_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ 018347_FSR‐SWM_U‐Haul_Burlington_Dec 04, 2018 FUNCTIONAL SERVICING REPORT PROPOSED U‐HAUL BURLINGTON AT 3267 Mainway City of Burlington Prepared for Strategy 4 Inc. Dec 04, 2018 Re‐Issued for ZBL Amendment Application Sep 13, 2018 Re‐Issued for ZBL Amendment Application May 11, 2018 Issued for ZBL Amendment Application REVISIONS 1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1 TEL: (647)496‐8055 www.floradesigns.net

Upload: others

Post on 09-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FUNCTIONAL SERVICING REPORT - Burlington

_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

018347_FSR‐SWM_U‐Haul_Burlington_Dec 04, 2018 

       

FUNCTIONAL SERVICING REPORT     

PROPOSED U‐HAUL BURLINGTON  

 AT 

3267 Mainway City of Burlington 

     Prepared for  Strategy 4 Inc. 

           

   

Dec 04, 2018  Re‐Issued for ZBL Amendment Application 

Sep 13, 2018  Re‐Issued for ZBL Amendment Application 

May 11, 2018  Issued for ZBL Amendment Application 

                   REVISIONS   

  1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1       TEL: (647)496‐8055                     www.floradesigns.net    

Page 2: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 2 of 33 

TABLE OF CONTENTS  1.0  INTRODUCTION  2.0  SITE DESCRIPTION  3.0  SITE PROPOSAL  4.0  STORMWATER MANAGEMENT AND DRAINAGE 

4.1  Design Criteria 4.2  Existing Conditions 4.3  Stormwater Management 

4.3.1  Quantity Control  4.3.2  Quality Control  

4.4  Down Stream Capacity  

5.0  EROSION AND SEDIMENT CONTROL DURING CONSTRUCTION  6.0  SANITARY DRAINAGE SYSTEM 

6.1  Population Density 6.2   Proposed Sanitary Flow 6.3  Down Stream Capacity  

7.0  WATER SUPPLY SYSTEM 7.1  Existing & Proposed Water Supply System 7.2  Proposed Fire Flow Requirements 8.3   Proposed Water Servicing   

8.0  CONCLUSIONS AND RECOMMENDATIONS 8.1  Storm 8.2  Sanitary  8.3   Water 

       LIST OF TABLES  Table 1   Pre‐development Input Parameters     Table 2   Pre‐development Peak Flows Table 3   Post‐development Input Parameters Table 4   Post‐development Peak Flows   

Page 3: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 3 of 33 

LIST OF APPENDICES  Appendix "A" Plans 

Site Location Map 

Site Survey Drawing 

Architectural Site Plan 

Conceptual Servicing Plan  Appendix "B"  Stormwater Management 

IDF Curve of City of Burlington 

Runoff Coefficient Calculations (C) 

Pre‐development Storm Drainage Plan 

Pre‐development Peak Flow Calculations 

Post‐development Storm Drainage Plan 

Post‐development Peak Flow Calculations  Appendix "C"  Sanitary Drainage System 

Population Density Calculations Pre‐development & Post‐development Sanitary Flow Calculations

 Appendix "D" Water Supply System 

Pre‐development & Post‐development Water Supply Requirement Calculations 

Post‐development Fire Flow Requirement Calculations 

Fire Protection Calculations 

Fire Flow Test Report  Appendix "E"  Statement of Limiting Conditions and Assumptions                    

Page 4: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 4 of 33 

1.0  INTRODUCTION  

Flora Designs Inc. has been retained by Strategy 4 Inc. to prepare a Functional Servicing Report for  the  Proposed  U‐Haul  Facility  Development  located  at  3267 Mainway,  City  of  Burlington, Ontario (Appendix "A"), in accordance with the engineering standard drawings provided by the City  of  Burlington  and  MOE  Stormwater  Management  Planning  and  Design  Manual  2003 (SWMPD)  as  well  as  the  Region  of  Halton  design  guidelines  provided  in  the  Water  and Wastewater Linear Design Manual.  This  report  is  prepared  in  support  of  a  Proposed  Zoning  By‐law  Amendment  application  by Strategy 4 Inc. The purpose of this report is to provide site‐specific information for the City and Region's  review  with  respect  to  the  infrastructure  required  to  support  the  proposed development in terms of storm drainage, sanitary discharge and water supply.   An  inventory  of  the  existing  infrastructure  in  the  area of  proposed development was  carried out. This report discusses the existing services together with the servicing requirements for the proposed development.  2.0  SITE DESCRIPTION  The  proposed  development  site  is  located  at  3267  Mainway,  City  of  Burlington,  Ontario (Appendix "A").  The site is bounded as follows:  

