHABILITATION - BRIDGES

2021-2025$1,600,000 UNDER COOK ST IN SPRINGFIELD

1BRIDGE NEW DECK SANGAMONI 55

I 72

US 36

Structure Information Str Number AADT Truck Pct NHS

750 NN/A0840103

REHABILITATION - BRIDGES

2021-2025$6,200,000 OVER ILL 54 & SANGAMON AVE IN SPRINGFIELD

1BRIDGE DECK OVERLAY SANGAMONI 55

PRESERVATION - BRIDGES

6 - 4

Page 8: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$15,700,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLEMiles = 0.01

1ADDITIONAL LANES

BRIDGE WIDENING

SANGAMONI 55

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$111,300,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLEMiles = 7.82

1RECONSTRUCTION

BRIDGE NEW DECK

BRIDGE REPLACEMENT

SANGAMONI 55

Roadway Information Miles AADT Truck Pct NHS

33,300 29.3 Y 6.41

Structure Information Str Number AADT Truck Pct NHS

16,650 Y290840023

16,650 Y290840022

950 N20840100

16,650 Y290840021

16,650 Y290840020

RECONSTRUCTION - PAVEMENTS

2021-2025$6,000,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE

5P.E. (PHASE II) SANGAMONI 55

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$450,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE

1UTILITY ADJUSTMENT SANGAMONI 55

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$3,000,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE

1CONSTRUCTION ENGINEERING SANGAMONI 55

INITIAL CONSTRUCTION - PAVEMENTS

6 - 5

Page 9: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,600,000 UNDER BISSELL RD

1BRIDGE NEW DECK SANGAMONI 55

Structure Information Str Number AADT Truck Pct NHS

3,550 N250840101

REHABILITATION - BRIDGES

2021-2025$900,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE

1LAND ACQUISITION SANGAMONI 55

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$4,000,000 SANGAMON RIVER BRIDGES 2.3 MI N OF SPRINGFIELD

2BRIDGE DECK OVERLAY SANGAMONI 55

PRESERVATION - BRIDGES

2020$3,000,000 UNDER ILL 123 (DINIUS RD) N OF WILLIAMSVILLE

3BRIDGE NEW DECK SANGAMONI 55

Structure Information Str Number AADT Truck Pct NHS

5,650 N190840171

REHABILITATION - BRIDGES

2021-2025$2,100,000 UNDER CH 10 W OF ELKHART

3BRIDGE NEW DECK LOGANI 55

Structure Information Str Number AADT Truck Pct NHS

250 N160540038

REHABILITATION - BRIDGES

6 - 6

Page 10: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$3,300,000 UNDER 800TH AVE AT BROADWELL INTCHG

1BRIDGE NEW DECK LOGANI 55

Structure Information Str Number AADT Truck Pct NHS

150 N200540039

REHABILITATION - BRIDGES

2020$18,100,000 1.3 MI S OF I-55 BUS TO 0.6 MI N OF ILL 10 W OF LINCOLNMiles = 10.66

5STANDARD OVERLAY

RAMP REPAIR

LOGANI 55

I 55 BUS

Roadway Information Miles AADT Truck Pct NHS

31,539 32.4 Y 5.13

29,500 39.7 Y 0.02

4,272 3.0 N 0.59

375 10.4 N 0.35

REHABILITATION - PAVEMENTS

2020$2,600,000 1.2 MI S OF I-55 BUS TO 0.3 MI N OF ILL 10 W OF LINCOLN

2BRIDGE REPAIR

BRIDGE JOINT REPLACE/REPAIR

BRIDGE DECK REPAIRS

SLOPEWALL REPAIR

LOGANI 55

MAINTENANCE - BRIDGES

2021-2025$3,600,000 UNDER I-55 BUS (OLD US 66)

1BRIDGE NEW DECK LOGANI 55

Structure Information Str Number AADT Truck Pct NHS

375 N100540040

REHABILITATION - BRIDGES

6 - 7

Page 11: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$19,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELDMiles = 2.51

1RECONSTRUCTION

INTERSECTION IMPROVEMENT

TURNING LANES

SIDEWALKS

SANGAMONI 55 BUS

6TH ST

STEVENSON DR

Roadway Information Miles AADT Truck Pct NHS

27,405 4.5 Y 1.16

11,100 2.6 Y 0.13

1,900 0.0 N 0.06

1,882 0.0 N 0.14

4,350 0.0 N 0.16

400 0.0 N 0.02

400 0.0 N 0.07

RECONSTRUCTION - PAVEMENTS

2021-2025$6,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELDMiles = 0.01

1ADDITIONAL LANES

TURNING LANES

SANGAMONI 55 BUS

6TH ST

STEVENSON DR

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$4,300,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD

1LAND ACQUISITION SANGAMONI 55 BUS

6TH ST

STEVENSON DR

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$1,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD

1UTILITY ADJUSTMENT SANGAMONI 55 BUS

6TH ST

STEVENSON DR

INITIAL CONSTRUCTION - PAVEMENTS

6 - 8

Page 12: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,900,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONI 55 BUS

6TH ST

STEVENSON DR

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$12,000,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELDMiles = 1.43

1RECONSTRUCTION

INTERSECTION RECONSTN

TURNING LANES

SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

STANFORD AV

Roadway Information Miles AADT Truck Pct NHS

24,282 2.6 Y 0.61

15,700 7.9 Y 0.15

13,367 12.3 Y 0.15

RECONSTRUCTION - PAVEMENTS

2021-2025$800,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELDMiles = 0.01

1ADDITIONAL LANES SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$2,000,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD

1LAND ACQUISITION SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

INITIAL CONSTRUCTION - PAVEMENTS

6 - 9

Page 13: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD

1UTILITY ADJUSTMENT SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$200,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$2,900,000 5TH ST: SPRUCE ST TO N OF STANFORD AVE; 6TH ST: N OF STANFORD AVE TO MYRTLE ST IN SPRINGFIELDMiles = 2.16

4DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONI 55 BUS

I 55 BUSA

6TH ST

5TH ST

Roadway Information Miles AADT Truck Pct NHS

14,860 7.4 Y 1.03

14,482 7.2 Y 1.13

REHABILITATION - PAVEMENTS

2021-2025$4,100,000 0.2 MI N OF DIRKSEN PKWY TO 0.3 MI N OF ANDREW RD IN SPRINGFIELDMiles = 2.98

1DESIGNED OVERLAY SANGAMONI 55 BUS

Roadway Information Miles AADT Truck Pct NHS

13,094 5.0 Y 2.98

REHABILITATION - PAVEMENTS

6 - 10

Page 14: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$1,100,000 E OF OLD ROUTE 66 TO S OF 1056TH AVE S OF LINCOLNMiles = 0.96

2STANDARD OVERLAY

NEW SHOULDERS

LOGANI 55 BUS

Roadway Information Miles AADT Truck Pct NHS

5,196 7.4 N 0.96

REHABILITATION - PAVEMENTS

2021-2025$1,300,000 I-55 BUS TO ILL 10/121 IN LINCOLNMiles = 1.58

1DESIGNED OVERLAY

ADA IMPROVEMENTS

LOGANI 55 BUS

KICKAPOO ST

Roadway Information Miles AADT Truck Pct NHS

3,871 10.1 N 1.58

REHABILITATION - PAVEMENTS

2020$35,000 MARK TWAIN MEMORIAL BRIDGE AT MISSISSIPPI RIVER IN HANNIBAL

1BRIDGE DECK SEALING PIKEI 72

MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.

PRESERVATION - BRIDGES

2021-2025$12,300,000 E OF US 54 / ILL 107 INTCHG TO 0.6 MI E OF 290TH AVE OVERHEADMiles = 5.39

1STANDARD OVERLAY

SHOULDER REPAIR

PIKEI 72

Roadway Information Miles AADT Truck Pct NHS

8,650 33.5 Y 5.39

REHABILITATION - PAVEMENTS

2021-2025$3,200,000 UNDER OLD US 36 AT WINCHESTER INTCHG

1BRIDGE NEW DECK SCOTTI 72

US 36

Structure Information Str Number AADT Truck Pct NHS

3,300 N120860027

REHABILITATION - BRIDGES

6 - 11

Page 15: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,500,000 OVER ILL 104 & B&N RR E OF JACKSONVILLE (WB)

1BRIDGE NEW DECK MORGANI 72

Structure Information Str Number AADT Truck Pct NHS

5,550 Y310690041

REHABILITATION - BRIDGES

2020$127,000 0.3 MI E OF JIMTOWN RD TO FARMINGDALE RD & 0.5 MI W OF KENT FARM RD TO MACON CO LINE (OUTSIDE SPFLD MPO)

1CRACK & JOINT SEALING SANGAMONI 72

PRESERVATION - PAVEMENTS

2020$7,500,000 OVER WABASH AVE & NS RR 1.2 MI E OF WABASH AVE INTCHG IN SPRINGFIELD

7BRIDGE NEW DECK

SLOPEWALL REPAIR

BRIDGE PAINTING

SANGAMONI 72

Structure Information Str Number AADT Truck Pct NHS

11,250 Y210840127

11,250 Y210840128

8,800 Y230840148

8,800 Y230840149

REHABILITATION - BRIDGES

2021-2025$3,000,000 UNDER CH 19 AT BUFFALO / MECHANICSBURG INTCHG

1BRIDGE NEW DECK SANGAMONI 72

US 36

Structure Information Str Number AADT Truck Pct NHS

1,700 N140840156

REHABILITATION - BRIDGES

2020$2,900,000 0.8 MI N OF I-72 BUS / MORTON AVE TO 1.1 MI N OF I-72Miles = 3.02

1DESIGNED OVERLAY MORGANI 72 BUS

US 67

(SOUTHBOUND)

Roadway Information Miles AADT Truck Pct NHS

5,217 20.3 Y 2.39

REHABILITATION - PAVEMENTS

6 - 12

Page 16: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$250,000 MARKHAM RD (TR 78) TO 1.1 MI N OF I-72

1PATCHING MORGANI 72 BUS

US 67

MAINTENANCE - PAVEMENTS

2021-2025$3,600,000 MAUVAISE TERRE CREEK 0.7 MI E OF ILL 267

3BRIDGE REPLACEMENT MORGANI 72 BUS

ILL 104

MORTON AVE

Structure Information Str Number AADT Truck Pct NHS

11,600 Y40690009

RECONSTRUCTION - BRIDGES

2021-2025$1,700,000 OVER I-155 (NB) & I-55 (SB)

1BRIDGE NEW DECK LOGANI 155

Structure Information Str Number AADT Truck Pct NHS

50 Y200540051

REHABILITATION - BRIDGES

2020$1,100,000 OVER ICG RR 2.8 MI S OF US 136

3BRIDGE DECK OVERLAY

BRIDGE REPAIR

LOGANI 155

PRESERVATION - BRIDGES

2020$7,500,000 2 MI S OF US 136 TO TAZEWELL CO LINEMiles = 4.60

6STANDARD OVERLAY

RAMP REPAIR

SHOULDER REPAIR

LOGANI 155

Roadway Information Miles AADT Truck Pct NHS

11,132 19.3 Y 3.03

REHABILITATION - PAVEMENTS

6 - 13

Page 17: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$500,000 UNDER EMDEN RD 1 MI S OF US 136 INTCHG

1BRIDGE REPAIR

BRIDGE DECK REPAIRS

BRIDGE JOINT REPLACE/REPAIR

LOGANI 155

MAINTENANCE - BRIDGES

2020$900,000 UNDER US 136 1 MI S OF TAZEWELL CO LINE

3BRIDGE DECK OVERLAY

BRIDGE DECK REPAIRS

BRIDGE REPAIR

LOGANI 155

PRESERVATION - BRIDGES

2021-2025$1,800,000 OVER I-55 (SB)

1BRIDGE NEW DECK LOGANI 155

Structure Information Str Number AADT Truck Pct NHS

5,500 Y190540050

REHABILITATION - BRIDGES

2020$100,000 N OF I-72 INTCHG TO N OF ILL 96 INTCHG

1CRACK & JOINT SEALING ADAMSI 172

PRESERVATION - PAVEMENTS

2021-2025$1,600,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER

3BRIDGE DECK OVERLAY ADAMSUS 24

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

PRESERVATION - BRIDGES

6 - 14

Page 18: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$5,000,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER

3BRIDGE PAINTING ADAMSUS 24

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

PRESERVATION - BRIDGES

2021-2025$6,000,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER

7P.E. (CONSULTANT PLANS) ADAMSUS 24

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

RECONSTRUCTION - BRIDGES

2021-2025$4,000,000 US 24: MISSISSIPPI RIVER BRIDGES TO 0.1 MI N OF GARDNER PARK DR & ILL 57: W OF 4TH ST TO BROADWAY ST IN QUINCY & ILL 104: 3RD ST TO E OF 4TH STMiles = 3.96

3DESIGNED OVERLAY

ADA IMPROVEMENTS

PATCHING

ADAMSUS 24

ILL 57

ILL 104

3RD ST

4TH ST

BROADWAY ST

MAINE ST

Roadway Information Miles AADT Truck Pct NHS

5,672 9.9 Y 1.93

4,483 11.3 Y 0.27

5,538 12.3 Y 1.46

5,070 14.0 Y 0.20

10,460 4.9 Y 0.10

REHABILITATION - PAVEMENTS

2021-2025$2,000,000 HOMAN CREEK 0.1 MI N OF 12TH ST N OF QUINCY

1BRIDGE NEW DECK ADAMSUS 24

Structure Information Str Number AADT Truck Pct NHS

4,650 Y100010010

REHABILITATION - BRIDGES

6 - 15

Page 19: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$800,000 ECL OF CAMP POINT TO 0.1 MI E OF ILL 94Miles = 1.49

1DESIGNED OVERLAY

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

ADAMSUS 24

Roadway Information Miles AADT Truck Pct NHS

4,129 9.6 Y 1.49

REHABILITATION - PAVEMENTS

2021-2025$1,900,000 E OF TIMEWELL TO 0.2 MI W OF BUCKHORN / DAMON RD IN MOUNT STERLINGMiles = 4.75

1DESIGNED OVERLAY BROWNUS 24

Roadway Information Miles AADT Truck Pct NHS

3,394 15.7 Y 4.75

REHABILITATION - PAVEMENTS

2020$860,000 US 24: 0.6 MI E OF OLD US 24 TO 0.1 MI W OF CEDAR ST IN RUSHVILLE & US 67: LAFAYETTE RD IN RUSHVILLE TO SCLMiles = 0.68

4STANDARD OVERLAY

ADA IMPROVEMENTS

SCHUYLERUS 24

US 67

Roadway Information Miles AADT Truck Pct NHS

3,928 12.2 Y 0.41

4,519 6.1 Y 0.27

REHABILITATION - PAVEMENTS

2020$342,000 AT US 67 IN RUSHVILLE

1TRAF SIGNAL REPLACEMENT SCHUYLERUS 24

MISCELLANEOUS IMPROVEMENTS

2020$60,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER

3BRIDGE DECK SEALING ADAMSUS 24 A

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

PRESERVATION - BRIDGES

6 - 16

Page 20: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$60,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER

1BRIDGE DECK SEALING ADAMSUS 24 A

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

PRESERVATION - BRIDGES

2021-2025$1,500,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER

2P.E. (BRIDGE INSPECTION) ADAMSUS 24 A

ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.

