frm i webinar

30
© EduPristine – www.edupristine.com Last Minute Doubts & Questions about FRMI Exam

Upload: edupristine

Post on 12-May-2015

449 views

Category:

Education


4 download

TRANSCRIPT

Page 1: FRM I Webinar

© EduPristine  FRM‐I© EduPristine – www.edupristine.com

Last Minute Doubts & Questions about FRM‐I Exam

Page 2: FRM I Webinar

© EduPristine  FRM‐I

Question 1 – FRM Exam 2008‐F

A portfolio has an average return over the last year of 13.2%. Its benchmark has provided an average return over the same period of 12.3%. The portfolio’s standard deviation is 15.3%, its beta is 1.15, its tracking error volatility is 6.5% and its semi‐standard deviation is 9.4%. Lastly the risk free rate is 4.5%. Calculate the portfolio’s Information Ratio (IR). 

A. 0.569B. 0.076C. 0.138D. 0.096

1

Page 3: FRM I Webinar

© EduPristine  FRM‐I

Answer

C.• Information Ratio = (Average Return on the Portfolio – Average Return on the benchmark)/Tracking Error 

Volatility • IR  = (13.2 – 12.3)/6.5 =  0.138 • This question tests whether the candidate knows the information ratio. It has a number of destructors that 

make it difficult to ‘guess’ the formula• A. Incorrect.  • B. Incorrect.  • D. Incorrect.  

2

Page 4: FRM I Webinar

© EduPristine  FRM‐I

Question 2

Albert Franklin wants to estimate the market risk premium for the stock of Arlene Pipes Company. He gathers the following information:1. Expected Return for Arlene  10.75%2. Risk free rate 6.00%3. Beta for Arlene 0.60  

He believes that stock of Arlene Pipes is fairly priced. Based on above information Market risk Premium for Arlene Pipes Company is closest to:

A. 1.75%B. 14%C. 8%D. 4.75%

3

Page 5: FRM I Webinar

© EduPristine  FRM‐I

Answer 

C (chapter 3, FRM)• Using CAPM Model• 10.75%=6%+0.6(E(RM)‐Rf)• (E(RM)‐Rf)=(10.75%‐6%)/0.6• (E(RM)‐Rf)=7.92%(close to 8%)

4

Page 6: FRM I Webinar

© EduPristine  FRM‐I

Question 3 – FRM Exam 2009`

An investment bank uses the Exponentially Weighted Moving Average (EWMA) technique with lambda of 0.9 to model the daily volatility of a security. The current estimate of the daily volatility is 1.5%. The closing price of the security is USD 20 yesterday and USD 18 today. Using continuously compounded returns, what is the updated estimate of the volatility?

A. 5.44%B. 3.62%C. 2.96%D. 1.31%

5

Page 7: FRM I Webinar

© EduPristine  FRM‐I

Answer

B.The current return of the security is = ln (18/20) = ‐10.536%. Using an EWMA model, the updated volatility is given as: V(t) = {lambda* ((V[t‐1]^2) +(1 – lambda)*(current return^2)} ^ 0.5= {0.9 * ((0.015^2) + (1 ‐ 0.9) * ( ‐0.10536^2 )} ^ 0.5= 3.62%• INCORRECT: A – Forgets to square the volatility terms• INCORRECT: C – Forgets to square the volatility terms and to take the square root of the resulting variance, 

then miscalculates conversion to percentage.• INCORRECT: D – Forgets to take the square root of the variance, then miscalculates conversion to 

percentage.

