front page
DESCRIPTION
front pageTRANSCRIPT
PROJECT TITLE
Troubleshooting & Optimization of Malfuctioned PLC conrolled
Rectification Plant
A Major Qualifying Project ReportSubmitted to the Faculty
of theChemical engineering
in partial fulfillment of the requirements for the
Degree of Bachelor of Sciencein Chemical Engineering
Project Supervised by:
Engr Abdul Waheed Bhutto
Project Submitted by:
Hasham Bin Tahir (Team Leader) D10CH-1274
Rana Muhammad Yousuf D10CH-1276
ArsalanAkram D10CH-1212
Syed Mojiz Abbas D10CH-12
Ali RazaAbbasi D10CH-12
Iqra D10CH-12
Department of Chemical engineering
Dawood University of Engineering & Technology
January 25,2014
Acknowledgement
This is to express our sincerest gratitude to Department of Chemical Engineering for providing us this opportunity to experience& Trouble shoot the Unit operation Laboratory Equipment DN 80 RECTIFICATION COLUMN.
The project has not only enhanced out Multitasking and Team building skills but also has made us practical aware of other aspects of manufacturing, safety, scheduling, economics, maintenance, etc. that are important and valuable components of our education and requisites of a successful professional.
We are grateful for the guidance and the friendly and caring with which we are treated through our Project working tenure. We should specifically like to thank the Lab Engineers and Staff who were kind enough to impart the valuable expertise and knowledge.
Special Thanks to our Supervisor of the Project under whom Leadership we being able to make this Project result oriented.
Thanks to
Engr Abdul Waheed BhuttoChairman Department of Chemical Engineering
Engr Mr Ghulamullah MateloLab Engineer Unit Operation Laboratory