MISCELLANEOUS IMPROVEMENTS

2020$900,000 0.2 MI W OF JCT US 51 / ILL 16 TO PINE ST IN PANAMiles = 1.19

1DESIGNED OVERLAY

NEW SHOULDERS

CHRISTIANUS 51

ILL 16

Roadway Information Miles AADT Truck Pct NHS

7,265 11.0 Y 1.19

REHABILITATION - PAVEMENTS

2021-2025$2,200,000 PINE ST IN PANA TO SHELBY CO LINEMiles = 3.62

5DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANUS 51

ILL 16

Roadway Information Miles AADT Truck Pct NHS

4,524 14.7 Y 3.62

REHABILITATION - PAVEMENTS

2020$2,030,000 US 54: 0.1 MI N OF N MONROE ST TO 0.1 MI E OF GROVE ST & ILL 106: US 54 TO E OF ILLINOIS ST IN PITTSFIELDMiles = 1.78

5DESIGNED OVERLAY

ADA IMPROVEMENTS

PARKING IMPROVEMENT

MISC TRAFFIC CONTROL

PIKEUS 54

ILL 106

S JACKSON ST

Roadway Information Miles AADT Truck Pct NHS

7,111 14.0 Y 1.70

3,650 4.9 N 0.08

REHABILITATION - PAVEMENTS

6 - 17

Page 21: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$120,000 AT ILL 106 (JACKSON ST / WASHINGTON ST) IN PITTSFIELD

3INTERSECTION IMPROVEMENT PIKEUS 54

ILL 106

MISCELLANEOUS IMPROVEMENTS

2020$1,500,000 AT ILL 106 (JACKSON ST / WASHINGTON ST), MADISON ST, MEMORIAL ST, FRANKLIN ST & SHETLAND DR IN PITTSFIELD

2TRAF SIGNAL REPLACEMENT

ADA IMPROVEMENTS

LIGHTING

PIKEUS 54

ILL 106

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,600,000 PLUM POINT SLOUGH 0.8 MI N OF MISSOURI STATE LINE

1BRIDGE REPLACEMENT PIKEUS 54

Structure Information Str Number AADT Truck Pct NHS

3,100 Y190750022

RECONSTRUCTION - BRIDGES

2021-2025$2,300,000 BLUFFS DITCH 1.8 MI NW OF ILL 100

3BRIDGE REPLACEMENT SCHUYLERUS 67

Structure Information Str Number AADT Truck Pct NHS

4,050 Y100850002

RECONSTRUCTION - BRIDGES

2021-2025$62,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWNMiles = 1.41

3BRIDGE REPLACEMENT

NEW CONSTRUCTION

SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

Structure Information Str Number AADT Truck Pct NHS

6,500 Y180090001

RECONSTRUCTION - BRIDGES

6 - 18

Page 22: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$100,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN

3ARCHAEOLOGICAL SURVEY SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2020$300,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN

1P.E. (CONSULTANT PLANS) SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2020$1,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN

3LAND ACQUISITION SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2021-2025$500,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN

3UTILITY ADJUSTMENT SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2021-2025$2,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN

3CONSTRUCTION ENGINEERING SCHUYLERCASS

US 67

ILL 100

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

6 - 19

Page 23: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$500,000 ILLINOIS RIVER BRIDGE TO 0.2 MI W OF ILL 125 IN BEARDSTOWNMiles = 0.51

1DESIGNED OVERLAY CASSUS 67

ILL 100

Roadway Information Miles AADT Truck Pct NHS

6,647 12.8 Y 0.51

REHABILITATION - PAVEMENTS

2021-2025$3,900,000 US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RDMiles = 5.61

2DESIGNED OVERLAY

ADA IMPROVEMENTS

CASSUS 67

ILL 100

ILL 125

Roadway Information Miles AADT Truck Pct NHS

6,130 9.6 Y 0.32

5,689 16.6 N 5.29

REHABILITATION - PAVEMENTS

2021-2025$7,900,000 US 67: HONEY POINT RD 1 MI N OF CASS / MORGAN CO LINE TO 2 MI E OF ILL 100 & ILL 100: US 67 TO 0.3 MI SMiles = 7.49

1DESIGNED OVERLAY MORGANCASS

US 67

ILL 100

ILL 104

Roadway Information Miles AADT Truck Pct NHS

2,000 27.3 Y 1.03

3,156 21.7 Y 6.12

1,850 23.8 N 0.34

REHABILITATION - PAVEMENTS

2021-2025$10,000,000 MISSISSIPPI RIVER BRIDGE AT KEOKUK

5BRIDGE DECK OVERLAY HANCOCKUS 136

ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.

PRESERVATION - BRIDGES

6 - 20

Page 24: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,400,000 E OF MARION ST IN CARTHAGE TO 0.3 MI E OF CARTHAGEMiles = 1.18

1DESIGNED OVERLAY

ADA IMPROVEMENTS

HANCOCKUS 136

ILL 94

Roadway Information Miles AADT Truck Pct NHS

5,322 11.4 Y 1.14

3,500 6.0 N 0.04

REHABILITATION - PAVEMENTS

2021-2025$1,300,000 3.1 MI S OF CARTHAGE TO 0.9 MI EMiles = 5.83

1CAPE SEAL

GRINDING

FOG SEAL

HANCOCKUS 136

ILL 110

ILL 336

PRESERVATION - PAVEMENTS

2021-2025$5,800,000 US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA)Miles = 0.91

5RECONSTRUCTION

ADA IMPROVEMENTS

VERTICAL REALIGNMENT

BI-DIRECT LEFT TURN LANE

MASONUS 136

ILL 78

ILL 97

Roadway Information Miles AADT Truck Pct NHS

7,418 8.7 Y 0.72

3,700 8.7 N 0.10

3,850 7.5 N 0.09

RECONSTRUCTION - PAVEMENTS

2021-2025$500,000 US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA)

1LAND ACQUISITION MASONUS 136

ILL 78

ILL 97

RECONSTRUCTION - PAVEMENTS

6 - 21

Page 25: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$250,000 US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA)

1UTILITY ADJUSTMENT MASONUS 136

ILL 78

ILL 97

RECONSTRUCTION - PAVEMENTS

2021-2025$450,000 S OF RANDOLPH ST TO E OF CHARLOTTE AVEMiles = 0.40

1DESIGNED OVERLAY

ADA IMPROVEMENTS

INTERSECTION IMPROVEMENT

MASONUS 136

Roadway Information Miles AADT Truck Pct NHS

5,328 18.9 Y 0.40

REHABILITATION - PAVEMENTS

2020$5,700,000 E OF CHARLOTTE AVE IN HAVANA TO 0.1 MI E OF FORREST CITY RD (CR 2800 E)Miles = 11.98

1STANDARD OVERLAY MASONUS 136

Roadway Information Miles AADT Truck Pct NHS

2,034 18.0 Y 11.98

REHABILITATION - PAVEMENTS

2021-2025$200,000 0.1 MI W TO 0.1 MI E OF PRAIRIE CREEK DITCH 1.5 MI E OF SAN JOSEMiles = 0.18

1DESIGNED OVERLAY LOGANUS 136

Roadway Information Miles AADT Truck Pct NHS

2,200 34.1 Y 0.18

REHABILITATION - PAVEMENTS

2020$2,700,000 0.5 MI W OF I-155 TO W OF UNION RDMiles = 4.89

5DESIGNED OVERLAY LOGANUS 136

Roadway Information Miles AADT Truck Pct NHS

1,999 27.5 Y 4.89

REHABILITATION - PAVEMENTS

6 - 22

Page 26: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$1,000,000 0.5 MI W OF I-155 TO W OF UNION RD

2SHOULDER RECONSTRUCTION LOGANUS 136

MAINTENANCE - PAVEMENTS

2021-2025$2,500,000 W OF UNION RD TO W OF MCLEAN CO LINEMiles = 5.51

3DESIGNED OVERLAY LOGANUS 136

Roadway Information Miles AADT Truck Pct NHS

2,091 28.8 Y 5.51

REHABILITATION - PAVEMENTS

2021-2025$1,400,000 W OF UNION RD TO W OF MCLEAN CO LINE

1SHOULDER RECONSTRUCTION LOGANUS 136

MAINTENANCE - PAVEMENTS

2021-2025$100,000 W FORK SUGAR CREEK 2 MI E OF UNION RD & SUGAR CREEK 1.2 MI W OF MCLEAN CO LINE

3BRIDGE PAINTING

BRIDGE JOINT REPLACE/REPAIR

SCOUR MITIGATION

LOGANUS 136

PRESERVATION - BRIDGES

2021-2025$5,600,000 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELDMiles = 2.96

1DESIGNED OVERLAY SANGAMONILL 4

Roadway Information Miles AADT Truck Pct NHS

31,134 10.2 Y 2.96

REHABILITATION - PAVEMENTS

6 - 23

Page 27: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$500,000 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELD

1PATCHING SANGAMONILL 4

VETERANS PKWY

MAINTENANCE - PAVEMENTS

2021-2025$2,200,000 OVER NS RR & GATEWAY W RR 0.1 M N OF I-72 INTCHG IN SPRINGFIELD

1BRIDGE DECK OVERLAY SANGAMONILL 4

(SOUTHBOUND)

PRESERVATION - BRIDGES

2021-2025$1,800,000 0.2 MI N OF MANSION RD TO N OF TEAL DR IN CHATHAMMiles = 1.18

1DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONILL 4

Roadway Information Miles AADT Truck Pct NHS

19,185 9.6 Y 1.18

REHABILITATION - PAVEMENTS

2021-2025$1,000,000 S OF NORTH ST IN GIRARD TO N OF CAMBRIDGE RD S OF GIRARDMiles = 1.14

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MACOUPINILL 4

Roadway Information Miles AADT Truck Pct NHS

3,036 5.5 Y 1.14

REHABILITATION - PAVEMENTS

2021-2025$5,100,000 S OF ALLEN RD TO N OF CARLINVILLE SQUAREMiles = 6.85

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MACOUPINILL 4

Roadway Information Miles AADT Truck Pct NHS

4,081 11.5 Y 6.85

REHABILITATION - PAVEMENTS

6 - 24

Page 28: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$900,000 S SIDE CARLINVILLE SQUARE TO CARLINVILLE SCLMiles = 0.82

1DESIGNED OVERLAY

PARKING IMPROVEMENT

ADA IMPROVEMENTS

MACOUPINILL 4

ILL 108

Roadway Information Miles AADT Truck Pct NHS

7,283 6.1 Y 0.79

4,000 5.8 N 0.03

REHABILITATION - PAVEMENTS

2021-2025$2,000,000 NCL OF EAST GILLESPIE TO ILL 16Miles = 0.93

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MACOUPINILL 4

ILL 16

Roadway Information Miles AADT Truck Pct NHS

2,801 12.3 Y 0.75

5,100 5.8 Y 0.18

REHABILITATION - PAVEMENTS

2021-2025$450,000 NCL OF EAST GILLESPIE TO ILL 16

1P.E. (PHASE I)

P.E. (PHASE II)

MACOUPINILL 4

ILL 16

REHABILITATION - PAVEMENTS

2021-2025$300,000 NCL OF EAST GILLESPIE TO ILL 16

1LAND ACQUISITION MACOUPINILL 4

ILL 16

REHABILITATION - PAVEMENTS

2021-2025$150,000 NCL OF EAST GILLESPIE TO ILL 16

1UTILITY ADJUSTMENT MACOUPINILL 4

ILL 16

REHABILITATION - PAVEMENTS

6 - 25

Page 29: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,600,000 CRANE CREEK 1.5 MI N OF EASTON

1BRIDGE REPLACEMENT MASONILL 10

Structure Information Str Number AADT Truck Pct NHS

600 N50630005

RECONSTRUCTION - BRIDGES

2021-2025$1,600,000 0.1 MI E OF ILL 29 TO W OF PRICE AVE IN MASON CITYMiles = 1.88

7DESIGNED OVERLAY

ADA IMPROVEMENTS

PARKING IMPROVEMENT

MASONILL 10

CHESTNUT ST

Roadway Information Miles AADT Truck Pct NHS

2,629 13.6 N 1.88

REHABILITATION - PAVEMENTS

2021-2025$150,000 DITCH 0.1 MI S OF ILL 10, DITCH AT ILL 10 & DITCH 0.1 MI E OF ILL 29

1CULVERT (NEW)

CULVERT REPLACEMENT

MASONILL 10

CHESTNUT ST

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,400,000 0.1 MI E OF MASON CO LINE TO 2.5 MI E OF NEW HOLLANDMiles = 4.36

7DESIGNED OVERLAY

ADA IMPROVEMENTS

LOGANILL 10

Roadway Information Miles AADT Truck Pct NHS

1,871 13.8 N 4.36

REHABILITATION - PAVEMENTS

2021-2025$600,000 DITCH 0.8 MI E OF MASON CO LINE

9CULVERT (NEW) LOGANILL 10

INITIAL CONSTRUCTION - BRIDGES

6 - 26

Page 30: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,300,000 E OF ELM ST TO NW OF KICKAPOO ST IN LINCOLNMiles = 0.94

3DESIGNED OVERLAY

ADA IMPROVEMENTS

LOGANILL 10

ILL 121

I 55 BUS

KEOKUK ST

WOODLAWN ST

Roadway Information Miles AADT Truck Pct NHS

11,350 10.7 Y 0.94

REHABILITATION - PAVEMENTS

2021-2025$8,000,000 JERSEY CO LINE TO ROSE LN IN SHIPMANMiles = 5.98

7DESIGNED OVERLAY

CULVERT (NEW)

CULVERT REPLACEMENT

CULVERT EXTENSION

ADA IMPROVEMENTS

MACOUPINILL 16

Roadway Information Miles AADT Truck Pct NHS

2,095 4.7 Y 5.98

REHABILITATION - PAVEMENTS

2021-2025$500,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN

1P.E. (PHASE II)

P.E. (CONSULTANT PLANS)

MACOUPINILL 16

REHABILITATION - PAVEMENTS

2021-2025$1,000,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN

4LAND ACQUISITION MACOUPINILL 16

REHABILITATION - PAVEMENTS

6 - 27

Page 31: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN

4UTILITY ADJUSTMENT MACOUPINILL 16

REHABILITATION - PAVEMENTS

2021-2025$1,600,000 PIASA CREEK 0.2 MI W OF PIASA

10BRIDGE REPLACEMENT MACOUPINILL 16

Structure Information Str Number AADT Truck Pct NHS

2,650 Y80590001

RECONSTRUCTION - BRIDGES

2021-2025$1,600,000 PIASA CREEK 3.1 MI W OF SHIPMAN

10BRIDGE REPLACEMENT

DRAINAGE

MACOUPINILL 16

Structure Information Str Number AADT Truck Pct NHS

1,950 Y30590002

RECONSTRUCTION - BRIDGES

2021-2025$5,000,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159Miles = 4.22

