INDONESIA - MANADO SOEKARNO BRIDGE Cable Stayed Bridge Description of the Project: Location Manado – Sulawesi – Indonesia Structures Supply and installation of 11 pair of cable stayed on a new seashore road and balanced cantilever bridge (120 meters total length) connecting to a single-pylon cable stayed bridge (372 meters total length) over Manado Harbour. Project value 28,9 billion IDR (2 000 k€) Position and responsibility : Project Manager in charge of : Managing and developing a good relationship with the Main Contractor and the Owner Representatives. Coordinating actions with the design manager of the bridge, to make sure design is fitting with Freyssinet works and reach the quality expected. Follow-up of Main Contractor target program. Preparation & negotiation of amendment and extra works. Identifying potential technical / financial risks and establishing preventive measures to ensure protection of Freyssinet interests. Managing site works in accordance with contract requirements and DGP (Major Project Department) standards regarding HSE. Management of site team (local staff and expatriate). Generating and monitoring budget objectives for Freyssinet works, included monthly forecast. Putting in place a snagging process in order to deliver a high quality works for the satisfaction of the Main Contractor and the Client. Client:. Kementrian Pekerjaan Umum (Public Work Ministry) Consultant: PT. Partono Fondas Contractor: PT Hutama Karya Sub-Contractor: FREYSSINEY Construction: May 2011 – Mar 2015 Freyssinet H2000 Parallel Strand System (PSS) cable stays: + 130 Ton of stay cable + 88 anchorages Kementrian Pekerjaan Umum François REMOND Engineer with specialisation in civil and environmental engineering [email protected] This document is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of François REMOND

Upload: francois-remond

Post on 21-Aug-2015

18 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: FREY - MANADO BRIDGE

INDONESIA - MANADO

SOEKARNO BRIDGE

Cable Stayed Bridge

Description of the Project:

Location Manado – Sulawesi – Indonesia

Structures Supply and installation of 11 pair of cable stayed on a new seashore road and balanced cantileverbridge (120 meters total length) connecting to a single-pylon cable stayed bridge (372 meters totallength) over Manado Harbour.

Project value 28,9 billion IDR (2 000 k€)

Position and responsibility :

Project Manager in charge of :� Managing and developing a good relationship with the Main Contractor and the Owner

Representatives.� Coordinating actions with the design manager of the bridge, to make sure design is fitting with

Freyssinet works and reach the quality expected.� Follow-up of Main Contractor target program.� Preparation & negotiation of amendment and extra works.� Identifying potential technical / financial risks and establishing preventive measures to ensure

protection of Freyssinet interests.� Managing site works in accordance with contract requirements and DGP (Major Project Department)

standards regarding HSE.� Management of site team (local staff and expatriate).� Generating and monitoring budget objectives for Freyssinet works, included monthly forecast.� Putting in place a snagging process in order to deliver a high quality works for the satisfaction of the

Main Contractor and the Client.

Client:. Kementrian Pekerjaan Umum(Public Work Ministry)

Consultant: PT. Partono Fondas

Contractor: PT Hutama Karya

Sub-Contractor: FREYSSINEY

Construction: May 2011 – Mar 2015

Freyssinet H2000 Parallel

Strand System (PSS)

cable stays:

+ 130 Ton of stay cable

+ 88 anchorages

Kementrian

Pekerjaan

Umum

François REMOND

Engineer with specialisation in civil and environmental engineering

[email protected]

This document is confidential and may not be used, reproduced or

communicated either in whole or in part, in any form or manner

without the prior written agreement of François REMOND