Existing residential dwellings and Consort Crescent beyond to the North,  

An existing industrial development to the East,  

Mainway to the South, and  

An existing industrial development to the West.   The  site  is  approximately  3.35  hectares  (8.28  acres)  in  size.  Currently  an  existing  industrial building  of  approximate  14,493.40  m2  GFA  is  located  on  the  property.  The  existing establishment on  site  is  serviced by  the City’s  existing  infrastructure of  storm  sewer  and  the Region’s  existing  infrastructure  of  sanitary  sewer  and  watermain  located  within  the  road allowance of Mainway. There are an existing 525mm dia regional sanitary sewer and an exiting 750mm dia municipal storm sewer running through the site within an easement along the West property  line.  Also  an  exiting  1050mm  dia  municipal  storm  sewer  running  through  the  site within an easement along the East property line. The existing regional sanitary sewer and both municipal  storm  sewers  conveys  flow  from  the  upstream  lands  to  the North  of  this  site  and discharges  to  the  municipal  infrastructure  of  sewers  located  within  the  road  allowance  of Mainway.  3.0  SITE PROPOSAL  This development application proposes change of use for an existing industrial building having an existing GFA of approximate 14,493.40 m2 on an approximate 33,512.14 m2 site area. This development  application does not  propose any  addition  to  the existing building nor propose any  alteration  to  the  existing  surface  treatments  exterior  to  the  building.  The  current development  application  proposes  change  of  use  for  the  existing  GFA  from  an  existing  CNC 

Page 5: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 5 of 33 

Machining use to self storage warehouse, vehicle sales,  rental,  leasing and service with office and ancillary retail use and re‐configuration of parking stalls and re‐painting of parking stripes to accommodate U‐Haul rental vehicles on existing asphalt surface. Please refer to the building and site statistics and OBC Matrix provided by Strategy 4 Inc.  The  site  improvement  application  proposes  to make  use  of  the  existing  storm,  sanitary  and water  services  in  the  post‐development  condition  without  any  alteration.  This  development application  does  not  propose  any  alteration  to  the  existing  water  meter  installation.  Please refer to mechanical drawings for modifications proposed to the existing plumbing and sprinkler system within the building envelope.  4.0  STORMWATER MANAGEMENT AND DRAINAGE  

4.1  Design Criteria The proposed development will meet  the Province of Ontario  standards as  set out  in  the  MOE  Stormwater  Management  Planning  and  Design  Manual  2003 (SWMPD), the Region of Halton Design Criteria and  local engineering standards provided  by  the  City  of  Burlington.  A  brief  summary  of  design  criteria  are  as follows;  

For this development, return frequency values for design shall be 5‐year for the Minor System and 100‐year for the Major System. 

City of Burlington Rainfall Intensity Curves (Standard Drawing No. S‐IDF) is to be used for analysis (Appendix "B").  

The  post‐development  peak  flows  for  all  events  from  the  site  should  be controlled  to  the  peak  flow  resulting  from  the  target  pre‐development conditions during respective rainfall events.  

An overland flow route is provided to direct runoff in excess of the 100‐Year storm event to a safe outlet. 

Maximum detention depth  in  the parking areas during  the 100‐year  storm event is not to exceed 300mm. 

Stormwater should be treated to Enhanced Protection level as defined in the MOE SWM Planning & Design Manual (2003).  

4.2  Existing Conditions Currently an existing industrial development is located on the property. Based on review of  the  topographic  survey and a  site visit, we concluded  that,  a private network  of  storm  sewers  collects  storm  runoff  from  the  roof  of  the  existing building including existing paved surface parking (CA‐1‐Pre), which subsequently generates  uncontrolled  discharge  into  the municipal  network  of  storm  sewers located  within  easements  along  the  East  and  West  property  lines  through multiple  service  connections.  The  pre‐development  surface  condition  and drainage area for this site has been illustrated in Appendix "B".  For  calculating  the  pre‐development  discharge  rates  and  runoff  for  2‐Year,  5‐Year and 100‐Year storm events, the inlet time of concentration (Tc) is based on the  minimum  Tc  provided  by  the  City.  The  value  for  the  weighted  runoff 

Page 6: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 6 of 33 

coefficient  (C)  is  calculated  based  on  actual  surface  conditions  per  the Engineering Standard Drawing No S‐3D provided by  the City of Burlington. The input  parameters  used  to  model  the  target  pre‐development  condition  are provided  in  Table‐1  below,  and  detailed  pre‐development  runoff  coefficient calculations are included in Appendix "B".  Table‐1  Pre‐development Input Parameters 

Catchment  # 

Drainage Area (ha) 

Runoff Coefficient (C)2 and 5‐Year 

Runoff Coefficient (C) 

100‐Year 

Time of Concentration 

Tc (min.) 