3DESIGNED OVERLAY

BRIDGE REPLACEMENT

CULVERT (NEW)

CULVERT EXTENSION

MACOUPINILL 16

Roadway Information Miles AADT Truck Pct NHS

2,018 4.8 Y 4.22

Structure Information Str Number AADT Truck Pct NHS

2,100 Y30590004

REHABILITATION - PAVEMENTS

2021-2025$750,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159

1LAND ACQUISITION MACOUPINILL 16

REHABILITATION - PAVEMENTS

6 - 28

Page 32: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$375,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159

1UTILITY ADJUSTMENT MACOUPINILL 16

REHABILITATION - PAVEMENTS

2020$400,000 ILL 16: N OF SEWARD ST TO ROUNTREE ST; ILL 127: SCHOOL ST TO S OF HILLTOP DR IN HILLSBORO

2ADA IMPROVEMENTS MONTGOMERYILL 16

ILL 127

MISCELLANEOUS IMPROVEMENTS

2021-2025$7,300,000 FREY AVE IN SCHRAM CITY TO GIBSON ST IN NOKOMISMiles = 13.51

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MONTGOMERYILL 16

Roadway Information Miles AADT Truck Pct NHS

2,507 13.3 Y 13.51

REHABILITATION - PAVEMENTS

2021-2025$1,500,000 BIG FOUR RESERVOIR OVERFLOW 1 MI E OF WCL OF SCHRAM CITY

1BRIDGE REPLACEMENT MONTGOMERYILL 16

Structure Information Str Number AADT Truck Pct NHS

4,700 Y80680011

RECONSTRUCTION - BRIDGES

2021-2025$1,400,000 S FORK SANGAMON RIVER 2.4 MI E OF ELM ST IN NOKOMIS

12BRIDGE REPLACEMENT MONTGOMERYILL 16

Structure Information Str Number AADT Truck Pct NHS

1,550 Y110680016

RECONSTRUCTION - BRIDGES

6 - 29

Page 33: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,400,000 SANGAMON CREEK AT WCL OF OHLMAN

12BRIDGE REPLACEMENT MONTGOMERYILL 16

Structure Information Str Number AADT Truck Pct NHS

1,600 Y150680017

RECONSTRUCTION - BRIDGES

2021-2025$950,000 DITCH 0.3 MI NE OF MONTGOMERY CO LINE

11CULVERT (NEW) CHRISTIANILL 16

INITIAL CONSTRUCTION - BRIDGES

2021-2025$3,000,000 MENARD CO LINE TO N OF FISHER RD S OF CANTRALLMiles = 3.07

8DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONILL 29

Roadway Information Miles AADT Truck Pct NHS

7,242 5.9 N 3.07

REHABILITATION - PAVEMENTS

2021-2025$4,250,000 N OF FISHER RD S OF CANTRALL TO 0.1 MI S OF ANDREW RD (INCL INT AT ANDREW RD)Miles = 2.60

10DESIGNED OVERLAY

INTERSECTION IMPROVEMENT

LEFT TURN LANES

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

SANGAMONILL 29

Roadway Information Miles AADT Truck Pct NHS

6,595 5.5 N 2.60

REHABILITATION - PAVEMENTS

2021-2025$900,000 MENARD CO LINE TO ANDREW RD

6LAND ACQUISITION SANGAMONILL 29

J DAVID JONES PKWY

REHABILITATION - PAVEMENTS

6 - 30

Page 34: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$300,000 MENARD CO LINE TO ANDREW RD

6UTILITY ADJUSTMENT SANGAMONILL 29

J DAVID JONES PKWY

REHABILITATION - PAVEMENTS

2021-2025$16,000,000 AT DIRKSEN PKWY IN SPRINGFIELD

1INTERSECTION RECONSTN

LEFT TURN LANES

SANGAMONILL 29

SANGAMON AVE

MISCELLANEOUS IMPROVEMENTS

2020$1,500,000 AT DIRKSEN PKWY IN SPRINGFIELD

2P.E. (PHASE I)

P.E. (PHASE II)

SANGAMONILL 29

SANGAMON AVE

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,500,000 AT DIRKSEN PKWY IN SPRINGFIELD

1LAND ACQUISITION SANGAMONILL 29

SANGAMON AVE

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,250,000 AT DIRKSEN PKWY IN SPRINGFIELD

1UTILITY ADJUSTMENT SANGAMONILL 29

SANGAMON AVE

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,520,000 0.2 MI S OF CLEAR LAKE AVE TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELDMiles = 1.07

4DESIGNED OVERLAY SANGAMONILL 29

DIRKSEN PKWY

Roadway Information Miles AADT Truck Pct NHS

19,028 4.9 Y 0.88

14,400 5.8 Y 0.11

REHABILITATION - PAVEMENTS

6 - 31

Page 35: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$800,000 0.2 MI SE OF JOHNS ST TO 0.2 MI S OF CARDINAL HILL RDMiles = 0.51

1DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONILL 29

Roadway Information Miles AADT Truck Pct NHS

9,951 11.0 Y 0.45

9,850 10.2 Y 0.06

REHABILITATION - PAVEMENTS

2020$850,000 0.1 MI S OF CARDINAL HILL RD TO 0.4 MI S OF BRANER RD S OF ROCHESTERMiles = 2.14

1EXPERIMENTAL PRESERVATION

GRINDING

FOG SEAL

SANGAMONILL 29

PRESERVATION - PAVEMENTS

2020$880,000 0.4 MI S OF BRANER RD S OF ROCHESTER TO 0.7 MI S OF JETT RD S OF BERRYMiles = 2.55

1EXPERIMENTAL PRESERVATION

GRINDING

FOG SEAL

SANGAMONILL 29

PRESERVATION - PAVEMENTS

2021-2025$2,000,000 0.2 MI S OF ILL 104 TO W OF MAIN CROSS ST IN TAYLORVILLEMiles = 2.15

1DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANILL 29

Roadway Information Miles AADT Truck Pct NHS

13,141 6.8 Y 2.15

REHABILITATION - PAVEMENTS

2021-2025$2,500,000 W OF MAIN CROSS ST IN TAYLORVILLE TO S OF VELMA RD S OF TAYLORVILLEMiles = 3.57

1DESIGNED OVERLAY CHRISTIANILL 29

Roadway Information Miles AADT Truck Pct NHS

8,161 6.2 Y 3.57

REHABILITATION - PAVEMENTS

6 - 32

Page 36: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,600,000 OVER ILL 48 IN TAYLORVILLE

1BRIDGE NEW DECK CHRISTIANILL 29

Structure Information Str Number AADT Truck Pct NHS

10,200 Y50110010

REHABILITATION - BRIDGES

2021-2025$1,700,000 FLATT BRANCH 0.7 MI SE OF ILL 48 RAMP

1BRIDGE SUPERSTRUCTURE CHRISTIANILL 29

Structure Information Str Number AADT Truck Pct NHS

10,200 Y50110011

REHABILITATION - BRIDGES

2020$7,100,000 S OF VELMA RD S OF TAYLORVILLE TO N OF MAGNOLIA ST IN PANAMiles = 10.63

2DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANILL 29

Roadway Information Miles AADT Truck Pct NHS

4,242 11.9 Y 10.08

4,050 13.0 Y 0.55

REHABILITATION - PAVEMENTS

2021-2025$1,700,000 LOCUST CREEK TRIB 0.3 MI SE OF MILLERSVILLE

5BRIDGE REPLACEMENT CHRISTIANILL 29

Structure Information Str Number AADT Truck Pct NHS

4,050 Y120110012

RECONSTRUCTION - BRIDGES

2021-2025$1,800,000 MAIN DRAINAGE DITCH 1.8 MI NW OF PANA

1BRIDGE REPLACEMENT CHRISTIANILL 29

Structure Information Str Number AADT Truck Pct NHS

4,050 Y120110013

RECONSTRUCTION - BRIDGES

6 - 33

Page 37: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,500,000 N OF MAGNOLIA ST TO US 51 (E JACKSON ST) IN PANAMiles = 1.85

5DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANILL 29

Roadway Information Miles AADT Truck Pct NHS

4,587 13.8 Y 1.27

3,666 11.1 N 0.58

REHABILITATION - PAVEMENTS

2021-2025$8,900,000 0.9 MI SW OF OLD ILL 48 (SPRESSER ST) SW OF TAYLORVILLE TO MONTGOMERY CO LINEMiles = 15.24

1DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANILL 48

Roadway Information Miles AADT Truck Pct NHS

2,548 17.3 N 15.24

REHABILITATION - PAVEMENTS

2021-2025$1,000,000 AT I-55 INTCHG W OF RAYMONDMiles = 0.96

1STANDARD OVERLAY MONTGOMERYILL 48

ILL 127

Roadway Information Miles AADT Truck Pct NHS

500 0.0 N 0.27

4,846 19.7 N 0.50

250 0.0 N 0.19

REHABILITATION - PAVEMENTS

2021-2025$760,000 S OF 700TH ST TO S OF ILL 121Miles = 1.58

6DESIGNED OVERLAY LOGANILL 54

Roadway Information Miles AADT Truck Pct NHS

1,050 21.0 N 1.58

REHABILITATION - PAVEMENTS

2021-2025$500,000 AT MCDONALD ST SE OF MT PULASKI

9INTERSECTION IMPROVEMENT

LEFT TURN LANES

RIGHT TURN LANE

LOGANILL 54

MCDONALD ST

MISCELLANEOUS IMPROVEMENTS

6 - 34

Page 38: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$4,500,000 ILL 121 TO SANGAMON CO LINEMiles = 9.12

2DESIGNED OVERLAY LOGANILL 54

Roadway Information Miles AADT Truck Pct NHS

1,512 22.9 N 9.12

REHABILITATION - PAVEMENTS

2020$200,000 AT CH 1 (1600TH AVE) S OF MT PULASKI

1INTERSECTION IMPROVEMENT LOGANILL 54

MISCELLANEOUS IMPROVEMENTS

2020$60,000 LAKE FORK CREEK 2 MI NE OF SANGAMON CO LINE

1BRIDGE JOINT REPLACE/REPAIR LOGANILL 54

PRESERVATION - BRIDGES

2021-2025$2,400,000 LOGAN CO LINE TO 0.2 MI E OF PRAIRIE SCHOOL RDMiles = 5.25

2DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONILL 54

Roadway Information Miles AADT Truck Pct NHS

1,825 15.2 N 5.25

REHABILITATION - PAVEMENTS

2021-2025$3,000,000 WOLF CREEK 1.6 MI E OF BARCLAYMiles = 0.26

15CULVERT REPLACEMENT

VERTICAL REALIGNMENT

SANGAMONILL 54

Structure Information Str Number AADT Truck Pct NHS

2,900 N190842002

RECONSTRUCTION - BRIDGES

6 - 35

Page 39: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$3,200,000 0.1 MI W OF PRAIRIE SCHOOL RD TO N OF BISSELL RD IN SPRINGFIELDMiles = 5.44

1DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONILL 54

Roadway Information Miles AADT Truck Pct NHS

4,504 10.4 N 5.44

REHABILITATION - PAVEMENTS

2021-2025$2,000,000 AT MAIN ST IN SPAULDING

1INTERSECTION RECONSTN

LEFT TURN LANES

TRAF SIGNAL INSTALLATION

RR INTERCONNECT

SANGAMONILL 54

MISCELLANEOUS IMPROVEMENTS

2021-2025$100,000 AT MAIN ST IN SPAULDING

1LAND ACQUISITION SANGAMONILL 54

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,000,000 ILL 104 (BROADWAY ST) IN QUINCY TO I-172

1P.E. (FEASIBILITY STUDY) ADAMSILL 57

INITIAL CONSTRUCTION - PAVEMENTS

2020$4,825,000 ILL 57 (3RD ST): MAINE ST IN QUINCY TO S OF MARBLEHEAD & YORK ST: 3RD ST TO W OF 4TH STMiles = 7.21

16STANDARD OVERLAY

DESIGNED OVERLAY

ADA IMPROVEMENTS

PARKING IMPROVEMENT

ADAMSILL 57

ILL 57 A

YORK ST (GRR)

Roadway Information Miles AADT Truck Pct NHS

6,246 21.7 Y 2.68

4,304 24.4 Y 4.47

4,350 13.2 Y 0.06

REHABILITATION - PAVEMENTS

6 - 36

Page 40: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$1,150,000 PAYSON AVE 0.5 MI S OF US 24 IN QUINCY

16BRIDGE NEW DECK

BRIDGE APPROACH ROADWAY

SLOPEWALL REPAIR

ADAMSILL 57

Structure Information Str Number AADT Truck Pct NHS

7,250 Y210010012

REHABILITATION - BRIDGES

2020$430,000 CURTIS CREEK 1.6 MI S OF US 24 IN QUINCY

9BRIDGE NEW DECK

BRIDGE REPAIR

BRIDGE SUBSTRUCTURE

SCOUR MITIGATION

ADAMSILL 57

Structure Information Str Number AADT Truck Pct NHS

4,750 Y260010013

REHABILITATION - BRIDGES

2021-2025$3,650,000 MILL CREEK AT MARBLEHEAD

4BRIDGE REPLACEMENT ADAMSILL 57

Structure Information Str Number AADT Truck Pct NHS

4,100 Y180010015

RECONSTRUCTION - BRIDGES

2020$750,000 MILL CREEK AT MARBLEHEAD

1P.E. (CONSULTANT PLANS)

P.E. (PHASE I)

ADAMSILL 57

RECONSTRUCTION - BRIDGES

2021-2025$250,000 MILL CREEK AT MARBLEHEAD

1LAND ACQUISITION ADAMSILL 57

RECONSTRUCTION - BRIDGES

6 - 37

Page 41: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,500,000 HASKNESS CREEK AT BLUFF HALL

