FUTURE CMP PROCESSING REQUIREMENTS FUTURE CMP PROCESSING REQUIREMENTS Kyle Flanigan & Michael Corbett Linx Consulting July 10, 2013 NCCAVS CMPUG @ Semicon West www.linx-consulting.com 617.273.8837• 973.698.2331 1 SEE BEYOND THE HORIZON

Upload: others

Post on 07-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

FUTURE CMP PROCESSING REQUIREMENTSFUTURE CMP PROCESSING REQUIREMENTSKyle Flanigan & Michael Corbett

Linx ConsultinggJuly 10, 2013

NCCAVS CMPUG @ Semicon West

www.linx-consulting.com 617.273.8837• 973.698.2331

1

SEE BEYOND THE HORIZON

Page 2: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Linx ConsultingLinx ConsultingLinx ConsultingLinx Consulting

1. We create knowledge and develop unique insights at the intersection of electronic thin film processes and the chemicals industry

2. We help our clients to succeed through our:• Experience in global electronics and advanced materials and thin film processing industries:

– Semi – Packaging – Nano Technology

• Experience in the global chemicals industry

– LCD – PV – Other

• Experience at Device Producers• Experience at OEMs• Global network and capabilities• Advanced modeling capabilitiesg p

www.linx-consulting.com 617.273.8837• 973.698.2331

2

SEE BEYOND THE HORIZON

Page 3: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Industry Analysis Reports OfferedIndustry Analysis Reports OfferedIndustry Analysis Reports OfferedIndustry Analysis Reports Offered

CMP Focused:1. CMP Technologies and Markets to the 11nm Node (5th edition)2. Specialty Abrasives in CMP (4th edition)3. CMP in TSV (2nd edition)4. Wafer Polishing Technologies and Markets

5. Advanced Thin Films for FEOL and BEOL Applications

6. Advanced Cleaning and Surface Preparation: Technologies and Markets

7. Advanced Patterning Forecasting

8. Chemicals and Materials for TSV Applications

9. The Econometric Semiconductor Forecasting Service

10. Strategic Cost Model

www.linx-consulting.com 617.273.8837• 973.698.2331

3

SEE BEYOND THE HORIZON

Page 4: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

High Confidence Decision Support ServicesHigh Confidence Decision Support ServicesHigh Confidence Decision Support Services High Confidence Decision Support Services

PLANNING IDEAS TO MARKETBusiness Analysis

M&A / Due DiligenceDiversification / Expansion

Planning

IP DevelopmentValue Chain Analysis

Technology Assessment and Commercialization

SINGLE CLIENT SERVICES

SUPPPLY CHAIN OPTIMIZATION Quality System Auditing Or Pre-audit

AssessmentSupplier Quality System Benchmarking

MARKETING & SALESMarket Analysis/Monitoring

Market Forecasting and ModelingSupplier Quality System BenchmarkingQuality/Product Management System Set-up Or

AugmentationExcursion Management

Market Forecasting and ModelingCompetitive IntelligenceCustomer Perceptions

www.linx-consulting.com 617.273.8837• 973.698.2331

4

SEE BEYOND THE HORIZON

Page 5: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

SHORT TERM VISIBILITYSHORT TERM VISIBILITY

www.linx-consulting.com 617.273.8837• 973.698.2331

5

SEE BEYOND THE HORIZON

Page 6: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Global Real GDP Growth: By RegionGlobal Real GDP Growth: By Region8

4

6

8

0

2

% C

hang

e

-4

-2 WorldU.S.AsiaEurope

%

• US: below trend in 2013 and slips below total world growth

-62007 2008 2009 2010 2011 2012 2013 2014

EuropeLatin America

• Asia growth the highest, but region growth estimate has been shaved a little since Q1 2013 forecast– Japan a little stronger on new policies– China weaker after weak report for Q1 real GDP growth

www.linx-consulting.com 617.273.8837• 973.698.2331

6

China weaker after weak report for Q1 real GDP growth• Eurozone recession continues through 2013, Europe overall flat

SEE BEYOND THE HORIZON

Page 7: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Q2 2013 Semiconductor ForecastQ2 2013 Semiconductor ForecastMSI grows roughly 50% faster than Global Real GDP in 2013, better than past two years, with MSI grows roughly 50% faster than Global Real GDP in 2013, better than past two years, with

acceleration in 2014acceleration in 2014

3,200

2,800SEMI MSIForecast

2,000

2,400

1,600

2,000

1,200

Shaded areas indicate US recessions

Annual Percent Change2010 2011 2012 2013f 2014f 2015f

39.7 -3.5 -0.1 3.3 9.8 8.1

www.linx-consulting.com 617.273.8837• 973.698.2331

7

80006 07 08 09 10 11 12 13 14 15

Shaded areas indicate US recessions

SEE BEYOND THE HORIZON

Page 8: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Semiconductor Area ForecastSemiconductor Area ForecastSemiconductor Area ForecastSemiconductor Area Forecast

