fy 2020-2025 proposed highway improvement program district 6 list of priorities.pdf · us...
TRANSCRIPT
FY 2020-2025 Proposed Highway
Improvement Program
HIGHWAY REGION 4 DISTRICT 6 TABLE OF CONTENTS
Program Summary
State Roadway Project Descriptions
Local Roadway Project Descriptions
MAPS
District 6
Springfield and Vicinity
6-i
TRANSPORTATION PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION
REGION 4, DISTRICT 6, SPRINGFIELD Overview Highway District 6 encompasses 15 counties in west central Illinois and includes the cities of Springfield, Quincy, Jacksonville, Lincoln and Taylorville, plus many smaller communities which serve as satellites for the larger employment areas or as focal points of this farming area. The state highway system in District 6 consists of 2,077 miles of highways and 847 bridges, supporting 11.1 million vehicle miles of travel daily. State Program The program for state and local highways will average $3.91 billion annually for the FY 2020-2025 period. Approximately $1.24 billion will be provided during FY 2020-2025 for improvements to state highways in District 6. The following table summarizes anticipated accomplishments on the state highway system in District 6 during this time frame.
FY 2020-2025 Programmed Improvements
Major Highway projects of interest that are tentatively scheduled during the FY 2020-2025 time frame include:
• Interstate 55 from 0.8 mile north of Illinois 16 to 0.7 mile south of County Highway 17 at Farmersville in Montgomery County. Resurfacing on 21.2 miles, a new bridge deck, bridge deck overlays, bridge raising, bridge repair, bridge joint replace/repair, bridge removal, ditch cleaning and slope wall repair are programmed during FY 2020-2025 at a cost of $49.8 million. Of this total,
Roadway Maintenance Interstate NHS (miles) 50 Non-Interstate NHS (miles) 151 Non-NHS Marked (miles) 238 Non-NHS Unmarked (miles) 27 Bridges Interstate NHS (Sq. Ft.) 284,922 Non-Interstate NHS (Sq. Ft.) 192,763 Non-NHS Marked (Sq. Ft.) 137,262 Non-NHS Unmarked (Sq. Ft.) 197,981 Safety/System Modernization Interstate NHS (miles) 0 Non-Interstate NHS (miles) 0 Non-NHS Marked (miles) 0 Non-NHS Unmarked (miles) 0 Safety Locations (number) 42 System Expansion Interstate NHS (miles) 6 Non-Interstate NHS (miles) 4 Non-NHS Marked (miles) 6 Non-NHS Unmarked (miles) 0 New Bridges (Sq. Ft.) 2,070 Preservation
Roads & Bridges ($M) 107.554
6-ii
resurfacing on 9.3 miles, a new bridge deck, bridge raising, bridge removal, slope wall repair, bridge deck overlay, bridge repair and bridge joint replace/repair are programmed in FY 2020 at a cost of $22.9 million.
• Interstate 55 from south of the Sangamon/Montgomery County line to 0.2 mile north of Lake Springfield Bridge in Sangamon County. Resurfacing on 19.3 miles, bridge deck overlay, bridge joint replace/repair, bridge repair and bridge approach roadway are programmed during FY 2020-2025 at a cost of $40.4 million. Of this total, resurfacing on 7.6 miles and bridge approach roadway are programmed in FY 2020 at a cost of $18.9 million.
• Interstate 55 0.5 mile north of Illinois 54/Sangamon Avenue in Springfield to 2.7 miles south of Illinois 123 in Williamsville. Additional lanes and reconstruction on 7.8 miles, a bridge replacement, bridge widening, bridge new deck, engineering for contract plans, utility adjustments, land acquisition and construction engineering are programmed during FY 2021-2025 at a cost of $137.4 million.
• Interstate 55/Interstate 55 Business from 1.3 miles south of Interstate 55 Business to 0.3 mile north of Illinois 10 west of Lincoln. Resurfacing on 10.7 miles (including ramp repair), bridge joint replace/repair, bridge deck repairs, bridge repair and slope wall repair are programmed in FY 2020 at a cost of $20.7 million. Also included are resurfacing and new shoulders on 1 mile on Interstate 55 Business from east of Old Route 66 to south of 1056th Avenue south of Lincoln that are programmed in FY 2020 at a cost of $1.1 million.
• Interstate 72 over Wabash Avenue and over Northern Southern Railroad 1.2 miles east of Wabash Avenue Interchange in Springfield in Sangamon County. A new bridge deck, slope wall repair and bridge painting are programmed during FY 2020 at a cost of $7.5 million.
• Interstate 155 from 2 miles south of US 136 to Tazewell County line in Logan County. Resurfacing on 4.6 miles (including ramp repair), shoulder repair and bridge repair, bridge deck repairs, bridge joint replace/repair and a bridge deck overlay on structures at US 136 and Emden Road are programmed in FY 2020 at a cost of $8.9 million.
• US 67/Illinois 100 over the Illinois River Bridge at Beardstown. A bridge replacement, new construction on 1.4 miles, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $65.9 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $1.3 million. This project has been approved for Illinois Special Bridge Program funding.
• Illinois 57 (3rd Street) from Maine Street in Quincy to south of Marblehead and York Street from 3rd Street to west of 4th Street, including structures at Payson Avenue and Curtis Creek in Adams County. Resurfacing on 7.2 miles, ADA improvements, a parking improvement, new bridge decks, bridge approach roadway, bridge repair, bridge substructure rehabilitation, slope wall repair and scour mitigation are programmed in FY 2020 at a cost of $6.4 million.
• Illinois 100/Illinois 106 over the Illinois River Bridge at Florence. A bridge replacement, engineering for contract plans, archaeological surveys, land acquisition, utility adjustments and construction engineering are programmed during FY 2020-2025 at a cost of $84.2 million. Of this total, engineering for contract plans and land acquisition are programmed in FY 2020 at a cost of $4.6 million. This project has been approved for Illinois Special Bridge Program funding.
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$164,000 MADISON CO LINE TO 0.8 MI N OF ILL 16
1CRACK & JOINT SEALING MACOUPINMONTGOMERY
I 55
PRESERVATION - PAVEMENTS
2020$22,450,000 0.8 MI N OF ILL 16 TO 0.6 MI N OF ILL 108Miles = 9.27
9STANDARD OVERLAY
BRIDGE NEW DECK
BRIDGE RAISING
BRIDGE REMOVAL/DEMOLITION
SLOPEWALL REPAIR
MONTGOMERYI 55
Roadway Information Miles AADT Truck Pct NHS
28,820 32.2 Y 7.39
Structure Information Str Number AADT Truck Pct NHS
250 N30680044
14,450 Y320680048
14,450 Y320680049
REHABILITATION - PAVEMENTS
2020$430,000 UNDER TR 235 (N 13TH AVE) & TR 48 (E 2ND RD) 1.1 MI N & 2.3 MI N OF ILL 16 & UNDER ILL 108
1BRIDGE DECK OVERLAY
BRIDGE REPAIR
BRIDGE JOINT REPLACE/REPAIR
MONTGOMERYI 55
PRESERVATION - BRIDGES
2021-2025$12,100,000 0.6 MI N OF ILL 108 TO 1.3 MI S OF WAGGONERMiles = 6.71
6DESIGNED OVERLAY
BRIDGE JOINT REPLACE/REPAIR
DITCH CLEANING
MONTGOMERYI 55
Roadway Information Miles AADT Truck Pct NHS
29,548 31.1 Y 5.03
REHABILITATION - PAVEMENTS
6 - 1
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$13,600,000 1.3 MI S OF WAGGONER TO 0.7 MI S OF CH 17 AT FARMERSVILLEMiles = 5.21
8DESIGNED OVERLAY MONTGOMERYI 55
Roadway Information Miles AADT Truck Pct NHS
31,100 32.0 Y 5.21
REHABILITATION - PAVEMENTS
2021-2025$1,200,000 UNDER CH 16 E OF WAGGONER AVE & UNDER TR 37 S OF FARMERSVILLE
1BRIDGE DECK OVERLAY MONTGOMERYI 55
PRESERVATION - BRIDGES
2021-2025$2,100,000 UNDER CH 16 E OF WAGGONER AVE
1BRIDGE NEW DECK MONTGOMERYI 55
Structure Information Str Number AADT Truck Pct NHS
200 N180680041
REHABILITATION - BRIDGES
2021-2025$3,600,000 UNDER CH 17
1BRIDGE NEW DECK MONTGOMERYI 55
Structure Information Str Number AADT Truck Pct NHS
4,250 N120680037
REHABILITATION - BRIDGES
2021-2025$2,100,000 UNDER TR 17
1BRIDGE NEW DECK
BRIDGE REPAIR
MONTGOMERYI 55
Structure Information Str Number AADT Truck Pct NHS
50 N600680036
REHABILITATION - BRIDGES
6 - 2
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,100,000 UNDER TR 7
1BRIDGE NEW DECK MONTGOMERYI 55
Structure Information Str Number AADT Truck Pct NHS
75 N210680035
REHABILITATION - BRIDGES
2021-2025$9,000,000 S OF SANGAMON / MONTGOMERY CO LINE TO BRUSH CREEK 0.7 MI S OF ILL 104Miles = 5.44
1DESIGNED OVERLAY SANGAMONMONTGOMERY
I 55
Roadway Information Miles AADT Truck Pct NHS
32,200 28.1 Y 0.03
32,744 30.2 Y 3.86
REHABILITATION - PAVEMENTS
2021-2025$10,200,000 BRUSH CREEK 0.7 MI S OF ILL 104 TO N OF GLENARM INTCHGMiles = 6.23
1DESIGNED OVERLAY SANGAMONI 55
Roadway Information Miles AADT Truck Pct NHS
38,032 26.0 Y 2.98
REHABILITATION - PAVEMENTS
2021-2025$2,300,000 OVER ILL 104 INTCHG & UNDER HORSE FARM RD 1.8 MI N OF ILL 104
1BRIDGE DECK OVERLAY
BRIDGE JOINT REPLACE/REPAIR
BRIDGE REPAIR
SANGAMONI 55
PRESERVATION - BRIDGES
2020$18,900,000 N OF GLENARM INTCHG TO 0.2 MI N OF LAKE SPRINGFIELD BRIDGEMiles = 7.59
2STANDARD OVERLAY
BRIDGE APPROACH ROADWAY
SANGAMONI 55
Roadway Information Miles AADT Truck Pct NHS
39,853 23.2 Y 5.33
REHABILITATION - PAVEMENTS
6 - 3
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$7,000,000 OVER ILLINOIS CENTRAL RR S OF SPRINGFIELD
1BRIDGE NEW DECK SANGAMONI 55
Structure Information Str Number AADT Truck Pct NHS
19,200 Y220840112
19,200 Y220840113
REHABILITATION - BRIDGES
2020$158,000 I-55: LAKE SPRINGFIELD BRIDGE TO 0.2 MI N OF SOUTHWIND RD & I-72: FARMINGDALE RD TO W OF OLD CHATHAM RD & 0.4 MI E OF I-55 (N) TO 0.5 MI E OF OVERPASS RD (INSIDE SPFLD MPO)
1CRACK & JOINT SEALING SANGAMONI 55
I 72
PRESERVATION - PAVEMENTS
2021-2025$1,600,000 UNDER W LAKE SHORE DRIVE
1BRIDGE NEW DECK SANGAMONI 55
I 72
US 36
Structure Information Str Number AADT Truck Pct NHS
4,150 N120840092
REHABILITATION - BRIDGES
2021-2025$1,600,000 UNDER COOK ST IN SPRINGFIELD
1BRIDGE NEW DECK SANGAMONI 55
I 72
US 36
Structure Information Str Number AADT Truck Pct NHS
750 NN/A0840103
REHABILITATION - BRIDGES
2021-2025$6,200,000 OVER ILL 54 & SANGAMON AVE IN SPRINGFIELD
1BRIDGE DECK OVERLAY SANGAMONI 55
PRESERVATION - BRIDGES
6 - 4
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$15,700,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLEMiles = 0.01
1ADDITIONAL LANES
BRIDGE WIDENING
SANGAMONI 55
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$111,300,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLEMiles = 7.82
1RECONSTRUCTION
BRIDGE NEW DECK
BRIDGE REPLACEMENT
SANGAMONI 55
Roadway Information Miles AADT Truck Pct NHS
33,300 29.3 Y 6.41
Structure Information Str Number AADT Truck Pct NHS
16,650 Y290840023
16,650 Y290840022
950 N20840100
16,650 Y290840021
16,650 Y290840020
RECONSTRUCTION - PAVEMENTS
2021-2025$6,000,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE
5P.E. (PHASE II) SANGAMONI 55
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$450,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE
1UTILITY ADJUSTMENT SANGAMONI 55
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$3,000,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE
1CONSTRUCTION ENGINEERING SANGAMONI 55
INITIAL CONSTRUCTION - PAVEMENTS
6 - 5
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,600,000 UNDER BISSELL RD
1BRIDGE NEW DECK SANGAMONI 55
Structure Information Str Number AADT Truck Pct NHS
3,550 N250840101
REHABILITATION - BRIDGES
2021-2025$900,000 0.5 MI N OF ILL 54 / SANGAMON AVE IN SPRINGFIELD TO 2.7 MI S OF ILL 123 IN WILLIAMSVILLE
1LAND ACQUISITION SANGAMONI 55
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$4,000,000 SANGAMON RIVER BRIDGES 2.3 MI N OF SPRINGFIELD
2BRIDGE DECK OVERLAY SANGAMONI 55
PRESERVATION - BRIDGES
2020$3,000,000 UNDER ILL 123 (DINIUS RD) N OF WILLIAMSVILLE
3BRIDGE NEW DECK SANGAMONI 55
Structure Information Str Number AADT Truck Pct NHS
5,650 N190840171
REHABILITATION - BRIDGES
2021-2025$2,100,000 UNDER CH 10 W OF ELKHART
3BRIDGE NEW DECK LOGANI 55
Structure Information Str Number AADT Truck Pct NHS
250 N160540038
REHABILITATION - BRIDGES
6 - 6
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$3,300,000 UNDER 800TH AVE AT BROADWELL INTCHG
1BRIDGE NEW DECK LOGANI 55
Structure Information Str Number AADT Truck Pct NHS
150 N200540039
REHABILITATION - BRIDGES
2020$18,100,000 1.3 MI S OF I-55 BUS TO 0.6 MI N OF ILL 10 W OF LINCOLNMiles = 10.66
5STANDARD OVERLAY
RAMP REPAIR
LOGANI 55
I 55 BUS
Roadway Information Miles AADT Truck Pct NHS
31,539 32.4 Y 5.13
29,500 39.7 Y 0.02
4,272 3.0 N 0.59
375 10.4 N 0.35
REHABILITATION - PAVEMENTS
2020$2,600,000 1.2 MI S OF I-55 BUS TO 0.3 MI N OF ILL 10 W OF LINCOLN
2BRIDGE REPAIR
BRIDGE JOINT REPLACE/REPAIR
BRIDGE DECK REPAIRS
SLOPEWALL REPAIR
LOGANI 55
MAINTENANCE - BRIDGES
2021-2025$3,600,000 UNDER I-55 BUS (OLD US 66)
1BRIDGE NEW DECK LOGANI 55
Structure Information Str Number AADT Truck Pct NHS
375 N100540040
REHABILITATION - BRIDGES
6 - 7
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$19,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELDMiles = 2.51
1RECONSTRUCTION
INTERSECTION IMPROVEMENT
TURNING LANES
SIDEWALKS
SANGAMONI 55 BUS
6TH ST
STEVENSON DR
Roadway Information Miles AADT Truck Pct NHS
27,405 4.5 Y 1.16
11,100 2.6 Y 0.13
1,900 0.0 N 0.06
1,882 0.0 N 0.14
4,350 0.0 N 0.16
400 0.0 N 0.02
400 0.0 N 0.07
RECONSTRUCTION - PAVEMENTS
2021-2025$6,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELDMiles = 0.01
1ADDITIONAL LANES
TURNING LANES
SANGAMONI 55 BUS
6TH ST
STEVENSON DR
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$4,300,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD
1LAND ACQUISITION SANGAMONI 55 BUS
6TH ST
STEVENSON DR
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$1,000,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD
1UTILITY ADJUSTMENT SANGAMONI 55 BUS
6TH ST
STEVENSON DR
INITIAL CONSTRUCTION - PAVEMENTS
6 - 8
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,900,000 I-72 TO 0.1 MI N OF STEVENSON DR IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONI 55 BUS
6TH ST
STEVENSON DR
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$12,000,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELDMiles = 1.43
1RECONSTRUCTION
INTERSECTION RECONSTN
TURNING LANES
SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
STANFORD AV
Roadway Information Miles AADT Truck Pct NHS
24,282 2.6 Y 0.61
15,700 7.9 Y 0.15
13,367 12.3 Y 0.15
RECONSTRUCTION - PAVEMENTS
2021-2025$800,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELDMiles = 0.01
1ADDITIONAL LANES SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$2,000,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD
1LAND ACQUISITION SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
INITIAL CONSTRUCTION - PAVEMENTS
6 - 9
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD
1UTILITY ADJUSTMENT SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$200,000 0.1 MI N OF STEVENSON DR TO 0.1 MI N OF STANFORD AVE IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$2,900,000 5TH ST: SPRUCE ST TO N OF STANFORD AVE; 6TH ST: N OF STANFORD AVE TO MYRTLE ST IN SPRINGFIELDMiles = 2.16
4DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONI 55 BUS
I 55 BUSA
6TH ST
5TH ST
Roadway Information Miles AADT Truck Pct NHS
14,860 7.4 Y 1.03
14,482 7.2 Y 1.13
REHABILITATION - PAVEMENTS
2021-2025$4,100,000 0.2 MI N OF DIRKSEN PKWY TO 0.3 MI N OF ANDREW RD IN SPRINGFIELDMiles = 2.98
1DESIGNED OVERLAY SANGAMONI 55 BUS
Roadway Information Miles AADT Truck Pct NHS
13,094 5.0 Y 2.98
REHABILITATION - PAVEMENTS
6 - 10
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$1,100,000 E OF OLD ROUTE 66 TO S OF 1056TH AVE S OF LINCOLNMiles = 0.96
2STANDARD OVERLAY
NEW SHOULDERS
LOGANI 55 BUS
Roadway Information Miles AADT Truck Pct NHS
5,196 7.4 N 0.96
REHABILITATION - PAVEMENTS
2021-2025$1,300,000 I-55 BUS TO ILL 10/121 IN LINCOLNMiles = 1.58
1DESIGNED OVERLAY
ADA IMPROVEMENTS
LOGANI 55 BUS
KICKAPOO ST
Roadway Information Miles AADT Truck Pct NHS
3,871 10.1 N 1.58
REHABILITATION - PAVEMENTS
2020$35,000 MARK TWAIN MEMORIAL BRIDGE AT MISSISSIPPI RIVER IN HANNIBAL
1BRIDGE DECK SEALING PIKEI 72
MISSOURI LEAD AGENCY; ILLINOIS' SHARE OF THE COST.