1BRIDGE REPLACEMENT ADAMSILL 57

Structure Information Str Number AADT Truck Pct NHS

4,250 Y160010016

RECONSTRUCTION - BRIDGES

2021-2025$2,800,000 ILL 101 IN AUGUSTA TO MCDONOUGH CO LINEMiles = 5.06

3DESIGNED OVERLAY

ADA IMPROVEMENTS

HANCOCKILL 61

Roadway Information Miles AADT Truck Pct NHS

1,366 12.5 N 5.06

REHABILITATION - PAVEMENTS

2021-2025$4,400,000 ILL 94 IN BOWEN TO SCHUYLER CO LINEMiles = 8.14

1DESIGNED OVERLAY

ADA IMPROVEMENTS

HANCOCKILL 61

ILL 101

Roadway Information Miles AADT Truck Pct NHS

1,441 11.0 N 8.14

REHABILITATION - PAVEMENTS

2021-2025$1,700,000 FLOUR CREEK 2.8 MI E OF ILL 94

1BRIDGE REPLACEMENT HANCOCKILL 61

Structure Information Str Number AADT Truck Pct NHS

1,550 N120340006

RECONSTRUCTION - BRIDGES

2021-2025$1,400,000 BIG NECK CREEK 0.5 MI N OF ILL 94

1BRIDGE REPLACEMENT ADAMSILL 61

ILL 94

Structure Information Str Number AADT Truck Pct NHS

700 N150010002

RECONSTRUCTION - BRIDGES

6 - 38

Page 42: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,400,000 BIG NECK CREEK 0.1 MI W OF ILL 94

4BRIDGE REPLACEMENT ADAMSILL 61

Structure Information Str Number AADT Truck Pct NHS

850 N50010003

RECONSTRUCTION - BRIDGES

2021-2025$600,000 S OF ILLINOIS ST TO N OF IM RR IN HAVANAMiles = 0.82

1STANDARD OVERLAY

ADA IMPROVEMENTS

MASONILL 78

Roadway Information Miles AADT Truck Pct NHS

3,193 11.7 N 0.82

REHABILITATION - PAVEMENTS

2021-2025$450,000 DITCH 0.8 MI S OF WHITE OAK CREEK S OF HAVANA

3CULVERT REPLACEMENT MASONILL 78

MISCELLANEOUS IMPROVEMENTS

2021-2025$450,000 DITCH 0.8 MI N OF ELM ST IN BATH

2CULVERT REPLACEMENT MASONILL 78

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,600,000 CASS CO LINE TO 0.3 MI N OF VALEVUE ACRES DRMiles = 5.17

1DESIGNED OVERLAY MORGANILL 78

Roadway Information Miles AADT Truck Pct NHS

2,119 10.4 N 5.17

REHABILITATION - PAVEMENTS

6 - 39

Page 43: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,500,000 SNAKE CREEK 3.6 MI N OF JACKSONVILLE

1BRIDGE REPLACEMENT MORGANILL 78

Structure Information Str Number AADT Truck Pct NHS

2,500 N80690004

RECONSTRUCTION - BRIDGES

2021-2025$2,600,000 0.1 MI N OF OAK ST TO ILL 104 IN JACKSONVILLEMiles = 3.26

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MORGANILL 78

Roadway Information Miles AADT Truck Pct NHS

4,504 9.0 N 3.26

REHABILITATION - PAVEMENTS

2020$40,000 ROCK CREEK 2.5 MI N OF CH 29 (FERRIS RD)

1BRIDGE DECK REPAIRS HANCOCKILL 94

MAINTENANCE - BRIDGES

2020$1,800,000 POWELLTON RD TO 1.1 MI N OF CH 29 (FERRIS RD)Miles = 4.01

1STANDARD OVERLAY HANCOCKILL 94

Roadway Information Miles AADT Truck Pct NHS

1,823 18.5 N 4.01

REHABILITATION - PAVEMENTS

2021-2025$1,500,000 SHORT CREEK 3 MI N OF US 136 N OF CARTHAGE

1BRIDGE (NEW) HANCOCKILL 94

INITIAL CONSTRUCTION - BRIDGES

6 - 40

Page 44: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,700,000 TYSON CREEK 1.7 MI S OF ILL 9 IN NIOTA

1BRIDGE REPLACEMENT HANCOCKILL 96

Structure Information Str Number AADT Truck Pct NHS

1,850 N20340054

RECONSTRUCTION - BRIDGES

2020$1,710,000 SHERIDAN CREEK 0.9 MI S OF NAUVOO

4BRIDGE REPLACEMENT HANCOCKILL 96

Structure Information Str Number AADT Truck Pct NHS

1,250 N30340020

RECONSTRUCTION - BRIDGES

2021-2025$2,100,000 BEAR CREEK TO S OF BIRCH ST IN URSAMiles = 3.90

1DESIGNED OVERLAY ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

3,396 7.8 N 3.90

REHABILITATION - PAVEMENTS

2021-2025$2,500,000 US 24 TO N OF KOCHS LN IN QUINCYMiles = 2.45

3DESIGNED OVERLAY ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

3,430 9.0 N 1.06

3,800 12.5 N 0.04

5,450 13.7 N 1.35

REHABILITATION - PAVEMENTS

2021-2025$250,000 US 24 TO N OF KOCHS LN IN QUINCY

1P.E. (PHASE II) ADAMSILL 96

REHABILITATION - PAVEMENTS

6 - 41

Page 45: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 US 24 TO N OF KOCHS LN IN QUINCY

1LAND ACQUISITION ADAMSILL 96

REHABILITATION - PAVEMENTS

2021-2025$250,000 US 24 TO N OF KOCHS LN IN QUINCY

1UTILITY ADJUSTMENT ADAMSILL 96

REHABILITATION - PAVEMENTS

2021-2025$880,000 DITCH 1 MI N OF KOCHS LN N OF QUINCY

8CULVERT (NEW) ADAMSILL 96

INITIAL CONSTRUCTION - BRIDGES

2021-2025$800,000 N OF KOCHS LN TO LOCUST ST IN QUINCYMiles = 1.12

1STANDARD OVERLAY

ADA IMPROVEMENTS

ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

6,638 10.2 N 1.12

REHABILITATION - PAVEMENTS

2021-2025$900,000 LOCUST ST TO SPRING ST IN QUINCYMiles = 0.95

1DESIGNED OVERLAY

ADA IMPROVEMENTS

ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

8,096 4.8 N 0.95

REHABILITATION - PAVEMENTS

6 - 42

Page 46: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,500,000 VERMONT ST TO S OF ALDO BLVD IN QUINCYMiles = 0.49

5RECONSTRUCTION

ADA IMPROVEMENTS

ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

8,134 4.1 N 0.49

RECONSTRUCTION - PAVEMENTS

2021-2025$2,500,000 S OF STATE ST IN QUINCY TO 0.5 MI S OF I-172Miles = 4.04

1DESIGNED OVERLAY

ADA IMPROVEMENTS

ADAMSILL 96

Roadway Information Miles AADT Truck Pct NHS

7,998 4.4 N 1.90

5,138 7.3 N 1.82

3,050 8.8 N 0.32

REHABILITATION - PAVEMENTS

2021-2025$2,600,000 0.3 MI N OF E CR 800 TO MENARD CO LINEMiles = 4.38

1DESIGNED OVERLAY MASONILL 97

Roadway Information Miles AADT Truck Pct NHS

1,944 13.6 N 4.38

REHABILITATION - PAVEMENTS

2021-2025$1,600,000 N OF WARING RD S OF ATTERBERRY TO C&IM RR N OF PETERSBURGMiles = 3.25

3DESIGNED OVERLAY

CULVERT REPAIR

MENARDILL 97

Roadway Information Miles AADT Truck Pct NHS

2,289 12.4 N 3.25

REHABILITATION - PAVEMENTS

6 - 43

Page 47: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$5,200,000 ILL 97: C&IM RR N OF PETERSBURG TO 0.1 MI N OF LAKE PETERSBURG RD & ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURGMiles = 2.90

10DESIGNED OVERLAY

INTERSECTION RECONSTN

BRIDGE JOINT REPLACE/REPAIR

CULVERT EXTENSION

CULVERT REMOVAL

ADA IMPROVEMENTS

MENARDILL 97

ILL 123

Roadway Information Miles AADT Truck Pct NHS

4,694 6.5 N 2.48

5,500 4.4 N 0.42

REHABILITATION - PAVEMENTS

2020$700,000 ILL 97: N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD; ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURG

1P.E. (PHASE II) MENARDILL 97

ILL 123

REHABILITATION - PAVEMENTS

2021-2025$250,000 N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD

4UTILITY ADJUSTMENT MENARDILL 97

ILL 123

REHABILITATION - PAVEMENTS

2021-2025$500,000 ILL 97: AT DITCH 0.1 MI S OF LINCOLN TRAIL RD & KELLY ST N OF PETERSBURG TO C&IM RR; ILL 123: VILLAGE GREEN RD (W INT) TO 0.7 MI E

3NEW SHOULDERS MENARDILL 97

ILL 123

MAINTENANCE - PAVEMENTS

2021-2025$1,300,000 0.1 MI N OF LAKE PETERSBURG RD TO N OF BOY SCOUT RDMiles = 2.13

1DESIGNED OVERLAY MENARDILL 97

ILL 123

Roadway Information Miles AADT Truck Pct NHS

4,916 10.2 N 2.13

REHABILITATION - PAVEMENTS

6 - 44

Page 48: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$3,300,000 N OF BOY SCOUT RD TO SANGAMON CO LINEMiles = 5.65

1DESIGNED OVERLAY MENARDILL 97

ILL 123

Roadway Information Miles AADT Truck Pct NHS

4,325 2.5 N 5.65

REHABILITATION - PAVEMENTS

2021-2025$4,300,000 MENARD CO LINE TO ILL 125Miles = 5.09

1DESIGNED OVERLAY SANGAMONILL 97

Roadway Information Miles AADT Truck Pct NHS

4,671 4.1 N 5.09

REHABILITATION - PAVEMENTS

2021-2025$19,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RDMiles = 2.19

1RECONSTRUCTION

BRIDGE REPLACEMENT

INTERSECTION RECONSTN

BRIDGE (NEW)

SANGAMONILL 97

ILL 125

Roadway Information Miles AADT Truck Pct NHS

9,287 5.0 N 2.19

Structure Information Str Number AADT Truck Pct NHS

10,050 N40840046

RECONSTRUCTION - PAVEMENTS

2021-2025$100,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD

1ARCHAEOLOGICAL SURVEY SANGAMONILL 97

ILL 125

RECONSTRUCTION - PAVEMENTS

2021-2025$4,700,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD

1LAND ACQUISITION SANGAMONILL 97

ILL 125

RECONSTRUCTION - PAVEMENTS

6 - 45

Page 49: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,150,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD

1UTILITY ADJUSTMENT SANGAMONILL 97

ILL 125

RECONSTRUCTION - PAVEMENTS

2021-2025$1,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD

1CONSTRUCTION ENGINEERING SANGAMONILL 97

ILL 125

RECONSTRUCTION - PAVEMENTS

2021-2025$13,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RDMiles = 0.01

1ADDITIONAL LANES

BRIDGE (NEW)

SANGAMONILL 97

ILL 125

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$23,000,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELDMiles = 4.28

1RECONSTRUCTION

BRIDGE REMOVAL/DEMOLITION

PEDESTRIAN OVERPASS

SANGAMONILL 97

JEFFERSON ST

CH 17

Roadway Information Miles AADT Truck Pct NHS

10,050 4.7 N 1.05

10,062 4.7 N 2.04

RECONSTRUCTION - PAVEMENTS

2021-2025$150,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD

1ARCHAEOLOGICAL SURVEY SANGAMONILL 97

ILL 125

JEFFERSON ST

RECONSTRUCTION - PAVEMENTS

6 - 46

Page 50: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$5,400,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD

1LAND ACQUISITION SANGAMONILL 97

JEFFERSON ST

RECONSTRUCTION - PAVEMENTS

2021-2025$2,500,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD

1UTILITY ADJUSTMENT SANGAMONILL 97

JEFFERSON ST

RECONSTRUCTION - PAVEMENTS

2021-2025$2,500,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONILL 97

JEFFERSON ST

RECONSTRUCTION - PAVEMENTS

2021-2025$13,000,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELDMiles = 0.01

1ADDITIONAL LANES SANGAMONILL 97

JEFFERSON ST

CH 17

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$3,700,000 SCHUYLER CO LINE TO 0.4 MI N OF MOUNT STERLINGMiles = 7.32

1DESIGNED OVERLAY BROWNILL 99

Roadway Information Miles AADT Truck Pct NHS

620 15.5 N 7.32

REHABILITATION - PAVEMENTS

6 - 47

Page 51: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$4,300,000 0.1 MI N OF VERSAILLES TO MCKEE DRAINAGE DITCH N OF ILL 104Miles = 6.40

3DESIGNED OVERLAY

ADA IMPROVEMENTS

BROWNPIKE

ILL 99

Roadway Information Miles AADT Truck Pct NHS

1,783 19.9 N 5.69

1,850 17.3 N 0.71

REHABILITATION - PAVEMENTS

2020$4,400,000 DUTCHMAN'S CREEK AT ECL OF BROWNING TO 0.4 MI S OF FULTON CO LINEMiles = 8.81

2STANDARD OVERLAY SCHUYLERILL 100

Roadway Information Miles AADT Truck Pct NHS

573 30.2 N 8.81

REHABILITATION - PAVEMENTS

2021-2025$2,400,000 ILLINOIS RIVER TRIBUTARIES E OF BROWNING

2BRIDGE REPLACEMENT SCHUYLERILL 100

Structure Information Str Number AADT Truck Pct NHS

550 N270850008

550 N270850010

550 N270850011

RECONSTRUCTION - BRIDGES

2020$1,800,000 ILLINOIS RIVER BRIDGE AT FLORENCE

4BRIDGE DECK REPAIRS

BRIDGE DECK OVERLAY

BRIDGE JOINT REPLACE/REPAIR

SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

MAINTENANCE - BRIDGES

6 - 48

Page 52: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$77,000,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1BRIDGE REPLACEMENT SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

Structure Information Str Number AADT Truck Pct NHS

1,500 N70860001

RECONSTRUCTION - BRIDGES

2021-2025$325,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1ARCHAEOLOGICAL SURVEY SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2020$3,850,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1P.E. (CONSULTANT PLANS) SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2020$700,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1LAND ACQUISITION SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2021-2025$350,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1UTILITY ADJUSTMENT SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

6 - 49

Page 53: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,000,000 ILLINOIS RIVER BRIDGE AT FLORENCE

1CONSTRUCTION ENGINEERING SCOTTILL 100

ILL 106

ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.