2 700

2,800Q2 2013 Forecast & History (May)Q1 2013 Forecast (Feb)

Semiconductors (MSI)

2,500

2,600

2,700 Q1 2013 Forecast (Feb)Q4 2012 Forecast (Dec 2012)

2 200

2,300

2,400

2,000

2,100

2,200

I II III IV I II III IV I II III IV I II III IV I

Q2 2013 Forecast(May 2013)

2013Q1 2013Q2F 2013Q3F 2013Q4F 2014Q1F

MSI 2128 2380 2495 2329 2334

I II III IV I II III IV I II III IV I II III IV I

2011 2012 2013 2014 2015

www.linx-consulting.com 617.273.8837• 973.698.2331

8

MSI 2128 2380 2495 2329 2334%Change -1.6% 11.8% 4.8% -6.7% 0.2%

SEE BEYOND THE HORIZON

Page 9: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

TRENDS IN CMP SLURRIES AND PADS FOR NEW DEVICES AND WAFERS

www.linx-consulting.com 617.273.8837• 973.698.2331

9

SEE BEYOND THE HORIZON

Page 10: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Major Developments in CMP to DateMajor Developments in CMP to DateMajor Developments in CMP to DateMajor Developments in CMP to Date3,000,000

Introduction of MG last and POP

Introduction of finFET CMP

2,000,000

2,500,000

10nmIntroduction of 300 mm wafers

Introduction of direst STI

1,500,000

14nm

22nm

32nm

45nm

65nmI t d ti f

Introduction of Copper CMP

mm wafers

1,000,000

90nm

130nm

180nm

250nm

Introduction of Tungsten CMP

0

500,000

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

www.linx-consulting.com 617.273.8837• 973.698.2331

10

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

SEE BEYOND THE HORIZON

Page 11: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Growth in CMP Consumables ($M) & # ToolsGrowth in CMP Consumables ($M) & # ToolsGrowth in CMP Consumables ($M) & # ToolsGrowth in CMP Consumables ($M) & # Tools

450

500$2,500# New ToolsSlurries & Pads ($M)

$687 $755$786

350

400

450

$2,000

$628 $666

$687$718

$755$

200

250

300

$1,000

$1,500

$983 $1,040 $1,078 $1,132 $1,191 $1,242100

150

00

$500

$ ,000

0

50

$02012 2013 2014 2015 2016 2017

Slurries Pads # New Tools

www.linx-consulting.com 617.273.8837• 973.698.2331

11

Slurries Pads # New Tools

SEE BEYOND THE HORIZON

Page 12: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Major Developments in CMP Going ForwardMajor Developments in CMP Going ForwardMajor Developments in CMP Going ForwardMajor Developments in CMP Going Forward1,200,000

Introduction of III-V

Introduction of 450mm wafers

800,000

1,000,000CMP and new B/S

450mm Wafer CMP

Introduction of TSV

600,000 10nm

14nm

22nm

Introduction of finFET CMP

Introduction of Ge CMP

400,000

22nmfinFET CMP

0

200,000

2013 2014 2015 2016 2017

www.linx-consulting.com 617.273.8837• 973.698.2331

12

2013 2014 2015 2016 2017

SEE BEYOND THE HORIZON

Page 13: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Defectivity RequirementsDefectivity Requirements –– Tools & ProcessTools & ProcessDefectivity Requirements Defectivity Requirements Tools & ProcessTools & Process

Control of the Tool• The trend is towards extremely low downforce in the polishing process• 1 to 2 psi is common at 14nm for oxide, nitride and poly (POP process) using ceria slurry• Silicon FinFET processing also uses low downforce CMP

• RPMs on both the platen and head have to be optimized– Higher RPM increases the removal rate but leads to more abrasion on the surface– Therefore lower RPMs are required

Control of the Pad• Pads

– Grooves should be free from debris due to groove cutting– Pads should not have sharp edges

• ConditioningConditioning– Optimum conditioning of the pad is of paramount importance. Grit size of conditioners

play an important role in defectivity control

www.linx-consulting.com 617.273.8837• 973.698.2331

13

SEE BEYOND THE HORIZON

Page 14: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Defectivity RequirementsDefectivity Requirements –– ConsumablesConsumablesDefectivity Requirements Defectivity Requirements ConsumablesConsumables