CA‐1‐Pre  3.35  0.79  0.88  10 

 The  pre‐development  peak  flow  was  calculated  using  the  City  of  Burlington Rainfall  Intensity  Curves  (Standard  Drawing  No.  S‐IDF)  using  the  Rational Method. Results of the pre‐development peak flow calculations are provided in Table‐2  below,  and  detailed  pre‐development  flow  calculations  have  been illustrated in Appendix "B". 

 Table‐2  Pre‐development Peak Flows 

Catchment  # 

Peak Flow (m3/s) 

2‐year  5‐year  100‐year 

CA‐1‐Pre  0.501  0.648  1.163 

 4.3  Stormwater Management 

In  the  post‐development  condition,  this  development  application  does  not propose any addition to the existing building nor propose any alteration to the existing  surface  treatments  exterior  to  the  building.  This  application  only proposes  re‐configuration of parking stalls and re‐painting of parking stripes  to accommodate  U‐Haul  rental  vehicles  on  existing  asphalt  surface.  The  post‐development  surface  condition  and  drainage  area  have  been  illustrated  in Appendix "B".  For  calculating  the post‐development  discharge  rates  and  runoff  for  2‐Year,  5‐Year and 100‐Year storm events,  Inlet time of Concentration (Tc) and weighted runoff  coefficient  (C)  is  calculated  similar  to  the pre‐development  calculations. Input  parameters  used  to  model  the  target  pre‐development  condition  are provided  in  Table‐3  below  and  detailed  calculations  have  been  illustrated  in Appendix "B".  Table‐3  Post‐development Input Parameters  

Catchment  # 

Drainage Area (ha) 

Runoff Coefficient (C)2 and 5‐Year 

Runoff Coefficient (C) 

100‐Year 

Time of Concentration 

Tc (min.) 

CA‐1‐Post  3.35  0.79  0.88  10 

 

Page 7: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 7 of 33 

Results of the post‐development peak flow calculations by considering minimum Tc and IDF data same as the pre‐development flow calculations are provided in Table‐4  below,  and  detailed  post‐development  flow  calculations  have  been illustrated in Appendix "B".  Table‐4  Post‐development Peak Flows 

Catchment  # 

Peak Flow (m3/s) 

2‐year  5‐year  100‐year 

CA‐1‐Post  0.501  0.648  1.163 

 The  post‐development  Stormwater Management will  be  justified  by  discussing following stormwater controls:  4.3.1  Quantity Control  

Stormwater  quantity  control  is  typically  implemented  to  minimise  the potential for downstream flooding, stream bank erosion and overflow of infrastructure.  As  per  minimum  standards  provided  by  the  City  of Burlington, the post‐development peak flows for all events from the site area should be controlled in  line with the respective peak flow resulting from  the  target  pre‐development  condition  during  2‐year  to  100‐year storm events.   A  review of  the  calculated  value of  the pre‐development  and  the post‐development  peak  flows  concluded  that,  this  development  application does  not  affect  stormwater  flow  contribution  to  the  municipal  storm sewer  system  in  the  post‐development  condition  and  will  not  require providing  any  new  lot  level  quantity  control  measures  in  the  post‐development condition.  However,  a  review  of  the  site  plan  indicated  there  are  several opportunities to implement the Low Impact Development techniques that will considerably reduce the post‐development runoff rates.  A  detailed  stormwater  management  analysis  and  design  including compliance with the current stormwater quantity control criteria per the City  standards  will  be  completed  upon  availability  of  existing  on‐site servicing  information  at  the  detailed  engineering  design  stage  in conjunction with the submission of the site plan application.  4.3.2  Quality Control  In  accordance  with  the  MOE  SWM  Planning  &  Design  Manual,  various levels  of  treatment  are  defined  with  the  goal  to  maintain  or  enhance existing aquatic habitat based on the efficiency of total suspended solids (TSS) removal. In accordance with the City of Burlington standard for this site,  stormwater  should  be  treated  to  Enhanced  Protection  (Level  1)  as defined in the MOE SWM Planning & Design Manual (2003). 