PRESERVATION - BRIDGES
2021-2025$12,300,000 E OF US 54 / ILL 107 INTCHG TO 0.6 MI E OF 290TH AVE OVERHEADMiles = 5.39
1STANDARD OVERLAY
SHOULDER REPAIR
PIKEI 72
Roadway Information Miles AADT Truck Pct NHS
8,650 33.5 Y 5.39
REHABILITATION - PAVEMENTS
2021-2025$3,200,000 UNDER OLD US 36 AT WINCHESTER INTCHG
1BRIDGE NEW DECK SCOTTI 72
US 36
Structure Information Str Number AADT Truck Pct NHS
3,300 N120860027
REHABILITATION - BRIDGES
6 - 11
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,500,000 OVER ILL 104 & B&N RR E OF JACKSONVILLE (WB)
1BRIDGE NEW DECK MORGANI 72
Structure Information Str Number AADT Truck Pct NHS
5,550 Y310690041
REHABILITATION - BRIDGES
2020$127,000 0.3 MI E OF JIMTOWN RD TO FARMINGDALE RD & 0.5 MI W OF KENT FARM RD TO MACON CO LINE (OUTSIDE SPFLD MPO)
1CRACK & JOINT SEALING SANGAMONI 72
PRESERVATION - PAVEMENTS
2020$7,500,000 OVER WABASH AVE & NS RR 1.2 MI E OF WABASH AVE INTCHG IN SPRINGFIELD
7BRIDGE NEW DECK
SLOPEWALL REPAIR
BRIDGE PAINTING
SANGAMONI 72
Structure Information Str Number AADT Truck Pct NHS
11,250 Y210840127
11,250 Y210840128
8,800 Y230840148
8,800 Y230840149
REHABILITATION - BRIDGES
2021-2025$3,000,000 UNDER CH 19 AT BUFFALO / MECHANICSBURG INTCHG
1BRIDGE NEW DECK SANGAMONI 72
US 36
Structure Information Str Number AADT Truck Pct NHS
1,700 N140840156
REHABILITATION - BRIDGES
2020$2,900,000 0.8 MI N OF I-72 BUS / MORTON AVE TO 1.1 MI N OF I-72Miles = 3.02
1DESIGNED OVERLAY MORGANI 72 BUS
US 67
(SOUTHBOUND)
Roadway Information Miles AADT Truck Pct NHS
5,217 20.3 Y 2.39
REHABILITATION - PAVEMENTS
6 - 12
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$250,000 MARKHAM RD (TR 78) TO 1.1 MI N OF I-72
1PATCHING MORGANI 72 BUS
US 67
MAINTENANCE - PAVEMENTS
2021-2025$3,600,000 MAUVAISE TERRE CREEK 0.7 MI E OF ILL 267
3BRIDGE REPLACEMENT MORGANI 72 BUS
ILL 104
MORTON AVE
Structure Information Str Number AADT Truck Pct NHS
11,600 Y40690009
RECONSTRUCTION - BRIDGES
2021-2025$1,700,000 OVER I-155 (NB) & I-55 (SB)
1BRIDGE NEW DECK LOGANI 155
Structure Information Str Number AADT Truck Pct NHS
50 Y200540051
REHABILITATION - BRIDGES
2020$1,100,000 OVER ICG RR 2.8 MI S OF US 136
3BRIDGE DECK OVERLAY
BRIDGE REPAIR
LOGANI 155
PRESERVATION - BRIDGES
2020$7,500,000 2 MI S OF US 136 TO TAZEWELL CO LINEMiles = 4.60
6STANDARD OVERLAY
RAMP REPAIR
SHOULDER REPAIR
LOGANI 155
Roadway Information Miles AADT Truck Pct NHS
11,132 19.3 Y 3.03
REHABILITATION - PAVEMENTS
6 - 13
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$500,000 UNDER EMDEN RD 1 MI S OF US 136 INTCHG
1BRIDGE REPAIR
BRIDGE DECK REPAIRS
BRIDGE JOINT REPLACE/REPAIR
LOGANI 155
MAINTENANCE - BRIDGES
2020$900,000 UNDER US 136 1 MI S OF TAZEWELL CO LINE
3BRIDGE DECK OVERLAY
BRIDGE DECK REPAIRS
BRIDGE REPAIR
LOGANI 155
PRESERVATION - BRIDGES
2021-2025$1,800,000 OVER I-55 (SB)
1BRIDGE NEW DECK LOGANI 155
Structure Information Str Number AADT Truck Pct NHS
5,500 Y190540050
REHABILITATION - BRIDGES
2020$100,000 N OF I-72 INTCHG TO N OF ILL 96 INTCHG
1CRACK & JOINT SEALING ADAMSI 172
PRESERVATION - PAVEMENTS
2021-2025$1,600,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER
3BRIDGE DECK OVERLAY ADAMSUS 24
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
PRESERVATION - BRIDGES
6 - 14
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$5,000,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER
3BRIDGE PAINTING ADAMSUS 24
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
PRESERVATION - BRIDGES
2021-2025$6,000,000 QUINCY MEMORIAL BRIDGE AT MISSISSIPPI RIVER
7P.E. (CONSULTANT PLANS) ADAMSUS 24
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
RECONSTRUCTION - BRIDGES
2021-2025$4,000,000 US 24: MISSISSIPPI RIVER BRIDGES TO 0.1 MI N OF GARDNER PARK DR & ILL 57: W OF 4TH ST TO BROADWAY ST IN QUINCY & ILL 104: 3RD ST TO E OF 4TH STMiles = 3.96
3DESIGNED OVERLAY
ADA IMPROVEMENTS
PATCHING
ADAMSUS 24
ILL 57
ILL 104
3RD ST
4TH ST
BROADWAY ST
MAINE ST
Roadway Information Miles AADT Truck Pct NHS
5,672 9.9 Y 1.93
4,483 11.3 Y 0.27
5,538 12.3 Y 1.46
5,070 14.0 Y 0.20
10,460 4.9 Y 0.10
REHABILITATION - PAVEMENTS
2021-2025$2,000,000 HOMAN CREEK 0.1 MI N OF 12TH ST N OF QUINCY
1BRIDGE NEW DECK ADAMSUS 24
Structure Information Str Number AADT Truck Pct NHS
4,650 Y100010010
REHABILITATION - BRIDGES
6 - 15
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$800,000 ECL OF CAMP POINT TO 0.1 MI E OF ILL 94Miles = 1.49
1DESIGNED OVERLAY
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
ADAMSUS 24
Roadway Information Miles AADT Truck Pct NHS
4,129 9.6 Y 1.49
REHABILITATION - PAVEMENTS
2021-2025$1,900,000 E OF TIMEWELL TO 0.2 MI W OF BUCKHORN / DAMON RD IN MOUNT STERLINGMiles = 4.75
1DESIGNED OVERLAY BROWNUS 24
Roadway Information Miles AADT Truck Pct NHS
3,394 15.7 Y 4.75
REHABILITATION - PAVEMENTS
2020$860,000 US 24: 0.6 MI E OF OLD US 24 TO 0.1 MI W OF CEDAR ST IN RUSHVILLE & US 67: LAFAYETTE RD IN RUSHVILLE TO SCLMiles = 0.68
4STANDARD OVERLAY
ADA IMPROVEMENTS
SCHUYLERUS 24
US 67
Roadway Information Miles AADT Truck Pct NHS
3,928 12.2 Y 0.41
4,519 6.1 Y 0.27
REHABILITATION - PAVEMENTS
2020$342,000 AT US 67 IN RUSHVILLE
1TRAF SIGNAL REPLACEMENT SCHUYLERUS 24
MISCELLANEOUS IMPROVEMENTS
2020$60,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER
3BRIDGE DECK SEALING ADAMSUS 24 A
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
PRESERVATION - BRIDGES
6 - 16
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$60,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER
1BRIDGE DECK SEALING ADAMSUS 24 A
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
PRESERVATION - BRIDGES
2021-2025$1,500,000 QUINCY BAYVIEW BRIDGE AT MISSISSIPPI RIVER
2P.E. (BRIDGE INSPECTION) ADAMSUS 24 A
ILLINOIS LEAD AGENCY; MISSOURI AND ILLINOIS WILL SHARE COST EQUALLY.
MISCELLANEOUS IMPROVEMENTS
2020$900,000 0.2 MI W OF JCT US 51 / ILL 16 TO PINE ST IN PANAMiles = 1.19
1DESIGNED OVERLAY
NEW SHOULDERS
CHRISTIANUS 51
ILL 16
Roadway Information Miles AADT Truck Pct NHS
7,265 11.0 Y 1.19
REHABILITATION - PAVEMENTS
2021-2025$2,200,000 PINE ST IN PANA TO SHELBY CO LINEMiles = 3.62
5DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANUS 51
ILL 16
Roadway Information Miles AADT Truck Pct NHS
4,524 14.7 Y 3.62
REHABILITATION - PAVEMENTS
2020$2,030,000 US 54: 0.1 MI N OF N MONROE ST TO 0.1 MI E OF GROVE ST & ILL 106: US 54 TO E OF ILLINOIS ST IN PITTSFIELDMiles = 1.78
5DESIGNED OVERLAY
ADA IMPROVEMENTS
PARKING IMPROVEMENT
MISC TRAFFIC CONTROL
PIKEUS 54
ILL 106
S JACKSON ST
Roadway Information Miles AADT Truck Pct NHS
7,111 14.0 Y 1.70
3,650 4.9 N 0.08
REHABILITATION - PAVEMENTS
6 - 17
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$120,000 AT ILL 106 (JACKSON ST / WASHINGTON ST) IN PITTSFIELD
3INTERSECTION IMPROVEMENT PIKEUS 54
ILL 106
MISCELLANEOUS IMPROVEMENTS
2020$1,500,000 AT ILL 106 (JACKSON ST / WASHINGTON ST), MADISON ST, MEMORIAL ST, FRANKLIN ST & SHETLAND DR IN PITTSFIELD
2TRAF SIGNAL REPLACEMENT
ADA IMPROVEMENTS
LIGHTING
PIKEUS 54
ILL 106
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,600,000 PLUM POINT SLOUGH 0.8 MI N OF MISSOURI STATE LINE
1BRIDGE REPLACEMENT PIKEUS 54
Structure Information Str Number AADT Truck Pct NHS
3,100 Y190750022
RECONSTRUCTION - BRIDGES
2021-2025$2,300,000 BLUFFS DITCH 1.8 MI NW OF ILL 100
3BRIDGE REPLACEMENT SCHUYLERUS 67
Structure Information Str Number AADT Truck Pct NHS
4,050 Y100850002
RECONSTRUCTION - BRIDGES
2021-2025$62,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWNMiles = 1.41
3BRIDGE REPLACEMENT
NEW CONSTRUCTION
SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
Structure Information Str Number AADT Truck Pct NHS
6,500 Y180090001
RECONSTRUCTION - BRIDGES
6 - 18
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$100,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN
3ARCHAEOLOGICAL SURVEY SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2020$300,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN
1P.E. (CONSULTANT PLANS) SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2020$1,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN
3LAND ACQUISITION SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2021-2025$500,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN
3UTILITY ADJUSTMENT SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2021-2025$2,000,000 ILLINOIS RIVER BRIDGE AT BEARDSTOWN
3CONSTRUCTION ENGINEERING SCHUYLERCASS
US 67
ILL 100
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
6 - 19
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$500,000 ILLINOIS RIVER BRIDGE TO 0.2 MI W OF ILL 125 IN BEARDSTOWNMiles = 0.51
1DESIGNED OVERLAY CASSUS 67
ILL 100
Roadway Information Miles AADT Truck Pct NHS
6,647 12.8 Y 0.51
REHABILITATION - PAVEMENTS
2021-2025$3,900,000 US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RDMiles = 5.61
2DESIGNED OVERLAY
ADA IMPROVEMENTS
CASSUS 67
ILL 100
ILL 125
Roadway Information Miles AADT Truck Pct NHS
6,130 9.6 Y 0.32
5,689 16.6 N 5.29
REHABILITATION - PAVEMENTS
2021-2025$7,900,000 US 67: HONEY POINT RD 1 MI N OF CASS / MORGAN CO LINE TO 2 MI E OF ILL 100 & ILL 100: US 67 TO 0.3 MI SMiles = 7.49
1DESIGNED OVERLAY MORGANCASS
US 67
ILL 100
ILL 104
Roadway Information Miles AADT Truck Pct NHS
2,000 27.3 Y 1.03
3,156 21.7 Y 6.12
1,850 23.8 N 0.34
REHABILITATION - PAVEMENTS
2021-2025$10,000,000 MISSISSIPPI RIVER BRIDGE AT KEOKUK
5BRIDGE DECK OVERLAY HANCOCKUS 136
ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.