RECONSTRUCTION - BRIDGES

2021-2025$2,600,000 0.2 MI W OF FREEMAN MINE RD TO US 67Miles = 5.71

2DESIGNED OVERLAY

ADA IMPROVEMENTS

SCHUYLERILL 101

Roadway Information Miles AADT Truck Pct NHS

444 13.3 N 5.71

REHABILITATION - PAVEMENTS

2021-2025$3,700,000 US 24 TO 1.7 MI W OF US 67Miles = 7.39

2DESIGNED OVERLAY SCHUYLERILL 103

Roadway Information Miles AADT Truck Pct NHS

1,364 11.5 N 7.39

REHABILITATION - PAVEMENTS

2021-2025$5,500,000 14TH ST IN QUINCY TO 0.4 MI E OF I-172Miles = 4.00

3DESIGNED OVERLAY

ADA IMPROVEMENTS

ADAMSILL 104

Roadway Information Miles AADT Truck Pct NHS

22,560 5.3 Y 3.79

11,700 9.0 N 0.21

REHABILITATION - PAVEMENTS

2021-2025$5,100,000 0.2 MI W OF FISHHOOK CREEK TO ILL 107Miles = 10.96

1DESIGNED OVERLAY ADAMSPIKE

ILL 104

Roadway Information Miles AADT Truck Pct NHS

625 19.2 N 1.82

625 44.8 N 9.14

REHABILITATION - PAVEMENTS

6 - 50

Page 54: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,500,000 0.4 MI W OF ILL 78/104 JCT NW OF JACKSONVILLE TO MORTON AVE IN JACKSONVILLEMiles = 2.45

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MORGANILL 104

Roadway Information Miles AADT Truck Pct NHS

2,669 9.7 N 2.45

REHABILITATION - PAVEMENTS

2020$150,000 0.1 MI W TO 0.1 MI E OF GATEWAY WESTERN RR BRIDGEMiles = 0.12

1DESIGNED OVERLAY MORGANILL 104

Roadway Information Miles AADT Truck Pct NHS

2,000 13.3 N 0.12

REHABILITATION - PAVEMENTS

2021-2025$1,500,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEKMiles = 0.74

3STANDARD OVERLAY

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

MORGANILL 104

Roadway Information Miles AADT Truck Pct NHS

3,100 7.4 N 0.74

REHABILITATION - PAVEMENTS

2020$200,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK

3LAND ACQUISITION MORGANILL 104

REHABILITATION - PAVEMENTS

2021-2025$100,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK

3UTILITY ADJUSTMENT MORGANILL 104

REHABILITATION - PAVEMENTS

6 - 51

Page 55: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$625,000 DITCH 1.9 MI W OF ILL 4

3CULVERT REPLACEMENT SANGAMONILL 104

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,300,000 1.1 MI E OF E BRANCH KISER CREEK TO US 54 W OF PITTSFIELDMiles = 2.52

3DESIGNED OVERLAY PIKEILL 106

Roadway Information Miles AADT Truck Pct NHS

1,688 9.8 N 2.52

REHABILITATION - PAVEMENTS

2021-2025$4,100,000 0.2 MI N OF ILL 104 TO WALL ST IN GRIGGSVILLEMiles = 7.86

1DESIGNED OVERLAY

ADA IMPROVEMENTS

PIKEILL 107

Roadway Information Miles AADT Truck Pct NHS

1,970 15.9 N 7.86

REHABILITATION - PAVEMENTS

2021-2025$1,200,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLEMiles = 0.97

6DESIGNED OVERLAY

SHOULDER RECONSTRUCTION

DRAINAGE

STORM SEWER REPAIR

GUARDRAIL

MACOUPINILL 108

Roadway Information Miles AADT Truck Pct NHS

1,850 5.4 N 0.30

2,630 16.8 N 0.67

REHABILITATION - PAVEMENTS

2021-2025$200,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE

3LAND ACQUISITION MACOUPINILL 108

REHABILITATION - PAVEMENTS

6 - 52

Page 56: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$100,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE

3UTILITY ADJUSTMENT MACOUPINILL 108

REHABILITATION - PAVEMENTS

2021-2025$1,700,000 0.1 MI E ALTON RD IN CARLINVILLE TO ILL 4 AT W SIDE OF CARLINVILLE SQUAREMiles = 0.30

2RECONSTRUCTION

PARKING IMPROVEMENT

ADA IMPROVEMENTS

MACOUPINILL 108

Roadway Information Miles AADT Truck Pct NHS

8,050 7.8 N 0.30

RECONSTRUCTION - PAVEMENTS

2021-2025$5,300,000 ILL 4 (S) IN CARLINVILLE TO MONTGOMERY CO LINEMiles = 9.01

1DESIGNED OVERLAY MACOUPINILL 108

Roadway Information Miles AADT Truck Pct NHS

2,524 12.1 N 9.01

REHABILITATION - PAVEMENTS

2020$1,100,000 AT I-55 INTCHGMiles = 0.97

1DESIGNED OVERLAY

MEDIAN REPAIR

LIGHTING

MONTGOMERYILL 108

Roadway Information Miles AADT Truck Pct NHS

2,723 11.2 N 0.49

1,200 9.2 N 0.27

1,150 3.2 N 0.12

REHABILITATION - PAVEMENTS

2020$1,950,000 3.1 MI S OF CARTHAGE TO 0.8 MI N OF WEST POINT RDMiles = 7.27

1CAPE SEAL

GRINDING

FOG SEAL

HANCOCKILL 110

ILL 336

PRESERVATION - PAVEMENTS

6 - 53

Page 57: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,600,000 APPLE CREEK 2.1 MI S OF ILL 104 IN WAVERLY

1BRIDGE REPLACEMENT MORGANILL 111

Structure Information Str Number AADT Truck Pct NHS

1,950 N170690023

RECONSTRUCTION - BRIDGES

2021-2025$3,000,000 JERSEY CO LINE TO ILL 16Miles = 5.19

1DESIGNED OVERLAY MACOUPINILL 111

ILL 267

Roadway Information Miles AADT Truck Pct NHS

3,623 14.4 N 5.19

REHABILITATION - PAVEMENTS

2021-2025$3,400,000 N OF ILL 16 TO JERSEY CO LINE IN BRIGHTONMiles = 5.70

1DESIGNED OVERLAY

ADA IMPROVEMENTS

MACOUPINILL 111

ILL 267

Roadway Information Miles AADT Truck Pct NHS

4,150 13.7 N 0.04

4,585 18.9 Y 5.66

REHABILITATION - PAVEMENTS

2021-2025$1,700,000 PIASA CREEK 0.2 MI S OF ILL 16

22BRIDGE REPLACEMENT MACOUPINILL 111

ILL 267

Structure Information Str Number AADT Truck Pct NHS

4,400 Y120590017

RECONSTRUCTION - BRIDGES

2021-2025$1,600,000 LITTLE PIASA CREEK 3.7 MI S OF ILL 16

22BRIDGE REPLACEMENT MACOUPINILL 111

ILL 267

Structure Information Str Number AADT Truck Pct NHS

4,450 Y230590019

RECONSTRUCTION - BRIDGES

6 - 54

Page 58: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,600,000 LITTLE PIASA CREEK 4 MI S OF ILL 16

22BRIDGE REPLACEMENT MACOUPINILL 111

ILL 267

Structure Information Str Number AADT Truck Pct NHS

4,450 Y230590020

RECONSTRUCTION - BRIDGES

2021-2025$2,700,000 S OF PULASKI ST IN LINCOLN TO 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING)Miles = 3.91

1DESIGNED OVERLAY LOGANILL 121

Roadway Information Miles AADT Truck Pct NHS

3,834 35.2 Y 3.91

REHABILITATION - PAVEMENTS

2021-2025$4,100,000 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING) TO 0.1 MI S OF IC RR IN MT PULASKIMiles = 6.12

1DESIGNED OVERLAY LOGANILL 121

Roadway Information Miles AADT Truck Pct NHS

3,628 37.4 Y 6.12

REHABILITATION - PAVEMENTS

2021-2025$500,000 0.1 MI S OF IC RR IN MT PULASKI TO ILL 54Miles = 0.60

3DESIGNED OVERLAY

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

LOGANILL 121

Roadway Information Miles AADT Truck Pct NHS

3,500 27.1 Y 0.60

REHABILITATION - PAVEMENTS

2021-2025$1,000,000 AT MCDONALD ST SE OF MT PULASKI

9INTERSECTION IMPROVEMENT

LEFT TURN LANES

RIGHT TURN LANE

LOGANILL 121

MCDONALD ST

MISCELLANEOUS IMPROVEMENTS

6 - 55

Page 59: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$200,000 AT MCDONALD ST SE OF MT PULASKI

7LAND ACQUISITION LOGANILL 121

MCDONALD ST

MISCELLANEOUS IMPROVEMENTS

2021-2025$100,000 AT MCDONALD ST SE OF MT PULASKI

6UTILITY ADJUSTMENT LOGANILL 121

MCDONALD ST

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,500,000 UNDER ILL 54 AT SCL OF MT PULASKI

12BRIDGE NEW DECK

BRIDGE SUPERSTRUCTURE

LOGANILL 121

Structure Information Str Number AADT Truck Pct NHS

1,050 N200540030

REHABILITATION - BRIDGES

2021-2025$1,600,000 RICHLAND CREEK 0.6 MI N OF ILL 125Miles = 0.18

14BRIDGE REPLACEMENT

VERTICAL REALIGNMENT

SANGAMONILL 123

Structure Information Str Number AADT Truck Pct NHS

1,150 N110840090

RECONSTRUCTION - BRIDGES

2021-2025$4,200,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55Miles = 6.09

8DESIGNED OVERLAY

SHOULDER RECONSTRUCTION

SANGAMONILL 123

Roadway Information Miles AADT Truck Pct NHS

2,507 9.2 N 6.09

REHABILITATION - PAVEMENTS

2021-2025$500,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55

2LAND ACQUISITION SANGAMONILL 123

REHABILITATION - PAVEMENTS

6 - 56

Page 60: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$200,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55

2UTILITY ADJUSTMENT SANGAMONILL 123

REHABILITATION - PAVEMENTS

2020$1,365,000 E OF ILL 29 TO 0.3 MI EMiles = 0.36

3CULVERT REPLACEMENT

CULVERT (NEW)

VERTICAL REALIGNMENT

STANDARD OVERLAY

RELOCATION

CULVERT REMOVAL

MISCELLANEOUS

SANGAMONILL 123

Structure Information Str Number AADT Truck Pct NHS

2,700 N70847099

RECONSTRUCTION - BRIDGES

2021-2025$2,200,000 FANCY CREEK 2.7 MI E OF ILL 29

9BRIDGE REPLACEMENT SANGAMONILL 123

Structure Information Str Number AADT Truck Pct NHS

2,650 N70840097

RECONSTRUCTION - BRIDGES

2020$400,000 E OF WEST OUTER RD TO W OF OLD US 66 IN WILLIAMSVILLEMiles = 0.53

1STANDARD OVERLAY

PATCHING

SANGAMONILL 123

Roadway Information Miles AADT Truck Pct NHS

5,650 19.5 N 0.25

5,700 9.5 N 0.28

PRESERVATION - PAVEMENTS

2021-2025$900,000 OVER BNSF RR IN BEARDSTOWN

2BRIDGE DECK OVERLAY CASSILL 125

PRESERVATION - BRIDGES

6 - 57

Page 61: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$700,000 US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RD

2NEW SHOULDERS

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

CASSILL 125

MISCELLANEOUS IMPROVEMENTS

2021-2025$5,000,000 ILL 125: 0.2 MI E OF S BLUFF SPRINGS RD TO 0.1 MI SE OF ILL 78 IN VIRGINIA & ILL 78: 0.1 MI NE TO 0.1 MI SW OF ILL 125Miles = 8.00

5DESIGNED OVERLAY

SHOULDER RECONSTRUCTION

MILLED RUMBLE STRIP

CASSILL 125

ILL 78

Roadway Information Miles AADT Truck Pct NHS

3,950 16.4 N 7.87

3,281 7.8 N 0.13

REHABILITATION - PAVEMENTS

2021-2025$3,700,000 ILL 159 TO MT CLARE RDMiles = 6.88

2DESIGNED OVERLAY

ADA IMPROVEMENTS

MACOUPINILL 138

Roadway Information Miles AADT Truck Pct NHS

1,218 7.0 N 6.88

REHABILITATION - PAVEMENTS

2020$900,000 ILL 4 TO 8TH ST IN BENLDMiles = 0.72

7STANDARD OVERLAY

ADA IMPROVEMENTS

PARKING IMPROVEMENT

MACOUPINILL 138

Roadway Information Miles AADT Truck Pct NHS

3,646 6.8 N 0.72

REHABILITATION - PAVEMENTS

2021-2025$2,000,000 NORTH ST TO ALTON ST IN BUNKER HILLMiles = 0.99

1DESIGNED OVERLAY

STORM SEWER (NEW)

CURB AND GUTTER

PARKING IMPROVEMENT

ADA IMPROVEMENTS

MACOUPINILL 159

Roadway Information Miles AADT Truck Pct NHS

3,535 14.0 N 0.99

REHABILITATION - PAVEMENTS

6 - 58

Page 62: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$450,000 NORTH ST TO ALTON ST IN BUNKER HILL

1P.E. (PHASE I)

P.E. (PHASE II)

MACOUPINILL 159

REHABILITATION - PAVEMENTS

2021-2025$300,000 NORTH ST TO ALTON ST IN BUNKER HILL

1LAND ACQUISITION MACOUPINILL 159

REHABILITATION - PAVEMENTS

2021-2025$150,000 NORTH ST TO ALTON ST IN BUNKER HILL

1UTILITY ADJUSTMENT MACOUPINILL 159

REHABILITATION - PAVEMENTS

2021-2025$100,000 AT ALTON ST IN BUNKER HILL

7DRAINAGE MACOUPINILL 159

MISCELLANEOUS IMPROVEMENTS

2021-2025$3,400,000 S OF I-72 TO 1.4 MI S OF WOODSONMiles = 5.30

1DESIGNED OVERLAY

NEW SHOULDERS

MORGANILL 267

Roadway Information Miles AADT Truck Pct NHS

4,194 17.0 N 5.30

REHABILITATION - PAVEMENTS

2021-2025$3,100,000 1.4 MI S OF WOODSON TO GREENE CO LINEMiles = 6.40

1DESIGNED OVERLAY MORGANILL 267

Roadway Information Miles AADT Truck Pct NHS

2,345 18.6 N 6.40

REHABILITATION - PAVEMENTS

6 - 59

Page 63: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$600,000 E OF STATE ST IN DIVERNON TO 0.1 MI E OF SULLIVAN RDMiles = 0.74

1DESIGNED OVERLAY SANGAMONBROWN ST

E DIVERNON RD

Roadway Information Miles AADT Truck Pct NHS

775 24.5 N 0.23

2,529 3.6 N 0.42

REHABILITATION - PAVEMENTS

2021-2025$2,700,000 PEORIA RD TO N OF NORTHFIELD DR IN SPRINGFIELDMiles = 1.83

1DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONDIRKSEN PKWY

Roadway Information Miles AADT Truck Pct NHS

14,997 6.7 Y 1.83

REHABILITATION - PAVEMENTS

2021-2025$2,400,000 0.1 MI N OF STEVENSON DR TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELDMiles = 1.88