Page 8: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 8 of 33 

 Currently, the site area occupied by the existing building roof and existing asphalt  parking  lot  generates uncontrolled discharge  into  the municipal network  of  storm  sewers  located within  easements  along  the  East  and West  property  lines  through  multiple  service  connections  without  any quality control measures.  A  detailed  stormwater  management  quality  control  design  including compliance with the current stormwater quality control criteria and exact sizing and model of the oil‐grit separator will be provided at the detailed engineering design  stage  in  conjunction with  the  submission of  the  site plan application. 

 4.4  Down Stream Capacity 

In  the  pre‐development  condition,  this  site  area  contributes  uncontrolled discharge into the municipal network of storm sewers located within easements along the East and West property  lines. Since, the post‐development peak flow for  all  events  from  the  site are equal  to  the  target pre‐development allowable release  during  respective  rainfall  events,  there  will  be  no  need  to  map  the downstream capacity of the existing municipal infrastructure of storm sewers.    

5.0  EROSION AND SEDIMENT CONTROL DURING CONSTRUCTION  Construction  activity,  especially  operations  involving  the  handling  of  earthen  material, dramatically increases the availability of particulate matter for erosion and transport by surface drainage. In order to mitigate the adverse environmental impacts caused by the release of silt‐‐laden  stormwater  runoff  into  receiving  watercourses,  measures  for  erosion  and  sediment control are required for construction sites.   The impact of construction on the environment is recognized  by  the  Greater  Golden  Horseshoe  Area  Conservation  Authorities.  “Erosion  & Sediment Control Guidelines for Urban Construction” released by Authority in December 2006, provides guidance for the preparation of effective erosion and sediment control plans.   Control measures must be selected  in  light of the erosion potential of  the site. The selection, implementation,  inspection,  and maintenance of  the  control  features will  be provided at  the detailed  engineering  design  stage  in  conjunction  with  the  submission  of  the  site  plan application. 

 6.0  SANITARY DRAINAGE SYSTEM  Currently the property is fully developed and serviced by the Region’s existing infrastructure of sanitary sewer located within the road allowance of Mainway. This development application does not propose any alteration to the existing private network of sanitary sewer and existing sanitary service connection. 

 6.1  Population Density 

Considering the existing and proposed use of the building falls within the similar development  type  of  Light  Industrial  Area,  the  equivalent  population 

Page 9: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 9 of 33 

accountable shall remain unchanged as 419 people in accordance with the Water and  Wastewater  Linear  Design  Manual  provided  by  the  Region  of  Halton. Detailed calculations have been illustrated in Appendix "C".  

6.2  Proposed Sanitary Flow Based on population density calculated in section 6.1 and infiltration allowance, the existing and proposed peak sanitary discharge  flow  in accordance with  the Water and Wastewater Linear Design Manual provided by the Region of Halton is estimated as 5.24 L/s. Detailed calculations have been illustrated in Appendix "C".  

 6.3  Down Stream Capacity 

Considering  no  change  in  the  site  area,  population  density  and  the  post‐development  sanitary  flow,  there  will  be  no  need  to  map  the  downstream capacity of the existing regional infrastructure of sanitary sewers.   An  analysis  of  existing  private  network  of  sanitary  sewer  and  existing  sanitary service  including  sewer  video  inspection  will  be  completed  at  the  detailed engineering  design  stage  in  conjunction  with  the  submission  of  the  site  plan application. 

 7.0  WATER SUPPLY SYSTEM  Currently the property is fully developed and serviced by the Region’s existing infrastructure of 300mm  dia  watermain  located  within  the  road  allowance  of  Mainway.  This  development application does not propose any alteration to the existing private network of watermains and existing water service connection.  

7.1  Existing & Proposed Water Supply System Considering  no  change  in  the  site  area  and  population  density,  the  post‐development domestic water  supply  requirements  for  this  site will  remain same  as  the  pre‐development  condition  of  approximately  3.0  L/s  in accordance with the Water and Wastewater Linear Design Manual provided by  the  Region  of  Halton.  Detailed  calculations  have  been  illustrated  in Appendix "D". 