PRESERVATION - BRIDGES
6 - 20
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,400,000 E OF MARION ST IN CARTHAGE TO 0.3 MI E OF CARTHAGEMiles = 1.18
1DESIGNED OVERLAY
ADA IMPROVEMENTS
HANCOCKUS 136
ILL 94
Roadway Information Miles AADT Truck Pct NHS
5,322 11.4 Y 1.14
3,500 6.0 N 0.04
REHABILITATION - PAVEMENTS
2021-2025$1,300,000 3.1 MI S OF CARTHAGE TO 0.9 MI EMiles = 5.83
1CAPE SEAL
GRINDING
FOG SEAL
HANCOCKUS 136
ILL 110
ILL 336
PRESERVATION - PAVEMENTS
2021-2025$5,800,000 US 136: ILLINOIS RIVER BRIDGE TO S OF RANDOLPH ST; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO S OF ILLINOIS ST (ALL IN HAVANA)Miles = 0.91
5RECONSTRUCTION
ADA IMPROVEMENTS
VERTICAL REALIGNMENT
BI-DIRECT LEFT TURN LANE
MASONUS 136
ILL 78
ILL 97
Roadway Information Miles AADT Truck Pct NHS
7,418 8.7 Y 0.72
3,700 8.7 N 0.10
3,850 7.5 N 0.09
RECONSTRUCTION - PAVEMENTS
2021-2025$500,000 US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA)
1LAND ACQUISITION MASONUS 136
ILL 78
ILL 97
RECONSTRUCTION - PAVEMENTS
6 - 21
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$250,000 US 136: ILLINOIS RIVER BRIDGE TO E OF CHARLOTTE AVE; ILL 97: US 136 TO S MCKINLEY ST; ILL 78: US 136 TO N OF IM RR (ALL IN HAVANA)
1UTILITY ADJUSTMENT MASONUS 136
ILL 78
ILL 97
RECONSTRUCTION - PAVEMENTS
2021-2025$450,000 S OF RANDOLPH ST TO E OF CHARLOTTE AVEMiles = 0.40
1DESIGNED OVERLAY
ADA IMPROVEMENTS
INTERSECTION IMPROVEMENT
MASONUS 136
Roadway Information Miles AADT Truck Pct NHS
5,328 18.9 Y 0.40
REHABILITATION - PAVEMENTS
2020$5,700,000 E OF CHARLOTTE AVE IN HAVANA TO 0.1 MI E OF FORREST CITY RD (CR 2800 E)Miles = 11.98
1STANDARD OVERLAY MASONUS 136
Roadway Information Miles AADT Truck Pct NHS
2,034 18.0 Y 11.98
REHABILITATION - PAVEMENTS
2021-2025$200,000 0.1 MI W TO 0.1 MI E OF PRAIRIE CREEK DITCH 1.5 MI E OF SAN JOSEMiles = 0.18
1DESIGNED OVERLAY LOGANUS 136
Roadway Information Miles AADT Truck Pct NHS
2,200 34.1 Y 0.18
REHABILITATION - PAVEMENTS
2020$2,700,000 0.5 MI W OF I-155 TO W OF UNION RDMiles = 4.89
5DESIGNED OVERLAY LOGANUS 136
Roadway Information Miles AADT Truck Pct NHS
1,999 27.5 Y 4.89
REHABILITATION - PAVEMENTS
6 - 22
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$1,000,000 0.5 MI W OF I-155 TO W OF UNION RD
2SHOULDER RECONSTRUCTION LOGANUS 136
MAINTENANCE - PAVEMENTS
2021-2025$2,500,000 W OF UNION RD TO W OF MCLEAN CO LINEMiles = 5.51
3DESIGNED OVERLAY LOGANUS 136
Roadway Information Miles AADT Truck Pct NHS
2,091 28.8 Y 5.51
REHABILITATION - PAVEMENTS
2021-2025$1,400,000 W OF UNION RD TO W OF MCLEAN CO LINE
1SHOULDER RECONSTRUCTION LOGANUS 136
MAINTENANCE - PAVEMENTS
2021-2025$100,000 W FORK SUGAR CREEK 2 MI E OF UNION RD & SUGAR CREEK 1.2 MI W OF MCLEAN CO LINE
3BRIDGE PAINTING
BRIDGE JOINT REPLACE/REPAIR
SCOUR MITIGATION
LOGANUS 136
PRESERVATION - BRIDGES
2021-2025$5,600,000 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELDMiles = 2.96
1DESIGNED OVERLAY SANGAMONILL 4
Roadway Information Miles AADT Truck Pct NHS
31,134 10.2 Y 2.96
REHABILITATION - PAVEMENTS
6 - 23
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$500,000 0.2 MI N OF GREENBRIAR DR TO S OF PRAIRIE CROSSING DR IN SPRINGFIELD
1PATCHING SANGAMONILL 4
VETERANS PKWY
MAINTENANCE - PAVEMENTS
2021-2025$2,200,000 OVER NS RR & GATEWAY W RR 0.1 M N OF I-72 INTCHG IN SPRINGFIELD
1BRIDGE DECK OVERLAY SANGAMONILL 4
(SOUTHBOUND)
PRESERVATION - BRIDGES
2021-2025$1,800,000 0.2 MI N OF MANSION RD TO N OF TEAL DR IN CHATHAMMiles = 1.18
1DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONILL 4
Roadway Information Miles AADT Truck Pct NHS
19,185 9.6 Y 1.18
REHABILITATION - PAVEMENTS
2021-2025$1,000,000 S OF NORTH ST IN GIRARD TO N OF CAMBRIDGE RD S OF GIRARDMiles = 1.14
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MACOUPINILL 4
Roadway Information Miles AADT Truck Pct NHS
3,036 5.5 Y 1.14
REHABILITATION - PAVEMENTS
2021-2025$5,100,000 S OF ALLEN RD TO N OF CARLINVILLE SQUAREMiles = 6.85
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MACOUPINILL 4
Roadway Information Miles AADT Truck Pct NHS
4,081 11.5 Y 6.85
REHABILITATION - PAVEMENTS
6 - 24
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$900,000 S SIDE CARLINVILLE SQUARE TO CARLINVILLE SCLMiles = 0.82
1DESIGNED OVERLAY
PARKING IMPROVEMENT
ADA IMPROVEMENTS
MACOUPINILL 4
ILL 108
Roadway Information Miles AADT Truck Pct NHS
7,283 6.1 Y 0.79
4,000 5.8 N 0.03
REHABILITATION - PAVEMENTS
2021-2025$2,000,000 NCL OF EAST GILLESPIE TO ILL 16Miles = 0.93
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MACOUPINILL 4
ILL 16
Roadway Information Miles AADT Truck Pct NHS
2,801 12.3 Y 0.75
5,100 5.8 Y 0.18
REHABILITATION - PAVEMENTS
2021-2025$450,000 NCL OF EAST GILLESPIE TO ILL 16
1P.E. (PHASE I)
P.E. (PHASE II)
MACOUPINILL 4
ILL 16
REHABILITATION - PAVEMENTS
2021-2025$300,000 NCL OF EAST GILLESPIE TO ILL 16
1LAND ACQUISITION MACOUPINILL 4
ILL 16
REHABILITATION - PAVEMENTS
2021-2025$150,000 NCL OF EAST GILLESPIE TO ILL 16
1UTILITY ADJUSTMENT MACOUPINILL 4
ILL 16
REHABILITATION - PAVEMENTS
6 - 25
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,600,000 CRANE CREEK 1.5 MI N OF EASTON
1BRIDGE REPLACEMENT MASONILL 10
Structure Information Str Number AADT Truck Pct NHS
600 N50630005
RECONSTRUCTION - BRIDGES
2021-2025$1,600,000 0.1 MI E OF ILL 29 TO W OF PRICE AVE IN MASON CITYMiles = 1.88
7DESIGNED OVERLAY
ADA IMPROVEMENTS
PARKING IMPROVEMENT
MASONILL 10
CHESTNUT ST
Roadway Information Miles AADT Truck Pct NHS
2,629 13.6 N 1.88
REHABILITATION - PAVEMENTS
2021-2025$150,000 DITCH 0.1 MI S OF ILL 10, DITCH AT ILL 10 & DITCH 0.1 MI E OF ILL 29
1CULVERT (NEW)
CULVERT REPLACEMENT
MASONILL 10
CHESTNUT ST
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,400,000 0.1 MI E OF MASON CO LINE TO 2.5 MI E OF NEW HOLLANDMiles = 4.36
7DESIGNED OVERLAY
ADA IMPROVEMENTS
LOGANILL 10
Roadway Information Miles AADT Truck Pct NHS
1,871 13.8 N 4.36
REHABILITATION - PAVEMENTS
2021-2025$600,000 DITCH 0.8 MI E OF MASON CO LINE
9CULVERT (NEW) LOGANILL 10
INITIAL CONSTRUCTION - BRIDGES
6 - 26
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,300,000 E OF ELM ST TO NW OF KICKAPOO ST IN LINCOLNMiles = 0.94
3DESIGNED OVERLAY
ADA IMPROVEMENTS
LOGANILL 10
ILL 121
I 55 BUS
KEOKUK ST
WOODLAWN ST
Roadway Information Miles AADT Truck Pct NHS
11,350 10.7 Y 0.94
REHABILITATION - PAVEMENTS
2021-2025$8,000,000 JERSEY CO LINE TO ROSE LN IN SHIPMANMiles = 5.98
7DESIGNED OVERLAY
CULVERT (NEW)
CULVERT REPLACEMENT
CULVERT EXTENSION
ADA IMPROVEMENTS
MACOUPINILL 16
Roadway Information Miles AADT Truck Pct NHS
2,095 4.7 Y 5.98
REHABILITATION - PAVEMENTS
2021-2025$500,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN
1P.E. (PHASE II)
P.E. (CONSULTANT PLANS)
MACOUPINILL 16
REHABILITATION - PAVEMENTS
2021-2025$1,000,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN
4LAND ACQUISITION MACOUPINILL 16
REHABILITATION - PAVEMENTS
6 - 27
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 JERSEY CO LINE TO ROSE LN IN SHIPMAN
4UTILITY ADJUSTMENT MACOUPINILL 16
REHABILITATION - PAVEMENTS
2021-2025$1,600,000 PIASA CREEK 0.2 MI W OF PIASA
10BRIDGE REPLACEMENT MACOUPINILL 16
Structure Information Str Number AADT Truck Pct NHS
2,650 Y80590001
RECONSTRUCTION - BRIDGES
2021-2025$1,600,000 PIASA CREEK 3.1 MI W OF SHIPMAN
10BRIDGE REPLACEMENT
DRAINAGE
MACOUPINILL 16
Structure Information Str Number AADT Truck Pct NHS
1,950 Y30590002
RECONSTRUCTION - BRIDGES
2021-2025$5,000,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159Miles = 4.22
3DESIGNED OVERLAY
BRIDGE REPLACEMENT
CULVERT (NEW)
CULVERT EXTENSION
MACOUPINILL 16
Roadway Information Miles AADT Truck Pct NHS
2,018 4.8 Y 4.22
Structure Information Str Number AADT Truck Pct NHS
2,100 Y30590004
REHABILITATION - PAVEMENTS
2021-2025$750,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159
1LAND ACQUISITION MACOUPINILL 16
REHABILITATION - PAVEMENTS
6 - 28
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$375,000 ROSE LN IN SHIPMAN TO 0.3 MI W OF ILL 159
1UTILITY ADJUSTMENT MACOUPINILL 16
REHABILITATION - PAVEMENTS
2020$400,000 ILL 16: N OF SEWARD ST TO ROUNTREE ST; ILL 127: SCHOOL ST TO S OF HILLTOP DR IN HILLSBORO
2ADA IMPROVEMENTS MONTGOMERYILL 16
ILL 127
MISCELLANEOUS IMPROVEMENTS
2021-2025$7,300,000 FREY AVE IN SCHRAM CITY TO GIBSON ST IN NOKOMISMiles = 13.51
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MONTGOMERYILL 16
Roadway Information Miles AADT Truck Pct NHS
2,507 13.3 Y 13.51
REHABILITATION - PAVEMENTS
2021-2025$1,500,000 BIG FOUR RESERVOIR OVERFLOW 1 MI E OF WCL OF SCHRAM CITY
1BRIDGE REPLACEMENT MONTGOMERYILL 16
Structure Information Str Number AADT Truck Pct NHS
4,700 Y80680011
RECONSTRUCTION - BRIDGES
2021-2025$1,400,000 S FORK SANGAMON RIVER 2.4 MI E OF ELM ST IN NOKOMIS
12BRIDGE REPLACEMENT MONTGOMERYILL 16
Structure Information Str Number AADT Truck Pct NHS
1,550 Y110680016
RECONSTRUCTION - BRIDGES
6 - 29
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,400,000 SANGAMON CREEK AT WCL OF OHLMAN
12BRIDGE REPLACEMENT MONTGOMERYILL 16
Structure Information Str Number AADT Truck Pct NHS
1,600 Y150680017
RECONSTRUCTION - BRIDGES
2021-2025$950,000 DITCH 0.3 MI NE OF MONTGOMERY CO LINE
11CULVERT (NEW) CHRISTIANILL 16
INITIAL CONSTRUCTION - BRIDGES
2021-2025$3,000,000 MENARD CO LINE TO N OF FISHER RD S OF CANTRALLMiles = 3.07
8DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONILL 29
Roadway Information Miles AADT Truck Pct NHS
7,242 5.9 N 3.07
REHABILITATION - PAVEMENTS
2021-2025$4,250,000 N OF FISHER RD S OF CANTRALL TO 0.1 MI S OF ANDREW RD (INCL INT AT ANDREW RD)Miles = 2.60
10DESIGNED OVERLAY
INTERSECTION IMPROVEMENT
LEFT TURN LANES
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
SANGAMONILL 29
Roadway Information Miles AADT Truck Pct NHS
6,595 5.5 N 2.60
REHABILITATION - PAVEMENTS
2021-2025$900,000 MENARD CO LINE TO ANDREW RD
6LAND ACQUISITION SANGAMONILL 29
J DAVID JONES PKWY
REHABILITATION - PAVEMENTS
6 - 30
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$300,000 MENARD CO LINE TO ANDREW RD
6UTILITY ADJUSTMENT SANGAMONILL 29
J DAVID JONES PKWY
REHABILITATION - PAVEMENTS
2021-2025$16,000,000 AT DIRKSEN PKWY IN SPRINGFIELD
1INTERSECTION RECONSTN
LEFT TURN LANES
SANGAMONILL 29
SANGAMON AVE
MISCELLANEOUS IMPROVEMENTS
2020$1,500,000 AT DIRKSEN PKWY IN SPRINGFIELD
2P.E. (PHASE I)
P.E. (PHASE II)
SANGAMONILL 29
SANGAMON AVE
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,500,000 AT DIRKSEN PKWY IN SPRINGFIELD
1LAND ACQUISITION SANGAMONILL 29
SANGAMON AVE
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,250,000 AT DIRKSEN PKWY IN SPRINGFIELD
1UTILITY ADJUSTMENT SANGAMONILL 29
SANGAMON AVE
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,520,000 0.2 MI S OF CLEAR LAKE AVE TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELDMiles = 1.07
4DESIGNED OVERLAY SANGAMONILL 29
DIRKSEN PKWY
Roadway Information Miles AADT Truck Pct NHS
19,028 4.9 Y 0.88
14,400 5.8 Y 0.11
REHABILITATION - PAVEMENTS
6 - 31
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$800,000 0.2 MI SE OF JOHNS ST TO 0.2 MI S OF CARDINAL HILL RDMiles = 0.51
1DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONILL 29
Roadway Information Miles AADT Truck Pct NHS
9,951 11.0 Y 0.45
9,850 10.2 Y 0.06
REHABILITATION - PAVEMENTS
2020$850,000 0.1 MI S OF CARDINAL HILL RD TO 0.4 MI S OF BRANER RD S OF ROCHESTERMiles = 2.14
1EXPERIMENTAL PRESERVATION
GRINDING
FOG SEAL
SANGAMONILL 29
PRESERVATION - PAVEMENTS
2020$880,000 0.4 MI S OF BRANER RD S OF ROCHESTER TO 0.7 MI S OF JETT RD S OF BERRYMiles = 2.55
1EXPERIMENTAL PRESERVATION
GRINDING
FOG SEAL
SANGAMONILL 29
PRESERVATION - PAVEMENTS
2021-2025$2,000,000 0.2 MI S OF ILL 104 TO W OF MAIN CROSS ST IN TAYLORVILLEMiles = 2.15
1DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANILL 29
Roadway Information Miles AADT Truck Pct NHS
13,141 6.8 Y 2.15
REHABILITATION - PAVEMENTS
2021-2025$2,500,000 W OF MAIN CROSS ST IN TAYLORVILLE TO S OF VELMA RD S OF TAYLORVILLEMiles = 3.57
1DESIGNED OVERLAY CHRISTIANILL 29
Roadway Information Miles AADT Truck Pct NHS
8,161 6.2 Y 3.57
REHABILITATION - PAVEMENTS
6 - 32
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,600,000 OVER ILL 48 IN TAYLORVILLE
1BRIDGE NEW DECK CHRISTIANILL 29
Structure Information Str Number AADT Truck Pct NHS
10,200 Y50110010
REHABILITATION - BRIDGES
2021-2025$1,700,000 FLATT BRANCH 0.7 MI SE OF ILL 48 RAMP
1BRIDGE SUPERSTRUCTURE CHRISTIANILL 29
Structure Information Str Number AADT Truck Pct NHS
10,200 Y50110011
REHABILITATION - BRIDGES
2020$7,100,000 S OF VELMA RD S OF TAYLORVILLE TO N OF MAGNOLIA ST IN PANAMiles = 10.63
2DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANILL 29
Roadway Information Miles AADT Truck Pct NHS
4,242 11.9 Y 10.08
4,050 13.0 Y 0.55
REHABILITATION - PAVEMENTS
2021-2025$1,700,000 LOCUST CREEK TRIB 0.3 MI SE OF MILLERSVILLE
5BRIDGE REPLACEMENT CHRISTIANILL 29
Structure Information Str Number AADT Truck Pct NHS
4,050 Y120110012
RECONSTRUCTION - BRIDGES
2021-2025$1,800,000 MAIN DRAINAGE DITCH 1.8 MI NW OF PANA
1BRIDGE REPLACEMENT CHRISTIANILL 29
Structure Information Str Number AADT Truck Pct NHS
4,050 Y120110013
RECONSTRUCTION - BRIDGES
6 - 33
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,500,000 N OF MAGNOLIA ST TO US 51 (E JACKSON ST) IN PANAMiles = 1.85
5DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANILL 29
Roadway Information Miles AADT Truck Pct NHS
4,587 13.8 Y 1.27
3,666 11.1 N 0.58
REHABILITATION - PAVEMENTS
2021-2025$8,900,000 0.9 MI SW OF OLD ILL 48 (SPRESSER ST) SW OF TAYLORVILLE TO MONTGOMERY CO LINEMiles = 15.24
1DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANILL 48
Roadway Information Miles AADT Truck Pct NHS
2,548 17.3 N 15.24
REHABILITATION - PAVEMENTS
2021-2025$1,000,000 AT I-55 INTCHG W OF RAYMONDMiles = 0.96
1STANDARD OVERLAY MONTGOMERYILL 48
ILL 127
Roadway Information Miles AADT Truck Pct NHS
500 0.0 N 0.27
4,846 19.7 N 0.50
250 0.0 N 0.19
REHABILITATION - PAVEMENTS
2021-2025$760,000 S OF 700TH ST TO S OF ILL 121Miles = 1.58
6DESIGNED OVERLAY LOGANILL 54
Roadway Information Miles AADT Truck Pct NHS
1,050 21.0 N 1.58
REHABILITATION - PAVEMENTS
2021-2025$500,000 AT MCDONALD ST SE OF MT PULASKI
9INTERSECTION IMPROVEMENT
LEFT TURN LANES
RIGHT TURN LANE
LOGANILL 54
MCDONALD ST
MISCELLANEOUS IMPROVEMENTS
6 - 34