4DESIGNED OVERLAY

ADA IMPROVEMENTS

SANGAMONDIRKSEN PKWY

Roadway Information Miles AADT Truck Pct NHS

12,934 8.7 Y 1.88

REHABILITATION - PAVEMENTS

2020$775,000 W OF HUNT RD TO 0.6 MI N OF CHATHAM RDMiles = 0.73

1STANDARD OVERLAY SANGAMONE LAKE SHORE DR

Roadway Information Miles AADT Truck Pct NHS

4,601 5.2 N 0.73

REHABILITATION - PAVEMENTS

2021-2025$630,000 AT I-55 INTCHG E OF GLENARMMiles = 0.73

1DESIGNED OVERLAY SANGAMONHORSE FARM RD

OLD ROUTE 66

Roadway Information Miles AADT Truck Pct NHS

680 0.0 N 0.35

900 0.0 N 0.38

REHABILITATION - PAVEMENTS

6 - 60

Page 64: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,200,000 W WAGGONER AVE E OF WAGGONER TO MORRISONVILLE AVE S OF FARMERSVILLEMiles = 3.01

1RECONSTRUCTION MONTGOMERYI 55 E FR RD

Roadway Information Miles AADT Truck Pct NHS

125 0.0 N 3.01

RECONSTRUCTION - PAVEMENTS

2021-2025$2,300,000 W WAGGONER AVE E OF WAGGONER TO 0.1 MI S OF MACOUPIN CREEK S OF FARMERSVILLEMiles = 4.08

1DESIGNED OVERLAY MONTGOMERYI 55 W FR RD

Roadway Information Miles AADT Truck Pct NHS

520 5.4 N 4.08

REHABILITATION - PAVEMENTS

2021-2025$900,000 1.4 MI N OF I-55 N OF LINCOLN TO KICKAPOO CREEKMiles = 1.98

1DESIGNED OVERLAY LOGANI 55 W FR RD

OLD US 66

Roadway Information Miles AADT Truck Pct NHS

3,250 10.8 N 1.98

REHABILITATION - PAVEMENTS

2021-2025$1,100,000 E OF ILL 48 TO CH 6 (1350N RD)Miles = 2.41

1DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANLINCOLN TRAIL

Roadway Information Miles AADT Truck Pct NHS

2,500 46.6 N 1.67

1,849 38.8 N 0.74

REHABILITATION - PAVEMENTS

2021-2025$15,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELDMiles = 1.49

1RECONSTRUCTION

TRAF SIGNAL REPLACEMENT

ADA IMPROVEMENTS

SANGAMONMACARTHUR BLVD

Roadway Information Miles AADT Truck Pct NHS

20,760 6.4 Y 1.49

RECONSTRUCTION - PAVEMENTS

6 - 61

Page 65: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$2,500,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD

1P.E. (PHASE I)

P.E. (PHASE II)

SANGAMONMACARTHUR BLVD

RECONSTRUCTION - PAVEMENTS

2021-2025$11,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD

1LAND ACQUISITION SANGAMONMACARTHUR BLVD

RECONSTRUCTION - PAVEMENTS

2021-2025$1,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD

1UTILITY ADJUSTMENT SANGAMONMACARTHUR BLVD

RECONSTRUCTION - PAVEMENTS

2021-2025$1,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONMACARTHUR BLVD

RECONSTRUCTION - PAVEMENTS

2021-2025$260,000 ILL 48 TO ILL 29 IN TAYLORVILLEMiles = 0.57

1DESIGNED OVERLAY

ADA IMPROVEMENTS

CHRISTIANMCADAM DR

Roadway Information Miles AADT Truck Pct NHS

2,582 0.0 N 0.57

REHABILITATION - PAVEMENTS

2021-2025$150,000 ILL 54 TO ILL 121 IN MT PULASKIMiles = 0.32

9DESIGNED OVERLAY LOGANMCDONALD ST

Roadway Information Miles AADT Truck Pct NHS

1,300 22.3 N 0.32

REHABILITATION - PAVEMENTS

6 - 62

Page 66: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$65,000 S OF ILL 123 TO 0.2 MI S

1BIT SURFACE TREATMENT-A2

BASE

SANGAMONOLD ILL 29

MAINTENANCE - PAVEMENTS

2021-2025$1,650,000 WALNUT CREEK 1 MI N OF WINCHESTER

1BRIDGE REPLACEMENT SCOTTOLD US 36

Structure Information Str Number AADT Truck Pct NHS

3,350 N130860004

RECONSTRUCTION - BRIDGES

2021-2025$450,000 DITCH 1.7 MI NE OF I-72 W OF RIGGSTON

4CULVERT REPLACEMENT

DITCH CLEANING

SCOTTOLD US 36

MISCELLANEOUS IMPROVEMENTS

2021-2025$1,300,000 ILL 127 TO ILL 108 E OF I-55Miles = 3.34

1DESIGNED OVERLAY MONTGOMERYOLD US 66

Roadway Information Miles AADT Truck Pct NHS

571 0.0 N 3.34

REHABILITATION - PAVEMENTS

2021-2025$1,400,000 3.5 MI N OF FARMERSVILLE TO E OF FARMERSVILLE E OF I-55Miles = 3.52

1DESIGNED OVERLAY MONTGOMERYOLD US 66

Roadway Information Miles AADT Truck Pct NHS

25 0.0 N 2.67

25 0.0 N 0.85

REHABILITATION - PAVEMENTS

6 - 63

Page 67: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$700,000 SANGAMON CO LINE TO 1.7 MI SMiles = 1.71

1DESIGNED OVERLAY MONTGOMERYOLD US 66

Roadway Information Miles AADT Truck Pct NHS

25 0.0 N 1.71

REHABILITATION - PAVEMENTS

2021-2025$5,700,000 STEVENSON DR: 0.1 MI E OF I-55 BUS (6TH ST) TO SPAULDING BRIDGE 0.3 MI E OF I-55 & DIRKSEN PKWY: STEVENSON DR TO 0.1 MI N (IN SPRINGFIELD)Miles = 2.19

4DESIGNED OVERLAY

ADA IMPROVEMENTS

SIDEWALKS

SANGAMONSTEVENSON DR

E LAKE SHORE DR

DIRKSEN PKWY

Roadway Information Miles AADT Truck Pct NHS

20,893 11.2 Y 0.15

18,204 7.8 Y 1.60

17,600 2.2 Y 0.29

17,600 2.2 N 0.15

REHABILITATION - PAVEMENTS

2021-2025$85,000 BRIDGE DECK SEALING

1BRIDGE DECK SEALING ADAMSMORGAN

VARIOUS

PRESERVATION - BRIDGES

2021-2025$415,000 BRIDGE DECK SEALING

1BRIDGE DECK SEALING ADAMSCHRISTIANBROWNCASSHANCOCKMASONMENARDMORGANSCHUYLER

VARIOUS

PRESERVATION - BRIDGES

6 - 64

Page 68: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 BRIDGE DECK SEALING

1BRIDGE DECK SEALINGVARIOUS

PRESERVATION - BRIDGES

2020$50,000 MISCELLANEOUS RAILROAD ENGINEERING

1RR ENGINEERING DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$2,000,000 STRUCTURE PRESERVATION

1MISCELLANEOUS

BRIDGE DECK OVERLAY

DISTRICT-WIDEVARIOUS

PRESERVATION - BRIDGES

2021-2025$30,000,000 PAVEMENT PRESERVATION

1MICROSURFACING 1 PASS

MISCELLANEOUS

DISTRICT-WIDEVARIOUS

PRESERVATION - PAVEMENTS

2021-2025$28,000,000 STRUCTURE PRESERVATION

1MISCELLANEOUS DISTRICT-WIDEVARIOUS

PRESERVATION - BRIDGES

2021-2025$400,000 VARIOUS LOCATIONS IN MOUNT STERLING & CAMDEN

2ADA IMPROVEMENTS BROWNSCHUYLER

VARIOUS

MISCELLANEOUS IMPROVEMENTS

6 - 65

Page 69: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$3,980,000 PAVEMENT PRESERVATION

2MICROSURFACING 1 PASS

GRINDING

DISTRICT-WIDEVARIOUS

PRESERVATION - PAVEMENTS

2020$318,000 BRIDGE DECK SEALING

5BRIDGE DECK SEALING VARIOUSPIKESCOTT

VARIOUS

PRESERVATION - BRIDGES

2020$182,000 BRIDGE DECK SEALING

1BRIDGE DECK SEALING VARIOUSPIKESCOTTCASS

VARIOUS

PRESERVATION - BRIDGES

2020$1,919,000 HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS

7SAFETY IMPROVEMENTS DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$18,805,000 HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS

6SAFETY IMPROVEMENTS DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$500,000 DISTRICT MISCELLANEOUS

6MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

6 - 66

Page 70: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 DISTRICT MISCELLANEOUS

4MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$500,000 DISTRICT MISCELLANEOUS

2MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$250,000 UTILITY ADJUSTMENTS

6UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,000,000 UTILITY ADJUSTMENTS

1UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$480,000 MISCELLANEOUS LAND ACQUISITION

5LAND ACQUISITION DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$500,000 MISCELLANEOUS LAND ACQUISITION

1LAND ACQUISITION DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

6 - 67

Page 71: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$4,500,000 MISCELLANEOUS LAND ACQUISITION

1LAND ACQUISITION DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,500,000 LAND ACQUISITION & DESIGN SURVEYS

1P.E. (ROW)

P.E. SURVEYS (ROW)

P.E. SURVEYS (PHASE I)

P.E. SURVEYS (PHASE II)

DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$500,000 SOIL BORINGS & PAVEMENT CORINGS

4P.E. SOILS (PHASE I)

P.E. SOILS (PHASE II)

DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$500,000 ON-CALL ENGINEERING

6PRELIMINARY ENGINEERING

P.E. (CONSULTANT PLANS)

DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2020$2,250,000 ON-CALL ENGINEERING

1PRELIMINARY ENGINEERING

P.E. (CONSULTANT PLANS)

DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$9,750,000 ON-CALL ENGINEERING

1PRELIMINARY ENGINEERING

P.E. (CONSULTANT PLANS)

DISTRICT-WIDEVARIOUS

MISCELLANEOUS IMPROVEMENTS

6 - 68

Page 72: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

State Highways

FY 2020-2025 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,400,000 CEDAR GLEN CREEK 0.7 MI W OF ILL 96

1BRIDGE REPLACEMENT HANCOCKWARSAW SPUR

Structure Information Str Number AADT Truck Pct NHS

1,650 N180340043

RECONSTRUCTION - BRIDGES

6 - 69

Page 73: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$30,410,000 AT NORFOLK SOUTHERN RR S OF BROAD PL IN SPRINGFIELD

1BRIDGE REPLACEMENT SANGAMON5TH ST

6TH ST

RECONSTRUCTION - BRIDGES

2021-2025$2,500,000 LINCOLN QUARRY RD TO I-55Miles = 2.44

3RECONSTRUCTION LOGAN5TH ST

1550TH ST

RECONSTRUCTION - PAVEMENTS

2021-2025$160,000 LINCOLN QUARRY RD TO I-55

3CONSTRUCTION ENGINEERING LOGAN5TH ST

1550TH ST

RECONSTRUCTION - PAVEMENTS

2021-2025$1,000,000 AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD

4BRIDGE REPLACEMENT SANGAMON8TH ST

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$120,000 AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD

4CONSTRUCTION ENGINEERING SANGAMON8TH ST

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2020$3,876,000 0.1 MI N OF GREENBRIAR RD TO 0.2 MI N OF ILES AVE & N OF FIELD LN TO YUCAN DR IN SPRINGFIELDMiles = 0.91

2RECONSTRUCTION SANGAMONARCHER ELEVATOR RD

RECONSTRUCTION - PAVEMENTS

6 - 70

Page 74: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$56,000 200TH ST TO SANGAMON CO LINE

1P.E. (PHASE I)

P.E. (PHASE II)

LOGANCH 1

ILLIOPOLIS BLKTP

1600TH AVE

REHABILITATION - PAVEMENTS

2021-2025$850,000 200TH ST TO SANGAMON CO LINEMiles = 2.00

1STANDARD OVERLAY LOGANCH 1

ILLIOPOLIS BLKTP

1600TH AVE

REHABILITATION - PAVEMENTS

2021-2025$54,000 200TH ST TO SANGAMON CO LINE

1CONSTRUCTION ENGINEERING LOGANCH 1

ILLIOPOLIS BLKTP

1600TH AVE

REHABILITATION - PAVEMENTS

2021-2025$158,000 CH 3: US 24 TO 1400 E RD AND 1400 E RD TO 1600 E ST; CH 11: 825 N AVE TO ILL 99Miles = 10.80

3BIT SURFACE TREATMENT-A3 BROWNCH 3

CH 11

PRESERVATION - PAVEMENTS

2021-2025$212,000 1600 E RD TO ECL OF VERSAILLESMiles = 12.91

2BIT SURFACE TREATMENT-A1 BROWNCH 3

CH 12

LAGRANGE RD

PRESERVATION - PAVEMENTS

6 - 71

Page 75: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$340,000 SCL OF FOREST CITY TO US 136Miles = 4.32

5CAPE SEAL MASONCH 4

PRESERVATION - PAVEMENTS

2020$500,000 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE

2BRIDGE REPLACEMENT CASSCH 4

NEWMANSVILLE RD

RECONSTRUCTION - BRIDGES

2020$40,000 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE

2CONSTRUCTION ENGINEERING CASSCH 4

NEWMANSVILLE RD

RECONSTRUCTION - BRIDGES

2021-2025$2,000,000 AT LA MOINE RIVER 0.3 MI W OF MCDONOUGH CO LINE

3BRIDGE REHABILITATION HANCOCKCH 6

BENTLEY RD

REHABILITATION - BRIDGES

2020$1,100,000 AT SALT CREEK 2 MI N OF CHESTNUT

4BRIDGE NEW DECK LOGANCH 6

BEASON RD

REHABILITATION - BRIDGES

2020$70,000 AT SALT CREEK 2 MI N OF CHESTNUT

4CONSTRUCTION ENGINEERING LOGANCH 6

BEASON RD

REHABILITATION - BRIDGES

6 - 72

Page 76: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$450,000 OVER ABANDONED RR IN PETERSBURG

2BRIDGE REMOVAL/DEMOLITION MENARDCH 6

DOUGLAS AVE

MISCELLANEOUS IMPROVEMENTS

2020$24,000 OVER ABANDONED RR IN PETERSBURG

2CONSTRUCTION ENGINEERING MENARDCH 6

DOUGLAS AVE

MISCELLANEOUS IMPROVEMENTS

2021-2025$200,000 N 1850TH AVE TO WESTPOINT PLEASANT RDMiles = 2.34

4CAPE SEAL ADAMSCH 7

BOTTOM RD (GRR)

PRESERVATION - PAVEMENTS

2021-2025$700,000 N BLUFF SPRINGS RD TO HICKORY RDMiles = 4.94

13DESIGNED OVERLAY CASSCH 7

CHANDLERVILLE RD

REHABILITATION - PAVEMENTS

2021-2025$60,000 N BLUFF SPRINGS RD TO HICKORY RD

4CONSTRUCTION ENGINEERING CASSCH 7

CHANDLERVILLE RD

REHABILITATION - PAVEMENTS

2021-2025$730,000 HICKORY RD TO ILL 78Miles = 4.42

13DESIGNED OVERLAY CASSCH 7

CHANDLERVILLE RD

REHABILITATION - PAVEMENTS

6 - 73

Page 77: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$60,000 HICKORY RD TO ILL 78