 7.2  Proposed Fire Flow Requirements 

The City  of  Burlington  and Region of Halton  requires  the  fire  flow  calculations based on the Water Supply for Public Fire Protection Guidelines provided by the Fire  Underwriters  Survey  (FUS).  The  fire  flow  required  for  the  proposed development  is  estimated  at  333.33  L/s  for  4  hours,  delivered with  a  residual pressure  of  not  less  then  140  kilopascals.  Detailed  calculations  have  been illustrated in Appendix "D".  A flow and pressure test were conducted by Corix Water Services on the Region of  Halton  hydrants  connected  to  an  existing  300mm  dia  watermain  located within the North Boulevard of Mainway. The test report is included in Appendix 

Page 10: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 10 of 33 

"D". A flow of 120 L/s was measured at the Region of Halton Hydrant # H4587 connected to 250mm dia watermain on Mainway using two 2.5" orifices, which resulted  in  a  residual  pressure  of  407  kPa  at  the  Region  of  Halton  Hydrant  # H4582. Based on actual pressure test on nearby municipal hydrants, a maximum flow  of  387  L/s  can  be  achieved while maintaining  a water  pressure  of  20  psi (140  kPa).  Detailed  calculations  for  the  projected  fire  flow  at  20  psi  residual pressure is included in Appendix "D".  Above measured  available  flow  complies  with  the minimum  requirements  for fire suppression outlined in the FUS and the City guidelines.   

8.0  CONCLUSIONS AND RECOMMENDATIONS  This report is to be read in conjunction with the submission materials for the project proposal known as Proposed U‐Haul Burlington located at 3267 Mainway, Burlington, Ontario. Based on our investigation, we conclude and recommend the following: 

 8.1  STORM 

 1. This development application does not affect stormwater flow contribution 

to the municipal storm sewer system in the post‐development condition and will not require providing any new lot level quantity control measures in the post‐development condition. 

2. The post‐development peak flow for all events from the site are equal to the target pre‐development allowable  release during  respective  rainfall events. Therefore,  there  will  be  no  need  to map  the  downstream  capacity  of  the existing municipal infrastructure of storm sewers. 

3. A  detailed  stormwater  management  quality  control  design  including compliance with  the  current  stormwater  quality  control  criteria  and  exact sizing  and model  of  the  oil‐grit  separator  will  be  provided  at  the  detailed engineering design stage. 

4. Erosion and Sediment controls are to be implemented during construction to prevent  silt‐laden  runoff  from  leaving  the  site  in  accordance  with  the "Erosion & Sediment Control Guidelines for Urban Construction". 

 8.2  SANITARY  

1. The  existing  and  proposed  peak  sanitary  discharge  from  the  site  remains unchanged as 5.24 L/s. 

2. This development application does not propose any alteration to the existing private network of sanitary sewer and existing sanitary service connection. 

 8.3  WATER  

1. The existing and proposed domestic water supply requirements for the site remains unchanged as 3.0 L/s. 

Page 11: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 11 of 33 

2. The fire flow required for the proposed development is estimated at 333.33 L/s  for  4  hours,  delivered  with  a  residual  pressure  of  not  less  than  140 kilopascals. 

3. A flow and pressure test conducted on the municipal hydrants confirms that a  maximum  flow  of  387  L/s  can  be  achieved  while  maintaining  a  water pressure of 20 psi (140 kPa). 

4. This development application does not propose any alteration to the existing private network of watermains and existing water service connection.  

We trust that this report satisfies the requirements of the Town of Milton and Region of Halton with  respect  to  the  subject development.  Should you have any questions, please  feel  free  to contact the undersigned.  Yours truly, FLORA DESIGNS INC. 

 Chirag C. Patel, P.Eng, PMP Senior Project Manager                          

Page 12: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 12 of 33 

Appendix "A"  Plans  

Site Location Map 

Site Survey Drawing 

Architectural Site Plan 

Conceptual Servicing Plan                           

              

Page 13: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 13 of 33 

SITE LOCATION MAP                         (Not to Scale)   

                

Page 14: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 14 of 33 

SITE SURVEY DRAWING                   (Not to Scale) 

 

Page 15: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 15 of 33 

ARCHITECTURAL SITE PLAN                  (Not to Scale) 

 

Page 16: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 16 of 33 

CONCEPTUAL SERVICING PLAN                (Not to Scale) 

 

Page 17: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 17 of 33 

Appendix "B"  Stormwater Management  

IDF Curve of City of Burlington 

Runoff Coefficient Calculations (C) 

Pre‐development Storm Drainage Plan 

Pre‐development Peak Flow Calculations 

Post‐development Storm Drainage Plan 

Post‐development Peak Flow Calculations                                       

Page 18: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 18 of 33 

IDF CURVE ‐ CITY OF BURLINGTON   

(In Accordance with Drawing No.S-IDF)

Parameters Return Period

2-year 5-year 10-year 25-year 50-year 100-year Coefficient ( A ) 592.60 697.40 798.50 926.90 1019.40 1114.20 Coefficient ( C ) 6.00 5.00 5.00 5.00 5.00 5.00