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$4,500,000 ILL 121 TO SANGAMON CO LINEMiles = 9.12
2DESIGNED OVERLAY LOGANILL 54
Roadway Information Miles AADT Truck Pct NHS
1,512 22.9 N 9.12
REHABILITATION - PAVEMENTS
2020$200,000 AT CH 1 (1600TH AVE) S OF MT PULASKI
1INTERSECTION IMPROVEMENT LOGANILL 54
MISCELLANEOUS IMPROVEMENTS
2020$60,000 LAKE FORK CREEK 2 MI NE OF SANGAMON CO LINE
1BRIDGE JOINT REPLACE/REPAIR LOGANILL 54
PRESERVATION - BRIDGES
2021-2025$2,400,000 LOGAN CO LINE TO 0.2 MI E OF PRAIRIE SCHOOL RDMiles = 5.25
2DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONILL 54
Roadway Information Miles AADT Truck Pct NHS
1,825 15.2 N 5.25
REHABILITATION - PAVEMENTS
2021-2025$3,000,000 WOLF CREEK 1.6 MI E OF BARCLAYMiles = 0.26
15CULVERT REPLACEMENT
VERTICAL REALIGNMENT
SANGAMONILL 54
Structure Information Str Number AADT Truck Pct NHS
2,900 N190842002
RECONSTRUCTION - BRIDGES
6 - 35
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$3,200,000 0.1 MI W OF PRAIRIE SCHOOL RD TO N OF BISSELL RD IN SPRINGFIELDMiles = 5.44
1DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONILL 54
Roadway Information Miles AADT Truck Pct NHS
4,504 10.4 N 5.44
REHABILITATION - PAVEMENTS
2021-2025$2,000,000 AT MAIN ST IN SPAULDING
1INTERSECTION RECONSTN
LEFT TURN LANES
TRAF SIGNAL INSTALLATION
RR INTERCONNECT
SANGAMONILL 54
MISCELLANEOUS IMPROVEMENTS
2021-2025$100,000 AT MAIN ST IN SPAULDING
1LAND ACQUISITION SANGAMONILL 54
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,000,000 ILL 104 (BROADWAY ST) IN QUINCY TO I-172
1P.E. (FEASIBILITY STUDY) ADAMSILL 57
INITIAL CONSTRUCTION - PAVEMENTS
2020$4,825,000 ILL 57 (3RD ST): MAINE ST IN QUINCY TO S OF MARBLEHEAD & YORK ST: 3RD ST TO W OF 4TH STMiles = 7.21
16STANDARD OVERLAY
DESIGNED OVERLAY
ADA IMPROVEMENTS
PARKING IMPROVEMENT
ADAMSILL 57
ILL 57 A
YORK ST (GRR)
Roadway Information Miles AADT Truck Pct NHS
6,246 21.7 Y 2.68
4,304 24.4 Y 4.47
4,350 13.2 Y 0.06
REHABILITATION - PAVEMENTS
6 - 36
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$1,150,000 PAYSON AVE 0.5 MI S OF US 24 IN QUINCY
16BRIDGE NEW DECK
BRIDGE APPROACH ROADWAY
SLOPEWALL REPAIR
ADAMSILL 57
Structure Information Str Number AADT Truck Pct NHS
7,250 Y210010012
REHABILITATION - BRIDGES
2020$430,000 CURTIS CREEK 1.6 MI S OF US 24 IN QUINCY
9BRIDGE NEW DECK
BRIDGE REPAIR
BRIDGE SUBSTRUCTURE
SCOUR MITIGATION
ADAMSILL 57
Structure Information Str Number AADT Truck Pct NHS
4,750 Y260010013
REHABILITATION - BRIDGES
2021-2025$3,650,000 MILL CREEK AT MARBLEHEAD
4BRIDGE REPLACEMENT ADAMSILL 57
Structure Information Str Number AADT Truck Pct NHS
4,100 Y180010015
RECONSTRUCTION - BRIDGES
2020$750,000 MILL CREEK AT MARBLEHEAD
1P.E. (CONSULTANT PLANS)
P.E. (PHASE I)
ADAMSILL 57
RECONSTRUCTION - BRIDGES
2021-2025$250,000 MILL CREEK AT MARBLEHEAD
1LAND ACQUISITION ADAMSILL 57
RECONSTRUCTION - BRIDGES
6 - 37
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,500,000 HASKNESS CREEK AT BLUFF HALL
1BRIDGE REPLACEMENT ADAMSILL 57
Structure Information Str Number AADT Truck Pct NHS
4,250 Y160010016
RECONSTRUCTION - BRIDGES
2021-2025$2,800,000 ILL 101 IN AUGUSTA TO MCDONOUGH CO LINEMiles = 5.06
3DESIGNED OVERLAY
ADA IMPROVEMENTS
HANCOCKILL 61
Roadway Information Miles AADT Truck Pct NHS
1,366 12.5 N 5.06
REHABILITATION - PAVEMENTS
2021-2025$4,400,000 ILL 94 IN BOWEN TO SCHUYLER CO LINEMiles = 8.14
1DESIGNED OVERLAY
ADA IMPROVEMENTS
HANCOCKILL 61
ILL 101
Roadway Information Miles AADT Truck Pct NHS
1,441 11.0 N 8.14
REHABILITATION - PAVEMENTS
2021-2025$1,700,000 FLOUR CREEK 2.8 MI E OF ILL 94
1BRIDGE REPLACEMENT HANCOCKILL 61
Structure Information Str Number AADT Truck Pct NHS
1,550 N120340006
RECONSTRUCTION - BRIDGES
2021-2025$1,400,000 BIG NECK CREEK 0.5 MI N OF ILL 94
1BRIDGE REPLACEMENT ADAMSILL 61
ILL 94
Structure Information Str Number AADT Truck Pct NHS
700 N150010002
RECONSTRUCTION - BRIDGES
6 - 38
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,400,000 BIG NECK CREEK 0.1 MI W OF ILL 94
4BRIDGE REPLACEMENT ADAMSILL 61
Structure Information Str Number AADT Truck Pct NHS
850 N50010003
RECONSTRUCTION - BRIDGES
2021-2025$600,000 S OF ILLINOIS ST TO N OF IM RR IN HAVANAMiles = 0.82
1STANDARD OVERLAY
ADA IMPROVEMENTS
MASONILL 78
Roadway Information Miles AADT Truck Pct NHS
3,193 11.7 N 0.82
REHABILITATION - PAVEMENTS
2021-2025$450,000 DITCH 0.8 MI S OF WHITE OAK CREEK S OF HAVANA
3CULVERT REPLACEMENT MASONILL 78
MISCELLANEOUS IMPROVEMENTS
2021-2025$450,000 DITCH 0.8 MI N OF ELM ST IN BATH
2CULVERT REPLACEMENT MASONILL 78
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,600,000 CASS CO LINE TO 0.3 MI N OF VALEVUE ACRES DRMiles = 5.17
1DESIGNED OVERLAY MORGANILL 78
Roadway Information Miles AADT Truck Pct NHS
2,119 10.4 N 5.17
REHABILITATION - PAVEMENTS
6 - 39
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,500,000 SNAKE CREEK 3.6 MI N OF JACKSONVILLE
1BRIDGE REPLACEMENT MORGANILL 78
Structure Information Str Number AADT Truck Pct NHS
2,500 N80690004
RECONSTRUCTION - BRIDGES
2021-2025$2,600,000 0.1 MI N OF OAK ST TO ILL 104 IN JACKSONVILLEMiles = 3.26
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MORGANILL 78
Roadway Information Miles AADT Truck Pct NHS
4,504 9.0 N 3.26
REHABILITATION - PAVEMENTS
2020$40,000 ROCK CREEK 2.5 MI N OF CH 29 (FERRIS RD)
1BRIDGE DECK REPAIRS HANCOCKILL 94
MAINTENANCE - BRIDGES
2020$1,800,000 POWELLTON RD TO 1.1 MI N OF CH 29 (FERRIS RD)Miles = 4.01
1STANDARD OVERLAY HANCOCKILL 94
Roadway Information Miles AADT Truck Pct NHS
1,823 18.5 N 4.01
REHABILITATION - PAVEMENTS
2021-2025$1,500,000 SHORT CREEK 3 MI N OF US 136 N OF CARTHAGE
1BRIDGE (NEW) HANCOCKILL 94
INITIAL CONSTRUCTION - BRIDGES
6 - 40
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,700,000 TYSON CREEK 1.7 MI S OF ILL 9 IN NIOTA
1BRIDGE REPLACEMENT HANCOCKILL 96
Structure Information Str Number AADT Truck Pct NHS
1,850 N20340054
RECONSTRUCTION - BRIDGES
2020$1,710,000 SHERIDAN CREEK 0.9 MI S OF NAUVOO
4BRIDGE REPLACEMENT HANCOCKILL 96
Structure Information Str Number AADT Truck Pct NHS
1,250 N30340020
RECONSTRUCTION - BRIDGES
2021-2025$2,100,000 BEAR CREEK TO S OF BIRCH ST IN URSAMiles = 3.90
1DESIGNED OVERLAY ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
3,396 7.8 N 3.90
REHABILITATION - PAVEMENTS
2021-2025$2,500,000 US 24 TO N OF KOCHS LN IN QUINCYMiles = 2.45
3DESIGNED OVERLAY ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
3,430 9.0 N 1.06
3,800 12.5 N 0.04
5,450 13.7 N 1.35
REHABILITATION - PAVEMENTS
2021-2025$250,000 US 24 TO N OF KOCHS LN IN QUINCY
1P.E. (PHASE II) ADAMSILL 96
REHABILITATION - PAVEMENTS
6 - 41
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 US 24 TO N OF KOCHS LN IN QUINCY
1LAND ACQUISITION ADAMSILL 96
REHABILITATION - PAVEMENTS
2021-2025$250,000 US 24 TO N OF KOCHS LN IN QUINCY
1UTILITY ADJUSTMENT ADAMSILL 96
REHABILITATION - PAVEMENTS
2021-2025$880,000 DITCH 1 MI N OF KOCHS LN N OF QUINCY
8CULVERT (NEW) ADAMSILL 96
INITIAL CONSTRUCTION - BRIDGES
2021-2025$800,000 N OF KOCHS LN TO LOCUST ST IN QUINCYMiles = 1.12
1STANDARD OVERLAY
ADA IMPROVEMENTS
ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
6,638 10.2 N 1.12
REHABILITATION - PAVEMENTS
2021-2025$900,000 LOCUST ST TO SPRING ST IN QUINCYMiles = 0.95
1DESIGNED OVERLAY
ADA IMPROVEMENTS
ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
8,096 4.8 N 0.95
REHABILITATION - PAVEMENTS
6 - 42
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,500,000 VERMONT ST TO S OF ALDO BLVD IN QUINCYMiles = 0.49
5RECONSTRUCTION
ADA IMPROVEMENTS
ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
8,134 4.1 N 0.49
RECONSTRUCTION - PAVEMENTS
2021-2025$2,500,000 S OF STATE ST IN QUINCY TO 0.5 MI S OF I-172Miles = 4.04
1DESIGNED OVERLAY
ADA IMPROVEMENTS
ADAMSILL 96
Roadway Information Miles AADT Truck Pct NHS
7,998 4.4 N 1.90
5,138 7.3 N 1.82
3,050 8.8 N 0.32
REHABILITATION - PAVEMENTS
2021-2025$2,600,000 0.3 MI N OF E CR 800 TO MENARD CO LINEMiles = 4.38
1DESIGNED OVERLAY MASONILL 97
Roadway Information Miles AADT Truck Pct NHS
1,944 13.6 N 4.38
REHABILITATION - PAVEMENTS
2021-2025$1,600,000 N OF WARING RD S OF ATTERBERRY TO C&IM RR N OF PETERSBURGMiles = 3.25
3DESIGNED OVERLAY
CULVERT REPAIR
MENARDILL 97
Roadway Information Miles AADT Truck Pct NHS
2,289 12.4 N 3.25
REHABILITATION - PAVEMENTS
6 - 43
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$5,200,000 ILL 97: C&IM RR N OF PETERSBURG TO 0.1 MI N OF LAKE PETERSBURG RD & ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURGMiles = 2.90
10DESIGNED OVERLAY
INTERSECTION RECONSTN
BRIDGE JOINT REPLACE/REPAIR
CULVERT EXTENSION
CULVERT REMOVAL
ADA IMPROVEMENTS
MENARDILL 97
ILL 123
Roadway Information Miles AADT Truck Pct NHS
4,694 6.5 N 2.48
5,500 4.4 N 0.42
REHABILITATION - PAVEMENTS
2020$700,000 ILL 97: N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD; ILL 123: ILL 97 TO SANGAMON RIVER BRIDGE E OF PETERSBURG
1P.E. (PHASE II) MENARDILL 97
ILL 123
REHABILITATION - PAVEMENTS
2021-2025$250,000 N OF WARING RD S OF ATTERBERRY TO 0.1 MI N OF LAKE PETERSBURG RD
4UTILITY ADJUSTMENT MENARDILL 97
ILL 123
REHABILITATION - PAVEMENTS
2021-2025$500,000 ILL 97: AT DITCH 0.1 MI S OF LINCOLN TRAIL RD & KELLY ST N OF PETERSBURG TO C&IM RR; ILL 123: VILLAGE GREEN RD (W INT) TO 0.7 MI E
3NEW SHOULDERS MENARDILL 97
ILL 123
MAINTENANCE - PAVEMENTS
2021-2025$1,300,000 0.1 MI N OF LAKE PETERSBURG RD TO N OF BOY SCOUT RDMiles = 2.13
1DESIGNED OVERLAY MENARDILL 97
ILL 123
Roadway Information Miles AADT Truck Pct NHS
4,916 10.2 N 2.13
REHABILITATION - PAVEMENTS
6 - 44
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$3,300,000 N OF BOY SCOUT RD TO SANGAMON CO LINEMiles = 5.65
1DESIGNED OVERLAY MENARDILL 97
ILL 123
Roadway Information Miles AADT Truck Pct NHS
4,325 2.5 N 5.65
REHABILITATION - PAVEMENTS
2021-2025$4,300,000 MENARD CO LINE TO ILL 125Miles = 5.09
1DESIGNED OVERLAY SANGAMONILL 97
Roadway Information Miles AADT Truck Pct NHS
4,671 4.1 N 5.09
REHABILITATION - PAVEMENTS
2021-2025$19,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RDMiles = 2.19
1RECONSTRUCTION
BRIDGE REPLACEMENT
INTERSECTION RECONSTN
BRIDGE (NEW)
SANGAMONILL 97
ILL 125
Roadway Information Miles AADT Truck Pct NHS
9,287 5.0 N 2.19
Structure Information Str Number AADT Truck Pct NHS
10,050 N40840046
RECONSTRUCTION - PAVEMENTS
2021-2025$100,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD
1ARCHAEOLOGICAL SURVEY SANGAMONILL 97
ILL 125
RECONSTRUCTION - PAVEMENTS
2021-2025$4,700,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD
1LAND ACQUISITION SANGAMONILL 97
ILL 125
RECONSTRUCTION - PAVEMENTS
6 - 45
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,150,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD
1UTILITY ADJUSTMENT SANGAMONILL 97
ILL 125
RECONSTRUCTION - PAVEMENTS
2021-2025$1,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RD
1CONSTRUCTION ENGINEERING SANGAMONILL 97
ILL 125
RECONSTRUCTION - PAVEMENTS
2021-2025$13,000,000 0.5 MI W OF ILL 97/125 JCT TO COVERED BRIDGE RDMiles = 0.01
1ADDITIONAL LANES
BRIDGE (NEW)
SANGAMONILL 97
ILL 125
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$23,000,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELDMiles = 4.28
1RECONSTRUCTION
BRIDGE REMOVAL/DEMOLITION
PEDESTRIAN OVERPASS
SANGAMONILL 97
JEFFERSON ST
CH 17
Roadway Information Miles AADT Truck Pct NHS
10,050 4.7 N 1.05
10,062 4.7 N 2.04
RECONSTRUCTION - PAVEMENTS
2021-2025$150,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD
1ARCHAEOLOGICAL SURVEY SANGAMONILL 97
ILL 125
JEFFERSON ST
RECONSTRUCTION - PAVEMENTS
6 - 46
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$5,400,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD
1LAND ACQUISITION SANGAMONILL 97
JEFFERSON ST
RECONSTRUCTION - PAVEMENTS
2021-2025$2,500,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD
1UTILITY ADJUSTMENT SANGAMONILL 97
JEFFERSON ST
RECONSTRUCTION - PAVEMENTS
2021-2025$2,500,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONILL 97
JEFFERSON ST
RECONSTRUCTION - PAVEMENTS
2021-2025$13,000,000 COVERED BRIDGE RD TO 0.1 MI W OF ILL 4 IN SPRINGFIELDMiles = 0.01
1ADDITIONAL LANES SANGAMONILL 97
JEFFERSON ST
CH 17
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$3,700,000 SCHUYLER CO LINE TO 0.4 MI N OF MOUNT STERLINGMiles = 7.32
1DESIGNED OVERLAY BROWNILL 99
Roadway Information Miles AADT Truck Pct NHS
620 15.5 N 7.32
REHABILITATION - PAVEMENTS
6 - 47
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$4,300,000 0.1 MI N OF VERSAILLES TO MCKEE DRAINAGE DITCH N OF ILL 104Miles = 6.40
3DESIGNED OVERLAY
ADA IMPROVEMENTS
BROWNPIKE
ILL 99
Roadway Information Miles AADT Truck Pct NHS
1,783 19.9 N 5.69
1,850 17.3 N 0.71
REHABILITATION - PAVEMENTS
2020$4,400,000 DUTCHMAN'S CREEK AT ECL OF BROWNING TO 0.4 MI S OF FULTON CO LINEMiles = 8.81
2STANDARD OVERLAY SCHUYLERILL 100
Roadway Information Miles AADT Truck Pct NHS
573 30.2 N 8.81
REHABILITATION - PAVEMENTS
2021-2025$2,400,000 ILLINOIS RIVER TRIBUTARIES E OF BROWNING
2BRIDGE REPLACEMENT SCHUYLERILL 100
Structure Information Str Number AADT Truck Pct NHS
550 N270850008
550 N270850010
550 N270850011
RECONSTRUCTION - BRIDGES
2020$1,800,000 ILLINOIS RIVER BRIDGE AT FLORENCE
4BRIDGE DECK REPAIRS
BRIDGE DECK OVERLAY
BRIDGE JOINT REPLACE/REPAIR
SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
MAINTENANCE - BRIDGES
6 - 48
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$77,000,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1BRIDGE REPLACEMENT SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
Structure Information Str Number AADT Truck Pct NHS
1,500 N70860001
RECONSTRUCTION - BRIDGES
2021-2025$325,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1ARCHAEOLOGICAL SURVEY SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2020$3,850,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1P.E. (CONSULTANT PLANS) SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2020$700,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1LAND ACQUISITION SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2021-2025$350,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1UTILITY ADJUSTMENT SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
6 - 49
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,000,000 ILLINOIS RIVER BRIDGE AT FLORENCE
1CONSTRUCTION ENGINEERING SCOTTILL 100
ILL 106
ILLINOIS SPECIAL BRIDGE PROGRAM PROJECT.