6

Page 8: FRM I Webinar

© EduPristine  FRM‐I

Question 4 – FRM Exam 2008

A factor analysis of the dividend‐adjusted returns of ABC Ltd.’s stock price was undertaken to determine which economic factors contributed to its performance. The regression was performed on 460 observations. The results are as follows:

Which one of the following options correctly describes which variables are significant at the 5% level, and the R2 statistic, respectively? Significant Variables at 5%  level R2 statistic

A. Intercept; Industrial_index 0.924834B. Intercept; Industrial_index 0.075166C. All_share_index; Industrial_Index 0.924834D. All_share_index; Industrial_Index 0.075166

7

Table 1:

Predictor Coeffecient Standard Error of Coefficient

Intercept ‐0.0243 0.005772

All_Share_Index 0.0256 0.017655

Industrial_Index 0.0469 0.006398

Financial_Index 0.0012 0.001412

Table 2

Sum of squared regression (SSR) 12,466,47

Sum of squared Errors (SSE) 1,013.22

Sum of Squared Total (SST) 13,479.69

Page 9: FRM I Webinar

© EduPristine  FRM‐I

Answer

A.• The following table shows the test statistics for each of the four variables, calculated by dividing the variable 

coefficient by the standard error . The variable is significant if the absolute value of the t‐stat is greater than the critical value from the student’s t‐distribution for 456 degrees of freedom (which is very close to the z‐statistic since the number of observations is so high), i.e. 1.96. Predictor t‐stat Significant?

• Intercept ‐.0243/0.005772 = ‐4.21 Yes • All_share_index .0256/0.017655 = 1.45 No• Industrial_index .0469/0.006398 = 7.33 Yes• Financial_index .0012/0.001412 = 0.85 No• The R2 statistic is defined as the ratio of SSR/SST = 12,466.47/13,479.69 = 0.924834. 

8

Page 10: FRM I Webinar

© EduPristine  FRM‐I

Question 5 – FRM Sample Paper 2011

The following GARCH(1,1) model is used to forecast the daily return variance of an asset:σn2 = 0.000005 + 0.05u2n‐1 + 0.92σ2n‐1Suppose the estimate of the volatility today is 5.0% and the asset return is ‐2.0%. What is the estimate of the long‐run average volatility per day?

A. 1.29%B. 1.73%C. 1.85%D. 1.91%

9

Page 11: FRM I Webinar

© EduPristine  FRM‐I

Answer

A.• The model corresponds to α = 0.05, β = 0.92, and ω = 0.000005. Because γ = 1− α− β, it follows that γ =  

0.03.• Because the long‐run average variance, VL, can be found by VL = ω / γ , it follows that VL = 0.000167. In 

other words, the long‐run average volatility per day implied by the model is sqrt(0. 000167) = 1.29%.

10

Page 12: FRM I Webinar

© EduPristine  FRM‐I

Question 6 – FRM Sample Paper 2006

Consider an equity portfolio with market value of USD 100M and a beta of 1.5 with respect to the S&P 500 Index. The current S&P 500 index level is 1000 and each futures contract is for delivery of USD 250 times the index level. Which of the following strategy will reduce the beta of the equity portfolio to 0.8?

A. Long 600 S&P 500 futures contractsB. Short 600 S&P 500 futures contractsC. Long 280 S&P 500 futures contractsD. Short 280 S&P 500 futures contracts

11

Page 13: FRM I Webinar

© EduPristine  FRM‐I

Answer

D.• To reduce the beta of a portfolio, one needs to lower the position’s exposure to the market. Thus, one needs 

to short futures contracts. The number of futures contracts, N, is:

• Thus, one needs to short 280 futures contracts

12

contractFuturesoneofSizePositionspotofSizeN oldnew )(

2801000*250

000,000,100)5.18.0(

Page 14: FRM I Webinar

© EduPristine  FRM‐I

Question 7‐ FRM Sample Paper 2007

An investor enters into a short position in a gold futures contract at USD 294.20. Each futures contract controls 100 troy ounces.  The initial margin is USD 3,200, and the maintenance margin is USD 2,900.  At the end of the first day, the futures price drops to USD 286.6.  Which of the following is the amount is the variation margin at the end of the first day? 