Exponent ( B ) -0.780 -0.764 -0.763 -0.762 -0.761 -0.761

                    

Page 19: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 19 of 33 

RUNOFF COEFFICIENT CALCULATIONS (C)  

In accordance with the Engineering Standard Drawing No S-3D, City of Burlington

Character of Surface

Runoff Coeff. "C"

for 2 and 5-year

Runoff Coeff. "C" for

100-year

Lawns - Average Slope, 2% to 7% 0.20 0.25

Asphalt, Concrete and Roofs 0.90 1.00

Pre-Development Drainage Area

Catchment # Area (m2) %

Impervious Composite Runoff Coeff. "C"

Impervious Total 2 and 5-year 100-year

CA-1-Pre 28222.81 33512.14 84.22 0.79 0.88

Post-Development Drainage Area

Catchment # Area (m2) %

Impervious Composite Runoff Coeff. "C"

Impervious Total 2 and 5-year 100-year

CA-1-Post 28207.89 33512.14 84.17 0.79 0.88

Runoff Coefficient ( C )

For 2 and 5-year C = 0.9 i + 0.2 (1 - i), Where i = Imperviousness Ratio

For 100-year C = 1 i + 0.25 (1 - i), Where i = Imperviousness Ratio

                       

Page 20: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 20 of 33 

PRE‐DEVELOPMENT STORM DRAINAGE PLAN            (Not to Scale) 

 

Page 21: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 21 of 33 

PRE‐DEVELOPMENT PEAK FLOW CALCULATIONS  

Catchment # Drainage

Area

Runoff Coeff. "C" for

2 and 5-year

Runoff Coeff. "C" for

100-year

Time of Concentration

"A" in Hector "C" "C" "Tc" in Minute CA-1-Pre 3.35 0.79 0.88 10

Rational Method Calculation:

Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in litre/sec A = Drainage Area in Hectors C = Runoff Coefficient I = Average Rainfall Intensity - mm/h Event 2 yr IDF Data Set, City of Burlington Coefficient, a = 592.60 Coefficient, b = 6.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.780

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Pre 3.35 68.16 0.79 501.49 0.501

Event 5 yr IDF Data Set, City of Burlington Coefficient, a = 697.40 Coefficient, b = 5.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.764

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Pre 3.35 88.09 0.79 648.13 0.648

Event 100 yr IDF Data Set, City of Burlington Coefficient, a = 1114.20 Coefficient, b = 5.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.761

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Pre 3.35 141.89 0.88 1162.87 1.163

         

Page 22: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 22 of 33 

POST‐DEVELOPMENT STORM DRAINAGE PLAN            (Not to Scale) 

 

Page 23: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 23 of 33 

POST‐DEVELOPMENT PEAK FLOW CALCULATIONS  

Catchment # Drainage

Area

Runoff Coeff. "C" for

2 and 5-year

Runoff Coeff. "C" for

100-year

Time of Concentration

"A" in Hector "C" "C" "Tc" in Minute CA-1-Post 3.35 0.79 0.88 10

Rational Method Calculation:

Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in litre/sec A = Drainage Area in Hectors C = Runoff Coefficient I = Average Rainfall Intensity - mm/h Event 2 yr IDF Data Set, City of Burlington Coefficient, a = 592.60 Coefficient, b = 6.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.780

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Post 3.35 68.16 0.79 501.49 0.501

Event 5 yr IDF Data Set, City of Burlington Coefficient, a = 697.40 Coefficient, b = 5.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.764

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Post 3.35 88.09 0.79 648.13 0.648

Event 100 yr IDF Data Set, City of Burlington Coefficient, a = 1114.20 Coefficient, b = 5.00 ( I ) = a * (Tc + b)^c Exponent, c = -0.761

Catchment # A

(ha) I

(mm/h) C

Q (L/s)

Q (m3/s)

CA-1-Post 3.35 141.89 0.88 1162.87 1.163            

Page 24: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 24 of 33 

Appendix "C"  Sanitary Drainage System  

Population Density Calculations Pre‐development & Post‐development Sanitary Flow Calculations

Page 25: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 25 of 33 

POPULATION DENSITY CALCULATIONS  

(According to Table 2-1, Water and Wastewater Linear Design Manual, Region of Halton)

Development Type Equivalent

population density(Persons/ha)

Area of Site (ha)

Population (Persons)

Light Industrial Areas 125 3.35 419 Post-development population density (According to Table 2-1, Water and Wastewater Linear Design Manual, Region of Halton)

Development Type Equivalent

population density(Persons/ha)

Area of Site (ha)