RECONSTRUCTION - BRIDGES
2021-2025$2,600,000 0.2 MI W OF FREEMAN MINE RD TO US 67Miles = 5.71
2DESIGNED OVERLAY
ADA IMPROVEMENTS
SCHUYLERILL 101
Roadway Information Miles AADT Truck Pct NHS
444 13.3 N 5.71
REHABILITATION - PAVEMENTS
2021-2025$3,700,000 US 24 TO 1.7 MI W OF US 67Miles = 7.39
2DESIGNED OVERLAY SCHUYLERILL 103
Roadway Information Miles AADT Truck Pct NHS
1,364 11.5 N 7.39
REHABILITATION - PAVEMENTS
2021-2025$5,500,000 14TH ST IN QUINCY TO 0.4 MI E OF I-172Miles = 4.00
3DESIGNED OVERLAY
ADA IMPROVEMENTS
ADAMSILL 104
Roadway Information Miles AADT Truck Pct NHS
22,560 5.3 Y 3.79
11,700 9.0 N 0.21
REHABILITATION - PAVEMENTS
2021-2025$5,100,000 0.2 MI W OF FISHHOOK CREEK TO ILL 107Miles = 10.96
1DESIGNED OVERLAY ADAMSPIKE
ILL 104
Roadway Information Miles AADT Truck Pct NHS
625 19.2 N 1.82
625 44.8 N 9.14
REHABILITATION - PAVEMENTS
6 - 50
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,500,000 0.4 MI W OF ILL 78/104 JCT NW OF JACKSONVILLE TO MORTON AVE IN JACKSONVILLEMiles = 2.45
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MORGANILL 104
Roadway Information Miles AADT Truck Pct NHS
2,669 9.7 N 2.45
REHABILITATION - PAVEMENTS
2020$150,000 0.1 MI W TO 0.1 MI E OF GATEWAY WESTERN RR BRIDGEMiles = 0.12
1DESIGNED OVERLAY MORGANILL 104
Roadway Information Miles AADT Truck Pct NHS
2,000 13.3 N 0.12
REHABILITATION - PAVEMENTS
2021-2025$1,500,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEKMiles = 0.74
3STANDARD OVERLAY
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
MORGANILL 104
Roadway Information Miles AADT Truck Pct NHS
3,100 7.4 N 0.74
REHABILITATION - PAVEMENTS
2020$200,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK
3LAND ACQUISITION MORGANILL 104
REHABILITATION - PAVEMENTS
2021-2025$100,000 WAVERLY LAKE RD / GORDON HILL RD TO 0.2 MI E OF WOODS CREEK
3UTILITY ADJUSTMENT MORGANILL 104
REHABILITATION - PAVEMENTS
6 - 51
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$625,000 DITCH 1.9 MI W OF ILL 4
3CULVERT REPLACEMENT SANGAMONILL 104
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,300,000 1.1 MI E OF E BRANCH KISER CREEK TO US 54 W OF PITTSFIELDMiles = 2.52
3DESIGNED OVERLAY PIKEILL 106
Roadway Information Miles AADT Truck Pct NHS
1,688 9.8 N 2.52
REHABILITATION - PAVEMENTS
2021-2025$4,100,000 0.2 MI N OF ILL 104 TO WALL ST IN GRIGGSVILLEMiles = 7.86
1DESIGNED OVERLAY
ADA IMPROVEMENTS
PIKEILL 107
Roadway Information Miles AADT Truck Pct NHS
1,970 15.9 N 7.86
REHABILITATION - PAVEMENTS
2021-2025$1,200,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLEMiles = 0.97
6DESIGNED OVERLAY
SHOULDER RECONSTRUCTION
DRAINAGE
STORM SEWER REPAIR
GUARDRAIL
MACOUPINILL 108
Roadway Information Miles AADT Truck Pct NHS
1,850 5.4 N 0.30
2,630 16.8 N 0.67
REHABILITATION - PAVEMENTS
2021-2025$200,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE
3LAND ACQUISITION MACOUPINILL 108
REHABILITATION - PAVEMENTS
6 - 52
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$100,000 2 MI TO 2.3 MI E OF ILL 111 & 0.7 MI W OF CARLINVILLE TO WCL OF CARLINVILLE
3UTILITY ADJUSTMENT MACOUPINILL 108
REHABILITATION - PAVEMENTS
2021-2025$1,700,000 0.1 MI E ALTON RD IN CARLINVILLE TO ILL 4 AT W SIDE OF CARLINVILLE SQUAREMiles = 0.30
2RECONSTRUCTION
PARKING IMPROVEMENT
ADA IMPROVEMENTS
MACOUPINILL 108
Roadway Information Miles AADT Truck Pct NHS
8,050 7.8 N 0.30
RECONSTRUCTION - PAVEMENTS
2021-2025$5,300,000 ILL 4 (S) IN CARLINVILLE TO MONTGOMERY CO LINEMiles = 9.01
1DESIGNED OVERLAY MACOUPINILL 108
Roadway Information Miles AADT Truck Pct NHS
2,524 12.1 N 9.01
REHABILITATION - PAVEMENTS
2020$1,100,000 AT I-55 INTCHGMiles = 0.97
1DESIGNED OVERLAY
MEDIAN REPAIR
LIGHTING
MONTGOMERYILL 108
Roadway Information Miles AADT Truck Pct NHS
2,723 11.2 N 0.49
1,200 9.2 N 0.27
1,150 3.2 N 0.12
REHABILITATION - PAVEMENTS
2020$1,950,000 3.1 MI S OF CARTHAGE TO 0.8 MI N OF WEST POINT RDMiles = 7.27
1CAPE SEAL
GRINDING
FOG SEAL
HANCOCKILL 110
ILL 336
PRESERVATION - PAVEMENTS
6 - 53
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,600,000 APPLE CREEK 2.1 MI S OF ILL 104 IN WAVERLY
1BRIDGE REPLACEMENT MORGANILL 111
Structure Information Str Number AADT Truck Pct NHS
1,950 N170690023
RECONSTRUCTION - BRIDGES
2021-2025$3,000,000 JERSEY CO LINE TO ILL 16Miles = 5.19
1DESIGNED OVERLAY MACOUPINILL 111
ILL 267
Roadway Information Miles AADT Truck Pct NHS
3,623 14.4 N 5.19
REHABILITATION - PAVEMENTS
2021-2025$3,400,000 N OF ILL 16 TO JERSEY CO LINE IN BRIGHTONMiles = 5.70
1DESIGNED OVERLAY
ADA IMPROVEMENTS
MACOUPINILL 111
ILL 267
Roadway Information Miles AADT Truck Pct NHS
4,150 13.7 N 0.04
4,585 18.9 Y 5.66
REHABILITATION - PAVEMENTS
2021-2025$1,700,000 PIASA CREEK 0.2 MI S OF ILL 16
22BRIDGE REPLACEMENT MACOUPINILL 111
ILL 267
Structure Information Str Number AADT Truck Pct NHS
4,400 Y120590017
RECONSTRUCTION - BRIDGES
2021-2025$1,600,000 LITTLE PIASA CREEK 3.7 MI S OF ILL 16
22BRIDGE REPLACEMENT MACOUPINILL 111
ILL 267
Structure Information Str Number AADT Truck Pct NHS
4,450 Y230590019
RECONSTRUCTION - BRIDGES
6 - 54
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,600,000 LITTLE PIASA CREEK 4 MI S OF ILL 16
22BRIDGE REPLACEMENT MACOUPINILL 111
ILL 267
Structure Information Str Number AADT Truck Pct NHS
4,450 Y230590020
RECONSTRUCTION - BRIDGES
2021-2025$2,700,000 S OF PULASKI ST IN LINCOLN TO 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING)Miles = 3.91
1DESIGNED OVERLAY LOGANILL 121
Roadway Information Miles AADT Truck Pct NHS
3,834 35.2 Y 3.91
REHABILITATION - PAVEMENTS
2021-2025$4,100,000 0.3 MI S OF 1200 ST (CHESTERVILLE CROSSING) TO 0.1 MI S OF IC RR IN MT PULASKIMiles = 6.12
1DESIGNED OVERLAY LOGANILL 121
Roadway Information Miles AADT Truck Pct NHS
3,628 37.4 Y 6.12
REHABILITATION - PAVEMENTS
2021-2025$500,000 0.1 MI S OF IC RR IN MT PULASKI TO ILL 54Miles = 0.60
3DESIGNED OVERLAY
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
LOGANILL 121
Roadway Information Miles AADT Truck Pct NHS
3,500 27.1 Y 0.60
REHABILITATION - PAVEMENTS
2021-2025$1,000,000 AT MCDONALD ST SE OF MT PULASKI
9INTERSECTION IMPROVEMENT
LEFT TURN LANES
RIGHT TURN LANE
LOGANILL 121
MCDONALD ST
MISCELLANEOUS IMPROVEMENTS
6 - 55
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$200,000 AT MCDONALD ST SE OF MT PULASKI
7LAND ACQUISITION LOGANILL 121
MCDONALD ST
MISCELLANEOUS IMPROVEMENTS
2021-2025$100,000 AT MCDONALD ST SE OF MT PULASKI
6UTILITY ADJUSTMENT LOGANILL 121
MCDONALD ST
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,500,000 UNDER ILL 54 AT SCL OF MT PULASKI
12BRIDGE NEW DECK
BRIDGE SUPERSTRUCTURE
LOGANILL 121
Structure Information Str Number AADT Truck Pct NHS
1,050 N200540030
REHABILITATION - BRIDGES
2021-2025$1,600,000 RICHLAND CREEK 0.6 MI N OF ILL 125Miles = 0.18
14BRIDGE REPLACEMENT
VERTICAL REALIGNMENT
SANGAMONILL 123
Structure Information Str Number AADT Truck Pct NHS
1,150 N110840090
RECONSTRUCTION - BRIDGES
2021-2025$4,200,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55Miles = 6.09
8DESIGNED OVERLAY
SHOULDER RECONSTRUCTION
SANGAMONILL 123
Roadway Information Miles AADT Truck Pct NHS
2,507 9.2 N 6.09
REHABILITATION - PAVEMENTS
2021-2025$500,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55
2LAND ACQUISITION SANGAMONILL 123
REHABILITATION - PAVEMENTS
6 - 56
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$200,000 ILL 29 E OF ATHENS TO 0.6 MI W OF I-55
2UTILITY ADJUSTMENT SANGAMONILL 123
REHABILITATION - PAVEMENTS
2020$1,365,000 E OF ILL 29 TO 0.3 MI EMiles = 0.36
3CULVERT REPLACEMENT
CULVERT (NEW)
VERTICAL REALIGNMENT
STANDARD OVERLAY
RELOCATION
CULVERT REMOVAL
MISCELLANEOUS
SANGAMONILL 123
Structure Information Str Number AADT Truck Pct NHS
2,700 N70847099
RECONSTRUCTION - BRIDGES
2021-2025$2,200,000 FANCY CREEK 2.7 MI E OF ILL 29
9BRIDGE REPLACEMENT SANGAMONILL 123
Structure Information Str Number AADT Truck Pct NHS
2,650 N70840097
RECONSTRUCTION - BRIDGES
2020$400,000 E OF WEST OUTER RD TO W OF OLD US 66 IN WILLIAMSVILLEMiles = 0.53
1STANDARD OVERLAY
PATCHING
SANGAMONILL 123
Roadway Information Miles AADT Truck Pct NHS
5,650 19.5 N 0.25
5,700 9.5 N 0.28
PRESERVATION - PAVEMENTS
2021-2025$900,000 OVER BNSF RR IN BEARDSTOWN
2BRIDGE DECK OVERLAY CASSILL 125
PRESERVATION - BRIDGES
6 - 57
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$700,000 US 67: 0.2 MI W OF ILL 125 TO 0.1 MI S OF ILL 125 & ILL 125: US 67 TO 0.1 MI E OF S BLUFF SPRINGS RD
2NEW SHOULDERS
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
CASSILL 125
MISCELLANEOUS IMPROVEMENTS
2021-2025$5,000,000 ILL 125: 0.2 MI E OF S BLUFF SPRINGS RD TO 0.1 MI SE OF ILL 78 IN VIRGINIA & ILL 78: 0.1 MI NE TO 0.1 MI SW OF ILL 125Miles = 8.00
5DESIGNED OVERLAY
SHOULDER RECONSTRUCTION
MILLED RUMBLE STRIP
CASSILL 125
ILL 78
Roadway Information Miles AADT Truck Pct NHS
3,950 16.4 N 7.87
3,281 7.8 N 0.13
REHABILITATION - PAVEMENTS
2021-2025$3,700,000 ILL 159 TO MT CLARE RDMiles = 6.88
2DESIGNED OVERLAY
ADA IMPROVEMENTS
MACOUPINILL 138
Roadway Information Miles AADT Truck Pct NHS
1,218 7.0 N 6.88
REHABILITATION - PAVEMENTS
2020$900,000 ILL 4 TO 8TH ST IN BENLDMiles = 0.72
7STANDARD OVERLAY
ADA IMPROVEMENTS
PARKING IMPROVEMENT
MACOUPINILL 138
Roadway Information Miles AADT Truck Pct NHS
3,646 6.8 N 0.72
REHABILITATION - PAVEMENTS
2021-2025$2,000,000 NORTH ST TO ALTON ST IN BUNKER HILLMiles = 0.99
1DESIGNED OVERLAY
STORM SEWER (NEW)
CURB AND GUTTER
PARKING IMPROVEMENT
ADA IMPROVEMENTS
MACOUPINILL 159
Roadway Information Miles AADT Truck Pct NHS
3,535 14.0 N 0.99
REHABILITATION - PAVEMENTS
6 - 58
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$450,000 NORTH ST TO ALTON ST IN BUNKER HILL
1P.E. (PHASE I)
P.E. (PHASE II)
MACOUPINILL 159
REHABILITATION - PAVEMENTS
2021-2025$300,000 NORTH ST TO ALTON ST IN BUNKER HILL
1LAND ACQUISITION MACOUPINILL 159
REHABILITATION - PAVEMENTS
2021-2025$150,000 NORTH ST TO ALTON ST IN BUNKER HILL
1UTILITY ADJUSTMENT MACOUPINILL 159
REHABILITATION - PAVEMENTS
2021-2025$100,000 AT ALTON ST IN BUNKER HILL