A. 0 B. USD 34 C. USD 334 D. USD 760 

13

Page 15: FRM I Webinar

© EduPristine  FRM‐I

Answer

A.• Since the investor is shorting the futures contract, she/he gains when the futures price goes down.  At the 

end of the first day, the investor has a gain of (294.2 – 286.6) * 100 = $ 760.  Therefore, no variation margin is needed

14

Page 16: FRM I Webinar

© EduPristine  FRM‐I

Question 8 – FRM Sample Paper 2011

Alan bought a futures contract on a commodity on the New York Commodity Exchange on June 1. The futures price was USD 500 per unit and the contract size was 100 units per contract. Alan set up a margin account with initial margin of USD 2,000 per contract and maintenance margin of USD 1,000 per contract. The futures price of the commodity varied as shown below. What was the balance in Alan’s margin account at the end of day on June 5?Day Futures Price (USD)June 1 497.30June 2 492.70June 3 484.20June 4 471.70June 5 468.80

A. USD 1,120B. USD 0C. USD 880D. USD 1,710

15

Page 17: FRM I Webinar

© EduPristine  FRM‐I

Answer

D.

16

Day Future’s Price Daily Gain (Loss) Cumulative Gain (Loss)

Margin Account Balance

Margin Call

June 1 497.30 (270) (270) 1730

June 2 492.70 (460) (730) 1270

June 3 484.20 (850) (1580) 420 1580

June 4 471.70 (1250) (2830) 750 1250

June 5 468.80 (290) (3120) 1710

Page 18: FRM I Webinar

© EduPristine  FRM‐I

Question 9

The USD interest rate is 4% per annum and the AUD rate is 6% per annum. Assume that the term structure of interest rates is flat in the US and Australia. Assume current value of AUD to be $0.91. Company ABC, under the terms of a swap agreement, pays 7% per annum in AUD and receives 3% per annum in US$. The principal in the US is 10million USD and that in Australia is 11million AUD. Payments are exchanged each year and the swap will last for 3 more years. Determine the value of swap assuming continuous compounding in all interest rates.

17

Page 19: FRM I Webinar

© EduPristine  FRM‐I

Solution

18

Valuation of currency swap in terms of bonds (millions):

Value of swap in million $ = 11.294*0.91 – 9.7225= $0.5448 million

Page 20: FRM I Webinar

© EduPristine  FRM‐I

Question 10 ‐ FRM Sample Paper 2012

A portfolio has a current market value equal to USD 6,247,000 with a daily variance of 0.0002. Assuming there are 250 trading days in a year and that the portfolio return follow  a normal distribution. The estimate of annual VaR at 95% confidence level is closes to which of the following?

A. USD 32595B. USD 145,770C. USD 2,297,854D. USD 2,737,868

19

Page 21: FRM I Webinar

© EduPristine  FRM‐I

Answer

CDaily standard deviation = sqrt ( 0.0002) = 0.01414Annual VaR = 6247000 * sqrt (250) * 0.01414 * 1.645= 2,297,854

20

Page 22: FRM I Webinar

© EduPristine  FRM‐I

Question 11 – FRM Exam 2006

Given the following 30 ordered simulated percentage returns of an asset, calculate the VAR and expected shortfall (both expressed in terms of returns) at a 90% confidence level.‐16, ‐14, ‐10, ‐7, ‐7, ‐5, ‐4, ‐4, ‐4, ‐3, ‐1, ‐1, 0, 0, 0, 1, 2, 2, 4, 6, 7, 8, 9,11, 12, 12, 14, 18, 21, 23

A. VAR (90%) = 10, Expected shortfall = 14B. VAR (90%) = 10, Expected shortfall = 15C. VaR (90%) = 14, Expected shortfall = 15D. VaR (90%) = 18, Expected shortfall = 22

21

Page 23: FRM I Webinar

© EduPristine  FRM‐I

Answer

B.• Ten percent of the observations will fall at or below the 3rd lowest observation of the 30 listed. Therefore, 

the VaR equals 10. The expected shortfall is the mean of the observations exceeding the VaR. Thus, the expected shortfall equals (16 + 14) / 2 = 15

22

Page 24: FRM I Webinar

© EduPristine  FRM‐I

Question 12 – FRM Exam 2006

A portfolio is composed of two securities and has the following characteristics• Investment in security A = USD 1,500,000• Investment in security B = USD 3,000,000• Volatility of security A = 7%• Volatility of security B = 3%• Correlation between security A and B = 10%

What is the closest answer for the portfolio diversified VAR at 95% confident level?