Population (Persons)

Light Industrial Areas 125 3.35 419

Page 26: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 26 of 33 

PRE‐DEVELOPMENT & POST‐DEVELOPMENT SANITARY FLOW CALCULATIONS 

Gross Site Area (A) = 3.35 ha Industrial Dry Weather Flow (Table 3-2, Water and Wastewater Linear Design Manual, Region of Halton)

Type of Development

Equivalent Population

Density (Persons/ha)

Unit Sewage Flow (m3/ha/day)

Unit Sewage Flow

(L/ha/s)

Light Industrial Areas 125 34.375 0.39786 Dry Weather Flow

Commercial Unit Sewage Flow (q) = 34375 L/ ha/ Day

Average Dry Weather Flow = ( ( A * q ) / 86400 ) = 1.33 L/Sec

Modified Harmon Peaking Factor (For Commercial and Industrial Land Use)

Design Population (P) = 0.419 In thousand

Harmon Peaking Factor (M) = 0.80 x ( 1 + ( 14 / ( 4 + P^0.5) ) ) (M) = 3.210

Infiltration Allowance

Infiltration Allowance (I) = 0.286 L/ha. Sec Design Flow

Design Flows (Q) = Average Dry

Weather Flow x

Average Peak

Wastewater + Flow Factor

Infiltration Allowance

(I x A)

Design Flows (Q) = 5.24 L/Sec

Page 27: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 27 of 33 

Appendix "D"  Water Supply System  

Pre‐development & Post‐development Water Supply Requirement Calculations 

Post‐development Fire Flow Requirement Calculations Fire Protection Calculations Fire Flow Test Report

Page 28: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 28 of 33 

PRE‐DEVELOPMENT & POST‐DEVELOPMENT WATER SUPPLY REQUIREMENT CALCULATIONS   

Gross Site Area (A) = 3.35 ha Design water Demand is greater of following;

a) Max. Daily Demand Plus Fire Flowb) Max. Hourly Demand

Equivalent Population Density and Water Service Connection Demand

(Table 2-1, Water and Wastewater Linear Design Manual, Region of Halton) Type of Development Equivalent

Population Density

(Persons/ha)

Average Day Service

Demands (m3/ha/day)

Light Industrial Areas 125 34.375 Design Factors (Clause 2.4.1 & Table 2-2, Water and Wastewater Linear Design Manual, Region of Halton)Type of Development Average Daily

Demand L/Cap

Maximum Daily Demand Factor

Maximum Hourly Demand

Factor

Light Industrial Areas 275 2.25 2.25

Water Supply Requirements Design Water Demand Population

(Persons) Per capita demand

L/Cap/day

Volume Required

L/day

Volume Required

L/sec

Max. Daily Demand 419 618.75 259257 3.00 Max. Hourly Demand 419 618.75 259257 3.00

                    

Page 29: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 29 of 33 

POST‐DEVELOPMENT FIRE FLOW REQUIREMENT CALCULATIONS  The Fire Underwriters Survey requires that a minimum water supply source "F" be provided at 140 kPa.

1 Estimate of Required Fire Flow

F = 220 * C * (A)^0.5

Where => F = Required Fire Flow (L/min) C = Coefficient related to construction A = Total Area (m2) Determining "C" C = 0.8 For non-combustible construction Determining "A"

A = Largest floor area + 25% of each of the two immediately

adjoining floors

For fire-resistive buildings, in which vertical openings are properly protected (1HR)

Largest Floor Area = 11,509.74 m2 First Floor

1st adjoining Floor Area = 2,983.66 m2 Second Floor

2nd adjoining Floor Area = 0.00 m2

A = 12,255.66 m2 So that, F = 19,000.00 L/min. (Rounded per FUS Guide Page # 20)

2 Addition / Reduction for occupancy type

Increased by 25% For the occupancies having high contents of fire hazard

So that, F = 23,750.00 L/min.

3 Reduction for sprinkler system Reduced by -30% Adequately designed sprinkler system per NFPA

4 Addition for structures exposed within distance of fire area Side Distance (m) % Addition North 32.5 5% South None 0% East 29.4 10% West 47.7 0% Total 15% Shall not exceed 75%

Net Reduction / Addition for step 3 & 4 Reduced by -15% So that, F = 20000.00 L/min. (Rounded per FUS Guide Page # 20)

N.B. - As per FUS requirements fire flow shall not exceed 45000 L/min nor be less the 2000 L/min.

