future lean layouts case studieseach case study is based on actual companies’ scenarios, but...
TRANSCRIPT
Each case study is based on actual companies’ scenarios, but names, data, and information have been modified to protect
confidentially and proprietary agreements.
Future Lean LayoutsCase Studies
Part of C&A Lean Transformation capabilities
Medical Devices ContractPackaging CompanyGeneva, Switzerland
Case Study 1
Medical Devices Contract Packaging Plant Layout Comparison Analysis
3
Future layout went from two (2)
floors process flow to one (1)
floor process flow
Medical Devices Contract Packaging Plant Layout Comparison Analysis
4
Part of C&A Lean Transformation capabilities
Automotive ComponentParts CompanyCincinnati, Ohio
Case Study 2
Automotive ComponentParts Company Plant Layout Traditional Product Flow
6
Automotive ComponentParts Company Plant Layout Lean Pull Product Flow
7•FIFO Inventory Storage System
Automotive ComponentParts Company Plant Layout Comparison Analysis
8
*The Lean layout eliminated waste and made the job easier, which
required fewer workers. Therefore, management must bring in more
sales or new business to sustain a continuous improvement culture.
Part of C&A Lean Transformation capabilities
Medical Device Injection Molded Component
Parts CompanyPhoenix, Arizona
Case Study 3
Lean Automation
Medical Devices Injection Molded Component Parts Cell Layout Comparison Analysis
10
Medical Device Injection Molded Component Parts Cell Layout Comparison Analysis
11
*The Lean automation eliminated waste and made the job easier, which
required fewer workers. Therefore, management must bring in more
sales or new business to sustain a continuous improvement culture.
12
www.CaldwellAssociatesExcel.com
(937) 367-6743