4CONSTRUCTION ENGINEERING CASSCH 7

CHANDLERVILLE RD

REHABILITATION - PAVEMENTS

2020$1,800,000 CHRISTIAN CO LINE TO NOKOMIS BLKTPMiles = 2.98

10DESIGNED OVERLAY MONTGOMERYCH 7

TAYLORVILLE RD

REHABILITATION - PAVEMENTS

2021-2025$625,000 ILL 125 TO 0.3 MI S OF PINE STMiles = 0.85

2STANDARD OVERLAY CASSCH 8

ARENZVILLE RD

REHABILITATION - PAVEMENTS

2021-2025$50,000 ILL 125 TO 0.3 MI S OF PINE ST

2CONSTRUCTION ENGINEERING CASSCH 8

ARENZVILLE RD

REHABILITATION - PAVEMENTS

2021-2025$510,000 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN

2BRIDGE REPLACEMENT CASSCH 8

ARENZVILLE RD

RECONSTRUCTION - BRIDGES

2021-2025$48,000 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN

2CONSTRUCTION ENGINEERING CASSCH 8

ARENZVILLE RD

RECONSTRUCTION - BRIDGES

6 - 74

Page 78: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$548,000 900 E RD TO SCHUYLER CO LINEMiles = 2.09

4BIT SURFACE TREATMENT-A3 BROWNCH 8

PRESERVATION - PAVEMENTS

2020$28,000 900 E RD TO SCHUYLER CO LINE

4CONSTRUCTION ENGINEERING BROWNCH 8

PRESERVATION - PAVEMENTS

2021-2025$500,000 AT MUD CREEK 1 MI W OF ARENZVILLE

2BRIDGE REPLACEMENT CASSCH 9

ARENZVILLE RD

RECONSTRUCTION - BRIDGES

2021-2025$40,000 AT MUD CREEK 1 MI W OF ARENZVILLE

2CONSTRUCTION ENGINEERING CASSCH 9

ARENZVILLE RD

RECONSTRUCTION - BRIDGES

2021-2025$1,600,000 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN

4BRIDGE REPLACEMENT MONTGOMERYCH 9

RED BALL TRAIL

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$77,000 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN

1CONSTRUCTION ENGINEERING MONTGOMERYCH 9

RED BALL TRAIL

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

6 - 75

Page 79: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$800,000 W OF WCL OF BASCO TO E OF WASHINGTON STMiles = 0.51

4DESIGNED OVERLAY

DRAINAGE

SIDEWALKS

HANCOCKCH 11

MAIN ST

REHABILITATION - PAVEMENTS

2021-2025$500,000 ILL 61/94 TO N 2400TH AVEMiles = 2.01

4DESIGNED OVERLAY ADAMSCH 11

E 2300TH ST

REHABILITATION - PAVEMENTS

2021-2025$700,000 N 1800TH RD TO ILL 104Miles = 1.55

1STANDARD OVERLAY CHRISTIANCH 11

REHABILITATION - PAVEMENTS

2021-2025$2,000,000 AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBOROMiles = 0.48

9BRIDGE REPLACEMENT

RECONSTRUCTION

MONTGOMERYCH 11

WALSHVILLE TRAIL

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$101,000 AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBORO

2CONSTRUCTION ENGINEERING MONTGOMERYCH 11

WALSHVILLE TRAIL

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

6 - 76

Page 80: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,525,000 AT MAUVAISE TERRE CREEK

1BRIDGE REPLACEMENT SCOTTCH 12

CHAPIN RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$130,000 AT MAUVAISE TERRE CREEK

1CONSTRUCTION ENGINEERING SCOTTCH 12

CHAPIN RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$750,000 AT LAKE FORK CREEK 1 MI E OF BROADWELL

2BRIDGE REPLACEMENT LOGANCH 12

BROADWELL RD

RECONSTRUCTION - BRIDGES

2021-2025$48,000 AT LAKE FORK CREEK 1 MI E OF BROADWELL

2CONSTRUCTION ENGINEERING LOGANCH 12

BROADWELL RD

RECONSTRUCTION - BRIDGES

2020$2,500,000 S COUNTY RD TO ILL 29Miles = 5.22

4DESIGNED OVERLAY

COLD IN-PLACE RECYCLING

CHRISTIANCH 12

BEAR CREEK RD

REHABILITATION - PAVEMENTS

2020$115,000 S COUNTY RD TO ILL 29

4CONSTRUCTION ENGINEERING CHRISTIANCH 12

BEAR CREEK RD

REHABILITATION - PAVEMENTS

6 - 77

Page 81: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$600,000 MCKEE CREEK TO SENATE ST IN COLUMBUSMiles = 1.51

4DESIGNED OVERLAY ADAMSCH 12

COLUMBUS /

COATSBURG RD

REHABILITATION - PAVEMENTS

2020$2,300,000 I-72 RAMP (EB) TO W OF SANGAMON RIVER BRIDGEMiles = 4.39

3RECONSTRUCTION SANGAMONCH 12

MECHANICSBURG RD

RECONSTRUCTION - PAVEMENTS

2020$144,000 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RDMiles = 0.86

4RECONSTRUCTION MACOUPINCH 13

CH 24

CH 37

NINE MILE RD

RECONSTRUCTION - PAVEMENTS

2020$92,000 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RD

4CONSTRUCTION ENGINEERING MACOUPINCH 13

CH 24

CH 37

NINE MILE RD

RECONSTRUCTION - PAVEMENTS

2020$243,000 CH 2 TO NCL OF DETROITMiles = 7.25

4BIT SURFACE TREATMENT-A1 PIKECH 14

PRESERVATION - PAVEMENTS

6 - 78

Page 82: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$325,000 E MANITO RD TO TAZEWELL CO LINEMiles = 4.30

1CAPE SEAL MASONCH 14

BLUE SPRUCE RD

2400 N RD

PRESERVATION - PAVEMENTS

2020$3,076,000 ECL OF BRIGHTON TO WCL OF BUNKER HILLMiles = 9.51

16RECONSTRUCTION

BRIDGE REPLACEMENT

MACOUPINCH 14

BRIGHTON /

BUNKER HILL RD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.

THIS EARMARK WILL BE FUNDED SEPARATELY.

RECONSTRUCTION - PAVEMENTS

2020$280,000 ECL OF BRIGHTON TO WCL OF BUNKER HILL

4CONSTRUCTION ENGINEERING MACOUPINCH 14

BRIGHTON /

BUNKER HILL RD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.

THIS EARMARK WILL BE FUNDED SEPARATELY.

RECONSTRUCTION - PAVEMENTS

2020$80,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND

3P.E. (PHASE I)

P.E. (PHASE II)

LOGANCH 15

MIDDLETOWN RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

REHABILITATION - BRIDGES

2021-2025$1,100,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND

4BRIDGE REHABILITATION LOGANCH 15

MIDDLETOWN RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

REHABILITATION - BRIDGES

6 - 79

Page 83: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$70,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND

4CONSTRUCTION ENGINEERING LOGANCH 15

MIDDLETOWN RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

REHABILITATION - BRIDGES

2021-2025$80,000 ILL 10 TO 5TH ST

2P.E. (PHASE I)

P.E. (PHASE II)

LOGANCH 15

MIDDLETOWN RD

REHABILITATION - PAVEMENTS

2021-2025$660,000 0.1 MI E OF TR 106 TO E MANITO RDMiles = 8.68

1CAPE SEAL MASONCH 15

FISH HATCHERY RD

PRESERVATION - PAVEMENTS

2021-2025$3,118,000 WASHINGTON ST TO PAJIM LNMiles = 0.63

8RECONSTRUCTION SANGAMONCH 17

BRADFORDTON RD

RECONSTRUCTION - PAVEMENTS

2021-2025$1,882,000 PAJIM LN TO OLD JACKSONVILLE RDMiles = 0.38

1ADDITIONAL LANES SANGAMONCH 17

BRADFORDTON RD

INITIAL CONSTRUCTION - PAVEMENTS

6 - 80

Page 84: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2020$400,000 DENVER-PLYMOUTH RD/CH 19: 2100 E RD TO WCL OF PLYMOUTH; WEST POINT RD/CH 23: 1500 E RD TO WOLF ST IN WEST POINT; BOWEN RD/CH 33: ILL 336 TO WCL OF BOWEN; AUGUSTA RD/CH 20: ILL 61/101 IN AUGUSTA TO ADAMS CO LINEMiles = 17.14

2BIT SURFACE TREATMENT-A1 HANCOCKCH 19

CH 23

CH 33

CH 20

DENVER/PLYMOUTH RD

WEST POINT RD

BOWEN RD

AUGUSTA RD

PRESERVATION - PAVEMENTS

2021-2025$370,000 NCL OF HAVANA TO 1950 N RDMiles = 4.96

1CAPE SEAL MASONCH 20

MANITO RD

PRESERVATION - PAVEMENTS

2021-2025$1,725,000 AT QUIVER CREEK 4 MI NE OF HAVANA

4BRIDGE REPLACEMENT MASONCH 20

MANITO RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$875,000 0.1 MI N OF 1950 N RD TO 0.1 MI W OF CH 15Miles = 0.63

1RECONSTRUCTION MASONCH 20

MANITO RD

RECONSTRUCTION - PAVEMENTS

2021-2025$435,000 1950 E RD TO 2450 E RDMiles = 4.96

3CAPE SEAL MASONCH 20

MANITO RD

PRESERVATION - PAVEMENTS

6 - 81

Page 85: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$285,000 2450 E RD TO WCL OF FOREST CITYMiles = 3.69

2COLD IN-PLACE RECYCLING

CAPE SEAL

MASONCH 20

MANITO RD

PRESERVATION - PAVEMENTS

2021-2025$4,000,000 11TH ST TO FOX BRIDGE RDMiles = 0.61

4DESIGNED OVERLAY

WIDENING EXISTING PAVEMENT

BIKEWAY

SIDEWALKS

SANGAMONCH 20

STANFORD AVE

REHABILITATION - PAVEMENTS

2020$462,000 WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELDMiles = 0.81

4PAVING

WIDENING & RESURFACING

SANGAMONCH 22

CH 23

WOODSIDE RD

IRON BRIDGE RD

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.THIS EARMARK WILL BE FUNDED SEPARATELY.

INITIAL CONSTRUCTION - PAVEMENTS

2020$4,125,000 WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD

4BRIDGE (NEW)

RR GRADE SEPARATION

SANGAMONCH 22

CH 23

WOODSIDE RD

IRON BRIDGE RD

INITIAL CONSTRUCTION - BRIDGES

2021-2025$1,200,000 SANGAMON CO LINE TO W ARCH ST (CH 19)Miles = 2.86

1STANDARD OVERLAY CHRISTIANCH 22

MT AUBURN RD

REHABILITATION - PAVEMENTS

6 - 82

Page 86: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$9,214,000 W OF MACARTHUR BLVD EXT TO E OF N LAKE RD (PHASE II)

2RR GRADE SEPARATION SANGAMONCH 23

WOODSIDE RD

INITIAL CONSTRUCTION - BRIDGES

2021-2025$800,000 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE

6BRIDGE REPLACEMENT MACOUPINCH 26

SAWYERVILLE HILLS

RD

RECONSTRUCTION - BRIDGES

2021-2025$51,000 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE

6CONSTRUCTION ENGINEERING MACOUPINCH 26

SAWYERVILLE HILLS

RD

RECONSTRUCTION - BRIDGES

2020$850,000 S 24TH ST TO S 36TH STMiles = 1.03

2STANDARD OVERLAY

PATCHING

ADAMSCH 30

MAINE ST

REHABILITATION - PAVEMENTS

2021-2025$225,000 CH 33: ILL 336 TO WCL OF BOWEN; FIFTH ST: WCL OF BOWEN TO ILL 94/61; CH 20: SCL OF AUGUSTA TO ADAMS CO LINEMiles = 5.39

2MICROSURFACING 1 PASS HANCOCKCH 33

FIFTH ST

CH 20

PRESERVATION - PAVEMENTS

6 - 83

Page 87: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 COLUMBUS RD TO BROADWAY STMiles = 0.67

4STANDARD OVERLAY ADAMSCH 37

48TH ST

REHABILITATION - PAVEMENTS

2021-2025$650,000 AT SUGAR CREEK 3.8 MI W OF VIRDEN

12CULVERT REPLACEMENT MACOUPINCH 37

NINE MILE RD

RECONSTRUCTION - BRIDGES

2021-2025$42,000 AT SUGAR CREEK 3.8 MI W OF VIRDEN

5CONSTRUCTION ENGINEERING MACOUPINCH 37

NINE MILE RD

RECONSTRUCTION - BRIDGES

2021-2025$1,400,000 1.2 MI S OF ILL 29 TO 0.3 MI N OF ST HILAIRE RD & NEW CITY RD TO CHRISTIAN CO LINE

7COLD IN-PLACE RECYCLING

CAPE SEAL

SANGAMONCH 37

CARDINAL HILL RD

PRESERVATION - PAVEMENTS

2021-2025$2,000,000 AT S FORK SANGAMON RIVER 1.5 MI N OF NEW CITY

3BRIDGE REPLACEMENT SANGAMONCH 37

CARDINAL HILL RD

RECONSTRUCTION - BRIDGES

2021-2025$750,000 E 1900TH ST (CH 12) TO E 1200TH ST (TR 354 )

1COLD IN-PLACE RECYCLING ADAMSCH 48

KELLERVILLE BLKTP

N 1200TH AVE

PRESERVATION - PAVEMENTS

6 - 84

Page 88: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,500,000 AT SPRING CREEK 0.5 MI SE OF ILL 4

5BRIDGE REPLACEMENT SANGAMONCH 59

BROWNING RD

RECONSTRUCTION - BRIDGES

2021-2025$1,150,000 AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD

1BRIDGE REPLACEMENT SANGAMONCHURCHILL RD

RECONSTRUCTION - BRIDGES

2021-2025$120,000 AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONCHURCHILL RD

RECONSTRUCTION - BRIDGES

2021-2025$750,000 AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD

1BRIDGE REPLACEMENT SANGAMONDRAWBRIDGE RD

RECONSTRUCTION - BRIDGES

2021-2025$80,000 AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD

1CONSTRUCTION ENGINEERING SANGAMONDRAWBRIDGE RD

RECONSTRUCTION - BRIDGES

2021-2025$2,486,000 W OF BROWN ST IN NEW SALEM TO US 54 / ILL 107 IN GRIGGSVILLEMiles = 6.17

2DESIGNED OVERLAY PIKEGRIGGSVILLE RD

REHABILITATION - PAVEMENTS

6 - 85

Page 89: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$470,000 N 8TH ST TO N 10TH ST IN QUINCYMiles = 0.18