Therefore, the fire flow required is =

20000.00 L/min. 333.33 L/sec 5283.44 USGPM 4402.87 Imp. GPM

Page 30: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 30 of 33 

FIRE PROTECTION CALCULATIONS  

(According to the National Fire Protection Association (NFPA) Guidelines)

MUNICIPALITY: City of Burlington

PROJECT NAME: U-Haul, Burlington

PROJECT No: 18347

Location of Test (FLOW) 3285 Mainway, Hydrant # H4587 Location of Test (RESIDUAL) 3267 Mainway, Hydrant # H4582

Mainline Pipe Size 250 mm Ø

Observed Flow From Hydrant Test Qf = 29.83 * c * (d2)*(p1/2)

Projected Fire Flow Qr = Qf*((Ps-Prd)/(Ps-Pra)

Test # # of

Nozzle/ Orifice

Nozzle/ Orifice

Dia. d (in)

Discharge Coeff. (c)

Static Pressure(Ps) (psi)

Pitot Pressure(Pp) (psi)

Actual Residual Pressure(Pra) (psi)

Qf (USGPM)

Desired Residual Pressure (Prd) (psi)

Qr (USGPM)

Qr (L/sec)

1 1 1.125 0.991 64 60 63 290 20 2239 142 2 1 1.75 0.994 64 54 62 668 20 3546 224 3 1 2.5 0.897 64 46 60 1135 20 4144 262 4 2 2.5 0.898 64 32 59 1894 20 6130 387

                          

Page 31: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 31 of 33 

FIRE FLOW TEST REPORT 

 

Page 32: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 32 of 33 

Appendix "E"  Statement  of  Limiting  Conditions  and Assumptions 

                                           

Page 33: FUNCTIONAL SERVICING REPORT - Burlington

Functional Servicing Report    City File # 00‐00 U‐Haul Burlington, 3267 Mainway, Burlington, ON    FD Proj # 018347 

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    Page 33 of 33 

Statement of Limiting Conditions and Assumptions  

1. This Report/Study (the "Work") has been prepared at the request of, and for the exclusive use of, the Owner, and its affiliates (the "Intended Users"). No one other than the intended users has the right to use and rely on the work without first obtaining the written authorization of FLORA DESIGNS and its Owners. 

2. The comments, recommendations and material in this report reflect Flora Designs best judgement in light of the  information  available  to  it  at  the  time  of  preparation  of  this  report.  It  is  not  qualified  to  and  is  not providing legal or planning advice in this work. 

3. Flora Designs expressly excludes  liability to any third party except the Intended Users for any use of, and/or reliance upon, the work. 

4. Flora Designs notes that the following assumptions were made in completing the work a)  The land use description(s) supplied to Flora Designs are correct b)  The surveys and other data supplied to Flora Designs by the Owner are accurate c)  Market  timing,  approval delivery  and  secondary  information  is within  the  control of parties other  than 

Flora Designs d)  There are no encroachments, leases, covenants, binding agreements, restrictions, pledges, charges, liens 

or  special  assessments  outstanding,  or  encumbrances,  which  would  significantly  affect  the  use  or servicing 

Investigations have not carried out to verify these assumptions. Flora Designs deems the sources of data and statistical  information  contained  herein  to  be  reliable,  but  we  extend  no  guarantee  of  accuracy  in  these respect. 

5. All the plans, photographs, and sketches prepared and presented in this report/study are included solely to aid the  visualizing  the  location  of  the  property,  the  boundaries  of  the  site,  and  the  relative  position  of  the improvements on the said lands are based on information provided by Owner 

6. Flora Designs accepts no responsibility for legal interpretations, questions of survey, opinion of title, hidden or inconspicuous conditions of the property, toxic wastes or contaminated materials, soil or sub soil conditions, environmental, engineering or other factual and technical matters disclosed by the owner, the clients, or any public agency, which by their nature, may change the outcome of the work.  

7. In  the  preparation  of  this  report,  Flora  Designs  have  made  investigations  from  secondary  sources  as documented  in  the  work,  but  did  not  checked  compliance  with  by‐laws,  codes,  agency  and  government regulations, etc., unless specifically noted in the work. 

8. The value of proposed improvements should apply only with regard to the purpose and function of the work, as outlined in the body of this work. Any cost estimated set out in the work based on construction averages and subject to change. 

9. Neither possession of Work, nor a copy of it, carries the right of publication. All copyright in the work reserved to Flora Designs and considered confidential by Flora Designs. The Work shall not be disclosed, reproduced, quoted  from,  or  referred  to,  in whole  or  in  part,  or  published  in  any manner, without  the  express written consent of Flora Designs and the Owner. 