funding commercial solar
TRANSCRIPT
1
Funding commercial solarIan Kay (CFO)
NSW Resources and Energy Investment Conference28 July 2015
2
ARENA supports all solar technologies incl. storage
To date, ARENA has committed almost $700m to solar PV and thermal, from R&D focused rounds to large scale deployment
# $m % # $m % # $m %
R&D 94 99.2 14.2% 34 78.7 11.3% 128 177.8 25.5%
Demonstration 10 81.6 11.7% 4 80.2 11.5% 14 161.9 23.2%
Deployment 5 358.8 51.4% - - 0.0% 5 358.8 51.4%
Total 109 539.6 77.3% 38 158.9 22.7% 147 698.5 100.0%
TotalStage Solar PV Solar Thermal
RenewEconomy
Australia’s Largest Solar Plant
Achieves Full Generation
Australia’s largest solar farm, the AGL Energy-owned 102MW Nyngan Solar Plant in western New South Wales is set to become fully operational in a matter of weeks after achieving the milestone of full generation
The Daily Telegraph
Miner to build $40m solar power
station
Sandfire Resources says the $40 million project at the DeGrussa copper mine 900km northeast of Perth will be the largest integrated off-grid solar and battery storage facility in Australia.The project… is getting up to $15 million in funding from the CEFC and $20.9 million from the ARENA
3
This includes a broad range of commercial solar projects
Large scale grid connected deployment
Off-grid mining load support
Fringe-of-grid commercial
Off-grid community
New commercial technology
Nyngan Solar Plant
(Utility scale)
Broken Hill Solar Plant (Utility scale)
Moree Solar Farm
(Utility scale)
Bluescope Steel(Built in PV)
Degrussa Solar Plant
(Off-grid mining)
Weipa Solar PV Project
(Off-grid mining)
Yulara Tourism PV
(Fringe-of-grid commercial)
Laing O’Rourke(Redeployable solar)
Doomadgee Solar Project
(Off-grid community)
Flinders Island Hybrid Energy
(Off-grid Community)
Coober Pedy Hybrid
(Off-grid Community)
4
Growth expected in behind the meter generation
• Significant growth is expected in behind the meter commercial and industrial solar in the future, coupled with storage capacity growth
• Policy frameworks remain uncertain
• Let’s not forget market risk
-
500
1,000
1,500
2,000
0
1,000
2,000
3,000
4,000
5,000
6,000
Cu
mu
lati
ve
Sto
rag
e C
ap
ac
ity
(M
Wh
)
Cu
mu
lati
ve
Ge
ne
rati
on
C
ap
ac
ity
(G
W)
Cumulative new PV + Storage capacity - Commercial and Industrial
Commercial - Generation Industrial - Generation Storage - Capacity
Source: Bloomberg New Energy Finance
5
Solar is now competitive with diesel in off-grid locations
• In the off-grid market, solar is competing with diesel today
Existing diesel
New build diesel
100
150
200
250
300
350
400
20
15
20
15
20
15
20
16
20
16
20
16
20
16
20
17
20
17
20
17
20
17
20
18
20
18
20
18
20
18
20
19
20
19
20
19
20
19
20
20
20
20
20
20
20
20
20
21
20
21
20
21
20
21
20
22
20
22
20
22
20
22
Pri
ce
pe
r M
Wh
Off-Grid Energy Costs (Diesel, Gas and Solar)
Source: Energetics; BNEF; ARENA Analysis
10 year solar
20 year solar
6
Solar is now competitive with diesel in off-grid locations
• In the off-grid market, solar is competing with diesel and gas today
Existing LNG
New build LNG
100
150
200
250
300
350
400
20
15
20
15
20
15
20
16
20
16
20
16
20
16
20
17
20
17
20
17
20
17
20
18
20
18
20
18
20
18
20
19
20
19
20
19
20
19
20
20
20
20
20
20
20
20
20
21
20
21
20
21
20
21
20
22
20
22
20
22
20
22
Pri
ce
pe
r M
Wh
Off-Grid Energy Costs (Diesel, Gas and Solar)
Source: Energetics; BNEF; ARENA Analysis
10 year solar
20 year solar
7
Solar is now competitive with diesel in off-grid locations
• In the off-grid market, solar is competing with diesel and gas today
• The off-take period is a big driver of the commerciality of any project
• We recently reached financial close at the Degrussa mine in WA
10 year solar