7DRAINAGE MACOUPINILL 159
MISCELLANEOUS IMPROVEMENTS
2021-2025$3,400,000 S OF I-72 TO 1.4 MI S OF WOODSONMiles = 5.30
1DESIGNED OVERLAY
NEW SHOULDERS
MORGANILL 267
Roadway Information Miles AADT Truck Pct NHS
4,194 17.0 N 5.30
REHABILITATION - PAVEMENTS
2021-2025$3,100,000 1.4 MI S OF WOODSON TO GREENE CO LINEMiles = 6.40
1DESIGNED OVERLAY MORGANILL 267
Roadway Information Miles AADT Truck Pct NHS
2,345 18.6 N 6.40
REHABILITATION - PAVEMENTS
6 - 59
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$600,000 E OF STATE ST IN DIVERNON TO 0.1 MI E OF SULLIVAN RDMiles = 0.74
1DESIGNED OVERLAY SANGAMONBROWN ST
E DIVERNON RD
Roadway Information Miles AADT Truck Pct NHS
775 24.5 N 0.23
2,529 3.6 N 0.42
REHABILITATION - PAVEMENTS
2021-2025$2,700,000 PEORIA RD TO N OF NORTHFIELD DR IN SPRINGFIELDMiles = 1.83
1DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONDIRKSEN PKWY
Roadway Information Miles AADT Truck Pct NHS
14,997 6.7 Y 1.83
REHABILITATION - PAVEMENTS
2021-2025$2,400,000 0.1 MI N OF STEVENSON DR TO 0.1 MI S OF S GRAND AVE IN SPRINGFIELDMiles = 1.88
4DESIGNED OVERLAY
ADA IMPROVEMENTS
SANGAMONDIRKSEN PKWY
Roadway Information Miles AADT Truck Pct NHS
12,934 8.7 Y 1.88
REHABILITATION - PAVEMENTS
2020$775,000 W OF HUNT RD TO 0.6 MI N OF CHATHAM RDMiles = 0.73
1STANDARD OVERLAY SANGAMONE LAKE SHORE DR
Roadway Information Miles AADT Truck Pct NHS
4,601 5.2 N 0.73
REHABILITATION - PAVEMENTS
2021-2025$630,000 AT I-55 INTCHG E OF GLENARMMiles = 0.73
1DESIGNED OVERLAY SANGAMONHORSE FARM RD
OLD ROUTE 66
Roadway Information Miles AADT Truck Pct NHS
680 0.0 N 0.35
900 0.0 N 0.38
REHABILITATION - PAVEMENTS
6 - 60
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,200,000 W WAGGONER AVE E OF WAGGONER TO MORRISONVILLE AVE S OF FARMERSVILLEMiles = 3.01
1RECONSTRUCTION MONTGOMERYI 55 E FR RD
Roadway Information Miles AADT Truck Pct NHS
125 0.0 N 3.01
RECONSTRUCTION - PAVEMENTS
2021-2025$2,300,000 W WAGGONER AVE E OF WAGGONER TO 0.1 MI S OF MACOUPIN CREEK S OF FARMERSVILLEMiles = 4.08
1DESIGNED OVERLAY MONTGOMERYI 55 W FR RD
Roadway Information Miles AADT Truck Pct NHS
520 5.4 N 4.08
REHABILITATION - PAVEMENTS
2021-2025$900,000 1.4 MI N OF I-55 N OF LINCOLN TO KICKAPOO CREEKMiles = 1.98
1DESIGNED OVERLAY LOGANI 55 W FR RD
OLD US 66
Roadway Information Miles AADT Truck Pct NHS
3,250 10.8 N 1.98
REHABILITATION - PAVEMENTS
2021-2025$1,100,000 E OF ILL 48 TO CH 6 (1350N RD)Miles = 2.41
1DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANLINCOLN TRAIL
Roadway Information Miles AADT Truck Pct NHS
2,500 46.6 N 1.67
1,849 38.8 N 0.74
REHABILITATION - PAVEMENTS
2021-2025$15,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELDMiles = 1.49
1RECONSTRUCTION
TRAF SIGNAL REPLACEMENT
ADA IMPROVEMENTS
SANGAMONMACARTHUR BLVD
Roadway Information Miles AADT Truck Pct NHS
20,760 6.4 Y 1.49
RECONSTRUCTION - PAVEMENTS
6 - 61
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$2,500,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD
1P.E. (PHASE I)
P.E. (PHASE II)
SANGAMONMACARTHUR BLVD
RECONSTRUCTION - PAVEMENTS
2021-2025$11,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD
1LAND ACQUISITION SANGAMONMACARTHUR BLVD
RECONSTRUCTION - PAVEMENTS
2021-2025$1,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD
1UTILITY ADJUSTMENT SANGAMONMACARTHUR BLVD
RECONSTRUCTION - PAVEMENTS
2021-2025$1,000,000 WABASH AVE / STANFORD AVE TO S GRAND AVE IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONMACARTHUR BLVD
RECONSTRUCTION - PAVEMENTS
2021-2025$260,000 ILL 48 TO ILL 29 IN TAYLORVILLEMiles = 0.57
1DESIGNED OVERLAY
ADA IMPROVEMENTS
CHRISTIANMCADAM DR
Roadway Information Miles AADT Truck Pct NHS
2,582 0.0 N 0.57
REHABILITATION - PAVEMENTS
2021-2025$150,000 ILL 54 TO ILL 121 IN MT PULASKIMiles = 0.32
9DESIGNED OVERLAY LOGANMCDONALD ST
Roadway Information Miles AADT Truck Pct NHS
1,300 22.3 N 0.32
REHABILITATION - PAVEMENTS
6 - 62
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$65,000 S OF ILL 123 TO 0.2 MI S
1BIT SURFACE TREATMENT-A2
BASE
SANGAMONOLD ILL 29
MAINTENANCE - PAVEMENTS
2021-2025$1,650,000 WALNUT CREEK 1 MI N OF WINCHESTER
1BRIDGE REPLACEMENT SCOTTOLD US 36
Structure Information Str Number AADT Truck Pct NHS
3,350 N130860004
RECONSTRUCTION - BRIDGES
2021-2025$450,000 DITCH 1.7 MI NE OF I-72 W OF RIGGSTON
4CULVERT REPLACEMENT
DITCH CLEANING
SCOTTOLD US 36
MISCELLANEOUS IMPROVEMENTS
2021-2025$1,300,000 ILL 127 TO ILL 108 E OF I-55Miles = 3.34
1DESIGNED OVERLAY MONTGOMERYOLD US 66
Roadway Information Miles AADT Truck Pct NHS
571 0.0 N 3.34
REHABILITATION - PAVEMENTS
2021-2025$1,400,000 3.5 MI N OF FARMERSVILLE TO E OF FARMERSVILLE E OF I-55Miles = 3.52
1DESIGNED OVERLAY MONTGOMERYOLD US 66
Roadway Information Miles AADT Truck Pct NHS
25 0.0 N 2.67
25 0.0 N 0.85
REHABILITATION - PAVEMENTS
6 - 63
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$700,000 SANGAMON CO LINE TO 1.7 MI SMiles = 1.71
1DESIGNED OVERLAY MONTGOMERYOLD US 66
Roadway Information Miles AADT Truck Pct NHS
25 0.0 N 1.71
REHABILITATION - PAVEMENTS
2021-2025$5,700,000 STEVENSON DR: 0.1 MI E OF I-55 BUS (6TH ST) TO SPAULDING BRIDGE 0.3 MI E OF I-55 & DIRKSEN PKWY: STEVENSON DR TO 0.1 MI N (IN SPRINGFIELD)Miles = 2.19
4DESIGNED OVERLAY
ADA IMPROVEMENTS
SIDEWALKS
SANGAMONSTEVENSON DR
E LAKE SHORE DR
DIRKSEN PKWY
Roadway Information Miles AADT Truck Pct NHS
20,893 11.2 Y 0.15
18,204 7.8 Y 1.60
17,600 2.2 Y 0.29
17,600 2.2 N 0.15
REHABILITATION - PAVEMENTS
2021-2025$85,000 BRIDGE DECK SEALING
1BRIDGE DECK SEALING ADAMSMORGAN
VARIOUS
PRESERVATION - BRIDGES
2021-2025$415,000 BRIDGE DECK SEALING
1BRIDGE DECK SEALING ADAMSCHRISTIANBROWNCASSHANCOCKMASONMENARDMORGANSCHUYLER
VARIOUS
PRESERVATION - BRIDGES
6 - 64
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 BRIDGE DECK SEALING
1BRIDGE DECK SEALINGVARIOUS
PRESERVATION - BRIDGES
2020$50,000 MISCELLANEOUS RAILROAD ENGINEERING
1RR ENGINEERING DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$2,000,000 STRUCTURE PRESERVATION
1MISCELLANEOUS
BRIDGE DECK OVERLAY
DISTRICT-WIDEVARIOUS
PRESERVATION - BRIDGES
2021-2025$30,000,000 PAVEMENT PRESERVATION
1MICROSURFACING 1 PASS
MISCELLANEOUS
DISTRICT-WIDEVARIOUS
PRESERVATION - PAVEMENTS
2021-2025$28,000,000 STRUCTURE PRESERVATION
1MISCELLANEOUS DISTRICT-WIDEVARIOUS
PRESERVATION - BRIDGES
2021-2025$400,000 VARIOUS LOCATIONS IN MOUNT STERLING & CAMDEN
2ADA IMPROVEMENTS BROWNSCHUYLER
VARIOUS
MISCELLANEOUS IMPROVEMENTS
6 - 65
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$3,980,000 PAVEMENT PRESERVATION
2MICROSURFACING 1 PASS
GRINDING
DISTRICT-WIDEVARIOUS
PRESERVATION - PAVEMENTS
2020$318,000 BRIDGE DECK SEALING
5BRIDGE DECK SEALING VARIOUSPIKESCOTT
VARIOUS
PRESERVATION - BRIDGES
2020$182,000 BRIDGE DECK SEALING
1BRIDGE DECK SEALING VARIOUSPIKESCOTTCASS
VARIOUS
PRESERVATION - BRIDGES
2020$1,919,000 HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS
7SAFETY IMPROVEMENTS DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$18,805,000 HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS
6SAFETY IMPROVEMENTS DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$500,000 DISTRICT MISCELLANEOUS
6MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
6 - 66
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 DISTRICT MISCELLANEOUS
4MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$500,000 DISTRICT MISCELLANEOUS
2MISCELLANEOUS PROJECTS DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$250,000 UTILITY ADJUSTMENTS
6UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,000,000 UTILITY ADJUSTMENTS
1UTILITY ADJUSTMENT DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$480,000 MISCELLANEOUS LAND ACQUISITION
5LAND ACQUISITION DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$500,000 MISCELLANEOUS LAND ACQUISITION
1LAND ACQUISITION DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
6 - 67
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$4,500,000 MISCELLANEOUS LAND ACQUISITION
1LAND ACQUISITION DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,500,000 LAND ACQUISITION & DESIGN SURVEYS
1P.E. (ROW)
P.E. SURVEYS (ROW)
P.E. SURVEYS (PHASE I)
P.E. SURVEYS (PHASE II)
DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$500,000 SOIL BORINGS & PAVEMENT CORINGS
4P.E. SOILS (PHASE I)
P.E. SOILS (PHASE II)
DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$500,000 ON-CALL ENGINEERING
6PRELIMINARY ENGINEERING
P.E. (CONSULTANT PLANS)
DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2020$2,250,000 ON-CALL ENGINEERING
1PRELIMINARY ENGINEERING
P.E. (CONSULTANT PLANS)
DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$9,750,000 ON-CALL ENGINEERING
1PRELIMINARY ENGINEERING
P.E. (CONSULTANT PLANS)
DISTRICT-WIDEVARIOUS
MISCELLANEOUS IMPROVEMENTS
6 - 68
District 6
State Highways
FY 2020-2025 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,400,000 CEDAR GLEN CREEK 0.7 MI W OF ILL 96
1BRIDGE REPLACEMENT HANCOCKWARSAW SPUR
Structure Information Str Number AADT Truck Pct NHS
1,650 N180340043
RECONSTRUCTION - BRIDGES
6 - 69
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$30,410,000 AT NORFOLK SOUTHERN RR S OF BROAD PL IN SPRINGFIELD
1BRIDGE REPLACEMENT SANGAMON5TH ST
6TH ST
RECONSTRUCTION - BRIDGES
2021-2025$2,500,000 LINCOLN QUARRY RD TO I-55Miles = 2.44
3RECONSTRUCTION LOGAN5TH ST
1550TH ST
RECONSTRUCTION - PAVEMENTS
2021-2025$160,000 LINCOLN QUARRY RD TO I-55
3CONSTRUCTION ENGINEERING LOGAN5TH ST
1550TH ST
RECONSTRUCTION - PAVEMENTS
2021-2025$1,000,000 AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD
4BRIDGE REPLACEMENT SANGAMON8TH ST
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$120,000 AT SPRING CREEK 0.3 MI N OF VETERANS PKWY IN SPRINGFIELD
4CONSTRUCTION ENGINEERING SANGAMON8TH ST
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2020$3,876,000 0.1 MI N OF GREENBRIAR RD TO 0.2 MI N OF ILES AVE & N OF FIELD LN TO YUCAN DR IN SPRINGFIELDMiles = 0.91
2RECONSTRUCTION SANGAMONARCHER ELEVATOR RD
RECONSTRUCTION - PAVEMENTS
6 - 70