3STANDARD OVERLAY

PATCHING

SIDEWALKS

ADAMSHAMPSHIRE ST

REHABILITATION - PAVEMENTS

2021-2025$900,000 AT RICHLAND CREEK 1.5 MI E OF SALISBURY

1BRIDGE REPLACEMENT SANGAMONIRWIN BRIDGE RD

RECONSTRUCTION - BRIDGES

2021-2025$625,000 WASHINGTON ST TO OLD JACKSONVILLE RD IN SPRINGFIELDMiles = 0.98

1RECONSTRUCTION SANGAMONKOKE MILL RD

RECONSTRUCTION - PAVEMENTS

2020$400,000 AT S FORK CEDAR CREEK E OF ADAMS CO LINE

2BRIDGE REPLACEMENT SCHUYLERLA PRAIRIE RD

RECONSTRUCTION - BRIDGES

2020$50,000 AT S FORK CEDAR CREEK E OF ADAMS CO LINE

2CONSTRUCTION ENGINEERING SCHUYLERLA PRAIRIE RD

RECONSTRUCTION - BRIDGES

2021-2025$1,550,000 ILL 267 TO US 67Miles = 5.03

1STANDARD OVERLAY MORGANMURRAYVILLE RD

REHABILITATION - PAVEMENTS

6 - 86

Page 90: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$500,000 AT LOCUST CREEK 2 MI NW OF OWANECO

1BRIDGE REPLACEMENT CHRISTIANN 1600 E RD

RECONSTRUCTION - BRIDGES

2021-2025$310,000 AT BEAR CREEK 2.5 MI E OF HARVEL

20BRIDGE REPLACEMENT CHRISTIANMONTGOMERY

N 24TH AVE

RECONSTRUCTION - BRIDGES

2021-2025$32,000 AT BEAR CREEK 2.5 MI E OF HARVEL

9CONSTRUCTION ENGINEERING CHRISTIANMONTGOMERY

N 24TH AVE

RECONSTRUCTION - BRIDGES

2020$300,000 NIOTA RD: ILL 9/96 TO COLUSA BLKTP; COLUSA BLKTP: NIOTA RD TO 1400 E RD; CONNABLE RD: ILL 96 TO FERRIS RD; POWELLTON RD / ADRIAN RD: CONNABLE RD TO 1700 E RDMiles = 19.98

1CAPE SEAL HANCOCKNIOTA RD

COLUSA BLKTP

CONNABLE RD

POWELLTON RD /

ADRIAN RD

PRESERVATION - PAVEMENTS

2021-2025$2,600,000 AT SANGAMON RIVER 2 MI E OF CLEAR LAKE

9BRIDGE REPLACEMENT SANGAMONOAK CREST RD

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

6 - 87

Page 91: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$2,900,000 OLD JACKSONVILLE RD: E OF MCKIBBIN LN TO 0.2 MI E OF BRADFORDTON RD; BRADFORDTON RD: N OF OLD JACKSONVILLE RD TO 0.1 MI SMiles = 0.81

10ADDITIONAL LANES SANGAMONOLD JACKSONVILLE

RD

BRADFORDTON RD

INITIAL CONSTRUCTION - PAVEMENTS

2021-2025$1,260,000 STATE ST TO HARRISON ST IN QUINCYMiles = 0.89

3STANDARD OVERLAY

PATCHING

SIDEWALKS

ADAMSS 24TH ST

REHABILITATION - PAVEMENTS

2021-2025$500,000 US 67 TO ILL 103Miles = 5.29

2CAPE SEAL SCHUYLERSUGAR GROVE RD

PRESERVATION - PAVEMENTS

2021-2025$160,000 AT BAPTIST CREEK 3.5 MI NE OF FOUNTAIN GREEN

2BRIDGE REPLACEMENT HANCOCKTR 6

RECONSTRUCTION - BRIDGES

2020$850,000 AT MOSQUITO CREEK 3 MI E OF MT AUBURN

9BRIDGE REPLACEMENT CHRISTIANTR 13

2850 N RD

RECONSTRUCTION - BRIDGES

2020$40,000 AT MOSQUITO CREEK 3 MI E OF MT AUBURN

9CONSTRUCTION ENGINEERING CHRISTIANTR 13

2850 N RD

RECONSTRUCTION - BRIDGES

6 - 88

Page 92: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,000,000 AT LAMOINE RIVER 3.3 MI SW OF LAHARPE

5BRIDGE REPLACEMENT HANCOCKTR 71

E 2500 N RD

RECONSTRUCTION - BRIDGES

2021-2025$260,000 AT ACHENBACH BRANCH 3.5 MI N OF PALMER

13BRIDGE REPLACEMENT CHRISTIANTR 82

N 700 E RD

RECONSTRUCTION - BRIDGES

2021-2025$32,000 AT ACHENBACH BRANCH 3.5 MI N OF PALMER

9CONSTRUCTION ENGINEERING CHRISTIANTR 82

N 700 E RD

RECONSTRUCTION - BRIDGES

2020$415,000 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA

2BRIDGE REPLACEMENT CASSTR 143

HALL RD

RECONSTRUCTION - BRIDGES

2020$32,000 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA

2CONSTRUCTION ENGINEERING CASSTR 143

HALL RD

RECONSTRUCTION - BRIDGES

2020$915,000 AT LA MOINE RIVER 4.5 MI NE OF CARTHAGE

5BRIDGE REPLACEMENT HANCOCKTR 175

E 1720 N RD

RECONSTRUCTION - BRIDGES

6 - 89

Page 93: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$600,000 AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE

10BRIDGE REPLACEMENT CHRISTIANTR 229

E 1025 N RD

RECONSTRUCTION - BRIDGES

2021-2025$32,000 AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE

8CONSTRUCTION ENGINEERING CHRISTIANTR 229

E 1025 N RD

RECONSTRUCTION - BRIDGES

2021-2025$500,000 AT LAKE FORK 2 MI NW OF PANA

1BRIDGE REPLACEMENT CHRISTIANTR 303

E 450 N RD

RECONSTRUCTION - BRIDGES

2021-2025$450,000 AT TOURNEAR CREEK 0.8 MI E OF PLAINVILLE RD

4BRIDGE REPLACEMENT ADAMSTR 419

N 900TH AVE

RECONSTRUCTION - BRIDGES

2021-2025$1,200,000 AT SPRING CREEK 0.4 MI S OF W BRIDGE ST IN NEBO

3BRIDGE REPLACEMENT PIKEUNION ST

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

2021-2025$80,000 AT SPRING CREEK 0.4 MI S OF W BRIDGE ST

3CONSTRUCTION ENGINEERING PIKEUNION ST

ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

RECONSTRUCTION - BRIDGES

6 - 90

Page 94: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

District 6

Local Highways

FY 2020-2023 Rebuild Illinois Highway Improvement Program

Route / Street Location Improvements Est. Cost County

TAMP Category Past Current

MYP Years

2021-2025$1,124,000 VARIOUS LOCATIONS IN PIKE COMiles = 72.00

2BIT SURFACE TREATMENT-A1 PIKEVARIOUS

PRESERVATION - PAVEMENTS

2020$60,000 VARIOUS LOCATIONS IN HANCOCK CO

1P.E. (BRIDGE INSPECTION) HANCOCKVARIOUS

MISCELLANEOUS IMPROVEMENTS

2021-2025$2,055,000 VARIOUS LOCATIONS IN SANGAMON CO

1COLD IN-PLACE RECYCLING SANGAMONVARIOUS

PRESERVATION - PAVEMENTS

6 - 91

Page 95: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

!!

!

!

!

!!

!

!

!

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

ll

l

l

l

l

l

l

l

l

l

l

l

l

!

l

l

l

l

l

l

l

l

l

l

l

l

l

l l

l

ll

l

ll

l

l

l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l l

l

l

l

l l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

ll

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

0/36

0/36

2172

2172

2155

:9104

:94

:978

2155

:929

:9104

:9125

:948

0/24

:954

:916

:910:996

:996

:996

0/24

:997

:91070/36 2172

:9111

:9111

:996

:929

0/67

0/136

21172

:9101

0/136

:9121

:916

:9106

:9100

:9100

:997

:999

:916

:91000/67

:994

0/51

:9106

:999

:9185

0/54

:9267

:9100

2155B

:9104

0/67

:994

:9108

:91040/67

:957

21155

0/136

:94

:961

:929

0/136

:910

:9127

:9336

:9123

:9103

:9127

:9138

:9108

:994

:961

:9106

:9159

:994:99

:94

:9106

:9123

:994:961

:9336

:996:99

0/24

:9108

:9123:929

:9124

:9106

:9138

0/54

:9123:997

2172

2155B

:99

:9336

:99

:9104

:994

:9127

:91212155B

0/51

0/67:9106

0/136

TaylorvilleTaylorville

SpringfieldSpringfield

JacksonvilleJacksonville

SpringfieldSpringfield

QuincyQuincy

LincolnLincoln

StauntonStaunton

DonnellsonDonnellsonPanamaPanamaBunker HillBunker HillBrightonBrighton

WalshvilleWalshvilleWilsonvilleWilsonville

MtMtOliveOlive

SouthernSouthernViewView

WhiteWhiteCityCity

DorchesterDorchesterCoffeenCoffeenBenldBenld

LakeLakeKa-hoKa-ho

Mt ClareMt ClareRoyal LakesRoyal LakesFillmoreFillmoreShipmanShipman

GillespieGillespieTaylor SpringsTaylor Springs

MedoraMedora

LitchfieldLitchfield

ButlerButler IrvingIrving

HillsboroHillsboro

ChesterfieldChesterfieldWittWitt

CoaltonCoaltonCarlinvilleCarlinville

RaymondRaymondNokomisNokomis

WenonahWenonah

OhlmanOhlman

Standard CityStandard CityHettickHettick

HarvelHarvel

WaggonerWaggoner

PanaPanaNilwoodNilwood

MorrisonvilleMorrisonvillePalmyraPalmyraNeboNebo FarmersvilleFarmersville

Pleasant HillPleasant Hill GirardGirardPearlPearl PalmerPalmer

ModestoModestoScottvilleScottvilleOwanecoOwaneco

VirdenVirdenAssumptionAssumption

ThayerThayerManchesterManchesterGlasgowGlasgow

TimeTime AlseyAlseyMiltonMiltonJeisyvilleJeisyvilleMurrayvilleMurrayville

ToveyTovey

DivernonDivernon

PawneePawnee KincaidKincaid

WaverlyWaverlyPittsfieldPittsfield AuburnAuburn

DetroitDetroit

MoweaquaMoweaqua

EldaraEldara FranklinFranklinWoodsonWoodson

FlorenceFlorence WinchesterWinchesterNew CantonNew Canton StoningtonStonington

EdinburgEdinburgLoamiLoami

LynnvilleLynnville

ChathamChatham

BarryBarry Valley CityValley CityKinderhookKinderhook

SoSoJacksonvilleJacksonville

GriggsvilleGriggsvilleNew SalemNew SalemHullHullExeterExeter

New BerlinNew Berlin

BaylisBaylisBluffsBluffs

NaplesNaples BerlinBerlinJeromeJeromeChapinChapin Mt AuburnMt Auburn

RochesterRochester

PerryPerryLeland GroveLeland GrovePlainvillePlainville

Clear LakeClear Lake MechanicsburgMechanicsburgGrandviewGrandviewConcordConcord

PaysonPayson

MeredosiaMeredosia BuffaloBuffalo IlliopolisIlliopolisDawsonDawson

RivertonRiverton

SpauldingSpauldingArenzvilleArenzvillePleasant PlainsPleasant Plains

VersaillesVersaillesLibertyLiberty AshlandAshland

ShermanSherman

CantrallCantrallTallulaTallulaVirginiaVirginia

WilliamsvilleWilliamsvilleAthensAthensAthensAthens LathamLatham

ColumbusColumbusMt SterlingMt Sterling

BeardstownBeardstownTimewellTimewell PetersburgPetersburg Mt PulaskiMt PulaskiElkhartElkhartRipleyRipleyClaytonClaytonCoatsburgCoatsburg

Camp PointCamp Point ChandlervilleChandlerville

BroadwellBroadwellGreenviewGreenview

UrsaUrsa

MendonMendon OakfordOakford MiddletownMiddletownRushvilleRushvilleGoldenGolden

BrowningBrowning

KilbourneKilbourneLa PrairieLa Prairie CamdenCamdenLoraineLoraine

LimaLima New HollandNew HollandBathBath

Mason CityMason City

EastonEaston

AugustaAugusta

BowenBowenLittletonLittleton

HartsburgHartsburgWest PointWest PointAtlantaAtlanta

PlymouthPlymouth EmdenEmdenHavanaHavana

San JoseSan Jose

TopekaTopekaBascoBascoBentleyBentley

Forest CityForest CityWarsawWarsaw

ElvastonElvaston

HamiltonHamilton

CarthageCarthage ManitoManito

FerrisFerris

NauvooNauvoo

La HarpeLa Harpe

Dallas CityDallas CityPontoosucPontoosuc

MACOUPINMACOUPIN

MONTGOMERYMONTGOMERY

SCOTTSCOTT

CHRISTIANCHRISTIAN

PIKEPIKE

MORGANMORGAN SANGAMONSANGAMON

BROWNBROWN

CASSCASS

MENARDMENARD

ADAMSADAMS

SCHUYLERSCHUYLER

LOGANLOGAN

MASONMASON

HANCOCKHANCOCK

See Inset Map

!

!

!

!

l

l

l

l

l

l

l

l

!

!

!

!

REGION 4DISTRICT 6

Proposed FY 2020-2025Highway Program l

l

l

l

Structure

!

!

!

!

SpotRoadway

l

l

l

l

Structure

!

!

!

!

Spot

Rehabilitation

Reconstruction

Preservation

Initial Construction

RoadwayFY 2020 FY 2021-2025

TAMP Categ

ory

Page 96: FY 2020-2025 Proposed Highway Improvement Program District 6 list of priorities.pdf · US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction

0/362172

:94

:94

:94

2155

2155

:929

:954

0/362172

:997

2155

2155B

:929

:9124

2172

0/362155

:997:929 :997

2155B

2155B

2155B

SpringfieldSpringfield

ChathamChatham

JeromeJerome

RochesterRochester

Leland GroveLeland Grove

Clear LakeClear LakeGrandviewGrandview

RivertonRiverton

SpauldingSpaulding

ShermanSherman

SANGAMONSANGAMON

SouthernSouthernViewView

!

!

!

!

!

!

l

l

l

l

l

l

l

ll

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l

l lll

l

l l

!

!

!

!

l

l

l

l

Airport

CountySPRINGFIELD AND VICINITY

REGION 4DISTRICT 6

Proposed FY 2020-2025Highway Program l

l

l

l

Structure

!

!

!

!

SpotRoadway

l

l

l

l

Structure

!

!

!

!

Spot

Rehabilitation

Reconstruction

Preservation

Initial Construction

RoadwayFY 2020 FY 2021-2025

TAMP Categ

ory