funding efficient and sustainable energy for wastewater treatment facilities · 2015-05-13 ·...

25
Connecticut Department of Energy and Environmental Protection Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy Demand

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental Protection

Funding Efficient and Sustainable Energy for Wastewater Treatment

Facilities

May 6, 2015

Diane W. Duva, Office of Energy Demand

Page 2: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Benefits of energy efficiency

• Energy efficiency is a valuable resource

– Reduces air pollutants and greenhouse gases

• Saves customers money

– Reduced operating costs = Opportunity for savings

reinvestment in facility

• Reduces need for more power generation

– More efficient large scale consumers can help reduce

grid strain.

• Creates jobs

3

Page 3: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Funding Sources

• Clean Water Fund

• Energy Savings Performance Contracts

• CT Energy Efficiency Fund

4

Page 4: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

Clean Water State Revolving Fund (CWF)

PRIORITY LIST:

The following are reserves in the CWF. Reserves are utilized on a first come, first served basis.

CWF Requirements:

• Agreement is between State and Municipality as defined by State Statute

• EPA requirement: Buy American for Iron & Steel

Page 5: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

Clean Water State Revolving Fund (CWF)

Available Reserves with Energy / Green

• RESERVE FOR PLANNING PROJECTS (55% grant):

– Energy audits for any WWTP that has not already received a CWF agreement for a complete treatment plant upgrade.

– Assessment of the risk to existing wastewater infrastructure from climate change (rising sea levels and increased storm intensities and coastal flooding) and an evaluation of alternatives for remedial actions.

– CSO communities to study the effectiveness of incorporating green infrastructure technologies into CSO mitigation projects associated with the implementation of a CSO LTCP.

Page 6: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

Clean Water State Revolving Fund (CWF)• RESERVE FOR CONSTRUCTION OF I/I

REHABILITATION PROJECTS (20% grant):

– Projects will minimize sewage overflows resulting from surcharge, reduce hydraulic overloading and energy consumption, improve treatment efficiency, and provide reserve treatment capacity.

• RESERVE FOR PUMP STATION REHABILITATION PROJECTS (20% grant):

– For replacing aging infrastructure, reducing hydraulic overloading, incorporating energy efficiency equipment and providing emergency power.

Page 7: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

Clean Water State Revolving Fund (CWF)

• RESERVE FOR RESILIENCY PROJECTS (20% grant):

– PA 13-15 requires wastewater improvement projects that may be affected by sea level rise to consider in the project’s design ways to mitigate the impact of sea level rise. The PA modified Section 22a-478 of the CGS. This reserve was created in response to this law.

– The types of projects funded under this reserve shall include work at the treatment plant, a pump station or within the collection system.

Page 8: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

Clean Water State Revolving Fund (SRF)

• RESERVE FOR GREEN INFRASTRUCTURE:

– Treatment plant, pump station, and/or collection system improvement projects that incorporate cost-effective renewable energy components. (20% grant)

– Community demonstration projects of green infrastructure technologies to promote infiltration of stormwater into the ground in combined sewer overflow areas, for CSO communities that are working toward compliance with their CSO LTCP. (50% grant)

Page 9: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Energy Savings Performance Contracting

(ESPC)

▪ Implementation of energy saving measures, paid for by

guaranteed savings from future operating budget

▪ Approach is over 30 years old, approx. $4.1 billion market

in U.S. in 20131

– Government and institutional Sector > 50% of ESPC Market

1 Lawrence Berkeley National Laboratory, “Current Size and Remaining Market Potential of U.S. ESCO Industry”. (Presentation to Energy Services Coalition, August 13, 2013)

Page 10: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Performance contracting concept

Page 11: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

– Address deferred maintenance

– Eliminate costly emergency

repairs

▪ Repurpose wasted utility dollars to:

– Upgrade to high efficiency energy systems

– Stabilize energy costs

– Improve budget accuracy

Why do one?

Page 12: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

How does the CT ESPC program work?

▪ Pre-qualified vendors

(QESPs = “ESCOs”)

▪ Pre-approved, standardized documents and process– Required for use by state agencies.

Optional for municipalities.

▪ Support Services

Page 13: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Existing Buildings

▪ Incentives to replace functioning equipment with

more energy-efficient options

Covers up to:

▪ 40% of installed cost

– 35% common lighting

upgrades

– 40% high-end lighting

technologies, EMS, Custom

▪ 50% of installed cost for

comprehensive projects

14

Energy efficient lighting

Lighting controls

EMS/ Programmable Thermostats

Process Equipment

VFDs HVAC

Refrigeration Controls

Gas Measures

Page 14: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Pump Station Improvements

15

Page 15: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Process Automation Improvements

16

Page 16: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

New Construction & Equipment

▪ Captures electric and natural gas savings where they are most cost-effective: during design

▪ Covers up to:– 95% of the incremental

cost of installing measures in new construction

– 75% of the incremental cost for equipment replacement projects

17

Energy Efficiency Lighting

Lighting Controls

HVAC Equipment

Building Envelope Refrigeration

Process Equipment

Gas Boilers VFDs

New Construction

Major Renovation

Equipment Replacement

Page 17: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Disinfection System Improvements

18

Page 18: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Aeration System Improvements

19

Page 19: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Business & Energy Sustainability

▪ Maximize operational strategies

with existing capital equipment

& people

▪ Integrate energy efficiency with

environmental stewardship &

corporate sustainability goals

▪ Develop sustainable energy

management practices

20

Page 20: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Control System Improvements

21

Page 21: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Pumping Efficiency

22

Page 22: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

De-watering System Improvements

23

Page 23: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Mixing Improvements

24

Page 24: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental ProtectionConnecticut Department of Energy and Environmental Protection

LINKS

Clean Water Fund: www.ct.gov/deep/cleanwaterfund

Municipal Wastewater: www.ct.gov/deep/municipalwastewater

Energy Efficiency: www.energizeCT.com

877-WISE-USE (877-947-3873)

Performance Contracting: www.ct.gov/deep/leadbyexample

Page 25: Funding Efficient and Sustainable Energy for Wastewater Treatment Facilities · 2015-05-13 · Energy for Wastewater Treatment Facilities May 6, 2015 Diane W. Duva, Office of Energy

Connecticut Department of Energy and Environmental Protection

Questions?

Ann A. Straut, Municipal Facilities, DEEP860-424-3137 [email protected]

Diane W. Duva, Office Director, Office of Energy Demand, DEEP860-827-2756 [email protected]

Andrew Brydges, The CT Green Bank [CEFIA]860-258-7834 [email protected]