from the beginning design standards and other post-construction program elements

15
From the Beginning From the Beginning Design Standards and Other Post-Construction Program Elements

Upload: shavonne-hancock

Post on 14-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: From the Beginning Design Standards and Other Post-Construction Program Elements

From the From the BeginningBeginning

Design Standards and Other Post-Construction Program

Elements

Page 2: From the Beginning Design Standards and Other Post-Construction Program Elements

Post-Construction BMPsPost-Construction BMPs

Long term BMPs that help protect runoff throughout the life of the

completed project

Page 3: From the Beginning Design Standards and Other Post-Construction Program Elements

Impervious AreaImpervious Area

• More runoff, More Pollutants

Page 4: From the Beginning Design Standards and Other Post-Construction Program Elements

Post Construction GoalsPost Construction Goals

Water Quality Goals

– Reduce impervious area

– Limit pollutant exposure

– Diminish pollutant transport

Program Goals– Process to

ensure that “Water Quality Goals” are met

Page 5: From the Beginning Design Standards and Other Post-Construction Program Elements

ProgramProgram

• Ordinance requiring developers to incorporate post construction BMPs

• Strategy of BMPs • Enforcement of ordinance• Long-term operation and

maintenance of BMPs

Page 6: From the Beginning Design Standards and Other Post-Construction Program Elements

OrdinanceOrdinance

• Model Ordinance– www.stormwatercenter.net– Model Urban Runoff Program

• Reference to separate document

Page 7: From the Beginning Design Standards and Other Post-Construction Program Elements

BMP StrategyBMP Strategy• Site and watershed conditions

– constraints– topography– areas to utilize

• Pollutants of concern– 303(d) list– pollutants expected to be present

• Options• Sizing

Page 8: From the Beginning Design Standards and Other Post-Construction Program Elements

BMPsBMPs

Site Design

Source Control

Treatment

Page 9: From the Beginning Design Standards and Other Post-Construction Program Elements

Site DesignSite Design

• Minimize building footprint• Cluster development (leaving more

useful open space)• Minimize directly connected

impervious areas (DCIA) – direct roof downspouts to landscape areas

• Protect slopes and channels• Aquatic buffers

Page 10: From the Beginning Design Standards and Other Post-Construction Program Elements

Source ControlSource Control

• Outdoor material storage areas• Trash enclosures• Equipment wash areas

Page 11: From the Beginning Design Standards and Other Post-Construction Program Elements

TreatmentTreatment

• Vegetated swales• Detention basins• Constructed wetlands

Page 12: From the Beginning Design Standards and Other Post-Construction Program Elements

RequirementsRequirements

• Attachment 4 - Design Standards

• Conserve Natural Areas

• Limit Directly Connected Impervious Area

• Parking Lots

• Restaurants• Retail Gasoline

Outlets• Vehicle

Equipment Wash Areas

• Storage Volume • Treatment Flow

Page 13: From the Beginning Design Standards and Other Post-Construction Program Elements

EnforcementEnforcement

• Site Plan Review– Checklist

• Site Inspection– As part of final approval

Page 14: From the Beginning Design Standards and Other Post-Construction Program Elements

MaintenanceMaintenance

• Legal agreements• Conditional use permits• Homeowner’s association• Conditions, covenants, and

restrictions• Databases• Inspections checklists