Control of the Slurries• For 22nm and 14nm, the industry needs to have extremely tight control on the slurries and

pad quality

• In advanced slurries, morphology of the slurry particles will be critical– No agglomerations and angular particles– Need mostly spherical particles and to minimize the number of edges

• Trend to low abrasives or abrasive free – 0.5% or lower solids content as the slurry formulation trend is to greater chemo effect than mechanical effect

• Selectivity requirements will prove challenging to slurries as selectivity is increased tuned as a key point of the overall process control

• Galvanic corrosion needs to be controlled in-situ – this is controlled by using the correct ingredients/formulations

• Advanced slurry formulations may utilize 10 to 15 distinct ingredients

www.linx-consulting.com 617.273.8837• 973.698.2331

14

SEE BEYOND THE HORIZON

Page 15: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

New Materials are Increasing RapidlyNew Materials are Increasing RapidlyNew Materials are Increasing RapidlyNew Materials are Increasing RapidlyNew Opportunities for Materials

R² = 0.9858405060

New Materials Required

The Quality Dilemma1 N M t i l ft f d i /

0102030

1990 2000 2010

1. New Materials are often found in / required for the most critical applications

2. New materials lead to new value chains3. New value chains lead to new sources4. New sources are usually unqualified

www.linx-consulting.com 617.273.8837• 973.698.2331

15

1990s 2000s 2010+

SEE BEYOND THE HORIZON

Page 16: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

SUPPLY CHAIN AND QUALITYSUPPLY CHAIN AND QUALITY

www.linx-consulting.com 617.273.8837• 973.698.2331

16

SEE BEYOND THE HORIZON

Page 17: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

SupplySupply--Chain OptimizationChain Optimization BackgroundBackgroundSupplySupply Chain Optimization Chain Optimization BackgroundBackground

• Market trend is to push supplier quality into the supply chain

• End customers (End-user) are pushing suppliers to avoid costly firefighting by pre-emptively qualifying the supply chain

• Some companies are developing collaborative programmes which are firewalled and fid i lconfidential

• Others are demanding more information with an expectation of supplier transparency for the whole supply chain.

• Suppliers need to set up effective audit trails for all sub suppliers

• This may lie within the capability of large suppliers, but small and medium size suppliers may not have the expertise to develop acceptable supply change qualification systems

www.linx-consulting.com 617.273.8837• 973.698.2331

17

SEE BEYOND THE HORIZON

Page 18: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Future Quality RequirementsFuture Quality RequirementsFuture Quality RequirementsFuture Quality Requirements

• Quality Improvement– Increasing number of metals and elements in CofA

• 8 to 24 or full spectrum– Increased Sensitivity

• ppm -> ppb -> ppt• Inorganic chemicals regularly specified at ppt levels

– Function specifications becoming more specific• Resolution, DOF EL, line collapse, profile, adhesion, footing, toploss, LER, LWR• Selective etch rates• Polish rates, defectivity, dishing, y, g

• Service Improvement– Beyond SPC– Ship to stock qualificationShip to stock qualification

• Sub-Supplier Monitoring– Materials component supply analysis

Materials fingerprinting

www.linx-consulting.com 617.273.8837• 973.698.2331

18

– Materials fingerprinting

SEE BEYOND THE HORIZON

Page 19: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Incumbent Supplier Base is being ChallengedIncumbent Supplier Base is being Challengedcu be t Supp e ase s be g C a e gedcu be t Supp e ase s be g C a e ged

New material formulations being introduced

Hendry ISS 2013 Hendry ISS 2013

New material formulations being introducedNew suppliers bring innovationMature formulations used for new applications

Technology cycles are being compressedNew suppliers have a steep learning curve

End-users have limited process characterization resources

www.linx-consulting.com 617.273.8837• 973.698.2331

19

SEE BEYOND THE HORIZON

Page 20: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

The Entire Value Chain is Being ChallengedThe Entire Value Chain is Being ChallengedThe Entire Value Chain is Being ChallengedThe Entire Value Chain is Being Challenged

End-UsersN d t h t i l lifi dNeed to have materials qualified

Need to track more of the supply chainNeed to control overheads

Handling many more materials

Prime SuppliersBeing held accountable for sub-supplier systems

Sub-SuppliersOriginal contracts did not call for stringent quality processes

Do not sell directly to end-user – it is not our Do not have capabilities to track activities at sub-suppliers

Need to understand appropriate levels of spending and scale to these operations

yproblem

Do not know how to implement systems

Need to understand appropriate levels of spending d l t th ti

www.linx-consulting.com 617.273.8837• 973.698.2331

20

and scale to these operations

SEE BEYOND THE HORIZON

Page 21: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Supply Chain Optimization ChallengeSupply Chain Optimization ChallengeSupply Chain Optimization ChallengeSupply Chain Optimization Challenge

• Companies at all levels in the value chain need to increase the levels of resourcing required to support the semiconductor industry.levels of resourcing required to support the semiconductor industry.