A. USD 7,351B. USD 212,920C. USD 365,715D. USD 234,630

23

Page 25: FRM I Webinar

© EduPristine  FRM‐I

Answer

D.• To calculate the VAR of the portfolio, we first must calculate the volatility of the portfolio, σ. The variance of 

the portfolio equals:• σ2 = (1/3)2 (7%)2 + (2/3)2 (3%)2 + 2*(1/3)*(2/3)*10%*7%*3% = 0.001, Thus, σ = 0.0316• Assuming a 95% confidence interval, VAR = 1.65 * 0.0316 * 4,500,000 = 234,630

24

Page 26: FRM I Webinar

© EduPristine  FRM‐I

Question 13 – FRM Exam 2011

Consider a bond with par value of EUR 1,000 maturity in 3 years, and that pays a coupon of 5% annually.The spot rate curve is as follows:

The value of the bond is closest to:

A. EUR 904B. EUR 924C. EUR 930D. EUR 950

25

Term Annual Spot Interest Rate

1 6%

2 7%

3 8%

Page 27: FRM I Webinar

© EduPristine  FRM‐I

Answer

B.• Using spot rates, the value of the bond is:• 50/(1.06) + 50/[(1.07)^2] + 1050/[(1.08)^3] = 924.37

26

Page 28: FRM I Webinar

© EduPristine  FRM‐I

Financial Risk Manager‐ Fast Track Study Packages

Give us a chance to hand hold your FRM prep with our brilliantly coordinated set of topic‐wise quizzes, video tutorials, summarized recordings and mock tests etc. To leverage your FRM Exam prep we have compiled all of this crisp & relevant information in the form of 3 exclusive online crash courses.

You can choose the Package most suitable to you and kickstart your FRM preparation.

FRM ‐Mock Tests & Questions to check your Preparation Level 2 Proctored Mock Tests 800+ Topic wise Quiz Questions 24 x 7 Access to Discussion ForumsPrice: USD 60

FRM ‐ Complete Package of Webinars, Video Tutorials & Question Bank (Pro) FRM Basic package worth USD 147 Doubt Solving on Forums Live Online TrainingsPrice: USD 397

FRM ‐ Tests & Video Tutorials for Quick Preparation (Basic) 2 Proctored Mock Tests & 800+ Questions worth USD 60. 50+ Hrs of Online Lecture Recordings 15+ Hrs Summarized Recordings Topic wise notes for easy reference 24 x 7 Access to Discussion Forums.Price: USD 197

Contact Us...Feel free to contact us in case of any further queries regarding Level I FRM Exam Preparation.

You can Call us at: +1 347 647 9001  orEmail us at: [email protected]

Stay Tuned.. www.edupristine.com/ca

About EdupristineEduPristine holds a profound history in training Risk Professionals across the globe. It has been an International Authorized Training provider for FRM trainings since past four years. It is also registered with GARP as an Approved Provider of Continuing Professional Education (CPE) credits. EduPristine's program on "Operational Risk Modeling" and “Financial Modeling” qualify for GARP CPE credit hours. 

Buy Now Buy Now

Buy Now

27

Page 29: FRM I Webinar

© EduPristine  FRM‐I

Formula Sheet

http://goo.gl/ZQjlMo (Google plus)

https://www.facebook.com/edupristine.inc (Facebook)

28

Page 30: FRM I Webinar

© EduPristine – www.edupristine.com

Thank You !

[email protected]