franklin, ma: dpw upcoming projects
DESCRIPTION
Status of the projects that the DPW will be doing over the next couple of years as presented to the Town Council meeting on April 24, 2013TRANSCRIPT
Franklin Public Works Upcoming Projects Robert Cantoreggi, DirectorMike Maglio, Assistant Town Engineer
2013 through 2015
2013 Water System Improvements• Replace Waterline & Improve Stormwater• Lincoln Street (Brook to Elm)• Daniels Street (Lincoln to Lenox)
• Replace Waterline:• Kathleen Drive (DPW Crews)• Fannie Way (DPW Crews)• Harborwood Drive• Betten Court• Corrine Road
2013 Water System Improvements
• Clean Interior of Tank & Add Agitator• FIP & Forge Hill Tanks
• Water System• Master Plan
2013 Highway Improvements• Reconstruct Roadway & Sidewalks:• Crescent Street & Garfield Street• East Street & West Street
• Reconstruct Roadway & Improve Stormwater• Pyne Road• Island Road
• Overlay Road• Grove Street (near railroad tracks)• Ledge Street (between Hill and Uncas)• Beaver Street Recycling Center
2013 Highway Improvements• Finish Stormwater Improvements• Miller Street, Green Street, Wylie Road
• Prospect Street• Culvert Repair (near Overlook Drive)
• Construct Sidewalk • Panther Way
• Improve Pedestrian Crossing• Parmenter School
• Crack, Chip & Seal • Various roadways
2013 Sewer System Improvements• Install New Grinder Pumps• Jefferson Road• Milliken Road
• I and I Program• Metering of Beaver Street Interceptor• Explore areas for improvement
• CRPCD• Monitor and Assist Proposed Reconstruction of Sewer Treatment Plant
“RAGS’Milliken Pump Station.
2013 Administration and Engineering• Downtown Reconstruction• HPP Project (140 / Main Street)
• Finish Reconstruction• Delcarte Dams (Pleasant Street)
• Lincoln Street Bridge Phase One• Bridge Repairs
• Construct New Hayward Street DPW Entrance
2013 Administration and Engineering
• Evaluate Sign Inventory and Establish Plan• Town wide
• Improve / Create Turning Lane• Panther Way/East Central Street
• Construct New Building for Storage• 247 Fisher Street
2013 DPW Wide
• Finish Construction:• Panther Way Park (off Panther Way)• Recycling Center (off Beaver Street)
• Design and Construct New Playground/Parking/Walkway• Delcarte Playground (Pleasant Street)
• Public Works “Touch-A-Truck” and Library Book Sale(s)• Open House (257 Fisher Street)
• Public Outreach• Earth Day / Arbor Day (Beaver Street Park)
2014 • Replace Waterline & Improve Stormwater• Anthony Road, Conlyn Avenue & Carmine Drive• Summer Street (Rt. 140 to King St)• Lewis Street
• Reconstruct Roadway, One Sidewalk & Improve Stormwater• Lincoln Street (Brook to Elm)
• Reconstruct Roadway & Improve Stormwater• Kathleen Drive (DPW Crews)• Fannie Way (DPW Crews)• Harborwood Drive• Bettoen Court• Corrine Road
• Demolition• Old DPW Garage; 257 Fisher Street
2015 • Reconstruct Roadway & Improve Stormwater• Anthony Road, Conlyn Avenue & Carmine Drive• Oak Street (near High School)
• Reconstruct Roadway, One Sidewalk & Improve Stormwater• Summer Street (Rt. 140 to King Street)• Lewis Street
Questions????