– Prime & sub-suppliers have multiple Tier 1 end users in the industry– End users have unique audit or pre-audit template required– Customer pre-audits and audits require significant resources to complete– Each process increases the depth and breadth of questions– Advanced process nodes require complete re-evaluation of established C of A

• Suppliers at all levels are struggling to meet expectations– New suppliers to the industry do not have the resources available

Older products have may have significant supply gaps but these will not be– Older products have may have significant supply gaps but these will not be identified or closed to meet ramp cycles

– Suppliers at all levels need to make new investments in quality systems and need guidance from a strategic materials supply chain organization.

www.linx-consulting.com 617.273.8837• 973.698.2331

21

21

Page 22: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

What is Happening Today?What is Happening Today?What is Happening Today?What is Happening Today?

IC Manufacturers are making changes• Focusing on formulation sub-suppliers• Are evaluating strategic supplier readiness• Imposed significant fines for quality manual violations• Actively eliminating under performing suppliers

Suppliers need assistance to overcome barriers:• Executive Sponsorship

– Assignment of talent and resources for change– Commitment to attainment of quality goals

• Education– Understanding WHAT and WHY and HOW MUCH

• Involvement– All aspects of sales and operations are stakeholders for quality metrics

• Price

www.linx-consulting.com 617.273.8837• 973.698.2331

22

– End users need to pay for the appropriate level of testing and production capabilities

SEE BEYOND THE HORIZON

Page 23: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Impact of ExcursionsImpact of Excursions

Detection location

CIMPACT to: Raws Qualified Product On Wafer Packed Chips Consumer

Product

Business

Operating capitalOperating capital

Good Will

Technical

ID Root Cause

Recurrence of Issue

www.linx-consulting.com 617.273.8837• 973.698.2331

23

SEE BEYOND THE HORIZON

Page 24: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Why Linx?Why Linx?Why Linx?Why Linx?The advanced materials and tooling market is again evolving. New platform development iscostly and risky. End-users are identifying new strategic partners and suppliers who they canrely on to help meet their business goals. Supply chain risk has been identified as a significantvulnerability In response to this FABs are rethinking strategic partnerships to focus on suppliersvulnerability. In response to this, FABs are rethinking strategic partnerships to focus on supplierswho have consistently met project deliverables and not slipped on manufacturing rampschedules. We can help throughout this evolution.

www.linx-consulting.com 617.273.8837• 973.698.2331

24

SEE BEYOND THE HORIZON

Page 25: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

Advanced Materials Advanced Materials L i /Ch i iL i /Ch i iLearning/CharacterizationLearning/Characterization

• Well controlled manufacturing at the prime supplier leads to SupplierS b S b p ppproduct qualification

• Changed process at the sub-supplier changes end product

Sourcing Receiving Distillation

SupplierSubSupplier

SubSupplier

performance

• Process audits identify areas of interest to be investigated

Reaction Reaction QC

during an excursionPurification Formulation ShippingPurification

• Sub-supplier process mapping is now expected during product development

Packaging

Shipping

Purification

Application Test

• CofA are not sufficient for adv. materials

www.linx-consulting.com 617.273.8837• 973.698.2331

25

Shipping Application TestQC • GOAL: Eliminate Variation

SEE BEYOND THE HORIZON

Page 26: FUTURE CMP PROCESSING REQUIREMENTS...a little since Q1 2013 forecast – Japan a little stronger on new policies – China weaker after weak report for Q1 real GDP growth 617.273.8837•

SummarySummarySummarySummary

• Continued strong organic industry growth for balance of 300mm ramp out

• Many new CMP applications including:– 450mm wafers– TSV– FEOL – Ge and III-V– New barrier and seed

• Multiple new device types – MRAM and RRAM on the horizon to replace NAND and DRAM mean for new opportunities

• Supply Chain Management is key differentiator. The Impact of excursions grows with time– Quality and supply chain sources of deviation most be better understood– Companies with strong supply chain management are the most likely to expand at or p g pp y g y p

better than the industry growth rate.

www.linx-consulting.com 617.273.8837• 973.698.2331

26

SEE BEYOND THE HORIZON