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$56,000 200TH ST TO SANGAMON CO LINE
1P.E. (PHASE I)
P.E. (PHASE II)
LOGANCH 1
ILLIOPOLIS BLKTP
1600TH AVE
REHABILITATION - PAVEMENTS
2021-2025$850,000 200TH ST TO SANGAMON CO LINEMiles = 2.00
1STANDARD OVERLAY LOGANCH 1
ILLIOPOLIS BLKTP
1600TH AVE
REHABILITATION - PAVEMENTS
2021-2025$54,000 200TH ST TO SANGAMON CO LINE
1CONSTRUCTION ENGINEERING LOGANCH 1
ILLIOPOLIS BLKTP
1600TH AVE
REHABILITATION - PAVEMENTS
2021-2025$158,000 CH 3: US 24 TO 1400 E RD AND 1400 E RD TO 1600 E ST; CH 11: 825 N AVE TO ILL 99Miles = 10.80
3BIT SURFACE TREATMENT-A3 BROWNCH 3
CH 11
PRESERVATION - PAVEMENTS
2021-2025$212,000 1600 E RD TO ECL OF VERSAILLESMiles = 12.91
2BIT SURFACE TREATMENT-A1 BROWNCH 3
CH 12
LAGRANGE RD
PRESERVATION - PAVEMENTS
6 - 71
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$340,000 SCL OF FOREST CITY TO US 136Miles = 4.32
5CAPE SEAL MASONCH 4
PRESERVATION - PAVEMENTS
2020$500,000 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE
2BRIDGE REPLACEMENT CASSCH 4
NEWMANSVILLE RD
RECONSTRUCTION - BRIDGES
2020$40,000 AT COX CREEK 1.5 MI SW OF NEWMANSVILLE
2CONSTRUCTION ENGINEERING CASSCH 4
NEWMANSVILLE RD
RECONSTRUCTION - BRIDGES
2021-2025$2,000,000 AT LA MOINE RIVER 0.3 MI W OF MCDONOUGH CO LINE
3BRIDGE REHABILITATION HANCOCKCH 6
BENTLEY RD
REHABILITATION - BRIDGES
2020$1,100,000 AT SALT CREEK 2 MI N OF CHESTNUT
4BRIDGE NEW DECK LOGANCH 6
BEASON RD
REHABILITATION - BRIDGES
2020$70,000 AT SALT CREEK 2 MI N OF CHESTNUT
4CONSTRUCTION ENGINEERING LOGANCH 6
BEASON RD
REHABILITATION - BRIDGES
6 - 72
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$450,000 OVER ABANDONED RR IN PETERSBURG
2BRIDGE REMOVAL/DEMOLITION MENARDCH 6
DOUGLAS AVE
MISCELLANEOUS IMPROVEMENTS
2020$24,000 OVER ABANDONED RR IN PETERSBURG
2CONSTRUCTION ENGINEERING MENARDCH 6
DOUGLAS AVE
MISCELLANEOUS IMPROVEMENTS
2021-2025$200,000 N 1850TH AVE TO WESTPOINT PLEASANT RDMiles = 2.34
4CAPE SEAL ADAMSCH 7
BOTTOM RD (GRR)
PRESERVATION - PAVEMENTS
2021-2025$700,000 N BLUFF SPRINGS RD TO HICKORY RDMiles = 4.94
13DESIGNED OVERLAY CASSCH 7
CHANDLERVILLE RD
REHABILITATION - PAVEMENTS
2021-2025$60,000 N BLUFF SPRINGS RD TO HICKORY RD
4CONSTRUCTION ENGINEERING CASSCH 7
CHANDLERVILLE RD
REHABILITATION - PAVEMENTS
2021-2025$730,000 HICKORY RD TO ILL 78Miles = 4.42
13DESIGNED OVERLAY CASSCH 7
CHANDLERVILLE RD
REHABILITATION - PAVEMENTS
6 - 73
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$60,000 HICKORY RD TO ILL 78
4CONSTRUCTION ENGINEERING CASSCH 7
CHANDLERVILLE RD
REHABILITATION - PAVEMENTS
2020$1,800,000 CHRISTIAN CO LINE TO NOKOMIS BLKTPMiles = 2.98
10DESIGNED OVERLAY MONTGOMERYCH 7
TAYLORVILLE RD
REHABILITATION - PAVEMENTS
2021-2025$625,000 ILL 125 TO 0.3 MI S OF PINE STMiles = 0.85
2STANDARD OVERLAY CASSCH 8
ARENZVILLE RD
REHABILITATION - PAVEMENTS
2021-2025$50,000 ILL 125 TO 0.3 MI S OF PINE ST
2CONSTRUCTION ENGINEERING CASSCH 8
ARENZVILLE RD
REHABILITATION - PAVEMENTS
2021-2025$510,000 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN
2BRIDGE REPLACEMENT CASSCH 8
ARENZVILLE RD
RECONSTRUCTION - BRIDGES
2021-2025$48,000 AT CLEAR CREEK 3 MI SE OF BEARDSTOWN
2CONSTRUCTION ENGINEERING CASSCH 8
ARENZVILLE RD
RECONSTRUCTION - BRIDGES
6 - 74
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$548,000 900 E RD TO SCHUYLER CO LINEMiles = 2.09
4BIT SURFACE TREATMENT-A3 BROWNCH 8
PRESERVATION - PAVEMENTS
2020$28,000 900 E RD TO SCHUYLER CO LINE
4CONSTRUCTION ENGINEERING BROWNCH 8
PRESERVATION - PAVEMENTS
2021-2025$500,000 AT MUD CREEK 1 MI W OF ARENZVILLE
2BRIDGE REPLACEMENT CASSCH 9
ARENZVILLE RD
RECONSTRUCTION - BRIDGES
2021-2025$40,000 AT MUD CREEK 1 MI W OF ARENZVILLE
2CONSTRUCTION ENGINEERING CASSCH 9
ARENZVILLE RD
RECONSTRUCTION - BRIDGES
2021-2025$1,600,000 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN
4BRIDGE REPLACEMENT MONTGOMERYCH 9
RED BALL TRAIL
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$77,000 AT E FORK SHOAL CREEK 3 MI S OF COFFEEN
1CONSTRUCTION ENGINEERING MONTGOMERYCH 9
RED BALL TRAIL
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
6 - 75
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$800,000 W OF WCL OF BASCO TO E OF WASHINGTON STMiles = 0.51
4DESIGNED OVERLAY
DRAINAGE
SIDEWALKS
HANCOCKCH 11
MAIN ST
REHABILITATION - PAVEMENTS
2021-2025$500,000 ILL 61/94 TO N 2400TH AVEMiles = 2.01
4DESIGNED OVERLAY ADAMSCH 11
E 2300TH ST
REHABILITATION - PAVEMENTS
2021-2025$700,000 N 1800TH RD TO ILL 104Miles = 1.55
1STANDARD OVERLAY CHRISTIANCH 11
REHABILITATION - PAVEMENTS
2021-2025$2,000,000 AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBOROMiles = 0.48
9BRIDGE REPLACEMENT
RECONSTRUCTION
MONTGOMERYCH 11
WALSHVILLE TRAIL
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$101,000 AT MIDDLE FORK SHOAL CREEK 1.2 MI W OF HILLSBORO
2CONSTRUCTION ENGINEERING MONTGOMERYCH 11
WALSHVILLE TRAIL
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
6 - 76
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,525,000 AT MAUVAISE TERRE CREEK
1BRIDGE REPLACEMENT SCOTTCH 12
CHAPIN RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$130,000 AT MAUVAISE TERRE CREEK
1CONSTRUCTION ENGINEERING SCOTTCH 12
CHAPIN RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$750,000 AT LAKE FORK CREEK 1 MI E OF BROADWELL
2BRIDGE REPLACEMENT LOGANCH 12
BROADWELL RD
RECONSTRUCTION - BRIDGES
2021-2025$48,000 AT LAKE FORK CREEK 1 MI E OF BROADWELL
2CONSTRUCTION ENGINEERING LOGANCH 12
BROADWELL RD
RECONSTRUCTION - BRIDGES
2020$2,500,000 S COUNTY RD TO ILL 29Miles = 5.22
4DESIGNED OVERLAY
COLD IN-PLACE RECYCLING
CHRISTIANCH 12
BEAR CREEK RD
REHABILITATION - PAVEMENTS
2020$115,000 S COUNTY RD TO ILL 29
4CONSTRUCTION ENGINEERING CHRISTIANCH 12
BEAR CREEK RD
REHABILITATION - PAVEMENTS
6 - 77
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$600,000 MCKEE CREEK TO SENATE ST IN COLUMBUSMiles = 1.51
4DESIGNED OVERLAY ADAMSCH 12
COLUMBUS /
COATSBURG RD
REHABILITATION - PAVEMENTS
2020$2,300,000 I-72 RAMP (EB) TO W OF SANGAMON RIVER BRIDGEMiles = 4.39
3RECONSTRUCTION SANGAMONCH 12
MECHANICSBURG RD
RECONSTRUCTION - PAVEMENTS
2020$144,000 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RDMiles = 0.86
4RECONSTRUCTION MACOUPINCH 13
CH 24
CH 37
NINE MILE RD
RECONSTRUCTION - PAVEMENTS
2020$92,000 NASSA CREEK TO 0.2 MI N OF OTTEN RD & 0.1 MI S OF LAUNER RD TO 0.2 MI E OF CAMPBELL RD
4CONSTRUCTION ENGINEERING MACOUPINCH 13
CH 24
CH 37
NINE MILE RD
RECONSTRUCTION - PAVEMENTS
2020$243,000 CH 2 TO NCL OF DETROITMiles = 7.25
4BIT SURFACE TREATMENT-A1 PIKECH 14
PRESERVATION - PAVEMENTS
6 - 78
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$325,000 E MANITO RD TO TAZEWELL CO LINEMiles = 4.30
1CAPE SEAL MASONCH 14
BLUE SPRUCE RD
2400 N RD
PRESERVATION - PAVEMENTS
2020$3,076,000 ECL OF BRIGHTON TO WCL OF BUNKER HILLMiles = 9.51
16RECONSTRUCTION
BRIDGE REPLACEMENT
MACOUPINCH 14
BRIGHTON /
BUNKER HILL RD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.
THIS EARMARK WILL BE FUNDED SEPARATELY.
RECONSTRUCTION - PAVEMENTS
2020$280,000 ECL OF BRIGHTON TO WCL OF BUNKER HILL
4CONSTRUCTION ENGINEERING MACOUPINCH 14
BRIGHTON /
BUNKER HILL RD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED.
THIS EARMARK WILL BE FUNDED SEPARATELY.
RECONSTRUCTION - PAVEMENTS
2020$80,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND
3P.E. (PHASE I)
P.E. (PHASE II)
LOGANCH 15
MIDDLETOWN RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
REHABILITATION - BRIDGES
2021-2025$1,100,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND
4BRIDGE REHABILITATION LOGANCH 15
MIDDLETOWN RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
REHABILITATION - BRIDGES
6 - 79
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$70,000 AT SUGAR CREEK OVERFLOW 1.5 MI S OF NEW HOLLAND
4CONSTRUCTION ENGINEERING LOGANCH 15
MIDDLETOWN RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
REHABILITATION - BRIDGES
2021-2025$80,000 ILL 10 TO 5TH ST
2P.E. (PHASE I)
P.E. (PHASE II)
LOGANCH 15
MIDDLETOWN RD
REHABILITATION - PAVEMENTS
2021-2025$660,000 0.1 MI E OF TR 106 TO E MANITO RDMiles = 8.68
1CAPE SEAL MASONCH 15
FISH HATCHERY RD
PRESERVATION - PAVEMENTS
2021-2025$3,118,000 WASHINGTON ST TO PAJIM LNMiles = 0.63
8RECONSTRUCTION SANGAMONCH 17
BRADFORDTON RD
RECONSTRUCTION - PAVEMENTS
2021-2025$1,882,000 PAJIM LN TO OLD JACKSONVILLE RDMiles = 0.38
1ADDITIONAL LANES SANGAMONCH 17
BRADFORDTON RD
INITIAL CONSTRUCTION - PAVEMENTS
6 - 80
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2020$400,000 DENVER-PLYMOUTH RD/CH 19: 2100 E RD TO WCL OF PLYMOUTH; WEST POINT RD/CH 23: 1500 E RD TO WOLF ST IN WEST POINT; BOWEN RD/CH 33: ILL 336 TO WCL OF BOWEN; AUGUSTA RD/CH 20: ILL 61/101 IN AUGUSTA TO ADAMS CO LINEMiles = 17.14
2BIT SURFACE TREATMENT-A1 HANCOCKCH 19
CH 23
CH 33
CH 20
DENVER/PLYMOUTH RD
WEST POINT RD
BOWEN RD
AUGUSTA RD
PRESERVATION - PAVEMENTS
2021-2025$370,000 NCL OF HAVANA TO 1950 N RDMiles = 4.96
1CAPE SEAL MASONCH 20
MANITO RD
PRESERVATION - PAVEMENTS
2021-2025$1,725,000 AT QUIVER CREEK 4 MI NE OF HAVANA
4BRIDGE REPLACEMENT MASONCH 20
MANITO RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$875,000 0.1 MI N OF 1950 N RD TO 0.1 MI W OF CH 15Miles = 0.63
1RECONSTRUCTION MASONCH 20
MANITO RD
RECONSTRUCTION - PAVEMENTS
2021-2025$435,000 1950 E RD TO 2450 E RDMiles = 4.96
3CAPE SEAL MASONCH 20
MANITO RD
PRESERVATION - PAVEMENTS
6 - 81
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$285,000 2450 E RD TO WCL OF FOREST CITYMiles = 3.69
2COLD IN-PLACE RECYCLING
CAPE SEAL
MASONCH 20
MANITO RD
PRESERVATION - PAVEMENTS
2021-2025$4,000,000 11TH ST TO FOX BRIDGE RDMiles = 0.61
4DESIGNED OVERLAY
WIDENING EXISTING PAVEMENT
BIKEWAY
SIDEWALKS
SANGAMONCH 20
STANFORD AVE
REHABILITATION - PAVEMENTS
2020$462,000 WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELDMiles = 0.81
4PAVING
WIDENING & RESURFACING
SANGAMONCH 22
CH 23
WOODSIDE RD
IRON BRIDGE RD
SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.THIS EARMARK WILL BE FUNDED SEPARATELY.