20 year solar100
150
200
250
300
350
400
20
15
20
15
20
15
20
16
20
16
20
16
20
16
20
17
20
17
20
17
20
17
20
18
20
18
20
18
20
18
20
19
20
19
20
19
20
19
20
20
20
20
20
20
20
20
20
21
20
21
20
21
20
21
20
22
20
22
20
22
20
22
Pri
ce
pe
r M
Wh
Off-Grid Energy Costs (Diesel, Gas and Solar)
Source: Energetics; BNEF; ARENA Analysis
LNG
Diesel
8
Large scale grid connected is closing in fastWe are bridging the gap to wind
40
60
80
100
120
140
160
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Utility Scale Solar PV (Global Average) Onshore Wind (Global Average) New Build Coal Australia
Utility scale solar PV (global) (1)
$87 (FRV, Brazil) (3)New build coal (Australia) (2)
Onshore wind (global) (1)
Current LCOE of Utility scale
solar PV in Australia (4)
LC
OE
(U
SD
$/M
Wh)
Source:
(1) Large scale solar PV and onshore wind projections are global averages (inc US, EU, China and India regions) from BNEF, New Energy Outlook Global 2015 (2) Coal projections are from Australian Bureau of Resources and Energy Economics, 2012 Australian Energy Technology Assessment model – they do not include a carbon price. (3) Bloomberg New Energy Finance News, Solar energy makes landfall in Brazil at record-setting low price, 4 November 2014
(4) Assumes average exchange rate USD:AUD (0.8:1)
The gap is closing, but
could be faster
9
Case Study – Degrussa Solar10MW Solar with 6MW
Battery
Integrated with 19MW Diesel
gen-set
Displacing 25% of annual diesel
consumption
Up to 95% of peak load
penetration
Financed by ARENA, CEFC
and Neoen
Direct hedge of diesel costs on a fixed take-or-pay
Or 50,000 tanks of fuel in the
standard 4WD
10
ARENA’s new open programme is ready for applicationsWe have recently launched an “Advancing Renewables Programme” which will open for applications from 1 August
11
Strategic priorities focused on 5 key areasWithin ARENA’s investment focus areas, our 5 priorities for new investment are:
Integrating renewables and grids
Renewables for industrial processes
Fringe-of-grid and network-constrained
Increase the penetration and use of renewable energy generation and distributed energy eg. providing customer-focused solutions, facilitating greater renewables uptake in low-voltage networks, or addressing knowledge gaps.
Off-grid areasLarge-scale solar
photovoltaics
Application and economic benefits of using renewable energy within industrial processes, eg. displacing fossil fuels, or reduction of technical and commercial risks.
How distributed renewable energy systems can alleviate the need for network augmentation or provide other benefits, particularly at the fringes of grids or where there are network constraints.
Activities that integrate renewable energy with existing electricity supply to power industrial processes and communities in remote off-grid areas.
Through the large-scale solar PV competitive round, pre-commercial deployment activities that show a clear path to commercial competitiveness for large-scale solar PV.
12
Large scale solar PV Priority
ARENA has begun consultation for a large scale solar competitive round to continue push the cost curve is the right direction
What? How much?
Program size ca. 200 MW (DC)
Individual project size 10 MW – 50MW (DC)
Budget $80m - $100m
Launch Timing Consultation to late July, launch in Aug/Sep
Financial Close and Construction December 2016 target Financial CloseDecember 2017 construction complete
LCOE Metric $130/MWh as minimum benchmark
Competitive metric ARENA grant per MWh (calculated over 20 year life)
For more information, go to:
arena.gov.au/large-scale-solar-pv
13
Find out more at arena.gov.au
ARENA at LinkedIn
@ARENA_aus on Twitter
Subscribe to updates: arena.gov.au/subscribe