INITIAL CONSTRUCTION - PAVEMENTS
2020$4,125,000 WOODSIDE RD: 0.2 MI E OF OLD CHATHAM RD TO MACARTHUR BLVD EXT; IRON BRIDGE RD: UP RR OVERPASS AT WOODSIDE RD TO 0.4 MI S IN SPRINGFIELD
4BRIDGE (NEW)
RR GRADE SEPARATION
SANGAMONCH 22
CH 23
WOODSIDE RD
IRON BRIDGE RD
INITIAL CONSTRUCTION - BRIDGES
2021-2025$1,200,000 SANGAMON CO LINE TO W ARCH ST (CH 19)Miles = 2.86
1STANDARD OVERLAY CHRISTIANCH 22
MT AUBURN RD
REHABILITATION - PAVEMENTS
6 - 82
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$9,214,000 W OF MACARTHUR BLVD EXT TO E OF N LAKE RD (PHASE II)
2RR GRADE SEPARATION SANGAMONCH 23
WOODSIDE RD
INITIAL CONSTRUCTION - BRIDGES
2021-2025$800,000 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE
6BRIDGE REPLACEMENT MACOUPINCH 26
SAWYERVILLE HILLS
RD
RECONSTRUCTION - BRIDGES
2021-2025$51,000 AT BIG BRANCH CREEK 0.3 MI W OF SAWYERVILLE
6CONSTRUCTION ENGINEERING MACOUPINCH 26
SAWYERVILLE HILLS
RD
RECONSTRUCTION - BRIDGES
2020$850,000 S 24TH ST TO S 36TH STMiles = 1.03
2STANDARD OVERLAY
PATCHING
ADAMSCH 30
MAINE ST
REHABILITATION - PAVEMENTS
2021-2025$225,000 CH 33: ILL 336 TO WCL OF BOWEN; FIFTH ST: WCL OF BOWEN TO ILL 94/61; CH 20: SCL OF AUGUSTA TO ADAMS CO LINEMiles = 5.39
2MICROSURFACING 1 PASS HANCOCKCH 33
FIFTH ST
CH 20
PRESERVATION - PAVEMENTS
6 - 83
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 COLUMBUS RD TO BROADWAY STMiles = 0.67
4STANDARD OVERLAY ADAMSCH 37
48TH ST
REHABILITATION - PAVEMENTS
2021-2025$650,000 AT SUGAR CREEK 3.8 MI W OF VIRDEN
12CULVERT REPLACEMENT MACOUPINCH 37
NINE MILE RD
RECONSTRUCTION - BRIDGES
2021-2025$42,000 AT SUGAR CREEK 3.8 MI W OF VIRDEN
5CONSTRUCTION ENGINEERING MACOUPINCH 37
NINE MILE RD
RECONSTRUCTION - BRIDGES
2021-2025$1,400,000 1.2 MI S OF ILL 29 TO 0.3 MI N OF ST HILAIRE RD & NEW CITY RD TO CHRISTIAN CO LINE
7COLD IN-PLACE RECYCLING
CAPE SEAL
SANGAMONCH 37
CARDINAL HILL RD
PRESERVATION - PAVEMENTS
2021-2025$2,000,000 AT S FORK SANGAMON RIVER 1.5 MI N OF NEW CITY
3BRIDGE REPLACEMENT SANGAMONCH 37
CARDINAL HILL RD
RECONSTRUCTION - BRIDGES
2021-2025$750,000 E 1900TH ST (CH 12) TO E 1200TH ST (TR 354 )
1COLD IN-PLACE RECYCLING ADAMSCH 48
KELLERVILLE BLKTP
N 1200TH AVE
PRESERVATION - PAVEMENTS
6 - 84
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,500,000 AT SPRING CREEK 0.5 MI SE OF ILL 4
5BRIDGE REPLACEMENT SANGAMONCH 59
BROWNING RD
RECONSTRUCTION - BRIDGES
2021-2025$1,150,000 AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD
1BRIDGE REPLACEMENT SANGAMONCHURCHILL RD
RECONSTRUCTION - BRIDGES
2021-2025$120,000 AT JACKSONVILLE BRANCH S OF ILL 97 IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONCHURCHILL RD
RECONSTRUCTION - BRIDGES
2021-2025$750,000 AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD
1BRIDGE REPLACEMENT SANGAMONDRAWBRIDGE RD
RECONSTRUCTION - BRIDGES
2021-2025$80,000 AT JACKSONVILLE BRANCH 0.1 MI S OF WABASH AVE IN SPRINGFIELD
1CONSTRUCTION ENGINEERING SANGAMONDRAWBRIDGE RD
RECONSTRUCTION - BRIDGES
2021-2025$2,486,000 W OF BROWN ST IN NEW SALEM TO US 54 / ILL 107 IN GRIGGSVILLEMiles = 6.17
2DESIGNED OVERLAY PIKEGRIGGSVILLE RD
REHABILITATION - PAVEMENTS
6 - 85
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$470,000 N 8TH ST TO N 10TH ST IN QUINCYMiles = 0.18
3STANDARD OVERLAY
PATCHING
SIDEWALKS
ADAMSHAMPSHIRE ST
REHABILITATION - PAVEMENTS
2021-2025$900,000 AT RICHLAND CREEK 1.5 MI E OF SALISBURY
1BRIDGE REPLACEMENT SANGAMONIRWIN BRIDGE RD
RECONSTRUCTION - BRIDGES
2021-2025$625,000 WASHINGTON ST TO OLD JACKSONVILLE RD IN SPRINGFIELDMiles = 0.98
1RECONSTRUCTION SANGAMONKOKE MILL RD
RECONSTRUCTION - PAVEMENTS
2020$400,000 AT S FORK CEDAR CREEK E OF ADAMS CO LINE
2BRIDGE REPLACEMENT SCHUYLERLA PRAIRIE RD
RECONSTRUCTION - BRIDGES
2020$50,000 AT S FORK CEDAR CREEK E OF ADAMS CO LINE
2CONSTRUCTION ENGINEERING SCHUYLERLA PRAIRIE RD
RECONSTRUCTION - BRIDGES
2021-2025$1,550,000 ILL 267 TO US 67Miles = 5.03
1STANDARD OVERLAY MORGANMURRAYVILLE RD
REHABILITATION - PAVEMENTS
6 - 86
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$500,000 AT LOCUST CREEK 2 MI NW OF OWANECO
1BRIDGE REPLACEMENT CHRISTIANN 1600 E RD
RECONSTRUCTION - BRIDGES
2021-2025$310,000 AT BEAR CREEK 2.5 MI E OF HARVEL
20BRIDGE REPLACEMENT CHRISTIANMONTGOMERY
N 24TH AVE
RECONSTRUCTION - BRIDGES
2021-2025$32,000 AT BEAR CREEK 2.5 MI E OF HARVEL
9CONSTRUCTION ENGINEERING CHRISTIANMONTGOMERY
N 24TH AVE
RECONSTRUCTION - BRIDGES
2020$300,000 NIOTA RD: ILL 9/96 TO COLUSA BLKTP; COLUSA BLKTP: NIOTA RD TO 1400 E RD; CONNABLE RD: ILL 96 TO FERRIS RD; POWELLTON RD / ADRIAN RD: CONNABLE RD TO 1700 E RDMiles = 19.98
1CAPE SEAL HANCOCKNIOTA RD
COLUSA BLKTP
CONNABLE RD
POWELLTON RD /
ADRIAN RD
PRESERVATION - PAVEMENTS
2021-2025$2,600,000 AT SANGAMON RIVER 2 MI E OF CLEAR LAKE
9BRIDGE REPLACEMENT SANGAMONOAK CREST RD
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
6 - 87
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$2,900,000 OLD JACKSONVILLE RD: E OF MCKIBBIN LN TO 0.2 MI E OF BRADFORDTON RD; BRADFORDTON RD: N OF OLD JACKSONVILLE RD TO 0.1 MI SMiles = 0.81
10ADDITIONAL LANES SANGAMONOLD JACKSONVILLE
RD
BRADFORDTON RD
INITIAL CONSTRUCTION - PAVEMENTS
2021-2025$1,260,000 STATE ST TO HARRISON ST IN QUINCYMiles = 0.89
3STANDARD OVERLAY
PATCHING
SIDEWALKS
ADAMSS 24TH ST
REHABILITATION - PAVEMENTS
2021-2025$500,000 US 67 TO ILL 103Miles = 5.29
2CAPE SEAL SCHUYLERSUGAR GROVE RD
PRESERVATION - PAVEMENTS
2021-2025$160,000 AT BAPTIST CREEK 3.5 MI NE OF FOUNTAIN GREEN
2BRIDGE REPLACEMENT HANCOCKTR 6
RECONSTRUCTION - BRIDGES
2020$850,000 AT MOSQUITO CREEK 3 MI E OF MT AUBURN
9BRIDGE REPLACEMENT CHRISTIANTR 13
2850 N RD
RECONSTRUCTION - BRIDGES
2020$40,000 AT MOSQUITO CREEK 3 MI E OF MT AUBURN
9CONSTRUCTION ENGINEERING CHRISTIANTR 13
2850 N RD
RECONSTRUCTION - BRIDGES
6 - 88
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,000,000 AT LAMOINE RIVER 3.3 MI SW OF LAHARPE
5BRIDGE REPLACEMENT HANCOCKTR 71
E 2500 N RD
RECONSTRUCTION - BRIDGES
2021-2025$260,000 AT ACHENBACH BRANCH 3.5 MI N OF PALMER
13BRIDGE REPLACEMENT CHRISTIANTR 82
N 700 E RD
RECONSTRUCTION - BRIDGES
2021-2025$32,000 AT ACHENBACH BRANCH 3.5 MI N OF PALMER
9CONSTRUCTION ENGINEERING CHRISTIANTR 82
N 700 E RD
RECONSTRUCTION - BRIDGES
2020$415,000 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA
2BRIDGE REPLACEMENT CASSTR 143
HALL RD
RECONSTRUCTION - BRIDGES
2020$32,000 LITTLE INDIAN CREEK 2 MI SW OF PHILADELPHIA
2CONSTRUCTION ENGINEERING CASSTR 143
HALL RD
RECONSTRUCTION - BRIDGES
2020$915,000 AT LA MOINE RIVER 4.5 MI NE OF CARTHAGE
5BRIDGE REPLACEMENT HANCOCKTR 175
E 1720 N RD
RECONSTRUCTION - BRIDGES
6 - 89
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$600,000 AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE
10BRIDGE REPLACEMENT CHRISTIANTR 229
E 1025 N RD
RECONSTRUCTION - BRIDGES
2021-2025$32,000 AT BRUSH CREEK 1.5 MI NE OF CLARKSDALE
8CONSTRUCTION ENGINEERING CHRISTIANTR 229
E 1025 N RD
RECONSTRUCTION - BRIDGES
2021-2025$500,000 AT LAKE FORK 2 MI NW OF PANA
1BRIDGE REPLACEMENT CHRISTIANTR 303
E 450 N RD
RECONSTRUCTION - BRIDGES
2021-2025$450,000 AT TOURNEAR CREEK 0.8 MI E OF PLAINVILLE RD
4BRIDGE REPLACEMENT ADAMSTR 419
N 900TH AVE
RECONSTRUCTION - BRIDGES
2021-2025$1,200,000 AT SPRING CREEK 0.4 MI S OF W BRIDGE ST IN NEBO
3BRIDGE REPLACEMENT PIKEUNION ST
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
2021-2025$80,000 AT SPRING CREEK 0.4 MI S OF W BRIDGE ST
3CONSTRUCTION ENGINEERING PIKEUNION ST
ILLINOIS SPECIAL BRIDGE PROGRAM LOCAL PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.
RECONSTRUCTION - BRIDGES
6 - 90
District 6
Local Highways
FY 2020-2023 Rebuild Illinois Highway Improvement Program
Route / Street Location Improvements Est. Cost County
TAMP Category Past Current
MYP Years
2021-2025$1,124,000 VARIOUS LOCATIONS IN PIKE COMiles = 72.00
2BIT SURFACE TREATMENT-A1 PIKEVARIOUS
PRESERVATION - PAVEMENTS
2020$60,000 VARIOUS LOCATIONS IN HANCOCK CO
1P.E. (BRIDGE INSPECTION) HANCOCKVARIOUS
MISCELLANEOUS IMPROVEMENTS
2021-2025$2,055,000 VARIOUS LOCATIONS IN SANGAMON CO
1COLD IN-PLACE RECYCLING SANGAMONVARIOUS
PRESERVATION - PAVEMENTS
6 - 91
!!
!
!
!
!!
!
!
!
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
ll
l
l
l
l
l
l
l
l
l
l
l
l
!
l
l
l
l
l
l
l
l
l
l
l
l
l
l l
l
ll
l
ll
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l l
l
l
l
l l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
ll
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
0/36
0/36
2172
2172
2155
:9104
:94
:978
2155
:929
:9104
:9125
:948
0/24
:954
:916
:910:996
:996
:996
0/24
:997
:91070/36 2172
:9111
:9111
:996
:929
0/67
0/136
21172
:9101
0/136
:9121
:916
:9106
:9100
:9100
:997
:999
:916
:91000/67
:994
0/51
:9106
:999
:9185
0/54
:9267
:9100
2155B
:9104
0/67
:994
:9108
:91040/67
:957
21155
0/136
:94
:961
:929
0/136
:910
:9127
:9336
:9123
:9103
:9127
:9138
:9108
:994
:961
:9106
:9159
:994:99
:94
:9106
:9123
:994:961
:9336
:996:99
0/24
:9108
:9123:929
:9124
:9106
:9138
0/54
:9123:997
2172
2155B
:99
:9336
:99
:9104
:994
:9127
:91212155B
0/51
0/67:9106
0/136
TaylorvilleTaylorville
SpringfieldSpringfield
JacksonvilleJacksonville
SpringfieldSpringfield
QuincyQuincy
LincolnLincoln
StauntonStaunton
DonnellsonDonnellsonPanamaPanamaBunker HillBunker HillBrightonBrighton
WalshvilleWalshvilleWilsonvilleWilsonville
MtMtOliveOlive
SouthernSouthernViewView
WhiteWhiteCityCity
DorchesterDorchesterCoffeenCoffeenBenldBenld
LakeLakeKa-hoKa-ho
Mt ClareMt ClareRoyal LakesRoyal LakesFillmoreFillmoreShipmanShipman
GillespieGillespieTaylor SpringsTaylor Springs
MedoraMedora
LitchfieldLitchfield
ButlerButler IrvingIrving
HillsboroHillsboro
ChesterfieldChesterfieldWittWitt
CoaltonCoaltonCarlinvilleCarlinville
RaymondRaymondNokomisNokomis
WenonahWenonah
OhlmanOhlman
Standard CityStandard CityHettickHettick
HarvelHarvel
WaggonerWaggoner
PanaPanaNilwoodNilwood
MorrisonvilleMorrisonvillePalmyraPalmyraNeboNebo FarmersvilleFarmersville
Pleasant HillPleasant Hill GirardGirardPearlPearl PalmerPalmer
ModestoModestoScottvilleScottvilleOwanecoOwaneco
VirdenVirdenAssumptionAssumption
ThayerThayerManchesterManchesterGlasgowGlasgow
TimeTime AlseyAlseyMiltonMiltonJeisyvilleJeisyvilleMurrayvilleMurrayville
ToveyTovey
DivernonDivernon
PawneePawnee KincaidKincaid
WaverlyWaverlyPittsfieldPittsfield AuburnAuburn
DetroitDetroit
MoweaquaMoweaqua
EldaraEldara FranklinFranklinWoodsonWoodson
FlorenceFlorence WinchesterWinchesterNew CantonNew Canton StoningtonStonington
EdinburgEdinburgLoamiLoami
LynnvilleLynnville
ChathamChatham
BarryBarry Valley CityValley CityKinderhookKinderhook
SoSoJacksonvilleJacksonville
GriggsvilleGriggsvilleNew SalemNew SalemHullHullExeterExeter
New BerlinNew Berlin
BaylisBaylisBluffsBluffs
NaplesNaples BerlinBerlinJeromeJeromeChapinChapin Mt AuburnMt Auburn
RochesterRochester
PerryPerryLeland GroveLeland GrovePlainvillePlainville
Clear LakeClear Lake MechanicsburgMechanicsburgGrandviewGrandviewConcordConcord
PaysonPayson
MeredosiaMeredosia BuffaloBuffalo IlliopolisIlliopolisDawsonDawson
RivertonRiverton
SpauldingSpauldingArenzvilleArenzvillePleasant PlainsPleasant Plains
VersaillesVersaillesLibertyLiberty AshlandAshland
ShermanSherman
CantrallCantrallTallulaTallulaVirginiaVirginia
WilliamsvilleWilliamsvilleAthensAthensAthensAthens LathamLatham
ColumbusColumbusMt SterlingMt Sterling
BeardstownBeardstownTimewellTimewell PetersburgPetersburg Mt PulaskiMt PulaskiElkhartElkhartRipleyRipleyClaytonClaytonCoatsburgCoatsburg
Camp PointCamp Point ChandlervilleChandlerville
BroadwellBroadwellGreenviewGreenview
UrsaUrsa
MendonMendon OakfordOakford MiddletownMiddletownRushvilleRushvilleGoldenGolden
BrowningBrowning
KilbourneKilbourneLa PrairieLa Prairie CamdenCamdenLoraineLoraine
LimaLima New HollandNew HollandBathBath
Mason CityMason City
EastonEaston
AugustaAugusta
BowenBowenLittletonLittleton
HartsburgHartsburgWest PointWest PointAtlantaAtlanta
PlymouthPlymouth EmdenEmdenHavanaHavana
San JoseSan Jose
TopekaTopekaBascoBascoBentleyBentley
Forest CityForest CityWarsawWarsaw
ElvastonElvaston
HamiltonHamilton
CarthageCarthage ManitoManito
FerrisFerris
NauvooNauvoo
La HarpeLa Harpe
Dallas CityDallas CityPontoosucPontoosuc
MACOUPINMACOUPIN
MONTGOMERYMONTGOMERY
SCOTTSCOTT
CHRISTIANCHRISTIAN
PIKEPIKE
MORGANMORGAN SANGAMONSANGAMON
BROWNBROWN
CASSCASS
MENARDMENARD
ADAMSADAMS
SCHUYLERSCHUYLER
LOGANLOGAN
MASONMASON
HANCOCKHANCOCK
See Inset Map
!
!
!
!
l
l
l
l
l
l
l
l
!
!
!
!
REGION 4DISTRICT 6
Proposed FY 2020-2025Highway Program l
l
l
l
Structure
!
!
!
!
SpotRoadway
l
l
l
l
Structure
!
!
!
!
Spot
Rehabilitation
Reconstruction
Preservation
Initial Construction
RoadwayFY 2020 FY 2021-2025
TAMP Categ
ory
0/362172
:94
:94
:94
2155
2155
:929
:954
0/362172
:997
2155
2155B
:929
:9124
2172
0/362155
:997:929 :997
2155B
2155B
2155B
SpringfieldSpringfield
ChathamChatham
JeromeJerome
RochesterRochester
Leland GroveLeland Grove
Clear LakeClear LakeGrandviewGrandview
RivertonRiverton
SpauldingSpaulding
ShermanSherman
SANGAMONSANGAMON
SouthernSouthernViewView
!
!
!
!
!
!
l
l
l
l
l
l
l
ll
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l lll
l
l l
!
!
!
!
l
l
l
l
Airport
CountySPRINGFIELD AND VICINITY
REGION 4DISTRICT 6
Proposed FY 2020-2025Highway Program l
l
l
l
Structure
!
!
!
!
SpotRoadway
l
l
l
l
Structure
!
!
!
!
Spot
Rehabilitation
Reconstruction
Preservation
Initial Construction
RoadwayFY 2020 FY 2021-2025
TAMP Categ
ory